6515--Ceiling Lift Replacement Project Plan to post the solicitation on/about 4/10.

Closed Solicitation Posted

Solicitation number
36C25021Q0508
Agency
Responses due
Set-aside
Service-Disabled Veteran-Owned Small Business

Opportunity facts

Place of performance
Indianapolis, Indiana 46202, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks turnkey installation services for 189 overhead ceiling-mounted patient lift systems at the Richard L. Roudebush VA Medical Center in Indianapolis, Indiana. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10 is procuring 167 standard lifts rated at 600 pounds, 21 bariatric lifts rated at 1,000 pounds, and 1 ambulatory lift rated at 440 pounds. The contractor must remove existing lifts, install new track systems and lifts to manufacturer specifications using certified technicians within 12 months, and provide training, testing, warranties and maintenance documentation. Proposals are due by April 10, 2022.

The set-aside is for Service-Disabled Veteran-Owned Small Businesses. The primary NAICS code is 238990 and PSC code is J070. The incumbent contractor is unknown. The place of performance is the Richard L. Roudebush VA Medical Center located at 1481 W 10th Street, Indianapolis, IN 46202. The contractor must complete all installations within 12 months of award, and performance will be monitored by the contracting officer's representative through quarterly evaluations and inspection of installation documentation, drawings, and invoices submitted through the VA payment system.

