YWCA Hartford Region - Specs - Solar.pdf

PDF 13 MB Posted

Attached to
Solar Panels
Solicitation number
37659
Issued by
Hartford County, Connecticut

About this file

YWCA Hartford Region Solar Panels Project - Technical Specifications and Invitation to Bid

This file comprises technical specifications and bidding documents for a solar panel installation project at YWCA Hartford Region, 135 Broad Street, Hartford, Connecticut, involving the organization, Northeast Collaborative Architects (project architect), and the State of Connecticut. The project involves furnishing all labor, materials, and equipment necessary to install a new solar panel system on the existing flat roof of the two-story office building, excluding the eight-story residential tower. Work scope includes obtaining necessary permits from the City of Hartford, removing roof debris, installing solar panel supports with flashing and sealant, patching roof areas, connecting panels to the existing electrical system, and providing a minimum 20-year manufacturer's warranty with installation warranty as specified. Site inspections may be arranged by contacting Todd Whitaker at (860) 525-1163 x 126. Sealed bids must be submitted via email to bids@ywcahartford.org by May 7, 2026 at 12:00 PM, with public bid opening at 12:15 PM the same day. The deadline for submitting written questions is April 30, 2026 at 3:00 PM. Work must be performed Monday through Friday during business hours while the office and residential tower remain operational. The contract will be executed using AIA Document A107-2007 Standard Form of Agreement for Limited Scope projects, and award will be made to the lowest responsible and qualified bidder based on comprehensiveness, quality, contractor experience, costs, and factors promoting efficient, cost-effective facilities maintenance.

This state-funded project is subject to Connecticut Department of Economic and Community Development prevailing wage rate requirements and state set-aside compliance mandates, including a minimum 25 percent of the state-funded contract value to be awarded to DAS-certified small businesses, with 6.25 percent allocated to DAS-certified minority-, women-, and/or disabled-owned businesses. Contractors must demonstrate good faith effort to meet these targets and comply with Connecticut General Statutes 4a-60, 4a-60a, 4a-60g, and 46a-68b through 46a-68f. Bidders must submit a 5 percent bid bond payable to YWCA Hartford Region issued by a Connecticut-licensed surety company, along with all required forms including Acknowledgement, Addenda Acknowledgment, Schedule of Prices, Work Hours and Staffing proposal, Company Information, Qualification Statement, and proof of roofing experience in New England. The selected contractor must provide performance bonds, labor and material bonds, and a CHRO Good Faith Efforts Short Form Plan prior to award. Insurance requirements include a $1,000,000 commercial umbrella policy per occurrence with $2,000,000 general aggregate, $1,000,000 umbrella liability, and builder's risk insurance naming YWCA Hartford Region and the State of Connecticut as additional insured parties. The project is exempt from federal excise taxes and Connecticut sales and use taxes, with 5 percent retainage held on all payments. Bids remain valid for 90 days following opening and cannot be modified thereafter.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL SPECIFICATIONS

YWCA HARTFORD REGION

Solar Panels 135 Broad St.

Hartford, CT. 06105 CD Specifications 2/25/2026

ARCHITECT

Northeast Collaborative Architects 11 Silver St. #116

Middletown, CT 06457 NCA Project #24011

SECTION 000110

TABLE OF CONTENTS

FEBRUARY 25, 2026 YWCA HARTFORD REGION SOLAR

PROJECT MANUAL: SPECIFICATIONS

Section 000100 Cover

Section 000110 Table of Contents Section 000115 Drawing Sheet list

DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS

Section 001116 Invitation to Bid Section 003126 Existing Hazardous Material Information Section 004113 Bid Form Section 004313 Bid Bond (A310) Section 004513 Contractor Qualification Statement (A305) Section 004519 Non-Collusion Section 004533. Nondiscrimination Certification Section 006113 Performance & Payment Bonds Section 006519.16 Release of Liens (AIA Document G706A) Section 006519.19 Contractor’s Final Payment (AIA Document G707-1994) Section 007200 General Conditions of the Contract for Construction (AIA Document A201- 2007) Section 007336 CHRO Good Faith Efforts Shor Form Plan Section 007339 Minority Business Enterprise Requirements Section 007343 Wage Rate Requirements Section 007343 Wage Rate Schedules

DIVISION 01 – GENERAL REQUIREMENTS

Section 011100 Summary of Work Section 012200 Unit Prices Section 012500 Substitution Procedures Section 012600 Contract Modification Procedures Section 012900 Payment Procedures Section 013100 Project Management and Coordination Section 013233 Photographic Documentation Section 013300 Submittal Procedures Section 014000 Quality Requirements Section 015000 Temporary Facilities and Controls Section 015800 Project Sign Section 016000 Product Requirements Section 017300 Execution Section 017700 Closeout Procedures Section 017823 Operation and Maintenance Data Section 017839 Project Record Documents

DIVISION 02 – EXISTING CONDITIONS

Section 024119 Selective Demolition

SECTION 000110

DIVISION 06 – WOODS, PLASTICS AND COMPOSITES

Section 061053 Miscellaneous Rough Carpentry

DIVISION 07 – THERMAL AND MOISTURE PROTECTION

Section 075423 Thermoplastic-Polyolefin (TPO) Roofing

DIVISION 26 – ELECTRICAL

Section 263100 Photovoltaic Systems

SECTION 000115

DRAWING SHEET LIST

DRAWING SHEET LIST

GENERAL

A-001 COVER SHEET

A-100 MAIN ROOF SOLAR CONSTRUCTION PLAN

A-101 UPPER ROOF SOLAR CONSTRUCTION PLAN

A-401 ROOF SOLAR DETAILS

SECTION 001116

INVITATION TO BID

Invitation to Bid For

Solar Panels at YWCA Hartford Region

Qualified bidders are invited to submit sealed bids for construction services for the Solar Panels Project at YWCA Hartford Region 135 Broad St. Hartford, Ct. The Project consists of a new solar panels and connections to be installed on the existing flat roof of the two-story office building. The eight story residential tower is not included in this bid. Work includes furnishing all labor, materials, equipment necessary to complete the installation of the new solar system.

It is the intention of YWCA Hartford Region to select a Contractor to provide these services based on the lowest responsible and qualified bid, which include the comprehensiveness and quality of the bid, the experience of the Contractor, the costs submitted by the Contractor, and factors which, in the opinion of YWCA Hartford Region, will lead to efficient, cost effective, and well-maintained facilities.

