6110--36C249-20-AP-2387 - 626-21-1-4138-0002, Triennial - York Electrical Distribution Testing

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
36C24920Q0383
Agency
Responses due
Set-aside
Service-Disabled Veteran-Owned Small Business

Opportunity facts

Place of performance
Alvin C. York VA Medical Center Murfreesboro 37129

Notice details come from SAM.gov. Updated .

About this opportunity

This combined synopsis/solicitation from the Department of Veterans Affairs Veterans Health Administration seeks quotations for electrical distribution testing, maintenance, and inspection services at the Alvin C. York VA Medical Center in Murfreesboro, Tennessee. The requirement includes infrared scanning, maintenance and testing of electrical equipment according to NETA standards, a 4-hour power outage test, and submitting a written report. Interested vendors must be experienced electrical contractors with NETA-certified technicians and provide all tools, equipment, and materials to perform the work. Quotes are due by September 8, 2020 and award will be made based on best value considering price and technical acceptability. Any questions regarding the solicitation must be submitted in writing by August 24, 2020.

The solicitation is set aside entirely for Service-Disabled Veteran Owned Small Businesses and issued under NAICS code 811310 with a size standard of $7.5 million. The period of performance is from December 1, 2020 through March 31, 2021 at the Alvin C. York VA Medical Center location. Services shall be provided for electrical distribution testing, maintenance, and inspection of equipment including switchgear, transformers, generators, transfer switches, and other components located throughout the medical center campus. The government estimates a value of $150,000 for the contract.

Notice text

5 versions

Update #5 · Latest ·

The purpose of this amendment is to respond to vendor questions.

ASCO Factory Representative:Â Can you provide the name and contact number of the ASCO factory representative? Emmett Yancey (Emmett.yancey@asco-power.com) 678-641-0138

Lightning Suppression System Survey: Can you provide the name and contact number of the contractor who installed or last surveyed the existing system? I do not know all of the vendors that have worked on and or installed all of the suppression systems, Jenkins and Associates in Nashville have worked on a few of them here. PowerCom Solutions, LLC Dennis or Jeff Jenkins, 615-714-2121

4-Hour Utility Outage: Can you provide the name and contact number for the MTEMC for cost quote and data for the 4 hour outage? Kevin Lee (kevin.lee@mtemc.com) 615-494-1608 or 615-809-4669, they usually do not charge anything for this service and the outage is a minimum time which will typically be in the 8-12 hour range.

Update #4 ·

The purpose of this amendment is to respond to vendor questions.

1) Name (and contact info if available) of the factory trained and certified field tech/engineer that previously worked on the EPSS ATS at the facility. Emmett Yancey (Emmett.yancey@asco-power.com) 678-641-0138

2)Â Existing electrical drawings (i.e. one-lines, etc.) An electronic version is not available to share via email.

3)Â Most recent Arc Flash study. An electronic version is not available to share via email.

4) Ref. G & W Electric, repair voltage sensing problem on PMSG-3 (pg 6 of 15 under ** note): Is there already a diagnosed. assessed or suspected cause of the voltage sensing problem? If not, please provide additional information on what is known about the problem. Initial assessment has been made by VA electricians, appears the voltage sensing relay is defective, contractor will need to verify issue prior to performing any repair work.

5) Ref. Repair motor circuit failure on PMSG-8 (pg 6 of 15 under ** note): Is there already a diagnosed, assessed or suspected cause of the failure? If not, please provide additional information on what is known about the problem, such as a known issue with the control signal, power to load or bad motor? No diagnosis has been performed, control board indicates motor failure, motor will not operate in either open or closed position, further troubleshooting is needed to identify exact fault before the repair can be accomplished.

6) How will payment be delivered? Payments for this work shall be as follows;

10% payment upon completion of infrared testing with notification of discrepancies found and manhole IR survey, functional test and list of discrepancies.

10% payment upon completion of all automatic transfer switches associated with the EPSS.

15% payment upon completion of the lightning suppression systems and an accepted report of deficiencies.

50% payment upon completion of electrical equipment testing, may be divided into more than 1 monthly period due to the time required to perform testing.

15% payment upon receipt and acceptance of the required reports.

Update #3 ·

The purpose of this amendment is to confirm that this requirement is still 100% set aside for Service Disabled Veteran Owned Small Business (SDVOSB) Opportunities.

Update #2 ·

The purpose of this amendment is to establish a site visit. All interested parties are required to attend a site visit prior to submitting a quote. Quotes from vendors who do not attend the site visit will not be considered. The site visit will occur on August 25th at 9am CT at Alvin C. York VA Medical Center.

