W81G6691212535
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
REFERENCE: Chicago Sanitary and Ship Canal (CSSC) Aquatic Nuisance Species Electrical Demonstration Permanent Dispersal Barrier IIB Building, Romeoville, Illinois
This Amendment #0003 is being issued to Incorporate Revised Drawing Sheets, Revisions to Specification Sections and the Attendance Sheet from the Pre-Bid Meeting held on August 26, 2009.
--THIS AMENDMENT CONTINUES ON PAGE 2—
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 27-Aug-2009
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P6-09-B-0021
X 9B. DATED (SEE ITEM 11)
11-Aug-2009
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
27-Aug-2009
CODE
U. S. ARMY ENGINEER DISTRICT, CHICAGO
111 NORTH CANAL STREET SUITE 600
CHICAGO IL 60606-7206
W912P6 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P6-09-B-0021
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Continuation of Amendment Description:
1. Amended Project Specification Sections:
The following Speciifcation Sections are amended as delineatd below; bidders shall remove the Specification Sections in their entirety and replace it with the revised Specificatin Sections attached hereto.
a. MEASUREMENT AND PAYMENT, Specification Section 01 22 00.00 10 is revised in its entirety.
b. CLEAN-AGENT FIRE-SUPPRESSION SYSTEMS, Specification Section 21 22 00, has been revised to add Paragraphs 3.1.2.2 "Secondary Supply" and 3.1.2.3 "Storage Batteries".
c. AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS, Specification Section 23 00 00 has been revised to add Paragraph 2.5.2.2 “Multiblade type damper system”.
d. INTERIOR DISTRIBUTION SYSTEM, Specification Section 26 20 00 has been revised as follows:
1. A submittal register is added for this Specification Section. Submittal requirements for fire dampers can be found in the new Paragraph 1.3;
2. Paragraph 2.5.2.2 “Fire Dampers” is added;
3. Paragraph 3.6 DAMPER ACCEPTANCE TEST” is added; and
4. Removed Paragraph 1.7.2 Utility Company Transformert 2 (UCT2)
e. STEEL DOORS AND FRAMES, Specification Section 08 11 13 has been revised to add Paragraph 2.6
“FIRE DOORS AND FRAMES”.
2. Changes to Plan Sheets are as follows:
a. The Bidders shall remove and replace Drawing sheets G-02, G-04, A-05, M-02, M -03, M-04, , M-15, E- 01, E-02, E-03, E-04, E-05, E-08, and E-10 with the respective Revised Drawing Sheets attached hereto, which are incorporated by way of this Amendment #0002.
b. Drawing Sheets M-03A and M-04A are added to the Bid Set and are attacehd hereto.
Please note: Drawing M-03 has been split into drawings M-03 and M-03A. Drawing M-04 has been split into drawings M-04 and M-04A.
3. The Submittal Register, which is located in the Solicitation Package after Specification Section 01 33 00 is revised by way of this Amendment. The Bidders shall remove and replace the Submittal Register in its entirety with the Revised Submittal Register, which is attached hereto.
4. The Attendance sheet from the Pre-Bid Meeting, held on August 26, 2009, at 10:00 a.m. in the Main Conference Room on the 6th floor of the River Center Building at 111 North Canal Street, Suite 600, Chicago, Illinois 60606, is attached hereto.
5. All other terms and conditions of this Solicitation remain unchanged.
6. Point of Contact for this Amendment is Anita R. Simpkins at (312) 846-5372.
(End of Summary of Changes)
Permanent Dispersal Barrier IIB W912P6-09-B-0021
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 22 00.00 10
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 LUMP SUM PAYMENT ITEMS
1.1.1 Mobilization and Demobilization (Bid Item 0001AA)
1.1.1.1 Payment
1.1.1.2 Unit of Measure
1.1.2 Project and Safety Signs (Bid Item 0001AB)
1.1.2.1 Payment
1.1.2.2 Unit of Measure
1.1.3 Foundation Preparation (Bid Item 0001AC)
1.1.3.1 Payment
1.1.3.2 Measurement
1.1.3.3 Unit of Measure
1.1.4 Building (Bid Item 0001AD)
1.1.4.1 Payment
1.1.4.2 Unit of Measure
1.1.5 Exterior Electrical Distribution (Bid Item 0001AE)
1.1.5.1 Payment
1.1.5.2 Unit of Measure
1.1.6 Phase III Remaining Work Items (Bid Item 0005)
1.1.6.1 Payment
1.1.6.2 Unit of Measure
1.1.7 Performance and Payment Bonds (Bid Item 007)
1.1.7.1 Payment
1.1.7.2 Unit of Measure
1.2 UNIT PRICE PAYMENT ITEMS
1.2.1 Test Well (Bid Item 0002AA)
1.2.1.1 Payment
1.2.1.2 Measurement
1.2.1.3 Unit of Measure
1.2.2 Additional Test Well Depth (Bid Item 0002AB)
1.2.2.1 Payment
1.2.2.2 Measurement
1.2.2.3 Unit of Measure
1.2.3 Install Water Well (First 300') (Bid Item 0003AA)
1.2.3.1 Payment
1.2.3.2 Measurement
1.2.3.3 Unit of Measure
1.2.4 Additional Water Well Depth (BEYOND 300') (Bid Item 0003AB)
1.2.4.1 Payment
1.2.4.2 Measurement
1.2.4.3 Unit of Measure
1.2.5 Phase II On-Site Coordination Efforts (Bid Item 0004)
1.2.5.1 Payment
1.2.5.2 Measurement
1.2.5.3 Unit of Measure
SECTION 01 22 00.00 10 - Page 1
AMD-0003
1.2.6 Fence Installation (Bid Item 0006)
1.2.6.1 Payment
1.2.6.2 Measurement
1.2.6.3 Unit of Measure
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION (Not Applicable)
-- End of Section Table of Contents --
SECTION 01 22 00.00 10 - Page 2
SECTION 01 22 00.00 10
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 LUMP SUM PAYMENT ITEMS
Payment items for the work of this contract for which contract lump sum payments will be made are listed in the BIDDING SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular lump sum or unit price payment item, shall be included in the listed lump sum item most closely associated with the work involved. The lump sum price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.