Owner: Derek Stubbs, Chief Financial Officer, YWCA Hartford Region, 135 Broad St, Hartford ,Ct

Architect: Northeast Collaborative Architects, 11 Silver St #116, Middletown, Ct. 06457, telephone:

860.344.9332

The bid documents may be found on the State of Connecticut Contracting Portal located at http://das.ct.gov/portal

All questions shall be directed to YWCA Hartford Region, attention Derek Stubbs in writing via email:

bids@ywcahartford.org. The last day to submit questions for review by YWCA Hartford Region is April 30, 2026 at 3pm.

All questions will be answered by Addendum. No oral interpretations shall be made to any respond-ent as to the meaning of any of the bid documents. Every request for an interpretation shall be made in writing. Such addenda will become part of this Invitation to Bid and the resulting con-tract. At least 3 days prior to the due date for bids, a copy of the addenda will be emailed to plan holders. It shall be the responsibility of each bidder to determine whether addenda have been is-sued.

BID SUBMITTAL AND OPENING

A. Bids shall be submitted via email to bids@ywcahartford.org and must contract the following:

1. Subject line: “Proposal for YWCA Hartford Region – Roof Replacement”.

2. Bid Date: May 7, 2026 .

3. Bid Time: 12pm local time.

4. Bid Public Opening: 12:15pm local time at YWCA Hartford Region

All Bids shall be prepared in compliance with Instructions to Bidders, included in the Project Manual, dated 2/25/26 mailto:bids@ywcahartford.org mailto:bids@ywcahartford.org

B. All forms and bonds must be included and completed for a submission to be considered complete:

1. Acknowledgement Form

2. Acknowledgment of Addenda

3. Schedule of Prices

4. Work Hours, Staffing, and Schedule Form

5. Company Information Form

6. Bidder’s Qualification Statement

7. Bid Bond – 5% of the contract amount, payable to YWCA Hartford Region and issued by a Surety Company licensed in the State of Connecticut

C. Forms to be submitted by the selected contractor prior to contract award:

1. Performance Bond

2. Labor and Material Bond

3. CHRO Good Faith Efforts Short Form Plan

D. All information must be typewritten or written legibly. Errors, alterations or corrections must be initiated by the person signing the bid.

E. Bids are considered valid for ninety (90) days after bids are opened.

F. Bidders may not modify their bid after bis are opened.

G. An authorized person representing the legal entity of the bidder must sign bids.

H. The inability to meet any specified requirement(s) must be stated in writing and attached to the bid form, or written on the bid form. If no exceptions are noted, it shall be assumed that the terms of the Invitation to Bid have been accepted.

I. YWCA Hartford Region reserves the right to waive any minor informality in a bid when such a waiver is in its best interest.

PREBID CONFERENCE

A. The Contractor can contact Todd Whitaker at (860) 525-1163 x 126 if they would like to inspect the site.

EQUAL OPPORTUNITIES REQUIREMENTS

A. An Affirmative Action/Equal Opportunity Employer. Minority/Women's Business Enterprises are encouraged to apply. This contract is subject to state set-aside and contract compliance requirements.

B. Wage Rates: Funding for this project has been received from the Connecticut Department of Economic and Community Development. As such, prevailing wage rates must be paid.

See section 007343 Wage Rate Requirements and Schedules for additional information.

C. CHRO Requirements: The contractor who is selected to perform this State project must comply with CONN. GEN. STAT. §§ 4a-60, 4a-60a, 4a-60g, and 46a-68b through 46a-

68f, inclusive, as amended by June 2015 Special Session Public Act 15-5. State law requires a minimum of twenty-five (25%) percent of the state-funded portion of the contract be set aside for award to subcontractors holding current certification from the Connecticut Department of Administrative Services (“DAS”) under the provisions of CONN. GEN. STAT. § 4a-60g. (25% of the total state-funded value with DAS-certified Small Businesses and 6.25% of the total state-funded value with DAS-certified Minority- , Women-, and/or Disabled-owned Businesses.) The contractor must demonstrate good faith effort to meet the 25% set-aside goals.

D. DAS Prequalification of Bidders:

a. Municipal contracts for the construction or renovation of a public works project, where the estimated value is $1,000,000 or greater, will need to comply with C.G.S.

Sec. 4b-91. In such cases the contractors must be pre-qualified by the State of Connecticut Department of Administrative Services (DAS). When applicable, this requirement will need to be included in the Invitation to Bid as a prerequisite for selecting the Lowest Responsible and Qualified Bidder.

b. "Prequalification" means prequalification issued by DAS to bid on a contract or perform work pursuant to a contract for the construction, reconstruction, alteration, remodeling, repair or demolition of any public building or any other public work by the state or a municipality.

c. It is permissible to use AIA form A305, Contractor's Qualification

i. Statement, as a prerequisite to bidding, provided prequalification

ii. Does not prevent minority/women owned firms from bidding.

iii. Consult your architect.

Please note that 100% of this contract will be state-funded.

Instructions to Bidders

1. Purpose: The Contractor will efficiently provide its services at YWCA Hartford Region in Hartford, CT for all matters listed in the Bid Documents which is attached hereto and incorporated herein by reference.

YWCA Hartford Region remains responsible for insuring that the facilities are in conform-ance with state law and shall monitor the Contractor through periodic monitoring and re-ports. YWCA Hartford Region retains control of the quality, and general nature of its facilities. YWCA Hartford Region shall be assured by the Contractor that all federal, state and local regulations are being met in performing work under this contract and all work shall be performed in accordance with applicable law.

All bids shall be submitted in accordance with these Bid Documents: drawings, specifica-tions and the conditions as set forth in the bid request documents. The successful re-spondent will be required to sign a contract with YWCA Hartford Region, which will comply with the terms and conditions hereof.

2. Project Overview:

• Obtain all necessary permits, including from the City of Hartford

• Remove any debris on the roof in preparation of installation

• Install new solar panel supports to roof and add flashing and sealant.

• Patch roof at support areas.

• Install new solar panels to the supports and connect to existing electrical system.

• Provide Manufacturer’s warranty of at least 20 years

• Provide minimum warranty on installation as stated in specifications.

3. Work Hours and Staffing:

The YWCA Hartford Region offices and residential tower will remain open during the roof replacements. As part of the bid submission, the Contractor is responsible for sub-mitting a proposal stating the hours they wish to work, the number of employees needed for this project and the total number of working days to complete the project.

