W912P518T0003
US Army Corps Of Engineers Nashville District
SYSTEMWIDE SCADA UPGRADE
Various Powerplants Cumberland River Basin
Tennessee and Kentucky
Technical Specifications
January 2018
THIS PAGE INTENTIONALLY LEFT BLANK
FOR DUPLEX PRINTING
Systemwide SCADA Upgrade Various Powerplants W912P518T0003 Cumberland River, Tennessee and Kentucky
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 11 11 DRAWINGS
01 22 00 PRICE AND PAYMENT PROCEDURES
01 31 19 COORDINATION MEETINGS
01 33 00 SUBMITTAL PROCEDURES
01 33 60 SYSTEM PERFORMANCE REQUIREMENTS
01 33 61 EQUIPMENT DESIGN AND CONSTRUCTION
01 35 50 PROJECT SITE SECURITY AND AT/OPSEC PROCEDURES
01 35 70 CYBERSECURITY
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 42 13 LIST OF TERMS, ABBREVIATIONS AND ACRONYMS
01 60 00 PRODUCT REQUIREMENTS
01 75 10 TESTING, INSTALLATION PERSONNEL AND ACCEPTANCE
01 79 20 TRAINING
DIVISION 26 - ELECTRICAL
26 00 51 ELECTRICAL DRAWINGS AND DATA
26 00 80 WIRING CHECKOUT AND TESTING
DIVISION 27 - COMMUNICATIONS
27 51 20 COMMUNICATION SYSTEM
DIVISION 40 - PROCESS INTERCONNECTIONS
40 94 51 SYSTEM HARDWARE
40 94 53 MASTER STATION BASIC SOFTWARE
40 94 54 HUMAN MACHINE INTERFACE SOFTWARE
40 94 55 PROJECT APPLICATION SOFTWARE
40 94 60 RTU
40 94 61 RTU SOFTWARE
PROJECT TABLE OF CONTENTS Page 1
Systemwide SCADA Upgrade Various Powerplants W912P518T0003 Cumberland River, Tennessee and Kentucky
PROJECT TABLE OF CONTENTS
PROJECT TABLE OF CONTENTS - Page 2
APPENDICES
APPENDIX A SCADA POINTS
APPENDIX B SCADA SPECIFICATIONS SCREEN SHOTS
APPENDIX C NETWORK DIAGRAMS
APPENDIX D SCADA REFERENCE DRAWINGS
APPENDIX E SAMPLE REPORTS
-- End of Project Table of Contents --
Syst emwi de SCADA Upgr ade Var i ous Power pl ant s W912P518T0003 Cumber l and Ri ver , Tennessee and Kent ucky
SECTI ON TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1. 1 EXECUTI VE SUMMARY
1. 2 LOCATI ONS
1. 2. 1 Gr oup 1
1. 2. 1. 1 Mast er Pl ant
1. 2. 1. 1. 1 Ol d Hi ckor y ( OLD/ P)
1. 2. 1. 2 Remot e Pl ant s
1. 2. 1. 2. 1 J. Per cy Pr i est ( JPP/ P)
1. 2. 1. 2. 2 Cheat ham ( CHE/ P)
1. 2. 2 Gr oup 2
1. 2. 2. 1 Mast er Pl ant
1. 2. 2. 1. 1 Cor del l Hul l ( COR/ P)
1. 2. 2. 2 Remot e Pl ant s
1. 2. 2. 2. 1 Dal e Hol l ow ( DAL/ P)
1. 2. 2. 2. 2 Cent er Hi l l ( CEN/ P)
1. 2. 3 Gr oup 3
1. 2. 3. 1 Mast er Pl ant
1. 2. 3. 1. 1 Bar kl ey ( BAR/ P)
1. 2. 3. 1. 2 Wol f Cr eek ( WOL/ P)
1. 2. 3. 2 Remot e Pl ant s
1. 2. 3. 2. 1 Laur el ( LAU/ P)
1. 2. 3. 3 ESS Of f i ce
1. 3 PRI NCI PAL COMPONENTS OF WORK
1. 3. 1 Desi gn
1. 3. 1. 1 Gener al
1. 3. 1. 2 New SCADA Syst em Funct i onal i t y
1. 3. 2 Suppl y
1. 3. 3 I nst al l at i on
1. 3. 4 Techni cal Suppor t
1. 4 WARRANTY
1. 5 DEFI NI TI ONS
1. 6 VETERANS EMPLOYMENT EMPHASI S FOR U. S. ARMY CORPS OF ENGI NEERS
CONTRACTS
PART 2 PRODUCTS
PART 3 EXECUTI ON
- - End of Sect i on Tabl e of Cont ent s - -
SECTI ON 01 11 00 Page 1
SECTI ON 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1. 1 EXECUTI VE SUMMARY
Fi ve r emot el y- oper at ed hydr oel ect r i c power pl ant s ( HPPs) i n t he U. S. Ar my Cor ps of Engi neer s Nashvi l l e Di st r i ct ( LRN) have super vi sor y, cont r ol , and dat a acqui s i t i on ( SCADA) syst ems t hat ar e end- of - l i f e. Techni cal suppor t f or f i r mwar e, r epl acement har dwar e, and moder n sof t war e ar e no l onger avai l abl e. LRN woul d l i ke t o upgr ade t he SCADA syst ems at t hese f i ve r emot e f aci l i t i es and addi t i onal l y pr ovi de new SCADA mast er st at i ons at f our mast er HPPs, wher e t he t er m " mast er " i dent i f i es an HPP whi ch can r emot el y oper at e one or mor e HPPs. At a hi gh l evel , t hi s cont r act ual scope of wor k gener al l y cover s t he f ol l owi ng: t he desi gn of new SCADA syst em r emot e t er mi nal uni t s ( RTUs) f or t he f i ve r emot e HPPs, t he desi gn of new SCADA mast er st at i ons at f our mast er HPPs, har dwar e and sof t war e suppl y f or t he new SCADA syst ems, and i nst al l at i on and t r ai ni ng suppor t f or t he new SCADA syst ems. LRN Oper at i ons and Mai nt enance per sonnel wi l l per f or m t he maj or i t y of t he physi cal i nst al l at i on f or t he new SCADA systems.
1. 2 LOCATIONS
1. 2. 1 Gr oup 1
1. 2. 1. 1 Mast er Pl ant
1. 2. 1. 1. 1 Ol d Hi ckor y ( OLD/ P)
a. Hi st or y and Cont ext .
The Ol d Hi ckor y pr oj ect i s owned and oper at ed by t he U. S. Ar my Cor ps of Engi neer s Nashvi l l e Di st r i ct . I t i s l ocat ed appr oxi mat el y ei ght een ( 18) mi l es nor t h of t he Nashvi l l e Downt own of f i ces on t he Cumber l and Ri ver . The pr oj ect oper at es wi t h a t went y- f our hour oper at i ons st af f and a day- t i me mai nt enance cr ew. I t i s cur r ent l y a mast er pl ant t o J.
Per cy Pr i est ( JPP/ P) and Cheat ham ( CHE/ P) . Addi t i onal l y, t he ESS of f i ce i s wi t hi n wal k i ng di st ance of t he pl ant .
b. Pl ant Det ai l s.
Ol d Hi ckor y i s a peaki ng pl ant wi t h f our gener at or s. Uni t 4 i s cur r ent l y under goi ng a maj or r ehabi l i t at i on ef f or t ; i t s post - r ehab expect ed gener at i on capaci t y shoul d be about 44- 45 MW. The ot her uni t s ar e par t of a HRAR and wi l l be r ehabbed i n out - year s. The pl ant al so has a backup di esel gener at or . Al l f our gener at i ng uni t s have Kapl an t ur bi nes. Al l f our gener at i ng uni t s oper at e occasi onal l y i n synchr onous condensi ng mode. None of t he gener at i ng uni t s oper at e i n pumpi ng mode. The pl ant does not have di gi t al exci t er s or di gi t al gover nor s f or any of t hei r uni t s.
c. Exi st i ng SCADA Syst em.
