W81G6691212535

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

SUBJECT: INVITATION FOR BIDS NUMBER W912P6-09-B-0021, “CHICAGO SANITARY AND SHIP CANAL (CSSC) AQUATIC NUISANCE SPECIES ELECTRICAL DEMONSTRATION PERMANENT DISPERSAL BARRIER IIB BUILDING, ROMEOVILLE, ILLINOIS”

The Government is issuing this Amendment Number 0008 to its previously issued Solicitation W912P6-09-B-0021 for the purpose of amending various areas of the Solicitation package as delineated on the follow ing pages of the Amendment.

THIS AMENDMENT CONTINUES ON THE NEXT PAGE

1. CONTRACT ID CODE PAGE OF PAGES

J 1 16

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 15-Oct-2009

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P6-09-B-0021

X 9B. DATED (SEE ITEM 11)

11-Aug-2009

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

15-Oct-2009

CODE

U. S. ARMY ENGINEER DISTRICT, CHICAGO

111 NORTH CANAL STREET SUITE 600

CHICAGO IL 60606-7206

W912P6 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P6-09-B-0021

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

A. BID OPENING DATE: The bid opening date is NOT EXTENDED by this Amendment;

therefore, the bids are due by 2:00 p.m. CDT on 20 October 2009. Detailed information regarding the submission of bids is located in SECTION 00010 of the Solicitation Document.

B. AMENDED SOLICITATION SECTIONS:

(1) Section 00010: The following changes were made to the Contract Line Items (CLIN) contained in the Bid Schedule. As a result, a Revised Bid Schedule is incorporated herein and shall be fully completed and submitted by the Bidder in order for it to be considered responsive to the IFB and eligible for a contract award.

CLIN 0001

The CLIN extended description has been modified to change the required completion date to: May 30, 2010.

CLIN 0004

The CLIN extended description has been modified to change the commencement and completion time period to: May 31, 2010 thru August 31, 2010.

CLIN 0005

The CLIN extended description has been modified to change the required completion date to: September 30, 2010.

(2) Reference Section 00700:

(a) Clause Number 52.211-10, has been revised to modify the commencement and completion dates that were delineated therein. Accordingly, the new dates are hereby incorporated as provided in the below relevant Clause.

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK

(APR 1984)

The Contractor is required to (a) commence PHASE I work under this contract within 10 calendar days following its acknowledgement of the Notice to Proceed Letter, (b) prosecute the work diligently, and (c) complete the entire work of PHASE I ready for use not later than May 30, 2010.

In addition the above, the Contractor is required to comply with the following mandatory performance schedule for PHASE II and PHASE III Work. There is no break in the work schedule; therefore, no separate Notice to Proceed will be issued for Phase II and Phase III Work.

Bid Item 0004: PHASE II - ON-SITE COORDINATION EFFORTS

The Contractor will be required to complete the work under this stage of the Contract from May 31, 2010 thru August 31, 2010. For this requirement, the contractor shall ensure that it will have personnel and equipment available for testing of the work performed by others.

Bid Item 0005: PHASE III - REMAINING WORK ITEMS Under this stage of the Contract, the Contractor is required to complete all remaining work (INCLUDES final testing and construction tasks related to project completion).

Final completion of all remaining work shall be accomplished by September 30, 2010.

The time stated for completion shall include final cleanup of the premises.

(End of clause)

(b) Clause Number 52.211-12, has been revised to modify the completion dates that were delineated therein. Accordingly, the new dates are hereby incorporated as provided in the below relevant Clause.

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) For the purposes of this Clause, the following stated amounts of liquidated damages apply to the delay for the each stage of the contract work. The conditions and a detailed description of what constitutes the completion of the building construction, on-site coordination efforts, and the remaining items are located in Section 00800 of this document.

PHASE I - CONSTRUCT FISH BARRIER BUILDING

If the Contractor fails to complete all of the building construction work (structural, mechanical, electrical and finishes) no later than May 30, 2010, the Contractor shall pay liquidated damages to the Government in the amount of $1,768.00 for each calendar day of delay until the work is completed or accepted.

PHASE II - ON-SITE COORDINATION EFFORTS

Should the Contractor fail to complete the work involved under Phase II by August 31, 2010, the Contractor shall pay liquidated damages to the Government in the amount of $1,768.00 for each calendar day of the delay until the work is completed or accepted.

PHASE III - REMAINING WORK ITEMS

Should the Contractor fail to complete the remaining work items (INCLUDES final testing and construction tasks related to project completion) by September 30, 2010, the Contractor shall pay liquidated damages to the Government in the amount of $1,768.00 for each calendar day of the delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(End of clause)

(3) Reference Section 00800: Under the segment entitled “Mandatory Completion of the Required Contract Work,” the commencement and completion dates as delineated therein, have been modified. Accordingly, the new dates are hereby incorporated as provided in the below relevant segment.

MANDATORY COMPLETION OF THE REQUIRED CONTRACT WORK:

PHASE I - CONSTRUCT FISH BARRIER BUILDING: Under Phase I of the Contract, the Contractor is REQUIRED to complete all building construction work (structural, mechanical, electrical and finishes) no later than May 30, 2010. This requirement does not apply to the mechanical and electrical testing, which will be performed by another government Contractor (referenced in the Technical Specifications as, “work performed by others”).

A partial list of items which must be completed for the Building “Construction” to be complete includes the following:

- All structural components of the building are complete and installed.

- All finishes are installed in the building.

- The building is considered “weather tight,” meaning that all doors, frames, louvers, etc. have been installed, roofing has been installed, sealants have been installed to create a “weather tight” structure.

- The HVAC system has been installed, tested, and balanced and is fully operational.

- All plumbing and mechanical systems have been installed, tested, and are fully operational, including the water wells and all pumps.

- The cooling tower and water treatment system are installed.

- All electrical power, lighting, alarm, and other systems have been installed. - Power stubs must be run into the facility for “Work by Others” as indicated in the documents.

- Fire suppression system and supporting alarms must be installed and tested.