All work will be done Monday through Friday. No work shall be performed on State or Federal holidays unless with prior approval.

4. Proposed Form: The Contractor shall fill out its bid on the official proposed form that is included in the Bid Documents.

5. Contract: A contract included in the Bid Documents will be executed between YWCA

Hartford Region and Successful Contractor. The contract shall be AIA Document A107 -

2007 Standard Form of Agreement Between Owner and Contractor for a Project of Limited Scope, preliminary copy included in these Bid Documents.

6. Contractor Eligibility: The Contractor can contact Todd Whitaker at (860) 525-1163 x

126 if they would like to inspect the site. The Contractor must submit appropriate evi-dence demonstrating the ability and the resources to provide the specified services. Sub-mittal of this information must include a list of roofing projects in New England that the contractor has performed. In addition, the Contractor shall complete the AIA Document A305 – 1986 Contractor’s Qualification Statement included in these Bid Documents.

7. Contractor Responsibility: It is the responsibility of the Contractor to examine all provi-sions and visit each location where work is to be performed to become fully acquainted with the sites, problems, conditions, and other factors that pertain to the operation. No claim for relief due to mistakes or omissions will be entertained and each Contractor will be held to his proposal. YWCA Hartford Region reserves the right to waive errors in bids, to accept other than the low bidder, and reject any or all proposals at its discretion.

8. Fiscal Arrangements: The Contractor shall keep and maintain accounting and billing rec-ords for the duration of the contract. Terms of Payment are outlined in AIA Document A107 – 2007 Owner-Contractor Agreement.

9. Project shall comply with U.S. Environmental Protection Agency April 22, 2008 rule re-garding Lead and renovation, repair and painting program. The AGENCY must docu-ment compliance using EPA sample pre-renovation disclosure form. All residents of the property must be notified. Furthermore, all contractors and subcontractors shall be EPA certified in performing work that could disturb lead. The above mentioned project shall be administered in accordance with all governing local, state and federal regulations.

10. Records, Certifications. Etc.: The Contractor shall keep full and accurate accounts and records in connection with the services covered in this contract. All such records shall be retained by the Contractor for a period of six (6) years and shall be subject to audit by the YWCA Hartford Region, at any time during regular working hours and any reasonable place. The records shall be kept in paper and electronic format. Both formats shall be accessible by YWCA Hartford Region.

Breach or violation of the contract will be subject to available remedies prescribed by law.

The Contractor will be totally and completely responsible for seeing that the operation is in complete conformity with all rules and regulations of the The City of Hartford, YWCA Hartford Region, and all other applicable Federal, State, and Local laws, codes or regula-tions. All assessments to YWCA Hartford Region for noncompliance will be paid by the Contractor.

11. Award: Award of contract will be to the Contractor that submits a bid that is determined to be responsive to this invitation and most advantageous to YWCA Hartford Region. Such determination will be based upon, but not limited to, the Objective Criteria for the Evalu-ation of Bidders, included in these Bid Documents.

12. Insurance: Original, completed Certificates of Insurance shall be presented to YWCA

Hartford Region prior to contract issuance. Provider agrees to provide replacement/re-newal certificates at least 60 days prior to the expiration date of the policies.

YWCA Hartford Region, Inc. and the State of Connecticut must be named as additional insured.

Insurance and Indemnity Coverage Requirements:

Commercial Umbrella $1,000,000 Each Occurrence General Aggregate $2,000,000 Umbrella Liability $1,000,000

Builder’s Risk Insurance. YWCA Hartford Region and the State of Connecticut shall be listed as A.T.I.M.A.

The “Hold Harmless” Indemnification endorsement of the insurance shall include the interest of YWCA Hartford Region and the State of Connecticut. The Contractor and Subcontractors and other interests shall also be named.

13. Taxes: The bidder shall be aware that YWCA Hartford Region is exempt from Federal Excise Taxes and Connecticut Sales and Use Taxes. Appropriate tax-exempt forms will be provided to the successful bidder(s) as part of the contract award process.

14. Subcontractors: YWCA Hartford Region will recognize only the successful contractor for the proper execution of the entire work under the contract.

15. Miscellaneous:

a) The submission of a bid will be construed to mean that the respondent is fully informed as to the extent and character of YWCA Hartford Region 's requirements, and the respondent represents that it is willing and able to furnish the services requested in a satisfactory man-ner in complete compliance with the specifications.

b) Once submitted, all bids become the property of YWCA Hartford Region, which reserves the right to reject any and all bids. Bids must be firm and may not be withdrawn for 90 days, or until YWCA Hartford Region awards the contract, whichever comes first.

c) YWCA Hartford Region shall not be liable for any costs incurred by respondents in pre-paring or submitting bids.

d) YWCA Hartford Region reserves the right to accept any item or group of items proposed in any bid, unless the respondent qualifies its offer by specific limitation. YWCA Hartford Region reserves the right to select a respondent who is not the lowest priced respondent as it deems in its best interest.

e) YWCA Hartford Region reserves the right to reject any bid, in whole or in part, and to waive technical defects, qualifications, irregularities, and omissions, if, in its sole judg-ment, the best interests of YWCA Hartford Region will be served. Each bid received within the required time frame will be evaluated individually by YWCA Hartford Region.

Each evaluation will come of necessity, consistent subjective judgments concerning each bid.

f) YWCA Hartford Region reserves the right to negotiate with any respondent regarding changes to the original bid which may be deemed to be in the best interests of YWCA Hartford Region.

g) In the event that such successful respondent fails to execute a contract and provide com-pleted W-9 Form within thirty (30) days after notification of award by YWCA Hartford Region, YWCA Hartford Region may cancel its action and reconsider other bids or solicit new bids.

h) YWCA Hartford Region shall consider the successful Contractor to be the sole point of contact with regard to contractual matters including payment to performance of service by the Contractor, its agents and employees. All work will be paid as provided in the Bid Form for all work, per section 012900 Payment Procedures. No payments will be made for mo-bilization or materials. 5% Retainage will be held.

i) If it becomes necessary to revise any part of this Request for Competitive Bid or otherwise provide additional information, an addendum will be issued by YWCA Hartford Region and furnished to all prospective respondents who have received copies of this original Re-quest for Competitive Bid.

