This document appears to be a Solicitation related to the Dredging, Cape Cod Canal and Sandwich Beaches Shore Damage Mitigation project. The U.S. Army Corps of Engineers, New England District is issuing an Invitation for Bids for this construction project located in Sandwich, Massachusetts. The work involves hydraulically dredging approximately 320,300 CY of sand from the Scussett Beach Borrow Area and pumping it directly onto Town Neck Beach via a 9,000-foot pipeline. The dredged material must be spread, shaped, and graded to meet the required beach berm and dune profile. The estimated construction cost is $5,000,000 to $10,000,000, with an anticipated 5-month period of performance. A production rate of 110,000 CY per month is required to complete the work within the designated dredging window of October 1, 2024 to March 15, 2025. The NAICS code is 237990 with a size standard of $37M, and the solicitation is unrestricted. The successful offeror will be required to provide all necessary equipment and materials for the dredging and beach placement operations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Abstract.pdf | ||
| Amendment 0004_G-002_Rev1.pdf | ||
| Amendment 0004.pdf | ||
| Amendment 0004_Scusset_Borrow_Site_Sampling.pdf | ||
| Amendment 0002_eelgrass_combined.zip | ZIP file | |
| Amendment 0003.pdf | ||
| Amendment 0002.pdf | ||
| CZM Federal Consistency Review.pdf | ||
| OFFICIAL AMENDMENT 0001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Maura T. Healey Governor
Kimberley Driscoll Lieutenant Governor
Rebecca L. Tepper Secretary
Bonnie Heiple Commissioner
This information is available in alternate format. Please contact Melixza Esenyie at 617-626-1282.
TTY# MassRelay Service 1-800-439-2370 MassDEP Website: www.mass.gov/dep
Printed on Recycled Paper
July 18, 2024
Jordan Macy DEP WQC AUTHORIZATION # New England District Army Corps of Engineers 24-WW07-0002-APP Department of the Army 401 WQC Application Completion on 696 Virginia Road 5/30/2024 Concord, MA 01742-2751
RE: Application for: BRP WW 07 - 401 WATER QUALITY CERTIFICATION FOR
DREDGING - MAJOR PROJECT
AT: Cape Cod Canal Section 111 Shore Damage Mitigation Project Cape Cod Drainage Basin and South Coastal Drainage Area
Dear Mr. Macy:
The Department of Environmental Protection (“MassDEP”) has reviewed your application for a 401 Water Quality Certification for Major Dredging, as referenced above and is basing its certification upon an evaluation of the information contained in the application which is relevant to water quality considerations. In accordance with the provisions of Section 401 of the Federal Clean Water Act (33 U.S.C. § 1251 et seq.), M.G.L. c. 21, §§ 26-53, and 314 CMR 9.00, MassDEP has determined there is reasonable assurance the project or activity, as conditioned herein, will be conducted in a manner which will not violate applicable water quality standards (314 CMR 4.00) and other appropriate requirements of state law.
The waters off of the Scusset Beach borrow area which is part of the South Coastal Drainage Area, and waters off of the Town neck Beach placement areas which is part of the Cape Cod Drainage Basin are designated in the Massachusetts Surface Water Quality Standards as SB. These waters are designated as a “habitat for fish, other aquatic life and wildlife, and for primary and secondary contact recreation”. Anti-degradation provisions of these Standards require that “existing uses and the level of water quality necessary to protect the existing uses shall be maintained and protected.”
The above-referenced project involves the dredging of approximately 327,000 to 387,000 cubic yards (cy) of sediment from a nearshore burrow area off of Scusset Beach and the
Cape Cod Canal Section 111 Shore Damage Mitigation Project
401 WQC 24-WW07-0002-APP
beneficial reuse as nearshore and beach nourishment material at the town-owned beach in Sandwich, Massachusetts (Town Neck Beach). Beneficial use of the dredged material for placement and construction of an engineered dune and beach berm at Town Neck Beach will allow the sand to stay in the littoral system and will build a beach profile protect public and private property, infrastructure, and an expansive saltmarsh system located behind the beach.
