W912P5-17-B-0015_TSpecs.pdf

PDF 21 MB Posted

Attached to
Kentucky Lock Site, Demolitions, and Utilities Construction
Solicitation number
W912P517B0015
Issued by

About this file

Technical Specifications

View the file

Other files

File Type Posted
OF1419_Construction-signed.pdf PDF
Amendment_0005.pdf PDF
W912P517B00150004.pdf PDF
W912P517B00150003.pdf PDF
W912P5-17-B-0015_TSpecs_050523pg3-_AMD_003.pdf PDF
W912P5-17-B-0015_TSpecs_051200pg6_-_AMD_003.pdf PDF
Amend_0002_Errata_Sheet.pdf PDF
W912P517B00150002.pdf PDF
W912P5-17-B-0015_Plans_-_AMD_002.pdf PDF
W912P5-17-B-0015_TSpecs_-_AMD_002.pdf PDF
KYLK_As-Built_Folio_1_Part15.pdf PDF
KYLK_As-Built_Folio_1_Part8.pdf PDF
KYLK_As-Built_Folio_1_Part10.pdf PDF
KYLK_As-Built_Folio_1_Part1.pdf PDF
KYLK_As-Built_Folio_2_Part3.pdf PDF
KYLK_As-Built_Folio_2_Part11.pdf PDF
KYLK_As-Built_Folio_1_Part4.pdf PDF
KYLK_As-Built_Folio_1_Part11.pdf PDF
KYLK_As-Built_Folio_1_Part9.pdf PDF
KYLK_As-Built_Folio_2_Part5.pdf PDF
KYLK_As-Built_Folio_2_Part7.pdf PDF
KYLK_As-Built_Folio_1_Part13.pdf PDF
KYLK_As-Built_Folio_2_Part9.pdf PDF
KYLK_As-Built_Folio_1_Part14.pdf PDF
KYLK_As-Built_Folio_1_Part3.pdf PDF
KYLK_As-Built_Folio_1_Part2.pdf PDF
KYLK_As-Built_Folio_2_Part4.pdf PDF
KYLK_As-Built_Folio_2_Part6.pdf PDF
KYLK_As-Built_Folio_2_Part10.pdf PDF
KYLK_As-Built_Folio_1_Part12.pdf PDF
KYLK_As-Built_Folio_2_Part2.pdf PDF
KYLK_As-Built_Folio_2_Part8.pdf PDF
KYLK_As-Built_Folio_1_Part6.pdf PDF
KYLK_As-Built_Folio_2_Part1.pdf PDF
KYLK_As-Built_Folio_1_Part7.pdf PDF
KYLK_As-Built_Folio_1_Part16.pdf PDF
KYLK_As-Built_Folio_1_Part5.pdf PDF
P&L_Railroad_Bridge_Reference_Folio.pdf PDF
Site_Visit_Roster.pdf PDF
Ky_Lock_SDU_-_Site_Visit_Presentation.pdf PDF
W912P517B00150001.pdf PDF
Mechanical_Reference_Folio.pdf PDF
Powerhouse_Access_Bridge_Reference_Folio.pdf PDF
US_62^641_Highway_Bridge_Reference_Folio.pdf PDF
Combined_Abutments_Reference_Folio.pdf PDF
SDU_-_QA_spreadsheet_-_Amend_1_v3.pdf PDF
Electrical_Reference_Folio.pdf PDF
W912P517B0015.pdf PDF
FN_Site_Visit_Form-KY_Lock.pdf PDF
W912P517B0015_Bid_Schedule.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 52 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No. W912P5-17-B-0015

US Army Corps Of Engineers Nashville District

Site, Demolition and Utility Relocations

Kentucky Lock Addition Livingston County, Kentucky

Technical Specifications

November 2017

THIS PAGE INTENTIONALLY LEFT BLANK

FOR DUPLEX PRINTING

Si t e, Demol i t i on and Ut i l i t y Rel ocat i ons Kent ucky Lock Addi t i on W912P5-17-B-0015 Gr and Ri ver s, Li v i ngst on Count y, KY

PROJECT TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 00 00 GENERAL REQUI REMENTS

01 22 00 PRI CE AND PAYMENT PROCEDURES

01 32 01 PROJECT SCHEDULE

01 33 00 SUBMI TTAL PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUI REMENTS

01 35 50 PROJECT SI TE SECURI TY AND AT/ OPSEC PROCEDURES

01 42 00 SOURCES FOR REFERENCE PUBLI CATI ONS

01 45 00 QUALI TY CONTROL

01 45 00. 15 RESI DENT MANAGEMENT SYSTEM CONTRACTOR MODE( RMS CM)

01 50 00 TEMPORARY CONSTRUCTI ON FACI LI TI ES AND CONTROLS

01 57 19 TEMPORARY ENVI RONMENTAL CONTROLS

01 74 19 CONSTRUCTI ON AND DEMOLI TI ON WASTE MANAGEMENT

01 78 00 CLOSEOUT SUBMI TTALS

01 78 23 OPERATI ON AND MAI NTENANCE DATA

01 95 00 FORMS AND ATTACHMENTS

DI VI SI ON 02 - EXI STI NG CONDI TI ONS

02 41 00. 01 DEMOLI TI ON OPERATI ONS BUI LDI NG RENOVATI ON

02 41 00. 02 DEMOLI TI ON UTI LI TY RELOCATI ON

02 42 91 REMOVAL AND SALVAGE OF HI STORI C CONSTRUCTI ON MATERI ALS

OPERATI ONS BUI LDI NG RENOVATI ON

02 82 14 ASBESTOS ABATEMENT WORK

DI VI SI ON 03 - CONCRETE

03 30 53 MI SCELLANEOUS CAST- I N- PLACE CONCRETE

DI VI SI ON 04 - MASONRY

04 20 00 UNI T MASONRY

04 42 13 DI MENSI ON STONE CLADDI NG

DI VI SI ON 05 - METALS

05 05 23 STRUCTURAL WELDI NG

05 12 00 STRUCTURAL STEEL

05 50 13 MI SCELLANEOUS METAL FABRI CATI ONS

05 50 14 STRUCTURAL METAL FABRI CATI ONS

05 50 15 CI VI L WORKS FABRI CATI ONS

DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON

07 60 00 FLASHI NG AND SHEET METAL

07 92 00 JOI NT SEALANTS

DI VI SI ON 08 - OPENI NGS

08 11 16 ALUMI NUM DOORS AND FRAMES

08 51 23 STEEL WI NDOWS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

DI VI SI ON 09 - FI NI SHES

PROJECT TABLE OF CONTENTS Page 1

09 90 00 PAI NTS AND COATI NGS

09 97 02 PAI NTI NG: PEDESTRI AN BRI DGES

DI VI SI ON 22 - PLUMBI NG

22 00 00 PLUMBI NG, GENERAL PURPOSE

DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)