SECTI ON 01 11 00 Page 2
The exi st i ng Tet r ageni cs SCADA Syst em at OLD/ P i s used f or r emot e oper at i on of CHE/ P and JPP/ P and al so moni t or i ng OLD/ P pl ant . OLD/ P i t sel f oper at es usi ng physi cal cont r ol s. The SCADA syst em consi st s of t wo hot - swappabl e deskt op mast er st at i ons r unni ng t he Tet r ageni cs MC3000 Oper at i ng Syst em. The Mast er st at i on comput er s r un 2 v i r t ual machi nes ( A&B) ut i l i z i ng Tet r ageni cs( TG) MC300 sof t war e and TG WTV- 32. WTV- 32 i s t he cur r ent HMI t hat i s capabl e of havi ng i n excess of 100 i nst ances of t he MC300 sof t war e r unni ng si mul t aneousl y. HMI s ut i l i ze a number of cust om scr eens f or t he oper at or s t o moni t or and cont r ol t he r emot e pl ant s. Ther e i s al so l i mi t ed moni t or i ng of t he mast er pl ant .
Communi cat i ons bet ween OLD/ P and CHE/ P i s pr ovi ded over a s i ngl e T1 l i ne and a mi cr owave T1 backup wi t h bandwi dt h capaci t y as hi gh as f our dedi cat ed T1' s. Communi cat i ons bet ween OLD/ P and JPP/ P i s pr ovi ded over a s i ngl e T1 l i ne wi t h a second dedi cat ed T1 as a backup.
Document at i on f or t he Tet r ageni cs Syst em i s l i mi t ed t o a dat abase and some Tet r ageni cs pr opr i et ar y code may be avai l abl e. Real - t i me al ar mi ng i s avai l abl e on t he HMI wi t h t he abi l i t y t o t ake act i on on t he al ar m.
Addi t i onal l y t he al ar m wi l l appear on an el ect r oni c pr i nt out ( E- pr i nt ) bot h when i t goes i nt o al ar m and when t he al ar m i s acknowl edged or c l ear ed. Thi s E- pr i nt wi l l r ecor d al l cont r ol act i ons t aken by oper at or s, al ar ms, and hour l y r epor t s and save t hem i n di gi t al f or mat t o a per manent l ocat i on.
Tennessee Val l ey Aut hor i t y ( TVA) owns and mai nt ai ns t wo i ndependent Si emens EMS RTUs at OLD/ P wi t h a dedi cat ed ser i al communi cat i on l i nk connect ed di r ect l y t o TVA' s di spat ch. Al l JemSt ar met er i ng dat a f or t he pl ant i s col l ect ed by t hi s RTU and t r ansmi t t ed of f s i t e. Thi s dat a i s pul l ed of f a di f f er ent TVA RTU RS- 232 ser i al connect i on, passed t hr ough a Moxa Npor t medi a conver t er , and del i ver ed as r out abl e, r eal - t i me dat a f or oper at or s t o v i ew on t he HMI s i n t he cont r ol r oom.
Dat a i s al so sent v i a di al up modem l i ne t o a comput er i n t he ESS office.
1. 2. 1. 2 Remot e Pl ant s
1. 2. 1. 2. 1 J. Per cy Pr i est ( JPP/ P)
a. Hi st or y and Cont ext .
The J. Per cy Pr i est pr oj ect i s owned and oper at ed by t he U. S. Ar my Cor ps of Engi neer s Nashvi l l e Di st r i ct . I t i s l ocat ed appr oxi mat el y t wel ve ( 12) mi l es f r om Nashvi l l e Di st r i ct downt own of f i ces on t he Per cy Pr i est Lake. The pr oj ect i s r emot el y oper at ed f r om OLD/ P and has no day t i me st af f . Dayt i me mai nt enance st af f f r om OLD/ P suppor t JPP/ P' s mai nt enance needs.
b. Pl ant Det ai l s.
JPP/ P i s a peaki ng pl ant wi t h a s i ngl e mai n uni t gener at or wi t h a capaci t y of 36MW and backup di esel gener at or . The mai n uni t does not r un i n synchr onous condensi ng or pumpi ng mode and ut i l i zes a s i ngl e f i xed pr opel l er t ur bi ne. JPP/ P does not have a di gi t al exci t er or di gi t al gover nor i nst al l ed. The uni t ut i l i zes an aut o- synchr oni zer f or aut omat ed st ar t onl i ne sequences, but t hi s wi l l be r epl aced wi t h a Basl er BE1- 25A pr i or t o t he new SCADA syst em i nst al l at i on. Due t o l ack of f l ow dur i ng t he maj or i t y of t he year , JPP/ P onl y gener at es
SECTI ON 01 11 00 Page 3 hydr opower a f ew mont hs out of t he year .
c. Exi st i ng SCADA Syst em.
JPP/ P has bot h a dedi cat ed pr i mar y and backup T1 connect i on t o OLD/ P.
Remot e oper at i ons ar e achi eved over t he T1 by ut i l i z i ng t he exi st i ng Tet r ageni cs SCADA syst em. I n t he event of an emer gency, t he pl ant can be oper at ed manual l y f r om t he cont r ol boar ds.
Ther e i s no dedi cat ed cont r ol r oom at JPP/ P, and al l manual swi t chboar ds ar e l ocat ed on t he gener at or f l oor . Ther e i s al so no l ocal SCADA Wor kst at i on. Ther e i s one Tet r ageni cs RTU f or pl ant cont r ol s and dat a, and one TVA RTU f or r evenue met er i ng dat a.
The exi st i ng RTU cabi net s ar e l ocat ed on t he gener at or f l oor . The cur r ent syst em i s capabl e of accept i ng st andar d 19 i nch r ack- mount equi pment . Pr ef er r ed AC i s avai l abl e at 120 Vol t s, 60 Hz. Means f or gr oundi ng al l equi pment i s avai l abl e. Adequat e cool i ng i s not avai l abl e f or al l suppl i ed equi pment .
Tennessee Val l ey Aut hor i t y ( TVA) owns and mai nt ai ns an i ndependent Si emens EMS RTUs at JPP/ P wi t h a dedi cat ed ser i al communi cat i on l i nk connect ed di r ect l y t o TVA' s di spat ch. Al l JemSt ar met er i ng dat a f or t he pl ant i s col l ect ed by t hi s RTU and t r ansmi t t ed of f s i t e. Thi s dat a i s pul l ed of f a di f f er ent TVA RTU RS- 232 ser i al connect i on, passed t hr ough a Moxa Npor t medi a conver t er , and del i ver ed as r out abl e, r eal - t i me dat a f or oper at or s t o v i ew on t he HMI s i n t he cont r ol r oom.
Dat a i s al so sent v i a di al up modem l i ne t o a comput er i n t he ESS office.
1. 2. 1. 2. 2 Cheat ham ( CHE/ P)
a. Hi st or y and Cont ext .
The Cheat ham ( CHE/ P) pr oj ect i s owned and oper at ed by t he U. S. Ar my Cor ps of Engi neer s Nashvi l l e Di st r i ct . I t i s l ocat ed appr oxi mat el y f or t y ( 40) mi l es nor t h- west of t he Nashvi l l e Di st r i ct downt own of f i ces on t he Cumber l and Ri ver . The pr oj ect i s r emot el y oper at ed f r om OLD/ P, but has a day t i me mai nt enance st af f .
b. Pl ant Det ai l s.
CHE/ P i s a peaki ng pl ant wi t h t hr ee gener at or s each wi t h a namepl at e capaci t y of 13. 3 MVA; t her e i s al so a backup di esel gener at or . Al l t hr ee gener at i ng uni t s ut i l i ze Kapl an t ur bi nes wi t h wel ded bl ades.
Gener at i ng uni t s one and t wo f eed st at i on ser vi ce and al l t hr ee uni t s oper at e r egul ar l y i n synchr onous condensi ng mode. None of t he gener at i ng uni t s oper at e i n pumpi ng mode. CHE/ P does not have di gi t al exci t er s or di gi t al gover nor s f or any of t hei r gener at i ng uni t s. Al l t hr ee uni t s ut i l i ze an aut o- synchr oni zer f or aut omat ed st ar t onl i ne sequences, but t hi s wi l l be r epl aced wi t h a Basl er BE1- 25A pr i or t o SCADA i nst al l at i on.
c. Exi st i ng SCADA Syst em.
CHE/ P has bot h a dedi cat ed T1 connect i on and a backup mi cr owave connect i on t o OLD/ P. Remot e oper at i ons ar e achi eved over t he T1 by ut i l i z i ng t he exi st i ng Tet r ageni c SCADA syst em. I n t he event of an emer gency, t he pl ant can be oper at ed manual l y f r om t he bench boar ds i n
SECTI ON 01 11 00 Page 4 t he cont r ol r oom at CHE/ P.
