AMENDMENT 0003 SPECIFICATION CHANGES

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W81G6691212535

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

REFERENCE: Chicago Sanitary and Ship Canal (CSSC) Aquatic Nuisance Species Electrical Demonstration Permanent Dispersal Barrier IIB Building, Romeoville, Illinois

This Amendment #0003 is being issued to Incorporate Revised Drawing Sheets, Revisions to Specification Sections and the Attendance Sheet from the Pre-Bid Meeting held on August 26, 2009.

--THIS AMENDMENT CONTINUES ON PAGE 2—

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 27-Aug-2009

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P6-09-B-0021

X 9B. DATED (SEE ITEM 11)

11-Aug-2009

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

27-Aug-2009

CODE

U. S. ARMY ENGINEER DISTRICT, CHICAGO

111 NORTH CANAL STREET SUITE 600

CHICAGO IL 60606-7206

W912P6 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P6-09-B-0021

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Continuation of Amendment Description:

1. Amended Project Specification Sections:

The following Speciifcation Sections are amended as delineatd below; bidders shall remove the Specification Sections in their entirety and replace it with the revised Specificatin Sections attached hereto.

a. MEASUREMENT AND PAYMENT, Specification Section 01 22 00.00 10 is revised in its entirety.

b. CLEAN-AGENT FIRE-SUPPRESSION SYSTEMS, Specification Section 21 22 00, has been revised to add Paragraphs 3.1.2.2 "Secondary Supply" and 3.1.2.3 "Storage Batteries".

c. AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS, Specification Section 23 00 00 has been revised to add Paragraph 2.5.2.2 “Multiblade type damper system”.

d. INTERIOR DISTRIBUTION SYSTEM, Specification Section 26 20 00 has been revised as follows:

1. A submittal register is added for this Specification Section. Submittal requirements for fire dampers can be found in the new Paragraph 1.3;

2. Paragraph 2.5.2.2 “Fire Dampers” is added;

3. Paragraph 3.6 DAMPER ACCEPTANCE TEST” is added; and

4. Removed Paragraph 1.7.2 Utility Company Transformert 2 (UCT2)

e. STEEL DOORS AND FRAMES, Specification Section 08 11 13 has been revised to add Paragraph 2.6

“FIRE DOORS AND FRAMES”.

2. Changes to Plan Sheets are as follows:

a. The Bidders shall remove and replace Drawing sheets G-02, G-04, A-05, M-02, M -03, M-04, , M-15, E- 01, E-02, E-03, E-04, E-05, E-08, and E-10 with the respective Revised Drawing Sheets attached hereto, which are incorporated by way of this Amendment #0002.

b. Drawing Sheets M-03A and M-04A are added to the Bid Set and are attacehd hereto.

Please note: Drawing M-03 has been split into drawings M-03 and M-03A. Drawing M-04 has been split into drawings M-04 and M-04A.

3. The Submittal Register, which is located in the Solicitation Package after Specification Section 01 33 00 is revised by way of this Amendment. The Bidders shall remove and replace the Submittal Register in its entirety with the Revised Submittal Register, which is attached hereto.

4. The Attendance sheet from the Pre-Bid Meeting, held on August 26, 2009, at 10:00 a.m. in the Main Conference Room on the 6th floor of the River Center Building at 111 North Canal Street, Suite 600, Chicago, Illinois 60606, is attached hereto.

5. All other terms and conditions of this Solicitation remain unchanged.

6. Point of Contact for this Amendment is Anita R. Simpkins at (312) 846-5372.

(End of Summary of Changes)

