W912P518B0010_TPlans_AMD01_Part1.pdf

PDF 33 MB Posted

Attached to
Center Hill Dam Site Restoration Project
Solicitation number
W912P518B0010
Issued by

About this file

Technical Plans Part 1

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

D A

T E

A P

P R

®of Engineers

US Army Corps a u t o t im e

ID

Sheet of Engineers

US Army Corps

AMENDMENT

0 0

A N

S I

D

C U

M B

E R

L A

N D R

IV

E R W

A T

E R

S H

E D

F C

M

/2

/2

J H

F C

M

F C

M S

IT

E R

E S

T O

R A

T

IO

N

G E

N E

R A

L

C E

N T

E R H

IL

L D

M

N

S

H V

IL

L E T

E N

N E

S S

E E

N A

S H

V

IL

L E D

IS

T R

IC

T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R

G-101

A

S H

V

IL

L E D

IS

T R

IC

T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

IN

D

E X O

F D

R A

W

IN

G S

N A

S H

V

IL

L E T

N

WATER LINE ROUTING THROUGH THE DAMQ4-CHSR PL-301

PROFILE OF EXISTING WATER LINE THROUGH THE DAMQ4-CHSR PL-300

ROADWAY PARAPET EROSION REPAIRQ4-CHSR CT-502

TRANSITION SLAB DETAILSQ4-CHSR CT-501

TRENCH DRAIN AND PAVING SURFACE DETAILSQ4-CHSR CT-500

HWY 96 MILLING AND PAVINGQ4-CHSR CT-100

WATER LINE REPLACEMENTGENERAL

WORK PLATFORM STABILIZATION

EISENHOWER PARK RESTORATION

CONTRACTOR WORK LIMITS & HAUL ROUTESQ4-CHSR_C-102

CHSR OVERALL SITE PLANQ4-CHSR_C-100

INDEX OF DRAWINGSQ4-CHSR_G-101

LOCATION AND VICINITY PLANQ4-CHSR_G-100

Cover Sheet for the Center Hill Site Restoration ContractQ4-CHSR_COVER

HIGHWAY 96 RESURFACING

CONSTRUCTION LOG AND CORE BOX DIAGRAMQ4-CHSR B-600

MONUMENT PROTECTION DETAILSQ4-CHSR B-500

WORK PLATFORM CROSS SECTIONS SHEET 2 OF 2Q4-CHSR B-201

WORK PLATFORM CROSS SECTIONS SHEET 1 OF 2Q4-CHSR B-200

WORK PLATFORM EXCAVATIONQ4-CHSR_B-105

WORK PLATFORM DEMOLITIONQ4-CHSR_B-104

INSTRUMENTS SHEET 4 OF 4Q4-CHSR B-103

INSTRUMENTS SHEET 3 OF 4Q4-CHSR B-102

INSTRUMENTS SHEET 2 OF 4Q4-CHSR_B-101

INSTRUMENTS SHEET 1 OF 4Q4-CHSR B-100

W P

B

CAMPGROUND ELECTRICAL DIAGRAMQ4-CHSR_RE-600

WEIR NOTESQ4-CHSR SE-502

WEIR DETAILS SHEET 2 OF 2Q4-CHSR SE-501

WEIR DETAILS SHEET 1 OF 2Q4-CHSR SE-500

QUARRY SPRING AREA RESTORATION DETAILSQ4-CHSR CE-900

DAILY CAMPGROUND WEIRFLOWQ4-CHSR_CE-600

WOODEN GUARDRAIL DETAILSQ4-CHSR_CE-502

RCP DETAILSQ4-CHSR CE-501

CUSTOM END WALL DETAILSQ4-CHSR CE-500

HWY 141 PAVEMENT DETAILSQ4-CHSR CE-301

HWY 141 CROSS SECTIONSQ4-CHSR CE-300

CHANNEL EXCAVATION PLAN, PROFILE, AND SECTIONQ4-CHSR CE-104

HWY 141 CULVERT REPLACEMENT FINAL SITE RESTORATION WORKQ4-CHSR CE-103

HWY 141 CULVERT REPLACEMENT PLAN AND PROFILEQ4-CHSR CE-102

EXCAVATION PLANQ4-CHSR CE-101

DEMOLITION PLAN

HWY 141 CULVERT REPLACEMENT SITE, UNWATERING, AND Q4-CHSR CE-100

QUARRY SPRING RESTORATION

PICNIC SPRINGS CULVERT REPLACEMENT AND

CAST-IN-PLACE STAIRWAY DETAILSQ4-CHSR_CR-508

4FT X 8FT CATCH BASIN DETAILSQ4-CHSR_CR-507

REINFORCED CONCRETE PIPE DETAILSQ4-CHSR_CR-506

CATCH BASIN DETAILSQ4-CHSR_CR-505

PRECAST BOATRAMP DETAILSQ4-CHSR CR-504

SIGN INDEXQ4-CHSR CR-503

PARKING SECTIONS AND DETAILSQ4-CHSR CR-502

CORRUGATED PIPE DETAILQ4-CHSR CR-501

TRENCH DRAIN DETAILSQ4-CHSR CR-500

SIGN AND STRIPING PLANQ4-CHSR CR-111

LEFT RIM CUT DRAINAGE IMPROVEMENTSQ4-CHSR CR-110

EISENHOWER PARK STAIRS AND RAMP PROFILEQ4-CHSR_CR-202

EISENHOWER PARK STAIRS AND RAMP PLANQ4-CHSR_CR-109

EISENHOWER PARK SIDEWALK SECTIONSQ4-CHSR CR-108

TN HWY 96 PARKING REHABILITATIONQ4-CHSR CR-107

BOAT RAMP ACCESS PARKING CONFIGURATIONQ4-CHSR CR-106

HWY 96 ENTRANCE TO BOAT RAMP - PLAN & PROFILEQ4-CHSR CR-105

ACCESS RAMP SECTIONSQ4-CHSR CR-201

EISENHOWER PARK ACCESS RAMP PLAN AND PROFILEQ4-CHSR CR-104

BOAT RAMP TYPICAL SECTIONSQ4-CHSR CR-200

EISENHOWER PARK BOATRAMP PLAN AND PROFILEQ4-CHSR CR-103

EISENHOWER PARK EXCAVATION PLANQ4-CHSR CR-102

EISENHOWER PARK FINAL SITE LAYOUT/CONFIGURATIONQ4-CHSR CR-101

EISENHOWER PARK DEMOLITIONQ4-CHSR CR-100

BORING DATA SHEET 2 OF 2Q4-CHSR BR-102

BORING DATA SHEET 1 OF 2Q4-CHSR BR-101

EISENHOWER PARK PARKING LOT LIGHTING DETAILSQ4-CHSR CI-103

EISENHOWER PARK SIDEWALK LIGHTSQ4-CHSR CI-102

HIGH MAST LIGHTING FOUNDATION DETAILSQ4-CHSR CI-101

HIGH MAST LIGHT DETAILSQ4-CHSR CI-100

LIGHTING CONTROL PANEL SCHEMATICSQ4-CHSR E-603

PUMP CONTROLS SCHEMATICQ4-CHSR E-602

COMFORT STATION ELECTRICAL DETAILQ4-CHSR E-601

SINGLE LINE DIAGRAMQ4-CHSR E-600

ELECTRICAL MANHOLE AND DUPLEX CONTROL PANEL STATIONQ4-CHSR E-503

ELECTRICAL DUPLEX STATIONQ4-CHSR E-502

ELECTRICAL DETAILS SHEET 2 OF 2Q4-CHSR E-501

ELECTRICAL DETAILS SHEET 1 OF 2Q4-CHSR E-500

LUMINAIRE LAYOUTQ4-CHSR E-101

ELECTRICAL GENERAL LAYOUTQ4-CHSR E-100

LIGHTING/ELECTRICAL NOTESQ4-CHSR E-001

SEWER LINE SCHEMATIC DIAGRAMQ4-CHSR CU-600

PIPE CASING DETAILSQ4-CHSR CU-504

GATE VALVE BOX DETAILQ4-CHSR CU-503

SEWER & WATER LINE PIPE TRENCHING DETAILSQ4-CHSR CU-502

SEPTIC AND DOSING TANK CONFIGURATIONQ4-CHSR CU-501

LIFT STATION DETAILSQ4-CHSR CU-500

SEWER LINE LAYOUT PLANQ4-CHSR CU-101

SEWER LINE OVERALL PLANQ4-CHSR CU-100

COMFORT STATION FOUNDATION & FLOOR DRAIN DETAILSQ4-CHSR SR-204

COMFORT STATION SIDE ELEVATIONSQ4-CHSR SR-203

COMFORT STATION FRONT & REAR ELEVATIONSQ4-CHSR SR-202

COMFORT STATION INTERIOR ELEVATIONSQ4-CHSR SR-201

WASTE, VENT AND WATER PIPING PLANQ4-CHSR_SR-102

COMFORT STATION PLUMBING PLAN AND DETAILSQ4-CHSR_SR-101

COMFORT STATION PLANQ4-CHSR SR-100

DAILY LAKE ELEV. MAXIMUM, MINIMUM, MEDIAN 2008-2017Q4-CHSR CR-602

DAILY LAKE ELEVATION OBSERVED 2008-2017Q4-CHSR CR-601

GUARDRAIL END TREATMENTQ4-CHSR C-505

WORK PLATFORM GUARDRAIL DETAILSQ4-CHSR C-504

STANDARD GUARDRAIL DETAILSQ4-CHSR C-503

COMFORT STATION SITE DETAILSQ4-CHSR C-502

SQUARE TUBE SWING GATE DETAILSQ4-CHSR C-501

COURTESY DOCK DETAILSQ4-CHSR CR-902

PICNIC SHELTERQ4-CHSR CR-901

CURB RAMP DETAILSQ4-CHSR_CR-510

CURB RAMP DETAILSQ4-CHSR_CR-509

F C

M A

D D

E D D

R A

W

IN

G C

G -1

/2

/1

GROIN ARTICULATED CONCRETE BLOCK DETAIL SHEETQ4-CHSR CG-500

GROIN CROSS SECTIONS STA 6+75 TO STA 8+32Q4-CHSR CG-205

GROIN CROSS SECTIONS STA 4+75 TO STA 6+50Q4-CHSR CG-204

GROIN CROSS SECTIONS STA 3+25 TO STA 4+50Q4-CHSR CG-203

GROIN CROSS SECTIONS STA 1+75 TO STA 3+00Q4-CHSR CG-202

GROIN CROSS SECTIONS STA 0+00 TO STA 1+50Q4-CHSR CG-201

GROIN TYPICAL SECTIONSQ4-CHSR CG-200

GROIN AND NEW CORPS BUILDING FOOTPRINTQ4-CHSR CG-106

HIGH BERM ACCESS SHOWING INSTRUMENTSCG-105 Q4-CHSR

LOWER ACCESS RAMP PLAN AND DETAILQ4-CHSR CG-104

TYPICAL BERM ACCESS LAYOUTQ4-CHSR CG-103

UPPER GROIN ACCESSQ4-CHSR CG-102

GROIN ARTICULATED BLOCK PLAN & PROFILEQ4-CHSR CG-101

GROIN STRIPPING AND DEMOLITIONQ4-CHSR CG-100

F C

M A

D D

E D D

R A

W

IN

G C

G -1

/0

/1

FILE NAME DRAWING TITLE

EISENHOWER PARK RESTORATION (continued)