Alvin C. York VA Medical Center

3400 Lebanon Pike

Murfreesboro, TN 37129

The meeting location will be outside of building 15.

All vendors attending the site visit must send an email to crystal.baird@va.gov of their intention to attend the site visit by August 20th.

Update #1 ·

Combined Synopsis Solicitation

Solicitation Number: 36C24920Q0383

Posted Date: 8/11/2020

Response Date/Time: September 8, 2020 at 8:00am CST

Set Aside: SDVOSB

NAICS: 811310

PSC: 6110

Description

This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Federal Acquisition Regulation (FAR) subpart 12.6, Streamlined Procedures for Evaluation and Solicitation for Commercial Items, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested, and a written solicitation document will not be issued.

This solicitation is issued as an RFQ. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2020-07 Effective 08-03-2020.

This solicitation is set-aside for Service Disabled Veteran Owned Small Businesses (SDVOSB).

The associated North American Industrial Classification System (NAICS) code for this procurement is 811310, with a size standard of $7.5 million.

The Alvin C. York VA Medical Center is seeking to electrical distribution testing services.

All interested companies shall provide quotations for the following:

DEPARTMENT OF VETERANS AFFAIRS

TVHS Alvin C. York VA MEDICAL CENTER

Statement of Work

Maintenance, Inspection and Testing of the Electrical Distribution System

PART I - GENERAL

Introduction

This contract requirement is for the Veterans Health Administration (VHA), National Fire Protection Association (NFPA) required 36-month interval maintenance, inspection, NETA testing, operation and /or calibration of the Electrical Power Distribution System and all the electrical distribution components at TVHS, Murfreesboro Campus, 3400 Lebanon Pike, Murfreesboro TN, 37129.

Background

The Electrical Distribution system is required to be tested under the requirements of VHA Directive 1028, NFPA and The Joint Commission. Maintenance, Inspections and testing will adhere to the requirements of the NFPA codes and standards including the National Electrical Code (NFPA 70), Recommended Practice for Electrical Equipment Maintenance (NFPA 70B), Standard for Electrical Safety in the Workplace (NFPA 70E), Health Care Facilities Code (NFPA 99), Life Safety Code (NFPA 101) and Standard for Emergency and Standby Power Systems (NFPA 110) as the basis for the requirements of the design, installation, operation, testing, and maintenance of the Electrical Power Distribution System at VHA facilities.

Scope of work

The contractor is to provide all supervision, transportation, qualified labor, tools, test equipment and materials to perform all NETA Standards for Maintenance Testing and Inspections of all electrical distribution equipment at the York Campus. Distribution equipment to include but not limited to 4160-volt distribution equipment such as substation breakers and associated protective relays and controls, switches (manual and automatic), cables and manholes and transformers, motor starters. 480- and 208-volt unit substations - switchboards and associated breakers, dry type transformers, panel boards and associated breakers, disconnect switches, variable speed drives, contactors etc.

D. Scheduling

a. This contract performance will be accomplished in multiple stages and will require work to be performed during normal working hours, after normal working hours as well as extended hours on weekends. No work will be performed on any Federal holidays. Normal working hours are from 7:00 am to 3:30 pm Monday through Friday. Weekend work hours will be from 7:00 am until the planned work for that day is complete and all electrical equipment under test for the facility is back in proper working order.

b. Performance of this contract will be complete within 120 days of the proposed start date December 1, 2020. December Complete site survey of all electrical equipment and prepare all required test sheets for all equipment requiring to be reported upon. Data

sheets are to be ready with all identifying information prior to power outages for testing. Perform inspection of the installed lightning suppression systems. Perform manhole survey. The Contractor and the Electrical Supervisor to structure a plan of schedule for power outages during the required to permit testing of the electrical equipment. Due to the power outages required for maintenance and testing, and the power requirements for the medical center, all outages and testing are to be coordinated and scheduled with the Electrician Supervisor, any requirements for adjusting the schedule (e.g. to minimize disruption to the VAMC) shall be incorporated by the Contractor. At no time will both emergency source and normal source of power be permitted to be out of service for any single building.

January complete Infrared inspection of all electrical equipment under this requirement. Infrared scan is to be accomplished during the time frame of the facilities highest electrical load, 8:30 am to 3:00pm Monday through Friday. The last weekend in January of 2021 will start weekend power outages and electrical device testing.