1.1.1 Mobilization and Demobilization (Bid Item 0001AA)
1.1.1.1 Payment
Payment will be made for costs associated with mobilization and demobilization, as defined in Special Clause PAYMENT FOR MOBILIZATION AND
DEMOBILIZATION.
1.1.1.2 Unit of Measure
Unit of measure: lump sum.
1.1.2 Project and Safety Signs (Bid Item 0001AB2)
1.1.2.1 Payment
Full compensation for all labor, equipment and materials for the project signs, safety signs, and warning signs as described in Section 01 58 00.00 03 Project Sign and Safety Sign.
1.1.2.2 Unit of Measure
Unit of measure: lump sum.
1.1.3 Foundation Preparation (Bid Item 0001AC3)
1.1.3.1 Payment
Payment will be made for costs associated with foundation preparation and surrounding site for the building structure, which includes performing required excavation and other operations incidental thereto, contractor-furnished disposal area(s) and disposition of excess excavated material and unsuitable and frozen materials, preliminary and final clean-up activities, furnishing of dental mortar and base course materials, and costs associated with transporting, stockpiling (if applicable), and
SECTION 01 22 00.00 10 - Page 3 placement of materials to meet the grades specified on the plans and specified in SECTION 31 60 00 FOUNDATION PREPARATION.
1.1.3.2 Measurement
The total quantity of excavated material and base course material for which payment will be made will be the theoretical quantity between the ground surface as determined by a survey and the grade and slope of the theoretical cross sections indicated. No allowance will be made for overdepth excavation or for the removal of any material outside the required slope lines unless authorized.
1.1.3.3 Unit of Measure
Unit of measure: Lump Sum.
1.1.4 Building (Bid Item 0001AD4)
1.1.4.1 Payment
Payment will be made for all costs associated with the construction of the building as specified in the plans and specifications. The building includes, but is not limited to, all exterior features, the building foundation and structure, the interior of the building, all utility services, HVAC System, evaporative cooling system, generator, sidewalk, sidewalk railing, guard rail, or any other item not broken out in the bid schedule.
1.1.4.2 Unit of Measure
Unit of measure: lump sum.
1.1.5 Exterior Electrical Distribution (Bid Item 0001AE5)
1.1.5.1 Payment
Payment will be made for all cost associated with the installation of the Electrical system, from power pole to the transformer, as described in DIVISION 26 and as indicated on the drawings. The transformer shall also be included in this bid items All cost associated with the electrical distribution with in the building shall be covered in Bid Item 0005.
1.1.5.2 Unit of Measure
Unit of measure: lump sum.
1.1.6 Phase III Remaining Work Items (Bid Item 0005)
1.1.6.1 Payment
Payment will be made for all cost associated with the work required to complete all remaining work (INCLUDES final testing and construction tasks related to project completion).
1.1.6.2 Unit of Measure
Unit of measure: lump sum.
SECTION 01 22 00.00 10 - Page 4
1.1.7 Performance and Payment Bonds (Bid Item 0079)
1.1.7.1 Payment
Payment will be made for the performance and paymenht bonds that are required as part of this contract. The Government will pay the actual cost of the bonds or the Contractor's bid price, whichever is less.
1.1.7.2 Unit of Measure
Unit of measure: Lump sum.
1.2 UNIT PRICE PAYMENT ITEMS
Payment items for the work of this contract on which the contract unit price payments will be made are listed in the BIDDING SCHEDULE and described below. The unit price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for each of the unit price items.
1.2.1 Test Well (Bid Item 00026AA)
1.2.1.1 Payment
Payment will be made for all costs associated with the required tasks of the Test Hole as described in Section 33 20 00.
1.2.1.2 Measurement
Measurement will be made for successful completion of the required tasks described in Section 33 20 00 for the Test Well to a depth of 200 feet.
