Text version
BDG Table of Contents SWF2 - REV1 1
BASE DEFENSE GROUP BEDDOWN
SECURITY FORCES – BUILDING 106
PROJECT NUMBER WHAY089079
105th AIRLIFT WING
NEW YORK AIR NATIONAL GUARD
STEWART INTERNATIONAL AIRPORT
NEWBURGH, NY
TABLE OF CONTENTS
DIVISION 01 – GENERAL REQUIREMENTS
011100 Summary of Work 011900 References 012300 Options 012500 Substitutions 012600 Change Orders / Modifications to Contract 013100 Project Coordination and Meetings 013200 Construction Progress Schedules and Reports 013233 Construction Photographs 013300 Submittals 014000 Quality Requirements 014100 Environmental Protection 014200 Definitions and Standards 015100 Temporary Utilities and Facilities 015200 Field Offices and Sheds 015700 Temporary Barriers and Controls 015800 Project Identification and Signs 016000 Equipment and Materials 017329 Cutting and Patching 017419 Construction Waste Management and Disposal 017500 Manufacturer’s Field Services 017800 Contract Closeout 017836 Warranties 018113 Sustainable Design Requirements Supplement – Sustainable Design Analysis Score Sheet 018150 Recycled / Recovered Materials 019113 Commissioning Requirements
DIVISION 02 – SITE WORK
024100 Demolition
DIVISION 03 – CONCRETE
031000 Concrete Formwork 031550 Vapor Retarder 032000 Concrete Reinforcement
2 BDG Table of Contents SWF2-REV1
DIVISION 03 – CONCRETE (continued)
033000 Concrete
DIVISION 04 – MASONRY
042000 Unit Masonry
DIVISION 05 – METALS
051200 Steel 052100 Steel Joists 053113 Steel Floor Deck 053123 Steel Roof Deck 054000 Cold-Formed Steel Framing 055000 Metal Fabrications 055100 Metal Stairs
DIVISION 06 – WOOD AND PLASTICS
061000 Rough Carpentry
061000.01 Anchors and Fasteners
061600 Sheathing 064023 Interior Architectural Woodwork
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
071113 Bituminous Dampproofing 072100 Thermal Insulation 074113 Metal Roof Panels 074213 Metal Wall Panels 074216 Insulated-Core Metal Wall Panels 075323 Ethylene-Propylene-Diene-Monomer (EPDM) Roofing 076200 Sheet Metal Flashing and Trim 077200 Roof Accessories 078413 Penetration Firestopping 079200 Joint Sealants 079500 Expansion Control
DIVISION 08 – DOORS AND WINDOWS
081113 Hollow Metal Doors and Frames 081416 Flush Wood Doors 083113 Access Doors and Frames 083323 Overhead Coiling Doors 083459 Vault Doors and Day Gates 084413 Glazed Aluminum Curtain Walls 085113 Aluminum Windows 087000 Finish Hardware 088000 Glazing 089000 Louvers and Vents
BDG Table of Contents SWF2-REV1 3
DIVISION 09 – FINISHES
092216 Non-Structural Metal Framing 092900 Gypsum Board 093000 Tiling 095123 Acoustic Tile Ceilings 096513 Resilient Base And Accessories 096519 Resilient Tile Flooring 096813 Tile Carpeting 097200 Wall Coverings 099000 Protective Coatings
DIVISION 10 – SPECIALITIES
101100 Visual Display Surfaces 101400 Signage 102113 Toilet Compartments 102219 Demountable Partitions 102226 Operable Partitions 102800 Toilet And Bath Accessories 104413 Fire Extinguisher Cabinets 105113 Metal Lockers
105626.10 Mobile Storage Shelving – Secured Weapons Cabinets
105626.23 Mobile Storage Shelving – Storage Lockers
107500 Flagpoles
DIVISION 11 – EQUIPMENT
115213 Projection Screens
DIVISION 12 – FURNISHINGS
122113 Horizontal Louver Blinds 124813 Entrance Floor Mats and Frames 129300 Site Furnishings
DIVISION 14 – CONVEYING SYSTEMS
142400 Hydraulic Elevator
DIVISION 21 – FIRE SUPPRESSION
210500 Common Work Results for Fire Suppression 211000 Fire-Suppression Piping
DIVISION 22 – PLUMBING
220500 Common Work Results for Plumbing 220513 Common Motor Requirements for Plumbing Equipment 220516 Expansion Fittings and Loops for Plumbing Piping
4 BDG Table of Contents SWF2-REV1
DIVISION 22 – PLUMBING (continued)
220519 Meters and Gauges for Plumbing Piping 220523 General-Duty Valves for Plumbing Piping 220529 Hangers and Supports for Plumbing Piping and Equipment 220548 Vibration and Seismic Controls for Plumbing Piping and Equipment 220553 Identification for Plumbing Piping and Equipment 221116 Domestic Water Piping 221119 Domestic Water Piping Specialties 221123 Domestic Water Pumps 221316 Sanitary Waste and Vent Piping 221319 Sanitary Waste Piping Specialties 221413 Facility Storm Drainage Piping 221423 Storm Drainage Piping Specialties 221429 Sump Pumps 223400 Fuel-Fired Water Heaters 224000 Plumbing Fixtures 224700 Drinking Fountains and Water Coolers
DIVISION 23 – HEATING, VENTILATING AND AIR CONDITIONING
230500 Common Work Results for HVAC 230513 Common Motor Requirements for HVAC Equipment 230516 Expansion Fittings and Loops for HVAC Piping 230519 Meters and Gauges for HVAC Piping 230523 General-Duty Valves for HVAC Piping 230529 Hangers and Supports for HVAC Piping and Equipment 230548 Vibration and Seismic Controls for HVAC Piping and Equipment 230553 Identification for HVAC Piping and Equipment 230593 Testing, Adjusting and Balancing 230700 Mechanical Insulation 230933 Direct Digital Control (DDC) Systems (Electric Actuation) 231123 Facility Natural Gas Piping 232113 Hydronic Piping 232123 Hydronic Pumps 232300 Refrigerant Piping 233113 Metal Ducts 233300 Duct Accessories 233423 Power Ventilators 233700 Air Terminal Units 233713 Diffusers, Registers and Grilles 233725 Intake and Relief Ventilators 233813 Commercial Kitchen Hoods 235216 Condensing Boilers 236423 Scroll Water Chillers 237200 Air-to-Air Energy Recovery Equipment 237313 Modular Central-Station Air-Handling Units 238123 Computer-Room Air-Conditioners 238153 Rooftop Kitchen Replacement-Air Units 238239 Cabinet Unit Heaters 238240 Propeller Unit Heaters
BDG Table of Contents SWF2-REV1 5
DIVISION 26 - ELECTRICAL
260000 Basic Electrical Requirements 260516 Wires and Cables 260526 Grounding 260529 Supporting Devices and Seals 260533 Raceways 260534 Electrical Boxes and Fittings 260536 Cable Tray 260553 Electrical Identification 260800 Field Testing 260923 Lighting Control Equipment 262213 Transformers and Medium Voltage Pad-mounted Sectionalizer Switch 262416 Panelboards 262713 Service Entrance 262726 Wiring Devices 262730 Electrical Connections and Equipment 262813 Fuses 262816 Circuit and Motor Disconnect Switches 262900 Motor Controllers, Contactors, Push Buttons, Selector Switches, Indicating Lights, and
