Amendment 0004_G-002_Rev1.pdf
PDF 8 MB Posted
- Solicitation number
- W912WJ24B0011
About this file
This document appears to be an amendment to a solicitation for a beach nourishment project at Town Neck Beach in Sandwich, Massachusetts. The U.S. Army Corps of Engineers, New England District is procuring the dredging and placement of approximately 320,300 cubic yards of sand from the Scusset Borrow Area onto Town Neck Beach. The successful contractor will be required to provide all necessary equipment and materials, including a hydraulic pipeline dredge plant, booster pump(s), and pipeline weights. The anticipated dredging window is from October 1, 2024 to March 15, 2025, with a required production rate of 110,000 cubic yards per month. The project has an estimated construction cost between $5,000,000 and $10,000,000. The solicitation number is W912WJ24B0011, and the NAICS code is 237990 with a $37M size standard.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Abstract.pdf | ||
| Amendment 0004.pdf | ||
| Amendment 0004_Scusset_Borrow_Site_Sampling.pdf | ||
| Amendment 0002_eelgrass_combined.zip | ZIP file | |
| Amendment 0003.pdf | ||
| Amendment 0002.pdf | ||
| WQC.pdf | ||
| CZM Federal Consistency Review.pdf | ||
| OFFICIAL AMENDMENT 0001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E 931300
N 27
N 27
N 27
N 27
N 27
0E 933300
N 27
0E 937300
N 27
E 929300
N 27
N 27
N 27
N 27
N 27
0 E 927300
E 929300
E 931300
E 933300
E 937300
FREEMAN AVENUE
FREEMAN AVENUE
CHADWELL AVENUE
DI
LL
IN
GH
AM
A
VE
NU
E
WOO
D
AV
EN
UE
KN
OT
T
AV
EN
UE
TO
W
N
NE
CK
R
OA
D
TOWN NECK BEACH
TOWN NECK BEACH
SCUSSET BEACH
C A P E C O D B A Y
C A P E C O D B A Y
NO
RT
H
BR
EA
KW
AT
ER
SO
UT
H
BR
EA
KW
AT
ER
-F
OO
T
EA
ST
E
NT
RA
NC
E
CH
AN
NE
L
BAY BEACH LANE
E 927300
G-003
SCUSSET BORROW SITE
SC
US
SE
T
BE
AC
H
RO
AD
SCUSSET BEACH
CAMPGROUND
B5
B1
B9
B8
B7
B6
B2
B3
B4
LIMITS OF SCUSSET BORROW
SITE; SEE G-003 FOR SOUNDINGS
SH
AW
ME
A
VE
NU
E
LIMITS AND AREA OF ROCKY
INTERTIDAL HABITAT (TYP)
LIMITS OF NEW BEACH FILL; NEW
DUNE GRASS AND SAND FENCE
NOT SHOWN FOR CLARITY
CORE SAMPLE (TYP)
LIMITS AND AREA OF EELGRASS (TYP);
SEE GENERAL NOTE 14
C A
P E
C
O D
C
A N
A L
C-101
C-102 C-103 E 935300
GC-5
RN-4
N 27
0E 935300
GC-3
GC-7
-F
OO
T
EA
ST
E
NT
RA
NC
E
CH
AN
NE
L
AT 100 FEET OFF SOUTHEAST LIMIT OF
EAST ENTRANCE CHANNEL, HYDRAULIC
PIPELINE MAY BE FLOATING OR
SUBMERGED FROM THIS POINT TO
POINTS ALONG THE BEACH
SOUTHEAST LIMIT OF EAST
ENTRANCE CHANNEL