As identified in the April 12, 2023 letter from the Massachusetts Division of Marine Fisheries (DMF) to the United States Army Corp of Engineers and the Environmental Assessment prepared by Army Corps of Engineers dated February 20231,2, the project is located near three separate areas which have been mapped as containing eelgrass (Zostera marina). Eelgrass beds provide one of the most productive habitats for numerous marine species and are designated “special aquatic sites” under the Federal Clean Water Act 404(b) (1) guidelines. Eelgrass has been mapped adjacent to the nearshore and beach nourishment placement area at the Town Neck Beach. Conditions 14 through 17 below discuss eelgrass survey, documentation, and mitigation requirements related to protection for the existing bed located adjacent to the nearshore and beach nourishment (disposal of dredged material) area at the Town Neck Beach.
Sediment Chemistry Results: The United States Army Corp of Engineers (USACE) developed a project-specific sampling and analysis plan which was conducted as part of the Suitability Evaluation and the project Environmental Assessment. The USACE collected sediment grab samples at ten locations within the burrow site dredge area for grain size analysis.
The sediment of the dredge area is characterized as predominately poorly graded, fine to coarse sand material. Materials sampled from the proposed placement locations was likewise found to be sand or sand and gravels materials. A suitability evaluation was provided by USACE, which concluded that the dredge sediment was compatible/suitable composition for placement and beneficial reuse as nearshore and beach nourishment at the Town Neck Beach in Sandwich, MA,3.
Additional Protective Measures: The USACE claims sovereign immunity with respect to dredging activities.4 However, MassDEP strongly recommends that conditions provided below for the disposal of dredged material also be followed (when applicable) for the
1 Letter from Daniel McKiernan, Massachusetts Division of Marine Fisheries to Michael Riccio, USACOE, dated
March 31, 2021.
2 Letter from Timithy Timmermann, US Environmental Protection Agency, to John Kennelly, to USACOE, dated
April 9, 2021.
3 Email from Paula Kulberg, US Army Corp of Engineers, to Phillip Nimeskern, US Army Corp of Engineers, dated
June 23, 2016.
4 The scope of sovereign immunity regarding state regulation of the proposed activity has not been definitively resolved. The Department does not address this issue at this time and reserves all rights to assert jurisdiction on future projects.
proposed dredging activity to be conducted to prevent degradation to wetlands and waters of the Commonwealth and to maintain the chemical, physical, and biological integrity of the water resources of the Commonwealth.
MassDEP requests that a bathymetric survey of the burrow site depicting post-dredge conditions be conducted following the completion of the dredging. At a minimum, the survey should include an overlay of the dredge footprint (i.e., top of slope) with sufficient coordinates in the Massachusetts State Plane (e.g., longitude and latitude) to clearly delineate the dredge footprint.
Every effort should be made to limit dredge vessel and/or barge overflow at dredge site and within waters of the Commonwealth.
Public Notice: The application public notice was published in the Sandwich Enterprise on February 9, 2024. No comments were received by MassDEP during the 21-day public comment period pursuant to 314 CMR 9.05(3)(e), which ended on March 1, 2024.
Section 61 Findings: As the Applicant, the USACE did not prepare an Environmental Notice (ENF) or Environmental Impact Report (EIR) in accordance with M.G.L. .c 30, §§ 61 to 62H including (MEPA). Rather, the USACE prepared a Draft Finding of No Significant Impact and Environmental Assessment (March 2021) as required under the National Environmental Policy Act.
Therefore, based on information currently in the record, MassDEP grants a 401 WQC for this project subject to the following conditions to maintain or attain water quality, to minimize any damage to the environment that may result from the project, and to ensure compliance with appropriate provisions of state law.
MassDEP certifies that there is reasonable assurance the project or activity, as conditioned herein, will be conducted in a manner which will not violate applicable water quality standards (314 CMR 4.00) and other appropriate requirements of state law.
1. Pursuant to 314 CMR 9.01(3), the Contractor shall take all steps necessary to assure that the proposed activities will be conducted in a manner that will avoid violations of the anti-degradation provisions of the Massachusetts Surface Water Quality Standards (314 CMR 4.00) that protect all waters, including wetlands. This condition is necessary to assure that any discharge from the project complies with the Massachusetts Surface Water Quality Standards, as provided in 314 CMR 9.00, to protect the public health and restore and maintain the chemical, physical, and biological integrity of the water resources of the Commonwealth.