23 00 00 AI R SUPPLY, DI STRI BUTI ON, VENTI LATI ON, AND EXHAUST SYSTEMS

23 07 00 THERMAL I NSULATI ON FOR MECHANI CAL SYSTEMS

23 83 00 ELECTRI C SPACE HEATI NG EQUI PMENT

DI VI SI ON 26 - ELECTRI CAL

26 00 00 BASI C ELECTRI CAL MATERI ALS AND METHODS

26 05 00 COMMON WORK RESULTS FOR ELECTRI CAL

26 05 13 MEDI UM- VOLTAGE CABLE

26 05 19 I NSULATED WI RE AND CABLE

26 20 00 I NTERI OR DI STRI BUTI ON SYSTEM

DI VI SI ON 31 - EARTHWORK

31 00 00 EARTHWORK

DI VI SI ON 32 - EXTERI OR I MPROVEMENTS

32 34 35 PREFABRI CATED UTI LI TY BRI DGES

32 92 19 SEEDING

DI VI SI ON 33 - UTI LI TI ES

33 11 00 WATER UTI LI TY DI STRI BUTI ON PI PI NG

33 30 00 SANI TARY SEWERS

33 32 16 PACKAGED UTI LI TY WASTEWATER PUMPI NG STATI ONS

- - End of Pr oj ect Tabl e of Cont ent s - -

PROJECT TABLE OF CONTENTS Page 2

SECTI ON TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 00 00

GENERAL REQUI REMENTS

PART 1 GENERAL

1. 1 DESCRI PTI ON

1. 2 COORDI NATI ON WI TH OTHERS

1. 2. 1 Coor di nat i on wi t h t he Tennessee Val l ey Aut hor i t y

1. 3 SI TE ACCESS

1. 4 DAM SAFETY EMERGENCY ACTI ONS

1. 4. 1 Dam Saf et y Tr ai ni ng

1. 4. 2 Dam Saf et y Condi t i on Not i f i cat i on

1. 5 COORDI NATI ON CONFERENCES

1. 6 PARTNERI NG

1. 7 REFERENCES

1. 8 PROJECT SI GN

1. 9 CONTRACTOR' S STAGI NG AREA

1. 10 SAFE CLEARANCE PROCEDURES

1. 11 DAI LY CLEANUP AND DI SPOSAL

1. 12 STORAGE OF EQUI PMENT AND MATERI ALS

1. 13 PROTECTI ON AND RESTORATI ON OF EXI STI NG FACI LI TI ES

1. 14 WORK BY THE GOVERNMENT CONCURRENT WI TH CONTRACTOR WORK

1. 15 EVALUATI ON OF CONTRACTOR PERFORMANCE

1. 16 VETERANS EMPLOYMENT EMPHASI S FOR U. S. ARMY CORPS OF ENGI NEERS

CONTRACTS

1. 17 PROJECT SCHEDULE

1. 18 SUMMARY OF WORK

1. 18. 1 Scopes of Base and One Opt i on

1. 18. 1. 1 Base Scope

1. 18. 1. 2 Opt i on 1

1. 19 MEASUREMENT AND PAYMENT

PART 2 PRODUCTS ( NOT USED)

PART 3 EXECUTI ON

3. 1 AVAI LABI LI TY AND USE OF UTI LI TY SERVI CES

3. 1. 1 Cont r act or Responsi bi l i t i es

3. 1. 2 I nt er r upt i ons of Ut i l i t i es

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 01 00 00 Page 1

SECTI ON 01 00 00

GENERAL REQUI REMENTS

PART 1 GENERAL

1. 1 DESCRIPTION

Thi s sect i on of t he Speci f i cat i ons pr ovi des gener al i nf or mat i on and r equi r ement s; wor k and access r est r i ct i ons; and r equi r ed coor di nat i on wi t h ot her s. The wor k cover ed by t hese Speci f i cat i ons consi st s of f ur ni shi ng al l equi pment , l abor , and mat er i al s r equi r ed f or t he r el ocat i on of t he mechani cal and el ect r i cal ut i l i t i es as wel l as t he modi f i cat i ons t o t he exi st i ng oper at i ons bui l di ng as shown on t he dr awi ngs and as descr i bed herein.

1. 2 COORDI NATI ON WI TH OTHERS

Const r uct i on of f eat ur es i n t hi s cont r act wi l l i mpact or be i mpact ed by many ot her or gani zat i ons. The Cont r act or has pr i mar y r esponsi bi l i t y t o i ni t i at e t he coor di nat i on and communi cat i on i n a t i mel y manner wi t h t he Cont r act i ng Of f i cer t o schedul e act i v i t i es of ot her s and mi ni mi ze or el i mi nat e conf l i c t s wi t h ot her s. The Cont r act i ng Of f i cer wi l l t hen det er mi ne t he appr opr i at e cour se of communi cat i ng wi t h t he ot her s i nvol ved. I n many cases, t he Cont r act i ng Of f i cer may det er mi ne t hat t he Cont r act or shoul d communi cat e di r ect l y wi t h ot her s whi l e ensur i ng t he Cont r act i ng Of f i cer i s t i mel y i nf or med of t he deci s i ons of t he communi cat i ons or act i vel y i nvol ved i n t he communi cat i ons. These di r ect communi cat i ons ar e l i kel y t o i ncl ude f r equent communi cat i ons wi t h t he Kent ucky Lock Lockmast er and l ock oper at or - on- dut y ahead of any cont r act or act i v i t i es t hat may af f ect t he use or oper at i on of t he l ock.

A cont r act was awar ded i n Sept ember 2016 t o Johnson Br ot her s Company ( JB) t o const r uct t he Downst r eam Cof f er dam j ust downst r eam of t he exi st i ng l ocks l ower l and si de gui de wal l . The cont r act i s cur r ent l y schedul ed t o be compl et ed by November 2019. Const r ai nt s and coor di nat i on i ssues r el at ed t o t hi s cont r act i ncl ude access t o t he Di sposal Ar ea D, t empor ar y changes t o t r af f i c f l ow on access r oads t o t he l ock, and shar i ng of t he ar ea desi gnat ed f or t he cont r act or s ' l aydown ar ea and of f i ces.

1. 2. 1 Coor di nat i on wi t h t he Tennessee Val l ey Aut hor i t y

The Cont r act or i s advi sed t hat al l of t he wor k l i mi t s of t hi s cont r act ar e l ocat ed on TVA pr oper t y t hat cont ai ns TVA f aci l i t i es, i ncl udi ng t he power l i nes t hat cr oss t he downst r eam cof f er dam si t e. The Cont r act or shal l ensur e t hat access i s pr ovi ded t o TVA per sonnel t hr oughout t he pr oj ect s i t e at al l t i mes and t hat t hei r act i v i t i es ar e not hi nder ed by t he Cont r act or ' s act i v i t i es. Pr ocedur es shal l be devel oped by t he Cont r act or t o ensur e t hi s access i s avai l abl e when t he Cont r act or ' s or sub- cont r act or ' s wor k cr ews ar e of f - dut y. These pr ovi s i ons shal l be devel oped i n consul t at i on wi t h t he TVA st af f bel ow and appr oved by t he Cont r act i ng Of f i cer .

Mr . Bi l l St al l i on - KY Dam Power pl ant Super i nt endent , ( 270) 362- 4318.

Mr . Tom Wal ker - KY Reser vat i on Mai nt enance Super vi sor , ( 270) 362- 4644.

SECTI ON 01 00 00 Page 2

1. 3 SI TE ACCESS

I n addi t i on t o t he s i t e r est r i ct i ons descr i bed i n t he above Sect i ons and el sewher e i n t hese Speci f i cat i ons and Cont r act Pl ans, t he Cont r act or i s advi sed t hat ot her access r est r i ct i ons wi l l appl y t o l and based act i v i t i es i n t he pr oj ect wor k ar ea. I n addi t i on, t he Cont r act or shal l adher e t o al l l oad r est r i ct i ons and speed l i mi t s on publ i c r oads when haul i ng mat er i al t o and f r om t he pr oj ect s i t e.

The Cont r act or i s advi sed t hat l and access t he r i ver s i de end of t he t hr ee l ock cr oss- over br i dges at Power house I s l and wi l l r equi r e t r ansi t t hr ough a publ i c par ki ng ar ea. Thi s par ki ng ar ea i s heavi l y used by t he publ i c dur i ng some t i me per i ods and by per sonal and commer ci al vehi c l es i nvol ved i n const r uct i on act i v i t i es f or TVA on t he i s l and. Any and al l t r ansi t of t he Cont r act or ' s equi pment and mat er i al del i ver y t r ucks t hr ough t hi s par ki ng l ot wi l l r equi r e t he pr esence of at l east t wo f l agmen pr ovi ded by t he Cont r act or . The Cont r act or may cl ose t he l andsi de r ow of par ki ng pl aces on t he r i ver si de hal f of t he par ki ng l ot dur i ng hi s t r ansi t per i ods. A pr e- condi t i on sur vey of t he r out e on al l TVA r oads and br i dges wi l l be r equi r ed t o be per f or med by t he Cont r act or bef or e i t s use. Upon compl et i on of i t s use by t he Cont r act or , a post - condi t i on sur vey of t he r out e t he by t he Cont r act or wi l l be r equi r ed. Upon compar i son of t he t wo sur veys, t he Cont r act i ng Of f i cer wi l l det er mi ne i f and how much r epai r wor k wi l l be r equi r ed of t he Cont r act or t o r est or e t he r out e t o i t s or i gi nal condi t i on. I n addi t i on, i f t he Cont r act i ng Of f i cer det er mi nes t hat not i ceabl e and unaccept abl e damage i s occur r i ng t o t he r out e dur i ng i t s use, he may di r ect t hat t he Cont r act or i mmedi at el y per f or m i nt er i m r epai r s. The cost of al l measur es descr i bed i n t hi s Par agr aph wi l l be consi der ed i nci dent al t o t he Cont r act and wi l l be t he r esponsi bi l i t y of t he Cont r act or . I t shoul d be not ed t hat t he use of t hi s r out e wi l l r equi r e t r ansi t over a TVA br i dge. The l oadi ng r est r i ct i ons on al l TVA br i dges i s HS- 20. Access t o t he power house i s l and vi a t he abandoned br i dge f r om t he east bank wi l l not be al l owed.