Relays 263213 Diesel Generator Set (Option #1) 263600 Transfer Switch (Base Bid: Manual Transfer Switch; Option #1: Automatic Transfer
Switch) 264100 Lightning Protection Systems 264300 Surge Protective Device (SPD) formerly known as Transient Voltage
Surge Suppression (TVSS) 265000 Interior Lighting Fixtures 265200 Emergency Lighting 265610 Exterior Lighting Fixtures
DIVISION 27 – COMMUNICATIONS
275116 Public Address System 276000 Communication, Premises Distribution System
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
283100 Fire Alarm Systems 283150 Mass Notification System 283200 Intrusion Detection System
DIVISION 31 – EARTHWORK
312000 Site Preparation and Earthwork 312313 Subgrade Preparation
6 BDG Table of Contents SWF2-REV1
DIVISION 32 – EXTERIOR IMPROVEMENTS
321100 Crushed Rock Base Course 321214 Bituminous Prime Coat 321215 Bituminous Tack Coat 321217 Hot-Mix Asphaltic-Concrete Pavement 321600 Curbs, Gutters, and Sidewalks 321723 Pavement Marking 323113 Chain-Link Fences and Gates 329200 Lawns
DIVISION 33 – UTILITIES
331100 Pressure Pipe 331123 Natural Gas Distribution 331216 Utility Valves and Accessories 333100 Gravity Pipe 333150 Pipe Installation 333900 Utility Structures
BDG012300.SWF2-REV1 012300-1
SECTION 012300 – BID OPTIONS
PART 1 - GENERAL
1.01 SUMMARY:
A. This Section specifies administrative and procedural requirements for Bid Options.
B. Definition: A Bid Option is an amount proposed by Bidders and stated on the Bid Form for certain construction activities defined in the Bidding Requirements that may be added to or deducted from Base Bid amount if the Contracting Officer decides to accept a corresponding change in either the amount of construction to be completed, or in the Equipment and Materials, or installation methods described in Contract Documents.
C. Coordination: Coordinate related Work and modify or adjust adjacent Work as necessary to ensure that Work affected by each accepted Bid Option is complete and fully integrated into the Project. Costs listed for each Bid Option shall include costs of related coordination, modification, or adjustment.
D. Notification: Immediately following the award of the Contract, prepare and distribute to each party involved, notification of the status of each Bid Option. Indicate whether Bid Options have been accepted, rejected, or deferred for consideration at a later date. Include a complete description of negotiated modifications to Bid Options.
E. Schedule: A "Schedule of Bid Options" is included at the end of this Section. Specification Sections and/or Drawings referenced in the Schedule, if any, contain requirements for Equipment and Materials and methods necessary to achieve the Work described under each Bid Option.
1. Each Bid Option is defined by abbreviated language, recognizing that Drawings and
Specifications document the requirements.
2. Include as part of each Bid Option, miscellaneous devices, accessory objects, and similar items incidental to or required for a complete installation whether or not mentioned as part of the Bid Option.
PART 2 - PRODUCTS – NOT APPLICABLE.
PART 3 - EXECUTION
3.01 SCHEDULE OF BID OPTIONS:
A. Bid Option No. 1: Provide and install outdoor stand-by generator and automatic transfer switch in lieu of generator connection and manual transfer switch as indicated by details on the Drawings labeled “Option No.1.” Complete product and execution requirements are included in Division 26, SECTION 263213- DIESEL GENERATOR SET and SECTION 263600 - TRANSFER SWITCH. Contractor is responsible for all conduit, handholes, manholes, wiring, accessories, and labor required to provide a fully functional system.
B. Bid Option No. 2: Provide and install mechanically assisted, carriage mounted high-density storage system for Squad Room 103 in Building 106 as indicated by details on the Drawings labeled “Option No. 2.” Complete product and execution requirements are included in
DIVISION 10, SECTION 105626.23 – MOBILE STORAGE SHELVING – STORAGE
LOCKERS. Contractor is responsible for all rails, carriages, operators, accessories, and labor required to provide a fully functional system. Interior configuration requirements to be determined by Base Civil Engineer.
C. Bid Option No. 3: Provide and install mechanically assisted, carriage mounted high-density storage system for Armory 106 in Building 106 as indicated by details on the Drawings labeled “Option No. 3.” Complete product and execution requirements are included in DIVISION 10, SECTION 012300 - BID OPTIONS: continued
012300-2 BDG012300.SWF2-REV1
SECTION 105626.10 – MOBILE STORAGE SHELVING – SECURED WEAPONS
CABINETS. Contractor is responsible for all rails, carriages, operators, accessories, and labor required to provide a fully functional system. Interior configuration requirements to be determined by Base Civil Engineer.
D. Bid Option No. 4: Provide and install Medium Voltage Pad-Mounted Sectionalizer Switch Cabinet. Contractor is responsble for connection in existing electrical manhole EMH#17, conductors, conduits, concrete pad, etc as indicated by details on the Drawings labeled “Option No. 4”. Complete product and execution requirements are included in SECTION 262213 –
TRANSFORMERS AND MEDIUM VOLTAGE PAD-MOUNTED SECTIONALIZER
SWITCH.
E. Bid Option No. 5: Remove existing exterior metal wall panels and trim from Building 106.
Provide and install new exterior metal wall panels and trim on Building 106 as indicated by details on the Drawings labeled “Option No.5”. Panel color and profile to match new insulated metal walls panels. This bid option shall include removal and reinstallation of all exterior light fixtures, signage and other appurtenances as required to allow for the installation of the new metal wall panel system. Complete product and execution requirements are included in SECTION 074213 – METAL WALL PANELS. Contractor is responsible for all material, trim, flashing, copings, fasteners, accessories and labor required to provide a functional and weathertight wall panel system.