Ther e i s no l ocal SCADA Wor kst at i on i nst al l ed at CHE/ P. Ther e i s one Tet r ageni c RTU f or pl ant cont r ol s and dat a, and t wo TVA RTUs f or JemSt ar met er i ng dat a.
The exi st i ng RTU cabi net s ar e l ocat ed i n t he communi cat i ons r oom. The cur r ent syst em i s capabl e of accept i ng st andar d 19 i nch r ack- mount equi pment . Pr ef er r ed AC i s avai l abl e at 120 Vol t s, 60 Hz. Means f or gr oundi ng al l equi pment i s avai l abl e. Adequat e cool i ng i s avai l abl e f or al l suppl i ed equi pment .
Tennessee Val l ey Aut hor i t y ( TVA) owns and mai nt ai ns an i ndependent Si emens EMS RTUs at CHE/ P wi t h a dedi cat ed ser i al communi cat i on l i nk connect ed di r ect l y t o TVA' s di spat ch. Al l JemSt ar met er i ng dat a f or t he pl ant i s col l ect ed by t hi s RTU and t r ansmi t t ed of f s i t e. Thi s dat a i s pul l ed of f a di f f er ent TVA RTU RS- 232 ser i al connect i on, passed t hr ough a Moxa Npor t medi a conver t er , and del i ver ed as r out abl e, r eal - t i me dat a f or oper at or s t o v i ew on t he HMI s i n t he cont r ol r oom.
Dat a i s al so sent v i a di al up modem l i ne t o a comput er i n t he ESS office.
1. 2. 2 Gr oup 2
1. 2. 2. 1 Mast er Pl ant
1. 2. 2. 1. 1 Cor del l Hul l ( COR/ P)
a. Hi st or y and Cont ext .
The Cor del l Hul l ( COR/ P) pr oj ect i s owned and oper at ed by t he U. S.
Ar my Cor ps of Engi neer s Nashvi l l e Di st r i ct . I t i s l ocat ed appr oxi mat el y s i xt y ( 60) mi l es east of t he Nashvi l l e Downt own of f i ces on Cumber l and Ri ver . The pr oj ect oper at es wi t h a t went y- f our hour oper at i ons st af f and a f ul l - t i me mai nt enance cr ew. I t i s cur r ent l y a mast er pl ant t o DAL/ P and CEN/ P. Cur r ent l y COR/ P oper at es usi ng physi cal cont r ol s.
b. Pl ant Det ai l s.
COR/ P i s a peaki ng pl ant wi t h t hr ee gener at or s, each wi t h a namepl at e capaci t y of 37 MVA, and a backup di esel gener at or r at ed at 250 KVA.
Al l t hr ee gener at i ng uni t s have Kapl an t ur bi nes; however , uni t t wo i s a f i xed bl ade pr opel l er t ur bi ne. Gener at i ng uni t s one and t wo f eed st at i on ser vi ce and al l t hr ee uni t s oper at e r egul ar l y i n synchr onous condensi ng mode. None of t he gener at i ng uni t s oper at e i n pumpi ng mode.
Al l uni t s have 480V ampl i dynes connect ed t o t he mai n exci t er s f or exci t at i on cont r ol . The pl ant does not have di gi t al exci t er s or di gi t al gover nor s f or any of t hei r uni t s.
c. Exi st i ng SCADA Syst em.
COR/ P r emot el y oper at es DAL/ P and CEN/ P usi ng dedi cat ed T1' s and l ever ages t he exi st i ng Tet r ageni c SCADA i n pl ace at each r espect i ve pr oj ect . Ther e i s a backup Sat el l i t e T1 i n pl ace f or each l i nk i n t he case of communi cat i on l oss al ong t he pr i mar y l i nes.
Tennessee Val l ey Aut hor i t y ( TVA) owns and mai nt ai ns an i ndependent Si emens EMS RTUs at COR/ P wi t h a dedi cat ed ser i al communi cat i on l i nk
SECTI ON 01 11 00 Page 5 connect ed di r ect l y t o TVA' s di spat ch. Al l JemSt ar met er i ng dat a f or t he pl ant i s col l ect ed by t hi s RTU and t r ansmi t t ed of f s i t e. Thi s dat a i s pul l ed of f a di f f er ent TVA RTU RS- 232 ser i al connect i on, passed t hr ough a Moxa Npor t medi a conver t er , and del i ver ed as r out abl e, r eal - t i me dat a f or oper at or s t o v i ew on t he HMI s i n t he cont r ol r oom.
Dat a i s al so sent v i a di al up modem l i ne t o a comput er i n t he ESS office.
1. 2. 2. 2 Remot e Pl ant s
1. 2. 2. 2. 1 Dal e Hol l ow ( DAL/ P)
a. Hi st or y and Cont ext .
The Dal e Hol l ow ( DAL/ P) pr oj ect i s owned and oper at ed by t he U. S. Ar my Cor ps of Engi neer s Nashvi l l e Di st r i ct . I t i s l ocat ed appr oxi mat el y one hundr ed ( 100) mi l es nor t h- east of t he Nashvi l l e Di st r i ct downt own of f i ces on t he Dal e Hol l ow Reser voi r . The pr oj ect i s r emot el y oper at ed f r om COR/ P, but has a f ul l - t i me mai nt enance st af f .
b. Pl ant Det ai l s.
DAL/ P i s a peaki ng pl ant wi t h t hr ee gener at or s each wi t h a namepl at e capaci t y of 20 MVA and a backup house uni t r at ed at 750 KVA. Al l t hr ee gener at i ng uni t s ut i l i ze Fr anci s t ur bi nes. Gener at i ng uni t s one and t wo f eed st at i on ser vi ce and al l t hr ee uni t s oper at e r egul ar l y i n synchr onous condensi ng mode. None of t he gener at i ng uni t s oper at e i n pumpi ng mode. DAL/ P has Basl er DECS- 200 di gi t al exci t er s and mechani cal gover nor s on al l uni t s. Al l t hr ee uni t s and t he house uni t ut i l i ze a Basl er BE1- 25A Aut o- Synchr oni zer .
c. Exi st i ng SCADA Syst em.
DAL/ P has a dedi cat ed T1 connect i on t o COR/ P and a backup sat el l i t e T1 al so t o COR/ P. Remot e oper at i ons ar e achi eved over t he T1 by ut i l i z i ng t he exi st i ng Tet r ageni c SCADA syst em. I n t he event of an emer gency, t he pl ant can be oper at ed manual l y f r om t he bench boar ds i n t he cont r ol r oom at DAL/ P.
The exi st i ng RTU cabi net s ar e l ocat ed i n t he cabl e spr eadi ng r oom. The cur r ent syst em i s i n l ockabl e cabi net and i s capabl e of accept i ng st andar d 19 i nch r ack- mount equi pment . Pr ef er r ed AC i s avai l abl e at 120 Vol t s, 60 Hz. Means f or gr oundi ng al l equi pment i s avai l abl e.
Adequat e cool i ng i s avai l abl e f or al l suppl i ed equi pment .
Tennessee Val l ey Aut hor i t y ( TVA) owns and mai nt ai ns an i ndependent Si emens EMS RTUs at DAL/ P wi t h a dedi cat ed ser i al communi cat i on l i nk connect ed di r ect l y t o TVA' s di spat ch. Al l JemSt ar met er i ng dat a f or t he pl ant i s col l ect ed by t hi s RTU and t r ansmi t t ed of f s i t e. Thi s dat a i s pul l ed of f a di f f er ent TVA RTU RS- 232 ser i al connect i on, passed t hr ough a Moxa Npor t medi a conver t er , and del i ver ed as r out abl e, r eal - t i me dat a f or oper at or s t o v i ew on t he HMI s i n t he cont r ol r oom.
Dat a i s al so sent v i a di al up modem l i ne t o a comput er i n t he ESS office.
1. 2. 2. 2. 2 Cent er Hi l l ( CEN/ P)
a. Hi st or y and Cont ext .
SECTI ON 01 11 00 Page 6
The Cent er Hi l l ( CEN/ P) pr oj ect i s owned and oper at ed by t he U. S. Ar my Cor ps of Engi neer s Nashvi l l e Di st r i ct . I t i s l ocat ed appr oxi mat el y s i xt y- f our ( 64) mi l es east of t he Nashvi l l e Di st r i ct downt own of f i ces on t he mout h of t he Caney For k Ri ver . The pr oj ect i s r emot el y oper at ed f r om COR/ P, but has a f ul l - t i me mai nt enance st af f .
b. Pl ant Det ai l s.