GROIN REPAIR

FILE NAME DRAWING TITLE FILE NAME DRAWING TITLE

N

S I

D

C U

M B

E R

L A

N D R

IV

E R W

A T

E R

S H

E D

W P

B

M

S H

E E

T O

F

W O

R K P

L A

T F

O R

M S

T A

B

IL

IZ

A T

IO

/2

/2

N A

S H

V

IL

L E T

E N

N E

S S

E E

N A

S H

V

IL

L E D

IS

T R

IC

T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

Q -C

H S

R

B -2

.d g n

K A

K

M M

L

S

IT

E R

E S

T O

R A

T

IO

N

C E

N T

E R H

IL

L D

A M

40'

SCALE:1''=20'

0 20'10'

9 INCHES BEDDING STONE

3.5 FT

B-200

C R

O S

S S

E C

T

IO

N S

W O

R K P

L A

T F

O R

M

N A

S H

V

IL

L E D

IS

T R

IC

T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

EL. 681 BENCH

APPROX. SAWCUT LOCATION

N A

S H

V

IL

L E T

N

SLAB REMOVAL APPROX. LIMITS

APPROX. 6 FEET

(SEE NOTE 1)

3.5 FEET OF STONE PROTECTION

DRAWINGS

SEE REFERENCE

EXISTING 16 IN. SLAB

WITH A 3FT THICKNESS MINIMUM

EXISTING RIPRAP THICKNESS VARIES

AREA TO BE EXCAVATED

HATCHED AREA REFLECTS

33.7ft

SEE SHEET B-105

BARRIER WALL CL/QA ALIGNMENT

31.2ft

33.7ft

33.2ft

33.0ft

DAM BASELINE = 0 (SEE SHEET C-100)

STOCKPILING PLAN, IF APPLICABLE.

3. SUBMIT PROPOSED WORK PLAN FOR DAM WORK PLATFORM EXCAVATION TO INCLUDE PROPOSED STONE

DRAWING CR-102 FOR APPROXIMATE LIMITS OF PULVERIZED CONCRETE.

MORE THAN FOUR FEET ABOVE EXISTING GROUND AND NO CLOSER THAN 40 FEET TO THE EXISTING TOP OF SLOPE. SEE

IN LOCATIONS WHERE THE EXISTING SLAB HAS BEEN DESIGNATED TO BE PULVERIZED. RECOVERED STONE WILL BE PILED NO

PLATFORM. THE CONTRACTOR WILL BE PERMITTED TO STOCKPILE THE RECOVERED STONE IN THE FORMER LAYDOWN AREA

2. THE STONE RECOVERED STONE PROTECTION WILL NOT BE PERMITTED TO BE STOCKPILED ON THE DAM WORK

THE DAM FACE. PLACE STONE ON THE SLOPE IN ACCORDANCE WITH THE SECTIONS.

CLASS C MACHINED RIPRAP FOR ANY ADDITIONAL STONE PROTECTION QUANTITIES REQUIRED FOR UPSTREAM STONE PROTECTION ON

1. THE CONTRACTOR SHALL RECOVER AND REUSE THE EXISTING STONE PROTECTION ON THE FACE OF THE DAM. USE TDOT

NOTES:

E L E

V A

T

IO

N

0 10 20-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150-160-170-180-190-200

14+50

E L E

V A

T

IO

N

E L E

V A

T

IO

N

0 10 20-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150-160-170-180-190-200

15+00

E L E

V A

T

IO

N

E L E

V A

T

IO

N

0 10 20-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150-160-170-180-190-200

E L E

V A

T

IO

N

16+00 (TYPICAL)

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

D A

T E

A P

P R

®of Engineers

US Army Corps

ID

Sheet of Engineers

US Army Corps

AMENDMENT

E L E

V A

T

IO

N

0 10 20-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150-160-170-180-190-200

17+00

E L E

V A

T

IO

N

E L E

V A

T

IO

N

0 10 20-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150-160-170-180-190-200

18+00

E L E

V A

T

IO

N

E L E

V A

T

IO

N

0 10 20-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150-160-170-180-190-200

19+00

E L E

V A

T

IO

N

U

M B

E R

L A

N D R

IV

E R W

A T

E R

S H

E D

W P

B

M

/2

/2

M

F C

M

F

IT

E R

E S

T O

R A

T

IO

N

C E

N T

E R H

IL

L D

/2

/2

N A

S H

V

IL

L E T

E N

N E

S S

E E

N A

S H

V

IL

L E D

IS

T R

IC

T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

-C

H S

R

C R -1

.d g n

D E

M O

L

IT

IO

N P

L A

N

CR-100

N

WITH CONCRETE SLAB

BE REMOVED ALONG

EXISTING PAVILION TO

TO BE REMOVED

EXISTING BOATRAMP

REMAINING SLAB OF

40'

SCALE:1"=40'

80'0

FOUNDATIONS TO REMAIN

EXISTING SLURRY TANK

S H

V

IL

L E D

IS

T R

IC

T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

GUARDRAIL TO BE REMOVED IN PREPARATION FOR REPLACEMENT

RETAINING WALL TO REMAIN

EXISTING UPHILL SIDE

WITH SLAB TO BE REMOVED;

EXISTING COMFORT STATION

ALIGNMENT TO BE REMOVED

PAVEMENT FROM OLD ROADWAY

EXISTING CURB TO BE REMOVED

N A

S H

V

IL

L E T

N

SHOULDER LINE.

JOINT APPROXIMATELY 3 FEET FROM THE ROADWAY

PLACEMENT OVERLAY; MILL TO THE ROADWAY SHOULDER

BASE MATERIAL IN PREPARATION FOR NEW ASPHALT

MILL/REMOVE APPROXIMATELY 3 INCHES OF AGGREGATE

UNDERGROUND BARRIER WALL

CONCRETE SLAB

EASTBOUND SHOULDER OF HWY 96)

TO BE REMOVED IN ITS ENTIRETY (TO THE

RESIDUAL ASPHALT FROM DETOUR ROAD

E

IS

E N

H O

W E

R P

A R

K R

E S

T O

R A

T

AS PART OF A PREVIOUS CONTRACT

STAIRCASE HAS ALREADY BEEN REMOVED

SLURRY TANK FOUNDATION DETAILS.

6. SEE .PDF PAGES 19-25 OF THE REFERENCE DRAWINGS FOR

BE FILLED WITH GROUT OR FLOWABLE FILL.

5. SEPTIC TANK LOCATED UNDER EXISTING COMFORT STATION TO

SIDEWALKS IF DAMAGED.

DEMOLITION DOES NOT IMPACT THE SIDEWALKS. REPAIR

SIDEWALK INTERFACES WITH SLABS TO BE REMOVED SO THAT

CONSTRUCTION COMPLETION. PLACE FULL DEPTH SAWCUTS AT

4. PROTECT EXISTING SIDEWALKS DESIGNATED TO REMAIN UPON

SPECIFICATIONS.

REPLACED IN ACCORDANCE WITH THE DRAWINGS AND

3. EXISTING LIGHT FIXTURES AND POLES WILL BE REMOVED AND

FILL TO PROTECT THE SMALLER AGGREGATE FROM WAVE ACTION.

COVERED WITH NO LESS THAN 30 INCHES OR ENGINEERED ROCK

AGGREGATE IS USED AS FILL FOR EISENHOWER PARK, IT MUST BE

AND STONE PROTECTION. IF RECOVERED COARSE GRADE

COARSE GRADE AGGREGATE, AS BEDDING MATERIAL FOR RIPRAP

RANDOM FILL FOR EISENHOWER PARK EARTHWORK OR, FOR

LOCAL REGULATIONS. ROCK MATERIAL MAYBE BE REUSED AS

DISPOSED OF OFF SITE IN ACCORDANCE WITH FEDERAL, STATE AND

2. MILLED AND DEMOLISHED ASPHALT AND CONCRETE,SHALL BE

IN ACCORDANCE WITH FEDERAL, STATE, AND LOCAL REGULATIONS.

OF THE CONTRACTOR UPON REMOVAL AND SHALL BE DISPOSED OF

CONCRETE, AND ROCK MATERIAL), SHALL BECOME THE PROERTY

GUARDRAIL, JERSEY BARRIERS, ETC., (EXCLUDING MILLED ASPHALT,

INCLUDE UTILITIES, WOOD, SHINGLES, CATCH BASINS, PIPES,

1. ALL MATERIALS REMOVED FROM SITE DURING DEMOLITION, TO

NOTES:

REMOVED

CONCRETE BOX TO BE

GROUT FILLED 10 FT X 18 FT

FILL FOR SHAPING EISENHOWER PARK

ENGINEERED ROCK FILL TO SERVE AS

1794 CY OF GOVERNMENT FURNISHED

WATERLINE AT TIME OF SURVEY

AND THE LAKE.

OR OTHER) ALWAYS EXISTS BETWEEN THE ROADWAY

MANNER SO THAT A BARRIER (GUARDRAIL, JERSEY BARRIER,

TO THE CONCRETE PORTION OF THE DAM; REMOVE IN A

NEW GUARDRAIL CONSTRUCTION; REMOVAL TO EXTEND

JERSEY BARRIERS TO BE REMOVED IN PREPARATION FOR

EXISTING CURB/WALL DETAILS)

REFERENCE DRAWINGS FOR

WIDENING WILL OCCUR. (SEE

PLACED OVER IT FOR AREAS WHERE LOT

MANNER TO WHERE ASPHALT CAN BE

CURB CAN BE CONSTRUCTED OR IN A

CURB. REMOVE SO THAT A NEW

AND REPLACED WITH A NEW MOUNTABLE

EXISTING CURB/WALL TO BE REMOVED

CONTRACT)

WIRING THAT WAS USED IN A PREVIOUS

PURPOSE IS TO PROTECT HIGH VOLTAGE

CONDUIT PIPES CAST IN THE MIDDLE. ITS

(2.5 FT X 2.5 FT CONCRETE BOX WITH

CONCRETE CONDUIT BOX TO BE REMOVED

(SEE SHEET C-100)

ORIGINAL DAM BASELINE

THAT NEED TO BE EXTENDED.