1.2.1.3 Unit of Measure
Unit of measure: Linear foot (LF)
1.2.2 Additional Test Well Depth (Bid Item 00026AB)
1.2.2.1 Payment
Payment will be made for all costs associated with the required tasks of the Test Hole as described in Section 33 20 00.
1.2.2.2 Measurement
Measurement will be made for successful completion of the required tasks described in Section 33 20 00, beyond the first 200 feet of depth.
1.2.2.3 Unit of Measure
Unit of measure: Linear foot (LF).
SECTION 01 22 00.00 10 - Page 5
1.2.3 Install Water Well (First 300150') (Bid Item 00037AA)
1.2.3.1 Payment
Payment will be made for all costs associated with the installation of the Water Well as described in Section 33 20 00 and as indicated on the drawings.
1.2.3.2 Measurement
Measurement will be made for the installation and testing of the well as described in Section 33 20 00, up to the first 300150 feet of well depth.
1.2.3.3 Unit of Measure
Unit of measure: Linear Foot (LF).
1.2.4 Additional Water Well Depth (BEYOND 300') (Bid Item 00037AB)
1.2.4.1 Payment
Payment will be made for all the costs associated with the installation of the Water Well as described in Section 33 20 00 and as indicated on the drawings for the additional depth beyond 300150 feet.
1.2.4.2 Measurement
Measurement will be made for costs associated with the installation and testing of the well as described in Section 33 20 00, beyond the first 300 150 feet of well depth.
1.2.4.3 Unit of Measure
Unit of measure: Linear foot (LF).
1.2.5 Phase II On-Site Coordination Efforts (Bid Item 0004)
1.2.5.1 Payment
Payment will be made for all the cost associated with coordination of all personnel and equipment onsite for work performed by others. In performance of these efforts, the contractor shall ensure that it will have personnel and equipment available for testing of the work performed by others.
1.2.5.2 Measurement
Measurement will be made for costs associated with the coordination of personnel and equipment for work performed by others.
1.2.5.3 Unit of Measure
Unit of measure: Hours (HRS).
SECTION 01 22 00.00 10 - Page 6
1.2.6 Fence Installation (Bid Item 00068)
1.2.6.1 Payment
Payment at the contract unit price will be made for installation of fencing with gates as described and identified on the drawings and in SECTION 31 31 13.00 03 FENCING AND GATES; TEMPORARY AND PERMANENT. Unit price shall include all the cost associated with connecting proposed fence to existing fence on both ends of the project and connecting proposed fence to the existing fence. Also the unit price shall include all the cost associated with relocating and reinstalling temporary fence. Payment constitutes full compensation for all materials and labor associated with site preparation, excavating, backfilling and other incidental items necessary to complete the work.
1.2.6.2 Measurement
Measurement will be based on the linear foot of permanent fence installed.
1.2.6.3 Unit of Measure
Unit of measure: Linear Foot (LF)
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION (Not Applicable)
-- End of Section --
SECTION 01 22 00.00 10 - Page 7
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 25 PAGES
Permanent Dispersal Barrier IIB
01 10 00.00 03 SD-01 Preconstruction Submittals 1.8Condition of Existing Structures
1.13 G CNCoordination with Others
Drug Free Workplace SD-11 Closeout Submittals
1.6 G CNAs-Built Drawings
01 32 01.01 10 SD-01 Preconstruction Submittals
3.4 G CNProject Schedule
01 35 26.00 03 SD-01 Preconstruction Submittals
1.6 G SOAccident Prevention Plan (APP)
1.7 G SOActivity Hazard Analysis (AHA)
1.6.1 G SOCrane Critical Lift Plan
1.5.1.3 G SOCrane Operators
SD-06 Test Reports 1.11Reports 1.11.1Accident Reports 1.11.3Monthly Exposure Reports 1.11.4Crane Reports
Regulatory Citations and Violations
SD-07 Certificates 1.8Confined Space Entry Permit 1.8Hot work permit
License Certificates 01 45 01.00 03 SD-01 Preconstruction Submittals
3.2 G CNQUALITY CONTROL PLAN
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 25 PAGES
Permanent Dispersal Barrier IIB
01 52 02 SD-01 Preconstruction Submittals
1.3 G *CN*Construction Site Plan
01 57 20.01 03 SD-01 Preconstruction Submittals
1.7 G DHEnvironmental Protection Plan
01 99 99 SD-02 Shop Drawings G DTStud Walls G DTSteel Roof Deck
SD-03 Product Data G DTPaint G DTSteel Roof Deck G DTEpoxy Flooring
