W912P518B0010_TPlans_AMD01_Part3.pdf

PDF 35 MB Posted

Attached to
Center Hill Dam Site Restoration Project
Solicitation number
W912P518B0010
Issued by

About this file

Technical Plans Part 3

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BLDG1

Default

N 642526.07

E 2018488.03

Elev 0.00

BLDG2

Default

N 642551.80

E 2018518.75

Elev 0.00

BLDG3

Default

N 642475.26

E 2018583.00

Elev 0.00

BLDG4

Default

N 642449.52

E 2018552.38

Elev 0.00

0+00

1+00

2+00

3+00

4+00

5+00

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

D A

T E

A P

P R

®of Engineers

US Army Corps

ID

Sheet of Engineers

US Army Corps

AMENDMENT

0 0

Q

-C

H S

R

C G -1

.d g n

N

120'0 60'

SCALE:1"=60'

H W

Y

H W

Y

N A

S H

V

IL

L E D

IS

T R

IC

T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

0+00

1+00

2+00

3+00

4+00

5+00

F O

O T P

R

IN

T

N E

W C

O R

P S B

U

IL

D

IN

G N

A S

H V

IL

L E T

E N

N E

S S

E E

A N

S I

D

C U

M B

E R

L A

N D R

IV

E R W

A T

E R

S H

E D

W P

B

N A

S H

V

IL

L E D

IS

T R

IC

T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

F C

M

/2

/2

F C

M

G R

O

IN

R

E P

A

IR

/2

/2

F C

M

F C

M

S

IT

E R

E S

T O

R A

T

IO

N

C E

N T

E R H

IL

L D

A M

G R

O

IN

A

N D

CG-106

N A

S H

V

IL

L E T

N

TO BE CONSTRUCTED IN MAY 2018

NEW CORPS STORAGE BUILDING

LANCASTER ROAD

APPROX. 23 FT. FROM EXISTING FENCE

FENCE WILL NOT BE PERMITTED

TEMPORARY REMOVAL OF EXISTING

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

D A

T E

A P

P R

®of Engineers

US Army Corps

ID

Sheet of Engineers

US Army Corps

AMENDMENT

N A

S H

V

IL

L E T

E N

N E

S S

E E

C U

M B

E R

L A

N D R

IV

E R W

A T

E R

S H

E D

N A

S H

V

IL

L E D

IS

T R

IC

T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

M

/2

/2

M

/2

/2

F C

M

F C

M

S

IT

E R

E S

T O

R A

T

IO

N

C E

N T

E R H

IL

L D

A M

N

A N

D D

E M

O L

IT

IO

N P

L A

N

S

IT

E

U N

W A

T E

R

IN

G

CE-100

UPON CONSTRUCTION COMPLETION

WOODEN GUARDRAIL TO BE REPLACED

CONTROL LINE

CONCRETE LINED CHANNEL OUTLINE

(GREATER THAN 3 FEET DEEP)

DIVERSION POND

CONCRETE LINED POTENTIAL

G R

A V

E L A

C C

E S S R

O A

D

LIMITS

EXCAVATION

APPROXIMATE

WATER VALVES

1+00

2+00

3+00

3+64 3+64

N A

S H

V

IL

L E D

IS

T R

IC

T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

PONDS HAVE BEEN FILLED IN

EXISTING CMPs TO BE REMOVED

CONSTRUCTION SEWER LINE

APPROXIMATE LOCATION OF NEWLY

CHAIN LINK FENCE TO BE REMOVED

(FIELD VERIFY)

NEW SEWER LINE

APPROX. LOCATION OF

(FIELD VERIFY)

NEW SEWER LINE

APPROX. LOCATION OF

N A

S H

V

IL

L E T

N

TO BE REMOVED

EXISTING SCREW GATES

SCALE:1"= 30'

30' 60'0

DEMOLITION LIMITS

APPROX. ASPHALT

A N

S I

D Q

-C

H S

R

C E -1

.d g n

H

IG

H W

A Y

C

U L

V E

R T R

E P

L A

C E

M E

N T

COMPLETION

DIMENSIONS UPON CONSTRUCTION

WITH MATCHING MATERIALS AND

WOODEN FENCE TO BE REPLACED

OVERHEAD LINES

LEFT IN PLACE

D.S. INVERT EL. 503.9

U.S. INVERT EL. 505.8

3.8 X 5 FOOT ELLIPTICAL CULVERT

SEWER LINE IS BURIED APPROXIMATELY 24 INCHES UNDER THE EARTH'S SURFACE.