Permanent Dispersal Barrier IIB W912P6-09-B-0021

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 22 00.00 10

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1.1 LUMP SUM PAYMENT ITEMS

1.1.1 Mobilization and Demobilization (Bid Item 0001AA)

1.1.1.1 Payment

1.1.1.2 Unit of Measure

1.1.2 Project and Safety Signs (Bid Item 0001AB)

1.1.2.1 Payment

1.1.2.2 Unit of Measure

1.1.3 Foundation Preparation (Bid Item 0001AC)

1.1.3.1 Payment

1.1.3.2 Measurement

1.1.3.3 Unit of Measure

1.1.4 Building (Bid Item 0001AD)

1.1.4.1 Payment

1.1.4.2 Unit of Measure

1.1.5 Exterior Electrical Distribution (Bid Item 0001AE)

1.1.5.1 Payment

1.1.5.2 Unit of Measure

1.1.6 Phase III Remaining Work Items (Bid Item 0005)

1.1.6.1 Payment

1.1.6.2 Unit of Measure

1.1.7 Performance and Payment Bonds (Bid Item 007)

1.1.7.1 Payment

1.1.7.2 Unit of Measure

1.2 UNIT PRICE PAYMENT ITEMS

1.2.1 Test Well (Bid Item 0002AA)

1.2.1.1 Payment

1.2.1.2 Measurement

1.2.1.3 Unit of Measure

1.2.2 Additional Test Well Depth (Bid Item 0002AB)

1.2.2.1 Payment

1.2.2.2 Measurement

1.2.2.3 Unit of Measure

1.2.3 Install Water Well (First 300') (Bid Item 0003AA)

1.2.3.1 Payment

1.2.3.2 Measurement

1.2.3.3 Unit of Measure

1.2.4 Additional Water Well Depth (BEYOND 300') (Bid Item 0003AB)

1.2.4.1 Payment

1.2.4.2 Measurement

1.2.4.3 Unit of Measure

1.2.5 Phase II On-Site Coordination Efforts (Bid Item 0004)

1.2.5.1 Payment

1.2.5.2 Measurement

1.2.5.3 Unit of Measure

SECTION 01 22 00.00 10 - Page 1

AMD-0003

1.2.6 Fence Installation (Bid Item 0006)

1.2.6.1 Payment

1.2.6.2 Measurement

1.2.6.3 Unit of Measure

PART 2 PRODUCTS (Not Applicable)

PART 3 EXECUTION (Not Applicable)

-- End of Section Table of Contents --

SECTION 01 22 00.00 10 - Page 2

SECTION 01 22 00.00 10

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1.1 LUMP SUM PAYMENT ITEMS

Payment items for the work of this contract for which contract lump sum payments will be made are listed in the BIDDING SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular lump sum or unit price payment item, shall be included in the listed lump sum item most closely associated with the work involved. The lump sum price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.

1.1.1 Mobilization and Demobilization (Bid Item 0001AA)

1.1.1.1 Payment

Payment will be made for costs associated with mobilization and demobilization, as defined in Special Clause PAYMENT FOR MOBILIZATION AND

DEMOBILIZATION.

1.1.1.2 Unit of Measure

Unit of measure: lump sum.

1.1.2 Project and Safety Signs (Bid Item 0001AB2)

1.1.2.1 Payment

Full compensation for all labor, equipment and materials for the project signs, safety signs, and warning signs as described in Section 01 58 00.00 03 Project Sign and Safety Sign.

1.1.2.2 Unit of Measure

Unit of measure: lump sum.

1.1.3 Foundation Preparation (Bid Item 0001AC3)

1.1.3.1 Payment

Payment will be made for costs associated with foundation preparation and surrounding site for the building structure, which includes performing required excavation and other operations incidental thereto, contractor-furnished disposal area(s) and disposition of excess excavated material and unsuitable and frozen materials, preliminary and final clean-up activities, furnishing of dental mortar and base course materials, and costs associated with transporting, stockpiling (if applicable), and

SECTION 01 22 00.00 10 - Page 3 placement of materials to meet the grades specified on the plans and specified in SECTION 31 60 00 FOUNDATION PREPARATION.

1.1.3.2 Measurement

The total quantity of excavated material and base course material for which payment will be made will be the theoretical quantity between the ground surface as determined by a survey and the grade and slope of the theoretical cross sections indicated. No allowance will be made for overdepth excavation or for the removal of any material outside the required slope lines unless authorized.

1.1.3.3 Unit of Measure

Unit of measure: Lump Sum.

1.1.4 Building (Bid Item 0001AD4)

1.1.4.1 Payment

Payment will be made for all costs associated with the construction of the building as specified in the plans and specifications. The building includes, but is not limited to, all exterior features, the building foundation and structure, the interior of the building, all utility services, HVAC System, evaporative cooling system, generator, sidewalk, sidewalk railing, guard rail, or any other item not broken out in the bid schedule.

1.1.4.2 Unit of Measure

Unit of measure: lump sum.

1.1.5 Exterior Electrical Distribution (Bid Item 0001AE5)

1.1.5.1 Payment

Payment will be made for all cost associated with the installation of the Electrical system, from power pole to the transformer, as described in DIVISION 26 and as indicated on the drawings. The transformer shall also be included in this bid items All cost associated with the electrical distribution with in the building shall be covered in Bid Item 0005.

1.1.5.2 Unit of Measure

Unit of measure: lump sum.

1.1.6 Phase III Remaining Work Items (Bid Item 0005)

1.1.6.1 Payment

Payment will be made for all cost associated with the work required to complete all remaining work (INCLUDES final testing and construction tasks related to project completion).

1.1.6.2 Unit of Measure

Unit of measure: lump sum.

SECTION 01 22 00.00 10 - Page 4

1.1.7 Performance and Payment Bonds (Bid Item 0079)

1.1.7.1 Payment

Payment will be made for the performance and paymenht bonds that are required as part of this contract. The Government will pay the actual cost of the bonds or the Contractor's bid price, whichever is less.

1.1.7.2 Unit of Measure

Unit of measure: Lump sum.

1.2 UNIT PRICE PAYMENT ITEMS

Payment items for the work of this contract on which the contract unit price payments will be made are listed in the BIDDING SCHEDULE and described below. The unit price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for each of the unit price items.

1.2.1 Test Well (Bid Item 00026AA)

1.2.1.1 Payment

Payment will be made for all costs associated with the required tasks of the Test Hole as described in Section 33 20 00.