2.8 G DTSealants
G DTImpact Resistant Gypsum Board G DTBlock or Board Insulation
SD-04 Samples
2.13.1 G DTManufacturer's Standard Color
Charts SD-08 Manufacturer’s Instructions
G DTNon-Magnetic Access Flooring System
2.13.2MSDS
03 11 13.00 10 SD-02 Shop Drawings
3.1.1Formwork SD-03 Product Data
2.1Form Materials 2.1.5Form Releasing Agents
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 25 PAGES
Permanent Dispersal Barrier IIB
03 11 13.00 10 1.3Design 03 20 01.00 10 SD-02 Shop Drawings
3.1 G DSReinforcement
SD-07 Certificates
2.1Reinforcing Steel 03 31 00.00 10 SD-03 Product Data
1.4 G DSMixture Proportions
G DSConcrete From Liners
Air-Entraining Admixture Accelerating Admixture Water-Reducing or Retarding Admixture
Curing Materials SD-06 Test Reports
2.2Aggregates SD-07 Certificates Cementitious Materials
2.2Aggregates G DSReinforcing Steel
05 12 00 SD-02 Shop Drawings
1.3.1.1 G DSErection Plan
SD-03 Product Data 2.4Shop primer
SD-07 Certificates 2.1Steel
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 25 PAGES
Permanent Dispersal Barrier IIB
05 12 00 1.3.1.2Welding procedures and qualifications
07 22 00 SD-02 Shop Drawings
2.1.4 G DTTapered roof insulation
SD-03 Product Data
2.1 G DTInsulation
SD-07 Certificates 1.3qualifications
SD-08 Manufacturer’s Instructions 2.3fasteners 2.1insulation
07 51 13 SD-03 Product Data 1.4.3wind uplift calculations 2.4Asphalt
3.3.3 G DTFelts
2.5.2 G DTGranule Surface Modified
Bitumen Cap Sheet
2.3 G DTFLASHING MEMBRANE
2.9Fasteners 2.6Primer 2.7Asphalt Roof Cement 2.8Cant Strips
2.10 G DTPre-Manufactured Accessories
1.8 G DTwarranties
SD-06 Test Reports Samples of Built-Up Roofing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 25 PAGES
Permanent Dispersal Barrier IIB
07 51 13 SD-07 Certificates 1.4.1Qualifications of Applicator
SD-08 Manufacturer’s Instructions 3.3.3felts flashings 2.4Asphalt 2.6Primer roof cement 2.9Fasteners
1.6 G DTcold weather conditions
SD-11 Closeout Submittals
1.8WARRANTY
3.6INFORMATION CARD
07 81 00 SD-03 Product Data 3.3Fireproofing Material
SD-04 Samples 2.1Spray-Applied Fireproofing
SD-06 Test Reports 1.2.2Fire Resistance Rating 3.6Field Tests
SD-07 Certificates 1.4.1Installer Qualifications 3.1Surface Preparation Report 3.5.2Manufacturer's Inspection Report
08 11 13 SD-02 Shop Drawings
2.1 G DTDoors
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 25 PAGES
Permanent Dispersal Barrier IIB
08 11 13 2.5 G DTFrames 2.3Accessories
G DTSchedule of doors G DTSchedule of frames
SD-03 Product Data
2.1 G DTDoors
2.5 G DTFrames
2.3Accessories
SD-04 Samples
2.9.4 G DTFactory-applied enamel finish
08 33 23 SD-02 Shop Drawings
2.1 G DTOverhead Coiling Doors
2.3Counterbalancing Mechanism 2.4Electric Door Operators 2.1.4Bottom Bar 1.5Guides 2.3.1Mounting Brackets 2.1.9Overhead Drum
Hood Painting
1.5Installation Drawings SD-03 Product Data
2.1Overhead Coiling Doors 2.2Hardware 2.3Counterbalancing Mechanism 2.4Electric Door Operators
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 25 PAGES
Permanent Dispersal Barrier IIB
08 33 23 Fire-Rated Door Assembly SD-04 Samples
G DTFactory-applied finish SD-10 Operation and Maintenance Data Operation and Maintenance Manuals
Overhead Coiling Door Assemblies
Materials Devices Procedures Manufacture's Brochures Parts Lists Cleaning
08 39 54 SD-02 Shop Drawings
3.1 G DTInstallation
SD-03 Product Data
1.3 G DTDoor Description
Door Installation Instructions Manufacturer's Field Service
SD-06 Test Reports
2.5.1 G DTPrototype Static Test
2.5.2 G DTPrototype Blast Test
SD-10 Operation and Maintenance Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 25 PAGES
Permanent Dispersal Barrier IIB
08 39 54 1.3Door Description 08 71 00 SD-02 Shop Drawings
1.3 G DTHardware schedule
2.3.5Keying system
SD-03 Product Data
2.3 G DTHardware items
SD-08 Manufacturer’s Instructions 3.1Installation
SD-10 Operation and Maintenance Data
1.3 G COHardware Schedule
SD-11 Closeout Submittals
1.4Key Bitting 09 90 00 SD-02 Shop Drawings
3.8Piping identification 3.8stencil
SD-03 Product Data 1.9.1Local/Regional Materials
Environmental Data 2.1Materials
2.1 G DTCoating
2.1Manufacturer's Technical Data
Sheets Sealant
SD-04 Samples G DTColor
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 25 PAGES
Permanent Dispersal Barrier IIB