February The weekend of February 13, 2021, continuation of building power outages for electrical testing to meet the VHA directive working on de-energized equipment. Continues each weekend until all buildings electrical equipment has been tested.

March actual date to be determined, the Contractor and the Electrical Supervisor to coordinate with Middle Tennessee Electric for a 100% normal power outage and separation from Middle Tennessee Electric utility power and complete testing of all Bldg. 111 substation equipment and all other 4160 distribution equipment not tested under building outages.

Part II Requirements

A. Safety

a. The Contractor shall adhere to all OSHA, EPA, NFPA Life Safety Codes, and all other regulatory requirements.

b. In performance of this contract, the Contractor shall follow VAMC safety policy and standard for safe work practices and take such safety precautions as the Safety Officer or designee may determine to be reasonably necessary to protect the lives and health of occupants of the building.

c. The Contractor shall comply with VAMC smoking policy, the facility is a smoke free environment, no smoking at the facility.

d. Patient, employee, visitors, and contractor personnel safety shall always be maintained. The contractor is responsible for the occupation safety and health of his/her employees. The Contractor shall comply with all applicable OSHA safety and health standards.

e. The Contractor is responsible to identify, provide and maintain all personal protective equipment required to perform the duties outlined in the contract. In addition, the

contractor is responsible for identifying and providing all applicable safety programs (i.e. lockout/tag out, confined space entry, universal precautions, etc.) required while performing the work. Training on required safety programs and the proper use of PPE s shall be provided, and documentation maintained by the contractor.

f. The Contractor is responsible for the supervision of all their employees while on government property. It is the Contractor s responsibility to assure compliance with the scope of work and requirements referenced in this contract. Provisions provided in the scope of work are not intended to relieve the Contractor of this responsibility.

B. Qualifications

a. Contractors shall be experienced Electrical Contractors, having properly trained and certified permanent staff required to perform the contracted work. Electrical Contracting (i.e. the construction, repair, testing and maintenance of industrial and commercial electrical distribution systems) shall be the primary interest/specialty of the Contractor s business.

b. Contractors and their employees shall be certified by the International Electrical Testing Association (NETA) or equivalent certifying organization as Certified Technicians with each having completed the appropriate Occupational Safety & Health Administration (OSHA) approved construction safety training.

c. Contractors shall have technical training and demonstrable track records of working experience in maintenance, inspection, and testing of the Electrical Power Distribution Systems and related components in healthcare, industrial, educational, and commercial facilities for a minimum of five (5) continuous years. Electrical components on which the Contractors have experience shall include, but not be limited to, switchboards & switchgear (low and medium voltage); low voltage controls; emergency and standby generators; automatic transfer switches, wiring, transformers, meters, and other electrical appurtenances.

d. Contractors shall have safety trainings either on-the-job or class-room type in electrical safety outlined in the OSHA Standard 29 Code of Federal Regulations(CFR) 1910 Subpart S Electrical, and the NFPA 70E Standard for Electrical Safety in the Workplace. Training certification shall be provided indicating each technician is a Qualified Person as defined by NFPA 70E. Training certifications shall be submitted to the VA Contracting Officer prior to work.

e. Contractors shall have ready access to the latest versions of the following references:

1) NFPA 70, National Electrical Code .A. NFPA 70B, Recommended Practice for Electrical Equipment Maintenance.

2) NFPA 70E, Standard for Electrical Safety for the Workplace.

3) NFPA 110, Standard for Emergency and Standby Power System.

4) OSHA Standard 29 CFR 1910, Subparts I & S.

5) Inter-National Electrical Testing Association, Inc. (NETA) Maintenance and Testing Specifications.

6) Operating /Maintenance manuals and specifications of the electrical equipment to be maintained and tested. These documents may be obtained from the VHA Medical Center, or the equipment manufacturers.

7) VHA Directive 1028 D 2020 02 24, Facility Electrical Power Systems

C. Contractor Equipment

a. Contractors shall have and provide ample quantity qualified labor, necessary tools, all proper test equipment, and PPE to perform the work safely, effectively, efficiently and timely. Tools, equipment, and PPE shall comply with the requirements of OSHA Standard 29 CFR 1910, Subpart I, and NFPA 70E.

b. Prior to initiating work, Contractor shall provide documentation that all instruments, test equipment, tools and PPE have current calibration. Dated calibration labels shall be visible on all instruments, test equipment, tools and PPE as appropriate.

c. The use of impact guns on reassembly of electrical equipment is prohibited, hand starting screws and fasteners is required and the use of electric/battery operated screw drivers with a properly set clutch will be allowed.