16. Stipulations

a) A contract issued as the result of a bid shall not be considered exclusive. YWCA Hartford Region reserves the right to contract with other vendors for similar services when deemed appropriate.

b) YWCA Hartford Region maintains the right to withhold payment for unsatisfactory mate-rials and/or workmanship until such time that the defect is corrected. If the defect is not satisfactorily remediated within 60 days, YWCA Hartford Region may elect to have the remediation done by an alternate vendor and subtract the cost from the contractor's in-voice. YWCA Hartford Region also reserves the right to deduct from the contractor’s billing any costs incurred as a result of inferior or unsatisfactory materials and/or workmanship.

c) YWCA Hartford Region reserves the right to cancel the contract at any time, for any or no reason, with no cost to YWCA Hartford Region. If the cancellation is for inadequate performance, then the cancellation shall be immediate. If the cancellation is for budget-ary considerations or is based upon the discretionary right of YWCA Hartford Region then the cancellation shall be upon thirty (30) days written notice.

d) YWCA Hartford Region reserves the right not to award the continuation of a multiple year bid. The award of each year's contract is contingent upon adoption and approval of budgetary funds for this purpose.

17. Dispute Resolution:

Any controversy or disputes arising under this contract shall be litigated in a court of competent jurisdiction in the State of Connecticut or, as determined by YWCA Hartford Region, be first subject to mediation. YWCA Hartford Region will have the option to choose the forum. If the matter is brought in a court of competent jurisdiction, the pre-vailing party shall be entitled to court costs and reasonable attorney’s fees. YWCA Hart-ford Region specifically does not agree to be a party to any arbitration proceedings.

18. Choice of Law:

If any controversy between the parties arises Connecticut law will apply and the contract will be interpreted and governed by the laws of the State of Connecticut (excluding its choice of law rules).

END OF INVITATION TO BID

An Affirmative Action/Equal Opportunity Employer. Minority/Women's Business Enterprises are encouraged to apply.

Industrial Hygiene / IAQ Hazardous Building Materials Environmental Assessments Laboratory Services & Training

8 SOUTH MAIN STREET, SUITE 3 • TERRYVILLE, CT 06786

PHONE (860) 589-8257 • FAX (860) 585-7034

December 20, 2024

Mr. Todd Whitaker Facilities Manager YWCA Hartford Region 135 Broad Street Hartford, CT 06105

RE: Lead-Based Paint Inspection and Risk Assessment Report

Hartford, Connecticut Eagle Project No. 24-208.10T1

Dear Mr. Whitaker:

Please find the report for the Lead-Based Paint Inspection and Radon testing conducted at 135 Broad Street in Hartford, Connecticut (Site). The Lead-Based Paint Inspection and radon testing services were performed as part of the YWCA’s due diligence for proposed renovation activities to convert select areas within the Site building into early childcare program. The Client identified select locations that will be licensed under the childcare program.

Please do not hesitate to contact if you have any questions regarding the contents of this report.

Sincerely, Eagle Environmental, Inc.

Report Prepared By:

William Petrucci Environmental Consultant I

Report Reviewed By:

Chris Liberti Vice President of Operations

X:\2024 Files\2024 Reports\YWCA Hartford\135 Broad St - LIRA - Daycare.doc

EAGLE ENVIRONMENTAL, INC.

PHONE (860) 589-8257 • FAX (860) 585-7034

TABLE OF CONTENTS

1.0 INTRODUCTION

1.1 Introduction

2.0 BACKGROUND INFORMATION

2.1 Scope of Inspection

2.2 Building Information

3.0 LEAD-BASED PAINT INSPECTION

3.1 Inspection Results

3.2 Risk Assessment

4.0 ENVIRONMENTAL SAMPLING

4.1 Dust Sampling Results

4.2 Soil Assessment Results

4.3 Water Sampling Results

4.4 Radon Testing Results

5.0 REGULATORY REQUIREMENTS

6.0 EXECUTIVE SUMMARY

APPENDICES

Appendix A Floor Plans Appendix B Standard Operating Procedures Appendix C XRF Lead-Based Paint Inspection Reports Appendix D Dust and Water Sample Laboratory Reports Appendix E Radon Testing Reports Appendix F Eagle Environmental, Inc. Certificates and License Appendix G Laboratory Certificate

PHONE (860) 589-8257 • FAX (860) 585-7034 1

1.0 INTRODUCTION

1.1 Introduction

Eagle Environmental, Inc. (Eagle) was retained by the YWCA Hartford Region to perform a lead-based paint inspection and radon testing for 135 Broad Street in Hartford, Connecticut (Site). The inspection was performed within the areas of the building which will be associated with a proposed the early childcare program. The lead-based paint inspection and risk assessment was performed on November 21, 2024 by William Petrucci; a State of Connecticut Department of Public Health (CT DPH) licensed Lead Inspector (license #002295).

2.0 BACKGROUND INFORMATION

2.1 Scope of Inspection

The scope of services included Lead-based paint testing utilizing an LPA-1 X-Ray Fluorescence (XRF) paint analyzer, dust sampling, lead-drinking-water sampling and radon testing. The Client’s representative identified the areas throughout the Basement and First-Floor level, which will be included in the childcare program’s licensing.

Additional areas outside the childcare program were inspected concurrently with this assessment in order to properly support the proposed renovation activities.

The following locations will be included in the licensed childcare program:

Basement level – Gymnasium Basement level – Corridors First Floor level – Soromundi Room Two (2) Stairwells First Floor level – Two (2) classrooms First Floor level – Restrooms First Floor level – Corridors and Closets

Floor plans identifying the childcare locations are attached in Appendix B.

2.2 Building Information

The Site building was constructed in 1974. The Basement consists of mechanical rooms, storage rooms, gym, pool, and locker rooms. The first-floor level consists of the entry lobby and offices. The second-floor level consists of mainly offices and conference rooms. The floors are concrete and covered with various types of vinyl flooring materials and carpet. The walls are masonry block and poured concrete in the mechanical rooms and of sheetrock and joint compound construction in most areas of the building. The ceilings consist of several types of suspended ceiling systems.

3.0 LEAD-BASED PAINT INSPECTION

3.1 Inspection Results

The lead-based paint inspection was performed utilizing an X-Ray Fluorescence (XRF) Sci-Apps X-550pb Lead Paint Analyzer (LPA 1), serial number 02230 within the limits of the inspection area(s). Room numbers designated by Eagle correspond to the attached

PHONE (860) 589-8257 • FAX (860) 585-7034 2

Lead-Based Paint Inspection XRF Report, located in Appendix C, and the floor plans attached in Appendix B. The “A” side is considered the front of the building with the “B”, “C” and “D” sides following in a clockwise direction.