END OF SECTION 012300
BDG087000.SWF2.REV1 087000-1
PART 1 -
SECTION 087000 - FINISH HARDWARE
1.01
GENERAL
SUMMARY
A. This Section includes hardware for the proper installation, operation, and control of doors.
B. Related Work Specified Elsewhere:
1. Hollow Metal Doors and Frames: SECTION 081113.
2. Wood Doors: SECTION 081416.
3. Glazed Aluminum Curtain Wall Entrances: SECTION 084113.
1.02 REFERENCES
A. Applicable Standards:
1. American National Standards Institute (ANSI):
a. A115 Series - Door and Frame Preparation.
b. A156 Series - Hardware.
c. A117.1 - Buildings and Facilities - Providing Accessibility and Usability for
Physically Handicapped People.
2. Builders Hardware Manufacturers Association (BHMA):
a. 1301 - Materials and Finishes.
3. Door and Hardware Institute (DHI):
a. Keying - Procedures, Systems and Nomenclature.
b. Architectural Hardware Scheduling Sequence and Schedule Format.
c. Abbreviations and Symbols.
d. Processing Hardware for Custom Aluminum Doors.
e. Hardware for Labeled Fire Doors.
f. Recommended Locations for Builder's Hardware for Standard Steel Doors and
Frames.
g. Recommended Procedure for Processing Hardware Schedules and Templates.
h. Wood Door Standards W2, W5, WDHS-2, and WDHS-3.
4. National Fire Protection Association (NFPA):
a. 80 - Standards for Fire Doors and Windows.
b. 101 - Life Safety Code.
5. Underwriters Laboratories (UL):
a. Building Materials Directory.
b. 305 - Panic Hardware.
6. Americans With Disabilities Act (ADA):
SECTION 087000 - FINISH HARDWARE: continued
087000-2 BDG087000.SWF2.REV1
a. 4.13 - Doors (and hardware).
1.03 SUBMITTALS
A. Submit as specified in DIVISION 1.
B. Includes, but not limited to, the following:
1. Product data includes manufacturers' technical product data for each item of door hardware, installation instructions, maintenance of operating parts and finish, and other information necessary to show compliance with requirements.
2. Final hardware schedule coordinated with doors, frames, and related work to ensure proper size, thickness, hand, function, and finish of door hardware.
a. Final Hardware Schedule Content: Based on hardware indicated, organize schedule into "hardware sets" indicating complete designations of every item required for each door or opening. Include the following information:
(1) Type, style, function, size, and finish of each hardware item.
(2) Name and manufacturer of each item.
(3) Fastenings and other pertinent information.
(4) Location of each hardware set cross referenced to indications on drawings both on floor plans and in door and frame schedule.
(5) Explanation of all abbreviations, symbols, and codes contained in schedule.
(6) Mounting locations for hardware.
(7) Door and frame sizes and materials.
(8) Keying information.
b. Submittal Sequence: Submit initial draft of final schedule along with essential product data in order to facilitate the fabrication of other work that is critical in the
Project construction schedule. Submit final schedule after samples, product data, coordination with shop drawings of other work, delivery schedules, and similar information has been completed and accepted.
c. Keying Schedule: Submit separate detailed schedule indicating clearly how
Owner's final instructions on keying of locks has been fulfilled.
d. Samples of each type of exposed hardware unit in finish indicated and tagged with full description for coordination with schedule. Submit Samples prior to submission of final hardware schedule.
(1) Samples will be returned to the Supplier. Units that are acceptable and remain undamaged through submittal, review, and field comparison process
BDG087000.SWF2.REV1 087000-3
may, after final check of operation, be incorporated in the Work, within limitations of keying coordination requirements.
e. Templates for doors, frames, and other work specified to be factory prepared for the installation of door hardware. Check Shop Drawings of other work to confirm that adequate provisions are made for locating and installing door hardware to comply with indicated requirements.
1.04 QUALITY ASSURANCE
A. Single Source Responsibility: Obtain each type of hardware (latch and lock sets, hinges, closers, etc.) from a single manufacturer.
B. Supplier Qualifications: A recognized architectural door hardware Supplier, with warehousing facilities in the Project's vicinity, that has a record of successful in-service performance for supplying door hardware similar in quantity, type, and quality to that indicated for this Project and that employs an experienced architectural hardware consultant (AHC) who is available to
Owner, Engineer, and Contractor for consultation at reasonable times during the course of the
Work.
1. Require supplier to meet with Owner to finalize keying requirements and to obtain final instructions in writing.
C. Fire-Rated Openings: Provide door hardware for fire-rated openings that complies with NFPA
Standard No. 80 and requirements of authorities having jurisdiction. Provide only items of door hardware that are listed and are identical to products tested by UL, Warnock Hersey, FM, or other testing and inspecting organization acceptable to authorities having jurisdiction for use on types and sizes of doors indicated in compliance with requirements of fire-rated door and door frame labels.
1.05 DELIVERY, STORAGE, AND HANDLING
A. Tag each item or package separately with identification related to final hardware schedule, and include basic installation instructions with each item or package.
B. Packaging of door hardware is responsibility of Supplier. As material is received by hardware
Supplier from various manufacturers, sort and repackage in containers clearly marked with appropriate hardware set number to match set numbers of approved hardware schedule. Two or more identical sets may be packed in same container.
C. Inventory door hardware jointly with representatives of hardware supplier and hardware installer until each is satisfied that count is correct.
087000-4 BDG087000.SWF2.REV1
D. Deliver individually packaged door hardware items promptly to place of installation (shop or
Project Site).
E. Provide secure lock-up for door hardware delivered to the project, but not yet installed.
Control handling and installation of hardware items that are not immediately replaceable so that completion of the work will not be delayed by hardware losses both before and after installation.
1.06 COORDINATION
A. Coordinate hardware with other Work.
B. Furnish templates and other detail matter as required to each fabricator of doors and frames, and to other Work to be prepared for the installation of hardware.
C. Where Modifications to this Specification are required due to unanticipated conditions, make recommendations of alternative procedures to Engineer for his consideration and approval.
1.07 MAINTENANCE
A. Maintenance Tools and Instructions: Furnish a complete set of specialized tools and maintenance instructions as needed for Owner's continued adjustment, maintenance, and removal and replacement of door hardware.
PART 2 -
2.01
PRODUCTS
ACCEPTABLE PRODUCTS
A. Items of hardware are specified in Schedule - HARDWARE SETS, with reference to the listing given in this Part - PRODUCT REQUIREMENTS.
2.02 PRODUCT REQUIREMENTS
A. Hardware shall meet the respective applicable standards specified in PART 1, this Section.
B. Provide hardware complete with all fasteners, anchors, instructions, layout templates, and any specialized tools as required for satisfactory installation and adjustment.
C. Provide manufacturer's standard products meeting the design intent of this Specification, free of imperfections affecting appearance or serviceability.
D. Hardware is specified in PART 2 - HARDWARE SETS, this Section, by type and function category, each of which has been selected as that best meeting the application. Acceptable products are given for each category as follows:
2.03 HARDWARE SCHEDULE
A. Refer to the Door Schedule on the Drawings to ascertain hands, sizes, and label conditions.
The "HDW SET" column in the Door Schedule indicates the door numbers to which each set applies.