2. Prior to the start of work, or for any portion of the work thereafter, MassDEP shall be notified of any change(s) in the proposed project or plans that may affect waters or wetlands. MassDEP will determine whether the change(s) requires a revision to this Certification. This condition, pursuant to 314 CMR 9.07(1) and 314 CMR 9.09(2), is necessary to protect the public health and restore and maintain the chemical, physical, and biological integrity of the water resources of the Commonwealth.
3. As provided by 314 CMR 9.09(1), disposal of dredged material in accordance with this Certification may begin following the 21-day appeal period and once all other permits have been received. This condition is necessary to protect the public health and restore and maintain the chemical, physical, and biological integrity of the water resources of the Commonwealth.
4. Pursuant to 314 CMR 9.05(1), all work shall be performed in accordance with the following documents and plans. This condition is necessary as these documents outline how the execution of the project will meet the criteria of 314 CMR 9.07 and thereby protecting water quality and preventing degradation to wetlands and waters.
• Application for Permit, Accela Application #24-WW07-0002-APP, dated January 29, 2024, with attachments, and additional attachments and revisions provided through May 30, 2024.
• “Environmental Assessment, DRAFT, Finding of No Significant Impact, Cape Cod Canal & Sandwich Beaches Study, Section 111 Shore Damage Mitigation Study, Sandwich, Massachusetts,” dated March 2021, prepared by Army Corps of Engineers.
• Plans entitled:
- “Beach Nourishment Project, Town Neck Beach, Sandwich, Massachusetts,” consisting of 10 sheets, various scales, dated June 2024, prepared by U.S. Army Corps of Engineers, New England District.
MassDEP shall be notified if there are modifications and or deletions of work as specified in the plans. Depending on the nature and the scope of any change, approval by the Department may be required.
Note that the document below shall be followed to extent that they pertain to the disposal of dredged material:
• Letter from Thomas W. French, MA Division of Fisheries & Wildlife (DFW) Natural Heritage & Endangered Species Program (NHESP), to the Town of Sandwich Town Manager and Sandwich Conservation Commission, dated December 12, 2014.
5. As provided by 314 CMR 9.05(4), the Department shall be notified, attention
Kenneth Alepidis (kenneth.alepidis@mass.gov), one week prior to the start of in-water work so that Department staff may inspect the work for compliance with the terms and conditions of this Certification. This condition is necessary to ensure that construction practices are implemented in such a manner as to prevent degradation to wetlands and waters of the Commonwealth.
6. Pursuant to 314 CMR 9.05(4), the applicant and its contractor shall allow agents of the
Department to enter the project sites to verify compliance with the conditions of this Certification. This condition is necessary to ensure that construction practices are implemented in such a manner as to prevent degradation to wetlands and waters of the Commonwealth.
7. Pursuant to 314 CMR 9.09(1), the term of the 401 WQC remains in effect for a 5 year period from the date of issuance. This condition is necessary to ensure that construction practices are implemented in such a manner as to prevent degradation to wetlands and waters of the Commonwealth.
8. The applicant, or its contractor, shall make every feasible effort to complete the project within the permitted timeframe. Should the applicant, or their contractor, fail to complete the project and wish to request an amendment to the Certification for incursion into the no-dredge related discharge period, the written request shall be received by MassDEP by March 2nd. The following information shall be included in the request:
a. project location and transmittal number,
b. the date on which dredging started,
c. the number of days and hours per day the dredge operated,
d. expected daily average production rate and the actual daily average production rate,
e. an explanation of why the project failed to remain on schedule,
f. an account of efforts made to get the project back on schedule,
g. a plan depicting the areas that remain to be dredged,
h. the number of cubic yards that remain to be dredged,
i. an accurate estimate of the number of days required to complete the project,
j. an evaluation of the impact of continued dredging on the species of concern,
k. a description of any efforts that will be made to minimize the impacts of the project on the species of concern, and a realistic assessment of any societal/financial effects of a denial of permission to continue dredging.
