QUESTIONS_AND_ANSWERS_-_1.pdf

PDF 84 KB Posted

Attached to
Replace Operations and Training Facility
Solicitation number
W912QG-17-B-0005
Issued by

About this file

Questions and Answers

View the file

Other files

File Type Posted
QUESTIONS_AND_ANSWERS_-_2.pdf PDF
0007.pdf PDF
0007.pdf PDF
074113.16_Standing_Seam_Metal_Roof_Panels.pdf PDF
072500_FL_-_Weather_Barriers.pdf PDF
0005.pdf PDF
Attendence_Roster.pdf PDF
0004.pdf PDF
2017-08-15_Addendum__2.pdf PDF
0003.pdf PDF
083473_Sound_Control_Door_Assemblies.pdf PDF
_010005_Table_of_Contents.pdf PDF
2017-06-07_Pre-Bid_Addendum__1_Drawings.pdf PDF
087100_Door_Hardware.pdf PDF
Pre-Bid_Addendum__1.pdf PDF
084113_Aluminum-Framed_Entrances_and_Storefront.pdf PDF
0003.pdf PDF
0002.pdf PDF
Amendment_0001.pdf PDF
Specs.pdf PDF
Drawings.pdf PDF
Solicitation.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS AND ANSWERS

08/15/2017

Q. Will this project require the General Contractor to have a LEED Certified individual on staff?

A. Paragraph 1.2, A, #15 states that the Contractor will be responsible for engaging a third party consultant to act as Construction LEED Administrator. The Contractor can retain Keith Sanders, who is the current LEED Administrator for this project, or another qualified individual.

Q. Originally, Explicit Access wasn’t required, but now it is required to obtain the documents. Can you tell me how long it will take for explicit access to be granted in order to retrieve the amendments? I see an addendum has been issued and I am unable to access the documents any more.

A. Explicit access can be granted on the same day as the request is made. Once access has been granted you will receive an email letting you know.

Q. Can the civil drawings be made available during the bid process as CADD files?

A. CADD files cannot be provided during the bid process.

Q. I have one question. What pole height do you want for area lighting fixture types P1 & P2? The light fixture schedule shows 30’ poles under FIXTURE DESCRIPTION. Put it also shows 20’ poles on the fixture schedule under MOUNTING REMARKS. Please let me know what height above grade poles you would like.

A. The light pole heights should be 20’‐0”.

Q. Spec Section 101400, PART 2.3, lists the metal letters as Times New Roman & Drawing A2.1 notes to follow Base Standards. I believe the Base Standards is Helvetica Medium. Can you clarify? Also ‐ Can you identify the letter height also ‐ appears to be 12" but I just want to be sure.

A. Base standards take precedence over what is listed in the specs and drawings. Can McEntire please confirm Base Standard font and height? Our preference is that the height of the exterior building sign be 11”.

Q. The Finish Legend, Sheet A8.1 indicates that CPT‐1 is style Color Field with 3 different patterns. The Finish Plan, Sheet A8.2 does not show any pattern for CPT‐1. Does this project have any carpet patterns?

A. Contractor shall supply 33.3% per color way. Random installation.

Q. P.01 indicates LAV‐1 top mount China for the solid surface vanities. A4/A8.5 is showing an ADA Solid surface sink. Can you clarify?

A. Solid surface undermount sinks are to be used in Women 105 and Men 106.

Q. Are there any SCIF site requirements?

A. No SCIF but there will be access control infrastructure requirements. Also, some walls will require insulation and gyp board from floor to ceiling to meet secure room standards.

Q. Will the attached Novelaire ERV be an approved equal? See tech sheets.

A. This is not a complete submittal package. It looks to meet standards but it would still be subject to full submittal package review.