Pre-Bid_Addendum__1.pdf
PDF 117 KB Posted
- Attached to
- Replace Operations and Training Facility
- Solicitation number
- W912QG-17-B-0005
About this file
Pre-Bid Addendum #1
View the file
Other files
| File | Type | Posted |
|---|---|---|
| QUESTIONS_AND_ANSWERS_-_2.pdf | ||
| 0007.pdf | ||
| 0007.pdf | ||
| 074113.16_Standing_Seam_Metal_Roof_Panels.pdf | ||
| 072500_FL_-_Weather_Barriers.pdf | ||
| Attendence_Roster.pdf | ||
| 0005.pdf | ||
| 0004.pdf | ||
| 2017-08-15_Addendum__2.pdf | ||
| 2017-06-07_Pre-Bid_Addendum__1_Drawings.pdf | ||
| 087100_Door_Hardware.pdf | ||
| 084113_Aluminum-Framed_Entrances_and_Storefront.pdf | ||
| _010005_Table_of_Contents.pdf | ||
| 083473_Sound_Control_Door_Assemblies.pdf | ||
| 0003.pdf | ||
| 0003.pdf | ||
| 0002.pdf | ||
| Amendment_0001.pdf | ||
| Drawings.pdf | ||
| Specs.pdf | ||
| QUESTIONS_AND_ANSWERS_-_1.pdf | ||
| Solicitation.pdf |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
All Pond & Company marketing materials are printed on papers containing post-consumer recycled fibers and are FSC Certified.
PrePrePrePre----Bid Addendum #1Bid Addendum #1Bid Addendum #1Bid Addendum #1
DATEDATEDATEDATE:::: 06/07/2017 PROJECT PROJECT PROJECT PROJECT
NAME/NUMBER:NAME/NUMBER:NAME/NUMBER:NAME/NUMBER:
Replace Operations and Training Facility
PSTE 009070/1170094
This addendum modifies the Drawings and Specifications of the above-referenced project dated February
24, 2017. Changes noted herein will become part of the Contract. Except as noted herein, original drawings and any previous addendum(s) will apply.
SPECIFICATIONS:
1. Table of ContentsTable of ContentsTable of ContentsTable of Contents, Division 8 add:
SectionSectionSectionSection 083473 Sound Control Door Assemblies083473 Sound Control Door Assemblies083473 Sound Control Door Assemblies083473 Sound Control Door Assemblies (see attached specification)
2. SSSSection 084113 Aluminumection 084113 Aluminumection 084113 Aluminumection 084113 Aluminum----Framed EnFramed EnFramed EnFramed Entrances trances trances trances andandandand StorefrontStorefrontStorefrontStorefront, Paragraph 2.3
a. Add clear anodic finishes for doors 137 and 155
3. Section 084113 AluminumSection 084113 AluminumSection 084113 AluminumSection 084113 Aluminum----Framed EnFramed EnFramed EnFramed Entrances trances trances trances andandandand StorefrontStorefrontStorefrontStorefront, Paragraph 2.9
a. Add clear anodic finishes for doors 137 and 155
4. Section 08Section 08Section 08Section 087100 Door Hardware7100 Door Hardware7100 Door Hardware7100 Door Hardware, Paragraph 3.8
a. Changed door hardware finishes for doors 101A, 101B, 102, 160A, and 160B to be
Dark Bronze to match door finish.
b. Corrected door numbers for Hardware Sets #17.1, #19, and #24.
DRAWINGS:
Architectural:Architectural:Architectural:Architectural:
1. Sheet A1.1 Floor PlanA1.1 Floor PlanA1.1 Floor PlanA1.1 Floor Plan: Correct door number for Pocket 111E. Door number changed to 111F.
2. Sheet A1.A1.A1.A1.3333 ABI #2 Operable PartitionsABI #2 Operable PartitionsABI #2 Operable PartitionsABI #2 Operable Partitions: Correct door number in Auditorium 111C. Door number changed to 111F to 111J.
3. Sheet AAAA4444.1 .1 .1 .1 Enlarged Enlarged Enlarged Enlarged Plans & DetailsPlans & DetailsPlans & DetailsPlans & Details: Ambulatory stalls added to Women 105 and Men 106.
4. Sheet AAAA6666.1 .1 .1 .1 DoDoDoDoor Schedule & Detailsor Schedule & Detailsor Schedule & Detailsor Schedule & Details:
a. Add door 111F for Pocket 111E to schedule.
b. Add separate Door Schedule table for ABI #2.
EEEElllleeeeccccttttrrrriiiiccccaaaallll::::
1. Sheet EEEE3333....1111 SSSSyyyysssstttteeeemmmmssss PPPPllllaaaannnn:
a. Add General Notes #4 and #5.
b. Add speakers throughout floor plan.
2. Sheet EEEE4444....1111 AAAAlllltttteeeerrrrnnnnaaaatttteeee BBBBiiiidddd ####2222 EEEElllleeeeccccttttrrrriiiiccccaaaallll PPPPllllaaaannnnssss:
a. Add General Notes #1 and #2.
b. Detail Detail Detail Detail 2: Add speakers to Auditoriums.
END OF PRE-BID ADDENDUM #1