1.2.1.2 Measurement

Measurement will be made for successful completion of the required tasks described in Section 33 20 00 for the Test Well to a depth of 200 feet.

1.2.1.3 Unit of Measure

Unit of measure: Linear foot (LF)

1.2.2 Additional Test Well Depth (Bid Item 00026AB)

1.2.2.1 Payment

Payment will be made for all costs associated with the required tasks of the Test Hole as described in Section 33 20 00.

1.2.2.2 Measurement

Measurement will be made for successful completion of the required tasks described in Section 33 20 00, beyond the first 200 feet of depth.

1.2.2.3 Unit of Measure

Unit of measure: Linear foot (LF).

SECTION 01 22 00.00 10 - Page 5

1.2.3 Install Water Well (First 300150') (Bid Item 00037AA)

1.2.3.1 Payment

Payment will be made for all costs associated with the installation of the Water Well as described in Section 33 20 00 and as indicated on the drawings.

1.2.3.2 Measurement

Measurement will be made for the installation and testing of the well as described in Section 33 20 00, up to the first 300150 feet of well depth.

1.2.3.3 Unit of Measure

Unit of measure: Linear Foot (LF).

1.2.4 Additional Water Well Depth (BEYOND 300') (Bid Item 00037AB)

1.2.4.1 Payment

Payment will be made for all the costs associated with the installation of the Water Well as described in Section 33 20 00 and as indicated on the drawings for the additional depth beyond 300150 feet.

1.2.4.2 Measurement

Measurement will be made for costs associated with the installation and testing of the well as described in Section 33 20 00, beyond the first 300 150 feet of well depth.

1.2.4.3 Unit of Measure

Unit of measure: Linear foot (LF).

1.2.5 Phase II On-Site Coordination Efforts (Bid Item 0004)

1.2.5.1 Payment

Payment will be made for all the cost associated with coordination of all personnel and equipment onsite for work performed by others. In performance of these efforts, the contractor shall ensure that it will have personnel and equipment available for testing of the work performed by others.

1.2.5.2 Measurement

Measurement will be made for costs associated with the coordination of personnel and equipment for work performed by others.

1.2.5.3 Unit of Measure

Unit of measure: Hours (HRS).

SECTION 01 22 00.00 10 - Page 6

1.2.6 Fence Installation (Bid Item 00068)

1.2.6.1 Payment

Payment at the contract unit price will be made for installation of fencing with gates as described and identified on the drawings and in SECTION 31 31 13.00 03 FENCING AND GATES; TEMPORARY AND PERMANENT. Unit price shall include all the cost associated with connecting proposed fence to existing fence on both ends of the project and connecting proposed fence to the existing fence. Also the unit price shall include all the cost associated with relocating and reinstalling temporary fence. Payment constitutes full compensation for all materials and labor associated with site preparation, excavating, backfilling and other incidental items necessary to complete the work.

1.2.6.2 Measurement

Measurement will be based on the linear foot of permanent fence installed.

1.2.6.3 Unit of Measure

Unit of measure: Linear Foot (LF)

PART 2 PRODUCTS (Not Applicable)

PART 3 EXECUTION (Not Applicable)

-- End of Section --

SECTION 01 22 00.00 10 - Page 7

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 25 PAGES

Permanent Dispersal Barrier IIB

01 10 00.00 03 SD-01 Preconstruction Submittals 1.8Condition of Existing Structures

1.13 G CNCoordination with Others

Drug Free Workplace SD-11 Closeout Submittals

1.6 G CNAs-Built Drawings

01 32 01.01 10 SD-01 Preconstruction Submittals

3.4 G CNProject Schedule

01 35 26.00 03 SD-01 Preconstruction Submittals

1.6 G SOAccident Prevention Plan (APP)

1.7 G SOActivity Hazard Analysis (AHA)

1.6.1 G SOCrane Critical Lift Plan

1.5.1.3 G SOCrane Operators

SD-06 Test Reports 1.11Reports 1.11.1Accident Reports 1.11.3Monthly Exposure Reports 1.11.4Crane Reports

Regulatory Citations and Violations

SD-07 Certificates 1.8Confined Space Entry Permit 1.8Hot work permit

License Certificates 01 45 01.00 03 SD-01 Preconstruction Submittals

3.2 G CNQUALITY CONTROL PLAN

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 25 PAGES

Permanent Dispersal Barrier IIB

01 52 02 SD-01 Preconstruction Submittals

1.3 G *CN*Construction Site Plan

01 57 20.01 03 SD-01 Preconstruction Submittals

1.7 G DHEnvironmental Protection Plan

01 99 99 SD-02 Shop Drawings G DTStud Walls G DTSteel Roof Deck

SD-03 Product Data G DTPaint G DTSteel Roof Deck G DTEpoxy Flooring

2.8 G DTSealants

G DTImpact Resistant Gypsum Board G DTBlock or Board Insulation

SD-04 Samples

2.13.1 G DTManufacturer's Standard Color

Charts SD-08 Manufacturer’s Instructions

G DTNon-Magnetic Access Flooring System

2.13.2MSDS

03 11 13.00 10 SD-02 Shop Drawings

3.1.1Formwork SD-03 Product Data

2.1Form Materials 2.1.5Form Releasing Agents

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 25 PAGES

Permanent Dispersal Barrier IIB

03 11 13.00 10 1.3Design 03 20 01.00 10 SD-02 Shop Drawings

3.1 G DSReinforcement

SD-07 Certificates

2.1Reinforcing Steel 03 31 00.00 10 SD-03 Product Data

1.4 G DSMixture Proportions

G DSConcrete From Liners

Air-Entraining Admixture Accelerating Admixture Water-Reducing or Retarding Admixture