BDG087000.SWF2.REV1 087000-5
2.04 SCHEDULED HARDWARE DESIGNATIONS
A. Requirements for design, grade, function, finish, size, and other distinctive qualities of each type of finish hardware are indicated in the "Hardware Schedule" at the end of this Section.
Products are identified by using hardware designation numbers of the following:
1. Manufacturer's Product Designations: A manufacturer's name and product number may be given in a Hardware Heading (Set) for a particular hardware item required, for the purpose of establishing a minimum requirement or as an example of a specific type.
Provide the product designated, or that of another manufacturer which is comparable in features, dimensions, and/or performance grade.
2. ANSI/BHMA designations used elsewhere in this Section or in schedules to describe hardware items or to define quality or function are derived from the following standards.
Provide products complying with these standards and requirements specified elsewhere in this Section.
a. Butts and Hinges: ANSI/BHMA A156.1.
b. Bored and Preassembled Locks and Latches: ANSI/BHMA A156.2.
c. Exit Devices: ANSI/BHMA A156.3.
d. Door Controls - Closers: ANSI/BHMA A156.4.
e. Auxiliary Locks and Associated Products: ANSI/BHMA A156.5.
f. Architectural Door Trim: ANSI/BHMA A156.6.
g. Template Hinge Dimensions: ANSI/BHMA A156.7.
h. Door Controls - Overhead Holders: ANSI/BHMA A156.8.
i. Interconnected Locks and Latches: ANSI/BHMA A156.12.
j. Mortise Locks and Latches: ANSI/BHMA A156.13.
k. Sliding and Folding Door Hardware: ANSI/BHMA A156.14.
l. Closer Holder Release Devices: ANSI/BHMA A156.15.
m. Auxiliary Hardware: ANSI/BHMA A156.16.
n. Self-Closing Hinges and Pivots: ANSI/BHMA A156.17.
o. Materials and Finishes: ANSI/BHMA A156.18.
2.05 KEYING
A. (Keying symbols for each cylinder are indicated in the "KEY" column in the Door
Schedule.) (Keying requirements shall be determined by consultation with (Owner) (and)
(Engineer).)
B. Description of Key System:
C. Provide keys as (follows: ) (directed by Owner.)
087000-6 BDG087000.SWF2.REV1
2.06 MATERIALS AND FABRICATION
A. Manufacturer's Name Plate: Do not use manufacturers' products that have manufacturer's name or trade name displayed in a visible location (omit removable nameplates) except in conjunction with required fire-rated labels and as otherwise acceptable to Engineer/Architect.
1. Manufacturer's identification will be permitted on rim of lock cylinders only.
B. Base Metals: Product hardware units of basic metal using manufacturer's standard metal alloy, composition, temper, and hardness, but in no case of lesser (commercially recognized) quality than specified for applicable hardware units by applicable ANSI/BHMA A156 series standards for each type of hardware item and with ANSI/BHMA A156.18 for finish designations indicated. Do not furnish "optional" materials or forming methods except as otherwise specified.
C. Fasteners: Provide hardware manufactured to conform to published templates, generally prepared for machine screw installation. Do not provide hardware that has been prepared for self-tapping sheet metal screws, except as specifically indicated or specified.
D. Furnish screws for installation with each hardware item. Provide Phillips flat-head screws except as otherwise indicated. Finish exposed screws to match hardware finish.
E. Provide concealed fasteners for hardware units that are exposed when door is closed except to the extent no standard units of type specified are available with concealed fasteners. Do not use through-bolts for installation where bolt head or nut on opposite face is exposed in other work unless their use is the only means of reinforcing the work adequately to fasten the hardware securely. Where through-bolts are used as a means of reinforcing the work, provide sleeves for each through-bolt.
PART 3 -
3.01
EXECUTION
PREPARATION
A. Check all frames and doors for proper hardware cutouts and reinforcements.
B. Except as specified otherwise, install articles of hardware after finishes have been completed on the substrate. Note all requirements for coordination with protective coating applications.
C. Install hardware at such a time in the Project schedule so as to minimize the possibility of damage from the activity of other trades prior to acceptance.
D. Check the installation directions of PART 1, paragraph 1.01B. - Related Work Specified
Elsewhere, this Section, before proceeding.
3.02 INSTALLATION
A. Mount articles of hardware at locations and in the manner prescribed in the respective DHI standards specified in PART 1, this Section, unless otherwise specified.
BDG087000.SWF2.REV1 087000-7
B. Install each hardware item in compliance with the manufacturer's instructions and recommendations. Where cutting and fitting is required to install hardware onto or into surfaces that are later to be painted or finished in another way, coordinate removal, storage, and reinstallation or application of surface protection with finishing work specified in the
DIVISION 9 Sections. Do not install surface-mounted items until finishes have been completed on the substrates involved.
C. Set units level, plumb, and true to line and location. Adjust and reinforce the attachment substrate as necessary for proper installation and operation.
D. All field preparations, such as drilling, cutting, tapping, and countersinking shall be accurately executed to assure precise fitting and adjustment.
E. Use fasteners of correct size and type with anchoring devices as required by construction conditions, suited to the nature of the attachment substrate, and the duty performance required.
F. In the course of installation, avoid damage to hardware mechanisms, finishes, and surrounding surfaces; smearing of paints, sealants, and lubricants onto surfaces not intended to receive them; and the admission of foreign matter into chassis and cases of units and their associated preparations.
G. Cut and fit thresholds to door frame profiles. Prepare thresholds for the attachment of strikes and clearance for spindles as required. Set thresholds in a continuously laid bed of mastic sealant to completely fill voids and exclude moisture from every source.
H. Seal weather-protection components attached to the exterior sides of doors and frames, such as drip caps, astragals, and sweeps in place with clear silicone caulk in such a manner as to ensure a continuously filled seam throughout the joinery.
I. Cut and fit weatherstripping accurately so as to effect the greatest possible continuity of the contact element. Where hardware-compatible extrusions are specified, do not cut weatherstrip.
Adjust templating of soffit- mounted hardware to suit the extrusion thickness, and mount all such items over the extrusions. Do not drill doors for hardware fasteners until this compensation has been accounted for.
J. Protection plates shall be installed on visual centers of closed doors. Bottom edges of all such plates shall be flush with bottoms of doors or shall meet top edges of surface-applied door sweeps where they are specified.
K. Adjust door closers immediately upon installation. Adjust in exact conformance with manufacturer's printed instructions. Back-check shall be advanced to reduce shock at dead
087000-8 BDG087000.SWF2.REV1
stop. Latching speed shall be set to assure unassisted positive latching. Readjustment of closers may be required prior to acceptance as directed by Engineer.