1. 4 DAM SAFETY EMERGENCY ACTI ONS

1. 4. 1 Dam Saf et y Tr ai ni ng

At l east one r epr esent at i ve f r om each of t he Cont r act or ' s and al l of hi s subcont r act or s ' wor k cr ews t hat ar e i nvol ved i n t hi s cont r act shal l be r equi r ed t o at t end dam saf et y t r ai ni ng. Thi s t r ai ni ng wi l l be pr ovi ded on- si t e by TVA per sonnel and shal l consi st of l ess t han t hr ee hour s of i nst r uct i onal v i deo t ape and si t e speci f i c i nst r uct i ons. The t r ai ni ng wi l l be pr ovi ded at no cost t o t he Cont r act or or subcont r act or s. Thi s t r ai ni ng i s r equi r ed pr i or t o any of t he descr i bed wor k ef f or t above.

1. 4. 2 Dam Saf et y Condi t i on Not i f i cat i on

I f a pot ent i al condi t i on t hr eat eni ng dam saf et y i s not i ced by t he Cont r act or or subcont r act or empl oyees, t he Cont r act or shoul d i mmedi at el y not i f y t he TVA' s Ri ver For ecast Lead Engi neer at 865- 632- 7063. The Ri ver For ecast Lead Engi neer wi l l t hen not i f y t he l ocal TVA power house per sonnel . A TVA empl oyee wi l l be di spat ched t o v i ew and r epor t on t he condi t i on. As soon as possi bl e, t he Cont r act or shal l al so not i f y t he Cont r act i ng Of f i cer ' s Repr esent at i ve at t he s i t e or t he Resi dent Engi neer . I f t he s i t uat i on i s a pot ent i al or act ual Dam Saf et y Emer gency, t he seni or power pl ant oper at or wi l l i ssue gui dance t hr ough t he Cont r act i ng Of f i cer ' s Repr esent at i ve or t he Resi dent Engi neer on act i ons t he

SECTI ON 01 00 00 Page 3

Cont r act or must t ake t o st abi l i ze t he dam saf et y s i t uat i on or TVA wi l l t ake act i ons i n an at t empt t o st abi l i ze t he dam saf et y s i t uat i on. I n t he event t he Cont r act i ng Of f i cer ' s Repr esent at i ve or Resi dent Engi neer ar e not avai l abl e, and t he si t uat i on i s consi der ed cr i t i cal , t he seni or power pl ant oper at or may i ssue t hi s gui dance di r ect l y t o t he Cont r act or .

Any par t of t he cont r act wor k del ayed or ot her wi se i mpact ed due t o a dam saf et y concer n as descr i bed her ei n wi l l be addr essed i n accor dance wi t h t he Cont r act Cl ause 52. 242- 14 SUSPENSI ON OF WORK.

1. 5 COORDI NATI ON CONFERENCES

Rout i ne coor di nat i on conf er ences wi l l be schedul ed by t he Cont r act i ng Of f i cer t hr oughout t he l i f e of t hi s pr oj ect . Coor di nat i on conf er ences wi l l be hel d t o di scuss cont r act admi ni st r at i on, Cont r act or qual i t y cont r ol , phasi ng, schedul i ng, and ot her aspect s r el at i ng t o t hi s const r uct i on. The Cor ps of Engi neer s and t he Cont r act or wi l l be r epr esent ed at each of t hese meet i ngs. Coor di nat i on conf er ences wi l l be schedul ed t o occur when not i f i ed by t he Cont r act i ng Of f i cer .

1. 6 PARTNERING

I n or der t o most ef f ect i vel y accompl i sh t hi s cont r act , t he Gover nment ur ges t he Cont r act or t o j oi n t he Gover nment i n est abl i shi ng a cohesi ve and pr of essi onal pr oj ect management t eam. Thr ough t hi s " par t ner i ng" r el at i onshi p bot h ent i t i es woul d st r i ve t o dr aw on t he st r engt hs of each or gani zat i on f or t he ul t i mat e goal of assur i ng t hat t he pr oj ect ’ s i nt ended r esul t s ar e achi eved, wi t hi n budget and on schedul e. Thi s endeavor seeks an envi r onment t hat nur t ur es t eam bui l di ng, cooper at i on and t r ust bet ween t he Gover nment and t he Cont r act or . The par t ner i ng r el at i onshi p woul d be bi l at er al i n make- up, and par t i c i pat i on wi l l be t ot al l y vol unt ar y.

The f i r st st ep i n i ni t i at i ng t he concept woul d be a j oi nt pr oj ect management t eam " par t ner i ng" conf er ence at t ended by mul t i pl e of f i cer s f r om each or gani zat i on r epr esent i ng management and t he key j obsi t e st af f of each ent i t y. The i ni t i al conf er ence woul d be hel d wi t hi n t he f i r st t hi r t y ( 30) days f ol l owi ng cont r act awar d. The Resi dent Engi neer woul d chai r t he conf er ence, est abl i sh i t s agenda and di st r i but e mi nut es of t he meet i ng. A pr of essi onal f aci l i t at or accept abl e t o bot h par t i es woul d l ead t he par t i c i pant s of t he sessi on, t hr ough t he st eps of t eam bui l di ng and t he f or mat i on of a pr obl em sol v i ng mechani sm wi t hi n t he gr oup. The conf er ence dur at i on woul d be no mor e t han one day. Locat i on of t he conf er ence woul d be of f s i t e wi t hi n a 60 mi l e r adi us of t he j obsi t e at a f aci l i t y whi ch of f er s conf er ence r ooms and f ood ser vi ce. Al l cost s i n connect i on wi t h r ent ed f aci l i t i es and t he f aci l i t at or woul d be shar ed equal l y by t he Gover nment and t he Cont r act or . Each or gani zat i on woul d pay ot her cost s of i t s r espect i ve empl oyees at t endi ng t he conf er ence.

Addi t i onal par t ner i ng sessi ons woul d be hel d no l ess t han bi annual l y.

I mpl ement at i on of t he par t ner i ng concept and phi l osophy woul d be an on- goi ng pr ocess.

1. 7 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s sect i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

SECTI ON 01 00 00 Page 4

U. S. ARMY CORPS OF ENGI NEERS ( USACE)

EP 310- 1- 6a ( 2006) Si gn St andar ds Manual , VOL 1

EP 310- 1- 6b ( 2006) Si gn St andar ds Manual , VOL 2, Appendices

ER 385- 1- 31 ( 2009) The Cont r ol of Hazar dous Ener gy

1. 8 PROJECT SI GN

a. Gener al . The Cont r act or shal l f ur ni sh and er ect , wi t hi n 30 days af t er i ssue of t he Not i ce t o Pr oceed, a PROJECT I DENTI FI CATI ON SI GN and a SAFETY PERFORMANCE SI GN at t he l ocat i on di r ect ed. The si gns shal l be l et t er ed on one si de onl y and shal l conf or m t o EP 310- 1- 6a, EP 310- 1- 6b, and t o t he det ai l s and col or s shown on t he sket ches at t ached at t he end of Sect i on 01 95 00 FORMS AND ATTACHMENTS. The name of t he pr oj ect shal l be as f ol l ows:

Kent ucky Lock Addi t i on - Si t e, Demol i t i on & Ut i l i t y Rel ocat i ons

b. Mat er i al s. The si gn shal l be const r uct ed wi t h a f ace sheet of 3/ 4 i nch ext er i or gr ade pl ywood mount ed on a subst ant i al f r amewor k of t r eat ed 4- i nch by 4- i nch mat er i al . Scr ews shal l be commer ci al qual i t y and of s i zes shown.

c. Pai nt i ng. The si gns and post s shal l be gi ven one pr i me coat and t wo f i ni sh coat s of ext er i or oi l pai nt bef or e l et t er i ng. Let t er s and t r i m shal l be appl i ed t o one si de onl y usi ng one coat of enamel of col or , st y l e, and si ze shown.

d. Er ect i on and Mai nt enance. The si gns shal l be er ect ed at t he desi gnat ed l ocat i ons. Si gns shal l be pl umb and backf i l l of post hol es shal l be wel l t amped t o pr oper l y suppor t t he s i gns t hr oughout t he l i f e of t he cont r act . The si gns shal l be mai nt ai ned i n good condi t i on unt i l compl et i on of t he cont r act , shal l r emai n t he pr oper t y of t he Cont r act or , and shal l be r emoved f r om t he si t e upon f i nal accept ance of t he cont r act wor k.

1. 9 CONTRACTOR' S STAGI NG AREA

The Cont r act or may use ar eas wi t hi n t he def i ned wor k l i mi t s, excl udi ng Di sposal Ar ea D, as st agi ng ar ea. The bui l di ng of st r uct ur es, t he er ect i on of t ent s or ot her f or ms of pr ot ect i on wi l l be per mi t t ed onl y at such pl aces as t he Gover nment shal l appr ove, and t he sani t ar y condi t i ons of t he gr ounds i n or about such st r uct ur es shal l at al l t i mes be mai nt ai ned i n a sat i sf act or y manner . Tempor ar y Cont r act or f aci l i t i es pr ovi ded dur i ng Const r uct i on shal l be r emoved pr i or t o f i nal accept ance f r om t he Gover nment . As a mi ni mum t he ar ea shal l be l ef t l ooki ng " br oom cl ean" and at l east as c l ean as bef or e t he st r uct ur e pl acement .

1. 10 SAFE CLEARANCE PROCEDURES

Pr oj ect per sonnel use A Saf e Cl ear ance Syst em, as st at ed i n ER 385- 1- 31 and amended by t he Nashvi l l e Di st r i ct t o ensur e cont i nui t y of ser vi ce and saf et y t o per sonnel and equi pment . Any wor k per f or med whi ch r equi r es t aki ng t he Pr oj ect ' s oper at i ng equi pment out of ser vi ce wi l l be done onl y af t er a f or mal c l ear ance i s obt ai ned by t he Cont r act i ng Of f i cer wi t h 48- hour mi ni mum not i ce. Cont r act or per sonnel shal l not v i ol at e

SECTI ON 01 00 00 Page 5

Site, Demolition and Utility Relocations Kentucky Lock Addition W912P5-17-B-0015 Grand Rivers, Livingston County, KY clearance. Any violation of Safe Clearance Procedures will be grounds for removal of the offender(s). Up to five copies of the Nashville District Safe Clearance Procedure will be supplied to the Contractor upon request.

1.11 DAILY CLEANUP AND DISPOSAL

Work areas shall be kept reasonably neat on a daily basis. Debris resulting from the work, such as empty paint cans, packing cases, scrap lumber, oil and grease spills, and other debris shall be collected, removed, and disposed of off-site at least once per week. Government trash cans, dump boxes and other containers shall not be used. Liquid waste shall not be disposed of in existing drains.

1.12 STORAGE OF EQUIPMENT AND MATERIALS

Storage of equipment and materials will be permitted only in designated staging areas. A minimum access space of three feet shall be maintained between the Contractor's stored items and existing facility equipment.

1.13 PROTECTION AND RESTORATION OF EXISTING FACILITIES

Existing facilities shall be protected whether or not shown on the drawings. Upon completion of the work, existing facilities, not included as a portion of the work, shall be left in a condition equal to the original condition prior to the contract. Costs for repair and restoration of any facilities shall be considered to be incidental to and included in the contract price.

1.14 WORK BY THE GOVERNMENT CONCURRENT WITH CONTRACTOR WORK

The Government will limit interference with the Contractor's work to the maximum reasonable extent and the Government and Contractor shall coordinate as necessary.

1.15 EVALUATION OF CONTRACTOR PERFORMANCE

The Contractor's performance will be evaluated in accordance with FAR Part

42.15 in the areas of quality, schedule, cost control, management, utilization of small businesses, and regulatory compliance at minimum.

The evaluation will include a written narrative and rating of either exceptional, very good, satisfactory, marginal, or unsatisfactory for each. The format for the evaluation is attached at the end of Section

01 95 00 FORMS AND ATTACHMENTS.

The Contractor's review of the evaluation shall be completed electronically at the CPARS website, http://www.cpars.gov . This website also includes guidance and the user's manual.

Upon contract award, the Contractor shall provide the Contracting Officer with the name and e-mail address of the Contractor's Representative to be registered into the system. Following initial completion by the Government, the Contractor will have sixty (60) calendar days to review, comment, and return the evaluation.

1.16 VETERANS EMPLOYMENT EMPHASIS FOR U.S. ARMY CORPS OF ENGINEERS

CONTRACTS

In addition to complying with the requirements outlined in FAR Part 22.13, FAR Clause 52.222-35, FAR Clause 52.222-37, DFARS

SECTION 01 00 00 Page 6

Site, Demolition and Utility Relocations Kentucky Lock Addition W912P5-17-B-0015 Grand Rivers, Livingston County, KY

222.13 and Department of Labor regulations, U.S. Army Corps of Engineers (USACE) Contractors and subcontractors at all tiers are encouraged to promote the training and employment of U.S. veterans while performing under a USACE contract. While no set-aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant contract, USACE Contractors are encouraged to seek out highly qualified veterans to perform services under this contract. The following resources are available to assist USACE contractors in their outreach efforts:

Federal Veteran employment information at:

http://www.fedshirevets.gov/index.aspx

Department of Labor Veterans Employment Assistance:

http://www.dol.gov/vets/

Department of Veterans Affairs-VOW to Hire Heroes Act:

http://benefits.va.gov/vow/

Army Wounded Warrior Program:

http://wtc.army.mil/modules/employers/index.html

U.S. Chamber of Commerce Foundation-Hiring Our Heroes http://www.hiringourheroes.org/

Guide to Hiring Veterans - Reference Material:

http://www.whitehouse.gov/sites/default/files/docs/white_house_business_council_-_ guide_to_hiring_veterans_0.pdf

1.17 PROJECT SCHEDULE

The Contractor shall provide project schedule submittals in accordance with Contract Clause 52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS and as specified in Section 01 32 01 PROJECT SCHEDULE.

1.18 SUMMARY OF WORK

1.18.1 Scopes of Base and One Option

1.18.1.1 Base Scope

The scope of the Base contract has been developed to ensure that it can be awarded based upon available funds and that it contains the critical path activities required to meet the performance period of the contract.

Significant features of work included in the base contract are:

a. The relocation of existing site and lock operations utilities.

Utilities requiring relocation include non-potable water lines, compressed air lines, electrical power lines, lock operations controls, telephone and fiber optic lines. The relocations will require the fabrication and installation of various pedestrian/utility cat-walks, and pre-fabricated bridges.

b. Renovation of the existing lock operations building. Renovations will require the demolition of portions of the existing building and appurtenant mechanical/electrical systems, new structural and architectural features, interior renovations, and new mechanical/electrical systems.

SECTION 01 00 00 Page 7

1. 18. 1. 2 Opt i on 1

The scope of t hi s opt i on i s t he r el ocat i on of exi st i ng pot abl e wat er l i nes, sewer l i nes and sewage pump st at i on. The r el ocat i ons wi l l r equi r e t he i nst al l at i on of t he l i nes on t he f abr i cat ed pedest r i an/ ut i l i t y cat - wal ks and pr ef abr i cat ed br i dges.

1. 19 MEASUREMENT AND PAYMENT

No separ at e payment wi l l be made f or t he wor k cover ed under t hi s sect i on.

The cost s t her eof shal l be i ncl uded i n t he i t em t o whi ch t he wor k per t ai ns.

PART 2 PRODUCTS ( NOT USED)

PART 3 EXECUTI ON

3. 1 AVAI LABI LI TY AND USE OF UTI LI TY SERVI CES

3. 1. 1 Cont r act or Responsi bi l i t i es

a. The Cont r act or shal l be r esponsi bl e f or t he avai l abi l i t y of ut i l i t i es f or use on t he pr oj ect . Raw wat er i s avai l abl e wi t h no char ge at t he s i t e. The Cont r act or shal l suppl y any ot her ut i l i t i es needed at hi s cost . The Cont r act or shal l car ef ul l y conser ve any ut i l i t i es f ur ni shed wi t hout char ge.

b. The Cont r act or , at i t s expense and i n a wor kmanl i ke manner sat i sf act or y t o t he Cont r act i ng Of f i cer , shal l i nst al l and mai nt ai n al l necessar y t empor ar y connect i ons and di st r i but i on l i nes. Bef or e f i nal accept ance of t he wor k by t he Gover nment , t he Cont r act or shal l r emove al l t he t empor ar y connect i ons, di st r i but i on l i nes, and associ at ed par apher nal i a.

c. The Cont r act or i s r esponsi bl e f or pr ovi di ng dr i nki ng wat er f aci l i t i es f or al l per sonnel associ at ed wi t h t hi s cont r act .

3. 1. 2 I nt er r upt i ons of Ut i l i t i es

a. No ut i l i t y ser vi ces shal l be i nt er r upt ed by t he Cont r act or t o make connect i ons, t o r el ocat e, or f or any pur pose wi t hout appr oval of t he Cont r act i ng Of f i cer .

b. Request f or Per mi ssi on t o shut down ser vi ces shal l be submi t t ed i n wr i t i ng t o t he Cont r act i ng Of f i cer not l ess t han sevent een ( 17) days pr i or t o dat e of pr oposed i nt er r upt i on. The r equest shal l gi ve t he f ol l owi ng i nf or mat i on:

( 1) Nat ur e of Ut i l i t y ( Gas, L. P. or H. P. , Wat er , et c. ) ( 2) Si ze of l i ne and l ocat i on of shut of f .

( 3) Bui l di ngs and ser vi ces af f ect ed.

( 4) Hour s and dat e of shut of f .

( 5) Est i mat ed l engt h of t i me ser vi ces wi l l be i nt er r upt ed.

c. Ser vi ces shal l not be shut of f unt i l r ecei pt of appr oval of t he pr oposed hour s and dat e f r om t he Cont r act i ng Of f i cer .

d. Shut of f s whi ch wi l l cause i nt er r upt i on of Gover nment wor k oper at i ons as det er mi ned by t he Cont r act i ng Of f i cer shal l be accompl i shed dur i ng r egul ar non- wor k hour s or on non- wor k days of t he Usi ng Agency.

SECTI ON 01 00 00 Page 8

e. Oper at i on of val ves on wat er mai ns wi l l be by Gover nment per sonnel .

Wher e shut of f of wat er l i nes i nt er r upt s ser vi ce t o f i r e hydr ant s or f i r e spr i nkl er syst ems, t he Cont r act or shal l ar r ange hi s oper at i ons and have suf f i c i ent mat er i al and per sonnel avai l abl e t o compl et e t he wor k wi t hout undue del ay or t o r est or e ser vi ce wi t hout del ay i n event of emer gency.

- - End of Sect i on - -

SECTI ON 01 00 00 Page 9

THIS PAGE INTENTIONALLY LEFT BLANK

FOR DUPLEX PRINTING

SECTI ON TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 22 00

PRI CE AND PAYMENT PROCEDURES

PART 1 GENERAL

1. 1 SI NGLE JOB PAYMENT I TEMS

1. 1. 1 Mobi l i zat i on and Demobi l i zat i on - Gener al

1. 1. 1. 1 Payment

1. 1. 1. 2 Uni t of Measur ement

1. 1. 2 Mobi l i zat i on and Demobi l i zat i on - Wat er Li ne Rel ocat i on

1. 1. 2. 1 Payment

1. 1. 2. 2 Uni t of Measur ement

1. 1. 3 Pr emi ums f or Per f or mance and Payment Bonds

1. 1. 3. 1 Payment

1. 1. 3. 2 Uni t of Measur ement

1. 1. 4 Mai nt enance and Pr ot ect i on of Tr af f i c

1. 1. 4. 1 Payment

1. 1. 4. 2 Uni t of Measur ement

1. 1. 5 Oper at i ons Bui l di ng Renovat i on

1. 1. 5. 1 Payment

1. 1. 5. 2 Uni t of Measur ement

1. 1. 6 Upst r eam Lock Tempor ar y Ut i l i t y Br i dge No. 1

1. 1. 6. 1 Payment

1. 1. 6. 2 Uni t of Measur ement

1. 1. 7 Upst r eam Lock Tempor ar y Ut i l i t y Br i dge No. 2

1. 1. 7. 1 Payment

1. 1. 7. 2 Uni t of Measur ement

1. 1. 8 Ut i l i t y Suppor t Cat wal k

1. 1. 8. 1 Payment

1. 1. 8. 2 Uni t of Measur ement

1. 1. 9 Tempor ar y Hazmat St or age Faci l i t i es

1. 1. 9. 1 Payment

1. 1. 9. 2 Uni t of Measur ement

1. 1. 10 Seedi ng

1. 1. 10. 1 Payment

1. 1. 10. 2 Uni t of Measur ement

1. 1. 11 Ut i l i t y Rel ocat i ons

1. 1. 11. 1 Payment

1. 1. 11. 2 Uni t of Measur ement

1. 1. 12 Gr and Ri ver s Wat er Li ne Rel ocat i on

1. 1. 12. 1 Payment

1. 1. 12. 2 Uni t of Measur ement

1. 2 UNI T PRI CE PAYMENT I TEMS

PART 2 PRODUCTS

PART 3 EXECUTI ON

SECTI ON 01 22 00 Page 1

3. 1 CONTRACT COST BREAKDOWN

SECTI ON 01 22 00 Page 2

SECTI ON 01 22 00

PRI CE AND PAYMENT PROCEDURES

PART 1 GENERAL

1. 1 SI NGLE JOB PAYMENT I TEMS

Payment i t ems f or t he wor k of t hi s cont r act f or whi ch cont r act j ob payment s wi l l be made ar e l i s t ed i n t he BID SCHEDULE and descr i bed bel ow.

Al l cost s f or i t ems of wor k, whi ch ar e not speci f i cal l y ment i oned t o be i ncl uded i n a par t i cul ar j ob or uni t pr i ce payment i t em, ar e i ncl uded i n t he l i s t ed j ob i t em most c l osel y associ at ed wi t h t he wor k i nvol ved. The j ob pr i ce and payment made f or each i t em l i st ed const i t ut es f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, and equi pment , and per f or mi ng any associ at ed Cont r act or qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, t est s and r epor t s, and f or per f or mi ng al l wor k r equi r ed f or whi ch separ at e payment i s not ot her wi se provided.

1. 1. 1 Mobi l i zat i on and Demobi l i zat i on - Gener al

1. 1. 1. 1 Payment

a. The Gover nment wi l l pay al l cost s f or t he mobi l i zat i on and demobi l i zat i on of al l of t he Cont r act or ' s pl ant and equi pment at t he s i ngl e j ob pr i ce f or t hi s i t em.

1. 60 per cent of t he s i ngl e j ob pr i ce wi l l be pai d upon compl et i on of t he Cont r act or ' s mobi l i zat i on at t he wor k s i t e.

2. The r emai ni ng 40 per cent wi l l be pai d upon compl et i on of demobilization.

b. The Cont r act i ng Of f i cer may r equi r e t he Cont r act or t o f ur ni sh cost dat a t o j ust i f y t hi s por t i on of t he bi d i f t he Cont r act i ng Of f i cer bel i eves t hat t he per cent ages i n par agr aphs ( a. ) ( 1. ) and ( 2. ) of t hi s sect i on do not bear a r easonabl e r el at i on t o t he cost of t he wor k i n t hi s cont r act .

1. Fai l ur e t o j ust i f y such pr i ce t o t he sat i sf act i on of t he Cont r act i ng Of f i cer wi l l r esul t i n payment , as det er mi ned by t he Cont r act i ng Of f i cer , of -

( i ) Act ual mobi l i zat i on cost s at compl et i on of mobi l i zat i on;

( i i ) Act ual demobi l i zat i on cost s at compl et i on of demobi l i zat i on;

and

( i i i ) The r emai nder of t hi s i t em i n t he f i nal payment under t hi s contract.

2. The Cont r act i ng Of f i cer ' s det er mi nat i on of t he act ual cost s i n par agr aph ( b. ) ( 1. ) of t hi s sect i on i s not subj ect t o appeal .

SECTI ON 01 22 00 Page 3

1. 1. 1. 2 Uni t of Measur ement

Uni t of measur e: Job.

1. 1. 2 Mobi l i zat i on and Demobi l i zat i on - Wat er Li ne Rel ocat i on

1. 1. 2. 1 Payment

a. The Gover nment wi l l pay al l cost s f or t he mobi l i zat i on and demobi l i zat i on of al l of t he Cont r act or ' s pl ant and equi pment at t he s i ngl e j ob pr i ce f or t hi s i t em.

1. 60 per cent of t he s i ngl e j ob pr i ce wi l l be pai d upon compl et i on of t he Cont r act or ' s mobi l i zat i on at t he wor k s i t e.

2. The r emai ni ng 40 per cent wi l l be pai d upon compl et i on of demobilization.

b. The Cont r act i ng Of f i cer may r equi r e t he Cont r act or t o f ur ni sh cost dat a t o j ust i f y t hi s por t i on of t he bi d i f t he Cont r act i ng Of f i cer bel i eves t hat t he per cent ages i n par agr aphs ( a. ) ( 1. ) and ( 2. ) of t hi s sect i on do not bear a r easonabl e r el at i on t o t he cost of t he wor k i n t hi s cont r act .

1. Fai l ur e t o j ust i f y such pr i ce t o t he sat i sf act i on of t he Cont r act i ng Of f i cer wi l l r esul t i n payment , as det er mi ned by t he Cont r act i ng Of f i cer , of -

( i ) Act ual mobi l i zat i on cost s at compl et i on of mobi l i zat i on;

( i i ) Act ual demobi l i zat i on cost s at compl et i on of demobi l i zat i on;

and

( i i i ) The r emai nder of t hi s i t em i n t he f i nal payment under t hi s contract.

2. The Cont r act i ng Of f i cer ' s det er mi nat i on of t he act ual cost s i n par agr aph ( b. ) ( 1. ) of t hi s sect i on i s not subj ect t o appeal .

1. 1. 2. 2 Uni t of Measur ement

Uni t of Measur e: Job

1. 1. 3 Pr emi ums f or Per f or mance and Payment Bonds

1. 1. 3. 1 Payment

The Gover nment wi l l pay f or pr emi ums f or Per f or mance and Payment Bonds i n accor dance wi t h Cont r act Cl ause 52. 232- 5 PAYMENTS UNDER FI XED- PRI CE CONSTRUCTI ON CONTRACTS. The pr emi ums f or per f or mance and payment bonds shal l be i ncl uded i n t he cont r act s i ngl e j ob pr i ce f or PREMI UMS FOR PERFORMANCE AND PAYMENT BONDS. The payment made under t hi s pr ovi s i on shal l not exceed t he amount i ncl uded f or PREMI UMS FOR PERFORMANCE AND PAYMENT BONDS, whi ch payment shal l t ake i nt o consi der at i on any di scount s or r ebat es t o t he Cont r act or f r om t he Sur et y. The Cont r act or i s advi sed t hat t he pay i t em PREMI UMS FOR PERFORMANCE AND PAYMENT BONDS i s onl y f or t he cost of bonds. Ot her cost s shoul d be al l ocat ed t o t he appr opr i at e payment i t ems.

SECTI ON 01 22 00 Page 4

1. 1. 3. 2 Uni t of Measur ement

Uni t of measur ement : Job.

1. 1. 4 Mai nt enance and Pr ot ect i on of Tr af f i c

1. 1. 4. 1 Payment

Payment wi l l be made f or al l cost s associ at ed wi t h or i nci dent al t o mai nt enance and pr ot ect i on of t r af f i c under Sect i on 01 50 00 TEMPORARY AND PERMANENT CONSTRUCTI ON FACI LI TI ES AND CONTROLS, i ncl udi ng, but not l i mi t ed t o, mai nt ai ni ng al l t r af f i c cont r ol devi ces at t he st ar t of const r uct i on act i v i t i es, mai nt ai ni ng al l cont r ol devi ces dur i ng const r uct i on, and r emovi ng such cont r ol devi ces af t er compl et i on of const r uct i on. Payment shal l i ncl ude, but not be l i mi t ed t o, al l t r af f i c bar r i er s, t empor ar y r oad si gnage, r oad sur veys and r epai r s, f l agmen, and i nci dent al t r af f i c cont r ol s t hr oughout t he dur at i on of t he cont r act .

1. 1. 4. 2 Uni t of Measur ement

Uni t of measur ement : Job.

1. 1. 5 Oper at i ons Bui l di ng Renovat i on

1. 1. 5. 1 Payment

a. Payment f or al l wor k r el at i ng t o t he r enovat i on of t he Oper at i ons Bui l di ng, i ncl udi ng demol i t i on and r euse of i dent i f i ed por t i ons of t he exi st i ng st r uct ur e, wi l l be made at t he s i ngl e j ob pr i ce f or OPERATI ONS BUI LDI NG RENOVATI ON. Thi s i ncl udes al l cost s i nci dent al t o t he wor k.

b. No seper at e payment wi l l be made f or concr et e, concr et e const i t uent mat er i al s, met al wor k, pai nt i ng, ar chi t ect ur al i t ems, or ot her i t ems not speci f i cal l y i ncl uded f or payment i n ot her sect i ons. Mechani cal , el ect r i cal , or ot her wor k r el at i ng t o t he Oper at i ons Bui l di ng, and t he ent i r e cost t her eof shal l be deemed as i ncl uded i n t he OPERATI ONS BUI LDI NG RENOVATI ON payment i t em.

1. 1. 5. 2 Uni t of Measur ement

Uni t of measur ement : Job.

1. 1. 6 Upst r eam Lock Tempor ar y Ut i l i t y Br i dge No. 1

1. 1. 6. 1 Payment

a. Payment f or al l cost s i n connect i on wi t h f abr i cat i on and i nst al l at i on of t he upst r eam l ock t empor ar y ut i l i t y br i dge and r el at ed appur t enances wi l l be made at t he cont r act s i ngl e j ob pr i ce f or UPSTREAM LOCK TEMPORARY UTI LI TY BRI DGE NO. 1. Thi s pr i ce shal l be f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, and suppl i es t o compl et e t he wor k i n accor dance wi t h t he cont r act dr awi ngs and as speci f i ed i n Sect i on 32 34 35 PREFABRI CATED UTI LI TY BRI DGES.

b. Payment f or al l cost s r el at ed t o pai nt i ng, as speci f i ed i n Sect i on 09 97 02 PAI NTI NG: PEDESTRI AN BRI DGES, shal l be i ncl uded i n t he s i ngl e j ob pr i ce.

SECTI ON 01 22 00 Page 5

1. 1. 6. 2 Uni t of Measur ement

Uni t of measur e: Job.

1. 1. 7 Upst r eam Lock Tempor ar y Ut i l i t y Br i dge No. 2

1. 1. 7. 1 Payment

a. Payment f or al l cost s i n connect i on wi t h f abr i cat i on and i nst al l at i on of t he upst r eam l ock t empor ar y ut i l i t y br i dge and r el at ed appur t enances wi l l be made at t he cont r act s i ngl e j ob pr i ce f or UPSTREAM LOCK TEMPORARY UTI LI TY BRI DGE NO. 2. Thi s pr i ce shal l be f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, and suppl i es t o compl et e t he wor k i n accor dance wi t h t he cont r act dr awi ngs and as speci f i ed i n Sect i on 32 34 35 PREFABRI CATED UTI LI TY BRI DGES.

b. Payment f or al l cost s r el at ed t o pai nt i ng, as speci f i ed i n Sect i on 09 97 02 PAI NTI NG: PEDESTRI AN BRI DGES, shal l be i ncl uded i n t he s i ngl e j ob pr i ce.

1. 1. 7. 2 Uni t of Measur ement

Uni t of measur e: Job.

1. 1. 8 Ut i l i t y Suppor t Cat wal k

1. 1. 8. 1 Payment

Payment f or al l wor k r el at i ng t o t he desi gn, f abr i cat i on, and i nst al l at i on of t he cat wal k suppor t syst em al ong t he out si de of t he l ock l andwal l wi l l be made at t he s i ngl e j ob pr i ce f or UTI LI TY SUPPORT CATWALK. Thi s pr i ce shal l be f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, and suppl i es t o compl et e t he wor k i n accor dance wi t h t he cont r act dr awi ngs and as speci f i ed. Any excavat i on and di sposal of mat er i al t hat i s r equi r ed t o i nst al l t he desi gned cat wal k i s consi der ed t o be i nci dent al t o t he wor k.

1. 1. 8. 2 Uni t of Measur ement

Uni t of measur ement : Job.

1. 1. 9 Tempor ar y Hazmat St or age Faci l i t i es

1. 1. 9. 1 Payment

Payment f or al l wor k r el at i ng t o t he pr ocur ement and i nst at i on of t he t empor ar y hazmat st or age f aci l i t i es, as shown i n t he dr awi ngs and as speci f i ed, wi l l be made at t he s i ngl e j ob pr i ce f or TEMPORARY HAZMAT STORAGE FACI LI TI ES. Thi s pr i ce shal l be f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, and suppl i es t o compl et e t he wor k i n accor dance wi t h t he cont r act dr awi ngs and as speci f i ed. Mechani cal , el ect r i cal , or ot her wor k r el at i ng t o t he hazmat st or age f aci l i t i es, and t he ent i r e cost t her eof shal l be deemed as i ncl uded i n t he TEMPORARY HAZMAT STORAGE FACI LI TI ES payment i t em.

1. 1. 9. 2 Uni t of Measur ement

Uni t of measur ement : Job.

SECTI ON 01 22 00 Page 6

1. 1. 10 Seeding

1. 1. 10. 1 Payment

Payment wi l l be made at t he s i ngl e j ob pr i ce f or al l cost s associ at ed wi t h or i nci dent al t o al l t empor ar y and per manent seedi ng oper at i ons t o be per f or med under Sect i on 32 92 19 SEEDI NG AND LANDSCAPE ESTABLI SHMENT i n t hi s cont r act at t he pr oj ect s i t e wi t hi n t he l i mi t s shown on t he dr awi ngs and as speci f i ed her ei n, i ncl udi ng, but not l i mi t ed t o, pr epar i ng t he seed bed; f ur ni shi ng and pl aci ng al l mat er i al s ( f er t i l i zer , seed, mul ch, et c. ) compl et e i n- pl ace; wat er i ng; and mai nt enance t hr oughout t he one year war r ant y per i od.

1. 1. 10. 2 Uni t of Measur ement

Uni t of measur ement : Job.

1. 1. 11 Ut i l i t y Rel ocat i ons

1. 1. 11. 1 Payment

Payment f or al l wor k r el at i ng t o t he r el ocat i on of ut i l i t i es, i ncl udi ng but not l i mi t ed t o pl umbi ng, el ect r i cal , mechani cal , suppor t s, and i nci dent al appur t enances not i ncl uded i n ot her sect i ons, wi l l be made at t he s i ngl e j ob pr i ce f or UTI LI TY RELOCATI ON. Thi s pr i ce shal l be f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, and suppl i es t o compl et e t he wor k and r equi r ed t est i ng i n accor dance wi t h t he cont r act dr awi ngs and as speci f i ed. Thi s pr i ce i s excl usi ve of wor k associ at ed wi t h t he r el ocat i on of t he Gr and Ri ver s wat er l i ne.

1. 1. 11. 2 Uni t of Measur ement

Uni t of measur ement : Job.

1. 1. 12 Gr and Ri ver s Wat er Li ne Rel ocat i on

1. 1. 12. 1 Payment

Payment f or al l wor k r el at i ng t o t he r el ocat i on of t he Gr and Ri ver s wat er l i ne, i ncl udi ng addi t i onal suppor t s, excavat i on, r emoval of mat er i al s, mi scel l aneous conr et e, and muni ci pal connect i on r equi r ement s, wi l l be made at t he s i ngl e j ob pr i ce f or GRAND RI VERS WATER LI NE RELOCATI ON. Thi s pr i ce shal l be f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, suppl i es, and i nci dent al s t o compl et e t he wor k and r equi r ed t est i ng i n accor dance wi t h t he cont r act dr awi ngs and as speci f i ed.

1. 1. 12. 2 Uni t of Measur ement

Uni t of measur ement : Job.

1. 2 UNI T PRI CE PAYMENT I TEMS

Payment i t ems f or t he wor k of t hi s cont r act on whi ch t he cont r act uni t pr i ce payment s wi l l be made ar e l i s t ed i n t he BID SCHEDULE and descr i bed bel ow. The uni t pr i ce and payment made f or each i t em l i st ed const i t ut es f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, and equi pment , and per f or mi ng any associ at ed Cont r act or qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, t est s and r epor t s, and f or per f or mi ng al l wor k r equi r ed f or each of t he uni t pr i ce i t ems.

SECTI ON 01 22 00 Page 7

PART 2 PRODUCTS

Not Used

PART 3 EXECUTI ON

3. 1 CONTRACT COST BREAKDOWN

The Cont r act or must f ur ni sh wi t hi n 30 days af t er t he dat e of Not i ce t o Pr oceed, and pr i or t o t he submi ssi on of i t s f i r st par t i al payment est i mat e, a br eakdown of i t s s i ngl e j ob pay i t em or i t ems whi ch wi l l be r evi ewed by t he Cont r act i ng Of f i cer as t o pr opr i et y of di st r i but i on of t he t ot al cost t o t he var i ous account s. Any unbal anced i t ems as bet ween ear l y and l at e payment i t ems or ot her di scr epanci es wi l l be r evi sed by t he Cont r act i ng Of f i cer t o agr ee wi t h a r easonabl e cost of t he wor k i ncl uded i n t he var i ous i t ems. Thi s cont r act cost br eakdown wi l l t hen be ut i l i zed as t he basi s f or pr ogr ess payment s t o t he Cont r act or .