For the purpose of this inspection, two hundred thirty-five (235) painted surfaces and components were tested with three (3) actionable readings. The actionable readings were identified on the metal I-beam frame supports to the overhead air handler unit within a mechanical room (Room 0-05) which is scheduled to be removed during the overall renovation project. The mechanical room is not located within the child-occupied areas associated with the proposed daycare.

At the time of the inspection, stairwell ST-2 was locked and inaccessible. The components appeared similar to those in stairwell ST-1 but additional testing will be required within the stairwell if it will be included within the childcare program’s licensing.

The lead-based paint inspection for the proposed childcare areas did not identify any of the tested components/surfaces to contain toxic levels of lead-based paint. The exterior proposed playground area was investigated, no painted surfaces or bare soil areas were identified. The exterior building facades included unpainted masonry walls and concrete columns.

Eagle did not test under any rigid enclosures. Components and or surfaces concealed under rigid enclosures are assumed to contain toxic levels of lead-based paint until tested and proven negative.

3.2 Risk Assessment

For the purpose of this inspection, toxic levels of lead-based paint were not identified within the proposed areas that will be converted into a childcare area. The XRF Lead Inspection Report is located in Appendix C.

4.0 ENVIRONMENTAL SAMPLING

4.1 Dust Sampling Results

Dust samples were collected from the floors and window sills within the inspected area of the proposed daycare and the adjoining hallways that are likely to be frequented by children under the age of six (6) years old. Dust sample results with concentrations of lead equal to or exceeding 10 µg/ft² on floors and 100 µg/ft² on window sills are considered to be dust-lead hazards.

The location of dust samples and results are provided in the following table:

Sample Number Location/Surface Sample Size Result 11-21-WP-01 1-09 D side floor 288 in² <1.0 µg/ft² 11-21-WP-02 1-09 B side floor 288 in² <1.0 µg/ft² 11-21-WP-03 1-09 A floor 288 in² <1.0 µg/ft² 11-21-WP-04 1-09 B floor 288 in² <1.0 µg/ft² 11-21-WP-05 1-08 D side floor 288 in² <1.0 µg/ft² 11-21-WP-06 1-08 B side floor 288 in² <1.0 µg/ft² 11-21-WP-07 1-17 floor 288 in² <1.0 µg/ft² 11-21-WP-08 1-18 floor 288 in² <1.0 µg/ft² 11-21-WP-09 1-10 Hallway floor 288 in² <1.0 µg/ft²

PHONE (860) 589-8257 • FAX (860) 585-7034 3

Sample Number Location/Surface Sample Size Result 11-21-WP-10 Field Blank N/A <10 µg/wipe 11-21-WP-11 Field Blank N/A <10 µg/wipe

No dust lead-hazards were identified in the areas where dust samples were collected.

4.2 Soil Assessment Results

A soil assessment was completed by Eagle during the lead-based paint inspection and risk assessment. Within the area of the proposed playground and rear entry, no bare soil was identified. Ground surfaces were covered by concrete walkways and bark mulch.

4.3 Water Sampling Results

Eagle collected two (2) first draw water samples and two (2) flush water samples from two (2) sinks located within the proposed daycare location. The first draw samples were confirmed by the building staff to have been sitting in the pipes for at least six (6) hours prior to sampling. The samples were collected in a one (1) Liter plastic collection bottle.

The sample was kept cool until analyzed by the laboratory.

The USEPA has set an action level of fifteen (15) parts per billion (ppb) (0.015 mg/Kg) as the lead in drinking water standard. Sample results that exceed this level may be harmful and pose a hazard to the consumer.

The location of the water sample and the result is provided in the following table:

The concentration of lead in the water samples collected from the sinks within Rooms 1- 09A and 1-09B were below the USEPA threshold of fifteen (15) ppb. No further action is necessary regarding lead in water.

4.4 Radon Testing Results

Radon is measured in PicoCuries per Liter of air or pCi/L. The USEPA has set an action level of 4.0 pCi/L. Ambient concentrations of radon are approximately 0.4 pCi/L of radon for outside air. The USEPA recommends that short term tests that have results of 4.0 pCi/L or greater be confirmed with a second short-term test. Two (2) short-term tests with results equal to or greater than 4.0 pCi/L require that radon mitigation be performed.

The charcoal canisters were sent to Radon Testing Corporation of America (RTCA) of Elmsford, New York for analysis. RTCA is listed in the USEPA Radon Measurement Proficiency (RMP) Program.

The location of the radon samples and the results are provided in the following table:

Sample Number Location Result 11-21-WP-CFD01 1-09A Sink – first draw 0.0022 mg/L (2.2 ppb) 11-21-WP-CF02 1-09A Sink – flush <0.0005 mg/L (<0.5ppb)

11-21-WP-BFD03 1-09B Left sink – first draw <0.0005 mg/L (<0.5ppb) 11-21-WP-BF04 1-09B Left sink – flush <0.0005 mg/L (<0.5ppb)

PHONE (860) 589-8257 • FAX (860) 585-7034 4

Canister ID# Test Start Test Stop Location Results (pCi/L)

4933842 11/21/2024 09:15

11/25/2024 08:11 Basement - Room 0-02 0.2

4934300 11/21/2024 09:20

11/25/2024 08:12

Basement - Room 0-06 (Left) 0.2

4934074 11/21/2024 09:22

11/25/2024 08:13

Basement Room 0-06 (Right) 0.3

4934327 11/21/2024 09:23

11/25/2024 08:13

Basement Room 0-06 (Right) - Duplicate 0.3

4934106 11/21/2024 09:26

11/25/2024 08:17 1st Floor Hallway 0.4

4934104 11/21/2024 09:30

11/25/2024 08:21

1st Floor - Proposed Daycare 0.1

4934078 11/21/2024 09:32

11/25/2024 08:21 Blank 0.1

Based on the results of this testing, all results fell below the USEPA action level of 4.0 pCi/L. No further testing is required at this time.

5.0 REGULATORY REQUIREMENTS

A Lead-Based Paint Correction Plan is not required for proposed daycare location as toxic levels of lead-based paint was not identified. No further action is required as it pertains to painted surfaces within the identified proposed daycare rooms.

A copy of this report should be maintained on Site in the event regulatory agencies request information pertaining to the inspected areas.