D. Maintenance and Inspection

a. Infra-Red Scanning/Thermo graphic Survey shall be performed on all electrical equipment listed in the inventory Attachment 1.

1.Use an infra-red scanning camera to detect hot spots in the Electrical Power Distribution System. Objective of this work is to detect any loose, broken, overloaded or corroded connections in the system. Survey will be conducted during the hours of 8:30am 3:00pm Monday-Friday during the times of peak load.

2.Note that since this work item must be done while the Electrical Power Distribution System is energized, appropriate safety precautions with proper PPE must be taken before, during and after scanning the system. A permit for working on live electrical equipment will be completed prior to this work and approved by the VA chain of command.

3.Contractor shall provide 2 separate hard copy reports on the Infra-Red/Thermographic study indicating all detected items needing corrections. Include thermal images of detected items within the report and recommendations for correction.

b. Contractor is to perform a non-destructive, non-invasive visual inspection and test of the installed lightning suppression system for each building containing a lightning suppression system, inventory and brief description of each building is in attachment 4. The system inspection is to include; checking for proper mounting and attachment to the building, inspection for weakened connections due to corrosion, inspect for loose connections that could create continuity high resistance problems, tighten as necessary, check condition of down leads, ensure leads are not loose from the structure or severed at ground level, provide a ground resistance check of each down leg for each building , reference NFPA780 Annex D. Contractor shall provide documentation of the inspection, results of the resistance checks and provide any recommendations for corrective actions and estimated costs of the corrective actions.

c. Work items, definitions, and references shall comply with the latest edition of the NETA Maintenance Testing Specifications (MTS) and with the VHA Directive1028, Electrical Power Distribution System. Below is a representative list and requirements (* denotes additional requirements) of electrical equipment that shall be maintained and tested:

1.Switchgear and Switchboard Assemblies.

2.Transformers, Dry Type, Air-Cooled, Low-voltage, Small.

3.Transformers, Dry Type, Air-Cooled, Low-voltage, Large.

4.Transformers, Liquid-Filled. *

5.Voltage regulators-single phase step type, medium voltage

6.Metal Enclosed Busways.

7.Switches, Air, Low-Voltage.

8.Switches, Air, Medium-Voltage, Metal-Enclosed.

9.Switches, Oil, Medium-Voltage.

10. Switches, Vacuum, Medium-Voltage, Automatic Transfer Switches**.

11. Switches, SF6, Medium-Voltage.

12. Circuit Breakers, Air, Insulated-Case/ Molded-Case. ***

13. Circuit Breakers, Air, Low-Voltage Power.

14. Circuit Breakers, Air, Medium-Voltage.

15. Circuit Breakers, Vacuum, Medium-Voltage.

16. Protective Relays, Mechanical, and Solid State.

17. Protective Relays, Microprocessor Based.

18. Grounding Systems. ***

19. Ground-fault Protection Systems.

20. Motor Control, Motor Starters, Low-Voltage.

21. Motor Control, Motor Starter, Medium-Voltage.

22. Emergency Systems, Engine Generators.

23. Emergency Systems, Automatic Transfer Switches. *****

24. Manholes and associated underground cables and connections. ******

25. Unit substation, battery charger, battery cleaning and battery load testing.

* (Item 4) Transformers/regulators, Liquid-Filled shall have the oil tested additionally for the presents of PCB s. If none are detected, labels for each transformer/regulator shall be affixed/replaced to each oil filled device indicating the unit as PCB free. Contractor is to remove any existing labels and replace with new.

** (Item 10) Medium Voltage Transfer Switches, manufactured by G & W electric, repair voltage sensing problem on PMSG-3 and repair motor circuit failure on PMSG-8, Attachment 2.

***(Item 12) Perform a continuity check of all molded case circuit breakers (frames size 225 amps or less) to determine if all contacts open and reclose when breaker is manually tripped and restored. All molded case breakers in all panels are to be tested including emergency panels. Breakers in panels with no attached loads are to be tested and restored to the OPEN position upon completion of testing. Panels feeding the Fire Alarm system: ensure proper FIRE ALARM CIRCUIT red labeling of the panel and the proper branch circuit breaker, ensure proper installation of the breaker locking device and label. Ensure the Fire Alarm Panel is labeled and matches the correct breaker and panel information. (Reference NFPA 72, 10.6.5.2.1 through 10.6.5.4 and NFPA 70, 760.121)

**** (Item 18) Inspect and tighten ground connections. Test ground resistance for the entire facility electrical distribution grounding system. Provide an individual ground testing report including each location of the ground resistance test and the resistance detected. Include recommended corrective actions and cost estimates within the report.

