QUESTIONS_AND_ANSWERS_-_1.pdf
PDF 84 KB Posted
- Attached to
- Replace Operations and Training Facility
- Solicitation number
- W912QG-17-B-0005
About this file
Questions and Answers
View the file
Other files
| File | Type | Posted |
|---|---|---|
| QUESTIONS_AND_ANSWERS_-_2.pdf | ||
| 0007.pdf | ||
| 0007.pdf | ||
| 074113.16_Standing_Seam_Metal_Roof_Panels.pdf | ||
| 072500_FL_-_Weather_Barriers.pdf | ||
| 0005.pdf | ||
| Attendence_Roster.pdf | ||
| 0004.pdf | ||
| 2017-08-15_Addendum__2.pdf | ||
| 0003.pdf | ||
| 083473_Sound_Control_Door_Assemblies.pdf | ||
| _010005_Table_of_Contents.pdf | ||
| 2017-06-07_Pre-Bid_Addendum__1_Drawings.pdf | ||
| 087100_Door_Hardware.pdf | ||
| Pre-Bid_Addendum__1.pdf | ||
| 084113_Aluminum-Framed_Entrances_and_Storefront.pdf | ||
| 0003.pdf | ||
| 0002.pdf | ||
| Amendment_0001.pdf | ||
| Specs.pdf | ||
| Drawings.pdf | ||
| Solicitation.pdf |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTIONS AND ANSWERS
08/15/2017
Q. Will this project require the General Contractor to have a LEED Certified individual on staff?
A. Paragraph 1.2, A, #15 states that the Contractor will be responsible for engaging a third party consultant to act as Construction LEED Administrator. The Contractor can retain Keith Sanders, who is the current LEED Administrator for this project, or another qualified individual.
Q. Originally, Explicit Access wasn’t required, but now it is required to obtain the documents. Can you tell me how long it will take for explicit access to be granted in order to retrieve the amendments? I see an addendum has been issued and I am unable to access the documents any more.
A. Explicit access can be granted on the same day as the request is made. Once access has been granted you will receive an email letting you know.
Q. Can the civil drawings be made available during the bid process as CADD files?
A. CADD files cannot be provided during the bid process.
Q. I have one question. What pole height do you want for area lighting fixture types P1 & P2? The light fixture schedule shows 30’ poles under FIXTURE DESCRIPTION. Put it also shows 20’ poles on the fixture schedule under MOUNTING REMARKS. Please let me know what height above grade poles you would like.
A. The light pole heights should be 20’‐0”.
Q. Spec Section 101400, PART 2.3, lists the metal letters as Times New Roman & Drawing A2.1 notes to follow Base Standards. I believe the Base Standards is Helvetica Medium. Can you clarify? Also ‐ Can you identify the letter height also ‐ appears to be 12" but I just want to be sure.
A. Base standards take precedence over what is listed in the specs and drawings. Can McEntire please confirm Base Standard font and height? Our preference is that the height of the exterior building sign be 11”.
Q. The Finish Legend, Sheet A8.1 indicates that CPT‐1 is style Color Field with 3 different patterns. The Finish Plan, Sheet A8.2 does not show any pattern for CPT‐1. Does this project have any carpet patterns?
A. Contractor shall supply 33.3% per color way. Random installation.
Q. P.01 indicates LAV‐1 top mount China for the solid surface vanities. A4/A8.5 is showing an ADA Solid surface sink. Can you clarify?
A. Solid surface undermount sinks are to be used in Women 105 and Men 106.
Q. Are there any SCIF site requirements?
A. No SCIF but there will be access control infrastructure requirements. Also, some walls will require insulation and gyp board from floor to ceiling to meet secure room standards.
Q. Will the attached Novelaire ERV be an approved equal? See tech sheets.
A. This is not a complete submittal package. It looks to meet standards but it would still be subject to full submittal package review.