CEN/ P i s a peaki ng pl ant wi t h t hr ee gener at or s, each wi t h a namepl at e capaci t y of 50 MVA and a backup house uni t r at ed at 1000 KVA. Al l t hr ee gener at i ng uni t s ut i l i ze Fr anci s t ur bi nes. Gener at i ng uni t s one and t wo f eed st at i on ser vi ce and al l t hr ee uni t s oper at e r egul ar l y i n synchr onous condensi ng mode. None of t he gener at i ng uni t s oper at e i n pumpi ng mode. CEN/ P uses a Basl er DECS- 200 di gi t al exci t er and an Al l en Br adl ey di gi t al gover nor on t he house uni t . Ther e ar e no di gi t al exci t er s or di gi t al gover nor s on t he mai n uni t s. Al l mai n uni t s use t he Basl er - 25A Aut omat i c Synchr oni zer f or st ar t onl i ne sequence and t he house uni t ut i l i zes t he SEL 700G f or st ar t sequence.
c. Exi st i ng SCADA Syst em.
CEN/ P has a dedi cat ed T1 connect i on t o COR/ P and a backup sat el l i t e T1 al so t o COR/ P. Remot e oper at i ons ar e achi eved over t he T1 by ut i l i z i ng t he exi st i ng Tet r ageni c SCADA syst em. I n t he event of an emer gency, t he pl ant can be oper at ed manual l y f r om t he bench boar ds i n t he cont r ol r oom at CEN/ P.
The exi st i ng RTU cabi net s ar e l ocat ed i n t he cabl e spr eadi ng r oom. The cur r ent syst em i s capabl e of accept i ng st andar d 19 i nch r ack- mount equi pment . Pr ef er r ed AC i s avai l abl e at 120 Vol t s, 60 Hz. Means f or gr oundi ng al l equi pment i s avai l abl e. Adequat e cool i ng i s not avai l abl e f or al l suppl i ed equi pment .
Tennessee Val l ey Aut hor i t y ( TVA) owns and mai nt ai ns an i ndependent Si emens EMS RTUs at CEN/ P wi t h a dedi cat ed ser i al communi cat i on l i nk connect ed di r ect l y t o TVA' s di spat ch. Al l JemSt ar met er i ng dat a f or t he pl ant i s col l ect ed by t hi s RTU and t r ansmi t t ed of f s i t e. Thi s dat a i s pul l ed of f a di f f er ent TVA RTU RS- 232 ser i al connect i on, passed t hr ough a Moxa Npor t medi a conver t er , and del i ver ed as r out abl e, r eal - t i me dat a f or oper at or s t o v i ew on t he HMI s i n t he cont r ol r oom.
Dat a i s al so sent v i a di al up modem l i ne t o a comput er i n t he ESS office.
1. 2. 3 Gr oup 3
1. 2. 3. 1 Mast er Pl ant
1. 2. 3. 1. 1 Bar kl ey ( BAR/ P)
a. Hi st or y and Cont ext .
The Bar kl ey ( BAR/ P) pr oj ect i s owned and oper at ed by t he U. S. Ar my Cor ps of Engi neer s Nashvi l l e Di st r i ct . I t i s l ocat ed appr oxi mat el y one hundr ed and f i f t een ( 115) mi l es nor t h- west of t he Nashvi l l e Di st r i ct downt own of f i ces on Cumber l and Ri ver . BAR/ P pr oj ect i s oper at ed usi ng t he exi st i ng manual cont r ol s f ound at t he bench boar ds wi t hi n t he cont r ol r oom.
b. Pl ant Det ai l s.
SECTI ON 01 11 00 Page 7
BAR/ P i s a peaki ng pl ant wi t h t hr ee gener at or s each wi t h a namepl at e capaci t y of 32. 5 MW, one uni t wi t h t he namepl at e capaci t y of 42 MW, and a backup di esel gener at or . Al l uni t s r un wi t h Kapl an t ur bi nes.
Uni t 3 has a f i xed bl ade pr opel l er t ur bi ne, but t he r est of t he uni t s have wor ki ng var i abl e pi t ch bl ades. Uni t s t wo and t hr ee f eed st at i on ser vi ce and al l uni t s ar e capabl e of oper at i ng i n synchr onous condensi ng mode. These uni t s do not oper at e as pumpi ng uni t s. BAR/ P does not have di gi t al exci t er s or di gi t al gover nor s on any of t hei r gener at i ng uni t s; however , t her e ar e pl ans t o i nst al l new di gi t al exci t er s i n t he pl ant pr i or t o t he new SCADA syst em i nst al l at i on.
Ther e i s cur r ent l y no aut o- synchr oni zer i nst al l ed at BAR/ P.
c. Exi st i ng SCADA Syst em.
Ther e i s an exi st i ng Tet r ageni cs SCADA comput er i nst al l ed at BAR/ P t hat i s used t o col l ect and send met er i ng dat a. The new SCADA i nt er f aces at Bar kl ey wi l l onl y r equi r e r evenue met er i ng and moni t or i ng of t he syst ems i n t he bel ow par agr aph.
Tennessee Val l ey Aut hor i t y ( TVA) owns and mai nt ai ns an i ndependent Si emens EMS RTUs at BAR/ P wi t h a dedi cat ed ser i al communi cat i on l i nk connect ed di r ect l y t o TVA' s di spat ch. Al l JemSt ar met er i ng dat a f or t he pl ant i s col l ect ed by t hi s RTU and t r ansmi t t ed of f s i t e. Thi s dat a i s pul l ed of f a di f f er ent TVA RTU RS- 232 ser i al connect i on, passed t hr ough a Moxa Npor t medi a conver t er , and del i ver ed as r out abl e, r eal - t i me dat a f or oper at or s t o v i ew on t he HMI s i n t he cont r ol r oom.
Dat a i s al so sent v i a di al up modem l i ne t o a comput er i n t he ESS office.
1. 2. 3. 1. 2 Wol f Cr eek ( WOL/ P)
a. Hi st or y and Cont ext .
The Wol f Cr eek ( WOL/ P) pr oj ect i s owned and oper at ed by t he U. S. Ar my Cor ps of Engi neer s Nashvi l l e Di st r i ct . I t i s l ocat ed appr oxi mat el y one hundr ed and si xt y ( 160) mi l es nor t h- east of t he Nashvi l l e Di st r i ct downt own of f i ces on t he Cumber l and Ri ver . The pr oj ect i s a mast er pl ant t o LAU/ P. The pr oj ect i ncl udes a f ul l t i me oper at i ons and dayt i me mai nt enance st af f .
b. Pl ant Det ai l s.
WOL/ P i s a peaki ng pl ant wi t h s i x gener at or s each wi t h a namepl at e capaci t y of 50 MVA and a backup house uni t r at ed at 1500 KVA. Al l s i x gener at i ng uni t s ut i l i ze Fr anci s t ur bi nes. Gener at i ng uni t s f our , f i ve, and si x and t r ansf or mer banks t wo and t hr ee f eed st at i on ser vi ce and al l uni t s oper at e r egul ar l y i n synchr onous condensi ng mode. None of t he gener at i ng uni t s oper at e i n pumpi ng mode. WOL/ P uses a Basl er DECS- 200 di gi t al exci t er on t he house uni t . The mai n uni t s do not have di gi t al exci t er s or di gi t al gover nor s. .
c. Exi st i ng SCADA Syst em.
WOL/ P has a dedi cat ed T1 connect i on t o LAU/ P and a backup sat el l i t e T1 al so t o LAU/ P. Remot e oper at i ons ar e achi eved over t he T1 by ut i l i z i ng t he exi st i ng Tet r ageni c SCADA syst em. WOL/ P i s oper at ed usi ng manual cont r ol s wi t hi n t he cont r ol r oom.
SECTI ON 01 11 00 Page 8
Tennessee Val l ey Aut hor i t y ( TVA) owns and mai nt ai ns an i ndependent Si emens EMS RTUs at WOL/ P wi t h a dedi cat ed ser i al communi cat i on l i nk connect ed di r ect l y t o TVA' s di spat ch. Al l JemSt ar met er i ng dat a f or t he pl ant i s col l ect ed by t hi s RTU and t r ansmi t t ed of f s i t e. Thi s dat a i s pul l ed of f a di f f er ent TVA RTU RS- 232 ser i al connect i on, passed t hr ough a Moxa Npor t medi a conver t er , and del i ver ed as r out abl e, r eal - t i me dat a f or oper at or s t o v i ew on t he HMI s i n t he cont r ol r oom.