***** (Item 23) All EPSS automatic transfer switches (ATSs) considered part of the Emergency Power Supply System shall have all maintenance, testing and functional tests of the transfer switches performed by a manufacturer s factory trained and authorized service technician. Inventory of all ATSs shall be provided by the VA. Most of this work is performed during normal working hours and with the equipment is energized, there are a few none by-passable switches that will require service during a power outage, Attachment 3.

****** (Item 24) Perform IR scan of all electrical distribution manholes.

Perform functional tests of all installed submersible pumps and associated receptacles. Provide a list of discrepancies noted for each manhole. This requirement to be performed a minimum of 28 calendar days prior to the separation of the utility power so corrective actions can be performed during the electrical outage.

d. 4-Hour Power Outage Test

The Contractor shall include in their bid proposal all costs associated with the disconnect/reconnect services of the local utility company (MTEMC) for the duration of the test. The estimated duration of the Contractor s involvement is between 8 12 hours. The Contractor shall assist the VAMC staff with troubleshooting and correcting malfunctioning electrical equipment discovered during the test. The Contractor shall provide a separate document stating the completion of the EES system outage test.

The Contractor shall be present for and will participate in the required VAMC 4-hour test of the Essential Electrical System (EES)and provide separate documentation of this test. This test shall fulfill the requirements of VHA Directive 1028, Electrical Power Distribution System, NFPA 110 (e.g. Para. 8.4.9.) and the Joint Commission. This test will be in conjunction with the testing and maintenance of the facilities Unit Sub-station equipment and will include opening of all utility service connections serving the VAMC for a minimum of 4-hours. During the test period, the contractor will verify operation of all EES components including the transfer to emergency power and return to normal service. Contractor shall record hourly generator stats and make any required adjustments and/or re-calibrations to all equipment which has been otherwise maintained, inspected, and tested under this Scope of Work. The VA recognizes the majority of TVHS York Campus installed emergency power generators do not meet the 30% data tag load requirement set by The Joint Commission and have performed a 4 hour load bank test in conjunction with the building load to satisfy The Joint Commission and the NFPA110 requirements.

e. Contractors shall immediately report to the Contracting Officers Representative and or the Electric Shop Supervisor or the Maintenance and Operations Supervisor any deficiencies that are deemed critical or catastrophic.

f. VA to provide an inventory list of electrical items to be tested under this contract. Due to construction and changes of the electrical distribution system from the time this contract is written, the inventory list is subject to change and shall not be considered 100% inclusive. Contractor shall accept a 5% change of equipment contained in the inventory, inventory may change due to construction removal of equipment or additions of equipment.

Cleaning

a. Contractor is required to clean all insulating boots and insulating tape during inspection of all medium voltage switches. Contractor to replace any insulating tape that appears to have lost the ability to adhere to itself.

b. The contractor will ensure to remove by vacuum and/or lint free cloth all dust and debris from all equipment under test in this contract.

F. Lubrication

a. All manually operated switches and moving parts of automatic type switches shall be lubricated and functionally tested for proper operation. Lubricants used shall be approved or recommended by the manufacturer of the equipment or a suitable non-flammable substitute listed in the NETA standard.

G. Summary of Work

a. A complete written report of the work performed shall be provided to the VA within14 working days of contract work completion. Information shown in the report shall meet the following:

1)Company s name, addresses, telephone, & FAX numbers.

2)Name and signature of all contractors who performed the maintenance and testing.

3)VA Work Contract Number, name and number of VA Contracting Officer.

4)Date and Time of work.

5)Copies of contractors valid licenses, professional and training certificates.

6)Descriptions and model number of specialized tools and equipment used, such as torque wrench or infra-red scanning camera.

7)Equipment items shall be listed in the report in a manner as the distribution system is installed (MV equipment, Bldg. MV equipment, switch boards, switch board breakers, Normal power panels, panel breakers, Emergency power panels, panel breakers, switches etc.

8)Location, Type, Name, and nameplate information of electrical equipment maintained and tested.

9)Descriptions of work items.

10)Test data.

11)Reference materials such as equipment manufacturer s specifications, coordination study, etc.

12)Provide an individual ground testing report including each location of the ground resistance test and the resistance detected. Include recommended corrective actions and cost estimates within the report.