- Exterior site work must be complete including fencing, to create a secure site.

- All utilities must be operational.

Building Construction work shall be considered complete when all the work is complete, except for the following:

- “Work by Others,” as described in the contract documents.

- Testing of all systems described as “Work by Others.”

PHASE II - ON-SITE COORDINATION EFFORTS

Under this stage of the Contract (from May 31, 2010 thru August 31, 2010), the Contractor will be required to furnish all personnel and equipment onsite to perform coordination efforts for work that will be performed by others. In the performance of these efforts, the contractor shall ensure that it will have personnel and equipment available for testing of the work performed by others.

PHASE III - REMAINING WORK ITEMS

Under this stage of the Contract, the Contractor is required to complete all remaining work (INCLUDES final testing and construction tasks related to project completion). Final completion of all remaining work shall be accomplished by September 30, 2010. - The entire building shall be considered complete when all systems have been installed and final testing has been accomplished.

LIQUIDATED DAMAGES: In consideration of the aforementioned “MANDATORY PERFORMANCE PERIODS,” the amount of Liquidated Damages will be assessed for each separate stage of the work, as delineated at Contract Clause 52.211-12, which specifies the “amount of the delay” for each separate stage of work.

C. AMENDED PROJECT SPECIFICATION SECTIONS: For the various Phases of Work, the commencement and completion dates as delineated throughout the various portions of the Specifications have been modified as follows: NOTE THAT, this Amendment does not provide revised portions of the relevant Specification Sections. The revised dates will be incorporated into the respective Spec Sections, via the conformed (resultant) contract set.

PHASE I work must be completed not later than May 30, 2010.

PHASE II work shall be accomplished from May 31, 2010 thru August 31, 2010.

PHASE III work shall be completed by September 30, 2010.

D. AMENDED PROJECT DRAWING SHEETS:

(1) The below Drawing Sheets have been MODIFIED; the revised Sheets are contained hereunder. Therefore, bidders shall replace the affected sheet that was issued under the IFB set with the revised respective Sheets attached hereto.

REVISED DRAWING SHEETS: G-04, C-02, A-02, A-05, S-01, S-04, A-04, C-01

(2) A new Drawing Sheet is hereby added. Refer to the attached Sheet numbered as “C- 03.”

(3) Any mention of the commencement and completion dates that were provided on any of the previously issued Drawing Sheets shall be disregarded as the dates have been modified as follows. NOTE THAT, this Amendment does not provide revised portions of the relevant Drawing Sheets. The revised dates will be incorporated into the respective Sheets, via the conformed (resultant) contract set.

PHASE I work must be completed not later than May 30, 2010.

PHASE II work shall be accomplished from May 31, 2010 thru August 31, 2010.

PHASE III work shall be completed by September 30, 2010.

E. WAGE RATES: This Amendment replaces the previously issued wage rates with those attached hereto, as provided under: General Decision Number: IL080009 10/02/2009

IL9.

END OF SUMMARY OF CHANGES

Section 00010 - Solicitation Contract Form

REVISED BID SCHEDULE (AMENDMENT 0008)

ITEM NO SUPPLIES/SERVICES

PHASE I - CONSTRUCT FISH BARRIER BUILDING – Under Phase I of the

Contract, the Contractor is REQUIRED to complete all building construction work (structural, mechanical, electrical and finishes) no later than May 30, 2010. This requirement does not apply to the mechanical and electrical testing, which will be performed by another government Contractor (referenced in the Technical Specifications as, “work performed by others”).

Bidder’s shall provide their pricing at Sub-Items 0001AA through 0001AG, as this Item 0001 identifies the information that relates directly to Sub-Items 0001AA through 0001AG; therefore, this Item 0001 it is not to be scheduled separately for delivery, identified separately for shipment or performance, or priced separately for payment purposes.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001AA 1 Lump Sum

MOBILIZATION / DEMOBILIZATION

Firm-Fixed Price (FFP)

NET AMT

0001AB 1 Lump Sum

PROJECT AND SAFETY SIGNS

FFP

0001AC 1 Lump Sum

FOUNDATION PREPARATION

0001AD 1 Lump Sum

BUILDING

0001AE 1 Lump Sum

RECOVERY ACTION - CONCRETE, INTERIOR AND

EXTERIOR

THIS ITEM WILL BE 100% FUNDED UNDER ARRA FUNDING.

0001AF 1 Lump Sum

RECOVERY ACTION - BUILDING ELECTRICAL

DISTRIBUTION

0001AG 1 Lump Sum

RECOVERY ACTION - EXTERIOR ELECTRICAL DISTRIBUTION

TEST WELL

This Item identifies information that relates directly to Sub-Items 0002AA and 0002AB; it is not to be scheduled separately for delivery, identified separately for shipment or performance, or priced separately for payment purposes. In that regard, the Offeror shall set forth its pricing at Sub-Items 0002AA and 0002AB.

0002AA 200 Linear

Foot

INSTALL ONE (1) TEST WELL, FIRST 200 LINEAR FEET (LF)

0002AB 100 Linear

INSTALL ONE (1) TEST WELL, OVER 200 LF

INSTALL WATER WELLS

This Item identifies information that relates directly to Sub-Items 0003AA and 0003AB; it is not to be scheduled separately for delivery, identified separately for shipment or performance, or priced separately for payment purposes. In that regard, the Offeror shall set forth its pricing at Sub-Items 0003AA and 0003AB.

0003AA 300 Linear

INSTALL TWO (2) WATER WELLS, FIRST 300 LF

0003AB 200 Linear

INSTALL TWO (2) WATER WELLS, OVER 300 LF

0004 520 Hours

PHASE II - ON-SITE COORDINATION EFFORTS: Under this stage of the Contract (from May 31, 2010 thru August 31, 2010), the Contractor will be required to furnish all personnel and equipment onsite to perform coordination efforts for work that will be performed by others. In the performance of these efforts, the contractor shall ensure that it will have personnel and equipment available for testing of the work performed by others.