MassDEP will share the information with other resource agencies and a decision to grant or deny the amendment shall be made by March 15th. Requests for amendment received after March 2nd will be considered at MassDEP’s discretion. This condition is necessary to protect water quality because it ensures that the project proponent is using planning and construction practices that will maintain the integrity of the site hydrology and maintain the aquatic resource functions and values.
9. Nearshore and beach nourishment activities shall be carried out in accordance with the MassDEP Guide to Beach Nourishment Best Management Practices (March 2007), any procedures developed by the Massachusetts Office of Coastal Zone Management. Nearshore and beach fill material should be of appropriate slope and grain size to avoid premature loss from the beach and transport impacts to nearshore eelgrass beds. Beach nourishment and grooming equipment (e.g., excavator, delivery/dump truck) should be staged upland of intertidal habitat to minimize impacts and avoid compaction of sediment in mapped shellfish habitat.
10. Dredged material placed in accordance with 314 CMR 9.07(6) shall not be a solid waste and is not subject to 310 CMR 16.00: Site Assignment Regulations for Solid Waste Facilities and 19.000: Solid Waste Management. Pursuant to 314 CMR 9.07(6), this condition is necessary to ensure that the dredged material is reused properly and is of suitable quality to be placed in these locations.
11. Nearshore and beach nourishment activities shall not occur from April 1st through
August 31st. Pursuant to 314 CMR 9.07, this condition is necessary to avoid adverse impacts on Rare Species Habitat and the prohibited take of state-listed species, as detailed in the MA Endangered Species Act review conducted by the Division of Fisheries and Wildlife Natural Heritage and Endangered Species Program for the proposed beach nourishment site.5
12. In order to avoid impacts to threatened and endangered species, the eelgrass growing season, anadromous fish passage, and shellfish spawning season, in-water or silt producing work, including, but not limited to nearshore/beach nourishment placement, work shall occur from October 1 – March 15.6 Pursuant to 314 CMR 9.07(3)(d), this condition is necessary to protect water quality by ensuring that the project proponent is using planning and construction practices that will maintain the aquatic resource functions and values in accordance with recommendations by the Massachusetts Division of Marine Fisheries.
13. Daily inspection of the dredging activity and nearshore and beach nourishment placement activities at Town Neck Beach shall be conducted by the USACE or its contractor. If any material other than compatible beach nourishment material is observed, the applicant shall direct the dredging contractor to cease dredging operation and conduct an investigation regarding the nature of the to the suspected material. If the suspected material is determined to be incompatible as beach
5 Letter from Thomas W. French, MA Division of Fisheries & Wildlife (DFW) Natural Heritage & Endangered
Species Program (NHESP), to the Town of Sandwich Town Manager and Sandwich Conservation Commission, dated December 12, 2014.
6 Email correspondence from John Logan, Massachusetts Division of Marine Fisheries to Hannah Doherty, USACOE, dated March 28, 2024.
nourishment material, the applicant shall remove the suspect material and dispose it appropriately after consultation with the Department.
14. A pre- and post-dredging/construction eelgrass survey shall be conducted at the documented eelgrass bed present adjacent to the beach nourishment and nearshore placement areas to observe eelgrass bed location and conditions after disposal of dredged material is completed. The survey should be conducted according to MA DMF Eelgrass Survey Guidelines. The eelgrass surveys shall be depicted on a plan with a scale of 1 inch equaling 20 feet. The pre- and post-construction eelgrass data and map shall be submitted to MassDEP, MA Division of Marine Fisheries and MA Office of Coastal Zone Management with 60 days of the completion of the post-placement survey. This condition is necessary to protect water quality because it ensures that the project proponent is using planning and construction practices that will maintain the integrity of the project site and maintain the aquatic resource functions and values.
15. A minimum of 75-feet shall remain unaltered between the edge of eelgrass and the slope of the placement areas, unless otherwise approved by MassDEP, with the exception of the two isolated areas where eelgrass has been observed at project stationing 7+33 and 13+24. At the two isolated areas, a minimum of 25-feet shall remain unaltered between the edge of eelgrass and the slope of the placement areas.
