W912P518B0010_TPlans_AMD01_Part2.pdf

PDF 22 MB Posted

Attached to
Center Hill Dam Site Restoration Project
Solicitation number
W912P518B0010
Issued by

About this file

Technical Plans Part 2

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

8+32 8+32

9+00

9+10

0+00

1+00

2+00

3+00

4+00

5+00

6+00

7+00

8+00

8+32 8+32

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

®of Engineers

US Army Corps of Engineers

US Army Corps

IS

S

U E D

A T

E

E L .0

690690

690690

0+00 2+00 4+00 6+00 8+00 10+00

E L E

V A

T

IO

N

E L E

V A

T

IO

N

STATION

E L.

.5

E L .0

P V I .0

E L .5

P V I .1

P V I .2

E L .9

P V I .2

E L .1

P V I .7

E L .8

P V I .3

E L .4

P V I .3

E L .6

P V I .4

E L .5

P V I .6

E L .8

P V I .3

E L .5

P V I .6

E L .7

P V I .6

E L .3

P V I .2

E L .6

E L .1

P V I .2

E L .2

P V I .2

E L .3

P V I .2

E L .0

P V I .2

P V I .2

P V I .2

E L .4 E

L.

.8

P V I 8

+3 1.

E L .6

P V I .4

E L .3

P V I .4

E L .1

P V I .4

P V I 0

+0 0.

0+35

0 0

N A

S H

V

IL

L E T

E N

N E

S S

E E

A N

S I

D

C U

M B

E R

L A

N D R

IV

E R W

A T

E R

S H

E D

W P

B

N A

S H

V

IL

L E D

IS

T R

IC

T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

F C

M

/2

/2

M

G R

O

IN

R

E P

A

IR

/2

/2

Q -C

H S

R

C G -1

.d g n

LOW BERM

MIDDLE BERM

HIGH BERM

DAM TOE WALL

TOE BERM

N

120'0 60'

SCALE:1"=60'

H W

Y

H W

Y

LOWER ACCESS RAMP

F C

M

F C

M

S

IT

E R

E S

T O

R A

T

IO

N

C E

N T

E R H

IL

L D

M

P L

A N A

N D P

R O

F

IL

E

A R

T

IC

U L

A T

E D B

L O

C K

CG-101

N A

S H

V

IL

L E D

IS

T R

IC

T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

APPROX. SEEDING AND MULCHING LIMITS

0+00

1+00

2+00

3+00

4+00

5+00

6+00

7+00

8+0

8+3

8+3

9+0

9+1

8 FOOT BOTTOM WIDTH ACB

DAM EMBANKMENT

SO AS TO ALIGN WITH EXISTING

STRIPPED AREA TO BE RESHAPED

MECHANICAL ANCHORING OF CONCRETE BLOCK MATS REQUIRED

REDUCE FLOW ENERGY

BAFFLE APPLICATION TO

APPROXIMATE LOCATION OF

WITDH AND SLOPES

MATCH EXISTING DITCH

WIDTH AND SLOPE

WIDTH TO MATCHING EXISTING

TRANSITION FROM 10 FT BOTTOM

W

O R

K P

L A

T F

O R

M G

R O

U T C

U R

T

IN

N

S H

V

IL

L E T

N

APPROVAL PRIOR TO CONSTRUCTION.

PROPOSED VERTICAL ALIGNMENT FOR DITCH INVERT TO CONTRACTING OFFICER FOR

ADJUSTMENTS MAY BE REQUIRED TO BETTER SUIT EXISTING CONDITIONS. SUBMIT

4. VERTICAL PIs PROVIDED TO HELP FACILITATE STAKING AND CONSTRUCTION. FIELD

ROADWAY WIDTHS WITH EXISTING BERMS.