0005 1 Lump Sum

PHASE III - REMAINING WORK ITEMS

Under this stage of the Contract, the Contractor is required to complete all remaining work (INCLUDES final testing and construction tasks related to project completion). Final completion of all remaining work shall be accomplished by September 30, 2010. - The entire building shall be considered complete when all systems have been installed and final testing has been accomplished.

0006 393 Linear

FENCE INSTALLATION

0007 1 Lump Sum

ALLOWANCE FOR ELECTRICAL UTILITY

CONNECTION AND SERVICE FEES

THIS IS A COST-REIMBURSABLE LINE ITEM - The Government will reimburse the Contractor for actual costs associated with this bid item, not to exceed its bid price. Therefore, the government will not pay more than the total line item amount for this bid item. Should the contractor exhaust its budget (bid price) for this line item because additional services are deemed necessary, the government may negotiate a fair and reasonable price with the contractor to make adjustments to the contract price. However, the contractor shall NOT incur any additional costs or perform any additional services outside of the bid price until the government has authorized the contractor to proceed with the additional services.

The COR is responsible for processing payments. The contractor shall provide the COR with paid invoices and all other supporting cost information for the verification of the Contractor’s expenditures for this line item.

NOT TO EXCEED

0008 1 Lump Sum

PERFORMANCE AND PAYMENT BONDS

THIS IS A COST REIMBURSABLE LINE ITEM - The Government will reimburse the Contractor for the actual cost of acceptable performance and payments bonds, upon receiving evidence of payment (paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line item amount for the performance and payment bonds. If the actual cost of the bonds is less than the line item amount, the contract will modified to adjust the line item accordingly.

Adjustment(s) to the line item will also be made for any revisions to the actual bond costs associated with contract changes.

NOT TO EXCEED

TOTAL BID PRICE (LINE ITEMS 0001 THROUGH 0008): $_______________

IMPORTANT BID NOTES:

1. BID CONDITIONS:

a. The bidder’s total price for the work shall be based on the TOTAL of all BID ITEMS included in the above Bid Schedule, with no exceptions. The Government intends to award all BID ITEMS to the successful bidder at the bid prices stated in the Bid Schedule.

b. Split awards or multiple award contracts will not result from this Solicitation.

c. Bidders are required to complete the entire Bid Schedule; therefore, any bidder who does not complete the entire Bid Schedule may be considered non-responsive to the Solicitation and ineligible for award.

2. SMALL BUSINESS SUBCONTRACTING PLAN:

a. Prior to the Contracting Officer awarding the contract, the successful bidder will be required to submit a Small Business Subcontracting Plan in accordance with the provision of FAR Clause 52.219-9, “Small Business Subcontracting Plan.” This requirement applies to all business concerns other than small businesses. The Contracting Officer must approve the Plan before an award can be made; the Plan will be made apart of the resultant contract.

b. The successful bidder shall make a good faith effort to apply the following percentages to its intended amount of subcontracts in order to satisfy the Small Business Subcontracting goals of the Chicago District. The District Goals are identified below:

(1) at least 70.0% with small businesses (SB)

(2) at least 6.2% with small disadvantaged businesses (SDB)

(3) at least 7.0% with women-owned SB (WOSB)

(4) at least 0.9% with service-disabled veteran-owned SB

(5) at least 9.8% with HUBZone SB

(6) at least 3.0% Veteran-Owned Small Business

NOTE: BIDDERS SHALL NOT INCLUDE A SMALL BUSINESS SUBCONTRACTING PLAN

WITH ITS BID; IT WILL BE REQUESTED AFTER BID OPENING WHEN APPROPRIATE.

3. BID SUBMISSION: Regardless of the method of delivery (mailed or hand-carried), Bids and all other documents called out in the Solicitation shall be enclosed and sealed in an envelope that is clearly marked “Bid” and shall include the assigned Solicitation Number, and the Bid Opening Date and Time. BIDS OR MODIFICATIONS TO BIDS THAT ARE RECEIVED BY

FACSIMILE OR TELETYPE WILL NOT BE CONSIDERED.

a. Mailed and Hand-Carried Bids: It is the responsibility of each bidder to ensure that its Sealed Bid is received by the Chicago District’s – USACE Contracting Branch, located at 111 North Canal Street, Suite 600, Chicago, IL 60606 prior to the date and time set of the opening of bids – See Block 13A of Page 1 of the Solicitation.

b. Hand-Carried Bids Delivered on the Day of the Bid Opening: For bids being hand-carried after 12:NOON on the date of the bid opening, the bidder shall deliver its sealed bid directly to the Bid Opening Room, which is located the River Center Building, 111 North Canal Street, Lobby Conference Room (1st Floor), Chicago, Illinois 60606.

c. BID OPENING ROOM: The designated Bid Opening Room is The Lobby Conference Room, located at the River Center Building, 111 North Canal Street, Chicago, Illinois 60606.

d. ACKNOWLEDGEMENT OF AMENDMENTS: Bidders are required to acknowledge the receipt of all amendments to the Solicitation on the Standard Form 1442 in the space provided, by completing Blocks 8 and 15 of the Amendment (Standard Form 30), by separate letter, or by telegram prior to opening of bids. Failure to acknowledge all amendments may cause rejection of the bid.

e. SF 1442 BACK (Page 2 of the Solicitation): Bidders shall fully complete all the required areas located under the section designated as “OFFER” (refer to Items 14. through 20C.)

f. SECTION 00600 (REPRESENTATIONS AND CERTIFICATIONS): The bidder must fully complete Section 00600 of this Solicitation and submit it along with all other documents required by this Solicitation. Bids received without this Section fully completed may be rejected, considered non-responsive and ineligible for award.

g. BID GUARANTEE: The bidder is required to submit a Bid Guarantee for this procurement. Any bidder failing to submit an authentic Bid Guarantee will be considered non-responsive to the Solicitation and ineligible for award. The Bid Guarantee shall be in the amount of 20% percent of the bidder’s bid price or $3,000,000.00, whichever is less.