16. If the results of the three year monitoring period indicate a loss of eelgrass or that an alteration has occurred resulting from the project at the beach nourishment and nearshore placement areas, the applicant shall develop and submit a proposed mitigation plan to MassDEP within 60 days of quantification of such alteration for review and written approval, and a copy of the proposed mitigation plan shall be submitted to MA Division of Marine Fisheries and MA Office of Coastal Zone Management for review and consultation. Upon receiving MassDEP’s written approval of the proposed mitigation plan, the USACE shall implement the approved mitigation plan in accordance with a schedule approved by MassDEP no later than two years after identification of the alteration, unless a different timeframe is requested by the USACE and is approved by MassDEP. The USACE may propose to amend the mitigation plan prior to project implementation if necessary. The amended plan needs to be approved by MassDEP. The obligation to develop a mitigation plan and/or perform mitigation activities as a component of this project is subject to the availability of funds remaining for the project that is within the federal $12.5M program limits established by Congress for Section 111 projects and in accordance with the Rivers and Harbors Act of 1968, as amended. USACE shall reserve $100,000 of the funds for this project for eelgrass mitigation. USACE shall work with DMF to use these funds. If there are remaining project funds after the monitoring period, those funds may be applied to the mitigation, in addition to the $100,000 reserved funds. Any additional funds are also subject to the federal program limit of $12.5M established by Congress for Section 111 projects, to develop and implement a mitigation plan acceptable to MassDEP, to the extent appropriate based on the amount of observed project impact to eelgrass.
17. The dredge vessel and/or barge shall never be anchored within the identified eelgrass habitat bordering the proposed dredging and nourishment placement sites.
There shall be no equipment (including pipes) placed within 25 feet of the edge of the eelgrass beds. Pursuant to 314 CMR 9.07(3), this condition is necessary to ensure that potential adverse effects to vegetated shallows are avoided.
18. Run-off from the sediment slurry after it is pumped onto Town Neck Beach shall be directed away from the eelgrass areas shown on the project plans located adjacent to the beach.
19. Pursuant to 314 CMR 9.06(6)(a)8., storing, servicing, or cleaning of equipment, including but not limited to fueling, changing, adding, or applying lubricants or hydraulic fluids, or washing/rinsing of trucks or equipment, shall be performed outside wetland resource areas. This condition ensures that no hazardous materials from equipment are inadvertently discharged into the water resource area in which construction is occurring, which would otherwise degrade water quality.
20. Pursuant to 314 CMR 9.06(6)(a)8., during the project period, there shall be no discharge or spillage of fuel, oil, or other pollutants, including sediments, onto any part of the site. The applicant shall take all reasonable precautions to prevent the release of pollutants by ignorance, accident, or vandalism. This condition is necessary to ensure that construction practices are implemented in such a manner as to prevent degradation to wetlands and waters.
21. The dredge vessel and/or barge shall not be allowed to ground. Pursuant to 314
CMR 9.06(6)(a)8., this condition is necessary to ensure that potential adverse effects to land under ocean are avoided.
22. Four weeks prior to commencement of dredging activity, the applicant shall submit a notification procedure outlining the reporting process to MassDEP for incidents relating to dredging activities that impact surrounding resource areas and habitats including, but not limited to, observed dead or distressed fish or other aquatic organisms, observed oily sheen on the surface of the water, a sediment spill, and a barge or equipment accident/spill. If at any time during implementation of the project such an incident occurs, the applicant shall immediately notify MassDEP and all site related activities impacting the water shall cease until the source of the problem is identified and adequate mitigating measures are deployed to the satisfaction of MassDEP. This condition is necessary to protect water quality because it ensures that the project proponent is using proper monitoring and construction practices that will maintain the aquatic resource functions and values.
23. Upon completion of the project, remnants of project debris shall be removed and disposed of appropriately at an offsite facility.
Failure to comply with this 401 WQC is grounds for enforcement, including civil and criminal penalties, under M.G.L. c. 21, § 42, 314 CMR 9.00, M.G.L. c. 21A, § 16, 310 CMR 5.00, or other possible actions/penalties as authorized by the General Laws of the Commonwealth.