Curing Materials SD-06 Test Reports

2.2Aggregates SD-07 Certificates Cementitious Materials

2.2Aggregates G DSReinforcing Steel

05 12 00 SD-02 Shop Drawings

1.3.1.1 G DSErection Plan

SD-03 Product Data 2.4Shop primer

SD-07 Certificates 2.1Steel

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 25 PAGES

Permanent Dispersal Barrier IIB

05 12 00 1.3.1.2Welding procedures and qualifications

07 22 00 SD-02 Shop Drawings

2.1.4 G DTTapered roof insulation

SD-03 Product Data

2.1 G DTInsulation

SD-07 Certificates 1.3qualifications

SD-08 Manufacturer’s Instructions 2.3fasteners 2.1insulation

07 51 13 SD-03 Product Data 1.4.3wind uplift calculations 2.4Asphalt

3.3.3 G DTFelts

2.5.2 G DTGranule Surface Modified

Bitumen Cap Sheet

2.3 G DTFLASHING MEMBRANE

2.9Fasteners 2.6Primer 2.7Asphalt Roof Cement 2.8Cant Strips

2.10 G DTPre-Manufactured Accessories

1.8 G DTwarranties

SD-06 Test Reports Samples of Built-Up Roofing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 25 PAGES

Permanent Dispersal Barrier IIB

07 51 13 SD-07 Certificates 1.4.1Qualifications of Applicator

SD-08 Manufacturer’s Instructions 3.3.3felts flashings 2.4Asphalt 2.6Primer roof cement 2.9Fasteners

1.6 G DTcold weather conditions

SD-11 Closeout Submittals

1.8WARRANTY

3.6INFORMATION CARD

07 81 00 SD-03 Product Data 3.3Fireproofing Material

SD-04 Samples 2.1Spray-Applied Fireproofing

SD-06 Test Reports 1.2.2Fire Resistance Rating 3.6Field Tests

SD-07 Certificates 1.4.1Installer Qualifications 3.1Surface Preparation Report 3.5.2Manufacturer's Inspection Report

08 11 13 SD-02 Shop Drawings

2.1 G DTDoors

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 25 PAGES

Permanent Dispersal Barrier IIB

08 11 13 2.5 G DTFrames 2.3Accessories

G DTSchedule of doors G DTSchedule of frames

SD-03 Product Data

2.1 G DTDoors

2.5 G DTFrames

2.3Accessories

SD-04 Samples

2.9.4 G DTFactory-applied enamel finish

08 33 23 SD-02 Shop Drawings

2.1 G DTOverhead Coiling Doors

2.3Counterbalancing Mechanism 2.4Electric Door Operators 2.1.4Bottom Bar 1.5Guides 2.3.1Mounting Brackets 2.1.9Overhead Drum

Hood Painting

1.5Installation Drawings SD-03 Product Data

2.1Overhead Coiling Doors 2.2Hardware 2.3Counterbalancing Mechanism 2.4Electric Door Operators

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 25 PAGES

Permanent Dispersal Barrier IIB

08 33 23 Fire-Rated Door Assembly SD-04 Samples

G DTFactory-applied finish SD-10 Operation and Maintenance Data Operation and Maintenance Manuals

Overhead Coiling Door Assemblies

Materials Devices Procedures Manufacture's Brochures Parts Lists Cleaning

08 39 54 SD-02 Shop Drawings

3.1 G DTInstallation

SD-03 Product Data

1.3 G DTDoor Description

Door Installation Instructions Manufacturer's Field Service

SD-06 Test Reports

2.5.1 G DTPrototype Static Test

2.5.2 G DTPrototype Blast Test

SD-10 Operation and Maintenance Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 25 PAGES