General Decision Number: IL080009 10/02/2009 IL9

Superseded General Decision Number: IL20070009

State: Illinois

Construction Types: Building, Heavy, Highway and Residential

County: Cook County in Illinois.

BUILDING, RESIDENTIAL, HEAVY, AND HIGHWAY PROJECTS (does not include landscape projects).

Modification Number Publication Date 0 02/08/2008 1 02/22/2008 2 03/21/2008 3 04/25/2008 4 06/06/2008 5 07/04/2008 6 07/25/2008 7 08/22/2008 8 11/14/2008 9 11/21/2008 10 11/28/2008 11 01/02/2009 12 02/06/2009 13 04/17/2009 14 05/15/2009 15 06/12/2009 16 07/10/2009 17 07/17/2009 18 09/04/2009 19 10/02/2009

ASBE0017-001 06/01/2009

Rates Fringes

ASBESTOS WORKER/INSULATOR

Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems..........$ 42.05 21.00 Fire Stop Technician.............$ 24.33 19.80

HAZARDOUS MATERIAL HANDLER

includes preparation, wetting, stripping removal scrapping, vacuuming, bagging and disposal of all insulation materials, whether they contain asbestos or not, from mechanical systems..........$ 31.54 19.80

BOIL0001-001 07/01/2009

Rates Fringes

BOILERMAKER......................$ 40.97 18.97

* BRIL0021-001 06/01/2009

Rates Fringes

BRICKLAYER.......................$ 39.03 19.90

* BRIL0021-004 06/01/2009

Rates Fringes

Marble Mason.....................$ 39.03 19.90

BRIL0052-001 06/01/2009

Rates Fringes

Pointer, cleaner and caulker.....$ 38.20 17.36

CARP0555-001 06/01/2009

Rates Fringes

CARPENTER

Carpenter, Lather, Millwright, Piledriver, and Soft Floor Layer........$ 40.77 20.13

* CARP0555-002 10/01/2008

Rates Fringes

CARPENTER (Excluding structures with elevators and structures over 3 1/2 stories)...$ 37.77 17.74

ELEC0009-003 05/25/2009

Rates Fringes

Line Construction Groundman...................$ 31.08 58.18% Lineman and Equipment Operator....................$ 39.85 58.18%

ELEC0134-001 06/02/2008

Rates Fringes

ELECTRICIAN......................$ 39.40 20.32

ELEC0134-002 04/01/1998

Rates Fringes

ELECTRICIAN ((CLASS B)

(Install magnetic or electronic replacement ballasts either singly or in groups including necessary wiring within fixture;

Install replacement lamp holders and/or sockets including necessary wiring within fixture including relocating sockets within fixture; Install replacement lighting circuit breakers where necessary; Install replacement lighting switches where necessary; Repair lighting fixtures other than ballast or socket replacements; Rewire chandeliers or incandescent fixtures only within fixtures themselves.).....................$ 20.71 2.975+a+b

FOOTNOTES:

a-Paid Vacation- Employees who have been employed for one year but less than three years receive 1 week of paid vacation; employees who have been employed three years but less than ten years receive 2 weeks of paid vacation;

Employees who have been employed ten years but less than twenty years receive 3 weeks of paid vacation; and employees who have worked twenty or more years receive 4 weeks of paid vacation.

b-Funeral Leave-In the instance of the death of a mother, other-in-law-; father, father-in-law, sister, brother, husband, wife, or a child of an employee shall receive up to three days of paid funeral leave.

ELEC0134-003 06/07/2004

Rates Fringes

ELECTRICIAN

ELECTRICAL TECHNICIAN.......$ 30.89 12.59

The work shall consist of the installation, operation, inspection, maintenance, repair and service of radio, television, recording, voice sound vision production and reproduction, telephone and telephone interconnect, facsimile, data appatatus, coaxial, fibre optic and wireless equipment, appliances and systems used for the transmission and reception of signals of any nature, business, domestic, commercial, education, entertainment and residential purposes, including but not limited to communication and telephone, electronic and sound equipment, fibre optic and data communication systems, and the performance of any task directly related to such installation or service whether at new or existing sites, such tasks to include the placing of wire and cable and electrical power conduit or other raceway work within the equipment room and pulling wire and/or cable through conduit and the installation of any incidential conduit.

ELEV0002-003 01/01/2009

Rates Fringes

ELEVATOR MECHANIC................$ 44.93 18.285+A+B

FOOTNOTES:

A. Eight paid holidays: New Year's Day; Memorial Day;

Independence Day; Labor Day; Thanksgiving Day; Day after Thanksgiving; Veterans' Day and Christmas Day.

B. Employer contributes 8% of regular basic hourly rate as vacation pay credit for employees with more than 5 years of service; and 6% for 6 months to 5 years of service.

* ENGI0150-006 06/01/2006

Building and Residential Construction

Rates Fringes

POWER EQUIPMENT OPERATOR

GROUP 1....................$ 41.55 15.05

GROUP 2....................$ 40.25 15.05

GROUP 3....................$ 37.70 15.05

GROUP 4....................$ 35.95 15.05

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Mechanic; Asphalt Plant*; Asphalt Spreader;

Autograde*; Backhoes with Caisson attachment*:Batch Plant*;

Benoto(Requires two Engineers); Boiler and Throttle Valve;

Caisson Rigs*; Central Redi-Mix Plant*; Combination Backhoe Front Endloader Machine; Compressor and Throttle Valve;

Concrete Breaker (Truck Mounted)*; Concrete Conveyor;

Concrete Conveyor, Truck Mounted; Concrete Paver over 27E

cu. ft.*; Concrete Paver 27E cu ft and Under*; Concrete Placer*; Concrete Placing Boom; Concrete Pump (Truck Mounted); Concrete Tower; Cranes*; Cranes, Hammerhead*;

Cranes, (GCI and similar type Requires two operators only);

Creter Crane; Crusher, Stone, etc; Derricks; Derricks, Traveling*; Formless Curb and Gutter Machine*; Grader, Elevating; Grouting Machines; Highlift Shovels or Front Endloader 2 1/4 yd. and over; Hoists, Elevators, Outside

Type Rack and pinion and similar Machines; Hoists, One, Two, and Three Drum; Hoists, Two Tugger One Floor;

Hydraulic Backhoes*; Hydraulic Boom Trucks; Hydraulic Vac (and similar equipment);Locomotives; Motor Patrol*; Pile Drivers amd Skid Rig*; Post Hole Digger; Pre- Stress Machine; Pump Cretes Dual Ram(Requiring frequent Lubrication and Water); Pump Cretes; Squeeze Cretes-Screw Type Pumps Gypsum Bulker and Pump; Raised and Blind Hole Drill*; Roto Mill Grinder (36" and Over)*; Roto Mill Grinder (Less Than 36")*; Scoops-Tractor Drawn; Slip-Form Paver*; Straddle Buggies; Tournapull; Tractor with Boom, and Side Boom; and Trenching Machines*.