This 401 WQC does not relieve the applicant of the obligation to comply with other appropriate state or federal statutes or regulations. Any changes made to the project or supplemental documents will require further notification to and, if an amendment is required, approval by MassDEP.
NOTICE OF APPEAL RIGHTS
Certain persons shall have a right to request an adjudicatory hearing concerning 401 WQCs by MassDEP when an application is required:
a. the applicant or property owner;
b. any person aggrieved by the decision who has submitted written comments during the public comment period;
c. any ten persons of the Commonwealth pursuant to M.G.L. c. 30A where a group member has submitted written comments during the public comment period; or
d. any governmental body or private organization with a mandate to protect the environment, which has submitted written comments during the public comment period.
Any person aggrieved, any ten (10) persons of the Commonwealth, or a governmental body or private organization with a mandate to protect the environment may appeal without having submitted written comments during the public comment period only when the claim is based on new substantive issues arising from material changes to the scope or impact of the activity and not apparent at the time of public notice. To request an adjudicatory hearing pursuant to M.G.L. c. 30A, § 10, a Notice of Claim must be made in writing, provided that the request is made by certified mail or hand delivery to MassDEP, with the appropriate filing fee specified within 310 CMR 4.10 along with a DEP Fee Transmittal Form within twenty-one 21 days from the date of issuance of this Certificate.
Case Administrator Massachusetts Department of Environmental Protection Office of Appeals and Dispute Resolution 100 Cambridge Street, Suite 900 Boston, MA 02114
A copy of the request shall at the same time be sent by certified mail or hand delivery to the issuing office of the Wetlands Program at:
Department of Environmental Protection
100 Cambridge Street, Suite 900 Boston, MA 02114
A Notice of Claim for Adjudicatory Hearing shall comply with MassDEP’s Rules for Adjudicatory Proceedings, 310 CMR 1.01(6), and shall contain the following information pursuant to 314 CMR 9.10(3):
a. the Permit Authorization Number;
b. the complete name of the applicant and address of the project;
c. the complete name, address, and fax and telephone numbers of the party filing the request, and, if represented by counsel or other representative, the name, fax and telephone numbers, and address of the attorney;
d. if claiming to be a party aggrieved, the specific facts that demonstrate that the party satisfies the definition of “aggrieved person” found at 314 CMR 9.02;
e. a clear and concise statement that an adjudicatory hearing is being requested;
f. a clear and concise statement of (1) the facts which are grounds for the proceedings, (2) the objections to this Certificate, including specifically the manner in which it is alleged to be inconsistent with the MassDEP’s Water Quality Regulations, 314 CMR 9.00, and (3) the relief sought through the adjudicatory hearing, including specifically the changes desired in the final written 401 WQC; and
g. a statement that a copy of the request has been sent by certified mail or hand delivery to the applicant, the owner (if different from the applicant), the conservation commission of the city or town where the activity will occur, the Department of Conservation and Recreation (when the certificate concerns projects in Areas of Critical Environmental Concern), the public or private water supplier where the project is located (when the certificate concerns projects in Outstanding Resource Waters), and any other entity with responsibility for the resource where the project is located.
The hearing request along with a DEP Fee Transmittal Form and a valid check or money order payable to the Commonwealth of Massachusetts in the amount of one hundred dollars ($100) must be mailed to:
Commonwealth of Massachusetts Department of Environmental Protection Commonwealth Master Lockbox PO Box 4062 Boston, MA 02211
The request will be dismissed if the filing fee is not paid, unless the appellant is exempt or granted a waiver. The filing fee is not required if the appellant is a city or town (or municipal agency), county, or district of the Commonwealth of Massachusetts, or a municipal housing authority. MassDEP may waive the adjudicatory hearing filing fee pursuant to 310 CMR 4.06(2) for a person who shows that paying the fee will create an undue financial hardship. A person seeking a waiver must file an affidavit setting forth the facts believed to support the claim of undue financial hardship together with the hearing request as provided above.