Notice text

2 versions

Update #2 · Latest ·

The follow-on solicitation will be for the supplies/services as outlined below: STATEMENT OF WORK SCOPE OF WORK: Contractor shall provide a turnkey 100% installation of all overhead mounted patient lifts for the Richard L. Roudebush VA Medical Center, 1481 W 10th Street, Indianapolis, IN 46202. The overhead, ceiling mounted patient lift system shall be complete with track system, lift units, motors and complete structural mounting system to attach to the existing structural/roof system. The contractor shall provide and install a complete XY or H Track Configuration with continuous charge based on the need of each room. A minimum hoist Capacity of 600 lbs., or 1,000 lbs. for bariatric applications must be supported by the product chosen. Installation Service shall include removal of all previous overhead mounted patient lifts, appropriate configuration and installation of all Unistrut with direct mounting to the building. Service must be provided by OEM certified technician and must use certified OEM parts. All service shall be coordinated through the COR/Richard L. Roudebush VAMC Healthcare Technology Management staff and Clinical staff. The contractor, after receiving award will have a period of twelve (12) months to complete the installation of all of the lifts. The number of/lifting capacity of each is defined below: 167 Standard Lifting Capacity of 600 lbs.; 21 Bariatric Lifting Capacity of 1,000 lbs.; 1 Ambulatory Low Weight Lifting Capacity of 440 lbs. CONFORMANCE STANDARDS: All services provided under this contract must be performed in conformance with the Original Equipment Manufacturer and Occupational Safety and Health Administration (OSHA) standards and specifications. Work must meet all VA requirements including certification for compliance as required by AL14-07PSA Checklist. All services must be coordinated with Biomedical Engineering/Healthcare Technology Management (HTM). HOURS OF WORK: Hours of Work for support are defined as standard hours Monday through Friday from 7 a.m. to 4:30 p.m. local time, not including Federal holidays or Contractor Holidays or as otherwise arranged with the Contracting Officer Representative (COR). The ten holidays observed by the Federal Government are New Year s Day, Martin Luther King Day, Washington s Birthday, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, and Christmas Day. Also, any other day declared by the President of the United States to be a national holiday. SERVICE: Submittals Contractor shall submit planned installation drawings to the COR for approval before installation of each patient lift. Contractor shall submit all updated as-built s/architectural drawings to the COR upon completion of the installation of each patient lift. Can be submitted in batches for contractor convenience. Contractor shall submit Certificates of compliance and all VHA required verification documentation upon completion of installation for each lift (Form AL14-07). Installation Contractor shall coordinate with COR and Clinical staff to schedule downtime for each patient room/exam room where lifts will be replaced. Contractor shall be responsible for all required electrical work to complete the installation of all overhead mounted patient lift systems. If current power receptacles are not in an appropriate location, contractor will be responsible for the relocation of power to support the lift systemDo respond to your question, all current lift systems are powered. There are two fresh installs that will need power pulled to that section of the wall/ceiling. . If additional power is required, the contractor shall be responsible for pulling power from the appropriate source to the location determined appropriate for the lift system. Remove old overhead mounted patient lift system to clear way for new system This includes any repairs that must be made to the structural support from the removal of the previous overhead mounted patient lift. During track installation, that contractor shall be responsible for all modifications to existing structural systems to support the patient lift track, including but not limited to any penetrations into the concrete deck. Install new overhead mounted patient lift system as per manufacturer s specifications, installed by manufacturer s certified installer as shown on provided drawings. If distance between the suspended ceiling and anchors is more than 12 , lateral braces will be required/installed. Contractor shall be responsible for purchase and replacement of all ceiling tiles that are affected during the installation of the new overhead lift systems. All new tiles must match existing tile in the room where the lift is being installed. Contractor shall be responsible for the repair (patch/paint) of all hard ceilings that are affected during the installation/deinstallation of ceiling mounted patient lifts. Instruction and Personnel Training Training shall be provided for the required personnel to educate them on proper operation and maintenance for the lift system and equipment. Testing and Certification Conduct performance test, verifying that the patient lift system equipment and control devices operate properly and in accordance with design and specification requirements; including weight testing and deflection testing. ICRA/ILSM Requirements Contractor shall comply with all facility infection prevention requirements All requirements will be outlined in the infection prevention and control construction permit that will be issued by facility infection prevention staff Requirements will include but are not limited to Remove or Isolate HVAC system in area where work is being done to prevent contamination of duct system. Complete all critical barriers i.e. sheetrock, plywood, plastic, to seal area from non-work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins. Type of barrier will be determined by infection prevention staff Maintain negative air pressure within work site utilizing HEPA equipped air filtration units if indicated. Contain construction waste before transport in tightly covered containers. Cover transport receptacles or carts. Tape covering unless solid lid. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction. Vacuum work area with HEPA filtered vacuums. Wet mop area with disinfectant upon completion of work. Remove isolation of HVAC system in areas where work is being performed. Contractor shall comply with facility interim life safety measures as determined appropriate by facility engineering staff. Interim life safety measures will correct existing significant life safety code deficiencies or conditions as a result of construction. Additionally, measures will be implemented when monitoring systems are impaired >4 hours Warranty Contractor shall supply a minimum of three-year parts and labor warranty for all installed patient lifts. PRODUCTS: Lift System The Overhead ceiling mounted patient lift system shall be complete with track system, lift units, motors and complete structural roof system. Ceiling Track System The ceiling track shall be made from high strength extruded aluminum at a minimum thickness of 3/16 (4.8mm). Lift Unit The lift unit shall be constructed of a steel frame system driven by a gear reduced high torque motor. Lift unit and all non-disposable accessories shall include proper cleaning instructions. All Lift units must be wipe-down compatible with most widely used disinfecting agents Lift unit shall have the following features Lift Capacity: 440lbs SWL, 600 lbs. SWL, 1000 lbs. SWL For 1000 lbs. dual lift systems are required with compatible use for a single handset. Dual lift system must be able to reposition from a full reclined position to a full sitting position. Emergency lowering device, with redundant, manual lowering device. Emergency stopping device Circuit Overload Protection to prevent damage in case of overload. Safety device that stops the motor to lift when batteries are low. Lifting speed: Minimum 2.0 in/s when there is no load on the lift, minimum 1.3in/s in full capacity for 600 lbs. lift Cab: VO plastic-fire retardant, UL94 compliant Vertical Axis Motor at minimum 110 watts Emergency Brake (in case of mechanical failure) Strap length greater than 94 Electronic Soft-start and soft stop motor control Easily removable motor assembly for part replacement in rails Quick disconnect spreader bar system Batteries The Life cycle for batteries shall be in compliance with IEC 801-2. Provide rechargeable batteries with up to 110 transfers with a load of 200 lbs. and a minimum of 35 transfers with maximum rated loads. Charger Charger input: 100-240 VAC, 50/60 Hz. Type: Continuous Charge via Lined Rail system. Infection Prevention Non-Porous surfaces utilized throughout lift unit exterior Plastic covered spreader bar Silicon emergency stop cord for easy cleaning/disinfection PERFORMANCE MONITORING, DOCUMENTATION, & REPORTS: The Contractor shall submit a field service report following each installation, which shall include detailed descriptions of the work performed. The field service report shall include location of work. Any additional charges not included within this contract shall have the prior approval by receipt of a separate purchase order before those costs are incurred. Any costs incurred without obtaining a separate purchase order may be determined by the VA to be unauthorized work and the contractor may bear the burden of such costs. The contractor s performance shall be monitored by the COR through service reports and quarterly quality assurance evaluations provided by the contractor. Invoices shall be submitted through the approved VA invoice payment processing system.Could either do monthly for the number of devices installed or by area completed. Fine with whatever option is preferred. Replacement of all lift systems are to be completed within 12 months of contract award date. COMPETENCY OF PERSONNEL SERVICING EQUIPMENT: All installation and maintenance services required under this contract shall be performed by an OEM Field Representative who is fully trained on the purchased OEM product line or OEM Authorized Field Service Representative. The contractor must use an OEM certified technician using OEM certified parts. SAFETY REQUIREMENTS: In the performance of this contract, the Contractor shall take such safety precautions as the CO may determine to be reasonably necessary to protect the lives and health of occupants of the building. The CO shall notify the Contractor of any safety issues and the action necessary to correct these issues. Such notice, when served on the Contractor or his representative at the work site shall be deemed sufficient for the corrective actions to be taken. Contractor shall follow all facility badging/identification policies when servicing equipment onsite. This includes checking in through the appropriate vendor service and Healthcare Technology Management channels.

