ATTACHMENT_15 _QASP.docx

DOCX document 37 KB Posted

Attached to
ARNG Recruit Sustainment Program Support Services Federal contract opportunity
Solicitation number
W9133L-16-R-0008
Issued by
Department of the Army National Guard Readiness Center

About this file

Quality Assurance Surveillance Plan

View the file

Other files for this federal contract opportunity

Other files attached to ARNG Recruit Sustainment Program Support Services, newest first.
File Type Posted
Amendment_Six_-_Questions_and_Answers.xlsx XLSX spreadsheet
Answers_to_Vendor_Questions.xlsx XLSX spreadsheet
RSP_Solicitation.docx DOCX document
ATTACHMENT_16 _Current_FY15_RSP_Staffing.xlsx XLSX spreadsheet
Offeror_Questions_-_Government_Responses_for_RSP.xlsx XLSX spreadsheet
ATTACHMENT_10 HIPPA-QC_Associate_Agreement.docx DOCX document
ATTACHMENT_16 _Current_FY15_RSP_Staffing.xlsx XLSX spreadsheet
ATTACHMENT_12 _RMS_Users_Guides.pdf PDF
ATTACHMENT_4 _VULCAN.pdf PDF
ATTACHMENT_11 _Retention_Leader_Guide.pdf PDF
ATTACHMENT_14 _Past_Performance_Questionnaire.docx DOCX document
Released_Solicitation_W9133L-16-R-0008.pdf PDF
ATTACHMENT_2 _RSP-QC_Shipper_Packet_Checklist.pdf PDF
ATTACHMENT_3 _DPRO_QuickGuide.pdf PDF
ATTACHMENT_9 _National_GC_Shipper_QC_Report.pdf PDF
ATTACHMENT_13 _Price_Proposal_Matrix_.xlsx XLSX spreadsheet
ATTACHMENT_1 _RSP_Leader_Guide_Version_5_Draft_(7_OCT_15).pdf PDF
ATTACHMENT_6 _Retention_notes_REDACTED.pdf PDF
ATTACHMENT_8 _Sample_QUICK_FACTS_REPORT.pdf PDF
ATTACHMENT_5 _REQUEST.pdf PDF
ATTACHMENT_7 _RSP_Redacted_Disposition_Report.pdf PDF
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

Recruit Sustainment Program (RSP)

QUALITY ASSURANCE SURVEILLANCE PLAN

(QASP)

INTRODUCTION

This quality assurance surveillance plan (QASP) is pursuant to the requirements listed in the performance work statement (PWS) entitled Recruit Sustainment Program (RSP) Support Contract. This plan sets forth the procedures and guidelines the Government will use in ensuring the required performance standards or services levels are achieved by the contractor.

Purpose The purpose of the QASP is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the performance standards/quality levels identified in the PWS and the Contractor’s quality control plan (QCP), and to ensure that the government pays only for the level of services received.

This QASP defines the roles and responsibilities of all members of the integrated project team (IPT), identifies the performance objectives, defines the methodologies used to monitor and evaluate the contractor’s performance, describes quality assurance documentation requirements, and describes the analysis of quality assurance monitoring results.

Performance Management Approach The PWS structures the acquisition around “what” service or quality level is required, as opposed to “how” the contractor should perform the work (i.e., results, not compliance). This QASP will define the performance management approach taken by the government (NGB/GSS) to monitor and manage the contractor’s performance to ensure the expected outcomes or performance objectives communicated in the PWS are achieved. Performance management rests on developing a capability to review and analyze information generated through performance assessment. The ability to make decisions based on the analysis of performance data is the cornerstone of performance management; this analysis yields information that indicates whether expected outcomes for the project are being achieved by the contractor.

Performance management represents a significant shift from the more traditional quality assurance (QA) concepts in several ways. Performance management focuses on assessing whether outcomes are being achieved and to what extent. This approach migrates away from scrutiny of compliance with the processes and practices used to achieve the outcome. A performance-based approach enables the contractor to play a large role in how the work is performed, as long as the proposed processes are within the stated constraints. The only exceptions to process reviews are those required by law (federal, state, and local) and compelling business situations, such as safety and health. A “results” focus provides the contractor flexibility to continuously improve and innovate over the course of the contract as long as the critical outcomes expected are being achieved and/or the desired performance levels are being met.