NORTHWEST LIMIT OF EAST
ENTRANCE CHANNEL
HYDRAULIC PIPELINE SHALL BE FULLY
SUBMERGED FROM BORROW SITE TO AT
LEAST 100 FEET OFF SOUTHEAST LIMIT
OF EAST ENTRANCE CHANNEL; BOTTOM
OF PIPELINE SHALL SIT ON AND RUN
CONTINUOUSLY ALONG THE OCEAN
BOTTOM; SEE GENERAL NOTE 13
100' MIN
ACTUAL ROUTE OF HYDRAULIC PIPELINE TO EITHER END OF BEACH FILL AND
PLACEMENT OF BOOSTER(S) SHALL BE DETERMINED BY THE CONTRACTOR; SEE
GENERAL NOTE 14. HYDRAULIC PIPELINE CAN BE EITHER FULLY SUBMERGED OR
FLOATING BUT CANNOT BE BOTH. REFER TO SPECIFICATION SECTION 35 20 23
(DREDGING AND DREDGED MATERIAL PLACEMENT) FOR REQUIREMENTS
PERTAINING TO FLOATING AND SUBMERGED HYDRAULIC PIPELINES
CONTRACTOR'S TEMPORARY
ACCESS TO BEACH; SEE C-102
CONTRACTOR'S TEMPORARY
STORAGE AND STAGING AREA;
SEE C-102 AND C-103
CONTRACTOR'S TEMPORARY
STORAGE AND STAGING
AREA; SEE C-101
TOWN NECK BEACH
SUB H
P
FLT/SUB HP
SUB H
P
SUB HP
FLT/SUB HP
FL
T/
SU
B
HP
BREAKWATER
LIGHT (FLR-6)
THE CONTRACTOR SHALL PROTECT THE
BREAKWATERS AND AVOID DAMAGE TO
THEM AT ALL TIMES DURING CONSTRUCTION
LIMITS OF NEW BEACH
FILL; NEW DUNE GRASS
AND SAND FENCE NOT
SHOWN FOR CLARITY
US Army Corps of Engineers ®
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N
EW
E N
G
LA
N D
D
IS
TR
IC
T
VI
R G
IN
IA
R O
AD
C
O N
C O
R D
, M A
2-
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
SC
AL
E:
D R
AW
IN
G C
O D
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SHEET ID
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
G-002
G
EN
ER
AL
P
LA
N , G
EN
ER
AL
N
O
TE
S
AN
D L
EG
EN
D
M . G
O D
FR
EY
M . G
O D
FR
EY
K.
M
U
EL
LE
R
L.
T
H
IB
O D
EA
U
AN
SI
D 1"
=4
JU
N
E
W
2W J2
4B
C C
C -2
4-
800'0 400'
GENERAL PLAN
SCALE: 1" = 400'A1
BE
AC
H N
O U
R
IS
H M
EN
T
PR
O
JE
C
T
TO
W N
N
EC
K
BE
AC
H
SA
N
D W
IC
H
, M
AS
SA
C
H U
SE
TT
S
EXISTING MAJOR CONTOUR; ON C-101 THRU C-103
EXISTING MINOR CONTOUR; ON C-101 THRU C-103
SOUNDING BELOW MLLW; ON G-003
SOUNDING ABOVE MLLW; ON G-003
MEAN HIGH WATER (MHW); ON C-101 THRU C-103
MEAN LOW WATER (MLW); ON C-101 THRU C-103
PROPERTY BOUNDARY; ON C-101 THRU C-103
SUBMERGED HYDRAULIC PIPELINE; ON G-002 AND G-003
FLOATING OR SUBMERGED HYDRAULIC PIPELINE; ON
G-002 AND G-003
LIMITS OF BORROW AREA; ON G-002 AND G-003
LIMITS OF CONTRACTOR'S TEMPORARY STORAGE AND
STAGING AREA; ON G-002, C-102 AND 103
EELGRASS (2023) LIMITS; ON G-002, C-102 AND C-103
ROCKY INTERTIDAL HABITAT (2018) LIMITS; ON G-002
BEACH FILL LIMITS; ON G-002, G-003, & C-101 THRU C-103
BEACH FILL CONTROL LINE; ON C-101 THRU C-103