Update #1 ·

The follow-on solicitation will be for the supplies/services as outlined below:

STATEMENT OF WORK

SCOPE OF WORK:

Contractor shall provide a turnkey 100% installation of all overhead mounted patient lifts for the Richard L. Roudebush VA Medical Center, 1481 W 10th Street, Indianapolis, IN 46202. The overhead, ceiling mounted patient lift system shall be complete with track system, lift units, motors and complete structural mounting system to attach to the existing structural/roof system. The contractor shall provide and install a complete XY or H Track Configuration with continuous charge based on the need of each room. A minimum hoist Capacity of 600 lbs., or 1,000 lbs. for bariatric applications must be supported by the product chosen. Installation Service shall include removal of all previous overhead mounted patient lifts, appropriate configuration and installation of all Unistrut with direct mounting to the building. Service must be provided by OEM certified technician and must use certified OEM parts. All service shall be coordinated through the COR/Richard L. Roudebush VAMC Healthcare Technology Management staff and Clinical staff. The contractor, after receiving award will have a period of twelve (12) months to complete the installation of all of the lifts. The number of/lifting capacity of each is defined below:

167 Standard Lifting Capacity of 600 lbs.;

21 Bariatric Lifting Capacity of 1,000 lbs.;

1 Ambulatory Low Weight Lifting Capacity of 440 lbs.

CONFORMANCE STANDARDS:

All services provided under this contract must be performed in conformance with the Original Equipment Manufacturer and Occupational Safety and Health Administration (OSHA) standards and specifications. Work must meet all VA requirements including certification for compliance as required by AL14-07PSA Checklist. All services must be coordinated with Biomedical Engineering/Healthcare Technology Management (HTM).

HOURS OF WORK:

Hours of Work for support are defined as standard hours Monday through Friday from 7 a.m. to 4:30 p.m. local time, not including Federal holidays or Contractor Holidays or as otherwise arranged with the Contracting Officer Representative (COR).

The ten holidays observed by the Federal Government are New Year s Day, Martin Luther King Day, Washington s Birthday, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, and Christmas Day. Also, any other day declared by the President of the United States to be a national holiday.