APPROVAL; VERIFY ALL ACTIVE STORM DRAIN PIPES

LARGER NEW PIPE; SUBMIT PROPOSED PLAN FOR

SLIP LINE EXISTING PIPE NO LESS THAN 6 FEET INTO

USE METAL BAND COUPLING WITH RUBBER GASKETS OR

TO BE EXTENDED IN PREPARATION FOR ADDITIONAL FILL;

EXISTING CORRUGATED METAL PIPE (CMP) DRAIN PIPES

DRAWINGS.

THICKNESS IS APPROXIMATELY 8 INCHES. SEE REFERENCE

ENCOUNTERED BENEATH SLAB. THE HATCHED AREA SLAB

TO BE REMOVED ALONG WITH ANY REMAINING UTILITIES

CROSS HATCHED PORTION OF THE CONCRETE WORK PLATFORM

SELECTIVE CLEARING

HATCHED AREA TO RECEIVE

SELECTIVE CLEARING BOUNDARY

SELECTIVE CLEARING BOUNDARY

FILL FOR SHAPING EISENHOWER PARK

ENGINEERED ROCK FILL TO SERVE AS

701 CY OF GOVERNMENT FURNISHED

/2

/1

F

C M

U P

D A

T E

D R

O C

K S

T O

C K

P

IL

E L

O C

A T

IO

N A

N D Q

T Y

F C

M /0

/1

R

E M

O V

E D H

W Y

E

X

IS

T

IN

G L

IG

H T P

O L

C B

.5

.5

.4

.6

.5

.4

.4

.2

.9

.7

.9

.0

.1

0 805

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

D A

T E

A P

P R

®of Engineers

US Army Corps

ID

Sheet of Engineers

630 630

660 665

C B

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

D A

T E

A P

P R

®of Engineers

US Army Corps

ID

Sheet of Engineers

US Army Corps

AMENDMENT

690690

690690

0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50

E L E

V A

T

IO

N

E L E

V A

T

IO

N

STATION

P V I .7

E L .0

P V I .7

E L .8

P V I .0

E L .8

0.00%

0.00%

L 50.00'

K 5.00

L 25.00'

K 2.50

10.0% APPROX.

M B

E R

L A

N D R

IV

E R W

A T

E R

S H

E D

W P

B

M

/2

/2

M

F C

M

F C

M S

IT

E R

E S

T O

R A

T

IO

N

C E

N T

E R H

IL

L D

/2

/2

N A

S H

V

IL

L E T

E N

N E

S S

E E

N A

S H

V

IL

L E D

IS

T R

IC

T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

-C

H S

R

C R -1

.d g n

N

40'

SCALE:1''=20'

0 20'10'

NEW PAVILLION

NEW COMFORT STATION

GUARDRAIL

COURTESY DOCK ACCESS

0+

CR-104

N A

S H

V

IL

L E D

IS

T R

IC

T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

6 IN. OF TDOT #1 STONE

TOP OF 8 IN. CONCRETE SLAB

BOAT PREP LANES

LOCATION

TRENCH DRAIN

APPOXIMATE

TRENCH DRAIN OUTFLOW

N A

S H

V

IL

L E T

N

AND COURTESY DOCK

SIDEWALK TO BOAT RAMP

E

IS

E N

H O

W E

R P

A R

K R

E S

T O

R A

T

IO

N

P L

A N A

N D P

R O

F

IL

E

A C

C E

S S R

A

P

WATERLINE AT TIME OF SURVEY

OUTLET

ENSURE POSITIVE DRAINAGE TOWARD

INCHES MIN. BELOW PAVEMENT SURFACE;

PERFORATED HDPE PIPE SHALL BE PLACED 24

TOWARD OUTLET

ENSURE POSITIVE DRAINAGE

C R

B

C R

B

F C

M /2

/1

U

P D

A T

E D P

E R

F O

R A

T E

D P

IP

E L

A Y

O U

T

HDPE FLARED END SECTION

HDPE FLARED END SECTION

4 IN. PERFORATED HDPE PIPE

N

S I

M

/2

/2

/2

/2

N A

S H

V

IL

L E T

E N

N E

S S

E E

N A

S H

V

IL

L E D

IS

T R

IC

T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

M

F C

M

Q -C

H S

R

C R -2

.d g n

C

C

C

C

6 IN. TDOT #1 STONE

6 IN. TDOT #1 STONE

6 IN. TDOT #1 STONE

EXISTING SHOTROCK FILL

FINAL DESIGN SURFACE

FINAL DESIGN SURFACE

EXISTING SHOTROCK FILL

EXISTING SHOTROCK FILL

CENTERED IN CONCRETE SLAB

#6 BARS @ 12" O.C. BOTH WAYS

CURB AND REINFORCEMENT DETAILS

CR-201

SEE PLAN VIEW

WIDTH VARIES FOR TURNOUT;

SEE PLAN VIEW

WIDTH VARIES FOR TURNOUT:

SEE PLAN AND PROFILE

MATCH BOATRAMP GRADE

BOATRAMP GRADE

FINAL DESIGN SURFACE

8 IN. CIP CONCRETE SLAB

8 IN. CIP CONCRETE SLAB

8 IN. CIP CONCRETE SLAB

8 IN. CIP CONCRETE SLAB

12.0ft12.0ft

5.0ft SIDEWALK

EXISTING SHOTROCK FILL

SURFACE

FINAL DESIGN

10.0ft12.0ft12.0ft10.0ft

12.0ft12.0ft 5.0ft

5.0ft

6 IN. TDOT #1 STONE

.5 ft

.5ft

.5ft

6 IN. TDOT #1 STONE

SIDEWALK

CENTERED IN 6 IN. CONCRETE

#4 BARS @ 12" O.C. BOTH WAYS

6 IN. CIP CONCRETE SIDEWALK

6 IN. CIP CONCRETE SIDEWALK

SIDEWALK

6 IN. CIP CONCRETE

C E

S S R

A M

P S

E C

T

IO

N S

N A

S H

V

IL

L E D

IS

T R

IC

T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

TRANSITIONS

PLAN VIEW FOR

PULLOFF AREA; SEE

BETWEEN CURB AND WALKWAY

PROVIDE CONTRACTION JOINT

ENGINEERED ROCK FILL

IN-SITU MATERIAL AND

6 IN. TDOT #1 STONE

F C

M U

P D

A T

E D U

P H

IL

L C

U R

B T

O M

O U

N T

A B

L E

/2

/1

MAXIMUM

COMPACTED TO 95% OF

ENGINEERED ROCK FILL

IN-SITU MATERIAL AND

F C

M /2

/1

A

D D

E D C

O M

P A

C T

IO

N D

E N

S

IT

Y N

O T

E T

O

PERF. HDPE PIPE

PERF. HDPE PIPE

PERF. HDPE PIPE

M /0

/1

S H

V

IL

L E T

E N

N E

S S

E E

A D

D E

D P

E R

F

H D

P E P

IP

E T

O S

E C

T

IO

N S

E L E

V A

T

IO

N

0 10 20 30 40 50-10-20-30-40-50

0+15

E L E

V A

T

IO

N

E L E

V A

T

IO

N

0 10 20 30 40 50-10-20-30-40-50

0+60

E L E

V A

T

IO

N

E L E

V A

T

IO

N

0 10 20 30 40 50-10-20-30-40-50

1+65

E L E

V A

T

IO

N

E L E

V A

T

IO

N

0 10 20 30 40 50-10-20-30-40-50

2+70

E L E

V A

T

IO

N

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

D A

T E

A P

P R

®of Engineers

US Army Corps

ID

Sheet of Engineers

N

S

M

/2

/2

M

F

/2

/2

N A

S H

V

IL

L E T

E N

N E

S S

E E

N A

S H

V

IL

L E D

IS

T R

IC

T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

-C

H S

R

C R -1

.d g n

N

N A

S H

V

IL

L E D

IS

T R

IC

T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

20'

SCALE:1"=20'

40'0

Horizontal scale 1" = 20'

Vertical scale: 1" = 10'

HWY 96

APPROXIMATE TOE OF EXCAVATION

50' INSIDE TURNING RADIUS

75' DIA. TURN-AROUND

A 50' TO 30' TURNING RADIUS

INSIDE SHOULDER TO REDUCE FROM

INSIDE SHOULDER TO TURN

20.0 ft

CR-105

P L

A N A

N D P

R O

F

IL

E

H W

Y

E

N T

R A

N C

E T

O B

O A

T R

A M

P

TO BE OVERLAYED WITH ASPHALT

#6 REBAR AT 12 IN. O.C. EACH WAY; SLAB

CONSTRUCT 8 IN. CONCRETE SLAB WITH

TO BE DEMOLISHED AND REMOVED

PAVEMENT FROM ROADWAY REALIGNMENT

AT PIPE OUTLET

FLARED END SECTION

CONSTRUCT PRECAST

MIN. 30 FT CIRCULATION LANE

MIN. 30 FT CIRCULATION LANE

RADIUS

TURNING

40' INSIDE

ALIGNMENT - ENTRANCE

PROFILE ALONG

0+50

700700

0+00 0+25 0+50 0+75 1+00 1+25 1+50

E L E

V A

T

IO

N

E L E

V A

T

IO

N

J H

ALIGNMENT - EXIT

TREATMENT

GUARDRAIL END

15.0 ft M

IN

ACCESS GATE

EXTEND 50' BEYOND

GUARDRAIL TO

50.0ft

ACCESS GATE

WIDE.

WIDE. CIRCULATION LANES SHOULD BE A MINIMUM OF 30 FEET

4. TRUCK WITH TRAILER SPACES SHALL BE 50 FT LONG BY 10 FT

CURB DETAILS FOR APPROVAL

3. SUBMIT PROPOSED CURB AND GUARDRAIL CONFIGURATION AND

SAFETY AND FUNCTION.