Dat a i s al so sent v i a di al up modem l i ne t o a comput er i n t he ESS office.
1. 2. 3. 2 Remot e Pl ant s
1. 2. 3. 2. 1 Laur el ( LAU/ P)
a. Hi st or y and Cont ext .
The Laur el ( LAU/ P) pr oj ect i s owned and oper at ed by t he U. S. Ar my Cor ps of Engi neer s Nashvi l l e Di st r i ct . I t i s l ocat ed appr oxi mat el y t wo hundr ed and f i f t een ( 215) mi l es nor t h- east of t he Nashvi l l e Di st r i ct downt own of f i ces on Laur el Ri ver . The pr oj ect i s a r emot e pl ant t hat i s oper at ed f r om WOL/ P. LAU/ P pr oj ect st af f i s mi ni mal wi t h day t i me maintenance.
b. Pl ant Det ai l s.
LAU/ P i s a peaki ng pl ant wi t h a s i ngl e gener at or t hat has a namepl at e capaci t y of 61 MW and a backup di esel gener at or . Thi s uni t does not oper at e i n pumpi ng mode or synchr onous condensi ng mode. LAU/ P does not have a di gi t al exci t er or di gi t al gover nor .
c. Exi st i ng SCADA Syst em.
LAU/ P has a dedi cat ed T1 connect i on t o WOL/ P and a backup sat el l i t e T1 al so t o WOL/ P. Remot e oper at i ons ar e achi eved over t he T1 by ut i l i z i ng t he exi st i ng Tet r ageni c SCADA syst em.
The exi st i ng RTU cabi net i s l ocat ed on t he gener at or f l oor . The cur r ent syst em i s i n a l ockabl e cabi net and i s capabl e of accept i ng st andar d 19 i nch r ack- mount equi pment . Pr ef er r ed AC i s avai l abl e at 120 Vol t s, 60 Hz. Means f or gr oundi ng al l equi pment i s avai l abl e.
Adequat e cool i ng i s avai l abl e f or al l suppl i ed equi pment .
1. 2. 3. 3 ESS Of f i ce
El ect r oni cs Ser vi ce Sect i on ( ESS) i s l ocat ed at 15 Over l ook Ci r c l e, Hender sonvi l l e TN 37075. The col l ect i on of r evenue met er i ng i s col l ect ed on a comput er at ESS f r om each mast er pl ant f or al l 9 pl ant s. The i nf or mat i on i s sent f r om each pl ant v i a a 56k modem wi t h ver i f i cat i on of each SCADA mast er . The i nf or mat i on i s consol i dat ed and ver i f i ed by ESS per sonnel and t r ansf er r ed f r om t he col l ect i on comput er t o SEPA t hr u an ext er nal har d dr i ve and sent t hr u emai l .
1. 3 PRI NCI PAL COMPONENTS OF WORK
The scope of wor k def i ned i n t hi s sect i on shal l not be consi der ed al l inclusive.
SECTI ON 01 11 00 Page 9
1. 3. 1 Design
1. 3. 1. 1 General
a. Desi gn a compl et e new SCADA syst em f or t he Nashvi l l e Di st r i ct Hydr opower pl ant s i dent i f i ed i n par agr aph 1. 1 of t hi s sect i on.
b. The new SCADA syst em shal l at a mi ni mum have t he same capabi l i t i es as t he cur r ent syst em.
c. The desi gn shal l i ncl ude, but i s not l i mi t ed t o, i nst al l at i on/ r emoval dr awi ngs, equi pment conf i gur at i on, pr ogr ammi ng, HMI devel opment , and suppor t i ng document at i on.
d. The syst em shal l be expandabl e t o i ncl ude addi t i onal cont r ol and moni t or s poi nt s wi t hout maj or equi pment or sof t war e modi f i cat i ons.
e. Per f or m a Fact or y Accept ance Test wi t h gover nment per sonnel pr i or t o shi pment of SCADA equi pment .
f . The syst em shal l be desi gned i n accor dance wi t h al l Ar my and DoD st andar ds. The cont r act or shal l pr ovi de al l document at i on r equi r ed t o obt ai n an Aut hor i t y t o Oper at e ( ATO) f or t he new SCADA syst em.
g. Desi gn a SCADA si mul at or f or t r ai ni ng and mai nt enance pur poses.
h. Exi st i ng pr i mar y and backup i nt er pl ant communi cat i ons shal l be r eused.
i . The desi gn shal l i ncl ude r evenue dat a col l ect i on f or t he ESS of f i ce.
Thi s wi l l be i nst al l ed bef or e any ot her pl ant syst ems.
1. 3. 1. 2 New SCADA Syst em Funct i onal i t y
a. The new SCADA syst em shal l suppor t t he f ol l owi ng hi gh- l evel f unct i ons, whi ch ar e expl ai ned i n mor e det ai l t hr oughout t he speci f i cat i on and i n t he appendi ces:
1) Syst em over vi ew and scr een navi gat i on.
2) Ti me synchr oni zat i on, t i me and dat e di spl ay, and t i mest ampi ng.
3) Syst em and devi ce st at us moni t or i ng, i ncl udi ng communi cat i ons, dat abases, hot / st andby cont r ol l er and/ or mast er st at i on i nf or mat i on, and di agnost i cs.
4) Al ar mi ng, event l oggi ng, syst em l oggi ng, and hi st or i cal t r endi ng.
5) I ndi cat i on and r epor t gener at i on f or r evenue met er i ng.
6) Power house, t ur bi ne, gener at or , t r ansf or mer , swi t chyar d, and st at i on ser vi ce cont r ol s, i ndi cat i on, and al ar mi ng.
1. 3. 2 Supply
a. Suppl y al l equi pment and mat er i al s needed t o i nst al l t he new SCADA system.
b. Suppl y al l sof t war e and l i censes needed f or t he oper at i on and mai nt enance of t he syst em.
SECTI ON 01 11 00 Page 10
c. Suppl y a SCADA Si mul at or .
d. Suppl y spar e par t s.
1. 3. 3 Installation
Pr ovi de on- si t e suppor t f or t he i nst al l at i on of t he SCADA syst em. LRN pl ant per sonnel wi l l be i nst al l i ng al l equi pment .
1. 3. 4 Techni cal Suppor t
a. Pr ovi de t r ai ni ng on t he compl et ed syst em.
b. Cont r act or shal l suppor t del i ver ed equi pment and sof t war e f or a mi ni mum of 15 year s
1) Fi r mwar e updat es and secur i t y pat chi ng on al l equi pment pr ovi ded under t hi s cont r act .
2) Af t er syst em i nst al l at i on i s compl et e i n al l pl ant s, pr ovi de t echni cal phone suppor t 6am - 8pm CST f or t he f i r st 90 days.
Af t er 90 days, as needed dur i ng nor mal busi ness hour s. Techni cal suppor t shal l be capabl e of answer i ng LRN- SCADA speci f i c quest i ons.
1. 4 WARRANTY
a. The Cont r act or war r ant s t hat wor k per f or med under t hi s cont r act conf or ms t o t he cont r act r equi r ement s and i s f r ee of any def ect i n equi pment , mat er i al , or desi gn f ur ni shed.
b. The cont r act or shal l guar ant ee r epl acement of any f aul t y component s pr ovi ded i n t hi s cont r act f or a per i od of one year af t er t he gover nment t akes possessi on.
c. Ther e shal l be no cost f or war r ant y ser vi ce or cust omer suppor t dur i ng t he war r ant y per i od.
d. Any component f ai l i ng t o per f or m i t s f unct i on as speci f i ed and document ed shal l be r epai r ed or r epl aced by t he cont r act or at no addi t i onal cost t o t he Gover nment . I t ems r epai r ed or r epl aced shal l be war r ant ed f or an addi t i onal per i od of at l east one year f r om t he dat e t hat i t becomes f unct i onal agai n.
e. The cont r act or shal l pr ovi de manuf act ur er war r ant y i nf or mat i on f or equi pment and mat er i al s suppl i ed under t hi s cont r act t hat ext end beyond t he cont r act war r ant y per i od.