SERVICE:

Submittals

Contractor shall submit planned installation drawings to the COR for approval before installation of each patient lift.

Contractor shall submit all updated as-built s/architectural drawings to the COR upon completion of the installation of each patient lift. Can be submitted in batches for contractor convenience.

Contractor shall submit Certificates of compliance and all VHA required verification documentation upon completion of installation for each lift (Form AL14-07).

Installation

Contractor shall coordinate with COR and Clinical staff to schedule downtime for each patient room/exam room where lifts will be replaced.

Contractor shall be responsible for all required electrical work to complete the installation of all overhead mounted patient lift systems.

If current power receptacles are not in an appropriate location, contractor will be responsible for the relocation of power to support the lift systemDo respond to your question, all current lift systems are powered. There are two fresh installs that will need power pulled to that section of the wall/ceiling.

.

If additional power is required, the contractor shall be responsible for pulling power from the appropriate source to the location determined appropriate for the lift system.

Remove old overhead mounted patient lift system to clear way for new system

This includes any repairs that must be made to the structural support from the removal of the previous overhead mounted patient lift.

During track installation, that contractor shall be responsible for all modifications to existing structural systems to support the patient lift track, including but not limited to any penetrations into the concrete deck.

Install new overhead mounted patient lift system as per manufacturer s specifications, installed by manufacturer s certified installer as shown on provided drawings.

If distance between the suspended ceiling and anchors is more than 12 , lateral braces will be required/installed.

Contractor shall be responsible for purchase and replacement of all ceiling tiles that are affected during the installation of the new overhead lift systems.

All new tiles must match existing tile in the room where the lift is being installed.

Contractor shall be responsible for the repair (patch/paint) of all hard ceilings that are affected during the installation/deinstallation of ceiling mounted patient lifts.

Instruction and Personnel Training

Training shall be provided for the required personnel to educate them on proper operation and maintenance for the lift system and equipment.

Testing and Certification

Conduct performance test, verifying that the patient lift system equipment and control devices operate properly and in accordance with design and specification requirements; including weight testing and deflection testing.

ICRA/ILSM Requirements

Contractor shall comply with all facility infection prevention requirements

All requirements will be outlined in the infection prevention and control construction permit that will be issued by facility infection prevention staff

Requirements will include but are not limited to

Remove or Isolate HVAC system in area where work is being done to prevent contamination of duct system.

Complete all critical barriers i.e. sheetrock, plywood, plastic, to seal area from non-work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.

Type of barrier will be determined by infection prevention staff

Maintain negative air pressure within work site utilizing HEPA equipped air filtration units if indicated.

Contain construction waste before transport in tightly covered containers.

Cover transport receptacles or carts. Tape covering unless solid lid. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

Vacuum work area with HEPA filtered vacuums.

Wet mop area with disinfectant upon completion of work.

Remove isolation of HVAC system in areas where work is being performed.

Contractor shall comply with facility interim life safety measures as determined appropriate by facility engineering staff.

Interim life safety measures will correct existing significant life safety code deficiencies or conditions as a result of construction.

Additionally, measures will be implemented when monitoring systems are impaired >4 hours

Warranty

Contractor shall supply a minimum of three-year parts and labor warranty for all installed patient lifts.

PRODUCTS:

Lift System

The Overhead ceiling mounted patient lift system shall be complete with track system, lift units, motors

and complete structural roof system.

Ceiling Track System

The ceiling track shall be made from high strength extruded aluminum at a minimum thickness of 3/16

(4.8mm).

Lift Unit

The lift unit shall be constructed of a steel frame system driven by a gear reduced high torque motor.

Lift unit and all non-disposable accessories shall include proper cleaning instructions.

All Lift units must be wipe-down compatible with most widely used disinfecting agents

Lift unit shall have the following features

Lift Capacity: 440lbs SWL, 600 lbs. SWL, 1000 lbs. SWL

For 1000 lbs. dual lift systems are required with compatible use for a single handset. Dual lift system must be able to reposition from a full reclined position to a full sitting position.

Emergency lowering device, with redundant, manual lowering device.