APPROXIMATE LIMITS OF BERM ACCESS RAMPS ARE SHOWN IN THIS DRAWING; MATCH

TRANSITIONS WILL LIKELY REQUIRE HAND PLACEMENT OF INDIVIDUAL CONCRETE BLOCKS;

BERM USING ACB TO ALLOW FOR EASY ACCESS VIA ALL TERRAIN VEHICLE OR TRUCK;

3. PROVIDE A SMOOTH TRANSITION FROM THE ARMORED DITCH TO EACH EMBANKMENT

24 HOURS OF OCCURRENCE.

NATURAL EVENTS SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE WITHIN

WITH GRAVEL OR STRAW WITHIN 48 HOURS. EROSION FROM RAIN OR OTHER

ADVANCE EXCAVATION IN A MANNER WHERE EXPOSED EARTH IS STABILIZED

2. ACB PLACEMENTS SHALL PROGRESS FROM DOWNSTREAM TO UPSTREAM.

VEHICULAR ACCESS TO THE DOWNSTREAM EMBANKMENT IN LIEU OF GRAVEL.

BLOCK TO SERVE AS BOTH A DRAINAGE SWALE FOR STORMWATER AND FOR PAVED

AND RESHAPE THE EXISTING GROIN FOOTPRINT AND PLACE ARTICULATED CONCRETE

TRAFFIC AND STORMWATER SURFACE DRAINAGE. THE INTENT OF THIS DESIGN IS TO REPAIR

OF STONE GRAVEL IS SUFFERING FROM SEVERE EROSION DUE TO BOTH VEHICULAR

PURPOSE OF INSPECTION AND INSTRUMENTATION READING. THE CURRENT APPLICATION

1. THE GROIN IS USED TO ACCESS THE DOWNSTREAM DAM EMBANKMENT FOR THE

NOTES:

TRANSITION ZONE

10 FOOT BOTTOM WIDTH ACB

F C

M R

E M

O V

E D B

A R

G A

T E A

T H

W Y

/2

/1

5+00

6+00

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

D A

T E

A P

P R

®of Engineers

US Army Corps

ID

Sheet of Engineers

US Army Corps

AMENDMENT

U

M B

E R

L A

N D R

IV

E R W

A T

E R

S H

E D

W P

B

M

/2

/2

M

G R

O

IN

R

E P

/2

/2

Q -C

H S

R

C G -1

.d g n

N

N A

S H

V

IL

L E D

IS

T R

IC

T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

N A

S H

V

IL

L E T

E N

N E

S S

E E

N A

S H

V

IL

L E D

IS

T R

IC

T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

M

F C

M

S

IT

E R

E S

T O

R A

T

IO

N

C E

N T

E R H

IL

L D

F

T

M

IN

IM

U M

MIDDLE BERM

R = 3FT

R = 20FT

R = 40FT

WATER FROM ENTERING BERMS

UPWARD BREAK TO PREVENT

8'0 4' 16'

SCALE:1/8"=1'

T Y

P

IC

A L B

E R

M A

C C

E S

S L

A Y

O U

T

CG-103

G R

O

IN

A

C C

E S S P

L A

T F

O R

M

(SEE TYP SECTIONS)

PORTION OF ACB

GROUTED AND KEYED

4+50

5+00

5+50

6+00

N A

S H

V

IL

L E T

N

REMOVAL

OF THE CONTRACTOR UPON

RISER SHALL BECOME THE PROPERTY

CONCRETE RISER TO BE REMOVED;

BURIED APPROXIMATELY 12 IN. IN THE GROUND.

ARE APPROXIMATELY 8 IN. THICK. IT HAS NO BOTTOM. AND IS

TALL, 48 IN. IN DIAMETER AND BURIED 12 IN. IN THE GROUND. WALLS

6. CONCRETE RISER TO BE REMOVED IS APPROXIMATELY 36 IN.

LAYOUT AND CONSTRUCTION.

DESIGNED BERM ACCESS RAMP SHALL BE PROVIDED TO FACILITATE

5. UPON REQUEST, .DTM, .ALG. AND/OR .XML DATA OF THE

APPROACHING FROM BOTH UPPER AND LOWER BERMS.