09 90 00 SD-07 Certificates 1.3Applicator's qualifications
1.4.1.2 G DTQualification Testing
SD-08 Manufacturer’s Instructions Application instructions
3.5.2Mixing 1.7.2Manufacturer's Material Safety
Data Sheets SD-10 Operation and Maintenance Data
2.1 G DTCoatings:
21 22 00 SD-02 Shop Drawings
1.4.2 G DTInstallation Drawings
SD-03 Product Data
2.2.2 G DTClean Agent storage tanks
2.2.2Pressure gauge 2.2.2Low pressure switch 2.2.3Discharge nozzles
2.2.1 G DTDistribution Piping and Fittings
2.2.4 G DHFire suppression agent
2.2.5.3 G DTFire Detectors
2.2.2 G DTControl Panel
2.2.5.1 G DTControl Panel
SD-05 Design Data Hydraulic flow calculations
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 25 PAGES
Permanent Dispersal Barrier IIB
21 22 00 Calculations for the battery stand-by power supply
G DTComplete sequence of operation SD-06 Test Reports
3.2Complete System 3.2.1Room pressurization Test 2.2.5.3Fire Detectors 2.2.2Control Panel 2.2.5.1Control Panel 2.2.5.7System Wiring
Request for Inspection and Test SD-07 Certificates Qualifications
SD-08 Manufacturer’s Instructions 3.1.4Operating Instructions
SD-10 Operation and Maintenance Data
3.1.4Operation and Maintenance Manuals
22 00 00 SD-02 Shop Drawings
3.7.1 GPlumbing System
SD-03 Product Data Equipment
1.5.1Welding 3.7.1Plumbing System
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 25 PAGES
Permanent Dispersal Barrier IIB
22 00 00 Tests and Flushing SD-07 Certificates
1.3Materials and Equipment 2.1.1Bolts
SD-10 Operation and Maintenance Data
3.7.1 GPlumbing System
22 07 19 SD-02 Shop Drawings
3.1Installation Drawings SD-03 Product Data
2.2Adhesives 2.7Coatings 2.3Insulating Cement 2.1Insulation Materials 2.6Jacketing 2.8Tape
SD-08 Manufacturer’s Instructions 2.1Insulation Materials
23 00 00 SD-02 Shop Drawings
1.4.5 GDetail Drawings
SD-03 Product Data 2.1Standard Products
Duct Connectors 2.5.2.1Duct Access Doors
2.5.2.2 G DTFire Dampers
2.5.2.2 G DTFire Dampers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r) h6teemjb Highlight
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 25 PAGES
Permanent Dispersal Barrier IIB
23 00 00 2.5.2.3Manual Balancing Dampers 2.5.4.1Registers and Grilles 2.5.5Louvers
Test Procedures
1.2.1 GDiagrams
Operation and Maintenance Training
SD-06 Test Reports
3.8 GPerformance Tests
3.6 G CNDamper Acceptance Test
SD-08 Manufacturer’s Instructions 3.2Manufacturer's Installation
Instructions Operation and Maintenance Training
SD-10 Operation and Maintenance Data Operation and Maintenance Manuals
2.5.2.2 G CNFire Dampers
2.5.2.3 GManual Balancing Dampers
23 05 93.00 40 SD-01 Preconstruction Submittals 1.3Records of Existing Conditions
SD-03 Product Data 1.3Equipment and Performance
Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r) h6teemjb Highlight h6teemjb Highlight
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 25 PAGES
Permanent Dispersal Barrier IIB
23 05 93.00 40 SD-06 Test Reports 1.3Test Reports
SD-07 Certificates 1.3Certificates
23 08 00.00 10 SD-02 Shop Drawings
1.5.2.2 GCommissioning Plan
SD-03 Product Data
3.2.1 GPre-Functional Performance Test
Checklists
3.2.2 GFunctional Performance Tests
SD-06 Test Reports
3.3 GCommissioning Report
SD-07 Certificates
1.5.1 GCommissioning Firm
1.5.2 GCommissioning Specialist
23 23 00 SD-02 Shop Drawings
2.3 GRefrigerant Piping System
SD-03 Product Data 2.3Refrigerant Piping System
1.3.1 GQualifications
3.5 GRefrigerant Piping Tests
3.4 GDemonstrations
3.1Verification of Dimensions
SD-06 Test Reports 3.5Refrigerant Piping Tests
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 25 PAGES
Permanent Dispersal Barrier IIB
23 23 00 2.1 GService Organization SD-10 Operation and Maintenance Data
1.5Maintenance 3.4Operation and Maintenance
Manuals 23 64 26 SD-03 Product Data
2.4.8 GCalibrated Balancing Valves
2.4.9 GAutomatic Flow Control Valves
2.4.10Pump Discharge Valve
GWater Temperature Regulating Valves
2.4.11Water Pressure Reducing Valve 2.4.12Pressure Relief Valve 2.4.13Combination Pressure and
Temperature Relief Valves
2.5.8 GExpansion Joints
2.6 GPumps
2.5.2Combination Strainer and Pump
Suction Diffuser 2.7Expansion Tanks 2.8Air Separator Tanks
SD-06 Test Reports 3.1.1.3Piping welds NDE report
3.4.2 GPressure tests reports
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 25 PAGES
