FIELD_ORDER.pdf
PDF 34 KB Posted
- Attached to
- Clay Center Road Path Construction and Culvert Replacement Project State and local contract opportunity
- Solicitation number
- 22-ENG-15
- Issued by
- Hamilton County, Indiana
About this file
This document is a blank Field Order form issued by the City of Carmel, Indiana, designed to document minor changes in a construction project without altering the contract price or time. The form provides a standardized template for the engineering team to interpret contract documents or order small modifications to the work, with a mechanism for the contractor to propose price or time adjustments if necessary. The form includes sections for describing the changes, listing attachments, and obtaining approval from the owner's representative.
The Field Order form is specifically associated with the Clay Center Road Path Construction and Culvert Replacement Project, which involves adding a 10-foot wide multi-use path along Clay Center Road, constructing curb ramps, creating a mid-block crossing at Brighton Avenue, and replacing existing triple 84" pipes with a new 64-foot, 19'x7' reinforced coated concrete box structure. While the form itself is blank and does not contain specific project details, it serves as an administrative tool for managing potential minor modifications during the project's implementation, ensuring clear communication and documentation of any changes to the original contract specifications.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| 22-ENG-15_Construction_Plans_Addendum_2_Added.pdf | ||
| BID_BOND.pdf | ||
| 22-ENG-15_Technical_Specifications_Addendum_2_Added.pdf | ||
| Clay_Center_Road_Path_Construction_and_Culvert_Replacement_Project_(Addendum_#1_Revision).pdf | ||
| PERFORMANCE_BOND.pdf | ||
| SAMPLE_AGREEMENT.pdf | ||
| SUBCONTRACTORS_LIST.pdf | ||
| NON_COLLUSION_AFFIDAVIT.pdf | ||
| CONTRACT_CHANGE_ORDER.pdf | ||
| CONTRACT_CHANGE_REQUEST.pdf | ||
| MAINTENANCE_BOND.pdf | ||
| MANUFACTURERS_LIST.pdf | ||
| REQUEST_FOR_PROPOSAL_CHANGE.pdf | ||
| SAMPLE_OF_MOU_FOR_E-VERIFY.pdf | ||
| Exhibit_D_E-Verify-1.PDF | ||
| PAYMENT_BOND.pdf | ||
| RIGHT_OF_ENTRY.pdf | ||
| SCREENSHOT_INSTRUCTIONS_-_FOR_BIDS.pdf | ||
| WORK_DIRECTIVE_CHANGE.pdf | ||
| 6._Comprehensive_Set_of_Technical_Specifications_2021-04-28_(V2.7).docx | DOCX document |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF CARMEL
OWNER: CITY OF CARMEL
FIELD ORDER NUMBER
DATE:
PROJECT NAME:
PROJECT NO:
You are hereby directed to execute promptly this Field Order which interprets the Contract Documents or orders minor changes in the Work without change in Contract Price or Contract Time.
If you consider that a change in Contract Price or Contract Time is required, please submit your itemized proposal to the ENGINEER immediately and before proceeding with this Work. If your proposal is found to be satisfactory and in proper order, this Field Order will in that event be superseded by a Change Order.
Description:
Attachments:
ENGINEER:
Approved By: _______________________________________ Owners Representative
Date: ___________________________________
File details come from the government source that posted it. Updated .