Failure to comply with this certification is grounds for enforcement, including civil and criminal penalties, under MGL c.21 §42, 314 CMR 9.00, MGL c. 21A §16, 310 CMR 5.00, or other possible actions/penalties as authorized by the General Laws of the Commonwealth.
Should you have any questions relative to this 401 WQC, please contact Kenneth Alepidis at kenneth.alepidis@mass.gov.
Sincerely, Lisa Rhodes
Wetlands Program Chief ecc: David DeConto, Sandwich Conservation Commission, 100 Route 6A, Sandwich, MA 02563
Brendan Mullaney, MassDEP Southeast Regional Office, 20 Riverside Drive, Lakeville, MA 02347 Grace Moses, Paul Maniccia, Army Corps of Engineers, Department of the Army, New England District, Corps of Engineers, 696 Virginia Road, Concord, MA 01742-2751 Edward Reiner and Rachel Croy, US EPA, 5 Post Office Square, Suite 100, Boston, MA 02109 Justin Bopp, John Logan and Amanda Davis, Division of Marine Fisheries, 836 S. Rodney French Boulevard, New Bedford, MA 02744 Amy Hoenig, National Heritage & Endangered Species Program, Massachusetts Division of Fish and Wildlife, 1 Rabbit Hill Road, Westborough, MA 01581 Todd Callaghan, Sean Duffey, Office of Coastal Zone Management, 100 Cambridge Street, Suite 900, Boston, MA attachments: Communication for Non-English Speaking Parties document Plans of Record
Contact Deneen Simpson 857-406-0738
100 Cambridge Street 9th Floor Boston, MA 02114 TTY# MassRelay Service 1-800-439-2370 • https://www.mass.gov/environmental-justice
(Version revised 8.2.2023) 310 CMR 1.03(5)(a)
Communication for Non-English-Speaking Parties
This document is important and should be translated immediately.
If you need this document translated, please contact MassDEP's Director of Environmental Justice at the telephone number listed below.
Español Spanish
Este documento es importante y debe ser traducido inmediatamente. Si necesita traducir este documento, póngase en contacto con el
Director de Justicia Ambiental de MassDEP
(MassDEP's Director of Environmental Justice) en el número de teléfono que figura más abajo.
Português Portuguese
Este documento é importante e deve ser traduzido imediatamente. Se você precisar traduzir este documento, entre em contato com o Diretor de Justiça Ambiental do MassDEP no número de telefone listado abaixo.
繁體中文 Chinese Traditional
本文檔很重要,需要即刻進行翻譯。
如需對本文檔進行翻譯,請透過如下列示電話號
碼與 MassDEP 的環境司法總監聯絡。
简体中文 Chinese Simplified
这份文件非常重要,需要立即翻译。
如果您需要翻译这份文件,请通过下方电话与
MassDEP 环境司法主任联系。
Ayisyen Kreyòl Haitian Creole
Dokiman sa a enpòtan epi yo ta dwe tradui l imedyatman. Si w bezwen tradui dokiman sa a, tanpri kontakte Direktè. Jistis Anviwònmantal
MassDEP a nan nimewo telefòn ki endike anba a.
Việt Vietnamese
Tài liệu này và quan trọng và phải được dịch ngay. Nếu quý vị cần bản dịch của tài liệu này, vui lòng liên hệ với Giám Đốc Phòng Công Lý Môi
Trường của MassDEP theo số điện thoại được liệt kê bên dưới.
ប្រទេសកម្ព ុជា Khmer/Cambodian ឯកសារននេះមានសារៈសំខាន់
ន ើយគប្បីគួរត្រូវបានប្កប្ត្ប្ភ្លា មៗ។.