GROUP 2: Bobcat (over 3/4 cu yd); Boilers; Broom, Power Propelled; Bulldozers; Concrete Mixer (Two Bag and over);

Conveyor, Portable; Forklift Trucks; Greaser Engineer;

Highlift Shovels or Front End loaders under 2 1/4 cu yd;

Aotomatic Hoists, Hoists, Inside Elevators; Hoists, Sewer Dragging Machine; Hoists, Tugger Single Drum; Laser Screed;

Rock Drill (Self-Propelled); Rock Drill (Truck Mounted)*;

Rollers; Steam Generators; Tractors; Tractor Drawn Vibratory Roller (Receives an additional $.50 per hour);

Winch Trucks with "A" Frame.

GROUP 3: Air Compressor-Small 250 and Under (1 to 5 not to exceed a total of 300 ft); Air Compressor-Large over 250;

Combination-Small Equipment Operator; Generator- Small 50 kw and under; Generator-Large over 50 kw; Heaters, Mechanical; Hoists, Inside Elevators (Remodeling or Renovatin work); Hydrualic Power Units (Pile Driving, Extracting, and Drilling); Low Boys; Pumps Over 3" (1 To 3 not to exceed a total of 300 ft); Pumps, Well Points;

Welding Machines (2 through 5); Winches, 4 Small Electric Drill Winches; Bobcat (up to and including 3/4 cu yd)

GROUP 4 - Bobcats and/or other Skid Steer Loaders; Brick Forklifts; Oilers

*-Requires Oiler

* ENGI0150-025 06/01/2009

Heavy and Highway Construction

Rates Fringes

POWER EQUIPMENT OPERATOR

GROUP 1.....................$ 43.30 22.80

GROUP 2.....................$ 42.75 22.80

GROUP 3.....................$ 40.70 22.80

GROUP 4.....................$ 39.30 22.80

GROUP 5.....................$ 38.10 22.80

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Asphalt Plant*; Asphalt Heater and Planer combination; Asphalt Heater Scarfire*, Asphalt Spreader;

Autograder/ GOMACO or similar; ABG Paver*, Backhoes with Caisson attachment*, Ballast Regulator, Belt Loader*;

Caisson Rigs*Car Dumper, Central Redi-Mix Plant*, Combination Backhoe; Front End Loader Machine (1 cu yd or over Backhoe bucket or with attachments); Concrete Breaker (truck mounted); Concrete Conveyor; Concrete Paver over 27E cu ft*; Concrete Placer*; Concrete Tube Float; Cranes, all attachments*; Cranes, Hammerhead, Linden, Peco and machines of a like nature*; Creter Crane; Crusher, stone; All Derricks; Derrick Boats; Derricks, traveling*; Dowell Machine with Air Compressor ($1.00 above Class 1);

Dredges*; Field Mechanic Welder; Formless Curb and Gutter Machine*; Gradall and machines of a like nature*; Grader, Elevating; Grader, Motor Grader, Motor Patrol, Auto Patrol, Form Grader, Pull Grader, Subgrader; Guard Rail Post Driver mounted*; Hoists, one, two, and three Drum; Hydraulic Backhoes*; Backhoes with Shear attachments*; Mucking Machine; Pile Drivers and Skid Rig*; Pre-Stress Machine;

Pump Cretes Dual Ram (requires frequent lubrication and water)*; Rock Drill- Crawler or Skid Rig*; Rock Drill truck mounted*; Rock/ Track Tamper; Roto Mill Grinder, (36" and over)*; Slip-Form Paver*; Soil Test Drill Rig, truck mounted*; Straddle Buggies; Hydraulic Telescoping Form (tunnel); Tractor Drawn Belt Loader*; Tractor Drawn Belt Loader with attached Pusher (two engineers); Tractor with boom; Tractaire with attachment; Traffic Barrier Transfer Machine*; Trenching Machine; Truck Mounted Concrete Pump with boom*; Underground Boring and/or Mining Machines 5 ft in diameter and over tunnel, etc.*; Wheel Excavator* & Widener (Apsco); Raised or Blind Hoe Drill, Tunnel & Shaft*

GROUP 2: Batch Plant*; Bituminous Mixer; Boiler and Throttle Valve; Bulldozer; Car Loader Trailing Conveyors;

Combination Backkhoe Front End Loader Machine, (less than 1 cu yd Backhoe Bucket with attachments); Compressor and Throttle Valve; Compressor, common receiver (3); Concrete Breaker or Hydro Hammer; Concrete Grinding Machine;

Concrete Mixer or Paver 7S series to and including 27 cu ft; Concrete Spreader; Concrete Curing Machine; Burlap Machine; Belting Machine and Sealing Machine; Concrete Wheel Saw; Conveyor Muck Cars (Haglund or similar type);

Drills (all); Finishing Machine-Concrete; Greaser Engineer;

Highlift Shovels or Front End Loader; Hoist- Sewer Dragging Machine; Hydraulic Boom Trucks, all attachments;

Hydro-Blaster (requires two operators); Laser Screed*;