L. Install overhead stops and self-limiting closers (integral arm stops) to manufacturer's template instructions permitting maximum opening angle.
M. Install key cabinet where directed by Engineer.
3.03 ADJUSTMENT AND CLEANING
A. Adjust and check each operating item of hardware and each door to ensure proper operation or function of every unit. Replace units that cannot be adjusted to operate freely and smoothly or as intended for the application made.
1. Where door hardware is installed more than one month prior to acceptance or occupancy return to the installation during the week prior to acceptance or occupancy and make final check and adjustment of all hardware items in such space or area. Clean operating items as necessary to restore proper function and finish of hardware and doors. Adjust door control devices to compensate for final operation of heating and ventilating equipment.
2. Checking and adjustment shall be performed by a certified Architectural Hardware
Consultant to ensure proper operation and function of each unit.
B. Lubricate units only as recommended by their manufacturers.
C. Remove excess sealants, lubricants, and any other foreign substances, and protect all installations from subsequent damage.
D. Clean units just prior to final acceptance, with only materials and procedures recommended by their manufacturers.
E. Maintain the sheets of instruction, layout templates, and any supplementary literature regarding hardware in a readable condition. Transmit to Owner all such matter together with all spare parts, specialized tools, and other accessories supplied with the hardware. Also, transmit to
Owner a copy of the approved hardware schedule. Notify Engineer in writing that such transmittal has occurred.
F. Instruct Owner's maintenance personnel in the proper adjustment and maintenance of door hardware and finishes. Instructions shall be performed by a certified Architectural Hardware
Consultant or a qualified representative of the manufacturer.
END OF SECTION 087000
HW-0
1.) CYLINDERS: Best Access Systems, 7-pin interchangeable cores, no substitution. IC cylinder housings for exit devices shall be of type and size that are correct for device functions indicated.
2.) LOCKS: Grade 1, ADA compliant lever x rose 4000 Series cylindrical type. Locks must accept small format Best compatible core.
3.) EXIT DEVICES: Manufacturer’s high-end push-pad style, Grade 1. Finish 630 in lieu of 626 is acceptable. Lever shall be similar in design to that of locksets. Removable mullions must be by same manufacturer as devices. Provide mullions with stabilizers. Exit devices on labeled doors shall be listed Fire-Exit Hardware.
4.) CLOSERS: Manufacturer’s high-end large piston series, full cover, all-weather fluid. Where C02021 (PA) version is specified, provide rigid heavy-duty, large knuckle bracket; where integral stop PT4G is specified, provide spring shock-absorber type; where C02061 is specified, provide electable (manual turn-piece) positive-acting hold-open.
HW-1
6 Hinges A5111 4 ½ x 4 ½ NRP 630
2 Flushbolts L04251 626
1 Dustproof Strike threshold mount 630/626
1 Lockset 4000 GR1 F86 Lever 626
1 Lockguard for cylindrical lock 630
1 Closer-Stop-Holder C02061 PT4H-BF/PT4D/PT4G (active) 689
1 Overhead Stop-Holder C82511 Heavy-Duty Surface (inactive) 652
2 Kickplates J102 10” x 2” LDW x .050 630
1 Threshold NGP 4425 or similar cast abr
2 Sweep-Drips NGP 101AV or similar
1 Set Weatherstrip NGP 700AS or similar*
1 Overhead Drip Cap NGP 16A or similar, full frame width
Overlapping astragal push (low-bevel) side inactive, forming stop for active (Z), by HM door mfr.
1 Gasket NGP 2525B or similar, in astragal, full height
*Hdwe-compatible extrusion; install head piece before OH stop. 1 set per door leaf.
Magnetic Switches by Security Contractor. Prep Frame and Door for Magnetic Switches if recessed type
HW-2
6 Hinges A5111 4.5 x 4.5 NRP 630
2 Exit Device Type 2 GR1 F08 Lever 630/626
2 Cylinder as required for trim 626
2 Closer-Stop C02021 PT4H-BF/PT4D/PT4G 689
2 Kickplates J102 10” x 2” LDW x .050 630
1 Threshold NGP 896 or similar Alum
2 Sweep-Drips NGP 101AV or similar
2 Sets Weatherstrip NGP 700AS or similar*
1 Overhead Drip Cap NGP 16A or similar, full frame width
1 Set Meeting Stile Astragal NGP 125NA or similar
*Hdwe-compatible extrusion; install head piece before OH stop. 1 set per door leaf.
Magnetic Switches by Security Contractor. Prep Frame and Door for Magnetic Switches if recessed type
HW-3
3 Hinges A5111 4.5 x 4.5 NRP 630
1 Exit Device Type 3 GR1 F08 Lever 630/626
1 Lockguard for mortise exit device 630
1 Closer-Stop-Holder C02061 PT4H-BF/PT4D/PT4G 689
1 Kickplate J102 10” x 2” LDW x .050 630
1 Threshold NGP 896 or similar Alum
1 Sweep-Drip NGP 101AV or similar
1 Set Weatherstrip NGP 700AS or similar*
1 Overhead Drip Cap NGP 16A or similar, full frame width
*Hdwe-compatible extrusion; install head piece before closer.
Magnetic Switch by Security Contractor. Prep Frame and Door for Magnetic Switch if recessed type
HW-4
3 Hinges A5111 4 ½ x 4 ½ NRP 630
1 Exit Device Type 3 GR1 F01 630/626
1 Lockguard for mortise exit device 630
1 Closer-Stop C02021 PT4H-BF/PT4D/PT4G 689
1 Kickplate J102 10” x 2” LDW x .050 630
1 Threshold NGP 896 or similar Alum
1 Sweep-Drip NGP 101AV or similar
1 Set Weatherstrip NGP 700AS or similar*
1 Overhead Drip Cap NGP 16A or similar, full frame width
HW-5
6 Hinges A8111 4.5 x 4.5 652
2 Exit Device Type 2 GR1 F14 630/626
2 Closer-Stop C02021 PT4H-BF/PT4D/PT4G 689
2 Kickplates J102 10” x 2” LDW x .050 630
1 Gasket, H x J NGP 2525B or similar
HW-6
6 Hinges A8111 4.5 x 4.5 652
2 Flushbolts L04251 626
1 Dustproof Strike with floor plate 630/626
1 Lockset 4000 GR1 F84 Lever 626
2 Closer-Stop-Holder C02061 PT4H-BF/PT4D/PT4G 689
2 Kickplates J102 10” x 2” LDW x .050 630
1 Gasket, H x J NGP 2525B or similar
Overlapping astragal push (low-bevel) side inactive, forming stop for active (Z), by HM door mfr.
