SCADA_TSpecs_Amend3.pdf
PDF 936 KB Posted
- Attached to
- SCADA System
- Solicitation number
- W912P518T0003
About this file
Revised Technical Specifications
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912P518T0003 Amendment No. 0003
US Army Corps Of Engineers Nashville District
SYSTEMWIDE SCADA UPGRADE
Various Powerplants Cumberland River Basin Tennessee and Kentucky
Technical Specifications
March 2018
THIS PAGE INTENTIONALLY LEFT BLANK
FOR DUPLEX PRINTING
Systemwide SCADA Upgrade Various Powerplants W912P518T0003 Amendment 0002 Cumberland River, Tennessee and Kentucky
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 11 11 DRAWINGS
01 22 00 PRICE AND PAYMENT PROCEDURES
01 31 19 COORDINATION MEETINGS
01 33 00 SUBMITTAL PROCEDURES
01 33 60 SYSTEM PERFORMANCE REQUIREMENTS
01 33 61 EQUIPMENT DESIGN AND CONSTRUCTION
01 35 50 PROJECT SITE SECURITY AND AT/OPSEC PROCEDURES
01 35 70 CYBERSECURITY
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 42 13 LIST OF TERMS, ABBREVIATIONS AND ACRONYMS
01 60 00 PRODUCT REQUIREMENTS
01 75 10 TESTING, INSTALLATION PERSONNEL AND ACCEPTANCE
01 79 20 TRAINING
DIVISION 26 - ELECTRICAL
26 00 51 ELECTRICAL DRAWINGS AND DATA
26 00 80 WIRING CHECKOUT AND TESTING
DIVISION 27 - COMMUNICATIONS
27 51 20 COMMUNICATION SYSTEM
DIVISION 40 - PROCESS INTERCONNECTIONS
40 94 51 SYSTEM HARDWARE
40 94 53 MASTER STATION BASIC SOFTWARE
40 94 54 HUMAN MACHINE INTERFACE SOFTWARE
40 94 55 PROJECT APPLICATION SOFTWARE
40 94 60 RTU
40 94 61 RTU SOFTWARE
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 EXECUTIVE SUMMARY
1.2 LOCATIONS
1.2.1 Group 1
1.2.1.1 Master Plant
1.2.1.1.1 Old Hickory (OLD/P)
1.2.1.2 Remote Plants
1.2.1.2.1 J. Percy Priest (JPP/P)
1.2.1.2.2 Cheatham (CHE/P)
1.2.2 Group 2
1.2.2.1 Master Plant
1.2.2.1.1 Cordell Hull (COR/P)
1.2.2.2 Remote Plants
1.2.2.2.1 Dale Hollow (DAL/P)
1.2.2.2.2 Center Hill (CEN/P)
1.2.3 Group 3
1.2.3.1 Master Plant
1.2.3.1.1 Barkley (BAR/P)
1.2.3.1.2 Wolf Creek (WOL/P)
1.2.3.2 Remote Plants
1.2.3.2.1 Laurel (LAU/P)
1.2.3.3 ESS Office
1.3 PRINCIPAL COMPONENTS OF WORK
1.3.1 Design
1.3.1.1 General
1.3.1.2 New SCADA System Functionality
1.3.2 Supply
1.3.3 Installation
1.3.4 Technical Support
1.4 WARRANTY
1.5 DEFINITIONS
1.6 VETERANS EMPLOYMENT EMPHASIS FOR U.S. ARMY CORPS OF ENGINEERS
CONTRACTS
1.7 SUSTAINABILITY REQUIREMENTS
PART 2 PRODUCTS
PART 3 EXECUTION
-- End of Section Table of Contents --
SECTION 01 11 00 Page 1
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 EXECUTIVE SUMMARY
Five remotely-operated hydroelectric power plants (HPPs) in the U.S. Army Corps of Engineers Nashville District (LRN) have supervisory, control, and data acquisition (SCADA) systems that are end-of-life. Technical support for firmware, replacement hardware, and modern software are no longer available. LRN would like to upgrade the SCADA systems at these five remote facilities and additionally provide new SCADA master stations at four master HPPs, where the term "master" identifies an HPP which can remotely operate one or more HPPs. At a high level, this contractual scope of work generally covers the following: the design of new SCADA system remote terminal units (RTUs) for the five remote HPPs, the design of new SCADA master stations at four master HPPs, hardware and software supply for the new SCADA systems, and installation and training support for the new SCADA systems. LRN Operations and Maintenance personnel will perform the majority of the physical installation for the new SCADA systems.
1.2 LOCATIONS
1.2.1 Group 1
1.2.1.1 Master Plant
1.2.1.1.1 Old Hickory (OLD/P)
a. History and Context.
The Old Hickory project is owned and operated by the U.S. Army Corps of Engineers Nashville District. It is located approximately eighteen
(18) miles north of the Nashville Downtown offices on the Cumberland River. The project operates with a twenty-four hour operations staff and a day-time maintenance crew. It is currently a master plant to J.
Percy Priest (JPP/P) and Cheatham (CHE/P). Additionally, the ESS office is within walking distance of the plant.
b. Plant Details.
Old Hickory is a peaking plant with four generators. Unit 4 is currently undergoing a major rehabilitation effort; its post-rehab expected generation capacity should be about 44-45 MW. The other units are part of a HRAR and will be rehabbed in out-years. The plant also has a backup diesel generator. All four generating units have Kaplan turbines. All four generating units operate occasionally in synchronous condensing mode. None of the generating units operate in pumping mode. The plant does not have digital exciters or digital governors for any of their units.
c. Existing SCADA System.
SECTION 01 11 00 Page 2
The existing Tetragenics SCADA System at OLD/P is used for remote operation of CHE/P and JPP/P and also monitoring OLD/P plant. OLD/P itself operates using hardwired control switches, meters, and indication lights . The SCADA system consists of two hot-swappable desktop master stations running the Tetragenics MC3000 Operating System. The Master station computers run two virtual machines (A&B) utilizing Tetragenics(TG) MC300 software and TG WTV-32. WTV-32 is the current HMI that is capable of having in excess of 100 instances of the MC300 software running simultaneously. HMIs utilize a number of custom screens for the operators to monitor and control the remote plants. There is also limited monitoring of the master plant.
Communications between OLD/P and CHE/P is provided over a single T1 line and a backup with bandwidth capacity as high as four dedicated T1'S .
Communications between OLD/P and JPP/P is provided over a single T1 line with a second dedicated T1 as a backup.