Locomotives, Dinky; Off-Road Hauling Units (including articulating); Pump Cretes; Squeeze Cretes-Screw Type pumps, Gypsum Bulker and Pump; Roller Asphalt; Rotary Snow Plows; Rototiller, Seaman, self-Propelled; Scoops-Tractor Drawn; Self- propelled Compactor; Spreader-Chip-Stone;

Scraper; Scraper-Prime Mover in Tandem regardless of size (add $1.00 to Group 2 hourly rate for each hour and for each machine attached thereto add $1.00 to Group 2 hourly rate for each hour); Tank Car Heater; Tractors, Push, pulling Sheeps Foot, Disc, or Compactor, etc; Tug Boats

GROUP 3: Boilers; Brooms, all power propelled; Cement Supply

Tender; Compressor, Common Receiver (2); Concrete Mixer, two bag and over; Conveyor, Portable; Farm type Tractors used for mowing, seeding, etc; Fireman on Boilers; Forklift Trucks; Grouting Machines; Hoists, Automatic; Hoists, all Elevators; Hoists, Tugger single Drum; Jeep Diggers; Low Boys; Pipe Jacking Machines; Post-hole Digger; Power Saw, Concrete, Power Driven; Pug Mills; Rollers, other than asphalt; Seed and Straw Blower; Steam Generators; Stump Machine; Winch Trucks with A-Frame; Work Boats; Tamper-Form motor driven

GROUP 4: Air compressor - Small 250 and under (1 to 5 not to exceed a total of 300 ft); Air Compressor - Large over 250;

Combination - Small Equipment Operator; Directional Boring Machine; Generators - Small 50 kw and under; Generators - Large , over 50 kw; Heaters, Mechanical; Hydraulic power unit (Pile Driving, Extracting or Drilling); Light Plants (1 to 5); Pumps, over 3" (1 to 3, not to exceed a total of 300 ft); Pumps, Well Points; Tractaire; Welding Machines (2 through 5); Winches, 4 small electric drill winches;

GROUP 5: Bobcats (All); Brick Forklifts; Oilers; Directional Boring

*Requires Oiler

IRON0001-026 06/01/2009

Rates Fringes

IRONWORKER

Sheeter.....................$ 41.00 27.24 Structural and Reinforcing..$ 40.75 27.24

* IRON0063-001 06/01/2009

Rates Fringes

IRONWORKER, ORNAMENTAL...........$ 39.20 22.99

* IRON0063-002 06/01/2009

Rates Fringes

IRONWORKER

Fence Erector...............$ 32.15 18.43

IRON0136-001 07/01/2009

Rates Fringes

IRONWORKER

Machinery Movers and Riggers.....................$ 37.25 25.54 Master Riggers..............$ 39.75 25.54

LABO0002-006 06/01/2008

LABORER

GROUP 1....................$ 34.75 15.27

GROUP 2....................$ 34.75 15.27

GROUP 3....................$ 34.825 15.27

GROUP 4....................$ 34.85 15.27

GROUP 5....................$ 34.90 15.27

GROUP 6....................$ 34.95 15.27

GROUP 7....................$ 34.975 15.27

GROUP 8....................$ 34.975 15.27

GROUP 9....................$ 35.025 15.27

GROUP 10....................$ 35.20 15.27

GROUP 11....................$ 35.025 15.27

GROUP 12....................$ 35.75 15.27

LABORER CLASSIFICATIONS

GROUP 1: Building Laborers; Plasterer Tenders; Pumps for Dewatering; and other unclassified laborers.

GROUP 2: Fireproofing and Fire Shop laborers.

GROUP 3: Cement Gun.

GROUP 4: Chimney over 40 ft.; Scaffold Laborers.

GROUP 5: Cement Gun Nozzle Laborers (Gunite); Windlass and capstan person.

GROUP 6: Stone Derrickmen & Handlers.

GROUP 7: Jackhammermen; Power driven concrete saws; and other power tools.

GROUP 8: Firebrick & Boiler Laborers.

GROUP 9: Chimney on fire brick; Caisson diggers; & Well Point System men.

GROUP 10: Boiler Setter Plastic Laborers.

GROUP 11: Jackhammermen on fire brick work only.

GROUP 12: Dosimeter use (any device) monitoring nuclear exposure); Asbestos Abatement Laborer; Toxic and Hazardous Waste Removal Laborers.

LABO0002-007 06/01/2008

Rates Fringes

LABORER

GROUP 1.....................$ 34.75 15.27

GROUP 2.....................$ 35.025 15.27

GROUP 3.....................$ 34.90 15.27

GROUP 4.....................$ 35.025 15.27

GROUP 5.....................$ 35.75 15.27

LABORER CLASSIFICATIONS

GROUP 1: Common laborer; Tenders; Material expeditor (asphalt plant); Street paving, Grade separation, sidewalk, curb & gutter, strippers & All laborers not otherwise mentioned

GROUP 2: Ashpalt tampers & smoothers; Cement gun laborers

GROUP 3: Cement Gun Nozzle (laborers), Gunite

GROUP 4: Rakers, Lutemen; Machine-Screwmen; Kettlemen;

Mixermen; Drun-men; Jackhammermen (asphalt); Paintmen;

Mitre box spreaders; Laborers on birch, overman and similar spreader equipment; Laborers on APSCO; Laborers on air compressor; Paving Form Setter; Jackhammermen (concrete);

Power drive concrete saws; other power tools.