Performance Management Strategy The contractor is responsible for the quality of all work performed. The contractor measures that quality through the contractor’s own quality control (QC) program. QC is work output, not workers, and therefore includes all work performed under this contract regardless of whether the work is performed by contractor employees or by subcontractors. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. The contractor will develop and implement a performance management system with processes to assess and report its performance to the designated government representative. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. This QASP enables the government to take advantage of the contractor’s QC program.

1.3.2 The government representative(s) will monitor performance and review performance reports furnished by the contractor to determine how the contractor is performing against communicated performance objectives. The contractor will be responsible for making required changes in processes and practices to ensure performance is managed effectively.

ROLES AND RESPONSIBILITIES

The Contracting Officer The Contracting Officer (KO) is responsible for monitoring contract compliance, contract administration, and cost control and for resolving any differences between the observations documented by the KO and the contractor. The KO will designate one full-time Per appointment memorandum as the government authority for performance management. The number of additional representatives serving as technical inspectors depends on the complexity of the services measured, as well as the contractor’s performance, and must be identified and designated by the KO.

METHODOLOGIES TO MONITOR PERFORMANCE

Surveillance Techniques In an effort to minimize the performance management burden, simplified surveillance methods shall be used by the government to evaluate contractor performance when appropriate. The primary methods of surveillance are (include those that apply)

· Random monitoring, which shall be performed by the COR designated inspector. Each of the outstate locations will be assigned a National Guard representative to conduct this monitoring, per the appointment memorandum assigned to each duty location.

· 100% Inspection – Each month, the COR or designated representative, shall review the generated documentation and enter summary results into the Surveillance Activity Checklist.

· Periodic Inspection – COR or designated representative, typically performs the periodic inspection on a monthly basis.

Customer Feedback The contractor is expected to establish and maintain professional communication between its employees and customers. The primary objective of this communication is customer satisfaction. Customer satisfaction is the most significant external indicator of the success and effectiveness of all services provided and can be measured through customer complaints.

Performance management drives the contractor to be customer focused through initially and internally addressing customer complaints and investigating the issues and/or problems but the customer always has the option to communicate complaints to the as opposed to the contractor.

Customer complaints, to be considered valid, must set forth clearly and in writing the detailed nature of the complaint, must be signed, and must be forwarded to COTR/COR or designated representative, will accept those customer complaints and investigate using the Quality Assurance Monitoring Form – Customer Complaint Investigation, identified in Attachment 2.

Customer feedback may also be obtained either from the results of formal customer satisfaction surveys or from random customer complaints.

Acceptable Quality Levels The acceptable quality levels (AQLs) included in Attachment 1, Performance Requirements Summary Table, for contractor performance are structured to allow the contractor to manage how the work is performed while providing negative incentives for performance shortfalls. For certain critical activities such as those involving monthly reporting, the desired performance level is established at 100 percent. Other levels of performance are keyed to the relative importance of the task to the overall mission performance at the National Guard Bureau/ GSS.

QUALITY ASSURANCE DOCUMENTATION

The Performance Management Feedback Loop The performance management feedback loop begins with the communication of expected outcomes. Performance standards are expressed in the PWS and are assessed using the performance monitoring techniques shown in Attachment 1.

Monitoring Forms The government’s QA surveillance, accomplished by the COTR/COR or designated representative will be reported using the monitoring forms in Attachments 2. The forms, when completed, will document the government’s assessment of the contractor’s performance under the contract to ensure that the required results Low Density recruit numbers are being achieved.

The COTR/COR or designated representative will retain a copy of all completed QA surveillance forms.

ANALYSIS OF QUALITY ASSURANCE ASSESSMENT

Determining Performance Government shall use the monitoring methods cited to determine whether the performance standards/service levels/AQLs have been met. If the contractor has not met the minimum requirements, it may be asked to develop a corrective action plan to show how and by what date it intends to bring performance up to the required levels Reporting At the end of each month, the Contractor will prepare a written report for the COR summarizing the overall results of the quality assurance surveillance of the contractor’s performance. This written report, which includes the contractor’s submitted monthly report per the PWS and the completed quality assurance monitoring forms (Attachment 2), will become part of the QA documentation. It will enable the government to demonstrate whether the contractor is meeting the stated objectives and/or performance standards, including cost/technical/scheduling objectives.