Documentation for the Tetragenics System is not available. Real-time alarming is available on the HMI with the ability to take action on the alarm. Additionally the alarm will appear on an electronic printout (E-print) both when it goes into alarm and when the alarm is acknowledged or cleared. This E-print will record all control actions taken by operators, alarms, and hourly reports and save them in digital format to a permanent location.
Tennessee Valley Authority (TVA) owns and maintains two independent Siemens EMS RTUs at OLD/P with a dedicated serial communication link connected directly to TVA's dispatch. All JemStar metering data for the plant is collected by this RTU and transmitted offsite. This data is pulled off a different TVA RTU RS-232 serial connection, passed through a Moxa Nport media converter, and delivered as routable, real-time data for operators to view on the HMIs in the control room.
Data is also sent via dialup modem line to a computer in the ESS office.
1.2.1.2 Remote Plants
1.2.1.2.1 J. Percy Priest (JPP/P)
a. History and Context.
The J. Percy Priest project is owned and operated by the U.S. Army Corps of Engineers Nashville District. It is located approximately twelve (12) miles from Nashville District downtown offices on the Percy Priest Lake. The project is remotely operated from OLD/P and has no day time staff. Daytime maintenance staff from OLD/P support JPP/P's maintenance needs.
b. Plant Details.
JPP/P is a peaking plant with a single main unit generator with a capacity of 36MW and backup diesel generator. The main unit does not run in synchronous condensing or pumping mode and utilizes a single fixed propeller turbine. JPP/P does not have a digital exciter or digital governor installed. The unit utilizes an auto-synchronizer for automated start online sequences, but this will be replaced with a Basler BE1-25A prior to the new SCADA system installation. Due to lack of flow during the majority of the year, JPP/P only generates hydropower a few months out of the year.
SECTION 01 11 00 Page 3
c. Existing SCADA System.
JPP/P has both a dedicated primary and backup T1 connection to OLD/P.
Remote operations are achieved over the T1 by utilizing the existing Tetragenics SCADA system. In the event of an emergency, the plant can be operated manually from the control boards.
There is no dedicated control room at JPP/P, and all manual switchboards are located on the generator floor. There is also no local SCADA Workstation. There is one Tetragenics RTU for plant controls and data, and one TVA RTU for revenue metering data.
The existing RTU cabinets are located on the generator floor. The current system is capable of accepting standard 19 inch rack-mount equipment. Preferred AC power is available at 120 Volts, 60 Hz. Means for grounding all equipment is available. Adequate cooling is not available for all supplied equipment. All supplied equipment must be rated for harsh environments.
Tennessee Valley Authority (TVA) owns and maintains an independent Siemens EMS RTUs at JPP/P with a dedicated serial communication link connected directly to TVA's dispatch. All JemStar metering data for the plant is collected by this RTU and transmitted offsite. This data is pulled off a different TVA RTU RS-232 serial connection, passed through a Moxa Nport media converter, and delivered as routable, real-time data for operators to view on the HMIs in the control room.
Data is also sent via dialup modem line to a computer in the ESS office.
1.2.1.2.2 Cheatham (CHE/P)
a. History and Context.
The Cheatham (CHE/P) project is owned and operated by the U.S. Army Corps of Engineers Nashville District. It is located approximately forty (40) miles north-west of the Nashville District downtown offices on the Cumberland River. The project is remotely operated from OLD/P, but has a day time maintenance staff.
b. Plant Details.
CHE/P is a peaking plant with three generators each with a nameplate capacity of 13.3 MVA; there is also a backup diesel generator. All three generating units utilize Kaplan turbines with welded blades.
Generating units one and two feed station service and all three units operate regularly in synchronous condensing mode. None of the generating units operate in pumping mode. CHE/P does not have digital exciters or digital governors for any of their generating units. All three units utilize an auto-synchronizer for automated start online sequences, but this will be replaced with a Basler BE1-25A prior to SCADA installation.
c. Existing SCADA System.
CHE/P has both a dedicated T1 connection and a backup connection to OLD/P. Remote operations are achieved over the T1 by utilizing the existing Tetragenic SCADA system. In the event of an emergency, the plant can be operated manually from the bench boards in the control
SECTION 01 11 00 Page 4 room at CHE/P.
There is no local SCADA Workstation installed at CHE/P. There is one Tetragenic RTU for plant controls and data, and two TVA RTUs for JemStar metering data.
The existing RTU cabinets are located in the communications room. The current system is capable of accepting standard 19 inch rack-mount equipment. Preferred AC is available at 120 Volts, 60 Hz. Means for grounding all equipment is available. Adequate cooling is available for all supplied equipment.
Tennessee Valley Authority (TVA) owns and maintains an independent Siemens EMS RTUs at CHE/P with a dedicated serial communication link connected directly to TVA's dispatch. All JemStar metering data for the plant is collected by this RTU and transmitted offsite. This data is pulled off a different TVA RTU RS-232 serial connection, passed through a Moxa Nport media converter, and delivered as routable, real-time data for operators to view on the HMIs in the control room.
Data is also sent via dialup modem line to a computer in the ESS office.
1.2.2 Group 2
1.2.2.1 Master Plant
1.2.2.1.1 Cordell Hull (COR/P)
a. History and Context.
The Cordell Hull (COR/P) project is owned and operated by the U.S.
Army Corps of Engineers Nashville District. It is located approximately sixty (60) miles east of the Nashville Downtown offices on Cumberland River. The project operates with a twenty-four hour operations staff and a full-time maintenance crew. It is currently a master plant to DAL/P and CEN/P. Currently COR/P operates using hardwired control switches, meters, and indication lights .
b. Plant Details.
COR/P is a peaking plant with three generators, each with a nameplate capacity of 37 MVA, and a backup diesel generator rated at 250 KVA.
All three generating units have Kaplan turbines; however, unit two is a fixed blade propeller turbine. Generating units one and two feed station service and all three units operate regularly in synchronous condensing mode. None of the generating units operate in pumping mode.
All units have 480V amplidynes connected to the main exciters for excitation control. The plant does not have digital exciters or digital governors for any of their units.
c. Existing SCADA System.
COR/P remotely operates DAL/P and CEN/P using dedicated T1's and leverages the existing Tetragenic SCADA in place at each respective project. There is a backup in place for each link in the case of communication loss along the primary lines.
Tennessee Valley Authority (TVA) owns and maintains an independent Siemens EMS RTUs at COR/P with a dedicated serial communication link
SECTION 01 11 00 Page 5 connected directly to TVA's dispatch. All JemStar metering data for the plant is collected by this RTU and transmitted offsite. This data is pulled off a different TVA RTU RS-232 serial connection, passed through a Moxa Nport media converter, and delivered as routable, real-time data for operators to view on the HMIs in the control room.
Data is also sent via dialup modem line to a computer in the ESS office.
1.2.2.2 Remote Plants
1.2.2.2.1 Dale Hollow (DAL/P)
a. History and Context.
The Dale Hollow (DAL/P) project is owned and operated by the U.S. Army Corps of Engineers Nashville District. It is located approximately one hundred (100) miles north-east of the Nashville District downtown offices on the Dale Hollow Reservoir. The project is remotely operated from COR/P, but has a full-time maintenance staff.
b. Plant Details.
DAL/P is a peaking plant with three generators each with a nameplate capacity of 20 MVA and a backup house unit rated at 750 KVA. All three generating units utilize Francis turbines. Generating units one and two feed station service and all three units operate regularly in synchronous condensing mode. None of the generating units operate in pumping mode. DAL/P has Basler DECS-200 digital exciters and mechanical governors on all units. All three units and the house unit utilize a Basler BE1-25A Auto-Synchronizer.
c. Existing SCADA System.
DAL/P has a dedicated T1 connection to COR/P and a backup to COR/P .
Remote operations are achieved over the T1 by utilizing the existing Tetragenic SCADA system. In the event of an emergency, the plant can be operated manually from the bench boards in the control room at
DAL/P.
The existing RTU cabinets are located in the cable spreading room. The current system is in a lockable cabinet and is capable of accepting standard 19 inch rack-mount equipment. Preferred AC power is available at 120 Volts, 60 Hz. Means for grounding all equipment is available.
Adequate cooling is available for all supplied equipment.
Tennessee Valley Authority (TVA) owns and maintains an independent Siemens EMS RTUs at DAL/P with a dedicated serial communication link connected directly to TVA's dispatch. All JemStar metering data for the plant is collected by this RTU and transmitted offsite. This data is pulled off a different TVA RTU RS-232 serial connection, passed through a Moxa Nport media converter, and delivered as routable, real-time data for operators to view on the HMIs in the control room.
Data is also sent via dialup modem line to a computer in the ESS office.
1.2.2.2.2 Center Hill (CEN/P)
a. History and Context.
SECTION 01 11 00 Page 6
The Center Hill (CEN/P) project is owned and operated by the U.S. Army Corps of Engineers Nashville District. It is located approximately sixty-four (64) miles east of the Nashville District downtown offices on the mouth of the Caney Fork River. The project is remotely operated from COR/P, but has a full-time maintenance staff.
b. Plant Details.
CEN/P is a peaking plant with three generators, each with a nameplate capacity of 50 MVA and a backup house unit rated at 1000 KVA. All three generating units utilize Francis turbines. Generating units one and two feed station service and all three units operate regularly in synchronous condensing mode. None of the generating units operate in pumping mode. CEN/P uses a Basler DECS-200 digital exciter and an Allen Bradley digital governor on the house unit. There are no digital exciters or digital governors on the main units. All main units use the Basler-25A Automatic Synchronizer for start online sequence and the house unit utilizes the SEL 700G for start sequence.
c. Existing SCADA System.
CEN/P has a dedicated T1 connection to COR/P and a backup to COR/P .
Remote operations are achieved over the T1 by utilizing the existing Tetragenic SCADA system. In the event of an emergency, the plant can be operated manually from the bench boards in the control room at
CEN/P.
The existing RTU cabinets are located in the cable spreading room. The current system is capable of accepting standard 19 inch rack-mount equipment. Preferred AC power is available at 120 Volts, 60 Hz. Means for grounding all equipment is available. Adequate cooling is not available for all supplied equipment. All supplied equipment must be rated for harsh environments.
Tennessee Valley Authority (TVA) owns and maintains an independent Siemens EMS RTUs at CEN/P with a dedicated serial communication link connected directly to TVA's dispatch. All JemStar metering data for the plant is collected by this RTU and transmitted offsite. This data is pulled off a different TVA RTU RS-232 serial connection, passed through a Moxa Nport media converter, and delivered as routable, real-time data for operators to view on the HMIs in the control room.
Data is also sent via dialup modem line to a computer in the ESS office.
1.2.3 Group 3
1.2.3.1 Master Plant
1.2.3.1.1 Barkley (BAR/P)
a. History and Context.
The Barkley (BAR/P) project is owned and operated by the U.S. Army Corps of Engineers Nashville District. It is located approximately one hundred and fifteen (115) miles north-west of the Nashville District downtown offices on Cumberland River. BAR/P project is operated using the existing manual controls found at the bench boards within the control room.
SECTION 01 11 00 Page 7
b. Plant Details.
BAR/P is a peaking plant with three generators each with a nameplate capacity of 32.5 MW, one unit with the nameplate capacity of 42 MW, and a backup diesel generator. All units run with Kaplan turbines.
Unit 3 has a fixed blade propeller turbine, but the rest of the units have working variable pitch blades. Units two and three feed station service and all units are capable of operating in synchronous condensing mode. These units do not operate as pumping units. BAR/P does not have digital exciters or digital governors on any of their generating units; however, there are plans to install new digital exciters in the plant prior to the new SCADA system installation.
There is currently no auto-synchronizer installed at BAR/P.
c. Existing SCADA System.
There is an existing Tetragenics SCADA computer installed at BAR/P that is used to collect and send metering data. The new SCADA interfaces at Barkley will only require revenue metering and monitoring of the systems in the below paragraph.
Tennessee Valley Authority (TVA) owns and maintains an independent Siemens EMS RTUs at BAR/P with a dedicated serial communication link connected directly to TVA's dispatch. All JemStar metering data for the plant is collected by this RTU and transmitted offsite. This data is pulled off a different TVA RTU RS-232 serial connection, passed through a Moxa Nport media converter, and delivered as routable, real-time data for operators to view on the HMIs in the control room.
Data is also sent via dialup modem line to a computer in the ESS office.
1.2.3.1.2 Wolf Creek (WOL/P)
a. History and Context.
The Wolf Creek (WOL/P) project is owned and operated by the U.S. Army Corps of Engineers Nashville District. It is located approximately one hundred and sixty (160) miles north-east of the Nashville District downtown offices on the Cumberland River. The project is a master plant to LAU/P. The project includes a full time operations and daytime maintenance staff.
b. Plant Details.
WOL/P is a peaking plant with six generators each with a nameplate capacity of 50 MVA and a backup house unit rated at 1500 KVA. All six generating units utilize Francis turbines. Generating units four, five, and six and transformer banks two and three feed station service and all units operate regularly in synchronous condensing mode. None of the generating units operate in pumping mode. WOL/P uses a Basler DECS-200 digital exciter on the house unit. The main units do not have digital exciters or digital governors.
c. Existing SCADA System.
WOL/P has a dedicated T1 connection to LAU/P and a backup to LAU/P .
Remote operations are achieved over the T1 by utilizing the existing Tetragenic SCADA system. WOL/P is operated using manual controls within the control room.
SECTION 01 11 00 Page 8
Tennessee Valley Authority (TVA) owns and maintains an independent Siemens EMS RTUs at WOL/P with a dedicated serial communication link connected directly to TVA's dispatch. All JemStar metering data for the plant is collected by this RTU and transmitted offsite. This data is pulled off a different TVA RTU RS-232 serial connection, passed through a Moxa Nport media converter, and delivered as routable, real-time data for operators to view on the HMIs in the control room.
Data is also sent via dialup modem line to a computer in the ESS office.
1.2.3.2 Remote Plants
1.2.3.2.1 Laurel (LAU/P)
a. History and Context.
The Laurel (LAU/P) project is owned and operated by the U.S. Army Corps of Engineers Nashville District. It is located approximately two hundred and fifteen (215) miles north-east of the Nashville District downtown offices on Laurel River. The project is a remote plant that is operated from WOL/P. LAU/P project staff is minimal with day time maintenance.
b. Plant Details.
LAU/P is a peaking plant with a single generator that has a nameplate capacity of 61 MW and a backup diesel generator. This unit does not operate in pumping mode or synchronous condensing mode. LAU/P does not have a digital exciter or digital governor.
c. Existing SCADA System.
LAU/P has a dedicated T1 connection to WOL/P and a backup to WOL/P .
Remote operations are achieved over the T1 by utilizing the existing Tetragenic SCADA system.
The existing RTU cabinet is located on the generator floor. The current system is in a lockable cabinet and is capable of accepting standard 19 inch rack-mount equipment. Preferred AC power is available at 120 Volts, 60 Hz. Means for grounding all equipment is available.
Adequate cooling is available for all supplied equipment.
1.2.3.3 ESS Office
Electronics Service Section (ESS) is located at 15 Overlook Circle, Hendersonville TN 37075. The collection of revenue metering is collected on a computer at ESS from each master plant for all 9 plants. The information is sent from each plant via a 56k modem with verification of each SCADA master. The information is consolidated and verified by ESS personnel and transferred from the collection computer to SEPA thru an external hard drive and sent thru email.
1.3 PRINCIPAL COMPONENTS OF WORK
The scope of work defined in this section shall not be considered all inclusive.
SECTION 01 11 00 Page 9
1.3.1 Design
1.3.1.1 General
a. Design a complete new SCADA system for the Nashville District Hydropower plants identified in paragraph 1. 2 of this section.
b. The new SCADA system shall at a minimum have the same capabilities as the current system. Refer to the appendices for more information on the capabilities of the current system.
c. The design shall include, but is not limited to, installation/removal drawings, equipment configuration, RTU cabinet and panel layout and fabrication, programming, HMI development, supporting documentation, and training sessions.
d. The system shall be expandable to include additional control and indication points without major equipment or software modifications.
e. Perform a Factory Acceptance Test with government personnel prior to shipment of SCADA equipment.
f. The system shall be designed in accordance with all Army and DoD standards. The contractor shall provide all documentation required to obtain an Authority to Operate (ATO) for the new SCADA system.
g. Design a SCADA simulator for training and maintenance purposes.
h. Existing primary and backup interplant communications shall be reused.
i. The design shall include revenue data collection for the ESS office.
This will be installed before any other plant systems.
j. The design shall include connections to the existing SEL protective relays for monitoring purposes only. The new SCADA system shall not allow any control actions on the protective relays.
1) Not all of the plants have completed their SEL protective relay upgrades. At these plants, program the new SCADA system to be able to communicate with SEL protective relays similar to the other plants which have completed SEL protective relay upgrades.
2) Support similar communication interfaces, protocols, database points, HMI screens, and any other hardware or software such that future connections to SEL protective relays can be streamlined.
1.3.1.2 New SCADA System Functionality
a. The new SCADA system shall support the following high-level functions, which are explained in more detail throughout the specification and in the appendices:
1) System overview and screen navigation.
2) Time synchronization, time and date display, and timestamping.
3) System and device status monitoring, including communications, databases, hot/standby controller and/or master station information, and diagnostics.
SECTION 01 11 00 Page 10
4) Alarming, event logging, system logging, and historical trending.
5) Indication and report generation for revenue metering.
6) Powerhouse, turbine, generator, transformer, switchyard, and station service controls, indication, and alarming.
7) Non-proprietary TCP/IP and serial SCADA protocols, including but not limited to Modbus TCP/IP, Modbus RTU, RS-232, RS-485, SFTP, and DNP 3.0.
1.3.2 Supply
a. Supply all equipment and materials needed to install the new SCADA system.
b. Supply all software and licenses needed for the operation and maintenance of the system.
c. Supply a SCADA Simulator.
d. Supply spare parts.
e. Supply system documentation, including but not limited to: drawings, commented software, operation and maintenance manuals, and training materials.
1.3.3 Installation
a. Provide on-site support for the installation of the SCADA system. LRN plant personnel will be installing all equipment.
b. The new SCADA system will be installed in parallel with the existing SCADA system. Both systems shall operate in parallel until commissioning on the new SCADA is complete. The cutover to the new SCADA system will be accomplished on a plant by plant basis and not based on completion of the entire LRN SCADA system.
1.3.4 Technical Support
a. Provide training on the completed system.
b. Provide a modern and complete hardware/software SCADA platform which will be supported for the next 15 years. The SCADA platform should not have any components with end-of-life or end-of-manufacture dates in this 15-year time period. Additional support shall include:
1) Firmware updates and security patching on all equipment provided under this contract.
2) After system installation is complete in all plants, provide technical phone support 6am - 8pm CST for the first 90 days.
After 90 days, as needed during normal business hours. Technical support shall be capable of answering LRN-SCADA specific questions.
1.4 WARRANTY
a. The Contractor warranties that work performed under this contract
SECTION 01 11 00 Page 11 conforms to the contract requirements and is free of any defect in equipment, material, or design furnished.
b. The contractor shall guarantee replacement of any faulty components provided in this contract for a period of one year after the government takes possession.
c. There shall be no cost for warranty service or customer support, including answering LRN-SCADA system-specific questions, during the warranty period.
d. Any component failing to perform its function as specified and documented shall be repaired or replaced by the contractor at no additional cost to the Government. Items repaired or replaced shall be warrantied for an additional period of at least one year from the date that it becomes functional again.
e. The contractor shall provide manufacturer warranty information for equipment and materials supplied under this contract that extend beyond the contract warranty period.
1.5 DEFINITIONS
When the specifications use a word or term defined in the Federal Acquisition Regulations (FAR), the word or term has the same meaning as the definition in FAR 2.101 in effect at the time the solicitation is issued, unless the specifications provide a different definition.
1.6 VETERANS EMPLOYMENT EMPHASIS FOR U.S. ARMY CORPS OF ENGINEERS CONTRACTS
In addition to complying with the requirements outlined in FAR Part 22.13, FAR Clause 52.222-35, FAR Clause 52.222-37, DFARS 222.13 and Department of Labor regulations, U.S. Army Corps of Engineers (USACE) contractors and subcontractors at all tiers are encouraged to promote the training and employment of U.S. veterans while performing under a USACE contract. While no set-aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant contract, USACE contractors are encouraged to seek out highly qualified veterans to perform services under this contract.
The following resources are available to assist USACE contractors in their outreach efforts:
a. U.S. Department of Labor Veterans employment: www.vets.gov/
b. Federal veteran employment information: www.fedshirevets.gov/index.aspx
c. Veterans’ Employment and Training Service (VETS):
http://www.dol.gov/vets/
d. Veterans Opportunity to Work (VOW) Program: http://benefits.va.gov/vow/
e. U.S. Army Warrior Transition Command Employment Index:
http://www.wct.army.mil/modules/employers/index.html
f. Hiring Our Heroes initiative:
www.uschamberfoundation.org/hiring-our-heroes
SECTION 01 11 00 Page 12
1.7 SUSTAINABILITY REQUIREMENTS
All computers and computer-related equipment supplied by the Contractor must be energy efficient. Use the following link for DOE Covered Product Categories:
http://energy.gov/eere/femp/find-product-categories-covered-efficiency-programs
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --
SECTION 01 11 00 Page 13
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 11 11
DRAWINGS
PART 1 GENERAL
1.1 DISCREPANCIES, ERRORS, OMISSIONS
1.2 PROJECT CONDITIONS
1.3 INFORMATIONAL DRAWINGS
PART 2 PRODUCTS
PART 3 EXECUTION
SECTION 01 11 11 Page 1
SECTION 01 11 11
DRAWINGS
PART 1 GENERAL
1.1 DISCREPANCIES, ERRORS, OMISSIONS
a. Inform the Contracting Officer of any discrepancies, errors, or omissions discovered on drawings.
b. In case of discrepancies, specifications take precedence over drawings unless otherwise specified.
1.2 PROJECT CONDITIONS
Where there are minor differences as determined by the Contracting Officer between details and dimensions shown on drawings and details and dimensions of existing features at jobsite, use details and dimensions of existing features at jobsite.
1.3 INFORMATIONAL DRAWINGS
a. Drawings in Appendix D are marked "for information only" and are included to show some feature about which additional knowledge is required for offers.
b. If there are differences as determined by the Contracting Officer between details and dimensions shown on these drawings and those of existing features at jobsite, use details and dimensions of existing features at jobsite.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
SECTION 01 11 11 Page 2
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 22 00
PRICE AND PAYMENT PROCEDURES
PART 1 GENERAL
1.1 SUBMITTALS
1.2 PAYMENT ITEMS
1.2.1 ITEM 0001 J. Percy Priest Shop Drawings
1.2.1.1 Payment
1.2.1.2 Unit of Measure
1.2.2 ITEM 0002 J. Percy Priest Equipment & Software
1.2.2.1 Payment
1.2.2.2 Unit of Measure
1.2.3 ITEM 0003 J. Percy Priest Test Reports
1.2.3.1 Payment
1.2.3.2 Unit of Measure
1.2.4 ITEM 0004 J. Percy Priest Closeout Documents
1.2.4.1 Payment
1.2.4.2 Unit of Measure
1.2.5 ITEM 0005 J. Percy Priest Operation & Maintenance Data
1.2.5.1 Payment
1.2.5.2 Unit of Measure
1.2.6 ITEM 0006 Cheatham Shop Drawings
1.2.6.1 Payment
1.2.6.2 Unit of Measure
1.2.7 ITEM 0007 Cheatham Equipment & Software
1.2.7.1 Payment
1.2.7.2 Unit of Measure
1.2.8 ITEM 0008 Cheatham Test Reports
1.2.8.1 Payment
1.2.8.2 Unit of Measure
1.2.9 ITEM 0009 Cheatham Closeout Documents
1.2.9.1 Payment
1.2.9.2 Unit of Measure
1.2.10 ITEM 0010 Cheatham Operation & Maintenance Data
1.2.10.1 Payment
1.2.10.2 Unit of Measure
1.2.11 ITEM 0011 Old Hickory Shop Drawings
1.2.11.1 Payment
1.2.11.2 Unit of Measure
1.2.12 ITEM 0012 Old Hickory Equipment & Software
1.2.12.1 Payment
1.2.12.2 Unit of Measure
1.2.13 ITEM 0013 Old Hickory Test Reports
1.2.13.1 Payment
1.2.13.2 Unit of Measure
1.2.14 ITEM 0014 Old Hickory Closeout Documents
1.2.14.1 Payment
1.2.14.2 Unit of Measure
SECTION 01 22 00 Page 1
1.2.15 ITEM 0015 Old Hickory Operation & Maintenance Data
1.2.15.1 Payment
1.2.15.2 Unit of Measure
1.2.16 ITEM 0016 Old Hickory Training
1.2.16.1 Payment
1.2.16.2 Unit of Measure
1.2.17 ITEM 0017 Center Hill Shop Drawings
1.2.17.1 Payment
1.2.17.2 Unit of Measure
1.2.18 ITEM 0018 Center Hill Equipment & Software
1.2.18.1 Payment
1.2.18.2 Unit of Measure
1.2.19 ITEM 0019 Center Hill Test Reports
1.2.19.1 Payment
1.2.19.2 Unit of Measure
1.2.20 ITEM 0020 Center Hill Closeout Documents
1.2.20.1 Payment
1.2.20.2 Unit of Measure
1.2.21 ITEM 0021 Center Hill Operation & Maintenance Data
1.2.21.1 Payment
1.2.21.2 Unit of Measure
1.2.22 ITEM 0022 Dale Hollow Shop Drawings
1.2.22.1 Payment
1.2.22.2 Unit of Measure
1.2.23 Item 0023 Dale Hollow Equipment & Software
1.2.23.1 Payment
1.2.23.2 Unit of Measure
1.2.24 Item 0024 Dale Hollow Test Reports
1.2.24.1 Payment
1.2.24.2 Unit of Measure
1.2.25 ITEM 0025 Dale Hollow Closeout Documents
1.2.25.1 Payment
1.2.25.2 Unit of Measure
1.2.26 ITEM 0026 Dale Hollow Operation & Maintenance Data
1.2.26.1 Payment
1.2.26.2 Unit of Measure
1.2.27 ITEM 0027 Cordell Hull Shop Drawings
1.2.27.1 Payment
1.2.27.2 Unit of Measure
1.2.28 ITEM 0028 Cordell Hull Equipment & Software
1.2.28.1 Payment
1.2.28.2 Unit of Meaure
1.2.29 ITEM 0029 Cordell Hull Test Reports
1.2.29.1 Payment
1.2.29.2 Unit of Measure
1.2.30 ITEM 0030 Cordell Hull Closeout Documents
1.2.30.1 Payment
1.2.30.2 Unit of Measure
1.2.31 ITEM 0031 Cordell Hull Operation & Maintenance Data
1.2.31.1 Payments
1.2.31.2 Unit of Measure
1.2.32 ITEM 0032 Cordell Hull Training
1.2.32.1 Payment
1.2.32.2 Unit of Measure
1.2.33 ITEM 0033 Laurel Shop Drawings
1.2.33.1 Payment
1.2.33.2 Unit of Measure
1.2.34 ITEM 0034 Laurel Equipment & Software
1.2.34.1 Payment
SECTION 01 22 00 Page 2
1.2.34.2 Unit of Measure
1.2.35 ITEM 0035 Laurel Test Reports
1.2.35.1 Payment
1.2.35.2 Unit of Measure
1.2.36 ITEM 0036 Laurel Closeout Documents
1.2.36.1 Payment
1.2.36.2 Unit of Measure
1.2.37 ITEM 0037 Laurel Operation & Maintenance Data
1.2.37.1 Payment
1.2.37.2 Unit of Measure
1.2.38 ITEM 0038 Wolf Creek Shop Drawings
1.2.38.1 Payment
1.2.38.2 Unit of Measure
1.2.39 ITEM 0039 Wolf Creek Equipment & Software
1.2.39.1 Payment
1.2.39.2 Unit of Measure
1.2.40 ITEM 0040 Wolf Creek Test Reports
1.2.40.1 Payment
1.2.40.2 Unit of Measure
1.2.41 ITEM 0041 Wolf Creek Closeout Documents
1.2.41.1 Payment
1.2.41.2 Unit of Measure
1.2.42 ITEM 0042 Wolf Creek Operation & Maintenance Data
1.2.42.1 Payment
1.2.42.2 Unit of Measure
1.2.43 ITEM 0043 Wolf Creek Training
1.2.43.1 Payment
1.2.43.2 Unit of Measure
1.2.44 ITEM 0044 Barkley Shop Drawings
1.2.44.1 Payment
1.2.44.2 Unit of Measure
1.2.45 ITEM 0045 Barkley Equipment & Software
1.2.45.1 Payment
1.2.45.2 Unit of Measure
1.2.46 ITEM 0046 Barkley Test Reports
1.2.46.1 Payment
1.2.46.2 Unit of Measure
1.2.47 ITEM 0047 Barkley Closeout Documents
1.2.47.1 Payment
1.2.47.2 Unit of Measure
1.2.48 ITEM 0048 Barkley Operation & Maintenance Data
1.2.48.1 Payment
1.2.48.2 Unit of Measure
1.2.49 ITEM 0049 Electronics Service Section Simulator
1.2.49.1 Payment
1.2.49.2 Unit of Measure
PART 2 PRODUCTS
PART 3 EXECUTION
3.1 CONTRACT COST BREAKDOWN
3.2 PROJECT SCHEDULE
3.2.1 Preliminary Project Schedule Submission
3.2.2 Initial Project Schedule Submission
3.2.3 Periodic Schedule Updates
3.2.4 Narrative Report
SECTION 01 22 00 Page 3
SECTION 01 22 00 Page 4
SECTION 01 22 00
PRICE AND PAYMENT PROCEDURES
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Pre-Work Submittals
Preliminary Project Schedule; G Initial Project Schedule; G Periodic Schedule Updates; G Narrative Report
1.2 PAYMENT ITEMS
Payment items for the work of this contract are listed in the BIDDING SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job or unit price payment item, are included in the listed payment item most closely associated with the work involved. The payment made for each item listed constitutes full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.
1.2.1 ITEM 0001 J. Percy Priest Shop Drawings
1.2.1.1 Payment
Payment will be made for Item 0001 at the contract price per Job. This price includes full compensation for furnishing all materials, equipment, and labor to satifactorily provide all Shop Drawings, Product Data, and Design Data as required in the following Sections: 01 35 70
CYBERSECURITY, 27 51 20 COMMUNICATION SYSTEM, 40 94 51 SYSTEM HARDWARE,
40 94 53 MASTER STATION BASIC SOFTWARE, 40 94 54 HUMAN MACHINE INTERFACE,
40 94 55 PROJECT APPLICATION SOFTWARE, 40 94 60 RTU, and 40 94 61 RTU
SOFTWARE.
1.2.1.2 Unit of Measure
Unit of measure: JOB.
SECTION 01 22 00 Page 5
1.2.2 ITEM 0002 J. Percy Priest Equipment & Software
1.2.2.1 Payment
Payment will be made for Item 0002 at the contract price per Job. This price includes full compensation for furnishing all materials, equipment, and labor to satisfactorily provide all equipment and software as required in the Systemwide SCADA Upgrade specifications.
1.2.2.2 Unit of Measure
Unit of measure: JOB.
1.2.3 ITEM 0003 J. Percy Priest Test Reports
1.2.3.1 Payment
Payment will be made for Item 0003 at the contract price per Job. This price includes full compensation for furnishing all materials, equipment, and labor to satisfactorily provide all Test Reports as required in Section 01 75 10 TESTING, INSTALLATION PERSONNEL AND ACCEPTANCE.
1.2.3.2 Unit of Measure
Unit of measure: JOB.
1.2.4 ITEM 0004 J. Percy Priest Closeout Documents
1.2.4.1 Payment
Payment will be made for Item 0004 at the contract price per Job. This price includes full compensation for furnishing all materials, equipment, and labor to satisfactorily provide all the closeout documents as required in the following Sections: 27 51 20 COMMUNICATION SYSTEM, 40 94 51 SYSTEM
HARDWARE, 40 94 53 MASTER STATION BASIC SOFTWARE, 40 94 54 HUMAN MACHINE
INTERFACE, 40 94 55 PROJECT APPLICATION SOFTWARE, 40 94 60 RTU, and
40 94 61RTU SOFTWARE.
1.2.4.2 Unit of Measure
Unit of measure: JOB.
1.2.5 ITEM 0005 J. Percy Priest Operation & Maintenance Data
1.2.5.1 Payment
Payment will be made for Item 0005 at the contract price per Job. This price includes full compensation for furnishing all materials, equipment, and labor to satisfactorily provide all operation and maintenance data as specified in the following Sections: 27 51 20 COMMUNICATION SYSTEM, 40 94 51SYSTEM HARDWARE, 40 94 53 MASTER STATION BASIC SOFTWARE, 40 94 54
HUMAN MACHINE INTERFACE, 40 94 55 PROJECT APPLICATION SOFTWARE, 40 94 60
RTU, and 40 94 61 RTU SOFTWARE.
1.2.5.2 Unit of Measure
SECTION 01 22 00 Page 6
1.2.6 ITEM 0006 Cheatham Shop Drawings
1.2.6.1 Payment
Payment will be made for Item 0006 at the contract price per Job. This price includes full compensation for furnishing all materials, equipment, and labor to satifactorily provide all Shop Drawings, Product Data, and Design Data as required in the following Sections: 01 35 70
CYBERSECURITY, 27 51 20 COMMUNICATION SYSTEM, 40 94 51 SYSTEM HARDWARE,
40 94 53 MASTER STATION BASIC SOFTWARE, 40 94 54 HUMAN MACHINE INTERFACE,
40 94 55 PROJECT APPLICATION SOFTWARE, 40 94 60 RTU, and 40 94 61 RTU
SOFTWARE.
1.2.6.2 Unit of Measure
Unit of measure: JOB.
1.2.7 ITEM 0007 Cheatham Equipment & Software
1.2.7.1 Payment
Payment will be made for Item 0007 at the contract price per Job. This price includes full compensation for furnishing all materials, equipment, and labor to satisfactorily provide all equipment and software as required in the Systemwide SCADA Upgrade specifications.
1.2.7.2 Unit of Measure
Unit of measure: JOB.
1.2.8 ITEM 0008 Cheatham Test Reports
1.2.8.1 Payment
Payment will be made for Item 0008 at the contract price per Job. This price includes full compensation for furnishing all materials, equipment, and labor to satisfactorily provide all Test Reports as required in Section 01 75 10 TESTING, INSTALLATION PERSONNEL AND ACCEPTANCE.
1.2.8.2 Unit of Measure
Unit of measure: JOB.
1.2.9 ITEM 0009 Cheatham Closeout Documents
1.2.9.1 Payment
Payment will be made for Item 0009 at the contract price per Job. This price includes full compensation for furnishing all materials, equipment, and labor to satisfactorily provide all the closeout documents as required in the following Sections: 27 51 20 COMMUNICATION SYSTEM, 40 94 51 SYSTEM
HARDWARE, 40 94 53 MASTER STATION BASIC SOFTWARE, 40 94 54 HUMAN MACHINE
INTERFACE, 40 94 55 PROJECT APPLICATION SOFTWARE, 40 94 60 RTU, and
40 94 61RTU SOFTWARE.
1.2.9.2 Unit of Measure
SECTION 01 22 00 Page 7
1.2.10 ITEM 0010 Cheatham Operation & Maintenance Data
1.2.10.1 Payment
Payment will be made for Item 0010 at the contract price per Job. This price includes full compensation for furnishing all materials, equipment, and labor to satisfactorily provide all operation and maintenance data as specified in the following Sections: 27 51 20 COMMUNICATION SYSTEM, 40 94 51SYSTEM HARDWARE, 40 94 53 MASTER STATION BASIC SOFTWARE, 40 94 54
HUMAN MACHINE INTERFACE, 40 94 55 PROJECT APPLICATION SOFTWARE, 40 94 60
RTU, and 40 94 61 RTU SOFTWARE.
1.2.10.2 Unit of Measure
Unit of measure: JOB.
1.2.11 ITEM 0011 Old Hickory Shop Drawings
1.2.11.1 Payment
Payment will be made for Item 0011 at the contract price per Job. This price includes full compensation for furnishing all materials, equipment, and labor to satifactorily provide all Shop Drawings, Product Data, and Design Data as required in the following Sections: 01 35 70
CYBERSECURITY, 27 51 20 COMMUNICATION SYSTEM, 40 94 51 SYSTEM HARDWARE,
40 94 53 MASTER STATION BASIC SOFTWARE, 40 94 54 HUMAN MACHINE INTERFACE,
40 94 55 PROJECT APPLICATION SOFTWARE, 40 94 60 RTU, and 40 94 61 RTU
SOFTWARE.
1.2.11.2 Unit of Measure
Unit of measure: JOB.
1.2.12 ITEM 0012 Old Hickory Equipment & Software
1.2.12.1 Payment
Payment will be made for Item 0012 at the contract price per Job. This price includes full compensation for furnishing all materials, equipment, and labor to satisfactorily provide all equipment and software as required in the Systemwide SCADA Upgrade specifications.
1.2.12.2 Unit of Measure
Unit of measure: JOB.
1.2.13 ITEM 0013 Old Hickory Test Reports
1.2.13.1 Payment
Payment will be made for Item 0013 at the contract price per Job. This price includes full compensation for furnishing all materials, equipment, and labor to satisfactorily provide all Test Reports as required in Section 01 75 10 TESTING, INSTALLATION PERSONNEL AND ACCEPTANCE.
1.2.13.2 Unit of Measure
SECTION 01 22 00 Page 8
1.2.14 ITEM 0014 Old Hickory Closeout Documents
1.2.14.1 Payment
Payment will be made for Item 0014 at the contract price per Job. This price includes full compensation for furnishing all materials, equipment, and labor to satisfactorily provide all the closeout documents as required in the following Sections: 27 51 20 COMMUNICATION SYSTEM, 40 94 51 SYSTEM
HARDWARE, 40 94 53 MASTER STATION BASIC SOFTWARE, 40 94 54 HUMAN MACHINE
INTERFACE, 40 94 55 PROJECT APPLICATION SOFTWARE, 40 94 60 RTU, and
40 94 61RTU SOFTWARE.