1. 5 DEFINITIONS
When t he speci f i cat i ons use a wor d or t er m def i ned i n t he Feder al Acqui s i t i on Regul at i ons ( FAR) , t he wor d or t er m has t he same meani ng as t he def i ni t i on i n FAR 2. 101 i n ef f ect at t he t i me t he sol i c i t at i on i s i ssued, unl ess t he speci f i cat i ons pr ovi de a di f f er ent def i ni t i on.
1. 6 VETERANS EMPLOYMENT EMPHASI S FOR U. S. ARMY CORPS OF ENGI NEERS CONTRACTS
I n addi t i on t o compl yi ng wi t h t he r equi r ement s out l i ned i n FAR Par t 22. 13, FAR Cl ause 52. 222- 35, FAR Cl ause 52. 222- 37, DFARS 222. 13 and Depar t ment of
SECTI ON 01 11 00 Page 11
Labor r egul at i ons, U. S. Ar my Cor ps of Engi neer s ( USACE) cont r act or s and subcont r act or s at al l t i er s ar e encour aged t o pr omot e t he t r ai ni ng and empl oyment of U. S. vet er ans whi l e per f or mi ng under a USACE cont r act . Whi l e no set - asi de, eval uat i on pr ef er ence, or i ncent i ve appl i es t o t he sol i c i t at i on or per f or mance under t he r esul t ant cont r act , USACE cont r act or s ar e encour aged t o seek out hi ghl y qual i f i ed vet er ans t o per f or m ser vi ces under t hi s cont r act .
The f ol l owi ng r esour ces ar e avai l abl e t o assi st USACE cont r act or s i n t hei r out r each ef f or t s:
a. U. S. Depar t ment of Labor Vet er ans empl oyment : www.vets.gov/
b. Feder al vet er an empl oyment i nf or mat i on: www.fedshirevets.gov/index.aspx
c. Vet er ans’ Empl oyment and Tr ai ni ng Ser vi ce ( VETS) :
http://www.dol.gov/vets/
d. Vet er ans Oppor t uni t y t o Wor k ( VOW) Pr ogr am: http://benefits.va.gov/vow/
e. U. S. Ar my War r i or Tr ansi t i on Command Empl oyment I ndex:
http://www.wct.army.mil/modules/employers/index.html f . Hi r i ng Our Her oes i ni t i at i ve:
www.uschamberfoundation.org/hiring-our-heroes
1. 7 SUSTAI NABI LI TY REQUI REMENTS
Al l comput er s and comput er - r el at ed equi pment suppl i ed by t he Cont r act or must be ener gy ef f i c i ent . Use t he f ol l owi ng l i nk f or DOE Cover ed Pr oduct Categories:
http://energy.gov/eere/femp/find-product-categories-covered-efficiency-programs
PART 2 PRODUCTS
Not used.
PART 3 EXECUTI ON
Not used.
- - End of Sect i on - -
SECTI ON 01 11 00 Page 12
SECTI ON TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 11 11
DRAWINGS
PART 1 GENERAL
1. 1 DI SCREPANCI ES, ERRORS, OMI SSI ONS
1. 2 PROJECT CONDI TI ONS
1. 3 I NFORMATI ONAL DRAWI NGS
PART 2 PRODUCTS
PART 3 EXECUTI ON
SECTI ON 01 11 11 Page 1
SECTI ON 01 11 11
DRAWINGS
PART 1 GENERAL
1. 1 DI SCREPANCI ES, ERRORS, OMI SSI ONS
a. I nf or m t he Cont r act i ng Of f i cer of any di scr epanci es, er r or s, or omi ssi ons di scover ed on dr awi ngs.
b. I n case of di scr epanci es, speci f i cat i ons t ake pr ecedence over dr awi ngs unl ess ot her wi se speci f i ed.
1. 2 PROJECT CONDI TI ONS
Wher e t her e ar e mi nor di f f er ences as det er mi ned by t he Cont r act i ng Of f i cer bet ween det ai l s and di mensi ons shown on dr awi ngs and det ai l s and di mensi ons of exi st i ng f eat ur es at j obsi t e, use det ai l s and di mensi ons of exi st i ng f eat ur es at j obsi t e.
1. 3 I NFORMATI ONAL DRAWI NGS
a. Dr awi ngs i n Appendi x D ar e mar ked " f or i nf or mat i on onl y" and ar e i ncl uded t o show some f eat ur e about whi ch addi t i onal knowl edge i s r equi r ed f or of f er s.
b. I f t her e ar e di f f er ences as det er mi ned by t he Cont r act i ng Of f i cer bet ween det ai l s and di mensi ons shown on t hese dr awi ngs and t hose of exi st i ng f eat ur es at j obsi t e, use det ai l s and di mensi ons of exi st i ng f eat ur es at j obsi t e.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTI ON
Not used.
SECTI ON 01 11 11 Page 2
SECTI ON TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 22 00
PRI CE AND PAYMENT PROCEDURES
PART 1 GENERAL
1. 1 SUBMI TTALS
1. 2 PAYMENT I TEMS
1. 2. 1 I TEM 0001 J. Per cy Pr i est Shop Dr awi ngs
1. 2. 1. 1 Payment
1. 2. 1. 2 Uni t of Measur e
1. 2. 2 I TEM 0002 J. Per cy Pr i est Equi pment & Sof t war e
1. 2. 2. 1 Payment
1. 2. 2. 2 Uni t of Measur e
1. 2. 3 I TEM 0003 J. Per cy Pr i est Test Repor t s
1. 2. 3. 1 Payment
1. 2. 3. 2 Uni t of Measur e
1. 2. 4 I TEM 0004 J. Per cy Pr i est Cl oseout Document s
1. 2. 4. 1 Payment
1. 2. 4. 2 Uni t of Measur e
1. 2. 5 I TEM 0005 J. Per cy Pr i est Oper at i on & Mai nt enance Dat a
1. 2. 5. 1 Payment
1. 2. 5. 2 Uni t of Measur e
1. 2. 6 I TEM 0006 Cheat ham Shop Dr awi ngs
1. 2. 6. 1 Payment
1. 2. 6. 2 Uni t of Measur e
1. 2. 7 I TEM 0007 Cheat ham Equi pment & Sof t war e
1. 2. 7. 1 Payment
1. 2. 7. 2 Uni t of Measur e
1. 2. 8 I TEM 0008 Cheat ham Test Repor t s
1. 2. 8. 1 Payment
1. 2. 8. 2 Uni t of Measur e
1. 2. 9 I TEM 0009 Cheat ham Cl oseout Document s
1. 2. 9. 1 Payment
1. 2. 9. 2 Uni t of Measur e
1. 2. 10 I TEM 0010 Cheat ham Oper at i on & Mai nt enance Dat a
1. 2. 10. 1 Payment
1. 2. 10. 2 Uni t of Measur e
1. 2. 11 I TEM 0011 Ol d Hi ckor y Shop Dr awi ngs
1. 2. 11. 1 Payment
1. 2. 11. 2 Uni t of Measur e
1. 2. 12 I TEM 0012 Ol d Hi ckor y Equi pment & Sof t war e
1. 2. 12. 1 Payment
1. 2. 12. 2 Uni t of Measur e
1. 2. 13 I TEM 0013 Ol d Hi ckor y Test Repor t s
1. 2. 13. 1 Payment
1. 2. 13. 2 Uni t of Measur e
1. 2. 14 I TEM 0014 Ol d Hi ckor y Cl oseout Document s
1. 2. 14. 1 Payment
1. 2. 14. 2 Uni t of Measur e
SECTI ON 01 22 00 Page 1
1. 2. 15 I TEM 0015 Ol d Hi ckor y Oper at i on & Mai nt enance Dat a
1. 2. 15. 1 Payment
1. 2. 15. 2 Uni t of Measur e
1. 2. 16 I TEM 0016 Ol d Hi ckor y Tr ai ni ng
1. 2. 16. 1 Payment
1. 2. 16. 2 Uni t of Measur e
1. 2. 17 I TEM 0017 Cent er Hi l l Shop Dr awi ngs