6.0 EXECUTIVE SUMMARY

Eagle Environmental, Inc. (Eagle) was retained by the YWCA Hartford Region to perform a lead-based paint inspection and risk assessment for the rooms associated with the proposed daycare within the Site building located at 135 Broad Street in Hartford, Connecticut (Site). The lead-based paint inspection and risk assessment was performed on November 21, 2024 by William Petrucci; a State of Connecticut Department of Public Health (CT DPH) licensed Lead Inspector (license #002295).

Lead-based paint equal to or exceeding 1.0 mg/cm² was not identified within the inspected area of the proposed daycare.

A complete list of components tested is identified in the Lead Paint Inspection Report located in Appendix C.

No dust-lead hazard was identified in the areas where dust wipes were collected.

PHONE (860) 589-8257 • FAX (860) 585-7034 5

No bare soils were identified within the proposed playground area during the soil assessment.

The concentration of lead in the water samples collected from Rooms 1-09A and 1-09B were below the USEPA threshold of fifteen (15) ppb. No further action is necessary regarding lead in water.

Any of the areas outside of the proposed childcare area, both interior and exterior, that have not been tested and confirmed to be negative for lead-based paint must be assumed to contain toxic levels of lead in paint and should be placed on the management plan to ensure all painted surfaces remain in intact condition. Components and surfaces concealed behind rigid enclosures or are otherwise inaccessible for testing must be assumed to contain toxic levels of lead-based paint for the purpose of this report.

A copy of this report should be maintained on Site in the event regulatory agencies request information pertaining to the inspected areas.

APPENDIX A

FLOOR PLANS

8 SOUTH MAIN STREET, SUITE 3

TERRYVILLE, CONNECTICUT 06786

860-589-8257

BP-1 BASEMENT

FP-1 FIRST FLOOR

DECEMBER 17, 2024

EAGLE PROJECT NUMBER: 24-208.10T1

135 BROAD STREET

HARTFORD, CONNECTICUT

Z:\2024 Files\2024 AutoCAD\YWCA\135 Broad Street\LBP Inspection\CAD\135 Broad Street.dwg

LOCATION MAP

Y.W.C.A. HARTFORD

INDEX OF DRAWINGS

KEY:

= LIMITS LEAD-BASED PAINT

INSPECTION AND RISK ASSESSMENT

= EAGLE ROOM NUMBER0-00

BASEMENT

NOT TO SCALE

BP-1

S

O U

TH

M

A

IN

S

TR

E E

T, S

U

IT

E

TE

R

R Y

V

IL

LE

, C

O N

N E

C

TI

C U

T

0-

9-

L E

A D

B

A S

E D

P

A I N

T

I N

S P

E C

T I O

N

A

N

R

I S

K

A

S S

E S

S M

E N

T

Y W

C

A

H

A R

T F

O R

D

B R

O A

D S

TR

EE

T H

A R

TF

O

R D

, C O

N N

EC

TI

C U

T

PR

O

JE

C

T N

O

-2

.1

0T

D A

TE

: 1

2/

/2

D R

A W

N B

Y : B

B

R

EV

IE

W

ED

B

Y : P

F

SHEET OF

SHEET NO.

S

ID

E -D

SIDE-A (STREET SIDE)

SIDE-C

S

ID

E -B

1 2

Z:\2024 Files\2024 AutoCAD\YWCA\135 Broad Street\LBP Inspection\CAD\135 Broad Street.dwg

0-05 0-06

0-07

ST-2

0-02

0-01

ST-1

0-04

0-03

KEY:

= LIMITS LEAD-BASED PAINT

INSPECTION AND RISK ASSESSMENT

= EAGLE ROOM NUMBER0-00

FIRST FLOOR

NOT TO SCALE

FP-1

S

O U

TH

M

A

IN

S

TR

E E

T, S

U

IT

E

TE

R

R Y

V

IL

LE

, C

O N

N E

C

TI

C U

T

0-

9-

L E

A D

B

A S

E

P

A I N

T

I N

S P

E C

T I O

N

A

N

R

I S

K

A

S S

E S

S M

E N

T

Y W

C

A

H

A R

T F

O R

D

B R

O A

D S

TR

EE

T H

A R

TF

O

R D

, C O

N N

EC

TI

C U

T

PR

O

JE

C

T N

O

-2

.1

0T

D A

TE

: 1

2/

/2

D R

A W

N B

Y : B

B

R

EV

IE

W

ED

B

Y : P

F

SHEET OF

SHEET NO.

S

ID

E -D

SIDE-A (STREET SIDE)

SIDE-C

S

ID

E -B

2 2

Z:\2024 Files\2024 AutoCAD\YWCA\135 Broad Street\LBP Inspection\CAD\135 Broad Street.dwg

1-19

ST-1

1-14

1-09 1-08 1-18

1-17

ST-2

1-09B 1-09A

1-10

1-12

1-11

E

1-15

1-19

APPENDIX B

LEAD-BASED PAINT INSPECTION AND RISK ASSESSMENT

STANDARD OPERATING PROCEDURES

LEAD-BASED PAINT INSPECTION AND RISK ASSESSMENT

STANDARD OPERATING PROCEDURES

PART I – INTRODUCTION

A. PRINCIPLES OF LEAD-BASED PAINT INSPECTIONS AND RISK ASSESSMENTS

The intent of the lead-based paint inspection is to determine the presence or absence of hazardous levels of lead-based paint within the subject property. The intent of the risk assessment is to determine the nature and severity of health risks associated with the hazardous levels of lead.

The actual process of performing the combined lead inspection and risk assessment can be broken down into four (4) major components that include: 1. documentation of building and tenant data including family use patterns; 2. environmental sampling; 3. visually assessing the condition of painted surfaces and soil areas; and 4. presenting lead hazard control options.

The data collected from the first three components of the lead inspection and risk assessment helps the Risk Assessor identify the existence, source, location and severity of lead-based paint hazards and lead exposure pathways. This allows the Lead Designer/Planner to provide appropriate and efficient options for correcting lead hazards.

B. SCOPE OF INSPECTION

The inspection report provides a description of completed work within the executive summary.

The introduction section within the report identifies the location of the inspection site and scope of services within that location, as well as the date(s) of service. The name(s) of the lead inspector/risk assessors providing inspection services and appropriate State of Connecticut license number(s) are also incorporated in the report.

PART II – BACKGROUND INFORMATION

A. BUILDING INFORMATION

In general, building information is comprised of the current building description and construction history. Data collected in the field from the tenants or owner in addition to the information collected by the inspector aids in a general knowledge of building components and age of the structure. A site diagram is drawn and rooms are designated with numbers to correspond to the XRF inspection report. This information also assists in the development of management and control plans.

C. IDENTIFICATION OF DAYCARE AREAS

The inspector interviews the daycare administrators to find out exactly where the children will be within the building and on the grounds during the course of a normal day. Potential rooms tested include classrooms, cafeterias, hallways, stairwells, bathrooms, exterior entryways and play areas. The inspector relies upon the daycare administrators to accurately communicate this information.

PART III – LEAD-BASED PAINT INSPECTION

A. INSPECTION PROTOCOL

The building site is tested for lead-based paint using selected portions of the inspection protocol of chapter 7 of the Department of Housing and Urban Development (HUD) Guidelines for the

Evaluation and Control of Lead-Based Paint Hazards in Housing (1997 and 2012) Revision and the State of Connecticut Department of Public Health Childhood Lead Poisoning Prevention regulations to determine whether lead-based paint is present in a house, dwelling unit, residential building, or housing development including common areas and exterior surfaces, and, if present, which building components contain lead-based paint.

For the purpose of the inspection, lead-based paint is defined as paint or other surface coatings (stain, shellac or varnish) applied prior to 1978 and containing lead equal to or exceeding 1.0 milligrams per square centimeter (under the Environmental Protection Agency standards) or 0.5% by weight in a dried state (under Consumer Product Safety Commissioner).

Representative testing is conducted at the site. This includes testing a minimum of one (1) of each type of building component or surface within each room or room equivalent within the inspection area. Within each room, the ceiling and four (4) walls are tested. In addition, one (1) representative component type is tested in each room (i.e. window components, door components, baseboards, etc.). Unique building components are also tested within each room and room equivalent. This testing protocol is in accordance with the State of Connecticut Department of Public Health requirements for a lead-based paint inspection.

For the purpose of the inspection report and labeled as such on the site diagram, the "A" side is considered the front of the building with the "B", "C", and "D" sides following in clockwise order.

B. X-RAY FLUORESCENCE (XRF) TESTING RESULTS

Testing is conducted in accordance with the requirements of American Society for Testing and Materials (ASTM) Designation E2119 - 00, Standard Provisional Practice for Quality Systems for Conducting In Situ Measurements of Lead Content in Paint or Other Coatings Using Field- Portable X-ray Fluorescence (XRF) Devices.

Eagle utilizes SciAps X-550 X-Ray Fluorescence (XRF) Devices with serial numbers 2330 and 2339. Eagle follows the manufacturer recommended warm-up procedures prior to initiating testing. In addition, Eagle utilizes the red 1.03 mg/cm² Standard Reference Material (SRM) paint film, developed by the National Institute of Standards and Technology (NIST). An initial calibration check is performed followed by subsequent calibration checks at the completion of testing in a dwelling unit.

Results are presented in a Lead Paint Inspection Report, which consists of two (2) sections: a coversheet and detailed report. Results of lead based paint components and surfaces with results equal to or above 1.0 mg/cm² are located highlighted in red text throughout the report.

PART IV – VISUAL ASSESSMENT

A. GENERAL

The visual assessment is conducted to locate potential lead based paint hazards and to evaluate the magnitude of the hazard. The visual assessment identifies deteriorated painted surfaces, areas of visible dust accumulation, areas of bare soil, the presence of friction and impact surfaces, and the presence of painted surfaces on which it is possible for a child under six (6) years old to mouth (“chewable surfaces”). The information gathered during the visual assessment is used to identify areas where defective paint is present and to determine where potential dust and soil samples are to be collected and preliminarily evaluate exposure pathways to lead hazards.

B. CONDITION OF PAINTED SURFACES

The Risk Assessor conducts a room-by-room examination of the painted surfaces in the dwelling interior, common areas and exterior of the subject building. Painted surfaces are rated as "intact" or "deteriorated". This rating system is consistent with rating system described in Chapter 5 of the HUD Guidelines. Painted surfaces containing a lead concentration of 1.0 mg/cm² or greater and receiving a rating of "deteriorated" are considered lead hazards while painted surfaces rated as "intact" are not.

The visual assessment also evaluates the potential of factors that may contribute to deteriorated surface coatings, that ultimately result with a “deteriorated” rating such factors are ambient temperature, moisture and water damage.

C. FRICTION AND IMPACT SURFACES

The Risk Assessor evaluates if any painted surfaces containing a lead concentration of 1.0 mg/cm² or greater are subject to friction or impact.

Friction surfaces are surfaces that have moveable parts and rub against one another when operated. Windows and doors are the most common sources of friction surfaces. For example, window sashes, jambs, stops, parting beads and interior portion of sills are components of a window system that rub against one another when operated. The area on a door that comes into contact with the door jamb and stop may also be considered a friction surface. Floors and stair treads are examples of impact surfaces. Impact surfaces are surfaces that are subject to impact by forces such as foot traffic.

Both friction and impact surfaces, if coated with lead-based paint, may have varying degrees of damage and are a potential for generating lead dust or paint chips according to the frequency of paint abrasion.

D. SETTLED DUST ASSESSMENT

During the visual assessment, the Risk Assessor evaluated areas where settled dust may accumulate, such as on window sills, in window wells and on floors. Settled dust, if contaminated with lead, presents an exposure risk to children residing in the dwelling unit.

E. SOIL ASSESSMENT

Areas of bare soil around the dwelling and where children play may be contaminated with lead.

The risk assessment evaluates the potential for exposure to lead from soil. For the purpose of this risk assessment, the yard surrounding the building is evaluated to determine if visible paint chips and/or bare soil areas.

PART V – ENVIRONMENTAL SAMPLING

A. DUST SAMPLING

Eagle Environmental collects samples of settled dust from various locations throughout finished areas within the daycare. Areas where paint is rated as "deteriorated" condition and or areas that contain accumulations of settled dust are generally tested. Areas tested frequently include classrooms, eating areas, primary play areas and most commonly used entries.

The samples are collected utilizing a single-ply disposable ASTM wipe as the sampling media.

The inspector utilizes disposable latex gloves during the sampling procedure to avoid cross-contamination of the samples. Where feasible, samples are collected from hard smooth surfaces such as floors, window sills and window wells. The sampling area is one (1) square foot for floor surfaces or the actual area of the component wiped, for a smaller surface, such as a window sill.