THROUGHOUT THE DURATION OF THE TIME THE LINE IS TAKEN OUT OF SERVICE. THE NEW

WILL BE RESPONSIBLE FOR ANY REQUIRED PUMPING AND DISPOSAL OF SEWAGE

A TEMPORARY SHUT-OFF OF THE SEWER LINE WILL BE APPROVED AND THE CONTRACTOR

DETERMINED THAT KEEPING THE LINE IN SERVICE DURING CONSTRUCTION IS TOO DIFFICULT, PLAN FOR PROTECTING THE SEWER LINE IN PLACE DURING CONSTRUCTION. IF IT IS

SHALL REMAIN IN SERVICE THROUGHOUT CONSTRUCTION DURATION. SUBMIT PROPOSED

NEWLY CONSTRUCTED SEWER LINE (APPROXIMATE LOCATION NOTED ON THIS SHEET) 8.

SHALL BE FULLY RESTORED PRIOR TO FINAL ACCEPTANCE.

COORDINATE WITH UTILITY OWNER FOR SHUTOFF AND REQUIRED RELOCATIONS. UTILITIES

WEEKS PRIOR TO ANTICIPATED SHUTOFF NEED. FOR UTILITIES NOT CONTROLLED BY USACE,

INSIDE THE CAMPGROUND, COORDINATE WITH COR FOR UTILITY SHUTOFF NO LESS THAN TWO

LOCATED INSIDE THE CAMPGROUND ARE CONTROLLED BY USACE. FOR UTILITIES LOCATED

VERIFY THE LOCATION OF ALL UTILITIES PRIOR TO BEGINNING CONSTRUCTION, UTILITIES 7.

PROPOSED EXCAVATION PLAN FOR APPROVAL PRIOR TO CONSTRUCTION.

STAMPED BY A GEOTECHNICAL ENGINEER LICENSED IN THE STATE OF TENNESSEE. SUBMIT

OF THE PRESCRIBED CONSTRAINTS DICTATED BY EM-385-1-1, THE EXCAVATION PLAN MUST BE

EM385-1-1. IF THE CONTRACTOR ELECTS TO PROPOSE AN EXCAVATION THAT FALLS OUTSIDE

TRENCH EXCAVATION SHALL BE IN ACCORDANCE WITH THE LATEST VERSION OF 6.

PRACTICES TO PROTECT EXISTING STRUCTURES AND MINIMIZE IMPACT TO THE SITE.

THEIR ORIGINAL CONDITION PRIOR TO FINAL ACCEPTANCE. USE BEST MANAGEMENT

STRUCTURES THAT ARE IMPACTED BY CONSTRUCTION EFFORTS SHALL BE RETURNED TO

UNLESS OTHERWISE NOTED IN THE PLANS OR SPECIFICATIONS, ANY EXISTING 5.

OUTFLOWS WILL BE FILTERED AND HOW OUTFLOW SITES SHALL BE PROTECTED FROM SCOUR.

NOT TO CAUSE ANY SCOURING OF EXISTING CHANNELS. PUMPING PLANS SHALL DETAIL HOW

DISCHARGE SHALL BE FILTERED AND OUTFLOW SHALL BE PROTECTED IN A METHOD SO AS

IF CONTRACTOR ELECTS TO USE PUMPING AS A METHOD OF DETWATERING, PUMP 4.

EXCAVATED PIPE TRENCH.

FLOWS OF UP TO 50 CUBIC FEET PER SECOND WHILE MAINTAINING DRY CONDITIONS IN THE

PROPOSED DE/UNWATERING PLAN. UNWATERING PLAN SHOULD BE PREPARED TO HANDLE

ARE INEFFECTIVE, SANDBAGGING OR OTHER APPROVED METHODS MAY BE USED. SUBMIT

WILL FACILITATE WATER DIVERSION AND RETENTION EFFORTS. IF EXISTING SCREW GATES

EXISTING NETWORKS OF SCREW GATES IN VICINITY OF THE UPSTREAM CULVERT INLET 3.

APPROVAL PRIOR TO CONSTRUCTION.

STOCKPILES ARE PROTECTED FROM LOCAL EROSION. SUBMIT EROSION CONTROL PLAN FOR

DAMS TO ENSURE WATER IS CLEAR PRIOR TO MOVING DOWNSTREAM. ENSURE ANY

EROSION CONTROL AND SEDIMENTATION MEASURES TO INCLUDE FILTER FABRIC AND CHECK

STREAMS OR RIVERS IN VICINITY OF THE CONSTRUCTION SITE. IMPLEMENT NECESSARY

CULVERT CONSTRUCTION IN THE DRY. SEDIMENT WILL NOT BE PERMITTED TO ENTER

UNWATERING WILL BE REQUIRED TO ALLOW FOR EXISTING PIPE REMOVAL AND BOX 2.

APPROVED BY THE COR.

OCTOBER AND 31 DECEMBER AFTER THE THE OPTION IS AWARDED UNLESS OTHERWISE

HIGHWAY 141 CULVERT REMOVAL AND REPLACEMENT SHALL OCCUR BETWEEN 1 1.

NOTES:

LATER THAN 1 APRIL.

SURFACE COURSE UNTIL ASPHALT PLANT REOPENING. ASPHALT SHALL BE PLACED NO

TO PLAN CLOSURES, THE CONTRACTOR SHALL PROVIDE AND MAINTAIN AGGREGATE

FOR MINIMUM REQUIREMENTS. IF WORK TIMELINES PREVENT ASPHALT PLACEMENT DUE

PAVEMENT UPON CONSTRUCTION COMPLETION; SEE PLAN DETAILS AND SPECIFICATIONS

3. IMPACTED ASPHALT AREAS SHALL BE REPAVED AND RESTRIPED TO MATCH EXISTING

IN ACCODANCE WITH THE TIMELINES AND STANDARDS OF TDOT SPECIFICATIONS.

2. THE CONTRACTOR WILL BE REQUIRED TO NOTIFY ALL AGENCIES REQUIRING NOTIFICATION

MUST BE OPEN TO TRAFFIC BY THE 21 DAY SUSPENSE.

ACCORDNACE WITH TDOT STANDARDS AND APPROVAL REQUIREMENTS. THE DIVERSION

TIMELINE, HE WILL BE REQUIRED TO PROVIDE A TRAFFIC DIVERSION AROUND THE SITE IN

MINIMUM ASPHALT BASE PAVEMENT FOR SAFE VEHICULAR PASSAGE WITHIN THE 21 DAY

THE CONTRACTOR CANNOT EXCAVATE, REMOVE, REPLACE, BACKFILL AND PROVIDE

AND DETOUR PLANS TO TDOT IN ACCORDANCE WITH THEIR SPECIFICATION TIMELINES. IF

APPROVAL NO LESS THAN 30 DAYS PRIOR TO BEGINNING CONSTRUCTION. SUBMIT TCP

DETOUR APPROVAL FROM TDOT. SUBMIT PROPOSED TRAFFIC CONTROL PLAN FOR

TRAFFIC CONTOL (TCP) AND DETOUR PLAN FOR COR APPROVAL AND OBTAIN TCP AND

APPROVED BY THE COR. THE CONTRACTOR SHALL BE REQUIRED TO SUBMIT A PROPOSED

CLOSURES AND/OR TIME EXTENSIONS WILL NOT BE PERMITTED UNLESS OTHERWISE

CONSECUTIVE DAYS WHILE THE WORK IN THIS CONTRACT IS EXECUTED. MULTIPLE

1. HWY 141 WILL BE PERMITTED TO BE CLOSED FOR NO MORE THAN A TOTAL OF 21

TRAFFIC CONTROL NOTES:

W P

B

CHANNEL EXCAVATION

PROPOSED QUARRY SPRING

F C

M /0

/1

U

P D

A T

E D A

S B

U

IL

T S

E W

E R L

IN

E L

O C

A T

IO

N

OVERHEAD LINES

UNDERGROUND LINES

UNDERGROUND LINES

UNDERGROUND LINES

/0

/1

F

C M

U P

D A

T E

D U

N D

E R

G R

O U

N D E

L E

C T

IC

A L D

IS

P L

A Y

SEWER LINE CROSSING

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

®of Engineers

US Army Corps of Engineers

US Army Corps

IS

S

U E D

A T

E

N A

S H

V

IL

L E T

E N

N E

S S

E E

C U

M B

E R

L A

N D R

IV

E R W

A T

E R

S H

E D

W P

B

N A

S H

V

IL

L E D

IS

T R

IC

T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

M

/2

/2

M

/2

/2

F C

M

F C

M

S

IT

E R

E S

T O

R A

T

IO

N

C E

N T

E R H

IL

L D

A M

N

PI3

+6

4.0

TOE OF SLOPE

LIMITS

EXCAVATION

APPROXIMATE

CONTROL LINE

WATER VALVES

10'

SCALE: 1"= 10'

20'0

643155.02017382.81+68.748.8 FT3+53.1

643310.82017318.10+00.048.8 FT1+84.4

YXCENTERLINE STATIONOFFSET TO CENERLINESTATION"

"CONTROL

CULVERT CENTERLINE TABULATION

STOCK PILE LOCATION

PROPOSED EXCAVATED MATERIAL

STOCK PILE LOCATION

PROPOSED EXCAVATED MATERIAL

PROP. STOCKPILE LOCATIONS

CE-101

N A

S H

V

IL

L E D

IS

T R

IC

T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

TOP OF BANK

PROPOSED

TOP OF BANK

PROPOSED

LINED POND

EXISTING CONCRETE

PROPOSED SHUTOFF)

(SEE NOTES FOR

TRANSFORMER 6

N A

S H

V

IL

L E T

N

HWY 141

CAM

PG

RO

UND

RO

AD

UTILITIES DIAGRAM.

7. SEE REFERENCE DRAWING RE-600 FOR EXISTING ELECTRICAL

EXECUTION.

UTILITY SHUT OFF MUST BE APPROVED BY THE COR PRIOR TO

ELECTRICAL UTILITIES; ALTERNATIVE WORK PLANS FOR ELECTRICAL

DRAWINGS FOR ADDITIONAL DETAILS REGARDING EXISTING

EXECUTING SHUTOFF; REFER TO ELECTRICAL UTILITIY REFERENCE

6. MINIMIZE ELECTRICAL DOWNTIME TO OTHER FACILITIES WHEN

REESTABLISH POWER UPON CONSTRUCTION COMPLETION

E. REPAIR SEVERED CONDUIT, REPLACE 120/240V CABLE AND

REFERENCE DWG. Q-4/784 FOR EQUIPMENT LOCATIONS.

AND PULLBOX 4 PRIOR TO BEGINNING EXCAVATION. REFER TO

D. PULL 120/240V CABLE FROM CONDUIT BETWEEN TRANFORMER 6

DWG. Q-4/784 FOR TRANSFORMER LOCATION.

C. REESTABLISH POWER TO TRANSFORMER 5. SEE REFERENCE

B. DISCONNECT 120/240V LINE FROM TRANSFORMER 6

SWITCHGEAR LOCATED NEXT TO THE SWITCHYARD

A. SHUT OFF POWER TO TRANSFORMERS 5 AND 6 FROM THE 5kV

PROPOSED ORDER OF WORK FOR ELECTRICAL UTILIY SHUT OFF:

MATERIAL PRIOR TO FINAL ACCEPTANCE. THE FOLLOWING IS THE

CONTRACTOR'S EXPENSE USING MATCHING OR COR APPROVED

UTILITIES. SEVERED CONDUITS SHALL BE REPAIRED AT THE

BEGINNING CONSTRUCTION ACTIVITIES IN VICINITY OF SAID

OFFICER'S REPRESENTATIVE NO LESS THAN 2 WEEKS PRIOR TO

COORDINATE POWER SHUT-OFF TIMELINE WITH THE CONTRACTING

CONSTRUCTION ACTIVITIES THAT COULD IMPACT THOSE UTILITIES.

ELECTRICAL CABLES MUST BE PULLED PRIOR TO EXECUTING

5. WATER AND ELECTRICAL UTILITES MUST BE SHUT OFF AND

THOSE UTILITIES.