Permanent Dispersal Barrier IIB
23 64 26 3.1.1.1Employer's Record Documents (For Welding)
3.1.1.2Welding Procedures and Qualifications
Fittings Unions Flanges Gaskets Bolting
SD-08 Manufacturer’s Instructions
3.5 GLesson plan for the Instruction
Course SD-10 Operation and Maintenance Data
2.4.8 GCalibrated Balancing Valves
2.4.9 GAutomatic Flow Control Valves
2.4.10 GPump Discharge Valve
GWater Temperature Regulating Valves
2.4.11 GWater Pressure Reducing Valve
2.4.12 GPressure Relief Valve
2.4.13 GCombination Pressure and
Temperature Relief Valves
2.5.8 GExpansion Joints
2.6 GPumps
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 25 PAGES
Permanent Dispersal Barrier IIB
23 64 26 2.5.2 GCombination Strainer and Pump Suction Diffuser
2.7 GExpansion Tanks
2.8 GAir Separator Tanks
23 65 00 SD-03 Product Data
2.4 G DTEvaporative Cooling Towers
3.1 G DTPosted Instructions
3.1 G DTDemonstrations
1.5.1 G DTVerification of Dimensions
SD-06 Test Reports G DTPackaged evaporative cooling tower - installation instructions G DTPackaged evaporative cooling tower - field acceptance test plan
3.4 G DTPackaged evaporative cooling
tower - field acceptance test report SD-07 Certificates
2.1Service Organization 2.4.1.11Cooling Tower
SD-08 Manufacturer’s Instructions Packaged evaporative cooling tower - installation instructions
SD-10 Operation and Maintenance Data
3.1Operation and Maintenance Manuals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 25 PAGES
Permanent Dispersal Barrier IIB
23 82 02.00 10 SD-02 Shop Drawings 1.4Drawings
SD-03 Product Data 2.1.1Materials and Equipment 1.6Spare Parts 3.4Posted Instructions 3.1Verification of Dimensions
Coil Corrosion Protection 3.6System Performance Tests
3.4 GDemonstrations
SD-06 Test Reports
3.5 GRefrigerant Tests, Charging, and
Start-Up
3.6 GSystem Performance Tests
SD-07 Certificates 2.1.1Materials and Equipment 2.1.1Service Organization
SD-10 Operation and Maintenance Data
3.4Operation and Maintenance Manuals
26 20 00 SD-02 Shop Drawings GPanelboards
2.15 GTransformers
2.4 GBusway
GCable trays
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 25 PAGES
Permanent Dispersal Barrier IIB
26 20 00 G DTMotor control centers
2.24 GWireways
G DTLoad centers and panelboard
3.1.7.1 G DTMarking strips
SD-03 Product Data
2.12 G DTReceptacles
G DTCircuit breakers
2.10 G DTSwitches
2.15 G DTTransformers
2.13 G DTEnclosed circuit breakers
2.17 G DTMotor controllers
G DTCombination motor controllers G DTLoad centers and panelboard G DTMotor starters G DTMetering
2.25 G DTSurge protective devices
SD-06 Test Reports
3.5.2 G DT600-volt wiring test
3.5.5 GGrounding system test
3.5.3 G DTTransformer tests
3.5.4 GGround-fault receptacle test
SD-07 Certificates
2.11 G DTFuses
SD-09 Manufacturer’s Field Reports
2.27.1Transformer factory tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 25 PAGES
Permanent Dispersal Barrier IIB
26 20 00 SD-10 Operation and Maintenance Data
1.5.1 G DTElectrical Systems
G DTMetering
26 28 00.00 10 SD-02 Shop Drawings
2.4.2 G DTDrawings
2.2.1 G DTShop Drawings
2.6 G DTMotor Control Centers
2.7 GSwitchboards
2.8 G DTPanelboards
SD-03 Product Data 2.10Factory Tests
SD-06 Test Reports 2.10Factory Tests
SD-07 Certificates 2.6Motor Control Centers
26 32 15.00 10 SD-02 Shop Drawings
1.4.19 G DTDetailed Drawings
3.7 G DTAcceptance
SD-03 Product Data 2.13Performance Criteria
2.6 G DTSound Limitations
1.4.15Harmonic Requirements 1.3.1Engine-Generator Parameter
Schedule 2.3.4Integral Main Fuel Storage Tank
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 25 PAGES
Permanent Dispersal Barrier IIB
26 32 15.00 10 Day Tank 3.4.1.2Power Factor 2.5.2Heat Exchanger 2.5Cooling System 2.17.5Time-Delay on Alarms 2.13Generator 2.2Manufacturer's Catalog 1.4.6Site Welding 1.4.20Spare Parts 3.6Onsite Training 2.11.3.2Battery Charger 1.4.11Vibration-Isolation
3.5 G DTPosted Data and Instructions
3.4.4.1 G DTInstructions
1.4.17Experience 1.4.18Field Engineer 3.1General Installation
SD-06 Test Reports 2.24Factory Inspection and Tests 2.24.2Factory Tests
3.4 G DTOnsite Inspection and Tests
SD-07 Certificates 1.4.11Vibration Isolation 2.24.2Prototype Test 1.3.4Reliability and Durability 2.10Emissions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 25 PAGES
Permanent Dispersal Barrier IIB
