MANUFACTURERS_LIST.pdf
PDF 59 KB Posted
- Attached to
- Clay Center Road Path Construction and Culvert Replacement Project State and local contract opportunity
- Solicitation number
- 22-ENG-15
- Issued by
- Hamilton County, Indiana
About this file
The document is a Manufacturers List form for the Clay Center Road Path Construction and Culvert Replacement Project, issued by the City of Carmel, Hamilton County, Indiana. The form provides instructions to bidders regarding the specification of equipment manufacturers for the project. Bidders are required to enter the name of one manufacturer for each listed equipment item, with the understanding that failure to do so may render the bid non-responsive. Upon contract award, each listed equipment item must be furnished by the named manufacturer, with equipment substitutions permitted only with prior owner consent.
The document emphasizes that preliminary acceptance of equipment by manufacturer name does not waive the drawing and specification requirements. Acceptance will be based on full conformity with the project's drawings and specifications. The form provides a table for bidders to list equipment items and their corresponding manufacturers, ensuring transparency and standardization in the equipment selection process for the Clay Center Road Path Construction and Culvert Replacement Project.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| 22-ENG-15_Technical_Specifications_Addendum_2_Added.pdf | ||
| 22-ENG-15_Construction_Plans_Addendum_2_Added.pdf | ||
| BID_BOND.pdf | ||
| Clay_Center_Road_Path_Construction_and_Culvert_Replacement_Project_(Addendum_#1_Revision).pdf | ||
| CONTRACT_CHANGE_ORDER.pdf | ||
| CONTRACT_CHANGE_REQUEST.pdf | ||
| MAINTENANCE_BOND.pdf | ||
| REQUEST_FOR_PROPOSAL_CHANGE.pdf | ||
| SAMPLE_OF_MOU_FOR_E-VERIFY.pdf | ||
| PERFORMANCE_BOND.pdf | ||
| SAMPLE_AGREEMENT.pdf | ||
| SUBCONTRACTORS_LIST.pdf | ||
| FIELD_ORDER.pdf | ||
| NON_COLLUSION_AFFIDAVIT.pdf | ||
| Exhibit_D_E-Verify-1.PDF | ||
| PAYMENT_BOND.pdf | ||
| RIGHT_OF_ENTRY.pdf | ||
| SCREENSHOT_INSTRUCTIONS_-_FOR_BIDS.pdf | ||
| WORK_DIRECTIVE_CHANGE.pdf | ||
| 6._Comprehensive_Set_of_Technical_Specifications_2021-04-28_(V2.7).docx | DOCX document |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MANUFACTURERS LIST
Instructions To Bidders:
The Bidder shall enter, in the spaces provided below, the name of the manufacturer of equipment that the Bidder proposes to furnish for each item of equipment listed in the Manufacturers List which follows. The Bidder shall enter the name of only one manufacturer for each listed equipment item. Failure to enter a manufacturer’s name for each listed equipment item may render the Bid non-responsive if it is determined that such omission is material by affording the Bidder a substantial advantage over other Bidders.
Upon award of a contract, each listed equipment item shall be furnished by the named manufacturer, unless changes are specifically authorized. Equipment substitutions will be permitted only with the OWNER’s prior consent.
Preliminary acceptance of equipment listed by the manufacturer’s name shall not in any way constitute a waiver of the Drawing and Specification requirements covering such equipment. Acceptance will be based on full conformity with the Drawings and Specifications covering the equipment.
Equipment Item (Contract Items) Manufacturer
File details come from the government source that posted it. Updated .