1 Gasket NGP 2525B or similar, in astragal, full height
HW-7
3 Hinges A8111 4.5 x 4.5 652
1 Exit Device Type 1 GR1 F14 630/626
1 Closer-Stop C02021 PT4H-BF/PT4D/PT4G 689
1 Kickplate J102 10” x 2” LDW x .050 630
1 Gasket, H x J NGP 2525B or similar
HW-8
3 Hinges A8111 4.5 x 4.5 652
1 Exit Device Type 1 GR1 F14 630/626
1 Closer C02021 PT4H-BF/PT4D 689
1 Wall Stop L52251 630
1 Kickplate J102 10” x 2” LDW x .050 630
HW-9
3 Hinges A8112 4.5 x 4.5 652
1 Lockset 4000 GR1 F86 Lever 626
1 Wall Stop L52251 630
3 Silencers
HW-10
3 Hinges A8112 4.5 x 4.5 652
1 Lockset 4000 GR1 F86 Lever 626
1 Overhead Stop C02541 630
HW-11
3 Hinges A8112 4.5 x 4.5 652
1 Lockset 4000 GR1 F86 Lever 626
1 Closer-Stop C02021 PT4H-BF/PT4D/PT4G 689
1 Kickplate J102 10” x 2” LDW x .050 630
HW-12
3 Hinges A8112 4.5 x 4.5 652
1 Lockset 4000 GR1 F86 Lever 626
1 Closer C02011 PT4H-BF/PT4D 689
1 Wall Stop L52251 630
1 Kickplate J102 10” x 2” LDW x .050 630
HW-13
3 Hinges A5111 4.5 x 4.5 NRP 630
1 Lockset 4000 GR1 F84 Lever 626
1 Lockguard for mortise exit device 630
1 Closer-Stop-Holder C02061 PT4H-BF/PT4D/PT4G 689
1 Kickplate J102 10” x 2” LDW x .050 630
1 Threshold NGP 896 or similar Alum
1 Sweep-Drip NGP 101AV or similar
1 Set Weatherstrip NGP 700AS or similar*
1 Overhead Drip Cap NGP 16A or similar, full frame width
HW-14
3 Hinges A8112 4.5 x 4.5 652
1 Lockset 4000 GR1 F84 Lever 626
1 Wall Stop L52251 630
HW-15
3 Hinges A8112 4.5 x 4.5 652
1 Lockset 4000 GR1 F84 Lever 626
1 Closer C02011 PT4H-BF/PT4D 689
1 Wall Stop L52251 630
1 Kickplate J102 10” x 2” LDW x .050 630
HW-16
3 Hinges A8112 4.5 x 4.5 652
1 Lockset 4000 GR1 F109 Lever 626
1 Wall Stop L52251 630
HW-17
3 Hinges A8112 4.5 x 4.5 652
1 Passage 4000 GR1 F75 Lever 626
1 Closer C02011 PT4H-BF/PT4D 689
1 Wall Stop L52251 630
1 Kickplate J102 10” x 2” LDW x .050 630
HW-18
3 Hinges A8112 4.5 x 4.5 652
1 Passage 4000 GR1 F75 Lever 626
1 Closer C02021 PT4H-BF/PT4D 689
1 Wall Stop L52251 630
1 Kickplate J102 10” x 2” LDW x .050 630
HW-18A
3 Hinges A8112 4.5 x 4.5 652
1 Passage 4000 GR1 F75 Lever 626
1 Closer C02021 PT4H-BF/PT4D 689
1 Wall Stop L52251 630
1 Kickplate J102 10” x 2” LDW x .050 630
HW-19
3 Hinges A8112 4.5 x 4.5 652
1 Passage 4000 GR1 F75 Lever 626
1 Wall Stop L52251 630
HW-20
3 Hinges A5111 4.5 x 4.5 630
1 Pull Plate J405 1” Round x 10” CTC w/ 4” x 16” Plate 630
1 Push Plate J301 - 8” x 16” 630
1 Closer C02011 PT4H-BF/PT4D 689
1 Wall Stop L52251 630
1 Kickplate J102 10” x 2” LDW x .050 630
HW-21
3 Hinges A8111 4.5 x 4.5 652
1 Passage 4000 GR1 F75 Lever 626
1 Closer-Stop C02021 PT4H-BF/PT4D/PT4G 689
1 Kickplate J102 10” x 2” LDW x .050 630
1 Mag Lock Securitron M62 or similar
1 Switch Maintained contact – single gang
3 Silencers
Use switch to engage/disengage mag lock. Tie into fire alarm system.
HW-22
3 Hinges A8111 4.5 x 4.5 NRP 652
1 Transfer Hinge A8111 4.5 x 4.5 one circuit 652
1 Lockset 4000 GR1 F86 EU Lever 626
1 Closer C02021 PT4H-BF/PT4D 689
1 Wall Stop L52251 630
1 Kickplate J102 10” x 2” LDW x .050 630
1 Gasket, H x J NGP 2525B or similar
Card Reader, Magnetic Switch, and Power Supply by security contractor
Prep Frame and Door for Magnetic Switch if recessed type
HW-23
3 Hinges A8111 4.5 x 4.5 NRP 652
1 Transfer Hinge A8111 4.5 x 4.5 one circuit 652
1 Lockset 4000 GR1 F86 EU Lever 626
1 Closer C02011 PT4H-BF/PT4D 689
1 Wall Stop L52251 630
1 Kickplate J102 10” x 2” LDW x .050 630
Release Button, Magnetic Switch, and Power Supply by security contractor
HW-24
2 Hinges A5111 4 ½ x 4 ½ NRP 630
1 Transfer Hinge A5111 4 ½” x 4 ½” one circuit 630
1 Exit Device Type 3 GR1 F03/Electrified lever trim 630/626
1 Cylinder as required for trim 626
1 Lockguard for mortise exit device 630
1 Closer-Stop C02021 PT4H-BF/PT4D/PT4G 689
1 Kickplate J102 10” x 2” LDW x .050 630
1 Threshold NGP 4425 or similar cast abr
1 Sweep-Drip NGP 101AV or similar
1 Set Weatherstrip NGP 700AS or similar*
1 Overhead Drip Cap NGP 16A or similar, full frame width
*Hdwe-compatible extrusion; install head piece before closer.
Card Reader, Magnetic Switch, and Power Supply by security contractor
HW-25
45db STC rated Level-Swing Wood: Overly assembly #4696241 is used as basis of design for verifiable compatibility with this hardware group.
3 Hinges A8111 5 x 4.5 626
1 Lockset 4000 GR1 F86 Lever 626
1 Electric Strike E59321 GR1 FSEC (e.g. VD 6211) 630
1 Spin-Dial Lock Kaba-Mas CD-X09 with strike
1 Closer C02011 PT4H-BF/PT4D 689
1 Wall Stop L52251 630
1 Kickplate J102 10” x 2” LDW x .050 630
1 Set Perimeter Seals by Acoustical Door Manufacturer
1 Flat Saddle ADA Compliant, Smooth Top*
*Omit if permitted by finish floor type.
Card Reader, Magnetic Switch, and Power Supply by security contractor
Provide 3 ¾” BS if required for clearance of sound seals
HW-26
Pressure resistant assembly conforming to UFC-4-010-01: Provide hardware that satisfies assembly manufacturer’s requirement for compliance.
4 Hinges A5111 4.5* x 4.5 NRP 630
2 Transfer Hinge A5111 4.5* x 4.5 One Circuit 630
1 Removable Mullion by device mfr., key release & stabilizers 630
1 Cylinder as required for KRM
2 Exit Device Type 1 GR1 F08 Lever EU-trim fail secure 630
2 Cylinder as required for exit device 630
2 Closer-Stop C02021 PT4H-BF/PT4D/PT4G 689
1 Threshold Door Assembly mfr Standard ADA compliant
*Provide 5 x 4.5 if required by assembly mfr for UFC4-010-01 compliance.
Note: Integral weatherstrip and sweep by Door manufacturer (with meeting stiles at pairs); Provide blade stop spacer, drop bracket, or other accessories required for proper closer installation
Card Reader, Magnetic Switches, and Power Supply by security contractor
Prep Frame and Door for Magnetic Switches if recessed type
HW-27
Pressure resistant assembly conforming to UFC-4-010-01: Provide hardware that satisfies assembly manufacturer’s requirement for compliance.
6 Hinges A5111 4.5* x 4.5 NRP 630
2 Exit Device Type 1 GR1 F08-NC Lever (Passage) 630/626
1 Removable Mullion with stabilizers
2 Closer-Stop C02021 PT4H-BF/PT4D/PT4G 689
1 Threshold NGP 896 or similar Alum
2 Sweep-Drips NGP 101AV or similar
1 Overhead Drip Cap NGP 16A or similar, full frame width
*Provide 5 x 4.5 if required by assembly mfr for UFC4-010-01 compliance.
Magnetic Switches by Security Contractor. Prep Frame and Door for Magnetic Switches if recessed type
Note: Integral weatherstrip by Door manufacturer; Provide blade stop spacer, drop bracket, or other accessories required for proper closer installation.
HW-28
3 Hinges A8112 4.5 x 4.5 652
1 Lockset 4000 GR1 F84 Lever 626
1 Closer C02021 PT4H-BF/PT4D 689
1 Wall Stop L52251 630
1 Kickplate J102 10” x 2” LDW x .050 630
HW-29
6 Hinges A8111 4.5 x 4.5 652
1 Set Automatic Flushbolts Fully Automatic type 25 626
1 Dustproof Strike with floor plate 630/626
1 Lockset 4000 GR1 F84 Lever 626
2 Closer-Stop C02021 PT4H-BF/PT4D/PT4G 689
1 Coordinator Mechanical type w/filler bar 628
2 Mounting Brackets Coordinator type for soffit mounted hardware
2 Kickplates J102 10” x 2” LDW x .050 630
HW-30
6 Hinges A8111 4.5 x 4.5 652
1 Set Automatic Flushbolts Fully Automatic type 25 626
1 Dustproof Strike with floor plate 630/626
1 Lockset 4000 GR1 F84 Lever 626
2 Closer C02011 PT4H-BF/PT4D 689
2 Wall Stop L52251 630
1 Coordinator Mechanical type w/filler bar 628
2 Kickplates J102 10” x 2” LDW x .050 630
HW-31
1 Mag Lock Securitron M62 or similar
Motion Sensor, Exit Button, Magnetic Switch, Card Reader, and Power Supply by Security Contractor.
Reuse balance of existing hardware. Verify compatibility with existing opening conditions.
HW-32
Reuse all existing Hardware.
HW-33
All Hardware by Vault Door Mfr.
BDG088000.SWF2-REV1 088000-1
SECTION 088000 - GLAZING
PART 1 - GENERAL
1.01 RELATED DOCUMENTS:
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and DIVISION 01 Specification Sections, apply to this Section.
1.02 SUMMARY:
A. Section includes glazing for the following products and applications, including those specified in other Sections where glazing requirements are specified by reference to this Section:
1. Windows.
2. Doors.
3. Glazed curtain walls.
4. Glazed entrances.
5. Interior borrowed lites.
B. Related Sections:
1. DIVISION 08 Section "Flush Wood Doors."
2. DIVISION 08 Section "Glazed Aluminum Curtain Walls."
3. DIVISION 08 Section "Aluminum Windows."
1.03 REFERENCES:
A. American Architectural Manufacturers Association:
1. AAMA 800-2005 - Voluntary Specifications and Test Methods for Sealants.
2. AAMA GDSG-1-1987 - Glass Design for Sloped Glazing.
3. AAMA TIR-A7-1983 - Sloped Glazing Guidelines.
B. American National Standards Institute:
1. ANSI Z97.1-2004 - Safety Glazing Materials Used in Buildings - Safety Performance
Specifications and Methods of Test.
C. American Society of Civil Engineers/Structural Engineering Institute:
1. ASCE/SEI 7-2005 - Minimum Design Loads for Buildings and Other Structures.
D. ASTM International:
1. ASTM C509-00 - Specification for Elastomeric Cellular Preformed Gasket and Sealing Material.
2. ASTM C542-05 - Specification for Lock-Strip Gaskets.
3. ASTM C716-00 - Specification for Installing Lock-Strip Gaskets and Infill Glazing
Materials.
4. ASTM C864-05 - Specification for Dense Elastomeric Compression Seal Gaskets, Setting Blocks, and Spacers.
5. ASTM C920-05 - Specification for Elastomeric Joint Sealants.
6. ASTM C1021-01 - Practice for Laboratories Engaged in the Testing of Building Sealants.
7. ASTM C1036-01 - Specification for Flat Glass.
8. ASTM C1048-04 - Specification for Heat-Treated Flat Glass - Kind HS, Kind FT Coated and Uncoated Glass.
9. ASTM C1087-00 - Test Method for Determining Compatibility of Liquid-Applied
Sealants with Accessories Used in Structural Glazing Systems.
10. ASTM C1115-00 - Specification for Dense Elastomeric Silicone Rubber Gaskets and
Accessories.