Permanent Dispersal Barrier IIB

08 39 54 1.3Door Description 08 71 00 SD-02 Shop Drawings

1.3 G DTHardware schedule

2.3.5Keying system

SD-03 Product Data

2.3 G DTHardware items

SD-08 Manufacturer’s Instructions 3.1Installation

SD-10 Operation and Maintenance Data

1.3 G COHardware Schedule

SD-11 Closeout Submittals

1.4Key Bitting 09 90 00 SD-02 Shop Drawings

3.8Piping identification 3.8stencil

SD-03 Product Data 1.9.1Local/Regional Materials

Environmental Data 2.1Materials

2.1 G DTCoating

2.1Manufacturer's Technical Data

Sheets Sealant

SD-04 Samples G DTColor

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 25 PAGES

Permanent Dispersal Barrier IIB

09 90 00 SD-07 Certificates 1.3Applicator's qualifications

1.4.1.2 G DTQualification Testing

SD-08 Manufacturer’s Instructions Application instructions

3.5.2Mixing 1.7.2Manufacturer's Material Safety

Data Sheets SD-10 Operation and Maintenance Data

2.1 G DTCoatings:

21 22 00 SD-02 Shop Drawings

1.4.2 G DTInstallation Drawings

SD-03 Product Data

2.2.2 G DTClean Agent storage tanks

2.2.2Pressure gauge 2.2.2Low pressure switch 2.2.3Discharge nozzles

2.2.1 G DTDistribution Piping and Fittings

2.2.4 G DHFire suppression agent

2.2.5.3 G DTFire Detectors

2.2.2 G DTControl Panel

2.2.5.1 G DTControl Panel

SD-05 Design Data Hydraulic flow calculations

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 25 PAGES

Permanent Dispersal Barrier IIB

21 22 00 Calculations for the battery stand-by power supply

G DTComplete sequence of operation SD-06 Test Reports

3.2Complete System 3.2.1Room pressurization Test 2.2.5.3Fire Detectors 2.2.2Control Panel 2.2.5.1Control Panel 2.2.5.7System Wiring

Request for Inspection and Test SD-07 Certificates Qualifications

SD-08 Manufacturer’s Instructions 3.1.4Operating Instructions

SD-10 Operation and Maintenance Data

3.1.4Operation and Maintenance Manuals

22 00 00 SD-02 Shop Drawings

3.7.1 GPlumbing System

SD-03 Product Data Equipment

1.5.1Welding 3.7.1Plumbing System

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 25 PAGES

Permanent Dispersal Barrier IIB

22 00 00 Tests and Flushing SD-07 Certificates

1.3Materials and Equipment 2.1.1Bolts

SD-10 Operation and Maintenance Data

3.7.1 GPlumbing System

22 07 19 SD-02 Shop Drawings

3.1Installation Drawings SD-03 Product Data

2.2Adhesives 2.7Coatings 2.3Insulating Cement 2.1Insulation Materials 2.6Jacketing 2.8Tape

SD-08 Manufacturer’s Instructions 2.1Insulation Materials

23 00 00 SD-02 Shop Drawings

1.4.5 GDetail Drawings

SD-03 Product Data 2.1Standard Products

Duct Connectors 2.5.2.1Duct Access Doors

2.5.2.2 G DTFire Dampers

2.5.2.2 G DTFire Dampers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r) h6teemjb Highlight

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 25 PAGES

Permanent Dispersal Barrier IIB

23 00 00 2.5.2.3Manual Balancing Dampers 2.5.4.1Registers and Grilles 2.5.5Louvers

Test Procedures

1.2.1 GDiagrams

Operation and Maintenance Training

SD-06 Test Reports

3.8 GPerformance Tests

3.6 G CNDamper Acceptance Test

SD-08 Manufacturer’s Instructions 3.2Manufacturer's Installation

Instructions Operation and Maintenance Training

SD-10 Operation and Maintenance Data Operation and Maintenance Manuals

2.5.2.2 G CNFire Dampers

2.5.2.3 GManual Balancing Dampers

23 05 93.00 40 SD-01 Preconstruction Submittals 1.3Records of Existing Conditions

SD-03 Product Data 1.3Equipment and Performance

Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r) h6teemjb Highlight h6teemjb Highlight

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 25 PAGES

Permanent Dispersal Barrier IIB

23 05 93.00 40 SD-06 Test Reports 1.3Test Reports

SD-07 Certificates 1.3Certificates

23 08 00.00 10 SD-02 Shop Drawings

1.5.2.2 GCommissioning Plan

SD-03 Product Data

3.2.1 GPre-Functional Performance Test

Checklists

3.2.2 GFunctional Performance Tests

SD-06 Test Reports

3.3 GCommissioning Report

SD-07 Certificates

1.5.1 GCommissioning Firm

1.5.2 GCommissioning Specialist

23 23 00 SD-02 Shop Drawings

2.3 GRefrigerant Piping System

SD-03 Product Data 2.3Refrigerant Piping System

1.3.1 GQualifications

3.5 GRefrigerant Piping Tests

3.4 GDemonstrations

3.1Verification of Dimensions

SD-06 Test Reports 3.5Refrigerant Piping Tests

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 25 PAGES

Permanent Dispersal Barrier IIB

23 23 00 2.1 GService Organization SD-10 Operation and Maintenance Data

1.5Maintenance 3.4Operation and Maintenance

Manuals 23 64 26 SD-03 Product Data

2.4.8 GCalibrated Balancing Valves

2.4.9 GAutomatic Flow Control Valves

2.4.10Pump Discharge Valve

GWater Temperature Regulating Valves

2.4.11Water Pressure Reducing Valve 2.4.12Pressure Relief Valve 2.4.13Combination Pressure and