26 32 15.00 10 2.6Sound Limitations 1.4.4Site Visit 2.13.1Current Balance 2.1Materials and Equipment 3.4.3Inspections 2.5Cooling System
SD-10 Operation and Maintenance Data
3.6 G DTOperation and Maintenance
Manuals
3.6 GMaintenance Procedures
2.12Special Tools 2.4.2Filters
26 36 23.00 20 SD-02 Shop Drawings
1.3.2 G DTAutomatic Transfer Switch
Drawings SD-03 Product Data
2.1 G DTAutomatic Transfer Switches
SD-06 Test Reports
3.3.1 G DTAcceptance Checks and Tests
3.3.2 G DTFunctional Acceptance Tests
SD-07 Certificates
1.3.1 G DTProof of Listing
SD-10 Operation and Maintenance Data
2.1 G DTAutomatic Transfer Switches
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 25 PAGES
Permanent Dispersal Barrier IIB
26 41 01.00 10 SD-02 Shop Drawings 1.3.3Detail Drawings
SD-07 Certificates 2.1Materials
26 51 00 SD-03 Product Data
2.1 G DTFluorescent lighting fixtures
1.6.1 G DTFluorescent electronic ballasts
2.1.3 G DTFluorescent electromagnetic
ballasts
2.1.4 G DTFluorescent lamps
2.2 G DTHigh-intensity-discharge (HID)
lighting fixtures
2.2.1 G DTHID ballasts
2.2.2 G DTHigh-pressure sodium (HPS)
lamps
2.5 G DTLighting contactor
2.6 G DTPhotocell switch
G DTPower hook fixture hangers
2.7 G DTExit signs
2.8 G DTEmergency lighting equipment
G DTLight Level Sensor Environmental Data
1.6.4.3Energy Efficiency SD-04 Samples
1.6.2 G DTLighting fixtures
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 25 PAGES
Permanent Dispersal Barrier IIB
26 51 00 3.3Operating test SD-10 Operation and Maintenance Data
G DTLighting Control System 1.8Operational Service
31 31 13.00 03 SD-02 Shop Drawings 2.1.1Chain Link Fence
SD-03 Product Data 2.1.1Chain Link Fence
SD-04 Samples
2.1.7 GHeavy Duty Breathable
Mesh/Windscreen GTemporary Project Safety
Fencing SD-07 Certificates Chain-Link Fence Materials
31 60 00 SD-01 Preconstruction Submittals Equipment Fill Material Certification
SD-06 Test Reports
3.6.1 G DGQuality Control
3.5.2Testing
33 20 00 SD-01 Preconstruction Submittals 1.6.2Qualifications
G DHSampling Quality Control Plan
1.6.1 G DGWell Installation Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 25 PAGES
Permanent Dispersal Barrier IIB
33 20 00 3.2.1 G DGWell Installation Plan
3.3 G DGWell Installation Plan
3.3 G DGWell Installation Plan
1.8Site Conditions
SD-02 Shop Drawings
3.10.2 G DGInstallation Diagrams
SD-03 Product Data Well Material
SD-06 Test Reports
3.10.1 G DGTest Hole Core Log
3.10.4 G DGGeophysical Logs
3.1.2Water Source
G DHSampling Report 3.10.3Well Development Records 3.9Decommissioning/Abandonment
Records SD-07 Certificates
2.1Casing 2.2Grout 1.6.1Drilling mud
44 41 20 SD-03 Product Data Electronic Chemical-Free treatment
Filtration skid and sweeper jet system
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 25 PAGES
Permanent Dispersal Barrier IIB
44 41 20 Conductivity Controller and Blowdown Valve
SD-06 Test Reports G DTInitial Start-up Service Report G *DT*Monthly Service Report
SD-10 Operation and Maintenance Data
G *CN*Water Treatment Systems
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
DIVISION 08 - OPENINGS
SECTION 08 11 13
STEEL DOORS AND FRAMES
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 DELIVERY, STORAGE, AND HANDLING
PART 2 PRODUCTS
2.1 STANDARD STEEL DOORS
2.1.1 Classification - Level, Performance, Model
2.1.1.1 Heavy Duty Doors
2.1.1.2 Extra Heavy Duty Doors
2.1.1.3 Maximum Duty Doors
2.2 CUSTOM HOLLOW METAL DOORS
2.3 ACCESSORIES
2.3.1 Moldings
2.4 INSULATION CORES
2.5 STANDARD STEEL FRAMES
2.5.1 Welded Frames
2.5.2 Knock-Down Frames
2.5.3 Mullions and Transom Bars
2.5.4 Stops and Beads
2.5.5 Anchors
2.5.5.1 Wall Anchors
2.5.5.2 Floor Anchors
2.6 FIRE DOORS AND FRAMES
2.6.1 Labels
2.6.2 Oversized Doors
2.6.3 Astragal on Fire Doors
2.7 WEATHERSTRIPPING
2.7.1 Integral Gasket
2.8 HARDWARE PREPARATION
2.9 FINISHES
2.9.1 Factory-Primed Finish
2.9.2 Hot-Dip Zinc-Coated and Factory-Primed Finish
2.9.3 Electrolytic Zinc-Coated Anchors and Accessories
2.9.4 Factory-Applied Enamel Finish
2.10 FABRICATION AND WORKMANSHIP
2.10.1 Grouted Frames
PART 3 EXECUTION
3.1 INSTALLATION
3.1.1 Frames
3.1.2 Doors
3.2 PROTECTION
SECTION 08 11 13 - Page 1
3.3 CLEANING
-- End of Section Table of Contents --
SECTION 08 11 13 - Page 2
SECTION 08 11 13
STEEL DOORS AND FRAMES
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.