GROUP 5: Asbestos Abatement Laborers; Toxic and Hazardous Waste Removal Laborers, Dosimeter (any device) monitoring nuclear exposure

LABO0002-008 06/01/2008

Rates Fringes

LABORER (Compressed Air)

0 - 15 POUNDS...............$ 35.75 15.27

16 - 20 POUNDS..............$ 36.25 15.27

21 - 26 POUNDS..............$ 36.75 15.27

27 - 33 POUNDS..............$ 37.75 15.27

34 - AND OVER...............$ 38.75 15.27

LABORER (Tunnel and Sewer)

GROUP 1.....................$ 34.75 15.27

GROUP 2.....................$ 34.875 15.27

GROUP 3.....................$ 34.975 15.27

GROUP 4.....................$ 35.10 15.27

GROUP 5.....................$ 35.75 15.27

LABORER CLASSIFICATIONS (TUNNEL)

GROUP 1: Cage tenders; Dumpmen; Flagmen; Signalmen; Top laborers

GROUP 2: Air hoist operator; Key board operator; concrete laborer; Grout; Lock tenders (Free Air Side); Steel setters; Tuggers; Switchmen; Car pusher

GROUP 3: Concrete repairmen; Lock tenders (pressure side);

Mortar men; Muckers; Grout machine operators; Track layers

GROUP 4: Air trac drill operator; Miner; Bricklayer tenders;

Concrete blower operator; Drillers; Dynamiters; Erector operator; Form men; Jackhammermen; Powerpac; Mining machine operators; Mucking machine operator; Laser beam operator;

Liner plate and ring setters; Shield drivers; Power knife operator; Welder- burners; Pipe jacking machine operator;

skinners; Maintenance technician

GROUP 5: Asbestos abatement laborer; Toxic and hazardous waste removal laborer; Dosimeter (any device) monitoring nuclear exposure

LABORER CLASSIFICATIONS (SEWER)

GROUP 1: Signalmen; Top laborers and All other laborers

GROUP 2: Concrete laborers and Steel setters

GROUP 3: Cement carriers; Cement mixers; Concrete repairmen;

Mortar men; Scaffold men; Second Bottom men

GROUP 4: Air trac drill operator; Bottom men;

Bracers-bracing; Bricklayer tenders; Catch basin diggers;

Drainlayers; dynamiters; Form men; Jackhammermen; Powerpac;

Pipelayers; Rodders; Welder-burners; Well point systems men

GROUP 5: Asbestos abatement laborer, Toxic and hazardous waste removal laborer; Dosimeter (any device) monitoring nuclear exposure

LABO0225-001 06/01/2008

Rates Fringes

LABORER (DEMOLITION/WRECKING)

GROUP 1.....................$ 28.45 15.52

GROUP 2.....................$ 34.75 15.52

GROUP 3.....................$ 34.75 15.52

LABORER CLASSIFICATIONS

GROUP 1 - Complete Demolition

GROUP 2 - Interior Wrecking and Strip Out Work

GROUP 3 - Asbestos Work with Complete Demolition/Wrecking or Strip Out Work

MARB0067-001 06/01/2008

Rates Fringes

TERRAZZO WORKER/SETTER...........$ 37.39 17.38

TILE FINISHER....................$ 32.15 13.62

TILE SETTER......................$ 38.63 15.34

MARB0087-001 06/01/2008

MARBLE FINISHER..................$ 28.65 18.17

PAIN0014-001 06/01/2009

Rates Fringes

PAINTER (including taper)........$ 38.00 18.47

PAIN0027-001 06/01/2009

Rates Fringes

GLAZIER..........................$ 37.00 22.88

PLAS0005-002 07/01/2009

Rates Fringes

PLASTERER........................$ 38.55 19.14

PLAS0502-001 06/01/2009

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 41.85 18.63

PLUM0130-001 06/01/2008

Rates Fringes

PLUMBER..........................$ 43.00 16.20

PLUM0597-002 06/01/2009

Rates Fringes

PIPEFITTER.......................$ 43.15 18.78

ROOF0011-001 06/01/2009

Rates Fringes

ROOFER...........................$ 37.00 12.85

SFIL0281-001 01/01/2008

Rates Fringes

SPRINKLER FITTER.................$ 40.50 16.00

SHEE0073-001 01/01/2007

Rates Fringes

Sheet Metal Worker...............$ 36.96 17.42

SHEE0073-002 01/01/2007

Sheet Metal Worker

ALUMINUM GUTTER WORK........$ 24.03 17.42

* TEAM0731-001 06/01/2008

COOK COUNTY - HEAVY AND HIGHWAY

Rates Fringes

TRUCK DRIVER

2 & 3 Axles.................$ 30.70 12.35 4 Axles.....................$ 30.95 12.35 5 Axles.....................$ 31.15 12.35 6 Axles.....................$ 31.35 12.35

FOOTNOTES:

A. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day.

B. 900 straight time hours or more in 1 calendar year for the same employer shall receive 1 week paid vacation; 3 years - 2 weeks paid vacation; 10 years - 3 weeks paid vacation; 20 years - 4 weeks paid vacation.

C. An additional $.20 per axle shall be paid for all vehicles with more than six (6) axles.

CLASSIFICATIONS:

Group 1 - Frame Truck when used for transportation purposes;

Air Compressor and Welding Machines, including those pulled by cars, pick-up trucks and tractors; Ambulances;

Articulated Dumps; Batch Gate Lockers; Batch Hopperman; Car and Truck Washers; Carry Alls; Forl Lifts and Hoisters;

Helpers; Mechanics Helpers and Greasers; Oil Distributors, two-man operation; Pavement Breakers; Pole Trailer, up to 40 feet; Pothole Repair Trucks; Power Mower Tractors; Quick Change Barrier; Self-Propelled Chip Spreader; Shipping and Receiving Clerks and Checkers; Skipman; Slurry Trucks, two-man operation; Slurry Trucks, Conveyor Operated - 2 or 3 man operation; Teamsters; Unskilled Dumpmen; Warehousemen and Dockmen; Truck Drivers hauling warning lights, barricades, and portable toilets on the job site

Group 2 - Dispatcher; Dump Crets and Adgetators under 7 yards; Dumpsters, Track Trucks, Euclids, Hug Bottom Dump Turnapulls or Turnatrailers when pulling other than self-loading equipment or similar equipment under 16 cubic yards; Mixer Trucks under 7 yards; Ready-Mix Plant Hopper Operator; Winch Trucks, 2 Axles

Group 3 - Dump Crets and Adgetators, 7 yards and over;

Dumpsters, Track Trucks, Euclids, Hug Bottom Dump Turnapulls or Turnatrailers when pulling other than self-loading equipment or similar equipment over 16 cubic yards; Explosives and/or Fission Material Trucks; Mixer Trucks 7 yards or over; Mobile Cranes while in transit; Oil Distributors, one-man operation; Pole Trailer, over 40 feet; Pole and Expandable Trailers hauling material over 50 feet long;

Slurry Trucks, one-man operation; Winch Trucks, 3 axles or more; Mechanic - *Truck Welder and *Truck Painter*These classifications shall only apply in areas where and when it has been a past area practice; Asphalt Plant Operators in areas where it has been past practice

Group 4 - Dual-purpose vehicels, such as mounted crane tucks with hoist and accessories; Foreman; Master Mechanic;

Self-loading equipment like P.B. and trucks with scoops on the front

* TEAM0786-001 06/01/2008

COOK COUNTY - BUILDING AND RESIDENTIAL

Rates Fringes

TRUCK DRIVER

2 & 3 Axles.................$ 31.33 .10+a 4 Axles.....................$ 31.58 .10+a 5 Axles.....................$ 31.78 .10+a 6 Axles.....................$ 31.98 .10+a

FOOTNOTES:

a. $463.00 per week.

An additional $.20 per axle shall be paid for all vehicles with more than six (6) axles.

Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day.

900 straight time hours or more in 1 calendar year for the same employer shall receive 1 week paid vacation; 3 years - 2 weeks paid vacation; 10 years - 3 weeks paid vacation; 20 years - 4 weeks paid vacation.

CLASSIFICATIONS:

Group 1 - Frame Truck when used for transportation purposes;

Air Compressor and Welding Machines, including those pulled by cars, pick-up trucks and tractors; Ambulances;

Articulated Dumps; Batch Gate Lockers; Batch Hopperman; Car and Truck Washers; Carry Alls; Forl Lifts and Hoisters;

Helpers; Mechanics Helpers and Greasers; Oil Distributors, two-man operation; Pavement Breakers; Pole Trailer, up to 40 feet; Pothole Repair Trucks; Power Mower Tractors; Quick Change Barrier; Self-Propelled Chip Spreader; Shipping and

Receiving Clerks and Checkers; Skipman; Slurry Trucks, two-man operation; Slurry Trucks, Conveyor Operated - 2 or 3 man operation; Teamsters; Unskilled Dumpmen; Warehousemen and Dockmen; Truck Drivers hauling warning lights, barricades, and portable toilets on the job site

Group 2 - Dispatcher; Dump Crets and Adgetators under 7 yards; Dumpsters, Track Trucks, Euclids, Hug Bottom Dump Turnapulls or Turnatrailers when pulling other than self-loading equipment or similar equipment under 16 cubic yards; Mixer Trucks under 7 yards; Ready-Mix Plant Hopper Operator; Winch Trucks, 2 Axles

Group 3 - Dump Crets and Adgetators, 7 yards and over;

Dumpsters, Track Trucks, Euclids, Hug Bottom Dump Turnapulls or Turnatrailers when pulling other than self-loading equipment or similar equipment over 16 cubic yards; Explosives and/or Fission Material Trucks; Mixer Trucks 7 yards or over; Mobile Cranes while in transit; Oil Distributors, one-man operation; Pole Trailer, over 40 feet; Pole and Expandable Trailers hauling material over 50 feet long;

Slurry Trucks, one-man operation; Winch Trucks, 3 axles or more; Mechanic - *Truck Welder and *Truck Painter*These classifications shall only apply in areas where and when it has been a past area practice; Asphalt Plant Operators in areas where it has been past practice

Group 4 - Dual-purpose vehicels, such as mounted crane tucks with hoist and accessories; Foreman; Master Mechanic;

Self-loading equipment like P.B. and trucks with scoops on the front

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

EXISTING ROADWAY

PROPOSED

FENCE

FP4

FP5

FP6

N

CHICAGO SANITARY AND

SHIP CANAL

2A MECHANICAL &

ELECTRICAL

EQUIPMENT

YARD

FP3

FP2

FENCING PLAN

FENCE GROUNDING PLAN

GRAPHIC SCALE

F E

N C

IN

G P

L A

N

FENCE GROUNDING SYSTEM NOTES

1. FENCES SHALL BE GROUNDED AT EACH SIDE OF THE GATES

OR OTHER OPENING. GROUNDING LINES TO BE INSTALLED WITH IN

FENCE LIMITS. (SEE FIGURE 5A)

2. GATES SHALL BE BONDED TO THE GROUNDING CONDUCTOR,

JUMPER OR FENCE. (SEE FIGURE 5A)

3. A BURIED BONDING JUMPER SHALL BE USED TO BOND ACROSS

THE GATE OR OTHER OPENING IN THE FENCE (SEE FIGURE 5A.)

4. IF BARBED WIRE STANDS ARE USED ABOVE THE FENCE FABRIC,

THE BARBED WIRE STRANDS SHALL BE BONDED TO THE

GROUNDING CONDUCTOR, JUMPER OR FENCE. (SEE FIGURE 5B.)

5. WHEN FENCE POSTS ARE OF CONDUCTING MATERIAL, THE

GROUNDING CONDUCTOR SHALL BE CONNECTED TO THE FENCE

POST OR POSTS AS REQUIRED WITH SUITABLE CONNECTING

MEANS.

6. WHEN FENCE POSTS ARE OF A NONCONDUCTING MATERIAL.

SUITABLE BONDING CONNECTION SHALL BE MADE TO THE

FENCE MESH STRANDS AND THE BARBED WIRE STRANDS AT

EACH GROUNDING CONDUCTOR POINT. (SEE FIGURE 5C.)

A SECOND CONDUCTOR, SHALL BE INSTALLED UNDER THE

GATE SWING AREA AS SHOWN IN FIGURE 5A. CONNECT THE GROUND

TO ALL FENCE CORNER POSTS AND TO THE LINE POSTS EVERY 50 FEET.

INSTALL 16’ WIDE

DOUBLE SWINGING

GATE

INSTALL 16’ WIDE

DOUBLE SWINGING

GATE

20 20 400

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C…