Temperature Relief Valves

2.5.8 GExpansion Joints

2.6 GPumps

2.5.2Combination Strainer and Pump

Suction Diffuser 2.7Expansion Tanks 2.8Air Separator Tanks

SD-06 Test Reports 3.1.1.3Piping welds NDE report

3.4.2 GPressure tests reports

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 25 PAGES

Permanent Dispersal Barrier IIB

23 64 26 3.1.1.1Employer's Record Documents (For Welding)

3.1.1.2Welding Procedures and Qualifications

Fittings Unions Flanges Gaskets Bolting

SD-08 Manufacturer’s Instructions

3.5 GLesson plan for the Instruction

Course SD-10 Operation and Maintenance Data

2.4.8 GCalibrated Balancing Valves

2.4.9 GAutomatic Flow Control Valves

2.4.10 GPump Discharge Valve

GWater Temperature Regulating Valves

2.4.11 GWater Pressure Reducing Valve

2.4.12 GPressure Relief Valve

2.4.13 GCombination Pressure and

Temperature Relief Valves

2.5.8 GExpansion Joints

2.6 GPumps

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 25 PAGES

Permanent Dispersal Barrier IIB

23 64 26 2.5.2 GCombination Strainer and Pump Suction Diffuser

2.7 GExpansion Tanks

2.8 GAir Separator Tanks

23 65 00 SD-03 Product Data

2.4 G DTEvaporative Cooling Towers

3.1 G DTPosted Instructions

3.1 G DTDemonstrations

1.5.1 G DTVerification of Dimensions

SD-06 Test Reports G DTPackaged evaporative cooling tower - installation instructions G DTPackaged evaporative cooling tower - field acceptance test plan

3.4 G DTPackaged evaporative cooling

tower - field acceptance test report SD-07 Certificates

2.1Service Organization 2.4.1.11Cooling Tower

SD-08 Manufacturer’s Instructions Packaged evaporative cooling tower - installation instructions

SD-10 Operation and Maintenance Data

3.1Operation and Maintenance Manuals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 25 PAGES

Permanent Dispersal Barrier IIB

23 82 02.00 10 SD-02 Shop Drawings 1.4Drawings

SD-03 Product Data 2.1.1Materials and Equipment 1.6Spare Parts 3.4Posted Instructions 3.1Verification of Dimensions

Coil Corrosion Protection 3.6System Performance Tests

3.4 GDemonstrations

SD-06 Test Reports

3.5 GRefrigerant Tests, Charging, and

Start-Up

3.6 GSystem Performance Tests

SD-07 Certificates 2.1.1Materials and Equipment 2.1.1Service Organization

SD-10 Operation and Maintenance Data

3.4Operation and Maintenance Manuals

26 20 00 SD-02 Shop Drawings GPanelboards

2.15 GTransformers

2.4 GBusway

GCable trays

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 25 PAGES

Permanent Dispersal Barrier IIB

26 20 00 G DTMotor control centers

2.24 GWireways

G DTLoad centers and panelboard

3.1.7.1 G DTMarking strips

SD-03 Product Data

2.12 G DTReceptacles

G DTCircuit breakers

2.10 G DTSwitches

2.15 G DTTransformers

2.13 G DTEnclosed circuit breakers

2.17 G DTMotor controllers

G DTCombination motor controllers G DTLoad centers and panelboard G DTMotor starters G DTMetering

2.25 G DTSurge protective devices

SD-06 Test Reports

3.5.2 G DT600-volt wiring test

3.5.5 GGrounding system test

3.5.3 G DTTransformer tests

3.5.4 GGround-fault receptacle test

SD-07 Certificates

2.11 G DTFuses

SD-09 Manufacturer’s Field Reports

2.27.1Transformer factory tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 25 PAGES

Permanent Dispersal Barrier IIB

26 20 00 SD-10 Operation and Maintenance Data

1.5.1 G DTElectrical Systems

G DTMetering

26 28 00.00 10 SD-02 Shop Drawings

2.4.2 G DTDrawings

2.2.1 G DTShop Drawings

2.6 G DTMotor Control Centers

2.7 GSwitchboards

2.8 G DTPanelboards

SD-03 Product Data 2.10Factory Tests

SD-06 Test Reports 2.10Factory Tests

SD-07 Certificates 2.6Motor Control Centers

26 32 15.00 10 SD-02 Shop Drawings

1.4.19 G DTDetailed Drawings

3.7 G DTAcceptance

SD-03 Product Data 2.13Performance Criteria

2.6 G DTSound Limitations

1.4.15Harmonic Requirements 1.3.1Engine-Generator Parameter

Schedule 2.3.4Integral Main Fuel Storage Tank

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 25 PAGES

Permanent Dispersal Barrier IIB

26 32 15.00 10 Day Tank 3.4.1.2Power Factor 2.5.2Heat Exchanger 2.5Cooling System 2.17.5Time-Delay on Alarms 2.13Generator 2.2Manufacturer's Catalog 1.4.6Site Welding 1.4.20Spare Parts 3.6Onsite Training 2.11.3.2Battery Charger 1.4.11Vibration-Isolation