13)Provide a separate document stating the completion of the EES system outage test.

14)Remarks on conditions of electrical equipment. List all deficiencies, if any.

15)Recommended corrective actions and cost estimates, if any.

b. Submit two (2) hard copies of the complete written report, and one (1) CD-ROM of the electronic version of the report in Microsoft Word or Excel format to the Contracting Officers Representative (COR-Electrical Supervisor) within fourteen (14)calendar days of contracted work completion. Contractor shall present the report by4160 equipment then by building number and the equipment tested will be listed in the report as it would follow a 1-line diagram. Separate report document for the disconnect of the utility and the recording of the EPSS, separate report for the infrared testing, separate report for the lightning suppression inspection. All reference materials shall be included in the electronic version of the report, either through scanning or other means of electronic text import methods.

H. Notes and Other Information

a. There are no known security issues with this Statement of Work.

b. Schedule of electrical equipment is attached.

c. The Contractor shall provide the COR with pertinent emergency telephone numbers, in order to summon assistance in case an electrical emergency develops. At least one of the emergency telephone numbers shall be manned twenty-four (24) hours per day. This information shall be provided in writing to the COR, prior to the contract start date.

SCHEDULE:

All interested parties shall provide a quotation for the following:

CLIN

Description

Quantity

Price

0001

Electrical Distribution Testing, Maintenance, and Inspection for the Alvin C. York VA Medical Center

POP: 12/1/2020-03/31/2021

1

Place of Performance

Alvin C. York VA Medical Center

3400 Lebanon Pike

Murfreesboro, TN 37129

EVALUATION OF QUOTES:

Award will be made to the lowest price offeror that is determined to bring the BEST VALUE to the Government and meets the technical requirement of the solicitation. Award shall be made to the vendor whose quotation offers the best value to the government, considering technical acceptability, past performance, and price.

QUOTE FORMAT AND SUBMISSION REQUIREMENTS:

Offerors shall provide only one quote. Quote should be emailed to crystal.baird@va.gov NLT 09/08/2020 at 8:00 AM CST. Non-compliance with this requirement may result in disqualification of the quote.

All vendors must be registered and complete all entries in the System for Award Management (SAM) to be considered for award. Potential vendors may register at the following web site: https://www.sam.gov/portal/public/SAM

All Quote submissions must list your DUNS number, CAGE code, and Federal TIN with Company name, POC, and phone number. If you need to obtain or renew a DUNS number or CAGE code, please visit www.sam.gov. Lack of registration in the SAM database will make an offeror ineligible for award.

The government intends to award a Firm Fixed Price contract as a result of this RFQ that will include the terms and conditions set forth herein. To facilitate the award process, ALL quotes shall include a statement regarding the terms and conditions herein as follows:

"The terms and conditions in the RFQ are acceptable to be included in the award document without modification, deletion, or addition."

OR

"The terms and conditions in the RFQ are acceptable to be included in the award document with the exception, deletion, or addition of the following:"

Offeror shall list exception(s) and rationale for the exception(s).

Offerors must complete annual representations and certifications electronically via the System for Award Management (SAM) website located at https://www.sam.gov/portal in accordance with FAR 52.212-3, Offerors Representations and Certifications Commercial Items. If paragraph (j) of the provision is applicable, a written submission is required.

The following solicitation provisions apply to this acquisition:

FAR 52.212-1, Instructions to Offerors Commercial Items March 2020

FAR 52.212-3, Offerors Representations and Certifications Commercial Items

Offerors must complete annual representations and certifications electronically via the System for Award Management (SAM) website located at https://www.sam.gov/portal in accordance with FAR 52.212-3, Offerors Representations and Certifications Commercial Items. If paragraph (j) of the provision is applicable, a written submission is required.

The full text of FAR provisions or clauses may be accessed electronically at http://acquisition.gov/comp/far/index.html.

The following contract clauses apply to this acquisition:

FAR 52.212-4, Contract Terms and Conditions Commercial Items OCT 2018

FAR 52.212-5, Contract Terms and Conditions Required to Implement Statutes or Executive Orders MAR 2020

FAR Number

Title

Date

52.203-16

PREVENTING PERSONAL CONFLICTS OF INTEREST

DEC 2011

52.203-17

CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS

APR 2014

52.204-4

PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER CONTENT PAPER

MAY 2011

52.204-13

SYSTEM FOR AWARD MANAGEMENT MAINTENANCE

OCT 2018

52.232-18

AVAILABILITY OF FUNDS

APR 1984

52.232-19

AVAILABILITY OF FUNDS FOR THE NEXT FISCAL YEAR

APR 1984

52.232-40

PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS

DEC 2013

(End of Clause)

52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)

The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 30.

(End of Clause)

VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018)

The Contractor shall not make reference in its commercial advertising to Department of Veterans Affairs contracts in a manner that states or implies the Department of Veterans Affairs approves or endorses the Contractor s products or services or considers the Contractor s products or services superior to other products or services.

(End of Clause)

VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018)

(a) Definitions. As used in this clause

(1) Contract financing payment has the meaning given in FAR 32.001;

(2) Designated agency office means the office designated by the purchase order, agreement, or contract to first receive and review invoices. This office can be contractually designated as the receiving entity. This office may be different from the office issuing the payment;

(3) Electronic form means an automated system transmitting information electronically according to the accepted electronic data transmission methods and formats identified in paragraph (c) of this clause. Facsimile, email, and scanned documents are not acceptable electronic forms for submission of payment requests;

(4) Invoice payment has the meaning given in FAR 32.001; and

(5) Payment request means any request for contract financing payment or invoice payment submitted by the contractor under this contract.

(b) Electronic payment requests. Except as provided in paragraph (e) of this clause, the contractor shall submit payment requests in electronic form. Purchases paid with a Government-wide commercial purchase card are considered to be an electronic transaction for purposes of this rule, and therefore no additional electronic invoice submission is required.

(c) Data transmission. A contractor must ensure that the data transmission method and format are through one of the following:

(1) VA s Electronic Invoice Presentment and Payment System at the current website address provided in the contract.

(2) Any system that conforms to the X12 electronic data interchange (EDI) formats established by the Accredited Standards Center (ASC) and chartered by the American National Standards Institute (ANSI).

(d) Invoice requirements. Invoices shall comply with FAR 32.905.

(e) Exceptions. If, based on one of the circumstances in this paragraph (e), the Contracting Officer directs that payment requests be made by mail, the Contractor shall submit payment requests by mail through the United States Postal Service to the designated agency office. Submission of payment requests by mail may be required for

(1) Awards made to foreign vendors for work performed outside the United States;

(2) Classified contracts or purchases when electronic submission and processing of payment requests could compromise the safeguarding of classified or privacy information;

(3) Contracts awarded by contracting officers in the conduct of emergency operations, such as responses to national emergencies;

(4) Solicitations or contracts in which the designated agency office is a VA entity other than the VA Financial Services Center in Austin, Texas; or

(5) Solicitations or contracts in which the VA designated agency office does not have electronic invoicing capability as described above.

(End of Clause)

VAAR 852.270-1 REPRESENTATIVES OF CONTRACTING OFFICERS (JAN 2008)

The contracting officer reserves the right to designate representatives to act for him/her in furnishing technical guidance and advice or generally monitor the work to be performed under this contract. Such designation will be in writing and will define the scope and limitation of the designee's authority. A copy of the designation shall be furnished to the contractor.

(End of Clause)

The following subparagraphs of FAR 52.212-5 are applicable:

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(2) 52.204 23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Jul 2018) (Section 1634 of Pub. L. 115 91).

(3) 52.204 25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (AUG 2019) (Section 889(a)(1)(A) of Pub. L. 115 232).

(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015).

(5) 52.233-3, Protest After Award (Aug 1996) (31 U.S.C. 3553).

(6) 52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004) (Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

[X] (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).

[X] (4) 52.204 10, Reporting Executive Compensation and First-Tier Subcontract Awards (Oct 2018) (Pub. L. 109 282) (31 U.S.C. 6101 note).

[X] (8) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (OCT 2015) (31 U.S.C. 6101 note).

[X] (19) 52.219-14, Limitations on Subcontracting (MAR 2020) (15 U.S.C. 637(a)(14)).

[X] (ii) Alternate I (MAR 2020) of 52.219-28.

[X] (27) 52.222-3, Convict Labor (June 2003) (E.O. 11755).

[X] (29) 52.222-21, Prohibition of Segregated Facilities (APR 2015).

[X] (30)(i) 52.222 26, Equal Opportunity (SEP 2016) (E.O. 11246).

[X] (ii) Alternate I (JULY 2014) of 52.222-35.

[X] (32)(i) 52.222-36, Equal Opportunity for Workers with Disabilities (JUL 2014) (29 U.S.C. 793).

[X] (33) 52.222-37, Employment Reports on Veterans (FEB 2016) (38 U.S.C. 4212).

[X] (34) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O. 13496).

[X] (ii) Alternate I (MAR 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).

[X] (44) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (AUG 2011)

[X] (51) 52.225-13, Restrictions on Certain Foreign Purchases (JUN 2008) (E.O.'s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

[X] (57) 52.232-33, Payment by Electronic Funds Transfer System for Award Management (Oct 2018) (31 U.S.C. 3332).

[X] (2) 52.222-41, Service Contract Labor Standards (AUG 2018) (41 U.S.C. chapter 67).

[X] (3) 52.222-42, Statement of Equivalent Rates for Federal Hires (MAY 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

[X] (4) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards Price Adjustment (Multiple Year and Option Contracts) (AUG 2018) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

[X] (8) 52.222-55, Minimum Wages Under Executive Order 13658 (DEC 2015).

[X] (9) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2017) (E.O. 13706).

All quotes shall be sent to Thomas Nicholls Thomas.Nicholls@va.gov

The following are the decision factors:

IAW FAR 15.102-2, Award will be made in the basis of the lowest priced offer.

To facilitate the award process, all quotes must include a statement regarding the terms and conditions herein as follows:

"The terms and conditions in the solicitation are acceptable to be included in the award document without modification, deletion, or addition."

OR

"The terms and conditions in the solicitation are acceptable to be included in the award document with the exception, deletion, or addition of the following:"

Quoters shall list exception(s) and rationale for the exception(s), if any.

Any questions or concerns regarding this solicitation should be forwarded in writing via e-mail to the Point of Contact listed below.

Point of Contact

Any questions or concerns regarding this solicitation should be forwarded in writing via email addressed to crysal.baird@va.gov subject line: 36C24920Q0383. Questions shall be submitted NO LATER THAN August 24, 2020 @ 8:00am CST.

Refernce the following wage determinations applicable to this requirement:

2015-4647 Rev. 14

https://beta.sam.gov/wage-determination/2015-4647/14?index=wd&keywords=&is_active=true&sort=-modifiedDate&date_filter_index=0&date_rad_selection=date&wdType=sca&state=TN&county=14764&is_wd_even=false&is_standard=true&prevP=prevPerfNo&page=1

Files

File Type Posted
36C24920Q0383 0003.docx DOCX document
36C24920Q0383 0002.docx DOCX document
36C24920Q0383 0001_2.docx DOCX document
36C24920Q0383 0001_1.docx DOCX document
36C24920Q0383.docx DOCX document
Copy of Attachment 3 EPSS ATS Inventory.xlsx XLSX spreadsheet
Copy of Attachment 1 Equipment Inventory.xls XLS spreadsheet
Attachment 4 Lightning Suppression Bldg list.pdf PDF
Attachment 2 G W MV ATS inventory.pdf PDF

Notice history

Notice Type Posted
J065--36C249-20-AP-2387 - Electrical Distribution Testing Alvin C. York VA Medical Center Award Award Notice
This notice Latest solicitation Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
657A5-26-111, Triennial Electrical Testing Marion, Illinois 62959, United States · NAICS 238210 Veterans Integrated Service Network 15 Service-Disabled Veteran-Owned Small Business Sole Source
36-Month Electrical Distribution Testing Georgia 30033, United States · NAICS 221122 Veterans Integrated Service Network 7 Service-Disabled Veteran-Owned Small Business
J061--triennial electrical maintenance FY26 amendment #3 q&a response, scope update, drawings and panel lists new deadline: 10/27/26 POP start date: 12/01/2026 Southeast Louisiana Veterans Healthcare System New Orleans Vamc New Orleans, Louisiana 77019, United States · NAICS 238210 Veterans Integrated Service Network 16 Service-Disabled Veteran-Owned Small Business
J061--SOURCES SOUGHT NOTICE - Triennial Electrical Inspection Testing and Maintenance Services Requirement - Louis A Johnson VA Medical Center 36C24527Q0039 Department of Veterans Affairs Louis A Johnson VA Medical Center Clarksburg, West Virginia 26301, United States · NAICS 238210 Veterans Integrated Service Network 5 No set-aside
J061--541 Electrical Power Distribution Equipment Testing, Inspection, and Maintenance - VAMC Cleveland Department of Veterans Affairs Louis Stokes Cleveland VA Medical Center Cleveland, Ohio 44106, United States · NAICS 238210 Veterans Integrated Service Network 10 Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity