App_E_-_Sample_Reports.pdf

PDF 901 KB Posted

Attached to
SCADA System
Solicitation number
W912P518T0003
Issued by

About this file

Appendix E

View the file

Other files

File Type Posted
PROPOSAL_DATA_SHEET.pdf PDF
W912P518T00030004.pdf PDF
SCADA_TSpecs_Amend3.pdf PDF
W912P518T00030003.pdf PDF
W912P518T00030002.pdf PDF
W912P518T00030001.pdf PDF
Sign_In_Sheet.pdf PDF
App_A_-_SCADA_Points.pdf PDF
Foreign_National_Security_Site_Visit_Form.pdf PDF
App_B_-_SCADA_Specs_Screen_Shots.pdf PDF
SCADA_TSpecs.pdf PDF
App_C_-_Network_Diagrams.pdf PDF
Site_Visit_Request_Form.pdf PDF
W912P518T0003.pdf PDF
App_D_-_SCADA_REFERENCE_DRAWINGS.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912P518T0003

US Army Corps Of Engineers Nashville District

SYSTEMWIDE SCADA UPGRADE

Various Powerplants Cumberland River Basin

Tennessee and Kentucky

Technical Specifications Appendix E – SAMPLE REPORTS

January 2018

THIS PAGE INTENTIONALLY LEFT BLANK

FOR DUPLEX PRINTING

U.S. ARMY ENGINEER DISTRICT, NASHVILLE BARKLEY HYDRO POWER PLANT

CORPS OF ENGINEERS DAILY RIVER REPORT DAY I DATE: Monday, September 12, 2016

NASHVILLE, TENNESSEE

TAIL SPILLWAY GATE DISCHARGE IN C.F.S. BARKLEY & KY CANAL C.F.S TURBINE DISCHARGE IN C.F.S TOTAL TOTAL TOTAL l;>OOL WATER NET KY B K 6HOUR TURBINE SPILL DISCH.

TIME ELEV. ELEV. HEAD 1 2 3 4 5 6 7 8 9 10 11 12 POOL DIFF FLO FLO TOTAL 1 2 3 4 6 HOUR AVG. DISCH. DISCH. TIME

0000 355.45 303.25 355.75 DIFF . SPILL CANAL TURB. C.F.S C.F.S C.F.S 0000

0100 355.50 303.30 52.20 355.79 0.29 K 6200 6200 0 6200 0100

0200 355.50 303.30 52.20 355.80 0.30 K 6200 6200 0 6200 0200

0300 355.50 303.30 52.20 3S5.84 0.34 K 6200 6200 0 6200 0300

0400 355.50 303.30 52.20 355.83 0.33 K 6200 6200 0 6200 0400

0500 355.50 303.30 52.20 355.84 0.34 K 6200 6200 0 6200 0500 0600 355.50 303.30 52.20 0.00 6200 0 6200 6200 0 6200 0600

0700 355.45 303.35 52.10 0.00 6200 6200 0 6200 0700

0800 355.45 303.35 52.10 0.00 6200 6200 0 6200 0800

0900 355.40 303.40 52.00 0.00 6200 6200 0 6200 0900

1000 355.40 303.40 52.00 0.00 6200 6200 0 6200 1000 .

1100 0.00 0.00 0 0 0 1100 1200 0.00 0.00 0 4133 0 0 0 1200

1300 0.00 0.00 0 0 0 1300

1400 0.00 0.00 0 0 0 1400

1500 0.00 0.00 0 0 0 1500

1600 0.00 0.00 0 0 0 1600

1700 0.00 0.00 0 0 0 1700 1800 0.00 0.00 0 0 0 0 0 1800

1900 0.00 0.00 0 0 0 1900

2000 0.00 0.00 0 0 0 2000

2100 0.00 0.00 0 0 0 2100

2200 0.00 0.00 0 0 0 2200

2300 0.00 0.00 0 0 0 2300 2400 0.00 0.00 0 0 0 0 0 2400

TOT. 3554.70 3033.30 521.40 0 0 0 0 0 0 0 0 0 0 0 0 ·o 0 0 62000 62000 0 62000 TOT.

AVG. 148.11 126.39 21.73 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2583 2583 0 2583 AVG.

-0100 355.50 MAX UniHMax

Unit2 Max Unit3Max Unit4Max Statton Max

0900 ·355.40 MIN #NIA .. O #NIA· 0 #NIA 0 0100 20 0100 20

SPILLWAY GATE CHANGES PERSON REMARKS: INFORMATION FOR LOCK & DAM 52

CHANGE IN C.F.S. ORDERED FEET FEET TIME MAKING WATER

TIME BY INCREASE DECREASE OPENED CLOSED CHANGED Gate Changes H.W. T.W. 6AM AVG. TEMP. PREC. GATE

BAR 355.50 303.30 6,200 7,846

KY

CHECKED BY:

APPROVED: SHIFT OTHER TRAINEE

OPERATOR OPERATOR 6:30 -14:30 ON OFF

CT!AM'BLISS 0000 0630

DUNIGAN 0630 1830

WATER TEMPERATURE

1830 2400

ORN 84 - D COMPUTER REPRODUCED CELRN-CO-T-H

APPENDIX E - SAMPLE REPORTS

U.S. ARMY ENGINEER, NASHVILLE DISTRICT BARKLEY HYDRO POWER PLANT

COPRS OF ENGINEERS DAILY METER REPORT

NASHVILLE, TENNESSEE DATE: Monday, September 12, 2016

GENERATOR# 1 GENERATOR# 2 GENERATOR# 3 GENERATOR# 4 STASER STASER TOTAL NET

TIME OUTGOING MW INCOMING MW OUTGOING MW INCOMING MW OUTGOING MW INCOMING MW OUTGOING MW INCOMING MW TRANS# 1 MW TRANS#2 MW GENERATION GENERATION TIME

0000 110525 08963 85594 04725 45557 06590 92774 07181 27808 25704 --- OUT IN MW MVAR 0000 0100 92794 20 20 20 0100 0200 92814 20 27809 1 20 19 0 0200 0300 92834 20 25705 1 20 19 0300 0400 92854 20 20 20 0 0400 0500 92874 20 20 20 0500 0600 92894 20 20 20 0 0600 0700 92914 20 20 20 0700 0800 92934 20 25706 1 20 19 2 0800 0900 92954 20 20 20 0900 1000 92974 20 20 20 2 1000 1100 92994 20 20 20 1100 120,0 93014 20 20 20 1200 1300 93034 20 20 20 1300 1400 93054 20 20 20 1400 1500 93074 20 20 20 1500 1600 93094 20 20 20 1600 1700 93114 20 20 20 1700 1800 93134 20 20 20 1800 1900 93154 20 20 20 1900 2000 93174 20 20 20 2000 2100 93194 20 20 20 2100 2200 93214 20 20 20 2200 2300 93234 20 20 20 2300 2400 93254 20 20 20 2400

TOTAL 110525 0 08963 0 85594 0 04725 0 45557 0 06590 0 93254 480 07181 0 27809 1 25706 2 480 0 477 TOTAL

GENERATORS - STATION SERVICE .

#1 #2 #3 #4 COND TOTAL #1 #2 TOTAL NET MAIN TRANSMISSION BUS VOLTAGE

OUT IN OUT IN OUT IN OUT IN IN OUT S.S. TRANS. S.S. TRANS. S.S. USE GEN 0200 166.0 1400

TODAY 0 0 0 0 0 0 480 0 0 480 1 2 3 477 0400 166.0 1600

MONTH PREVIOUS 0 0 6826 0 1558 0 4826 0 0 13210 35 58 93 13117 0600 166.0 1800

MONTH TO DATE 0 0 6826 0 1558 0 5306 0 0 13690 36 60 96 13594 0800 164.0 2000

Unif1 Max Unit2 Max Unit3Max - Unit4 Max Station Max 1000 164.0 2200

-- _#NIA -0 •

- #NIA 0 #NIA G 1.noo 20 0100 20 1200 2400

#1 #2 #3 #4 COND REQUESTED BY: APPROVED BY:

ON CORPS: SHIFT OPERATOR OTHER OPERATOR TRAINEE 0630-1830 ON OFF

OFF TVA: CttAM'BLISS 0000 0630

ON TOTAL: VUNIGAN 0630 1830

OFF -- 1830 2400

TODAY -

MONTH PREVIOUS 0 0.00 225 0.00 44 0.50 160 0.83

MONTH TO DATE 0 0.00 225 0.00 44 0.50 160 0.83 -

YEAR PREVIOUS

YEAR TO DATE -- --

ORN 103-C COMPUTER REPRODUCED CELRN-CP~T-H

TVA HYDRO GENERATION PRESCHEDULE Wednesday, September 14, 2016 Generated: 2016-09-13 14:35

MEL 72 40 320 519 167 140 31 80 270 48 99 75 30 48 120

MSL 133 41 335 540 180 222 37 100 300 54 108 90 31 49 145

Notes 19 14 19,20 20 21,22 23

GUH TFH WEH WLH PKH KYH GFH Cent Wolf Dale Cord OldH JPer Chea Bark CUM SEPA NET TVA TOT 1 48 0 71 98 40 56 0 0 0 0 0 25 0 0 20 45 0 45 491 536 2 48 0 71 98 40 56 0 0 0 0 0 25 0 0 20 45 0 45 497 542 3 48 0 71 98 40 56 0 0 0 0 0 25 0 0 20 45 0 45 490 535 4 48 0 71 98 40 25 0 0 0 0 0 25 0 0 0 25 0 25 481 506

II 48 0 71 147 40 25 0 0 0 0 0 25 0 0 0 25 3 22 512 534

6 48 0 71 147 40 25 0 0 0 0 33 25 0 12 0 70 8 62 604 666

7 48 0 71 147 76 25 0 0 0 0 33 25 0 12 0 70 8 62 615 677 en 6 48 0 71 147 118 25 0 0 0 0 33 25 0 12 0 70 8 62 691 753

9 48 0 71 147 118 25 0 0 0 0 0 25 0 24 0 49 9 40 762 802 'f- 10 48 0 71 147 118 25 0 40 90 0 0 25 0 24 0 179 33 145 881 1026 0

11 48 0 71 147 118 25 0 40 90 16 0 25 0 24 0 195 76 117 1034 1151 en

12 48 0 71 147 118 25 0 0 90 32 33 25 0 24 0 204 80 122 1256 1378 ..

147 118 25 32 66 "' 13 48 0 71 0 0 90 25 0 24 0 237 91 144 1396 1540

"' [L 14 48 0 71 147 118 25 0 0 90 32 66 50 0 24 0 262 164 95 1505 1600 v 16 48 0 71 147 118 25 0 0 90 32 66 75 0 24 0 287 218 65 1560 1625

16 48 0 71 147 118 25 0 0 90 32 66 75 0 24 0 287 230 52 1585 1637 (0 v

48 0 71 147 118 25 0 0 90 32 66 75 0 24 0 287 230 1585 1637 N 17 52

ID

lf)

18 48 0 71 147 118 25 0 0 90 32 66 75 0 24 0 287 103 182 1593 1775 (0

19 48 0 71 147 118 25 0 0 90 32 66 50 0 24 0 262 103 157 1460 1617 20 48 0 71 147 118 25 0 0 90 32 66 25 0 24 0 237 48 188 1228 1416 21 48 0 71 147 118 25 0 0 90 32 66 25 0 24 0 237 46 190 871 1061

A 22 48 0 71 98 118 25 0 0 90 16 33 25 0 24 0 188 35 152 678 830 I 23 48 0 71 98 76 25 0 0 90 0 33 25 0 12 0 160 0 160 479 639

< 48 0 71 98 40 25 0 0 0 0 0 25 0 0 0 462 :> 24 0 25 25 437 I-

TOT 1152 0 1704 3185 2202 693 0 80 1260 352 792 850 0 384 60 3778 1493 2255 22691 24945

Gunt Tims Whee Wlls Pick Kent Grea Cent Wolf Dale Cord OldH JPer Chea Bark 600 288 0 426 686 240 243 0 0 0 0 33 150 0 12 60 120 288 0 426 882 666 150 0 80 270 48 99 150 0 120 0 180 288 0 426 882 708 150 0 0 540 192 396 375 0 144 0

:::i 240 288 0 426 735 588 150 0 0 450 112 264 175 0 108 0

[L

" v 1. MSL 13. NJH: UFN Schedule 1 and 2 unit use (19 & 38 MW) m schedule mode.

N 2. BOH. UFN. Spread generation and llmit ramping to stabilize TW. 14. TFH. thru 10/15. No generation. Spill/sluice for pool control ISJ

3. DGH: UFN. Ramp down 1 unit per hour for last two units. 16. WBH: 8/29-9/23. WBN Diffuser work \\1th divers Max 20k 0700-1700 M-F each week.

(0

4. FPH. UFN. Notify TEC at 423-229-3735 for any unscheduled 2-unit use. 16. WBH/CHH. UFN. SQN Min 7 kcfs & steady now past SQN re 6, DGH: UFN. Max 19,000 cfs for snail darter. 17. WBH: UHi. WBN-Run 1 hour of 1 urut generabon after4 consecubve hours of zero.

6. Follow schedule for recreabon (standing note) 18. WBH: UFN. Operate units 2,3 & 5 only forWBN. .. 7. 03H: 9114 Investigate service station relay issues 0700-1630 19. GUH/WEH: UFN. BFN. Min 10kcfs & steady flow past BFN If Q<20K .

..0

"' 8. APH & MHH: UFN. Ramp dov.n 1 unit at a time. 20. WEH/WLH. When WLH loaded, run WEH as needed to control WLH pool. :;

a. 9. WIH: UFN. Call Matt Allen if running 10MW or more between 1500 and 0600 . 21. PKH: UFN. Run 1 unit min for DO ..

"' 10. WTHN/fH: UFN. Run WTH as needed for WIH pool (standing note). 22. PKH: If running Unit 3, run it 24/7 'f- 11. BOH. 9/ 12-16 Shoreline work No gen 0630-1500 daily 23. KYH· Run up to 25kcfs to maintain 301 tailwater

~ 12. BRH. Copperhill temp control. Generate HE 10 & 11 when possible. 24. Temp @peak= 90'F@ 1700

"' " "' O> I-

U.S. Army Engineers District Nashville, Tennessee DAILY RIVER CONTROL REPORT (TURBINE) Wednesday, September 14, 2016

OLD HICKORY POWER PLANT CHEATHAM POWER PLANT J. PERCY PRIEST POWER PLANT

TURBINE DISCHARGE CFS TURBINE DISCHARGE CFS TURBINE DISCHARGE CFS

Head Turbine Total Gate Total Head Turbine Total Gate Total Head Turbine Total Gate Total Time Waler Tail Water NetHead Unit 1 Unit2 Unit3 Unit4 Disch. Disch. Disch. Water Tail Water Net Head Unit 1 Unit2 Unit3 Disch. Disch. Disch. Water Tail Water Net Head Disch. Disch. Disch. Time

00 444.60 388.00 385.65 357.55 490.20 387.79 00 01 444.67 387.27 57.40 5700 5700 5700 385.87 357.42 28.45 0 0 490.19 387.78 102.41 50 50 01 02 444.70 387.20 57.50 5700 5700 5700 385.89 357.19 28.70 0 0 490.19 387.78 102.41 50 50 02 03 444.72 387.22 57.50 5700 5700 5700 385.97 356.87 29.10 0 0 490.19 387.78 102.41 50 50 03 04 444.74 387.14 57.60 5700 5700 5700 386.00 356.70 29.30 0 0 490.19 387.78 102.41 50 50 04 05 444.72 387.22 57.50 5700 5700 5700 386.10 356.40 29.70 0 0 490.19 387.78 102.41 50 50 05 06 444.70 387.20 57.50 5700 5700 5700 385.95 356.65 29.30 6400 6400 6400 490.19 387.78 102.41 50 50 06

Avg. 5700 0 5700 1067 0 1067 0 50 50

07 444.66 387.35 57.31 5700 5700 5700 385.97 356.40 29.57 6400 6400 6400 490.19 387.76 102.43 50 50 07 08 444.54 387.54 57.00 5800 5800 5800 385.97 356.44 29.53 6400 6400 6400 490.19 387.78 102.41 50 50 08 09 0.00 0 0 0.00 0 0 0.00 0 09 10 0.00 0 0 0.00 0 0 0.00 0 10 11 0.00 0 0 0.00 0 0 0.00 0 11 12 0.00 0 0 0.00 0 0 0.00 0 12

Avg. 1917 0 1917 2133 0 2133 0 17 17

13 0.00 0 0 0.00 0 0 0.00 0 13 14 0.00 0 0 0.00 0 0 0.00 0 14 15 0.00 0 0 0.00 0 0 0.00 0 15 16 0.00 0 0 0.00 0 0 0.00 0 16 17 0.00 0 0 0.00 0 0 0.00 0 17 18 0.00 0 0 0.00 0 0 0.00 0 18

Avg. 0 0 0 0 0 0 0 0 0

19 0.00 0 0 0.00 0 0 0.00 0 19 20 0.00 0 0 0.00 0 0 0.00 0 20 21 0.00 0 0 0.00 0 0 0.00 0 21 22 0.00 0 0 0.00 0 0 0.00 0 22 23 0.00 0 0 0.00 0 0 0.00 0 23 24 0.00 0 0 0.00 0 0 0.00 0 24

Avg. 0 0 0 0 0 0 0 0 0

Total 459.31 45700 0 45700 233.65 19200 0 19200 819.30 0 400 400

Avg. 19.14 1904 0 1904 9.74 l 800 0 800 34.14 0 17 17

Ula HICKOry nec1p1tat1on 1gt uouu (inches) 1 emperature@ uouu Deg.F cooung water Deg.F

ORN FORM 84-A REVISED MARCH 2002

TIME

TOTAL

U.S.ARMY CORPS OF ENGINEERS, NASHVILLE DISTRICT

GENERA TOR #1 GENERATOR #2 GENERA TOR #3

GENERATE CONDENSE GENERATE CONDENSE GENERATE CONDENSE

1673173 MW 2072 MW 1903139 MW 8982 MW 1825354 MW 398 MW

1673173 2072 1903164 25 8982 1825354 398 1673173 2072 1903189 25 8982 1825354 398 1673173 2072 1903214 25 8982 1825354 398 1673173 2072 1903239 25 8982 1825354 398 1673173 2072 1903264 25 8982 1825354 398 1673173 2072 1903289 25 8982 1825354 398 1673173 2072 1903314 25 8982 1825354 398 1673173 2072 1903339 25 8982 1825354 398 1673173 2072 1903339 8982 1825354 398 1673173 2072 1903339 8982 1825354 398 1673173 2072 1903339 8982 1825354 398 1673173 2072 1903339 8982 1825354 398 1673173 2072 1903339 8982 1825354 398 1673173 2072 1903339 8982 1825354 398 1673173 2072 1903339 8982 1825354 398 1673173 2072 1903339 8982 1825354 398 1673173 2072 1903339 8982 1825354 398 1673173 2072 1903339 8982 1825354 398 1673173 2072 1903339 8982 1825354 398 1673173 2072 1903339 8982 1825354 398 1673173 2072 1903339 8982 1825354 398 1673173 2072 1903339 8982 1825354 398 1673173 2072 1903339 8982 1825354 398 1673173 2072 1903339 8982 1825354 398

0 0 200 0 0 0

OLD HICKORY HYDRO POWER PLANT

DAILY METER REPORT

GENERATOR #4 NORTH BANK XFMR

GENERATE CONDENSE #1 METER #2 METER

1127878 MW 10027 MW 3702 MW 2458 MW

1127878 10027 3702 2458 1127878 10027 3702 2458 1127878 10027 3702 2458 1127878 10027 3702 2458 1127878 10027 3702 2458 1127878 10027 3702 2458 1127878 10027 3702 2458 1127878 10027 3702 2458 1127878 10027 3702 2458 1127878 10027 3702 2458 1127878 10027 3702 2458 1127878 10027 3702 2458 1127878 10027 3702 2458 1127878 10027 3702 2458 1127878 10027 3702 2458 1127878 10027 3702 2458 1127878 10027 3702 2458 - 1127878 10027 3702 2458 1127878 10027 3702 2458 1127878 10027 3702 2458 1127878 10027 3702 2458 1127878 10027 3702 2458 1127878 10027 3702 2458 1127878 10027 3702 2458

0 0 0 0

OLD HICKORY

DATE: Wednesday, September 14, 2016

WAREHOUSE XFMR STA. SER. XFMR TOTAL GEN. NET GEN.

#1 METER #2 METER #1 METER #2 METER GENERATE COND MW

11224 MW 4849 MW 14861 MW 19340 MW

11224 4849 14862 1 19340 25 0 24 11224 4849 14862 19341 1 25 0 24 11224 4849 14862 19341 25 0 25 11224 4849 14862 19341 25 0 25 11224 4849 14862 19341 25 0 25 11224 4849 14862 19341 25 0 25 11224 4849 14862 19341 25 0 25 11224 4849 14862 19341 25 0 25 11224 4849 14862 19341 0 0 0 11224 4849 14862 19341 0 0 0 11224 4849 14862 19341 0 0 0 11224 4849 14862 19341 0 0 0 11224 4849 14862 19341 0 0 0 11224 4849 14862 19341 0 0 0 11224 4849 14862 19341 0 0 0 11224 4849 14862 19341 0 0 0 11224 4849 14862 19341 0 0 0 11224 4849 14862 19341 0 0 0 11224 4849 14862 19341 0 0 0 11224 4849 14862 19341 0 0 0 11224 4849 14862 19341 0 0 0 11224 4849 14862 19341 0 0 0 11224 4849 14862 19341 0 0 0 11224 4849 14862 19341 0 0 0

0 0 1 1 200 0 198

GENERA TOR #1 GENERA TOR #2 GENERATOR #3 GENERA TOR #4 NORTH BANK XFMR WAREHOUSE XFMR STATION SERVICE XFMR

GENERATE CONDENSE GENERATE CONDENSE GENERATE CONDENSE

TODAY 0 0 200 0 0 0

MONTH PREVIOUS 3675 0 3775 0 3350 0

MONTH TO DATE 3675 0 3975 0 3350 0

OLD HICKORY OPERATING TIME - HOURS

GENERATOR #1 GENERATOR #2 GENERATOR #3 GENERA TOR #4 DIESEL

ON 0

OFF

ON

OFF

TODAY 0.00 0.00 0.00 0.00 0.00

MONTH PREVIOUS 147.00 151.00 134.00 0.00 0.00

MONTH TO DATE 147.00 151.00 134.00 0.00 0.00

GENERATE CONDENSE #1 USAGE

0 0 0 0 0 14 0 0 14

OLD HICKORY METERING SHEET

REVISED APRIL 2013

BASED ON ORN FORM 103 B

#2 USAGE #1 USAGE

0 0 0 11 0 11

TODAY

MONTH PREVIOUS

MONTH TO DATE

#2USAGE #1 USAGE #2 USAGE

0 1 1 12 24 49 12 25 50

TOTAL GROSS

TOTAL STATION USE

TOTAL NET TOTAL

GENERATION GENERATION CONDENSING

200 2 198 0 10800 110 10690 0 11000 112 10888 0

TIME

I---

24 -TOTAL

REQ.BY

U.S. ARMY CORPS OF ENGINEERS, NASHVILLE DISTRICT CHEATHAM & J. PERCY PRIEST HYDRO POWER PLANTS DATE: Wednesday, September 14, 2016 DAILY METER REPORT

CHEATHAM J. PERCY PRIEST

GENERATOR #1 GENERA TOR #2 GENERA TOR #3 STA. SER. XFMR TOTAL GEN. NET GEN. GENERATOR STA. SER. XFMR TOTAL GEN. NET GEN.

TIME GENERATE CONDENSE GENERATE CONDENSE GENERATE CONDENSE #1 METER #2METER GENERATE COND MW TIME GENERATE METER MW MW TIME

00 718076 MW 541 MW 732912 MW 1901 MW 725880 MW 8432 MW 16377 MW 23509 MW 00 662007 MW 16660 MW 00 01 718076 541 732912 1901 725880 8432 16377 23509 0 0 0 01 662007 16660 0 0 01 02 718076 541 732912 1901 725880 8432 16377 23509 0 0 0 02 662007 16660 0 0 02 03 718076 541 732912 1901 725880 8432 16377 23509 0 0 0 03 662007 16660 0 0 03 04 - 718076 541 732912 1901 725880 8432 16377 23509 0 0 0 04 662007 16660 0 0 04 05 718076 541 732912 1901 725880 8432 16377 23509 0 0 0 05 662007 16660 0 0 05 06 718076 541 732924 12 1901 725880 8432 16377 23509 12 0 12 06 662007 16660 0 0 06 07 718076 541 732936 12 1901 725880 8432 16377 23510 1 12 0 11 07 662007 16660 0 0 07 08 718076 541 732936 1901 725880 8432 16378 1 23510 0 0 -1 08 662007 16660 0 0 08 09 718076 541 732936 1901 725880 8432 16378 23510 0 0 0 09 662007 16660 0 0 09 10 718076 541 732936 1901 725880 8432 16378 23510 0 0 0 10 662007 16660 0 0 10 11 718076 541 732936 1901 725880 8432 16378 23510 0 0 0 11 662007 16660 0 0 -11 12 718076 541 732936 1901 725880 8432 16378 23510 0 0 0 12 662007 16660 0 0 12 13 718076 541 732936 1901 725880 8432 16378 23510 0 0 0 13 662007 16660 0 0 13 14 718076 541 732936 1901 725880 8432 16378 23510 0

0 0 14 662007 16660 0 0 14

15 718076 541 732936 1901 725880 8432 16378 23510 0 0 0 15 662007 16660 0 0 15 16 718076 541 732936 1901 725880 8432 16378 23510 0 0 0 16 662007 16660 0 0 16 17 718076 541 732936 1901 725880 8432 16378 23510 0 0 0 17 662007 16660

0 0 17

18 718076 541 732936 1901 725880 8432 16378 23510 0 0 0 18 662007 16660 0 0 18 19 718076 541 732936 1901 725880 8432 16378 23510 0 0 0 19 662007 16660 0 0 19 20 718076 541 732936 1901 725880 8432 16378 23510 0 0 0 20 662007 16660 0 0 20 21 718076 541 732936 1901 725880 8432 16378 23510 0 0 0 21 662007 16660 0 0 21 22 718076 541 732936 1901 725880 8432 16378 23510 0 0 0 22 662007 16660 0 0 22 23 718076 541 732936 1901 725880 8432 16378 23510 0 0 0 23 662007 16660 0 0 23 24 718076 541 732936 1901 725880 8432 16378 23510 0 0 0 24 662007 16660 0 0 24

TOTAi 0 0 24 ·. 0 0 0 1 1 24 0 22 TOTAi 0 0 0 0 TOTAL

CHEATHAM J. PERCY PRIEST

GENERATOR #1 GENERA TOR #2 GENERATOR #3 STATION SERVICE TOTAL GROSS TOTAL STATION TOTAL NET TOTAL REQ. TOTAL GROSS TOTAL STATION TOTAL NET

GENERATE COND GENERATE COND GENERATE COND #1 USE #2 USE GENERATION SERVICE USE GENERATION CONDENSING BY GENERATION SERVICE USE GENERATION

TODAY 0 0 24 0 0 0 1 1 24 2 22 0 TODAY 0 0 0

MONTH PREVIOUS 1935 0 1914 0 894 0 20 32 4743 52 4691 0 MONTH PREVIOUS 0 0 0

MONTH TO DATE 1935 0 1938 0 894 0 21 33 4767 54 4713 0 MONTH TO DATE 0 0 0

CHEATHAM OPERATING TIME - HOURS JPP OPERATING TIME - HOURS

GENERA TOR #1 GENERATOR #2 GENERA TOR #3 DIESEL GENERATOR DIESEL

ON 800 500 ON

OFF

CHEATHAM & J. PERCY PRIEST OFF

ON

METERING SHEET ON

OFF OFF

TODAY -8.00 -5.00 0.00 0.00

REVISED APRIL 2013

TODAY 0.00 0.00

MONTH PREVIOUS 161.55 159.70 74.70 0.00 BASED ON ORN FORMS 103D & E

MONTH PREVIOUS 0.00 0.00

MONTH TO DATE 153.55 154.70 74.70 0.00 MONTH TO DATE 0.00 0.00

U.S. ARMY ENGINEER DISTRICT, NASHVILLE

CORPS OF ENGINEER POWER PLANT: BARKLEY POWER PLANT

NASHVILLE, TENNESSEE

RIVER RECORD MONTH: March 2016

24 HOUR AVERAGE

DATE MAXIMUM TIME MINUMUM TIME AVER GROSS

ELEVATION ELEVATION NET TURBINES GATES TOTAL MEGA-

HEAD C.F.S. C.F.S OUTPUT WATTS

1 355.50 0400 355.05 1900 26.15 25779 28892 54671 1079

2 355.55 1900 355.25 0100 26.15 25808 28967 54775 1080

3 355.65 1000 355.35 2200 25.64 25550 36238 61788 1035

4 355.30 0100 355.00 1600 24.52 25013 44613 69626 935

5 355.00 0100 354.55 1800 24.67 25038 44275 69313 951

6 354.55 0100 354.15 2300 25.05 25392 43975 69367 991

7 354.20 1300 353.95 1000 26.96 26258 32388 58646 1150

8 354.05 0100 354.00 0800 29.59 28213 22000 50213 1400

9 354.25 0700 354.10 0100 31.46 29500 22025 51525 1577

10 355.10 2300 355.15 0100 31.40 29121 22275 51396 1552

11 355.50 1900 355.35 0100 32.19 29154 22600 51754 1604

12 355.50 0100 355.35 1800 32.59 29375 22600 51975 1643

13 355.50 1900 355.40 0100 30.90 27288 21658 48946 1497

14 355.70 2100 355.50 0100 32.35 26308 22600 48908 1420

15 355.95 1600 355.70 0100 32.93 24171 22800 46971 1292

16 355.80 0100 355.60 1500 32.96 23133 22750 45883 1219

17 355.70 2400 355.45 1200 33.95 22879 12250 35129 1248

18 355.75 0700 355.65 1900 36.06 23842 0 23842 1443

19 355.65 0100 355.55 0300 36.01 24050 0 24050 1454

20 355.60 0100 355.60 0100 36.00 23913 0 23913 1441

21 355.60 0100 354.90 1700 35.34 24154 0 24154 1428

22 354.85 0100 354.70 2200 35.44 24254 0 24254 1445.

23 354.65 0100 354.05 2200 36.48 23913 0 23913 1477

24 354.60 0900 354.00 2200 40.67 15671 0 15671 1059

25 354.50 2300 354.00 0100 43.55 15729 0 15729 1213

26 355.00 2400 354.55 0300 47.63 6471 0 6471 480

27 355.45 1900 355.00 0100 49.71 6396 0 6396 489

28 355.50 1100 355.10 0100 50.67 6288 0 6288 482

29 355.75 0700 355.50 0100 51.24 6279 0 6279 486

30 356.15 1600 355.70 0100 50.93 6296 0 6296 480

31 356.60 0600 356.25 0100 46.20 20929 0 20929 1728

TOTAL 36778

AVG. 35.34 21812 15255 37067

MAX. 356.60 0600

MIN. 353.95 1000

OVN FORM 71-2 (revised) Computer Reproduced OPERATIONS DICE.-OVNKH

March 2016

Holt/kgr/270-362-8159

MEMORANDUM FOR RECORD

SUBJECT: Monthly Operating Maintenance Summary, Barkley Power Plant

1. OPERATIONS

a. Units 1 and 3 were available the entire month. Unit 2 was unavailable for 684.00 hours on planned outage to replace cooling water piping. Unit 4 was unavailable for 57.00 hours on planned outage to replace cooling water piping.

b. The 161kv switchyard was in service the entire.month.

c. The station service diesel generator was available for service the entire month. ·

d. Generation Data :

Total Net Station Net Total

Generation Service Use Generation Condensing

KWH KWH KWH KWH

PrevMTHFY 296,204,000 1,953,000 294,251,000 0

PrevMTHCY 86,922,000 849,000 86,073,000 0

Current MTH KWH 36,778,000 398,000 36,380,000 0

FY TO DATE 332,982,000 2,351,000 330,631,000 0

CY TO DATE 123,700,000 1,247,000 122,453,000 0

e. FPC Summary of Net Generation :

Dam Resource Lock Net .. · F.P.C.

Use. Use Use Generation .· Net Gen

KWH KWH KWH KWH KWH

PrevMTHFY 39,060 102,594 451,990 294,251,000 294,844,644

Current MTH KWH 7,960 1,585 91,220 36,380,000 36,480,765

FY TO DATE 47,020 104,179 543,210 330,631,000 331,325,409

f. Line Outages :

Date Time Date Time Total '

LINE Out Out In In Outage

No outages this month

Cause

BAR/P March 2016

The diesel was operated on day Not operated this month No. of days diesel was operated - 0 Total operating time this month 0 hour

Number of days spill required 17

Unit Unavailabilitly this period

Date #1 Hours #2 Hours #3 Hours #4 Hours

March 01 0.00 24.00 0.00 0.00

March 02 0.00 24.00 0.00 0.00

March 03 0.00 24.00 0.00 0.00

March 04 0.00 24.00 0.00 0.00

March 05 0.00 24.00 0.00 0.00

March 06 0.00 24.00 0.00 0.00

March 07 0.00 24.00 0.00 0.00

March 08 0.00 24.00 0.00 0.00

March 09 0.00 24.00 0.00 0.00

March 10 0.00 24.00 0.00 0.00

March 11 0.00 24.00 0.00 0.00

March 12 0.00 24.00 0.00 0.00

March 13 0.00 23.00 0.00 0.00

March 14 0.00 24.00 0.00 0.00

March 15 0.00 24.00 0.00 0.00

March 16 0.00 24.00 0.00 0.00

March 17 0.00 24.00 0.00 0.00

March 18 0.00 24.00 0.00 0.00

March 19 0.00 24.00 0.00 0.00

March 20 0.00 24.00. 0.00 0.00

March 21 0.00 24.00 0.00 0.00

March 22 0.00 24.00 0.00 0.00

March 23 0.00 24.00 0.00 0.00

March 24 0.00 24.00 0.00 0.00

March 25 0.00 24.00 0.00 0.00

March 26 0.00 24.00 0.00 0.00

March 27 0.00 24.00 0.00 0.00

March 28 0.00 24.00 0.00 0.00

March 29 0.00 13.00 0.00 9.00

March 30 0.00 0.00 0.00 24.00

March 31 0.00 0.00 0.00 24.00 Total Outage Hrs 0.00 684.00 0.00 57.00

Reason For Outage replace cooling water piping replace cooling water piping replace cooling water piping replace cooling water piping replace cooling water piping replace cooling water piping replace cooling water piping replace cooling water piping replace cooling water piping replace cooling water piping replace cooling water piping replace cooling water piping replace cooling water piping replace cooling water piping replace cooling water piping replace cooling water piping replace cooling water piping replace cooling water piping replace cooling water piping replace cooling water piping replace cooling water piping replace cooling water piping replace cooling water piping replace cooling water piping replace cooling water piping replace cooling water piping replace cooling water piping replace cooling water piping replace cooling water piping replace cooling water piping replace cooling water piping 741.00

LINE

OVN FORM63

CORPS OF ENGINEERS, U.S. ARMY

NASHVILLE DISTRICT

NASHVILLE, TENNESSEE

SERVICE INTERRUPTION REPORT

GENERATING PLANTS

DATE TIME DATE TIME TOTAL

OUT OUT IN IN OUTAGE

0 : 0

0 : 0

0 : 0

0 : 0

0 : 0

0 : 0

0 : 0

0 : 0

0 : 0

0 : 0

0 : 0

0 : 0

0 : 0

0 : 0

0 : 0

0 : 0

0 : 0

0 : 0

0 : 0

0 : 0

0 : 0

0 : 0

0 : 0

0 : 0

0 : 0

0 : 0

0 : 0

0 : 0

0 : 0

0 : 0

0 : 0

0 : 0

0 : 0

0 : 0

Entries are for actual power interruptions

No outages this month

REPORTS CONTROL OVN -18

PLANT:

BARKLEY HYDRO-POWER

MONTH: March 2016

CAUSE

OPERATIONS DIV- OVNKH

RIVER OPERATIONS ORNFORM61

Pool Elevation, Beginning of Period 355.45 Ft Pool Elevation, End of Period 356.45 Ft U. S. ARMY ENGINEER Gain/Loss in Pool Elevation (GAIN) 1.00 Ft DISTRICT, NASHVILLE

TIME DAY CORPS OF ENGINEERS

Maximum Pool Elevation 0600 31 356.60 Ft NASHVILLE, TENNESSEE Minimum Pool Elevation 1000 7 353.95 Ft Reservoir Release During Period, Gross 37,067 DSF SUMMARY OF HYDRO Reservoir Inflow During Period ************' DSF PLANT OPERATING Gain I Loss in Reservoir Storage ************' DSF STATISTICS Useful Storage Above Minimum Elevation ************' DSF NetHead (44 ft) 35.34 Ft BARKLEY Maximum Day Release On Day 4 69,626 DSF OPERATING STATISTICS Minimum Day Release On Day 29 6,279 DSF March 2016 Average Turbine Discharge 21,812 DSF Period Days 31 Average Spillway Discharge 15,255 DSF Period Hours 743 Number of Days Spilled 17 Days Average River Flow 37,067 DSF Power Available In Release 82,434,583 KWH Water Through Turbines 36,778,000 KWH Water Converted 58.84 % Average Generation 1,186,387 KWH

KWH GENERATION UNIT iVIAX MW

TOTAL GENERATION 36,778,000 KWH

NET STATION USE 1.08% 398,000 KWH Unit 1 32 MW at 0800 on March 31.

TOTAL NET GENERATION 36,380,000 KWH Unit 2 32 MW at 0100 on March 31.

TOTAL CONDENSING OKWH Unit 3 32 MW at 0700 on March 31.

Dam Use 2% 7,960 KWH Unit 4 21 MW at 1800 on March 24.

Resource Use 0.40% 1,585 KWH Lock Use 22.92% 91,220 KWH Total 25.32% 100,765 KWH FPC Net Generation 36,480,765 KWH

STATION DEMAND

TIME DAY

Max Day Generation 31 1,728,000 KWH Max Hour Generation 0800 31 96,000 KWH

PLANT SERVICE FACTORS

Station Load Factor 51.56 % Station Capacity Factor 38.08 % Generator Use Factor 64.84 % Generator Availability Factor 75.07 % Average Unit Efficiency 75.86 %

STATION SERVICE METER SUMMARY

Station Service Transformer 1 120,000 KWH Station Service Transformer 2 278,000 KWH Total Station Service Use 398,000 KWH

UNIT USE AND AVAILABILITY

KW GEN COND Avail Gen Cond Un avail Use UNITS OFF Unit RATED KWH KWH HRs HRs HRs HRs HRs &AVAILHRs

1 32,500 12,533,000 0 743.00 650.00 0.00 0.00 650.00 93.00 2 32,500 1,472,000 0 59.00 59.00 0.00 684.00 59.00 0.00 3 32,500 13,373,000 0 743.00 615.00 0.00 0.00 615.00 128.00

4 32,500 9,400,000 0 686.00 603.00 0.00 57.00 603.00 83.00

Tot. 130,000 36,778,000 0 2231.00 1927.00 0.00 741.00 1927.00 304.00

Unit Max Hr Gen Load Factor Capacity Factor In Service Date Condensing CORP TVA 1 32,000 52.71% 51.90% January 20, 1966 lKWH 0 0 2 32,000 6.19% 6.10% February 4, 1966 2KWH 0 0 3 32,000 56.25% 55.38% March 7, 1966 3KWH 0 0 4 21,000 60.24% 38.93% March 30, 1966 4KWH 0 0

GENERA TING EQUIPMENT SERVICE SUMMARY REPORTS CONTROL SYMBOL

(ER 1130-2-338) DAEN-CW0-34

E.E.I. UNIT TOTAL SERVICE RATES

EQUIV. ITEM NUMBER FYTDHours (PERCENT)

PH MAIN GENERATORS 1 - 4 17568.00

SH SERVICE HOURS 12420.75 70.701 %

RSH STAND BY HOURS 3042.75 17.320 %

AH AVAILABLE HOURS 15463.50 88.021 %

FOH

FORCED OUTAGES

GENERATOR 4 4.25 0.024 %

NON GENERATOR 0 0.00 0.000 %

= DELAYED FORCED

GENERATOR 0 0.00 0.000 %

SOH ~ NON GENERATOR 0 0.00 0.000 %

SCHEDULED

GENERATOR 0 0.00 0.000 %

= 0 NON GENERATOR 2,1 2100.25 11.955 %

PLANNED MODIFICATION OUTAGES 0 0.00 0.000 %

UNAVAILABLE HOURS 2104.50

REJ\tIARKS:

Unit 4, UI forced outage due to Packing Ring on 10-13-15 at 1400 thru 1815. 4.25 Hours Unit 2, Planned Outage to Replace cooling water piping on 1-20-16 at 0845 thru 3-29-1 < 1659.25 Hours Unit 1, Planned Outage to Install 480v Station Service Bus 1 ACB 1-20-16 at 1208 thru 2-5-16 ~ 384.00 Hours Unit 4, Planned Outage to Replace cooling water piping on 3-29-16 at 1500 thru 57.00 Hours

Hours Hours Hours Hours Hours Hours Hours Hours Hours Hours Hours Hours Hours Hours

2104.50 Total Hours

FISCAL YEAR 2016 DIVISION/DISTRICT/PROJECT SUMMARY

March RN-CO-WKY-BARKLEY POWER PLANT

ENG FORM 4338-E AUG 89 EDITION OF DEC 75 IS OBSOLETE (Proponent CECW-OM)

RIVER OPERATIONS ORN FORM 61

Pool Elevation, Beginning of Period 444.70 Ft Pool Elevation, End of Period 0.00 Ft U. S. ARMY ENGINEER Gain/Loss in Pool Elevatio1 (LOSS) -444.70 Ft DISTRICT, NASHVILLE

TIME DAY CORPS OF ENGINEERS

Maximum Pool Elevation 0200 4 445.03 Ft NASHVILLE, TENNESSEE Minimum Pool Elevation 1800 12 444.25 Ft Reservoir Release During Period, Gross 8,213 DSF SUMMARY OF HYDRO Reservoir Inflow During Period ************* DSF PLANT OPERATING Gain I Loss in Reservoir Storage ************* DSF STATISTICS Useful Storage Above Minimum Elevation ************* DSF Net Head (45 ft) 56.37 Ft OLD HICKORY Maximum Day Release On Day 1 9,858 DSF OPERATING STATISTICS Minimum Day Release On Day 14 0 DSF September 2016

Average Turbine Discharge 8,213 DSF Period Days 13

Average Spillway Discharge 0 DSF Period Houn 312

Average Fish Hatchery 0 DSF Average River Flow 8,213 DSF Power Available In Release 12,217,694 KWH Water Through Turbines 10,800,000 KWH Water Converted 100.00 % Average Generation 830,769 KWH

KWH GENERATION

TOTAL GENERATION 10,800,000 KWH

NET STATION USE 1.02% 110,000 KWH UNIT MAX MW

TOTAL NET GENERATION 10,690,000 KWH

TOTAL CONDENSING 0 KWH Unit 1 25 MW at 0100 on September Dam Use 3,100 KWH Unit 2 25 MW at 1100 on September Service Base & ESS Use 37,000 KWH Unit 3 25 MW at 1300 on September Lock Use 0 KWH Unit 4 No Generation Total 40,100 KWH FPC Net Generation 10,806,100 KWH

STATION DEMAND

TIME DAY

Max Day Generation 1 975,000 KWH Max Hour Generation 1300 1 75,000 KWH

PLANT SERVICE FACTORS

Station Load Factor 46.15 % Station Capacity Factor 34.62 % Generator Use Factor 34.62 % Generator Availability Factor 75.00 % Average Unit Efficiency 88.45 %

STATION SERVICE METER SUMMARY

Station Service Generator 0 KWH Station Service Transformer 110,000 KWH Total Station Service Use 110,000 KWH

UNIT USE AND AVAILABILITY

KW GEN COND Avail Gen Cond Unavail Use UNITS OFF

Unit RATED KWH KWH HRs HRs HRs HRs HRs &AVAILHRs 1 25,000 3,675,000 0 312.00 147.00 0.00 0.00 147.00 165.00 2 25,000 3,775,000 0 312.00 151.00 0.00 0.00 151.00 161.00 3 25,000 3,350,000 0 312.00 134.00 0.00 0.00 134.00 178.00 4 25,000 0 0 0.00 0.00 0.00 312.00 0.00 0.00

Tot. 100,000 10,800,000 0 936.00 432.00 0.00 312.00 432.00 504.00

Unit Max HrGen Load Factor Capacity Factor In Service Date Condensing CORP TVA

1 25,000 47.12% 47.12% 4/5/1957 1 KWH 0 0

2 25,000 48.40% 48.40% 7/2/1957 2KWH 0 0

3 25,000 42.95% 42.95% 9/21/1957 3KWH 0 0

4 0 #DIV/O! 0.00% 12/19/1957 4KWH 0 0

Old Hickory Power Plant - Service Interruption Report

Line Date Time Date Time Total Outage Cause Out Out In In Hrs Min

DuPont 1 694

DuPont2 684

Springfield 674

Edenwold 628

Gallatin 638

OCB648

OCB658

OCB644

OCB654

MainBankl

MainBank2

SS Trans 1

SS Trans 2

North Bank 1

NorthBank2

WHSEl

WHSE2

UNITl

UNIT2

UNIT3

UNIT4

OLD/P September 2016

The diesel was operated on day 100 of this month.

No. of days diesel was operated - 0

Total operating time this month 0 hour

Number of days spill required 0

Unit Unavailabilitly this period Date #1 Hours #2 Hours #3 Hours

September 01 0.00 0.00 0.00

September 02 0.00 0.00 0.00

September 03 0.00 0.00 0.00

September 04 0.00 0.00 0.00

September 05 0.00 0.00 0.00

September 06 0.00 0.00 0.00

September 07 0.00 0.00 0.00

September 08 0.00 0.00 0.00

September 09 0.00 0.00 0.00

September 10 0.00 0.00 0.00

September 11 0.00 0.00 0.00

September 12 0.00 0.00 0.00

September 13 0.00 0.00 0.00

September 14 0.00 0.00 0.00

September 15 0.00 0.00 0.00

September 16 0.00 0.00 0.00

September 17 0.00 0.00 0.00

September 18 0.00 0.00 0.00

September 19 0.00 0.00 0.00

September 20 0.00 0.00 0.00

September 21 0.00 0.00 0.00

September 22 0.00 0.00 0.00

September 23 0.00 0.00 0.00

September 24 0.00 0.00 0.00

September 25 0.00 0.00 0.00

September 26 0.00 0.00 0.00

September 27 0.00 0.00 0.00

September 28 0.00 0.00 0.00

September 29 0.00 0.00 0.00

September 30 0.00 0.00 0.00

31 0.00 0.00 0.00

#4Hours Reason For Outage

24.00

24.00

24.00

24.00

24.00

24.00

24.00

24.00

24.00

24.00

24.00

24.00

24.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

24.00

24.00

24.00

24.00

OLD HICKORY POWER PLANT

September 2016

End of Month Pool

LOCK & RESOURCE USEAGE

Lock Heat Lock Power NBl NB2 WHSEl WHSE2 1st of Mth Reading 36880 24580 112130 48370 Current Reading 37020 24580 112240 48490 Usage 0 0 1,400 0 1,100 1,200 Total WHSE I ESS 37,000

d. GENERATIONDATA

Total Net Station Net Total Generation Service Use Generation Condensing

KWH KWH KWH KWH

PrevMTHFY 441,139,000 3,372,000 437,767,000 167,000

PrevMTHCY 320,812,000 2,511,000 318,301,000 128,000

Current MTH KWH 10,800,000 110,000 10,690,000 0

FY TO DATE 451,939,000 3,482,000 448,457,000 167,000

CY TO DATE 331,612,000 2,621,000 328,991,000 128,000

e. SUMMARY of F.P.C. NET GENERATION

Dam Reservoir Net F.P.C.

Use TransfUse Generation NetGen

KWH KWH KWH KWH

PrevMTHFY 34,100 1,225,000 437,767,000 438,928,000

Current MTH KWH 3,100 113,000 10,690,000 10,806,100

FY TO DATE 37,200 1,338,000 448,457,000 449,734,100

COVER
Barkley Daily Reports
Old Hickory Daily Reports
Usage Reports