11. ASTM C1172-03 - Specification for Laminated Architectural Flat Glass.
12. ASTM C1281-03 - Specification for Preformed Tape Sealants for Glazing Applications.
SECTION 088000 - GLAZING: continued
088000-2 BDG088000.SWF2-REV1
13. ASTM C1330-02 - Specification for Cylindrical Sealant Backing for Use with Cold Liquid Applied Sealants.
14. ASTM C1376-03 - Specification for Pyrolytic and Vacuum Deposition Coatings on Flat Glass.
15. ASTM E1300-04 - Practice for Determining Load Resistance of Glass in Buildings.
16. ASTM E1886-05 - Test Method for Performance of Exterior Windows, Curtain Walls, Doors, and Impact Protective Systems Impacted by Missile(s) and Exposed to Cyclic Pressure Differentials.
17. ASTM E1996-06 - Specification for Performance of Exterior Windows, Curtain Walls, Doors and Impact Protective Systems Impacted by Windborne Debris in Hurricanes.
18. ASTM E2190-02 - Specification for Insulating Glass Unit Performance and Evaluation.
E. Code of Federal Regulations:
1. 16 CFR 1201-2006 - Safety Standard for Architectural Glazing Materials.
2. 40 CFR 59, Subpart D-2005 - National Volatile Organic Compound Emission Standards for Architectural Coatings.
F. Glass Association of North America:
1. Engineering Standards Manual. 2001.
2. Glazing Manual. 2004.
3. Laminated Glazing Reference Manual. 2006.
G. Insulating Glass Manufacturers Alliance:
1. IGMA TB-3001-2001 - Guidelines for Sloped Glazing.
2. SIGMA TM-3000-1990 (Revised 2004) - North American Glazing Guidelines for Sealed
Insulating Glass Units for Commercial and Residential Use.
H. International Code Council:
1. International Building Code. 2003.
I. Lawrence Berkeley National Laboratory; Environmental Energy Technologies Division;
Building Technologies Department; Windows & Daylighting Group:
1. WINDOW 5.2 - A PC Program for Analyzing Window Thermal Performance (Available at http://windows.lbl.gov/software).
J. National Fenestration Rating Council:
1. NFRC 100-2004 - Procedure for Determining Fenestration Product Thermal Properties (Currently Limited to U-Factors).
2. NFRC 200-2004 - Procedure for Determining Fenestration Product Solar Heat Gain Coefficients at Normal Incidence.
3. NFRC 300-2004 - Procedures for Determining Solar Optical Properties of Simple Fenestration Products.
K. NFPA 252-2003 - Fire Tests of Door Assemblies.
L. Department of Defense Unified Facilities Criteria (UFC):
1. 4-010-01 - DoD Minimum Antiterrorism Standards for Buildings.
2. 4-010-02 - DoD Minimum Antiterrorism Standoff Distances for Buildings (FOUO).
1.04 DEFINITIONS:
A. Glass Manufacturers: Firms that produce primary glass, fabricated glass, or both, as defined in referenced glazing publications.
B. Glass Thicknesses: Indicated by thickness designations in millimeters according to
ASTM C1036.
C. Interspace: Space between lites of an insulating-glass unit.
BDG088000.SWF2-REV1 088000-3
1.05 PERFORMANCE REQUIREMENTS:
A. General: Installed glazing systems shall withstand normal thermal movement and wind and impact loads (where applicable) without failure, including loss or glass breakage attributable to the following: defective manufacture, fabrication, or installation; failure of sealants or gaskets to remain watertight and airtight; deterioration of glazing materials; or other defects in construction. Comply with ASTM E1300. Design of blast resistant glazing systems shall comply with ASTM F2248 and UFC 4-010-01.
B. Delegated Design: Glass thicknesses specified or indicated on Drawings are minimum.
Confirm glass thicknesses by analyzing Project loads and in-service conditions. Glass thicknesses for blast resistant glazing systems shall be determined in accordance with ASTM F2248, ASTM E1300 and UFC 4-010-01.
C. See structural drawings for wind loading diagrams and wind borne debris code requirements.
D. Thermal Movements: Normal thermal movement results from the following maximum change (range) in ambient and surface temperatures acting on glass-framing members and glazing components. Base engineering calculation on materials' actual surface temperatures due to both solar heat gain and nighttime sky heat loss.
1. Temperature Change: 120ºF (67ºC), ambient; 180ºF (100ºC), material surfaces.
1.06 PRECONSTRUCTION TESTING:
A. Preconstruction Adhesion and Compatibility Testing: Test each glazing material type, tape sealant, gasket, glazing accessory, and glass-framing member for adhesion to and compatibility with elastomeric glazing sealants.
1. Testing will not be required if data are submitted based on previous testing of current sealant products and glazing materials matching those submitted.
2. Use ASTM C1087 to determine whether priming and other specific joint-preparation techniques are required to obtain rapid, optimum adhesion of glazing sealants to glass, tape sealants, gaskets, and glazing channel substrates.
3. Test no fewer than eight Samples of each type of material, including joint substrates, shims, sealant backings, secondary seals, and miscellaneous materials.
4. Schedule sufficient time for testing and analyzing results to prevent delaying the Work.
5. For materials failing tests, submit sealant manufacturer's written instructions for corrective measures including the use of specially formulated primers.
1.07 ACTION SUBMITTALS:
A. Product Data: For each glass product and glazing material indicated.
B. LEED Submittals:
1. Product Data for Credit IEQ 4.1: For glazing sealants used inside the weatherproofing system, documentation including printed statement of VOC content.
C. Glass Samples: For each type of glass product other than clear monolithic vision glass the following products; 12 inches (300 mm) square.
1. Insulating, blast glass assembly including, tinted, Low-E coated and laminated glass with clear interlayer and airspace.
2. Spandrel glass
D. Glazing Schedule: List glass types and thicknesses for each size opening and location. Use same designations indicated on Drawings.
E. Delegated-Design Submittal: For glass indicated to comply with performance requirements and design criteria, including analysis data signed and sealed by the qualified professional engineer responsible for their preparation.
088000-4 BDG088000.SWF2-REV1
1.08 INFORMATIONAL SUBMITTALS:
A. Qualification Data: For installers, manufacturers of insulating-glass units with sputter-coated, low-e coatings, glass testing agency and sealant testing agency.
B. Product Certificates: For glass and glazing products, from manufacturer.
C. Product Test Reports: Based on evaluation of comprehensive tests performed by a qualified testing agency, for tinted, coated, insulating glass, glazing sealants and glazing gaskets.
1. For glazing sealants, provide test reports based on testing current sealant formulations within previous 36-month period.
D. Preconstruction adhesion and compatibility test report.
E. Warranties: Sample of special warranties.
1.09 QUALITY ASSURANCE:
A. Manufacturer Qualifications for Insulating-Glass Units with Sputter-Coated, Low-E Coatings:
A qualified insulating-glass manufacturer who is approved and certified by coated-glass manufacturer.
B. Installer Qualifications: A…
This is the start of the file's text. The full file is on GovTribe.