Samples are collected while passing the wipe over the sampling area in an “S” type motion. For floor samples, the first pass is started at the top of the area, working vertically downward. The second pass is started at the side of the area, working laterally. The third pass is made around the edges of the designated sampling area. For window sills or wells, the area is wiped several times with the horizontal “S” type motion. The wipe samples are placed directly into fifty (50) milliliter centrifuge tubes. Two (2) blank wipe samples were submitted to the laboratory for analysis to examine the integrity of the testing process.

Currently, the State of Connecticut risk assessment standards for lead-contaminated dust wipe samples are equal to or exceeding forty (40) micrograms per square foot (µg/ft²) on floors and two-hundred and fifty (250) µg/ft² on window sills. Dust wipe sample results that exceed these levels are considered lead hazards.

B. SOIL SAMPLING

Eagle Environmental evaluates bare soil areas at the site to determine if sampling for lead in soil is warranted. In accordance with the regulations of Connecticut State Lead Poisoning, Prevention and Control Agency (PCSA), if bare soil areas that are not covered by grass, sod, other live ground covering or similar coverings are present, then soil samples should be collected. For the purposes of the evaluation, the site is characterized by areas of similar function and usage such as the dripline of the building, mid-yard, and children’s play areas.

Composite soil samples are collected where required. This entails collecting approximately five

(5) sub-samples within the area of evaluation and combining them. Sub-samples are only combined from similar evaluation areas (i.e. dripline samples are not composited with play areas, etc.).

The soil sampling is performed in accordance with the ASTM 1727 designation, Standard Practice for Field Collection of Soil Samples for Lead Determination by Atomic Absorption Spectrometry (AAS) Techniques, or its HUD approved equivalent.

The EPA states the following levels of concern for lead concentration levels present in bare soil:

equal to or above 400mg/kg in bare areas of soil, concentrations equal to or greater than 1,200 mg/Kg in child play area and equal to or exceeding 5,000 mg/kg will require permanent abatement under the EPA’s guidance.

C. PAINT CHIP SAMPLING

Paint chip sampling includes painted surfaces that were determined to be in the low positive range (1.0 mg/cm2) for the SciAps X-550 XRF inspection instrument. Paint chip sampling is performed in accordance with the requirements of the American Society of Testing and Materials standard E 1729 Standard Practice for Field Collection of Dried Paint Samples for Lead Determination by Atomic Absorption Spectrometry Techniques. Paint chip samples are analyzed by flame Atomic Absorption Spectrometry (AAS) utilizing the USEPA SW 846, 7420 method.

Specifically, a paint chip is collected to include all layers of paint on a surface, but not to include the substrate. Paint chips shall include a minimum of one (1) square inch of paint.

Paint chip analysis results that are equal to or exceed 0.5% lead by weight defined by Consumer Product Safety Commissioner are considered positive (lead-based). Paint chip analysis results below 0.5% lead by weight are negative.

D. WATER SAMPLING

Drinking water is sampled at primary sources of drinking water, including water fountains and kitchen sinks. First draw water samples are collected after allowing the water to stand in the pipes for at least six (6) hours. First draw samples evaluate the lead content that is leaching into the water supply from the domestic piping in the building. First draw samples also detect lead that may have leached from plumbing fixtures at the point of use.

Samples are collected in one (1) Liter plastic collection and kept cool in an ice filled cooler or refrigerated until analyzed by the laboratory. The standard USEPA threshold used for evaluation of results is fifteen (15) parts per billion (PPB) lead.

PART VII – DISCLOSURES AND NOTIFICATIONS

Certain federal and state requirements apply when lead hazards are found in a daycare site, For example, Eagle Environmental is required to notify the local health department when toxic levels of lead are identified. Eagle Environmental identifies the applicable regulations and explains the requirements within the body of the inspection report.

PART VIII – LABORATORY SERVICES

Dust, soil and paint chip samples are analyzed by EMSL Analytical of Carle Place, New York and Scientific Analytical Institute (SAI) of Greensboro, North Carolina.

Lead in drinking water samples are analyzed by Phoenix Environmental Laboratories, Inc. of Manchester, Connecticut.

Z:\SOP\Lead\SOP - (LIRA) use for Daycare with SciAps.doc

APPENDIX C

XRF LEAD-BASED PAINT INSPECTION REPORT

Lead-Based Paint Inspection Report

Inspection Site: YWCA Hartford Inspection Date: 11/20/2024 - 11/21/2024 Unit Started: 11/20/2024 08:55:08

135 Broad Street, Total Readings: 235 Unit Ended: 11/21/2024 01:37:38

Hartford, CT 06105 Action Level: 1.0 (mg/cm²) Classification Level: 1.0 (mg/cm²)

Test # Room Wall Structure Components Substrate Position Color Conditition Result Lead Mode Notes (mg/cm²)

743 (CAL) PCS Pass 1.0 Timed

744 (CAL) PCS Pass 1.0 Timed

745 (CAL) PCS Pass 1.0 Timed

746 (CAL) PCS Pass 1.0 Timed

748 0-01 Pipe Metal Red Intact Negative 0.0 Quick

749 0-01 Pipe Metal Red Intact Negative 0.0 Quick

750 0-01 Pipe Metal Right Red Intact Negative 0.3 Quick

751 0-01 Pipe Metal Left Red Intact Negative 0.4 Quick

752 0-01 Pipe Metal Middle Red Intact Negative 0.1 Quick

753 0-01 Pipe Metal Middle Red Intact Negative 0.1 Quick

755 0-01 D Pipe Metal Right Red Intact Negative 0.0 Quick

756 0-01 D Pipe Metal Right Red Intact Negative 0.4 Quick

757 0-01 D Pipe Metal Middle Red Intact Negative 0.3 Quick

758 0-01 D Pipe Metal Middle Red Defective Negative 0.0 Quick

759 0-01 D Pipe Metal Left Red Defective Negative 0.8 Quick

760 0-01 D Pipe Metal Left Red Defective Negative -0.0 Quick

761 0-04 D Wall CMU White Intact Negative 0.0 Quick

762 0-04 C Wall CMU White Intact Negative -0.0 Quick

763 0-04 A Door Casing Metal White Intact Negative 0.0 Quick

764 0-04 A Door Jamb Metal White Intact Negative 0.1 Quick

E…