BEACH FILL CONTROL LINE COORDINATE ID; ON C-101
THRU C-103
SCUSSET BORROW SITE COORDINATE ID; ON G-002
AREA OF EELGRASS (2023); ON G-002, G-003, C-101 & C-102
AREA OF ROCKY INTERTIDAL HABITAT (2018), ON G-002,
G-003, AND C-101 THRU C-103
SCUSSET BORROW SITE; ON G-002
SCUSSET BORROW SITE; ON G-003
CONTRACTOR'S TEMPORARY STORAGE AND STAGING
AREA; ON G-002, C-102, AND C-103
EXISTING STONE GROIN; ON C-101 THRU C-103
BEACH FILL MATERIAL ALONG SLOPES; ON C-101 THRU
C-103, C-302, AND C-303
DUNE CREST AND BEACH BERM; ON C-101 THRU C-103
MATERIAL DREDGED FROM BORROW SITE; ON C-301
BREAKWATER LIGHT AND NAV AID; ON G-002 & G-003
CORE SAMPLING LOCATION AND ID; ON G-002
CONTROL POINT (DISK OR HUB); ON C-101 & C-103
CONTROL POINT (MONUMENT); ON C-103
LEGEND
DESCRIPTION SYMBOL
+1.3
1.3
931124.480 930511.327 930048.928 929482.513 928829.359 930987.182 931188.749 930431.572
2746763.701 2747038.888 2747160.258 2747545.349 2747955.674 2746587.157 2746910.958 2746863.026
# EASTINGNORTHING
A B1
GENERAL NOTES:
1. SOUNDINGS SHOWN AT THE SCUSSET BORROW SITE AND ENTRANCE
CHANNEL ARE IN FEET AND TENTHS. THE REFERENCE PLANE IS MEAN
LOWER LOW WATER (MLLW) AND IS BASED ON THE 1983-2001 TIDAL
EPOCH. ANY SOUNDINGS NOTED WITH A PLUS SIGN (+) ARE ABOVE
THE REFERENCE PLANE OF MLLW. ANY SOUNDINGS WITHOUT A SIGN
ARE BELOW THE REFERENCE PLANE OF MLLW AND SHALL BE
CONSIDERED NEGATIVE.
2. ALL STRUCTURES AND LAND FEATURES, INCLUDING SHORELINE,
BRIDGES, PIERS, ETC., SHOWN ARE FROM NOAA CHART 13236 AND
2022 AERIAL IMAGERY AND ARE LOCATED APPROXIMATE UNLESS
OTHERWISE NOTED AND SHALL BE USED AS A GENERAL REFERENCE
ONLY.
3. BENCHMARK DATA FOR SCUSSET BORROW SITE AND CHANNEL: TIDES
WERE RECORDED USING RTK GPS. A HYPACK KTD FILE WAS CREATED
FROM MLLW TO NAVD88; CORRECTIONS ESTABLISHED OR PUBLISHED
IN THE VICINITY OF NOAA BENCHMARKS AT SANDWICH MARINA
(CORRECTION 5.25'). NAVD88 IS ABOVE MLLW; THEREFORE,
CORRECTION SHOULD BE ADDED TO NAVD88 TO CONVERT TO MLLW.
NO TIDE GAUGES WERE USED ON THIS PROJECT. AVERAGE RANGE OF
TIDE IS 8.7' AT THE EAST END IN SANDWICH.
4. COORDINATES SHOWN ARE BASED ON THE NAD83 MASSACHUSETTS
MAINLAND ZONE 2001 DATUM AND ARE REFERENCED IN U.S. SURVEY
FEET.
5. HYDROGRAPHIC SURVEY FOR SCUSSET BORROW SITE AND CHANNEL
WAS PERFORMED USING A RESON T-50 MULTIBEAM SONAR SYSTEM
OPERATING AT 300 KHZ. HORIZONTAL POSITIONING AND REAL TIME
TIDE READINGS WERE RECORDED UTILIZING A TRIMBLE SPS 855 RTK
GPS SYSTEM. RTK BASE STATION USED WAS MTS SMARTNET MAX.