Emergency stopping device

Circuit Overload Protection to prevent damage in case of overload.

Safety device that stops the motor to lift when batteries are low.

Lifting speed:

Minimum 2.0 in/s when there is no load on the lift, minimum 1.3in/s in full capacity for 600 lbs. lift

Cab: VO plastic-fire retardant, UL94 compliant

Vertical Axis Motor at minimum 110 watts

Emergency Brake (in case of mechanical failure)

Strap length greater than 94

Electronic Soft-start and soft stop motor control

Easily removable motor assembly for part replacement in rails

Quick disconnect spreader bar system

Batteries

The Life cycle for batteries shall be in compliance with IEC 801-2.

Provide rechargeable batteries with up to 110 transfers with a load of 200 lbs. and a minimum of 35 transfers with maximum rated loads.

Charger

Charger input: 100-240 VAC, 50/60 Hz. Type: Continuous Charge via Lined Rail system.

Infection Prevention

Non-Porous surfaces utilized throughout lift unit exterior

Plastic covered spreader bar

Silicon emergency stop cord for easy cleaning/disinfection

PERFORMANCE MONITORING, DOCUMENTATION, & REPORTS:

The Contractor shall submit a field service report following each installation, which shall include detailed descriptions of the work performed. The field service report shall include location of work. Any additional charges not included within this contract shall have the prior approval by receipt of a separate purchase order before those costs are incurred. Any costs incurred without obtaining a separate purchase order may be determined by the VA to be unauthorized work and the contractor may bear the burden of such costs.

The contractor s performance shall be monitored by the COR through service reports and quarterly quality assurance evaluations provided by the contractor.

Invoices shall be submitted through the approved VA invoice payment processing system.Could either do monthly for the number of devices installed or by area completed. Fine with whatever option is preferred.

Replacement of all lift systems are to be completed within 12 months of contract award date.

COMPETENCY OF PERSONNEL SERVICING EQUIPMENT:

All installation and maintenance services required under this contract shall be performed by an OEM Field Representative who is fully trained on the purchased OEM product line or OEM Authorized Field Service Representative. The contractor must use an OEM certified technician using OEM certified parts.

SAFETY REQUIREMENTS:

In the performance of this contract, the Contractor shall take such safety precautions as the CO may determine to be reasonably necessary to protect the lives and health of occupants of the building. The CO shall notify the Contractor of any safety issues and the action necessary to correct these issues. Such notice, when served on the Contractor or his representative at the work site shall be deemed sufficient for the corrective actions to be taken.

Contractor shall follow all facility badging/identification policies when servicing equipment onsite. This includes checking in through the appropriate vendor service and Healthcare Technology Management channels.

Files

Show all 24

Notice history

Notice Type Posted
This notice Latest solicitation Solicitation
6515--Ceiling Lift Replacement Project Plan to post the solicitation on/about 4/10. Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
6530--Rehabilitation Equipment - High Low Beds and Parallel Bars - for the East Indianapolis VA clinic East Indianapoli VA Clinic Lawrenceburg, Indiana 46229, United States · NAICS 339113 Veterans Integrated Service Network 10 No set-aside
Z1DA--537-26-101 Construction of Ogden Elevator Cab Interiors Jesse Brown VA Medical Center 820 S. Damen Ave Chicago IL 60612 · NAICS 238290 Veterans Integrated Service Network 12 Service-Disabled Veteran-Owned Small Business
C1DA--AE Replace Elevators Cx 539-24-102 Cincinnati VA Medical Center 3200 Vine Street · NAICS 541330 Veterans Integrated Service Network 10 Service-Disabled Veteran-Owned Small Business
C1DA-- AE Replace Elevators 539-24-102 Cincinnati VA Medical Center 3200 Vine Street · NAICS 541330 Veterans Integrated Service Network 10 Service-Disabled Veteran-Owned Small Business
Z1DA--Modernize Damen (Bldg. 1) Elevators Construction 537-24-101 Chicago, Illinois 60612, United States · NAICS 238290 Veterans Integrated Service Network 12 Service-Disabled Veteran-Owned Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity