Attachment 4 Lightning Suppression Bldg list.pdf
PDF 73 KB Posted
- Attached to
- 6110--36C249-20-AP-2387 - 626-21-1-4138-0002, Triennial - York Electrical Distribution Testing
- Solicitation number
- 36C24920Q0383
About this file
This document is a combined synopsis/solicitation for electrical distribution testing, maintenance, and inspection services at the Alvin C. York VA Medical Center in Murfreesboro, Tennessee. The solicitation is set aside for Service Disabled Veteran Owned Small Businesses and seeks quotations for testing, inspecting, and maintaining electrical equipment including switchgear, transformers, circuit breakers, protective relays, grounding systems, emergency generators, and automatic transfer switches. Interested vendors must provide pricing for electrical distribution testing, maintenance, and inspection services from December 1, 2020 through March 31, 2021. Quotes are due by September 8, 2020 and award will be made to the lowest priced offeror meeting the technical requirements. The solicitation incorporates standard FAR clauses for commercial items and service contracts.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24920Q0383 0003.docx | DOCX document | |
| 36C24920Q0383 0002.docx | DOCX document | |
| 36C24920Q0383 0001_2.docx | DOCX document | |
| 36C24920Q0383 0001_1.docx | DOCX document | |
| Attachment 2 G W MV ATS inventory.pdf | ||
| Copy of Attachment 3 EPSS ATS Inventory.xlsx | XLSX spreadsheet | |
| Copy of Attachment 1 Equipment Inventory.xls | XLS spreadsheet | |
| 36C24920Q0383.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Lightning Suppression (LP) systems inventory
Bldg. 1 – 5 story 97,529 sqft. external LP system, pitched roof Bldg. 2 – 2 story 46,633 sqft. external LP system with an antenna mast, flat roof Bldg. 3 - 3 story 50,958 sqft. external LP system, pitched roof Bldg. 4 – 2 story with theater roof, 18,306 sqft external LP system, flat roof Bldg. 5 – 3 story 45634 sqft. external LP system, pitched roof Bldg. 6 – 3 story 55,559 sqft. external LP system pitched roof Bldg. 7 – 3 story 41178 sqft. external LP system mostly pitched roof with 2 areas flat Bldg. 8 – 3 story 40,509 sqft external LP system mostly pitched roof with 2 areas flat Bldg. 9 – 3 story 45,627 sqft. external LP system, pitched roof Bldg. 10 – 3 story 15,300 sqft. external LP system mostly pitched roof with 2 areas flat Bldg. 11 – 3 story 17,250 sqft. external LP system mostly pitched roof with 2 areas flat Bldg. 13 – 1 story 4840 sqft. LP external system, pitched roof, 2 years ago the system was modified with new roof Bldg. 16 – boiler plant 4844, certified installation 4 years ago, external LP system, flat roofs Bldg. 17 – 1 story, 9430 sqft, internal installation certified 3-4 years ago, combination flat/pitched roof Bldg. 106 – 1 story 14, 550 sqft, internal installation, certified 3 years ago, low sloped roof (3-4/12) Bldg. 107 - multi-level, 57,100 sqft, external installation, flat roofs Bldg. 116 - mainly 1 level with 2nd floor service room, 55245 sqft. external system mostly flat roof with pitched service room roof Bldg. 117, 2 story 53,690 sqft. with 2- 3rd floor service rooms, external system, flat roofs Bldg. 120. 2 story 12,264 sqft, I believe it is all external system, flat roof Cooling towers 4000 sqft (+/-) certified external system 2 years ago.
Most buildings have 6/12 pitch, a few with 5/12 and a couple with 7/12.
File details come from the government source that posted it. Updated .