2. DIMENSIONS PROVIDED SERVE AS MINIMUM REQUIREMENTS FOR

1. SUBMIT FINAL PARKING CONFIGURATION FOR APPROVAL BY COR.

NOTES:

ENTRANCE INSIDE SHOULDER ALIGNMENT

ENTRANCE INSIDE SHOULDER ALIGNMENT

NEW SIDEWALK

EDGE OF CURB

EXISTING GROUND ALONG

SMOOTH TRANSITION FROM HWY 96 ONTO NEW LOT

PLACE ADDITIONAL WEDGING TO PROVIDE A

E L : 0 .0

E : 2

.0

N : 6

.1

E L : 0 .0

E : 2

.0

N : 6

.0

E L : 0 .0

E : 2

.1

N : 6

.5

E L : 0 .0

E : 2

.9

N : 6

.3

E L : 0 .0

E : 2

.1

N : 6

.3

AT 15 FT O.C. AS SHOWN.

PLACE FLEXIBLE DELINEATOR POSTS

AT 15 FT O.C. AS SHOWN.

PLACE FLEXIBLE DELINEATOR POSTS

M A

D D

E D F

L E

X

IB

L E D

E L

IN

E A

T O

R P

O S

T S T

O E

X

IT

/0

/1

N A

S H

V

IL

L E T

E N

N E

S S

E E

C U

M B

E R

L A

N D R

IV

E R W A

T E

R S

H E

D

S

IT

E R

E S

T O

R A

T

IO

N

C E

N T

E R H

IL

L D

A M

E

IS

E N

H O

W E

R P

A R

K R

E S

T O

R A

T

IO

STOP

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

D A

T E

A P

P R

®of Engineers

US Army Corps

ID

Sheet of Engineers

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

®of Engineers

US Army Corps of Engineers

US Army Corps

IS

S

U E D

A T

E

720720

720720

0+00 0+50 1+00 1+50 2+00 2+50

E L E

V A

T

IO

N

E L E

V A

T

IO

STATION

M

/2

/2

M

F C

M

F

/2

/2

N A

S H

V

IL

L E T

E N

N E

S S

E E

N A

S H

V

IL

L E D

IS

T R

IC

T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

-C

H S

R

C R -1

.d g n

N

40'

SCALE:1''=20'

0 20'10'

CATCH BASIN

CATCH BASIN

TOP OF BERM

DESIGN SURFACE

EXISTING SURFACE

D R

A

IN

A G

E I

M P

R O

V E

M E

N T S

H W

Y

CATCH BASIN

GROUT CURTAIN AND

SLOPE TO DRAIN TOWARD

1V:2H

1V:2H

L E

F T R

IM

C

U T

C U

M B

E R

L A

N D R

IV

E R W

A T

E R

S H

E D

C E

N T

E R H

IL

L D

A M

S

IT

E R

E S

T O

R A

T

IO

N W

P

B

N A

S H

V

IL

L E D

IS

T R

IC

T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

N A

S H

V

IL

L E T

N

CR-110

COVER OVER PIPE

MAINTAIN A 24 IN. MIN.

HWY 96

2 IN. ASPHALT SURFACE OVERLAY

ROCK FILL.

GOVERNMENT PROVIDED ENGINEERED

WITH NO LESS THAN 30 IN. OF

LAKESIDE SLOPE TO BE ARMORED

TO BE REMOVED

CONCRETE UTILITY BOX

WALL CENTERLINE

UNDERGROUND BARRIER

E

IS

E N

H O

W E

R P

A R

K R

E S

T O

R A

T

IO

N

EL. 699.5

EL. 690.9

EL. 688.9

1.5% MIN.

10% MIN.

FLOW. SUBMIT PROPOSED PRODUCT.

SHOULD HAVE DISSIPATOR BLOCKS TO SLOW

PRECAST STRUCTURE. OUTLET STRUCTURE

NON-SHRINK GROUT TO ANCHOR PIPE INTO

WHERE PIPE DAYLIGHTS ON SLOPE. USE

CONSTRUCT PRECAST OUTLET STRUCTURE

WEIR CHANNEL TOES OF SLOPE.

FILL EXTENDING 24 INCHES BEYOND THE WIDTH OF THE

BACKSIDE SLOPE WITH 30 INCHES OF ENGINEERED ROCK

WEIR OVERFLOW TOWARD EXISTING DRAIN PATH; ARMOR

12 INCHES LOWER THAN THE REST OF THE BERM; DIRECT

PROVIDE 8 FOOT WIDE LOW FLOW WEIR APPROXIMATELY

ROAD TO THE INSIDE OF BASIN

PROVIDE 10% GRADE ACCESS

TO THE ROADSIDE DITCH

BERM ROUTING ANY OVERFLOW DRAINAGE

PROVIDE ENGINEERED ROCK FILL CUTOFF

8.00ft

EXISTING FENCE

F

T

AND ENGINEERED ROCK FILL

WITH STRIPPED AGGREGATE

BASIN BERM; CONSTRUCTED

30 IN. CLASS III RCP

30IN. CLASS III RCP

GROUND

24 IN. ABOVE EXISTING

8FT WIDE BERM APPROX.

8 F T

CR-507 FOR DETAILS)

GRATED INLET (SEE SHEET

4FT x 8FT CATCH BASIN WITH

(SEE SHEET CR-505)

30 IN. CLASS III RCP

SIZED TO ACCOMMODATE

PIPE GRADE CHANGE

NEW CATCH BASIN FOR

EXISTING ROADSIDE DITCH

UTILITY BOX TO BE REMOVED

JOINTS IN CONCRETE SLAB

ROCK FILL

ENGINEERED

PIPE

REINFORCED CONCRETE

30 INCH CLASS III

LRM-21

M0056

M0147

IMPROVEMENT OPTION.

WILL BE CONSTRUCTED AS PART OF THE LEFT RIM DRAINAGE

THE RCP PASSING UNDER HWY 96 INCLUDING THE 4 X 8 CATCH BASIN

CONSTRUCTED AS PART OF THE BASE CONTRACT. THE PORTION OF

BASIN AND END TREATMENT WITH DISSIPATOR BLOCKS SHALL BE

ACROSS THE EISENHOWER PARK PARKING LOT TO INCLUDE THE CATCH

6. RCP CONSTRUCTION SHALL BE EXECUTED IN PHASES. THE RCP

NON-INLET SIDE.

OF THE BASIN AND ANY ENGINEERED ROCK FILL IS PLACED ON THE

THE STRIPPED AGGREGATE AND EARTH IS PLACED ON THE INLET SIDE

ANY ADDITIONAL REQUIRED FILL TO CONSTRUCT THE BASIN. ENSURE

CONCRETE BLOCK SYSTEM PLACEMENT. USE ENGINEERED ROCK FOR

EXCAVATION OPERATIONS IN PREPARATION FOR ARTICULATED

SOIL PRODUCED AS PART OF GROIN AREA STRIPPING AND MINOR

5. TO CONSTRUCT THE BASIN, USE THE RESULTING AGGREGATE AND

TO THE CONTRACTOR UPON CONTRACT AWARD.

4. THE DESIGN TERRAIN MODEL (.DTM) OF THE BASIN WILL BE PROVIDED

3. SOME FIELD ADJUSTMENTS ARE PERMITTED PENDING COR APPROVAL.

STRUCTURES AND APPROXIMATE ELEVATIONS ARE MET.

INVERTS TO VERIFY POSITIVE DRAINAGE EXISTS BETWEEN DRAINAGE

2. UPON CONSTRUCTION COMPLETION, SURVEY PIPE INLET AND OUTLET

APPROVAL PRIOR TO ANY CONSTRUCTION OPERATIONS.

PERFORMING THIS WORK. SUBMIT TRAFFIC CONTROL PLAN FOR

1. ONE LANE OF TRAFFIC SHALL BE OPEN AT ALL TIMES WHILE

NOTES:

F C

M A

D D

E D G

U A

R D

R A

IL

A

N D S

IG

N S

/0

/1

NEW GUARDRAIL

ON BOTH ENDS

TYPE 38 END TREATMENT

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

D A

T E

A P

P R

®of Engineers

US Army Corps

ID

Sheet of Engineers

655 660

C B

740 745

0 805

810820

N

S I

D

C U

M B

E R

L A

N D R

IV

E R W

A T

E R

S H

E D

W P

B

M

/2

/2

V

R

IO

U S

L C

T

K

W

E R

E S

T O

R A

T

IO

N

E

IS

E N

H O

W E

R P

A R

K R

E S

T O

R A

T

IO

N

C E

N T

E R H

IL

L D

/2

/2

N A

S H

V

IL

L E T

E N

N E

S S

E E

N A

S H

V

IL

L E D

IS

T R

IC

T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

-C

H S

R

C U -1

.d g n

N

N A

S H

V

IL

L E D

IS

T R

IC

T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

W E

R L

IN

E O

V E

R A

L L P

L A

N

CU-100

TO GROUT CURTAIN

EXISTING PAVED ACCESS

HWY 14

NEW 3000 GAL. SEPTIC TANK

NEW 3000 GAL. DOSING TANK

CONSTRUCTED IS NOT SHOWN

ARTICULATED BLOCK TO BE

CONTRACTING OFFICER

ENGINEER YARD UNLESS OTHERWISE APPROVED BY THE

SEWER LINE SHOULD PASS AROUND THE EAST SIDE OF THE

SCALE:1"=100'

200'100'

EMBANKMENT

BURIED UP THE

LINE TO REMAIN

DETERMINED IN THE FIELD

EXACT LOCATION TO BE

LINE TO CROSS UNDER HWY 96;

TOP OF BANK

TO NEWLY CONSTRUCTED

CONCRETE WORK PLATFORM

LINE WILL PASS THROUGH

CONCRETE SLAB

CONSTRUCTED

PULVERIZED AND NEWLY

LINE TO RUN UNDER

DETERMINED IN THE FIELD

TO COMFORT STATION TO BE

EXACT APPROACH AND TIE-IN

NEW PAVILLIONS

N A

S H

V

IL

L E T

N

INCIDENTAL TO PIPE PLACEMENT.