3.5 G DTPosted Data and Instructions

3.4.4.1 G DTInstructions

1.4.17Experience 1.4.18Field Engineer 3.1General Installation

SD-06 Test Reports 2.24Factory Inspection and Tests 2.24.2Factory Tests

3.4 G DTOnsite Inspection and Tests

SD-07 Certificates 1.4.11Vibration Isolation 2.24.2Prototype Test 1.3.4Reliability and Durability 2.10Emissions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 25 PAGES

Permanent Dispersal Barrier IIB

26 32 15.00 10 2.6Sound Limitations 1.4.4Site Visit 2.13.1Current Balance 2.1Materials and Equipment 3.4.3Inspections 2.5Cooling System

SD-10 Operation and Maintenance Data

3.6 G DTOperation and Maintenance

Manuals

3.6 GMaintenance Procedures

2.12Special Tools 2.4.2Filters

26 36 23.00 20 SD-02 Shop Drawings

1.3.2 G DTAutomatic Transfer Switch

Drawings SD-03 Product Data

2.1 G DTAutomatic Transfer Switches

SD-06 Test Reports

3.3.1 G DTAcceptance Checks and Tests

3.3.2 G DTFunctional Acceptance Tests

SD-07 Certificates

1.3.1 G DTProof of Listing

SD-10 Operation and Maintenance Data

2.1 G DTAutomatic Transfer Switches

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 25 PAGES

Permanent Dispersal Barrier IIB

26 41 01.00 10 SD-02 Shop Drawings 1.3.3Detail Drawings

SD-07 Certificates 2.1Materials

26 51 00 SD-03 Product Data

2.1 G DTFluorescent lighting fixtures

1.6.1 G DTFluorescent electronic ballasts

2.1.3 G DTFluorescent electromagnetic

ballasts

2.1.4 G DTFluorescent lamps

2.2 G DTHigh-intensity-discharge (HID)

lighting fixtures

2.2.1 G DTHID ballasts

2.2.2 G DTHigh-pressure sodium (HPS)

lamps

2.5 G DTLighting contactor

2.6 G DTPhotocell switch

G DTPower hook fixture hangers

2.7 G DTExit signs

2.8 G DTEmergency lighting equipment

G DTLight Level Sensor Environmental Data

1.6.4.3Energy Efficiency SD-04 Samples

1.6.2 G DTLighting fixtures

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 25 PAGES

Permanent Dispersal Barrier IIB

26 51 00 3.3Operating test SD-10 Operation and Maintenance Data

G DTLighting Control System 1.8Operational Service

31 31 13.00 03 SD-02 Shop Drawings 2.1.1Chain Link Fence

SD-03 Product Data 2.1.1Chain Link Fence

SD-04 Samples

2.1.7 GHeavy Duty Breathable

Mesh/Windscreen GTemporary Project Safety

Fencing SD-07 Certificates Chain-Link Fence Materials

31 60 00 SD-01 Preconstruction Submittals Equipment Fill Material Certification

SD-06 Test Reports

3.6.1 G DGQuality Control

3.5.2Testing

33 20 00 SD-01 Preconstruction Submittals 1.6.2Qualifications

G DHSampling Quality Control Plan

1.6.1 G DGWell Installation Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 25 PAGES

Permanent Dispersal Barrier IIB

33 20 00 3.2.1 G DGWell Installation Plan

3.3 G DGWell Installation Plan

3.3 G DGWell Installation Plan

1.8Site Conditions

SD-02 Shop Drawings

3.10.2 G DGInstallation Diagrams

SD-03 Product Data Well Material

SD-06 Test Reports

3.10.1 G DGTest Hole Core Log

3.10.4 G DGGeophysical Logs

3.1.2Water Source

G DHSampling Report 3.10.3Well Development Records 3.9Decommissioning/Abandonment

Records SD-07 Certificates

2.1Casing 2.2Grout 1.6.1Drilling mud

44 41 20 SD-03 Product Data Electronic Chemical-Free treatment

Filtration skid and sweeper jet system

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 25 PAGES

Permanent Dispersal Barrier IIB

44 41 20 Conductivity Controller and Blowdown Valve

SD-06 Test Reports G DTInitial Start-up Service Report G *DT*Monthly Service Report