Reviews and Resolution The COR or designated representative may require the contractor’s project manager, or a designated alternate, to meet with the COTR/COR or designated representative and other government IPT personnel as deemed necessary to discuss performance evaluation. The COR will define a frequency of in-depth reviews with the contractor, including appropriate self-assessments by the contractor; however, if the need arises, the contractor will meet with the COR, COTR, ACO, QAR, or PM as often as required or per the contractor’s request. The agenda of the reviews may include:

· Monthly performance assessment data and trend analysis

· Issues and concerns of both parties

· Projected outlook for upcoming months and progress against expected trends, including a corrective action plan analysis

· Recommendations for improved efficiency and/or effectiveness

The COR must coordinate and communicate with the contractor to resolve issues and concerns regarding marginal or unacceptable performance.

The COR and contractor should jointly formulate tactical and long-term courses of action. Decisions regarding changes to metrics, thresholds, or service levels should be clearly documented. Changes to service levels, procedures, and metrics will be incorporated as a contract modification at the convenience of the PCO/ACO.

ATTACHMENT 1: PERFORMANCE REQUIREMENTS SUMMARY

Performance Requirements Summary This Performance Requirements Summary includes performance standards. The Government will use these standards to determine Contractor performance and shall compare Contractor performance to the Acceptable Quality Level (AQL).

PWS Para. Ref.
Task
Performance Standard
Acceptable Quality Levels (AQL)
Surveillance Method, Frequency, and by Whom
1.4.8
Conduct a Post-Award / kickoff meeting
Shall attend within 2 days of award
Shall attend within 3 days of award
100%, once by COR/KO
1.4.5.6
Contractor shall submit certificates of completion for each affected Contractor employee and subcontractor employee
Training within 29 calendar days of their reporting for duty and annually thereafter. The Contractor shall submit certificates of completion for each affected Contractor employee and subcontractor employee, within 14 calendar days after completion of training
Training within 30 calendar days of their reporting for duty and annually thereafter. The Contractor shall submit certificates of completion for each affected Contractor employee and subcontractor employee, within 15 calendar days after completion of training
100% Inspection by COR
1.4.14
Contractor shall adhere to the Transition Plan
Fill all positions within 12 days of contract award. Contractor shall have personnel available during the phase-out for 30 days.
Fill all positions within 15 days of contract award. Contractor shall have personnel available during the phase-out for 35 days.
100%, during phase-out period by the COR.
5.0
Contractor shall ensure all Shipper Packets are compliant and Contractor shall scan and upload Shipper Packets into Vulcan
Contractor shall be held to the performance standard set in the Shipper Packet Accuracy Performance Matrix in Section 5.0
Contractor shall be held to the performance standard set in the Shipper Packet Accuracy Performance Matrix in Section 5.0
Periodic inspection and monthly, by the COR using DPRO.
5.1.1
Contract shall use Vulcan to address and fix Trouble Tickets
Contractor shall be held to the performance standard set in the Shipper Packet Accuracy Performance Matrix in Section 5.1.1
Contractor shall be held to the performance standard set in the Shipper Packet Accuracy Performance Matrix in Section 5.1.1
Periodic inspection and monthly, by the COR using DPRO.
5.2- 5.7, 5.8.4, 5.10, 5.11,
Contractor shall provide MSR
MSR shall be submitted for approval to the COR via email by the 4th of each Month.
MSR shall be submitted for approval to the COR via email by the 4th of each Month.
100%, monthly by the COR
5.3
Contractor shall communicate with the Initial Active Duty Training (IADT) Manager, MEPS Guidance Counselor (GC) and ARNG-LNO
Contractor shall be held to the performance standard set in the Shipper Packet Accuracy Performance Matrixes in Section 5.0, 5.1.1, and 5.17
Contractor shall be held to the performance standard set in the Shipper Packet Accuracy Performance Matrixes in Section 5.0, 5.1.1, and 5.17
Periodic inspection and monthly, by the COR using DPRO.
5.4
Contractor shall work state/territory RRC, and the RSP Commanders and RSP Cadre
Contractor shall be held to the performance standard set in the Shipper Packet Accuracy Performance Matrixes in Section 5.0, 5.1.1, and 5.17
Contractor shall be held to the performance standard set in the Shipper Packet Accuracy Performance Matrixes in Section 5.0, 5.1.1, and 5.17
Periodic inspection and monthly, by the COR using DPRO.
5.5
The Contractor shall document any quality assurance plan activities.
For data collected, track, and uploaded, the Contractor shall be held to the performance standard set in the Shipper Packet Accuracy Performance Matrixes in Section 5.0, 5.1.1, and 5.17.