ត្ប្សិននប្ើអ្នកត្រូវការនោយឯកសារននេះប្កប្ត្ប្
សូមទាក់ទងនាយកប្ននកយុរត ិធម៌ប្រសិាា នរប្ស់
MassDEPតាមរយៈនេខទូរស័ព្ទប្ែេបានរាយែូចខា
ងនត្កាម។
Kriolu Kabuverdianu Cape Verdean
Es dokumentu sta important i tenki ser tradusidu immediatamenti. Se nho ta presisa ke es dokumentu sta tradisidu, por favor kontata O
Diretor di Justisia di Environman di DEP ku es numero di telifoni menxionadu di baixo.
https://www.mass.gov/environmental-justice
Contact Deneen Simpson 857-406-0738
100 Cambridge Street 9th Floor Boston, MA 02114 TTY# MassRelay Service 1-800-439-2370 • https://www.mass.gov/environmental-justice
(Version revised 8.2.2023) 310 CMR 1.03(5)(a)
Pусский Russian
Это чрезвычайно важный документ, и он должен быть немедленно переведен. Если вам нужен перевод этого документа, обратитесь к директору Департамента экологического правосудия MassDEP
(MassDEP's Director of Environmental Justice) по телефону, указанному ниже.
Arabic العربية .جب ترجمتها على الفوروتهذه الوثيقة مهمة
فيرجى الاتصال بمدير الوثيقة،إذا كنت بحاجة إلى ترجمة هذه
.على رقم الهاتف المذكور أدناه MassDEPالعدالة البيئية في
한국어 Korean
이 문서는 중대하므로 즉시 번역되어야 합니다.
본 문서 번역이 필요하신 경우, 매사추세츠
환경보호부의 "환경정의" 담당자 분께
문의하십시오. 전화번호는 아래와 같습니다.
հայերեն Armenian Այս փաստաթուղթը կարևոր է, և պետք է անհապաղ թարգմանել այն:
Եթե Ձեզ անհրաժեշտ է թարգմանել այս փաստաթուղթը, դիմեք Մասաչուսեթսի շրջակա միջավայրի պահպանության նախարարության (MassDEP) Բնապահպանական հարցերով արդարադատության ղեկավարին (Director of Environmental Justice)` ստորև նշված հեռախոսահամարով
Farsi Persian فارسی اين نوشتار بسيار مهمی است و بايد فوراً ترجمه شود.
اگر نياز به ترجمه اين نوشتار داريد لطفاً با مدير عدالت محيط در شماره تلفن ذکر شده زير تماس MassDEPزيستی بگيريد.
Français French Ce document est important et doit être traduit immédiatement. Si vous avez besoin d'une traduction de ce document, veuillez contacter le directeur de la justice environnementale du MassDEP au numéro de téléphone indiqué ci-dessous.
Deutsch German Dieses Dokument ist wichtig und muss sofort übersetzt werden. Wenn Sie eine Übersetzung dieses Dokuments benötigen, wenden Sie sich bitte an MassDEP's Director of Environmental Justice (Direktor für Umweltgerechtigkeit in Massachusetts) unter der unten angegebenen Telefonnummer.
Ελληνική Greek Το έγγραφο αυτό είναι πολύ σημαντικό και πρέπει να μεταφραστεί αμέσωςю. Αν χρειάζεστε μετάφραση του εγγράφου αυτού, παρακαλώ επικοινωνήστε με τον Διευθυντή του Τμήματος Περιβαλλοντικής Δικαιοσύνης της Μασαχουσέτης στον αριθμό τηλεφώνου που αναγράφεται παρακάτω
Italiano Italian Questo documento è importante e deve essere tradotto immediatamente. Se hai bisogno di tradurre questo documento, contatta il Direttore della Giustizia Ambientale di MassDEP al numero di telefono sotto indicato.
Język Polski Polish Ten dokument jest ważny i powinien zostać niezwłocznie przetłumaczony. Jeśli potrzebne jest tłumaczenie tego dokumentu, należy skontaktować się z dyrektorem
ds. sprawiedliwości środowiskowej MassDEP pod numerem telefonu podanym poniżej.
हिन्दी Hindi
यह दस्तावेज महत्वपूर्ण है और इसका अनुवाद तुरंत ककया जाना चाहहए।. यहद आपको इस दस्तावेज का अनुवाद कराने की जरूरत है, तो कृपया नीचे हदए गए टेलीफोन नंबर पर MassDEP के पयाणवरर्ीय न्याय ननदेशक से संपकण करें। https://www.mass.gov/environmental-justice
File details come from the government source that posted it. Updated .