BERMS WILL BE ACCESSED BY ATV FOR INSTRUMENT READING

APPROACHING THE BERMS FROM HWY 96. ON A DAILY BASIS,

OPERATIONS, BERMS WILL BE ACCESSED BY DRILL RIGS

MOST EFFICIENT ACCESS TO EACH BERM. DURING GENERAL

PROPOSED ACCESS CONCEPT THAT PROVIDES AND SAFEST AND

USACE' PROPOSED DESIGN. THE CONTRACTOR SHALL SUBMIT HIS

4. THE ACCESS BEAKLINES SHOWN IN THIS DRAWING REFLECT

THE SWALE AND FLOWING OUT ONTO THE BERMS.

THE BERM ACCESS SO AS TO PREVENT WATER FROM ESCAPING

3. ENSURE AN UPHILL BREAK EXISTS BETWEEN THE SWALE AND

GEOTEXTILE, GRANULAR FILL, AND GEOGRID.

SECTION SHALL MATCH THE TYPICAL SECTIONS TO INCLUDE

METHOD OF CONCRETE BLOCK PLACEMENT; THE CONCRETE BLOCK

APPROVED BY THE CONTRACTING OFFICER; SUBMIT PROPOSED

PLACED ARTICULATED CONCRETE BLOCKS UNLESS OTHERWISE

2. THE ACCESS PAVEMENT WILL BE CONSTRUCTED OF HAND

BERM.

ARTICULATED CONCRETE BLOCK SWALE AND EACH DAM ACCESS

1. CONSTRUCT A SMOOTH TRANSITION PAVEMENT BETWEEN THE

NOTES:

F C

M /2

/1

U

P D

A T

E D N

O T

E T

O R

E M

O V

E B

A R G

A T

E

/8

1+00

2+00

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

D A

T E

A P

P R

®of Engineers

US Army Corps

ID

Sheet of Engineers

U

M B

E R

L A

N D R

IV

E R W

A T

E R

S H

E D

W P

B

M

/2

/2

M

G R

O

IN

R

E P

/2

/2

Q -C

H S

R

C G -1

.d g n

N

N A

S H

V

IL

L E D

IS

T R

IC

T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

N A

S H

V

IL

L E T

E N

N E

S S

E E

N A

S H

V

IL

L E D

IS

T R

IC

T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

M

F C

M

S

IT

E R

E S

T O

R A

T

IO

N

C E

N T

E R H

IL

L D

A M

WATER FROM ENTERING BERMS

UPWARD BREAK TO PREVENT

8'0 4' 16'

SCALE:1/8"=1'

(SEE TYP SECTIONS)

PORTION OF ACB

GROUTED AND KEYED

APPROX. SEEDING AND MULCHING LIMITS

TOE BERM ACCESS RAMP

P L

A N A

N D D

E T

A

IL

L O

W E

R A

C C

E S

S R

A M

P

CG-104

10.0ft

BASE ACCESS RAMP

1+00

1+50

2+00

2+50

EXISTING ROCK PILE

N A

S H

V

IL

L E T

N

LAYOUT AND CONSTRUCTION.

DESIGNED BERM ACCESS RAMP SHALL BE PROVIDED TO FACILITATE

5. UPON REQUEST, .DTM, .ALG. AND/OR .XML DATA OF THE

MOST EFFICIENT ACCESS THE SWALE/ROADWAY.

PROPOSED ACCESS CONCEPT THAT PROVIDES AND SAFEST AND

USACE' PROPOSED DESIGN. THE CONSTRACTOR SHALL SUBMIT HIS

4. THE ACCESS BEAKLINES SHOWN IN THIS DRAWING REFLECT

SWALE/CHANNEL.

ACCESS RAMP SO AS TO PREVENT WATER FROM ESCAPING THE

3. ENSURE AN UPHILL BREAK EXISTS BETWEEN THE SWALE AND

GEOTEXTILE, GRANULAR FILL, AND GEOGRID.