1. 2. 17. 1 Payment
1. 2. 17. 2 Uni t of Measur e
1. 2. 18 I TEM 0018 Cent er Hi l l Equi pment & Sof t war e
1. 2. 18. 1 Payment
1. 2. 18. 2 Uni t of Measur e
1. 2. 19 I TEM 0019 Cent er Hi l l Test Repor t s
1. 2. 19. 1 Payment
1. 2. 19. 2 Uni t of Measur e
1. 2. 20 I TEM 0020 Cent er Hi l l Cl oseout Document s
1. 2. 20. 1 Payment
1. 2. 20. 2 Uni t of Measur e
1. 2. 21 I TEM 0021 Cent er Hi l l Oper at i on & Mai nt enance Dat a
1. 2. 21. 1 Payment
1. 2. 21. 2 Uni t of Measur e
1. 2. 22 I TEM 0022 Dal e Hol l ow Shop Dr awi ngs
1. 2. 22. 1 Payment
1. 2. 22. 2 Uni t of Measur e
1. 2. 23 I t em 0023 Dal e Hol l ow Equi pment & Sof t war e
1. 2. 23. 1 Payment
1. 2. 23. 2 Uni t of Measur e
1. 2. 24 I t em 0024 Dal e Hol l ow Test Repor t s
1. 2. 24. 1 Payment
1. 2. 24. 2 Uni t of Measur e
1. 2. 25 I TEM 0025 Dal e Hol l ow Cl oseout Document s
1. 2. 25. 1 Payment
1. 2. 25. 2 Uni t of Measur e
1. 2. 26 I TEM 0026 Dal e Hol l ow Oper at i on & Mai nt enance Dat a
1. 2. 26. 1 Payment
1. 2. 26. 2 Uni t of Measur e
1. 2. 27 I TEM 0027 Cor del l Hul l Shop Dr awi ngs
1. 2. 27. 1 Payment
1. 2. 27. 2 Uni t of Measur e
1. 2. 28 I TEM 0028 Cor del l Hul l Equi pment & Sof t war e
1. 2. 28. 1 Payment
1. 2. 28. 2 Uni t of Meaur e
1. 2. 29 I TEM 0029 Cor del l Hul l Test Repor t s
1. 2. 29. 1 Payment
1. 2. 29. 2 Uni t of Measur e
1. 2. 30 I TEM 0030 Cor del l Hul l Cl oseout Document s
1. 2. 30. 1 Payment
1. 2. 30. 2 Uni t of Measur e
1. 2. 31 I TEM 0031 Cor del l Hul l Oper at i on & Mai nt enance Dat a
1. 2. 31. 1 Payment s
1. 2. 31. 2 Uni t of Measur e
1. 2. 32 I TEM 0032 Cor del l Hul l Tr ai ni ng
1. 2. 32. 1 Payment
1. 2. 32. 2 Uni t of Measur e
1. 2. 33 I TEM 0033 Laur el Shop Dr awi ngs
1. 2. 33. 1 Payment
1. 2. 33. 2 Uni t of Measur e
1. 2. 34 I TEM 0034 Laur el Equi pment & Sof t war e
1. 2. 34. 1 Payment
SECTI ON 01 22 00 Page 2
1. 2. 34. 2 Uni t of Measur e
1. 2. 35 I TEM 0035 Laur el Test Repor t s
1. 2. 35. 1 Payment
1. 2. 35. 2 Uni t of Measur e
1. 2. 36 I TEM 0036 Laur el Cl oseout Document s
1. 2. 36. 1 Payment
1. 2. 36. 2 Uni t of Measur e
1. 2. 37 I TEM 0037 Laur el Oper at i on & Mai nt enance Dat a
1. 2. 37. 1 Payment
1. 2. 37. 2 Uni t of Measur e
1. 2. 38 I TEM 0038 Wol f Cr eek Shop Dr awi ngs
1. 2. 38. 1 Payment
1. 2. 38. 2 Uni t of Measur e
1. 2. 39 I TEM 0039 Wol f Cr eek Equi pment & Sof t war e
1. 2. 39. 1 Payment
1. 2. 39. 2 Uni t of Measur e
1. 2. 40 I TEM 0040 Wol f Cr eek Test Repor t s
1. 2. 40. 1 Payment
1. 2. 40. 2 Uni t of Measur e
1. 2. 41 I TEM 0041 Wol f Cr eek Cl oseout Document s
1. 2. 41. 1 Payment
1. 2. 41. 2 Uni t of Measur e
1. 2. 42 I TEM 0042 Wol f Cr eek Oper at i on & Mai nt enance Dat a
1. 2. 42. 1 Payment
1. 2. 42. 2 Uni t of Measur e
1. 2. 43 I TEM 0043 Wol f Cr eek Tr ai ni ng
1. 2. 43. 1 Payment
1. 2. 43. 2 Uni t of Measur e
1. 2. 44 I TEM 0044 Bar kl ey Shop Dr awi ngs
1. 2. 44. 1 Payment
1. 2. 44. 2 Uni t of Measur e
1. 2. 45 I TEM 0045 Bar kl ey Equi pment & Sof t war e
1. 2. 45. 1 Payment
1. 2. 45. 2 Uni t of Measur e
1. 2. 46 I TEM 0046 Bar kl ey Test Repor t s
1. 2. 46. 1 Payment
1. 2. 46. 2 Uni t of Measur e
1. 2. 47 I TEM 0047 Bar kl ey Cl oseout Document s
1. 2. 47. 1 Payment
1. 2. 47. 2 Uni t of Measur e
1. 2. 48 I TEM 0048 Bar kl ey Oper at i on & Mai nt enance Dat a
1. 2. 48. 1 Payment
1. 2. 48. 2 Uni t of Measur e
1. 2. 49 I TEM 0049 El ect r oni cs Ser vi ce Sect i on Si mul at or
1. 2. 49. 1 Payment
1. 2. 49. 2 Uni t of Measur e
PART 2 PRODUCTS
PART 3 EXECUTI ON
3. 1 CONTRACT COST BREAKDOWN
3. 2 PROJECT SCHEDULE
3. 2. 1 Pr el i mi nar y Pr oj ect Schedul e Submi ssi on
3. 2. 2 I ni t i al Pr oj ect Schedul e Submi ssi on
3. 2. 3 Per i odi c Schedul e Updat es
3. 2. 4 Nar r at i ve Repor t
SECTI ON 01 22 00 Page 3
SECTI ON 01 22 00 Page 4
SECTI ON 01 22 00
PRI CE AND PAYMENT PROCEDURES
PART 1 GENERAL
1. 1 SUBMITTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . The f ol l owi ng shal l be submi t t ed i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:
SD- 01 Pr e- Wor k Submi t t al s
Pr el i mi nar y Pr oj ect Schedul e; G I ni t i al Pr oj ect Schedul e; G Per i odi c Schedul e Updat es; G Nar r at i ve Repor t
1. 2 PAYMENT I TEMS
Payment i t ems f or t he wor k of t hi s cont r act ar e l i s t ed i n t he BI DDI NG SCHEDULE and descr i bed bel ow. Al l cost s f or i t ems of wor k, whi ch ar e not speci f i cal l y ment i oned t o be i ncl uded i n a par t i cul ar j ob or uni t pr i ce payment i t em, ar e i ncl uded i n t he l i s t ed payment i t em most c l osel y associ at ed wi t h t he wor k i nvol ved. The payment made f or each i t em l i st ed const i t ut es f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, and equi pment , and per f or mi ng any associ at ed Cont r act or qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, t est s and r epor t s, and f or per f or mi ng al l wor k r equi r ed f or whi ch separ at e payment i s not ot her wi se pr ovi ded.
1. 2. 1 I TEM 0001 J. Per cy Pr i est Shop Dr awi ngs
1. 2. 1. 1 Payment
Payment wi l l be made f or I t em 0001 at t he cont r act pr i ce per Job. Thi s pr i ce i ncl udes f ul l compensat i on f or f ur ni shi ng al l mat er i al s, equi pment , and l abor t o sat i f act or i l y pr ovi de al l Shop Dr awi ngs, Pr oduct Dat a, and Desi gn Dat a as r equi r ed i n t he f ol l owi ng Sect i ons; 01 35 70
CYBERSECURI TY, 27 51 20 COMMUNI CATI ON SYSTEM, 40 94 51 SYSTEM HARDWARE,
40 94 53 MASTER STATI ON BASI C SOFTWARE, 40 94 54 HUMAN MACHI NE I NTERFACE,
40 94 55 PROJECT APPLI CATI ON SOFTWARE, 40 94 60 RTU, and 40 94 61 RTU
SOFTWARE.
1. 2. 1. 2 Uni t of Measur e
Uni t of measur e: JOB.