EXCAVATION AND CONSTRUCTION ACTIVITIES THAT WILL AFFECT

FOOTPRINT. FIELD VERIFY LOCATIONS OF ALL UTILITIES PRIOR TO

NOT ACCOUNT FOR ALL UTILITES IN THE VICINITY OF CONSTRUCTION

4. LOCATIONS OF UTILITIES SHOWN ARE APPROXIMATE AND MAY

OFFSET DISTANCES, MAXIMUM SLOPES AND HEIGHTS.

PRIOR TO CONSTRUCTION WHICH SHALL INCLUDE STOCKPILE

PROPOSED EXCAVATION AND STOCKPILING PLAN FOR APPROVAL

OTHERWISE APPROVED BY THE CONTRACTING OFFICER. SUBMIT

OFFSET FROM THE FENCED ELECTRICAL EQUIPMENT AREA UNLESS

RISKS TO THE EXCAVATED TRENCH. MAINTAIN A MINIMUM 20 FOOT

OFFICER. STOCKPILE SO AS TO NOT CAUSE ANY SLOPE STABILITY

REPAVING IF DETERMINED NECESSARY BY THE CONTRACTING

RETURNED TO THE PREEXISTING CONDITIONS TO INCLUDE

UPON CONSTRUCTION COMPLETION, ROADWAYS SHALL BE

TRENCH OR IN HATCHED LOCATIONS SHOWN ON THE DRAWINGS.

3. EXCAVATED MATERIAL MAY BE STOCKPILED ALONG SIDE OF THE

CONTRACTING OFFICER REPRESENTATIVE PRIOR TO EXECUTION.

MEANS OF PIPE INSTALLATION ARE SUBJECT TO APPROVAL BY THE

EXPERIENCE WITH EARTHWORK CONSTRUCTION. ALTERNATIVE

IN THE STATE OF TENNESSEE WITH NO LESS THAN FIVE YEARS OF

STAMPED AS APPROVED BY A LICENSED GEOTECHNICAL ENGINEER

SUBMIT A PROPOSED EXCAVATION AND STOCKPILING PLAN THAT IS

SITE. IF IT IS PREFERRED TO DEVIATE FROM EM 385-1-1 GUIDELINES,

WITH EM 385-1-1 AS IT ALIGNS WITH THE SOIL ENCOUNTERED ON

GRAVEL ROADBED FILL. EXECUTE EXCAVATION IN ACCORDANCE

A CONGLOMERATE OF SILT, SAND, AND CLAY COUPLED WITH

THE AREA TO BE EXCAVATED. ANTICIPATE SOIL CONDITIONS TO BE

PRIOR TO BEGINNING EXCAVATION. NO SOIL DATA IS AVAILABLE FOR

PROPOSED EXCAVATION FOR CONTRACTING OFFICER APPROVAL

ORDER TO MINIMIZE THE EXCAVATION FOOTPRINT. SUBMIT

BRACED BY A TRENCH BOX OR OTHER APPROVED METHOD IN

EM 385-1-1 WITH THE ASSUMPTION THAT THE TRENCH SIDES WILL BE

REPRESENT THE THEORETICAL EXCAVATION IN ACCORDANCE WITH

2. THE EXCAVATION LINES AND SLOPES SHOWN IN THE PLANS

APPROVED BY THE CONTRACING OFFICER

ALIGNMENT AS THE EXISTING CULVERT UNLESS OTHERWISE

1. THE NEW CULVERT WILL PLACED ALONG THE SAME GENERAL

NOTES:

A N

S I

D

H

IG

H W

A Y

C

U L

V E

R T R

E P

L A

C E

M E

N T

Q -C

H S

R

C E -1

.d g n

E X

C A

V A

T

IO

N P

L A

N

NEW SEWER LINE

NEW SEWER LINE

F C

M

F C

M

F C

M

R E

M O

V E

D T

R E

N C

H S

L O

P E N

O T

E

U P

D A

T E

D E

L E

C T

R

IC

A L D

IS

P L

A Y

U P

D A

T E

D S

E W

E R L

IN

E A

S B

U

IL

T L

O C

A T

IO

N

/0

/1

/0

/1

/0

/1

File details come from the government source that posted it.