PLACEMENT SHALL BE CONSIDERED

OF WORK PLATFORM FOR WATERLINE

ADDITIONAL SAWCUTTING AND REMOVAL

ADEQUATE SPACE FOR PIPE BURIAL;

PLATFORM MAY BE REQUIRED TO PROVIDE

ADDITIONAL SAWCUTTING OF THE WORK

HWY 96

LANCASTER ROAD

WORK PLATFORM

ACROSS HWY 96 TO EDGE OF DAM

PROVIDE DUCTILE IRON PIPE SLEEVE

CONNECTED AT A 45° ANGLE TO HELP DETER BACKFLOW

IN THE APPROXIMATE LOCATION SHOWN; LINE WILL BE

THE RECENTLY CONSTRUCTED LEFT BANK SEWER LINE

EISENHOWER PARK WASTEWATER LINE WILL BE CONNECTED TO

LIFT STATION 1 (LS1)

EXIST.

LIFT STATION 2 (LS2)

EXIST.

FOR FUTURE WATERLINE CONNECTION

PROVIDE TEE STUB FOR FUTURE

LA-2

LA-3

LA-6 LA-7

LA-8

LA-9

Z05-RIO

Z06-RIO

LA-4

33 30 00 FOR DETAILS

SEE SPECIFICATIONS SECTION

2" DIA. PIPE - HDPE

COMFORT STATION

NEW PRECAST

CONSTRUCTION

TO REMAIN INTACT DURING

INTRUMENTATION ELECTRICAL LINES

SPECIFICATION CRITERIA.

10. ANY INSTRUMENTATION LINES DAMAGED DURING CONSTRUCTION SHALL BE REPAIRED BY AN ELECTRICIAN MEETING

SHALL BE FURNISHED AND INSTALLED BY THE CONTRACTOR.

MENTIONED IN THE SPECIFICATIONS OR SHOWN ON THE DRAWINGS BUT NECESSARY TO FULLY COMPLETE THE WORK

9. THE WORK SHALL BE COMPLETE IN EVERY RESPECT AND THAT ANY MATERIAL OR WORK NOT SPECIFICALLY

STRINGENT REQUIREMENT SHALL APPLY.

STANDARDS. WHERE A CONFLICT EXISTS BETWEEN CODES & STANDARDS, & THE PROJECT DOCUMENTS, THE MORE

8. ALL WORK SHALL MEET OR EXCEED ALL APPLICABLE LOCAL & NATIONAL SANITARY WASTE CODE REQUIREMENTS OR

ALIGNMENTS TO FACILITATE LOCATING COMPONENTS AND PIPES FOR FUTURE CONSTRUCTION EFFORTS AS NEEDED.

7. IN ADDITION TO ASBUILT MARKUPS IN CAD, SUBMIT SURVEYED X,Y,Z DATA OF ALL SEWER COMPONENTS AND PIPE

IDENTIFIED BY BIOLOGIST IS REQUIRED TO BE REMOVED THEN ADDITIONAL COORDINATION MAY BE REQUIRED.

A MEETING WITH A BIOLOGIST IS REQUIRED BEFORE TREE REMOVAL. IF POTENTIAL SUMMER ROOST BAT HABITAT

6. CONTRACTOR SHALL COORDINATE WITH COR PRIOR TO ANY TREE REMOVAL OR CHANGE TO PROPOSED PIPING PLAN.

12 INCHES MINIMUM. PROVIDE DUCTILE IRON PIPE SLEEVE THAT COMPLIES WITH AWWA C151 CL350.

5. PROVIDE DUCTILE IRON PIPE SLEEVE FOR ALL PIPE CROSSINGS UNDER ROADS. BURIED DEPTH FOR TOP OF SLEEVE IS

SUBSURFACE SEWAGE DISPOSAL.

ACCORDANCE TO TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION's REGULATION TO GOVERN

TANK, COMPONENTS, ETC. SHALL MEET THE REQUIRED DISTANCE FROM STREAM, SINK HOLES, DITCHES, ETC. IN

4. UNLESS OTHERWISE APPROVED BY THE GOVERNMENT, LOCATIONS OF SEWER LINES, THE SEPTIC TANK, THE DOSING

STREAMS, CULVERTS, BRIDGES, UTILITIES, ETC PRIOR TO SUBMITTING THE BID.

DRAWINGS FOR GOVERNMENT APPROVAL. CONTRACTOR SHALL VERIFY LOCATIONS OF ALL EXISTING SEPTIC TANKS, APPROXIMATE. FINAL EXACT LOCATIONS SHALL BE DETERMINED BY THE CONTRACTOR AND SHOWN ON THE SHOP

3. LOCATIONS FOR THE SEPTIC TANK, DOSING TANK, LIFT STATIONS, SEWER LINES AND OTHER EQUIPMENT ARE

SHOULD BE BETWEEN 3 AND 5 FEET AND COMPLY WITH ABA STANDARDS.

FROM TRAFFIC. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS OF BOLLARDS FOR GOVERNMENT APPROVAL. SPACING

2. NEW BOLLARDS SHALL BE INSTALLED AROUND ELECTRICAL CONTROLS AND OTHER EQUIPMENT TO PROTECT THEM

CAST-IN-PLACE CONCRETE TANKS SHALL BE ACCEPTABLE.

1. CONCRETE SEPTIC AND DOSING TANKS SHALL HAVE H-20 DESIGN LOAD. SEE DWG. CU-501 FOR DETAILS.

SEWER LINE NOTES:

TO REMAIN INTACT DURING CONSTRUCTION

INTRUMENTATION ELECTRICAL LINES

PIPE SLEEVE LIMITS

APPROXIMATE DUCTILE IRON

FOR ROADWAY CROSSING

DUCTILE IRON PIPE SLEEVE REQUIRED

YARD HYDRANT AT CONNECTION

BELOW GROUND. PROVIDE

AT WEST ADIT DOOR 24 IN.

WATERLINE LOCATED

TIE INTO EXISTING 2 IN. PVC

/0

/1

F

C M

A D

D E

D H

Y D

R A

N T A

T A

D

IT

D

O O

R A

N D N

O T

E

GROUND SURFACE WITH FREE DRAINING OPERATING PIPE TO PREVENT FREEZING.

CASING AND 1 INCH BRASS HOSE NOZZLE. SHUT-OFF VALVE TO BE LOCATED 24 IN. BELOW

10. YARD HYDRANT AT CONNECTION SHALL BE A 125 PSI RATED WITH BRASS PIPE OUTER

APPLICABLE.

9. MINIMIZE THE FRICTION FORCES WITH APPROVED JOINT LUBRICATION, WHEN

MARKED ON THE PIPE PRIOR TO INSTALLION.

8. AVOID OVER INSERTION OF JOINTS. EACH PIPE END SHALL HAVE THE LIMIT OF INSERTION

COMPONENTS AND CONCRETE THRUST BLOCKS.

7. THE CONTRACTOR WILL PROVIDE X AND Y DATA LOCATION FOR ALL NEW PIPES,

STRINGENT REQUIREMENT GOVERNS.

ARISES BETWEEN THE LOCAL CODES AND THE PLANS & SPECIFICATIONS, THEN THE MORE

PLUMBING, AND FIRE PROTECTION CODE REQUIREMENTS OR STANDARDS. IF A CONFLICT

6. ALL WORK SHALL MEET OR EXCEED ALL APPLICABLE LOCAL AND NATIONAL MECHANICAL,

CONTRACT COMPLETION.

5. CONTRACTOR SHALL PRESSURE TEST, DISINFECT, AND FLUSH ALL NEW PIPING PRIOR TO

INFORMATION FOR APPROVAL BY THE GOVERNMENT PRIOR TO PURCHASE.

FITTINGS ARE PER THE SPECIFICATIONS. CONTRACTOR SHALL SUBMIT PRODUCT

4. NEW WATER PIPING, GATE VALVES, AND ALL OTHER MISCELLANEOUS CONNECTION

WITHIN 48 HOURS.

PROGRESS IN A MANNER SO THAT THE CONTRACTOR CAN BACKFILL ALL OPEN TRENCHES

3. UNLESS OTHERWISE APPROVED, TRENCH EXCAVATION AND PIPE PLACEMENT SHALL

CONSTRUCTED AS PART OF THIS CONTRACT.

THE WEST ADIT DOOR AND CONNECTION TO THE PRECAST COMFORT STATION TO BE

2. NEW WATER LINE INSTALLATION INCLUDES CONNECTION TO THE EXISTING PVC LINE AT

OFFICER PRIOR TO CONSTRUCTION.

COORDINATE DISCREPANCIES AND FINAL PIPE ALIGNMENT WITH THE CONTRACTING

EXISTING UTILITIES AND SITE FEATURES PRIOR TO BEGINNING CONSTRUCTION.

1. THE CONTRACTOR SHALL FIELD VERIFY ALL PROPOSED ALIGNMENTS WITH RESPECT TO

WATER LINE GENERAL NOTES:

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

D A

T E

A P

P R

®of Engineers

US Army Corps

ID

Sheet of Engineers

N

S I

D

W P

B

M

/2

/2

R

IO

U S

L C

T

K

IS

E N

H O

W E

R P

A R

K R

E S

T O

R A

T

E R

E S

T O

R A

T

IO

N

C E

N T

E R H

IL

L D

A M

C U

M B

E R

L A

N D R

IV

E R W

A T

E R

S H

E D

/2

/2

N A

S H

V

IL

L E T

E N

N E

S S

E E

N A

S H

V

IL

L E D

IS

T R

IC

T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

S H

V

IL

L E D

IS

T R

IC

T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

Q -C

H S

R

C U -5

.d g n

CU-502

P

IP

E T

R E

N C

H

IN

G D

E T

A

IL

S

S E

W E

R A

N D W

A T

E R

L

IN

E

BACKFILL

TDOT NO. 10

1. WHERE APPLICABLE, TAPER CONSTRUCTION JOINTS BETWEEN ASPHALT LAYERS

NOTE:

.5 F

T

8 IN.

I

N

I

N

D

12 INCHES OF GRAVEL

6 INCHES TOPSOIL OR

CRUSHED STONE OR DGA

5 INCHES MINIMUM OF

PROPOSED REINFORCEMENT PLAN

REINFORCED CONCRETE; SUBMIT

6 IN. 4000 PSI FIBER OR STEEL

N A

S H

V

IL

L E T

N

1. WHERE APPLICABLE, TAPER CONSTRUCTION JOINTS BETWEEN ASPHALT LAYERS

NOTE:

INITIAL BACKFILL

BEDDING AND

EXISTING ASPHALT

FLOWABLE FILL

25FT

ASPHALT SURFACE

MIN. 2 INCHES OF NEW

TRANSITION

TIE-IN AND SMOOTH

TO PROVIDE FULL DEPTH

MILL EXISTING ASPHALT

F

T M

IN

25FT

1. WHERE APPLICABLE, TAPER CONSTRUCTION JOINTS BETWEEN ASPHALT LAYERS

NOTE:

INITIAL BACKFILL

BEDDING AND

FLOWABLE FILL

I

N

ASPHALT SURFACE

2 INCHES OF NEW

EXISTING CONCRETE SLABS

F

T M

IN

I

N

PRESENT

NO JOINTS ARE

JOINT OR 12 IN. WHEN

OR CONCRETE

EXISTING SIDEWALK

F

T

12 IN.

I

N

F C

M /0

/1

DUCTILE IRON PIPE SLEEVE

R E

M O

V E

D D

IP

S

L E

E V

E F

R O

M S

E C

T

IO

N S

NON-TRAFFIC OR GRAVEL AREA

CL

CL

TYPICAL TRENCH DETAILS

CL

TDOT NO. 10

N.T.S.

TRAFFIC OR PARKING AREA (ASPHALT)

UNDER STATE ROADWAYS

CL

EISENHOWER PARK MAIN LOT GROIN WORK PLATFORM

AND CONCRETE PORTION OF

SIDEWALK CUT-THROUGH DETAIL

NOTES:

1. OPEN TRENCHES AND EXCAVATIONS AT THE CONSTRUCTION SITE

SHALL BE PROMINENTLY MARKED WITH ORANGE FLAGS AND

BARRICADES IN ACCORDANCE WITH EM 385-1-1.

2. MILLED AND DEMOLISHED ASPHALT AND CONCRETE SHALL BE

DISPOSED OF OFF SITE AT THE CONTRACTOR'S EXPENSE IN

ACCORDANCE WITH FEDERAL, STATE, AND LOCAL DISPOSAL

REGULATIONS, UNLESS OTHERWISE APPROVED BY THE COR.

3. ANY DAMAGE TO FENCES, LIGHTS, ASPHALT, OR OTHER

STRUCTURES CAUSED BY THE CONTRACTOR'S OPERATIONS, SHALL

BE REPAIRED AT THE CONTRACTOR'S EXPENSE.

4. LOCATIONS OF THE EXISTING ABOVEGROUND AND

UNDERGROUND UTILITIES INDICATED ON THE PLANS ARE

APPROXIMATELY ONLY, AND THOSE INDICATED ARE NOT

NECESSARILY ALL WHICH MAY EXIST ON THE PROJECT SITE. THE

CONTRACTOR SHALL DETERMINE THE LOCATION OF ALL UTILITIES

ON THE PROJECT.

5. UNLESS OTHERWISE INDICATED, DO NOT DISTURB EXISTING

UTILITIES. ANY DAMAGE TO THE UTILITIES OR INTERRUPTIONS OF

THE SERVICE CAUSED BY THE CONTRACTOR'S OPERATIONS SHALL

BE REPAIRED AND THE SERVICE RESTORED PROMPTLY AT THE

CONTRACTOR'S EXPENSE.

6. IF BORING AND JACKING IS PREFERED OVER REPLACING THE

ASPHALT, CONTRACTOR MUST SUBMIT PROPOSED WORKPLAN.

7. A DUCTILE IRON PIPE SLEEVE WILL NOT BE REQUIRED FOR PIPE

PLACEMENT UNDER THE CONCRETE PAVED PORTION OF THE

GROUT CURTAIN LOCATED ON THE DOWNSTREAM SIDE OF THE DAM

OR UNDER THE CONCRETE AT EISENHOWER PARK.

8. REFER TO THE SPECIFICATIONS FOR WARNING AND

IDENTIFICATION TAPE REQUIREMENTS.

9. USE 12" OF DENSE GRADE AGGREGATE OR CRUSHED STONE

PLACED IN TWO LIFTS AND COMPACTED TO A FIRM AND STABLE

STATE FOR LOCATIONS WHERE TRENCHING CUTS THROUGH

EXISTING AGGREGATE SURFACE COURSE.

N

S I

D

C U

M B

E R

L A

N D R

IV

E R W

A T

E R

S H

E D

W P

B

M

/2

/2

R

IO

U S

L C

T

K

E R

E S

T O

R A

T

IO

N

E

IS

E N

H O

W E

R P

A R

K R

E S

T O

R A

T

IO

N

C E

N T

E R H

IL

L D

/2

/2

N A

S H

V

IL

L E T

E N

N E

S S

E E

N A

S H

V

IL

L E D

IS

T R

IC

T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

S H

V

IL

L E D

IS

T R

IC

T

N A

S H

V

IL

L E T

N

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

Q -C

H S

R

C U -5

.d g n

4"

12"12"MAX

6'-8'

PAVEMENT VARIES

R.O.W.

P

IP

E C

A S

IN

G D

E T

A

IL

S

CU-504

EXISTING GRADE

CASING SPACERS OR APPROVED EQUAL.

PSI MODEL CODE NUMBER HTR/HTR - 11.10X19-OL

PER MANUFACTURERS RECOMENDATIONS. USE

CASING PIPE WITH CASING SPACERS, SPACED

PROPOSED CARRIER PIPE TO BE INSTALLED IN

N.T.S.

TYPICAL CASING PIPE INSTALLATION DETAIL

DUCTILE IRON PIPE SLEEVE

WHEN APPLICABLE

EACH DITCH LINE

EXTEND 5 FEET BEYOND

CASING PIPE SHALL

NOTE:

LATEST APPROVED AWWA C150 AND AWWA C151.

1. CASING PIPE SHALL BE OF DUCTILE IRON MEETING THE

SHOWN ON THE DRAWINGS.

CARRIER PIPE MAY BE POSITIONED AT THE ELEVATION

OF THE BORE SHALL BE SUCH THAT THE INVERT OF THE

9. THE ALLOWABLE TOLERANCE AT THE UPSTREAM END POINT

END OF THE BORE.

INCHES INSIDE THE INTERIOR FACE OF THE MANHOLE AT THE

INVERT. FOR SEWERS, THE SIDES SHALL BE A MINIMUM OF 8

ELEVATION NO LOWER THAN THE EXISTING INLET PIPE

SHOWN ON THE DRAWINGS AND ON THE BOTTOM BY AN

TOP BY AN ELEVATION NO HIGHER THAN THE ELEVATION

BE POSITIONED WITHIN A VERTICAL AREA LIMITED ON THE

SHALL BE SUCH THAT THE INVERT OF THE CARRIER PIPE MAY

TOLERANCE AT THE DOWNSTREAM END POINT OF THE BORE

TO THE LINE AND GRADE SPECIFIED. THE ALLOWABLE

COMPLETED CASING BETWEEN THE POINTS SPECIFIED AND

8. THE CONTRACTOR SHALL GUARANTEE A USABLE

ON GRADE.

DETAILED LAYOUT REQUIRED TO KEEP THE TUNNEL OR BORE

CONSTRUCTION. THE CONTRACTOR WILL PROVIDE THE

CONTROL POINTS REQUIRED BY THE CONTRACTOR FOR THIS

7. THE GOVERNMENT WILL PROVIDE THE NECESSARY

THE CASING.

TO OFFSET ANY MINOR VARIATIONS IN THE ALIGNMENT OF

FASTEN ONLY APPROVED BLOCKING TO THE CARRIER PIPE

ACHIEVE PROPER LINE AND GRADE ON THE CARRIER PIPE,

CASING UNLESS OTHERWISE APPROVED. IF NECESSARY TO

AND INSTALLED IN THE CASING BY JACKING IT THROUGH THE

6. CARRIER PIPE SHALL BE FURNISHED BY THE CONTRACTOR

CASING.

PREVENT CAVING IN OF THE EARTH SURROUNDING THE

CASING IS PERMITTED, MAKE PROPER PROVISIONS TO

PRIOR APPROVAL FROM THE COR. IF THE REMOVAL OF

C. DO NOT REMOVE UNACCEPTABLE CASING WITHOUT

IT IS DAMAGED BY WELDING.

REPLACE THE PROTECTIVE COATINGS IN AREA WHERE

PIPE TOGETHER TO PROVIDE WATERTIGHT JOINTS, AND

EXCAVATION PROCEEDS. WELD SECTIONS OF CASING

CASING PIPE INTO THE OPEN CUT AS THE TRENCH

B. FOR OPEN CUT OF CASING PIPES, INSTALL THE

PROVIDE WATER TIGHT JOINTS.

WELD SECTIONS OF CASING PIPE TOGETHER TO

CASING PIPE INTO PLACE AS THE BORING PROCEEDS.

A. FOR BORING CASING PIPE, JACK THE DUCTILE

5. INSTALLATION OF CASING PIPE:

TO THE SIZE, LINE, AND GRADE SHOWN ON THE DRAWINGS.

4. BORING SHALL BE ACCOMPLISHED BY MEANS OF AUGURING

NOTED ON THE DRAWINGS.

3. THE CARRIER PIPE SHALL BE HDPE, UNLESS OTHERWISE

APPROVAL.

ANY ADJUSTMENTS TO THIS MUST BE SUBMITTED FOR

PIPE (DIP) WITH A MINIMUM CALCULATED THICKESS OF 0.25 IN.

2. THE CASING PIPE AN 8 IN. DIAMETER LOCKING DUCTILE IRON

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

D A

T E

A P

P R

®of Engineers

US Army Corps

ID

Sheet of Engineers

US Army Corps

AMENDMENT

SECTION VIEW

SECTION VIEW

ON CASING PIPE

PIPE BELL FROM RESTING

SPACERS MUST PREVENT

NOTE:

CASING PIPE SPACER DETAIL

N.T.S.

MODEL C1 OR S1, OR EQUAL

ADVANCE PRODUCTS AND SYSTEMS

POLYETHELENE CASING SPACERS

AC OR EQUAL

PRODUCTS AND SYSTEMS

END SEAL - ADVANCED

DUCTILE IRON PIPE SLEEVE

A

S H

V

IL

L E T

E N

N E

S S

E E

N A

S H

V

IL

L E D

IS

T R

IC

T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

T P

S

/2

/2

:1

A N

S I

D

N O

T E

S

L

IG

H T

IN

G /E

L E

C T

R

IC

A L

Q -C

H S

R E -0

.d g n

E-001

N A

S H

V

IL

L E D

IS

T R

IC

T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

ELECTRICAL NODE

TRANSFORMER

FUSE

X

ELECTRICAL CONTACT

LIGHT, LETTER DENOTES FIXTURE TYPE

RELAY CONTACTOR

ELECTRIC HEATER

PUSHBUTTON

GROUND

TERMINAL BLOCK

PHOTOELECTRIC CELL

SELECTOR SWITCH

EXTERNAL WIRE (SCHEMATIC)

WATT HOUR METER

ACTIVITIES, THE CONTRACTOR SHALL PROVIDE TOPSOIL AND SEEDING.

7. AT ALL UNPAVED AREAS WHICH ARE DISTURBED DUE TO CONSTRUCTION

THE COST OF OTHER ITEMS.

BY THE CONTRACTOR. COST OF DISPOSAL SHALL BE INCLUDED IN

6. ALL REMOVED EQUIPMENT OR MATERIALS SHALL BE DISPOSED OF

RESIDENTS ALONG THE PROPOSED CONSTRUCTION AREA.

THE SAFETY AND CONVENIENCE OF THE GENERAL PUBLIC AND THE

RELIEVE THE CONTRACTOR FROM HIS RESPONSIBILITIES TOWARD

5. NOTHING IN THE GENERAL NOTES OR SPECIAL PROVISIONS SHALL

PLACED AS PART OF THIS CONTRACT.

4. CONTRACTOR SHALL PROVIDE AS BUILT DRAWINGS OF ALL EQUIPMENT

AT THE DISCRETION OF THE CONTRACTING OFFICERS REPRESENTATIVE.

CONTRACTORS IN THE WORK AREA. CONFLICTS WILL BE HANDLED

3. CONTRACTOR SHALL COORDINATE ACTIVITIES WITH OTHER

OFFICERS REPRESENTATIVE PRIOR TO INSTALLATION OR CONSTRUCTION.

POLE LOCATIONS AND RECEIVE APPROVAL BY THE PROJECT CONTRACTING

OFFICERS REPRESENTATIVE. THE CONTRACTOR SHALL STAKE OR MARK ALL

FROM THE PROPOSED LOCATIONS MUST BE APPROVED BY THE CONTRACTING

2. ADJUSTMENTS IN THE FIELD MAY BECOME NECESSARY. VARIATIONS

PURPOSES ONLY AND ARE NOT STAKED IN THE FIELD.

1. ALL BASELINES SHOWN ON PLANS ARE FOR GRAPHICAL INFORMATION

MISCELLANEOUS

GENERAL NOTES

CIRCUIT BREAKER

UTILITIES

PRIOR TO COMMENCEMENT OF OPERATIONS ON THE UTILITY.

SHALL BE GIVEN AT LEAST TWO (2) AND NOT MORE THAN TEN (10) BUSINESS DAYS

PROPERLY LOCATE THEIR RESPECTIVE UTILITY ON THE GROUND. THIS NOTIFICATION

THE CONTRACTOR SHALL CONTACT THE UTILITY OWNERS AND REQUEST THEM TO

OF OPERATION IN THE AREA OF THE UTILITIES. PRIOR TO COMMENCING WORK,

11. THE CONTRACTOR SHALL NOTIFY EACH INDIVIDUAL UTILITY OWNER OF HIS PLAN

TO BE ADJUSTED CONCURRENTLY WITH THE CONTRACTORS OPERATIONS.

FACILITIES THAT WILL REMAIN IN PLACE. OTHER UTILITY FACILITIES MAY NEED

OF WORK FOR THE PROJECT. WORK MAY BE REQUIRED ADJACENT TO UTILITY

UTILITY RELOCATIONS AND/OR ADJUSTMENTS WILL HAVE UPON THE SCHEDULE

OF ALL AFFECTED UTILITIES IN ORDER TO DETERMINE THE EXTENT OF WHICH

10. THE CONTRACTOR WILL BE SOLELY RESPONSIBLE FOR CONTACTING OWNERS

THE UTILITY COMPANIES INVOLVED.

ONLY. EXACT LOCATIONS SHALL BE DETERMINED IN THE FIELD BY CONTACTING

9. THE LOCATIONS OF UTILITIES SHOWN WITHIN THESE PLANS ARE APPROXIMATE

CONSTRUCTION.

EQUIPMENT WILL BE INCLUDED IN THE PRICE BID FOR OTHER ITEMS OF

PROTECTING UTILITIES FROM DAMAGE AND FURNISHING SPECIAL

WILL BE REQUIRED TO FURNISH SUCH EQUIPMENT. THE COST OF

REQUIRED TO WORK OVER AND AROUND THE UTILITIES, THE CONTRACTOR

OF THIS PROJECT. IN THE EVENT THAT SPECIAL EQUIPMENT IS

TO SAFEGUARD EXISTING UTILITIES FROM DAMAGE DURING CONSTRUCTION

8. THE CONTRACTOR WILL PROVIDE ALL NECESSARY PROTECTIVE MEASURES

ELECTRICAL

TAGS ON ENCLOSURES AND DISCONNECTS.

9. FURNISH AND INSTALL BRASS TAGS OR LAMINATED ENGRAVED IDENTIFICATION

WHICH ALL CHANGES AND DEVIATIONS FROM THE ORIGINAL LAYOUT ARE RECORDED.

8. MAINTAIN AN UP TO DATE SET OF RECORD DRAWINGS AT THE JOB SITE UPON

THE PARTICULAR TYPE MATERIAL.

U.L. LISTING AND LABELING WHERE SUCH STANDARDS HAVE BEEN ESTABLISHED FOR

7. UNLESS OTHERWISE NOTED, ALL MATERIALS REQUIRED SHALL BE NEW AND SHALL BEAR

PANEL WIRE INSULATION SHALL BE TYPE SIS.

ALL WIRING FOR BELOW GRADE INSTALLATIONS SHALL BE TYPE "USE-RHH-RHW" WITH OUTER JACKET.

TYPE CROSS-LINKED POLYETHYLENE (XLP) WIRES, PVC TYPE INSULATION WILL NOT BE PERMITTED.

6. UNLESS OTHERWISE NOTED, ALL INDOOR AND OUTDOOR WIRING SHALL BE 600V, 1/C COPPER

WEATHER-RESISTANT.

AND ALL OTHER LOCATIONS WHERE WIRE TERMINATES. ALL LABELING SHALL BE PERMANENT AND

5. PROVIDE IDENTIFICATION LABELS ON ALL CONDUCTORS AT ALL JUNCTION BOXES, PANELBOARDS

USE MOISTURE TIGHT HUBS FOR ALL CONDUIT ENTRIES INTO EQUIPMENT ENCLISURES.

ENTRIES SHALL NOT BE PRMITTED. ALL CONDUIT CONNECTIONS SHALL BE MOISTURE TIGHT

CONDUIT SHALL ENTER ONLY THROUGH THE NOTTOM OF THE ENCLOSURE. TOP CONDUIT

4. FOR ALL JUCTION BOXES AND ENCLAUSERS INSTALLED IN DAMP AND WET LOCATIONS;

THE "NATIONAL ELECTRICAL CODE" AND LOCAL BUILDING CODES.

SHALL CONFORM TO THE REQUIREMENTS OF THE LATEST EDITION OF

ADJUSTMENT MAY BE NECESSARY. ELECTRICAL POWER SERVICE DUCT

3. ALL CONDUIT RUNS SHOWN ON THE PLANS ARE SCHEMATIC AND FIELD

REPRESENTATIVE.

DETERMINED BY FIELD CONDITIONS UPON APPROVAL OF CONTRACTING OFFICERS

2. PROPOSED CONDUIT LOCATIONS ARE APPROXIMATE. EXACT LOCATIONS TO BE

1. PULL BOXES SHALL BE INSTALLED AT A DISTANCE OF 300' MAX BETWEEN BOXES.

LIGHTING GENERAL NOTES

THE "NATIONAL ELECTRICAL CODE" AND LOCAL BUILDING CODES.

ELECTRICAL POWER SERVICE DUCT SHALL CONFORM TO THE REQUIREMENTS OF THE LATEST EDITION OF

4. ALL CONDUIT RUNS SHOWN ON THE PLANS ARE SCHEMATIC AND FIELD ADJUSTMENT MAY BE NECESSARY.

THE PRICE BID FOR OTHER ITEMS OFCONSTRUCTION.

COST OF PROTECTING UTILITIES FROM DAMAGE AND FURNISHING SPECIAL EQUIPMENT WILL BE INCLUDED IN

OVER AND AROUND THE UTILITIES, THE CONTRACTOR WILL BE REQUIRED TO FURNISH SUCH EQUIPMENT. THE

DURING CONSTRUCTION OF THIS PROJECT. IN THE EVENT THAT SPECIAL EQUIPMENT IS REQUIRED TO WORK

3. PROVIDE ALL NECESSARY PROTECTIVE MEASURES TO SAFEGUARD THE EXISTING UTILITIES FROM DAMAGE

THE DISCRETION OF THE CONTRACTING OFFICER'S REPRESENTATIVE.

2. COORDINATE ACTIVITIES WITH OTHER CONTRACTORS IN THE WORK AREA. CONFLICTS WILL BE HANDLED AT

OR CONSTRUCTION.

AND RECEIVE APPROVAL BY THE PROJECT CONTRACTING OFFICER REPRESENTATIVE PRIOR TO INSTALLATION

CONTRACTING OFFICERS REPRESENTATIVE. THE CONTRACTOR SHALL STAKE OR MARK ALL POLE LOCATIONS

THE FIELD MAY BE NECESSARY. VARIATIONS FROM THE PROPOSED LOCATIONS MUST BE APPROVED BY THE

1. THE LOCATIONS OF UTILITIES SHOWN WITHIN THESE PLANS ARE APPROXIMATE ONLY. ADJUSTMENTS IN

V A

R

IO

U S

WHICH WILL SUPPLY ELECTRICAL SERVICE FOR THE SITE AS SHOWN ON DRAWINGS.

