57554_Bldg 105_Drawings - Addendum 3.pdf
PDF 148 KB Posted
- Attached to
- Base Defense Group Beddown Federal contract opportunity
- Solicitation number
- W912PQ-11-B-0004
About this file
Bldg 105 Drawings Addendum 3
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1DETAIL
PIPE HANGER - TRAPEZE
NOT TO SCALE
GC
GAS
METER
2DETAIL
NATURAL GAS PRESSURE
REGULATOR / METER (GRADE TO WALL)
NOT TO SCALE
3-WAY MIXING VALVE
WALL SURFACE
CLEANOUT PLUG
ROUND POLISHED STAINLESS
STEEL WALL COVER PLATE
(NOT REQUIRED UNLESS
LOCATED IN WALLS)
COUNTERSUNK SCREW
SCREWED COUNTERSUNK PLUG
OPENING CUT-OUT IN WALL
HORIZONTAL LINE
OR CLEANOUT TEE
4DETAIL
WALL CLEANOUT CONCEALED
WITHIN WALL OR END OF PIPE
NOT TO SCALE
STAND
6" CHANNEL
14 GUAGE INSULATION
SHIELD MIN. 18" LONG
ROLLER
PIPE NO INSULATION
VAPOR BARRIER
INSULATION
MAX SPACING 42"
PIPE
HANGER ROD
INSULATION (NOT
VAPOR BARRIER)
PIPE SADDLE AT
LEAST 18" LONG
LOCKING NUT
BOLT PIPE ROLLER
TO CHANNEL
VALVE
BY BG&E
SEE PLANS
FOR CAPACITY
BUILDING WALL
GRADE
SEE PLANS FOR SIZES
PRESSURE REGULATOR 10 PSIG
INLET, 14 IN W.C. OUTLET
GAS
SUB
METER
BG&E CONTRACTOR
WITH REMOTE
METERING
CONTACTS
IF
APPROXIMATE GRADE
DCWS - (SEE PLANS FOR SIZES)
UTILITY
WATER METER BMS SUB-WATER METER
DCWS TO SYSTEM
SEE PLANS FOR SIZE
TO BMS
4DETAIL
WATER METER W/ SUB METER
AND REDUCED PRESSURE ZONE
NOT TO SCALE
REDUCED PRESSURE
ZONE ASSEMBLY (BFP-1)
S ca le F or M ic ro fil m in g
In ch es M ill im et er s
no. date descriptionby
1 1615141312111098765432 17
M
L
K
J
I
H
G
F
E
D
C
B
A date detailed checkeddesigned ofsheet sheets project contract rev.drawing file ckd
BASE DEFENSE GROUP BEDDOWN
NEW YORK AIR NATIONAL GUARD
STEWART INTERNATIONAL AIRPORT
BUILDING 105
WHAY08907957554
NYANG BDG BEDDOWN
ISSUED FOR BIDAP0 07/29/11
M. SCHLUENDER
C O P Y R
IG
H T
B U
R N
S
M cD
O N
N E
LL
E
N G
IN
E
E R
IN
G
C O
M P
A N
Y , I
N C
FEBRUARY 22, 2011 C. PARRA
A. PASQUALI
PLUMBING DETAILS
P402 1 57554P401.dwg
CP
I:\USAIRNG\57554\CAD\MECH\BUILDING-105\MODEL\PLBG\57554P401.DWG 8/30/2011 2:25 PM CPARRA
ADDENDUM 3AP1 08/30/11 CP
File details come from the government source that posted it. Updated .