About this file
This document is a Work Directive Change form from the City of Carmel, specifically prepared by the Board of Public Works and Safety. The form serves as a template for documenting and authorizing modifications to an existing project contract, with spaces to detail the specific changes, reasons for the change, and potential impacts on project completion timeline and costs. The form includes sections for specification and drawing references, a description of work covered by the directive change, the reason for the order, and authorization details.
The form provides a structured mechanism for the City of Carmel to formally document and approve alterations to a contract, with provisions for future issuance of a Contract Change Order to cover the specified work. It requires signatures from the Owner's Representative and multiple members of the Board of Public Works and Safety, including the Presiding Officer, Board Members, and City Engineer. The document is designed to ensure transparent and systematic modification of project scope, with placeholders for specific project details, change order amounts, and potential adjustments to the project completion date.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| 22-ENG-15_Construction_Plans_Addendum_2_Added.pdf | ||
| BID_BOND.pdf | ||
| 22-ENG-15_Technical_Specifications_Addendum_2_Added.pdf | ||
| Clay_Center_Road_Path_Construction_and_Culvert_Replacement_Project_(Addendum_#1_Revision).pdf | ||
| PERFORMANCE_BOND.pdf | ||
| SAMPLE_AGREEMENT.pdf | ||
| SUBCONTRACTORS_LIST.pdf | ||
| Exhibit_D_E-Verify-1.PDF | ||
| PAYMENT_BOND.pdf | ||
| RIGHT_OF_ENTRY.pdf | ||
| SCREENSHOT_INSTRUCTIONS_-_FOR_BIDS.pdf | ||
| FIELD_ORDER.pdf | ||
| NON_COLLUSION_AFFIDAVIT.pdf | ||
| CONTRACT_CHANGE_ORDER.pdf | ||
| CONTRACT_CHANGE_REQUEST.pdf | ||
| MAINTENANCE_BOND.pdf | ||
| MANUFACTURERS_LIST.pdf | ||
| REQUEST_FOR_PROPOSAL_CHANGE.pdf | ||
| SAMPLE_OF_MOU_FOR_E-VERIFY.pdf | ||
| 6._Comprehensive_Set_of_Technical_Specifications_2021-04-28_(V2.7).docx | DOCX document |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF CARMEL
TO: WORK DIRECTIVE CHANGE NO.______________
DATE: ______________________________________
PROJECT NAME:_____________________________
PROJECT NO.: _______________________________
Specification Reference
Drawing Reference:
DESCRIPTION OF WORK COVERED BY THIS DIRECTIVE CHANGE:
REASON FOR THIS ORDER:
AUTHORIZATION:
THIS WORK DIRECTIVE CHANGE AUTHORIZES THE WORK TO BE COMPLETED AS
OUTLINED. A Contract Change Order in the amount of $______________ will be issued to you in the near future to cover this Work Directive Change.
PROJECT COMPLETION DATE: ADD/DEDUCT/UNCHANGED ___________ DAYS.
By:_______________________________ Approved By:
Owner’s Representative
CITY OF CARMEL
BOARD OF PUBLIC
WORKS AND SAFETY
By:__________________________
Laura Campbell, Presiding Officer
By:__________________________ James Barlow, Member
By:__________________________ Alan Potasnik, Member
By:__________________________ Brad Pease, PE, City Engineer
DATE:_______________________
ATTEST:
DATE:_______________________
Jacob Quinn, Clerk