For data that is analyze and provided to the Government, the documents shall be 99% accurate, complete and submitted in a timely manner.

For data collected, track, and uploaded, the Contractor shall be held to the performance standard set in the Shipper Packet Accuracy Performance Matrixes in Section 5.0, 5.1.1, and 5.17.

For data that is analyze and provided to the Government, the documents shall be 98% accurate, complete and submitted in a timely manner.

Periodic inspection and monthly by the COR using DPRO and Vulcan

5.6
Contractor shall use ATRRS and shall email a State’s RRC and/or the RSP Commander for any recruit’s status change(s) and then update the recruit file in Vulcan.
Contractor shall adhere to this task 99%, provide emails to RRC and/or RSP Commander and update Vulcan within 24 hours.
Contractor shall adhere to this task 98%, provide emails to RRC and/or RSP Commander and update Vulcan within 48 hours.
Periodic inspection monthly by COR using ATRRS.
5.7
Contractor shall use RSP Metrics to draft the Data Trend Report
In the MSR and shall be 99% accurate, complete and submitted in a timely manner
In MSR and shall be 98% accurate, complete and submitted in a timely manner.
Periodic inspection monthly by COR
5.8.1
Contractor shall update Vulcan’s Ship Date Management tab
99.5% of the Ship date requests shall be accurate, complete and submitted in a timely manner
99% of the Ship date requests shall be accurate, complete and submitted in a timely manner
Periodic inspection from reports sent by State RSP Cadre to the COR
5.8.2
Contractor shall monitor Vulcan for Ship Date Management requests and email Ship Date Management Roster to the COR
99.5% of the Ship date requests shall be accurate, complete and submitted in a timely manner
99% of the Ship date requests shall be accurate, complete and submitted in a timely manner
Periodic inspection from reports sent by State RSP Cadre to the COR
5.8.3
Contractor shall use REQUEST and Contractor will then create a Ship Recommendation Report
99.5% of the Ship date requests shall be accurate, complete and submitted in a timely manner
99% of the Ship date requests shall be accurate, complete and submitted in a timely manner
Periodic inspection from reports sent by State RSP Cadre to the COR
5.8.4
After approval, the Contractor shall reserve the approved new ship date and provide a summary
99.5% of the Ship date requests shall be accurate, complete and submitted in a timely manner
99% of the Ship date requests shall be accurate, complete and submitted in a timely manner
Periodic inspection from reports sent by State RSP Cadre to the COR
5.9.1
Contractor shall conduct statistical and trends analysis using DPRO and RMS and provide reports.
Contractor shall adhere to this task 99%. The National Retention Notes Report shall be provided by MONDAY 3:00 PM EST. The State Retention Notes Report shall be provided with 24 hours. Both reports shall be 99% shall be accurate, complete and submitted in a timely manner
Contractor shall adhere to this task 98%. The National Retention Notes Report shall be provided by MONDAY 4:00 PM EST. The State Retention Notes Report shall be provided with 48 hours. Both reports shall be 98% shall be accurate, complete and submitted in a timely manner
Periodic inspection monthly by COR RMS and DPRO.
5.9.2
Contractor shall create and provide a State specific Quick Facts Report.
The report is routinely requested by the Government 4-5 times each week and shall be 99% shall be accurate, complete and submitted in a timely manner
The report is routinely requested by the Government 4-5 times each week and shall be 98% accurate, complete and submitted in a timely manner
Requested by the COR and shall be provided within three (3) hours
5.10
Contractor shall follow the terms of the Quality Assurance Plan
Shall document all QAP activities, e.g. periodic inspections of subordinates on site visits, any deficiencies, and mitigation’s and the report findings to the COR in the MSR and shall be 99% shall be accurate, complete and submitted in a timely manner.
Shall document all QAP activities, e.g. periodic inspections of subordinates on site visits, any deficiencies, and mitigation’s and the report findings to the COR in the MSR and shall be 98% shall be accurate, complete and submitted in a timely manner.
Reported to COR immediately via email or phone call.
5.11
Contractor shall draft and maintain the Monthly Disposition Report
The report shall be in an Excel document using data retrieved from the VULCAN reports tab and shall be 99% shall be accurate, complete and submitted in a timely manner
The report shall be in an Excel document using data retrieved from the VULCAN reports tab and shall be 98% shall be accurate, complete and submitted in a timely manner