6. THE SOUNDINGS SHOWN WITHIN THE ENTRANCE CHANNEL WERE
OBTAINED FROM HYDROGRAPHIC SURVEYS CONDUCTED BETWEEN
MARCH 2022 AND JUNE 2022.
7. THE SOUNDINGS SHOWN WITHIN THE SCUSSET BORROW SITE WERE
OBTAINED FROM A HYDROGRAPHIC SURVEY CONDUCTED IN
NOVEMBER 2023.
8. THE INFORMATION DEPICTED ON THE DRAWINGS REPRESENTS THE
RESULTS OF SURVEYS MADE ON THE DATES INDICATED, AND CAN
ONLY BE CONSIDERED AS INDICATING THE GENERAL CONDITIONS
EXISTING AT THAT TIME.
9. FIELD BOOK: R&H 4981; EAST ENTRANCE CHANNEL AND SCUSSET
BORROW SITE SURVEYED BY: MATTHEW O'NEILL AND CREW
EAST ENTRANCE CHANNEL: REFER TO SURVEY NO.:
MA_36_CCC_CURRENT_20220804_CS_032
SCUSSET BORROW SITE: REFER TO SURVEY NO.:
MA_36_CCC_20231109_CS_086
10. AIDS TO NAVIGATION WHEN SHOWN ARE LOCATED DURING SURVEY
OPERATIONS AND ARE PLOTTED AT THE FIELD-DETERMINED
POSITIONS. THE USCG IS THE AUTHORITATIVE SOURCE OF AIDS TO
NAVIGATION. ADDITIONAL INFORMATION ON PUBLISHED LOCATIONS
AND DETAILS CAN BE FOUND IN THE USCG LIGHT LIST, VOLUME 1.
11. AERIAL IMAGERY SHOWN ON THESE DRAWINGS IS FROM 2022 AND
WAS OBTAINED BY NOAA'S NATIONAL GEODETIC SURVEY (NGS)
REMOTE SENSING DIVISION. THE IMAGERY SHOWN ON THESE
DRAWINGS ARE FOR GENERAL INFORMATION ONLY AND IS NOT TO BE
USED FOR MEASUREMENTS.
12. LIMITS OF EELGRASS SHOWN IS FROM 2023 DATA PROVIDED BY
WOODS HOLE GROUP. THE LIMITS OF INTERTIDAL ROCKY HABITAT IS
FROM 2018 DATA.
13. UNLESS OTHERWISE APPROVED, THE SUBMERGED HYDRAULIC
PIPELINE SHALL CROSS THE CHANNEL AT STATION -30+00. REFER TO
SPECIFICATION SECTION 35 20 23 (DREDGING AND DREDGED MATERIAL
PLACEMENT) FOR ADDITIONAL REQUIREMENTS FOR CROSSING THE
FEDERAL NAVIGATION CHANNEL.
14. HYDRAULIC PIPELINE SHALL NOT CROSS OVER OR COME WITHIN 75
FEET OF ANY EELGRASS. BOOSTER PUMP(S) SHALL NOT BE PLACED IN
EELGRASS OR COME WITHIN 75 FEET OF ANY EELGRASS.
B1 B2 B3 B4 B5 B6 B7 B8 B9
2747933.47 2747527.97 2747403.62 2747237.94 2746967.60 2746479.09 2746866.65 2746885.91 2747475.45
929365.62 930128.06 930452.54 930804.57 931342.30 930988.30 930246.58 930072.61 929020.90
SCUSSET BORROW SITE
COORDINATES
MA STATE PLANE (NAD 1983)
# EASTINGNORTHING
CORE SAMPLING
COORDINATES
MA STATE PLANE (NAD 1983)
SUB HP
FLT/SUB HP
R
EM
OV
ED
C
AL
LO
UT
S
FO
R
DU
NE
G
RA
SS
A
ND
S
AN
D
FE
NC
E.
JU
L 2
File details come from the government source that posted it. Updated .