COORDINATING WITH UPPER CUMBERLAND ELECTRIC MEMBERSHIP CORPORATION (UCEMC)

STATION AT EISENHOWER PARK. THE SCOPE ALSO INCLUDES CONTACTING AND

CENTER HILL DAM RESTORATION CONTRACT, INTERSECTION LIGHTING AND COMFORT

LIGHT POLE PIERS, CONDUCTORS AND ANY OTHER WORK DESCRIBED HEREIN FOR THE

RISERS, PANELBOARDS, LIGHTING CONTROL ENCLOSURES, LIGHT POLES, FIXTURES,

THE SCOPE OF WORK INCLUDES THE INSTALLATION OF CONDUIT, PULL BOXES, CONDUIT

SCOPE

C T P

/0

S H

V

IL

L E T

E N

N E

S S

E E

S P

E L L E

D O

U T U

C E

M C I

N S

C O

P

M B

E R

L A

N D R

IV

E R W

A T

E R

S H

E D

S

IT

E R

E S

T O

R A

T

IO

N

C E

N T

E R H

IL

L D

A M

E

IS

E N

H O

W E

R P

A R

K R

E S

T O

R A

T

IO

N

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

D A

T E

A P

P R

®of Engineers

US Army Corps

ID

Sheet of Engineers

WH

LEGEND

Zq - 480V DISCONNECT

W - WATTS

CORPORATION

ELECTRICAL MEMBERSHIP

UCEMC - UPPER CUMBERLAND

TD - TIME DELAY RELAY

SS - SELECTOR SWITCH

RL - ROADWAY LIGHTS

q - 480V SERVICE CLASSIFICATION

PL - PILOT LIGHT

PE - PHOTOELECTRIC CELL

PDP - POWER DISTRIBUTION PANEL

NC - NORMALLY CLOSED

NO - NORMALLY OPEN

N - NEUTRAL

LCP - LIGHTING CONTACTOR PANEL

LC - LIGHTING CONTACTOR

LT - LIGHT

HTR - HEATER

HM - HIGH MAST

GND - GROUND

GRN - GREEN

DS - DISCONNECT SWITCH

CR - CONTROL RELAY

CB - CIRCUIT BREAKER

C - CONDUIT

AWG - AMERICAN WIRE GAUGE

ABBREVIATIONS

N

S

P

S

/2

/2

N A

S H

V

IL

L E T

E N

N E

S S

E E

N A

S H

V

IL

L E D

IS

T R

IC

T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

S H

V

IL

L E D

IS

T R

IC

T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

S

IN

G L E L

IN

E D

IA

G R

A M

E-600

Q -C

H S

R E -6

.d g n

END OF CABLE RUN

CIRCUIT #

SERVICE CLASSIFICATION

START OF CABLE RUN

AWG SIZE

SINGLE CONDUCTOR

QUANTITY

W A

R N

IN

G L

IG

H T

V A

R

IO

U S

P

A D

D E

D U

C E

M C T

O

U T

IL

IT

Y S

E R

V

IC

E

N O

T E

/0

S H

V

IL

L E T

E N

N E

S S

E E

C U

M B

E R

L A

N D R

IV

E R W

A T

E R

S H

E D

C E

N T

E R H

IL

L D

A M

S

IT

E R

E S

T O

R A

T

IO

N

E

IS

E N

H O

W E

R P

A R

K R

E S

T O

R A

T

IO

N

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

D A

T E

A P

P R

®of Engineers

US Army Corps

ID

Sheet of Engineers

US Army Corps

AMENDMENT

75KVA

SINGLE PHASE

7200:480VAC

XF203

X

WH

WHM204

DS206

POWER DISTRIBUTION

PANEL(PDP)

LIGHTING CONTRACTOR

PANEL(LCP)

CB211

30 AMP

CR212

L

G

K

COMFORT STATION

CB215

100A

DS210

100 AMP

LIFT STATION

PAVILION #1

CB221

30A

PAVILION #2

CB221A

PAVILION #3

CB221B

5 HP

5 HP

50 KVA

480:240/120VAC

XF212

PAD MOUNTED

E R H E A D L

IG

H

TS

R E C E P

TA

C

LE

C E P

TA

C

A R E

S P A R E

S P A R E

O V E R H E A D L

IG

H

TS

R E C E P

TA

C

C E P

TA

C

A R E

S P A R E

S P A R E

O V E R H E A D L

IG

H

TS

R E C E P

TA

C

C E P

TA

C

A R E

S P A R E

S P A

DS214

100A

NOTE 1 NOTE 1 NOTE 1

7.5 KVA

XF220

XF220B

XF220A

NOTE 2

DS218

15A

DS218A

DS218B

V E R H E A D L

IG

H

TS

R E C E P

TA

C

C E P

TA

C

A

TE

R

H E A

TE

R

O

TH

O S

TE

R P

U M P

3KW

1.2KW

0.7KW

NOTE 3

YG

Δ-

YG

Δ-

YG

Δ-

YG

Δ-

E

LAND SIDE

LAKE SIDE

F

1.3KW

L T

G

PDP-q1-Zq:

2-1C #1/0 AWG

1C #6 GRN GND

PDP-q2-Zq:

2-1C #4 AWG

1C #8 GRN GND

PDP-q3-LCP:

2-1C #10 AWG

1C #10 GRN GND

LCP-q4-LT:

2-1C #8 AWG

1C #8 GRN GND

LCP-q5-LT

2-1C #8 AWG

1C #8 GRN GND

9. 2-1C #10

8. PDP-q1-Zq

7. POWER DISTRIBUTION PANEL SHALL HAD PROPERLY SIZED POWER DISTRIBUTION BLOCKS

PROVIDE UL APPROVED HIGH VOLTAGE WARNING STICKER

6. ALL ENCLOSURES SHALL BE PROPERLY PROTECTED AND GROUNDED. CONTRACTOR SHALL

5. ALL ENCLOSURES SHALL BE TYPE NEMA 4X

4. CONTRACTOR SHALL COORDINATE WITH THE LOCAL UTILITIES FOR ELECTRICAL SERVICE

3. PROVIDE FUSES FOR LIGHTS PER NEC

2. SEE DRAWING E-601 FOR FOR DETAILS

1. 20 AMP EACH UNLESS OTHERWISE SPECIFIED

NOTES

UTILITY SERVICE (UCEMC)

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

D A

T E

A P

P R

®of Engineers

US Army Corps

ID

Sheet of Engineers

N

S I

D

C U

M B

E R

L A

N D R

IV

E R W

A T

E R

S H

E D

W P

B

M

/2

/2

K

K

F C

M

F C

M S

IT

E R

E S

T O

R A

T

IO

N

W A

T E

R L

IN

E R

E P

L A

C E

M E

N T

C E

N T

E R H

IL

L D

/2

/2

N A

S H

V

IL

L E T

E N

N E

S S

E E

N A

S H

V

IL

L E D

IS

T R

IC

T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

S H

V

IL

L E D

IS

T R

IC

T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

Q -C

H S

R P

L -3

.d g n

T H

R O

U G

H D

A

PL-301

T E

R L

IN

E R

O U

T

IN

G

N A

S H

V

IL

L E T

N

F C

M /2

/1

A

D D

E D E

A S

T A

D

IT

D

O O

R V

A L

V E P

IC

T U

R E

OF CONCRETE WALL

GATE VALVE ON INSIDE

/2

/1

A

D D

E D I

N

M E

T A

L P

IP

E P

IC

T U

R E

F C

M

CONNECTIONS AND VALVES.

2 IN. PVC ALONG WITH ALL

BETWEEN 3 IN. LINE AND

REPLACE SHORT PIPE SEGMENT

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

D A

T E

A P

P R

®of Engineers

US Army Corps of Engineers

US Army Corps

ID

Sheet

C U

M B

E R

L A

N D R

IV

E R W

A T

E R

S H

E D

C E

N T

E R H

IL

L R

E S

E R

V O

IR

P

R O J E

C T

C U

M B

E R

L A

N D R

IV

E R T

N N

A S

H V

IL

L E D

IS

T R

IC

T

N A

S H

V

IL

L E T

E N

N E

S S

E E

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

E

IS

E N

H O

W E

R P

A R

K S

IT

E R

E S

T O

R A

T

N

S I

D

W P

B

M

/2

/2

M

F C

M

F

S H

V

IL

L E D

IS

T R

IC

T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

N A

S H

V

IL

L E T

E N

N E

S S

E E

N A

S H

V

IL

L E D

IS

T R

IC

T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

CT-502

O

A D

W A

Y P

A R

A P

E T

E R

O S

IO

N R

E P

IR

4 FT. MIN. EROSION PROTECTION

PARAPET END

FILL HOLE WITH #1 STONE

FACE OF THE PARAPET END

BEYOND THE NORTHEASTERN

NO EROSION REPAIR WORK

SURROUNDING PARAPET END

STRIP AND REMOVE EXISTING AGGREGATE

RESTABLISH EMBANKMENT SHAPE.

RECOMPACT TILLED TO 95% STANDARD PROCTOR IN ORDER

HAND TIL TO A DEPTH OF 6 INCHES. USING HAND TOOLS,

FOR SOIL FALLING WITHIN 4 FEET OF THE PARAPET END,

CONCENTRATED FLOW

EDGE TO PROTECT AGAINST

PLACED NEATLY ALONG CONCRETE

TN LIMESTONE BLOCKS. MIN. 8" X 8"

EXISTING CONCRETE PARAPET

EXISTING ASPHALT ROADWAY (HWY 96)

HAS BEEN RESHAPED AND COMPACTED

EMBANKMENT AFTER EMBANKMENT

4 INCHES MINIMUM INTO EXISTING

TN LIMESTONE BLOCK TO BE KEYED

ROADWAY

EXISTING

SIDEWALK

EXISTING

CONCENTRATED FLOW AND SPLASH

TO HELP PROTECT AGAINST

TWO ROWS OF BLOCKS (16 INCHES)

A-2 RIPRAP

TDOT CLASS

6 IN. MIN.

N A

S H

V

IL

L E T

N

OF GRAVEL AND RESHAPED

EXISTING GROUND TO BE STRIPPED

EDGES

FILTER FABRIC ON ALL

12 IN. MIN. KEY-IN OF

NEW BURIED ELECTRICAL LINE

UTILITIES OCCURS.

REQUIRED TO ENSURE NO DAMAGE TO ANY EXISTING

UTILITIES PRIOR TO CONSTRUCTION. USE HAND TOOLS AS

TO THE PARAPET AS OF 03/29/2018. VERIFY LOCATION OF

3. A NEW BURIED ELECTRICAL LINE WAS ADDED NEXT

AND QUANTITIES SHOULD BE VERIFIED IN THE FIELD.

2. DRAWINGS AND DETAILS ARE CONCEPTUAL. DIMENSION

KEYED IN NO LESS THAN A DEPTH OF 12 INCHES.

COMPACTED SOIL SURFACE. ENSURE ALL EDGES ARE

1. PLACE FILTER FABRIC OVER THE TOP OF NEWLY

NOTES:

F C

M /2

/1

A

D D

E D N

O T

E N

E W E

L E

C T

R

IC

A L L

IN

File details come from the government source that posted it.