SECTI ON 01 22 00 Page 5
1. 2. 2 I TEM 0002 J. Per cy Pr i est Equi pment & Sof t war e
1. 2. 2. 1 Payment
Payment wi l l be made f or I t em 0002 at t he cont r act pr i ce per Job. Thi s pr i ce i ncl udes f ul l compensat i on f or f ur ni shi ng al l mat er i al s, equi pment , and l abor t o sat i sf act or i l y pr ovi de al l equi pment and sof t war e as r equi r ed i n t he Syst emwi de SCADA Upgr ade speci f i cat i ons.
1. 2. 2. 2 Uni t of Measur e
Uni t of measur e: JOB.
1. 2. 3 I TEM 0003 J. Per cy Pr i est Test Repor t s
1. 2. 3. 1 Payment
Payment wi l l be made f or I t em 0003 at t he cont r act pr i ce per Job. Thi s pr i ce i ncl udes f ul l compensat i on f or f ur ni shi ng al l mat er i al s, equi pment , and l abor t o sat i sf act or i l y pr ovi de al l Test Repor t s as r equi r ed i n Sect i on 01 75 10 TESTI NG, I NSTALLATI ON PERSONNEL AND ACCEPTANCE.
1. 2. 3. 2 Uni t of Measur e
Uni t of measur e: JOB.
1. 2. 4 I TEM 0004 J. Per cy Pr i est Cl oseout Document s
1. 2. 4. 1 Payment
Payment wi l l be made f or I t em 0004 at t he cont r act pr i ce per Job. Thi s pr i ce i ncl udes f ul l compensat i on f or f ur ni shi ng al l mat er i al s, equi pment , and l abor t o sat i sf act or i l y pr ovi de al l t he c l oseout document s as r equi r ed i n t he f ol l owi ng Sect i ons; 27 51 20 COMMUNI CATI ON SYSTEM, 40 94 51 SYSTEM
HARDWARE, 40 94 53 MASTER STATI ON BASI C SOFTWARE, 40 94 54 HUMAN MACHI NE
I NTERFACE, 40 94 55 PROJECT APPLI CATI ON SOFTWARE, 40 94 60 RTU, and
40 94 61RTU SOFTWARE.
1. 2. 4. 2 Uni t of Measur e
Uni t of measur e: JOB.
1. 2. 5 I TEM 0005 J. Per cy Pr i est Oper at i on & Mai nt enance Dat a
1. 2. 5. 1 Payment
Payment wi l l be made f or I t em 0005 at t he cont r act pr i ce per Job. Thi s pr i ce i ncl udes f ul l compensat i on f or f ur ni shi ng al l mat er i al s, equi pment , and l abor t o sat i sf act or i l y pr ovi de al l oper at i on and mai nt enance dat a as speci f i ed i n t he f ol l owi ng Sect i ons; 27 51 20 COMMUNI CATI ON SYSTEM, 40 94 51SYSTEM HARDWARE, 40 94 53 MASTER STATI ON BASI C SOFTWARE, 40 94 54
HUMAN MACHI NE I NTERFACE, 40 94 55 PROJECT APPLI CATI ON SOFTWARE, 40 94 60
RTU, and 40 94 61 RTU SOFTWARE.
1. 2. 5. 2 Uni t of Measur e
SECTI ON 01 22 00 Page 6
1. 2. 6 I TEM 0006 Cheat ham Shop Dr awi ngs
1. 2. 6. 1 Payment
Payment wi l l be made f or I t em 0006 at t he cont r act pr i ce per Job. Thi s pr i ce i ncl udes f ul l compensat i on f or f ur ni shi ng al l mat er i al s, equi pment , and l abor t o sat i f act or i l y pr ovi de al l Shop Dr awi ngs, Pr oduct Dat a, and Desi gn Dat a as r equi r ed i n t he f ol l owi ng Sect i ons; 01 35 70
CYBERSECURI TY, 27 51 20 COMMUNI CATI ON SYSTEM, 40 94 51 SYSTEM HARDWARE,
40 94 53 MASTER STATI ON BASI C SOFTWARE, 40 94 54 HUMAN MACHI NE I NTERFACE,
40 94 55 PROJECT APPLI CATI ON SOFTWARE, 40 94 60 RTU, and 40 94 61 RTU
SOFTWARE.
1. 2. 6. 2 Uni t of Measur e
Uni t of measur e: JOB.
1. 2. 7 I TEM 0007 Cheat ham Equi pment & Sof t war e
1. 2. 7. 1 Payment
Payment wi l l be made f or I t em 0007 at t he cont r act pr i ce per Job. Thi s pr i ce i ncl udes f ul l compensat i on f or f ur ni shi ng al l mat er i al s, equi pment , and l abor t o sat i sf act or i l y pr ovi de al l equi pment and sof t war e as r equi r ed i n t he Syst emwi de SCADA Upgr ade speci f i cat i ons.
1. 2. 7. 2 Uni t of Measur e
Uni t of measur e: JOB.
1. 2. 8 I TEM 0008 Cheat ham Test Repor t s
1. 2. 8. 1 Payment
Payment wi l l be made f or I t em 0008 at t he cont r act pr i ce per Job. Thi s pr i ce i ncl udes f ul l compensat i on f or f ur ni shi ng al l mat er i al s, equi pment , and l abor t o sat i sf act or i l y pr ovi de al l Test Repor t s as r equi r ed i n Sect i on 01 75 10 TESTI NG, I NSTALLATI ON PERSONNEL AND ACCEPTANCE.
1. 2. 8. 2 Uni t of Measur e
Uni t of measur e: JOB.
1. 2. 9 I TEM 0009 Cheat ham Cl oseout Document s
1. 2. 9. 1 Payment
Payment wi l l be made f or I t em 0009 at t he cont r act pr i ce per Job. Thi s pr i ce i ncl udes f ul l compensat i on f or f ur ni shi ng al l mat er i al s, equi pment , and l abor t o sat i sf act or i l y pr ovi de al l t he c l oseout document s as r equi r ed i n t he f ol l owi ng Sect i ons; 27 51 20 COMMUNI CATI ON SYSTEM, 40 94 51 SYSTEM
HARDWARE, 40 94 53 MASTER STATI ON BASI C SOFTWARE, 40 94 54 HUMAN MACHI NE
I NTERFACE, 40 94 55 PROJECT APPLI CATI ON SOFTWARE, 40 94 60 RTU, and
40 94 61RTU SOFTWARE.
1. 2. 9. 2 Uni t of Measur e
SECTI ON 01 22 00 Page 7
1. 2. 10 I TEM 0010 Cheat ham Oper at i on & Mai nt enance Dat a
1. 2. 10. 1 Payment
Payment wi l l be made f or I t em 0010 at t he cont r act pr i ce per Job. Thi s pr i ce i ncl udes f ul l compensat i on f or f ur ni shi ng al l mat er i al s, equi pment , and l abor t o sat i sf act or i l y pr ovi de al l oper at i on and mai nt enance dat a as speci f i ed i n t he f ol l owi ng Sect i ons; 27 51 20 COMMUNI CATI ON SYSTEM, 40 94 51SYSTEM HARDWARE, 40 94 53 MASTER STATI ON BASI C SOFTWARE, 40 94 54
HUMAN MACHI NE I NTERFACE, 40 94 55 PROJECT APPLI CATI ON SOFTWARE, 40 94 60
RTU, and 40 94 61 RTU SOFTWARE.
1. 2. 10. 2 Uni t of Measur e
Uni t of measur e: JOB.
1. 2. 11 I TEM 0011 Ol d Hi ckor y Shop Dr awi ngs
1. 2. 11. 1 Payment
Payment wi l l be made f or I t em 0011 at t he cont r act pr i ce per Job. Thi s pr i ce i ncl udes f ul l compensat i on f or f ur ni shi ng al l mat er i al s, equi pment , and l abor t o sat i f act or i l y pr ovi de al l Shop Dr awi ngs, Pr oduct Dat a, and Desi gn Dat a as r equi r ed i n t he f ol l owi ng Sect i ons; 01 35 70
CYBERSECURI TY, 27 51 20 COMMUNI CATI ON SYSTEM, 40 94 51 SYSTEM HARDWARE,
40 94 53 MASTER STATI ON BASI C SOFTWARE, 40 94 54 HUMAN MACHI NE I NTERFACE,
40 94 55 PROJECT APPLI CATI ON SOFTWARE, 40 94 60 RTU, and 40 94 61 RTU
SOFTWARE.
1. 2. 11. 2 Uni t of Measur e
Uni t of measur e: JOB.
1. 2. 12 I TEM 0012 Ol d Hi ckor y Equi pment & Sof t…