AMERICAN WELDING SOCIETY (AWS)
AWS D1.1/D1.1M (2008; Errata 2009) Structural Welding Code - Steel
ASTM INTERNATIONAL (ASTM)
ASTM A 653/A 653M (2008) Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process
ASTM A 879/A 879M (2006) Standard Specification for Steel Sheet, zinc Coated by the Electrolytic Process for Applications Requiring Designation of the Coating Mass on Each Surface
ASTM A 924/A 924M (2008a) Standard Specification for General Requirements for Steel Sheet, Metallic-Coated by the Hot-Dip Process
ASTM C 612 (2004e1) Mineral Fiber Block and Board Thermal Insulation
ASTM E 1300 (2007e1) Determining Load Resistance of Glass in Buildings
ASTM E 283 (2004) Determining the Rate of Air Leakage Through Exterior Windows, Curtain Walls, and Doors Under Specified Pressure Differences Across the Specimen
ASTM F 2248 (2003) Standard Practice for Specifying an Equivalent 3-Second Duration Design Loading for Blast Resistant Glazing Fabricated with Laminated Glass
BUILDERS HARDWARE MANUFACTURERS ASSOCIATION (BHMA)
ANSI/BHMA A156.115 (2006) Hardware Preparation in Steel Doors and Steel Frames
SECTION 08 11 13 - Page 3
NATIONAL ASSOCIATION OF ARCHITECTURAL METAL MANUFACTURERS (NAAMM)
NAAMM HMMA HMM (1999; R2000) Hollow Metal Manual
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 252 (2007) Standard Methods of Fire Tests of Door Assemblies
NFPA 80 (2006; Errata 2008) Standard for Fire Doors and Other Opening Protectives
STEEL DOOR INSTITUTE (SDI/DOOR)
SDI/DOOR 111 (2004) Recommended Selection and Usage Guide for Standard Steel Doors, Frames and Accessories
SDI/DOOR 113 (2001) Determining the Steady State Thermal Transmittance of Steel Door and Frame Assemblies
SDI/DOOR A250.11 (2001) Recommended Erection Instructions for Steel Frames
SDI/DOOR A250.3 (1999) Test Procedure and Acceptance Criteria for Factory Applied Finish Painted Steel Surfaces for Steel Doors and Frames
SDI/DOOR A250.6 (2003) Hardware on Steel Doors (Reinforcement - Application)
SDI/DOOR A250.8 (2003) Recommended Specification for Standard Steel Doors and Frames
UNDERWRITERS LABORATORIES (UL)
UL 10B (2008; Rev thru Apr 2009) Fire Tests of Door Assemblies
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Doors;G, DT
Frames;G, DT
Accessories
Show elevations, construction details, metal gages, hardware
SECTION 08 11 13 - Page 4 provisions, method of glazing, and installation details.
Schedule of doors;G,DT
Schedule of frames;G,DT
Submit door and frame locations.
SD-03 Product Data
Doors;G, DT
Frames;G, DT
Accessories
Submit manufacturer's descriptive literature for doors, frames, and accessories. Include data and details on door construction, panel (internal) reinforcement, insulation, and door edge construction. When "custom hollow metal doors" are provided in lieu of "standard steel doors," provide additional details and data sufficient for comparison to SDI/DOOR A250.8 requirements.
SD-04 Samples
Factory-applied enamel finish; G, DT
Where colors are not indicated, submit manufacturer's standard colors and patterns for selection.
1.3 DELIVERY, STORAGE, AND HANDLING
Deliver doors, frames, and accessories undamaged and with protective wrappings or packaging. Store doors and frames on platforms under cover in clean, dry, ventilated, and accessible locations, with 1/4 inch airspace between doors. Remove damp or wet packaging immediately and wipe affected surfaces dry. Replace damaged materials with new.