SD-10 Operation and Maintenance Data

G *CN*Water Treatment Systems

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

DIVISION 08 - OPENINGS

SECTION 08 11 13

STEEL DOORS AND FRAMES

PART 1 GENERAL

1.1 REFERENCES

1.2 SUBMITTALS

1.3 DELIVERY, STORAGE, AND HANDLING

PART 2 PRODUCTS

2.1 STANDARD STEEL DOORS

2.1.1 Classification - Level, Performance, Model

2.1.1.1 Heavy Duty Doors

2.1.1.2 Extra Heavy Duty Doors

2.1.1.3 Maximum Duty Doors

2.2 CUSTOM HOLLOW METAL DOORS

2.3 ACCESSORIES

2.3.1 Moldings

2.4 INSULATION CORES

2.5 STANDARD STEEL FRAMES

2.5.1 Welded Frames

2.5.2 Knock-Down Frames

2.5.3 Mullions and Transom Bars

2.5.4 Stops and Beads

2.5.5 Anchors

2.5.5.1 Wall Anchors

2.5.5.2 Floor Anchors

2.6 FIRE DOORS AND FRAMES

2.6.1 Labels

2.6.2 Oversized Doors

2.6.3 Astragal on Fire Doors

2.7 WEATHERSTRIPPING

2.7.1 Integral Gasket

2.8 HARDWARE PREPARATION

2.9 FINISHES

2.9.1 Factory-Primed Finish

2.9.2 Hot-Dip Zinc-Coated and Factory-Primed Finish

2.9.3 Electrolytic Zinc-Coated Anchors and Accessories

2.9.4 Factory-Applied Enamel Finish

2.10 FABRICATION AND WORKMANSHIP

2.10.1 Grouted Frames

PART 3 EXECUTION

3.1 INSTALLATION

3.1.1 Frames

3.1.2 Doors

3.2 PROTECTION

SECTION 08 11 13 - Page 1

3.3 CLEANING

-- End of Section Table of Contents --

SECTION 08 11 13 - Page 2

SECTION 08 11 13

STEEL DOORS AND FRAMES

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.

AMERICAN WELDING SOCIETY (AWS)

AWS D1.1/D1.1M (2008; Errata 2009) Structural Welding Code - Steel

ASTM INTERNATIONAL (ASTM)

ASTM A 653/A 653M (2008) Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process

ASTM A 879/A 879M (2006) Standard Specification for Steel Sheet, zinc Coated by the Electrolytic Process for Applications Requiring Designation of the Coating Mass on Each Surface

ASTM A 924/A 924M (2008a) Standard Specification for General Requirements for Steel Sheet, Metallic-Coated by the Hot-Dip Process

ASTM C 612 (2004e1) Mineral Fiber Block and Board Thermal Insulation

ASTM E 1300 (2007e1) Determining Load Resistance of Glass in Buildings

ASTM E 283 (2004) Determining the Rate of Air Leakage Through Exterior Windows, Curtain Walls, and Doors Under Specified Pressure Differences Across the Specimen

ASTM F 2248 (2003) Standard Practice for Specifying an Equivalent 3-Second Duration Design Loading for Blast Resistant Glazing Fabricated with Laminated Glass

BUILDERS HARDWARE MANUFACTURERS ASSOCIATION (BHMA)

ANSI/BHMA A156.115 (2006) Hardware Preparation in Steel Doors and Steel Frames

SECTION 08 11 13 - Page 3

NATIONAL ASSOCIATION OF ARCHITECTURAL METAL MANUFACTURERS (NAAMM)

NAAMM HMMA HMM (1999; R2000) Hollow Metal Manual

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 252 (2007) Standard Methods of Fire Tests of Door Assemblies

NFPA 80 (2006; Errata 2008) Standard for Fire Doors and Other Opening Protectives

STEEL DOOR INSTITUTE (SDI/DOOR)

SDI/DOOR 111 (2004) Recommended Selection and Usage Guide for Standard Steel Doors, Frames and Accessories

SDI/DOOR 113 (2001) Determining the Steady State Thermal Transmittance of Steel Door and Frame Assemblies

SDI/DOOR A250.11 (2001) Recommended Erection Instructions for Steel Frames

SDI/DOOR A250.3 (1999) Test Procedure and Acceptance Criteria for Factory Applied Finish Painted Steel Surfaces for Steel Doors and Frames

SDI/DOOR A250.6 (2003) Hardware on Steel Doors (Reinforcement - Application)

SDI/DOOR A250.8 (2003) Recommended Specification for Standard Steel Doors and Frames

UNDERWRITERS LABORATORIES (UL)

UL 10B (2008; Rev thru Apr 2009) Fire Tests of Door Assemblies

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-02 Shop Drawings

Doors;G, DT

Frames;G, DT

Accessories

Show elevations, construction details, metal gages, hardware

SECTION 08 11 13 - Page 4 provisions, method of glazing, and installation details.

Schedule of doors;G,DT

Schedule of frames;G,DT

Submit door and frame locations.

SD-03 Product Data

Doors;G, DT

Frames;G, DT

Accessories

Submit manufacturer's descriptive literature for doors, frames, and accessories. Include data and details on door construction, panel (internal) reinforcement, insulation, and door edge construction. When "custom hollow metal doors" are provided in lieu of "standard steel doors," provide additional details and data sufficient for comparison to SDI/DOOR A250.8 requirements.

SD-04 Samples

Factory-applied enamel finish; G, DT

Where colors are not indicated, submit manufacturer's standard colors and patterns for selection.

1.3 DELIVERY, STORAGE, AND HANDLING

Deliver doors, frames, and accessories undamaged and with protective wrappings or packaging. Store doors and frames on platforms under cover in clean, dry, ventilated, and accessible locations, with 1/4 inch airspace between doors. Remove damp or wet packaging immediately and wipe affected surfaces dry. Replace damaged materials with new.

PART 2…