SHALL MATCH THE TYPICAL CHANNEL SECTIONS TO INCLUDE

CONCRETE BLOCK PLACEMENT; THE CONCRETE BLOCK SECTION

BY THE CONTRACTING OFFICER; SUBMIT PROPOSED METHOD OF

ARTICULATED CONCRETE BLOCKS UNLESS OTHERWISE APPROVED

2. THE ACCESS PAVEMENT WILL BE CONSTRUCTED OF

ACCESS ROAD

ARTICULATED CONCRETE BLOCK SWALE AND EXISTING DAM LOWER

1. CONSTRUCT A SMOOTH TRANSITION PAVEMENT BETWEEN THE

NOTES:

F C

M R

E M

O V

E D N

O T

E

/2

/1

/8

6+00

7+00

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

D A

T E

A P

P R

®of Engineers

US Army Corps

ID

Sheet of Engineers

W P

B

M

/2

/2

/2

/2

Q -C

H S

R

C G -1

.d g n

N

N A

S H

V

IL

L E D

IS

T R

IC

T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

N A

S H

V

IL

L E T

E N

N E

S S

E E

N A

S H

V

IL

L E D

IS

T R

IC

T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

T

F

8'0 4' 16'

SCALE:1/8"=1'

6+00

C U

M B

E R

L A

N D R

IV

E R W

A T

E R

S H

E D

IT

E R

E S

T O

R A

T

IO

N

C E

N T

E R H

IL

L D

A M

N A

S H

V

IL

L E T

N

CG-105

W O

R K P

L A

T F

O R

M G

R O

U T C

U R

T

IN

HIGH BERM

DURING CONSTRUCTION

INSTRUMENTS NOT TO BE DISTURBED

S H

O W

IN

G I

N S

T R

U M

E N

T S L

O C

A T

IO

N S

H

IG

H B

E R

M A

C C

E S

S

LAYOUT AND CONSTRUCTION.

DESIGNED BERM ACCESS RAMP SHALL BE PROVIDED TO FACILITATE

5. UPON REQUEST, .DTM, .ALG. AND/OR .XML DATA OF THE

APPROACHING FROM BOTH UPPER AND LOWER BERMS.

BERMS WILL BE ACCESSED BY ATV FOR INSTRUMENT READING

APPROACHING THE BERMS FROM HWY 96. ON A DAILY BASIS,

OPERATIONS, BERMS WILL BE ACCESSED BY DRILL RIGS

MOST EFFICIENT ACCESS TO EACH BERM. DURING GENERAL

PROPOSED ACCESS CONCEPT THAT PROVIDES AND SAFEST AND

USACE' PROPOSED DESIGN. THE CONTRACTOR SHALL SUBMIT HIS

4. THE ACCESS BEAKLINES SHOWN IN THIS DRAWING REFLECT

THE SWALE AND FLOWING OUT ONTO THE BERMS.

THE BERM ACCESS SO AS TO PREVENT WATER FROM ESCAPING

3. ENSURE AN UPHILL BREAK EXISTS BETWEEN THE SWALE AND

GEOTEXTILE, GRANULAR FILL, AND GEOGRID.

SECTION SHALL MATCH THE TYPICAL SECTIONS TO INCLUDE

METHOD OF CONCRETE BLOCK PLACEMENT; THE CONCRETE BLOCK

APPROVED BY THE CONTRACTING OFFICER; SUBMIT PROPOSED

PLACED ARTICULATED CONCRETE BLOCKS UNLESS OTHERWISE

2. THE ACCESS PAVEMENT WILL BE CONSTRUCTED OF HAND

BERM.

ARTICULATED CONCRETE BLOCK SWALE AND EACH DAM ACCESS

1. CONSTRUCT A SMOOTH TRANSITION PAVEMENT BETWEEN THE

NOTES:

File details come from the government source that posted it.