1.2.14.2 Unit of Measure
Unit of measure: JOB.
1.2.15 ITEM 0015 Old Hickory Operation & Maintenance Data
1.2.15.1 Payment
Payment will be made for Item 0015 at the contract price per Job. This price includes full compensation for furnishing all materials, equipment, and labor to satisfactorily provide all operation and maintenance data as specified in the following Sections: 27 51 20 COMMUNICATION SYSTEM, 40 94 51SYSTEM HARDWARE, 40 94 53 MASTER STATION BASIC SOFTWARE, 40 94 54
HUMAN MACHINE INTERFACE, 40 94 55 PROJECT APPLICATION SOFTWARE, 40 94 60
RTU, and 40 94 61 RTU SOFTWARE.
1.2.15.2 Unit of Measure
Unit of measure: JOB.
1.2.16 ITEM 0016 Old Hickory Training
1.2.16.1 Payment
Payment will be made for Item 0016 at the contract price per Job. This price includes full compensation for furnishing all materials, equipment, and labor to satisfactorily provide training as specified in Section
01 79 20 TRAINING.
1.2.16.2 Unit of Measure
Unit of measure: JOB.
1.2.17 ITEM 0017 Center Hill Shop Drawings
1.2.17.1 Payment
Payment will be made for Item 0017 at the contract price per Job. This price includes full compensation for furnishing all materials, equipment, and labor to satifactorily provide all Shop Drawings, Product Data, and Design Data as required in the following Sections: 01 35 70
CYBERSECURITY, 27 51 20 COMMUNICATION SYSTEM, 40 94 51 SYSTEM HARDWARE,
40 94 53 MASTER STATION BASIC SOFTWARE, 40 94 54 HUMAN MACHINE INTERFACE,
40 94 55 PROJECT APPLICATION SOFTWARE, 40 94 60 RTU, and 40 94 61 RTU
SOFTWARE.
SECTION 01 22 00 Page 9
1.2.17.2 Unit of Measure
Unit of measure: JOB.
1.2.18 ITEM 0018 Center Hill Equipment & Software
1.2.18.1 Payment
Payment will be made for Item 0018 at the contract price per Job. This price includes full compensation for furnishing all materials, equipment, and labor to satisfactorily provide all equipment and software as required in the Systemwide SCADA Upgrade specifications.
1.2.18.2 Unit of Measure
Unit of measure: JOB.
1.2.19 ITEM 0019 Center Hill Test Reports
1.2.19.1 Payment
Payment will be made for Item 0019 at the contract price per Job. This price includes full compensation for furnishing all materials, equipment, and labor to satisfactorily provide all Test Reports as required in Section 01 75 10 TESTING, INSTALLATION PERSONNEL AND ACCEPTANCE.
1.2.19.2 Unit of Measure
Unit of measure: JOB.
1.2.20 ITEM 0020 Center Hill Closeout Documents
1.2.20.1 Payment
Payment will be made for Item 0020 at the contract price per Job. This price includes full compensation for furnishing all materials, equipment, and labor to satisfactorily provide all the closeout documents as required in the following Sections: 27 51 20 COMMUNICATION SYSTEM, 40 94 51 SYSTEM
HARDWARE, 40 94 53 MASTER STATION BASIC SOFTWARE, 40 94 54 HUMAN MACHINE
INTERFACE, 40 94 55 PROJECT APPLICATION SOFTWARE, 40 94 60 RTU, and
40 94 61RTU SOFTWARE.
1.2.20.2 Unit of Measure
Unit of measure: JOB.
1.2.21 ITEM 0021 Center Hill Operation & Maintenance Data
1.2.21.1 Payment
Payment will be made for Item 21 at the contract price per Job. This price includes full compensation for furnishing all materials, equipment, and labor to satisfactorily provide all operation and maintenance data as specified in the following Sections: 27 51 20 COMMUNICATION SYSTEM, 40 94 51SYSTEM HARDWARE, 40 94 53 MASTER STATION BASIC SOFTWARE, 40 94 54
HUMAN MACHINE INTERFACE, 40 94 55 PROJECT APPLICATION SOFTWARE, 40 94 60
RTU, and 40 94 61 RTU SOFTWARE.
SECTION 01 22 00 Page 10
1.2.21.2 Unit of Measure
Unit of measure: JOB.
1.2.22 ITEM 0022 Dale Hollow Shop Drawings
1.2.22.1 Payment
Payment will be made for Item 0022 at the contract price per Job. This price includes full compensation for furnishing all materials, equipment, and labor to satifactorily provide all Shop Drawings, Product Data, and Design Data as required in the following Sections: 01 35 70
CYBERSECURITY, 27 51 20 COMMUNICATION SYSTEM, 40 94 51 SYSTEM HARDWARE,
40 94 53 MASTER STATION BASIC SOFTWARE, 40 94 54 HUMAN MACHINE INTERFACE,
40 94 55 PROJECT APPLICATION SOFTWARE, 40 94 60 RTU, and 40 94 61 RTU
SOFTWARE.
1.2.22.2 Unit of Measure
Unit of measure: JOB.
1.2.23 Item 0023 Dale Hollow Equipment & Software
1.2.23.1 Payment
Payment will be made for Item 0023 at the contract price per Job. This price includes full compensation for furnishing all materials, equipment, and labor to satisfactorily provide all equipment and software as required in the Systemwide SCADA Upgrade specifications.
1.2.23.2 Unit of Measure
Unit of Measure: JOB.
1.2.24 Item 0024 Dale Hollow Test Reports
1.2.24.1 Payment
Payment will be made for Item 0024 at the contract price per Job. This price includes full compensation for furnishing all materials, equipment, and labor to satisfactorily provide all Test Reports as required in Section 01 75 10 TESTING, INSTALLATION PERSONNEL AND ACCEPTANCE.
1.2.24.2 Unit of Measure
Unit of measure: JOB.
1.2.25 ITEM 0025 Dale Hollow Closeout Documents
1.2.25.1 Payment
Payment will be made for Item 0030 at the contract price per Job. This price includes full compensation for furnishing all materials, equipment, and labor to satisfactorily provide all the closeout documents as required in the following Sections: 27 51 20 COMMUNICATION SYSTEM, 40 94 51 SYSTEM
HARDWARE, 40 94 53 MASTER STATION BASIC SOFTWARE, 40 94 54 HUMAN MACHINE
INTERFACE, 40 94 55 PROJECT APPLICATION SOFTWARE, 40 94 60 RTU, and
40 94 61RTU SOFTWARE.
SECTION 01 22 00…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.