Provided to the COR as an attachment to the MSR.
5.12
Contractor shall create and provide a State specific Quick Facts Report.
The report is routinely requested by the Government 4-5 times each week and shall be 99% accurate, complete and submitted in a timely manner.
The report is routinely requested by the Government 4-5 times each week and shall be 98% accurate, complete and submitted in a timely manner.
Requested by the COR and shall be provided within three (3) hours
5.13
Contractor shall create and provide the National GC Shipper QC Report.
Report is created using data from VULCAN and shall be 99% accurate, complete and submitted in a timely manner
Report is created using data from VULCAN and shall be 98% accurate, complete and submitted in a timely manner
Shall be emailed to COR monthly NLT the 14th.
5.14
Contractor shall hold a RSP Weekly Conference Call and provide a RSP Weekly Conference Call Agenda.
Phone conference shall be held each Monday at 1:00 PM EST, except Federal holidays in which it shall be held the next business day. The call shall be held using a conference call service that includes access via a phone number, identification number, and PIN. The agenda shall be provided NLT 10:00 AM EST prior to the call.
Phone conference shall be held each Monday at 1:00 PM EST, except Federal holidays in which it shall be held the next business day. The call shall be held using a conference call service that includes access via a phone number, identification number, and PIN. The agenda shall be provided NLT 10:00 AM EST prior to the call.
An email shall be sent to the COR prior to the call and provide all necessary contact information and the agenda.
5.15
Contractor shall hold a RSP Quarterly SYNC Meetings (SYNC Meetings) between the Government and the Contractor and provide an RSP Quarter SYNC Meetings Agenda.
The SYNC meetings shall occur within the first two weeks of each quarter at locations determined by the Contractor and approved by the COR. The agenda shall be provided NLT 20 days from scheduled date of SYNC meeting.
The SYNC meetings shall occur within the first two weeks of each quarter at locations determined by the Contractor and approved by the COR. The agenda shall be provided NLT 30 days from scheduled date of SYNC meeting.
100% Inspection by the COR
5.16
Contractor shall draft and maintain an RSP Contact Roster.
The roster shall be 99% accurate, complete and submitted in a timely manner
The roster shall be 98% accurate, complete and submitted in a timely manner
100% Inspection by the COR
5.17
Contractor shall handle provided estimate numbers and surge requirement.
Contractor shall be held to the performance standard set in the Shipper Packet Accuracy Performance Matrixes in Section 5.0, 5.1.1, and 5.17
Contractor shall be held to the performance standard set in the Shipper Packet Accuracy Performance Matrixes in Section 5.0, 5.1.1, and 5.17
Periodic Inspection by COR
5.18
Contractor shall provide 10 questions at Post-Award Meeting
At Post-Award Meeting
Day after Post-Award Meeting
100% inspection by KO/COR.
5.19
Contractor shall be ready and able to provide ad hoc reports (electronically)
Contractor shall be ready and able to provide ad hoc reports to the Government via email and shall be within the allowable labor hours (8), otherwise to be negotiated with the KO prior to work being done on such reports. Historically, ad hoc reports are provided at the rate of five reports per month. Ad Hoc reports shall be 99% accurate, complete and submitted in a timely manner
Contractor shall be ready and able to provide ad hoc reports to the Government via email and shall be within the allowable labor hours (8), otherwise to be negotiated with the KO prior to work being done on such reports. Historically, ad hoc reports are provided at the rate of five reports per month. Ad Hoc reports shall be 98% accurate, complete and submitted in a timely manner
Periodic Inspection by COR
5.24
CMRA
100% Compliance
100% Compliance
100% Inspection by COR

ATTACHMENT 2: QUALITY ASSURANCE

MONITORING FORM

SERVICE or STANDARD:

SURVEY PERIOD:

SURVEILLANCE METHOD (Check):

Random Sampling 100% Inspection Periodic Inspection Customer Complaint LEVEL OF SURVEILLANCE (Check):

MonthlyQuarterlyAs needed
PERCENTAGE OF ITEMS SAMPLED DURING SURVEY PERIOD:______ %

ANALYSIS OF RESULTS:

Observed Service Provider Performance Measurement Rate: ______%

Service Provider’s Performance (Check):Meets Standards
Does Not Meet Standards

Narrative of Performance During Survey Period:

PREPARED BY: ___________________________________ DATE: _________________

File details come from the government source that posted it. Updated .