- - End of Sect i on - -

SECTI ON 01 22 00 Page 8

SECTI ON TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 32 01

PROJECT SCHEDULE

PART 1 GENERAL

1. 1 REFERENCES

1. 2 SUBMI TTALS

1. 3 PROJECT SCHEDULER QUALI FI CATI ONS

PART 2 PRODUCTS

2. 1 SOFTWARE

2. 1. 1 Gover nment Def aul t Sof t war e

2. 1. 2 Cont r act or Sof t war e

PART 3 EXECUTI ON

3. 1 GENERAL REQUI REMENTS

3. 2 BASI S FOR PAYMENT AND COST LOADI NG

3. 2. 1 Act i v i t y Cost Loadi ng

3. 2. 2 Wi t hhol di ngs / Payment Rej ect i on

3. 3 PROJECT SCHEDULE DETAI LED REQUI REMENTS

3. 3. 1 Level of Det ai l Requi r ed

3. 3. 2 Act i v i t y Dur at i ons

3. 3. 3 Pr ocur ement Act i v i t i es

3. 3. 4 Mandat or y Tasks

3. 3. 5 Gover nment Act i v i t i es

3. 3. 6 St andar d Act i v i t y Codi ng Di ct i onar y

3. 3. 6. 1 Wor ker s Per Day ( WRKP)

3. 3. 6. 2 Responsi bl e Par t y Codi ng ( RESP)

3. 3. 6. 3 Ar ea of Wor k Codi ng ( AREA)

3. 3. 6. 4 Modi f i cat i on Number ( MODF)

3. 3. 6. 5 Bi d I t em Codi ng ( BI DI )

3. 3. 6. 6 Phase of Wor k Codi ng ( PHAS)

3. 3. 6. 7 Cat egor y of Wor k Codi ng ( CATW)

3. 3. 6. 8 Feat ur e of Wor k Codi ng ( FOW)

3. 3. 7 Cont r act Mi l est ones and Const r ai nt s

3. 3. 7. 1 Pr oj ect St ar t Dat e Mi l est one and Const r ai nt

3. 3. 7. 2 End Pr oj ect Fi ni sh Mi l est one and Const r ai nt

3. 3. 7. 3 I nt er i m Compl et i on Dat es and Const r ai nt s

3. 3. 7. 3. 1 St ar t Phase

3. 3. 7. 3. 2 End Phase

3. 3. 8 Cal endar s

3. 3. 9 Open Ended Logi c

3. 3. 10 Def aul t Pr ogr ess Dat a Di sal l owed

3. 3. 11 Out - of - Sequence Pr ogr ess

3. 3. 12 Added and Del et ed Act i v i t i es

3. 3. 13 Or i gi nal Dur at i ons

3. 3. 14 Leads, Lags, and St ar t t o Fi ni sh Rel at i onshi ps

SECTI ON 01 32 01 Page 1

3. 3. 15 Ret ai ned Logi c

3. 3. 16 Per cent Compl et e

3. 3. 17 Remai ni ng Dur at i on

3. 3. 18 Cost Loadi ng of Cl oseout Act i v i t i es

3. 3. 18. 1 As- Bui l t Dr awi ngs

3. 3. 18. 2 O & M Manual s

3. 3. 19 Ant i c i pat ed Adver se Weat her

3. 3. 20 Ear l y Compl et i on Schedul e and t he Ri ght t o Fi ni sh Ear l y

3. 4 PROJECT SCHEDULE SUBMI SSI ONS

3. 4. 1 Pr el i mi nar y Pr oj ect Schedul e Submi ssi on

3. 4. 2 I ni t i al Pr oj ect Schedul e Submi ssi on

3. 4. 3 Per i odi c Schedul e Updat es

3. 5 SUBMI SSI ON REQUI REMENTS

3. 5. 1 Dat a CD/ DVDs

3. 5. 2 Nar r at i ve Repor t

3. 5. 3 Schedul e Repor t s

3. 5. 3. 1 Act i v i t y Repor t

3. 5. 3. 2 Logi c Repor t

3. 5. 3. 3 Tot al Fl oat Repor t

3. 5. 3. 4 Ear ni ngs Repor t by CLI N

3. 5. 3. 5 Schedul e Log

3. 5. 4 Net wor k Di agr am

3. 5. 4. 1 Cont i nuous Fl ow

3. 5. 4. 2 Pr oj ect Mi l est one Dat es

3. 5. 4. 3 Cr i t i cal Pat h

3. 5. 4. 4 Bandi ng

3. 5. 4. 5 Cash Fl ow / Schedul e Var i ance Cont r ol ( SVC) Di agr am

3. 6 PERI ODI C SCHEDULE UPDATE

3. 6. 1 Per i odi c Schedul e Updat e Meet i ngs

3. 6. 2 Updat e Submi ssi on Fol l owi ng Pr ogr ess Meet i ng

3. 7 WEEKLY PROGRESS MEETI NGS

3. 8 REQUESTS FOR TI ME EXTENSI ONS

3. 8. 1 Just i f i cat i on of Del ay

3. 8. 2 Ti me I mpact Anal ysi s ( Pr ospect i ve Anal ysi s)

3. 8. 3 For ensi c Schedul e Anal ysi s ( Ret r ospect i ve Anal ysi s)

3. 8. 4 Fr agment ar y Net wor k ( Fr agnet )

3. 8. 5 Ti me Ext ensi on

3. 8. 6 I mpact t o Ear l y Compl et i on Schedul e

3. 9 FAI LURE TO ACHI EVE PROGRESS

3. 9. 1 Ar t i f i c i al l y I mpr ovi ng Pr ogr ess

3. 9. 2 Fai l ur e t o Per f or m

3. 9. 3 Recover y Schedul e

3. 10 OWNERSHI P OF FLOAT

3. 11 TRANSFER OF SCHEDULE DATA I NTO RMS/ QCS

3. 12 PRI MAVERA P6 MANDATORY REQUI REMENTS

SECTI ON 01 32 01 Page 2

SECTI ON 01 32 01

PROJECT SCHEDULE

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

AACE I NTERNATI ONAL ( AACE)

AACE 29R- 03 ( 2011) For ensi c Schedul e Anal ysi s

AACE 52R- 06 ( 2006) Ti me I mpact Anal ysi s - As Appl i ed i n Const r uct i on

U. S. ARMY CORPS OF ENGI NEERS ( USACE)

ER 1- 1- 11 ( 1995) Admi ni st r at i on - - Pr ogr ess, Schedul es, and Net wor k Anal ysi s Syst ems

1. 2 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Pr oj ect Schedul er Qual i f i cat i ons; G Pr el i mi nar y Pr oj ect Schedul e; G I ni t i al Pr oj ect Schedul e; G Per i odi c Schedul e Updat e; G

1. 3 PROJECT SCHEDULER QUALI FI CATI ONS

Desi gnat e an aut hor i zed r epr esent at i ve t o be r esponsi bl e f or t he pr epar at i on of t he schedul e and al l r equi r ed updat i ng and pr oduct i on of r epor t s. The aut hor i zed r epr esent at i ve must have a mi ni mum of 2- year s exper i ence schedul i ng const r uct i on pr oj ect s s i mi l ar i n s i ze and nat ur e t o t hi s pr oj ect wi t h schedul i ng sof t war e t hat meet s t he r equi r ement s of t hi s speci f i cat i on. Repr esent at i ve must have a compr ehensi ve knowl edge of CPM schedul i ng pr i nci pl es and appl i cat i on.

PART 2 PRODUCTS

2. 1 SOFTWARE

The schedul i ng sof t war e ut i l i zed t o pr oduce and updat e t he schedul es r equi r ed her ei n must be capabl e of meet i ng al l r equi r ement s of t hi s

SECTI ON 01 32 01 Page 3 specification.

2. 1. 1 Gover nment Def aul t Sof t war e

The Gover nment i nt ends t o use Pr i maver a P6 ver si on 8. 4.

2. 1. 2 Cont r act or Sof t war e

Schedul i ng sof t war e used by t he cont r act or must be Pr i maver a P6 ver si on

7. 0 or l at er .

PART 3 EXECUTI ON

3. 1 GENERAL REQUI REMENTS

Pr epar e f or appr oval a Pr oj ect Schedul e, as speci f i ed her ei n. Show i n t he schedul e t he pr oposed sequence t o per f or m t he wor k and dat es cont empl at ed f or st ar t i ng and compl et i ng al l schedul e act i v i t i es. The schedul i ng of t he ent i r e pr oj ect i s r equi r ed. The schedul i ng of construction i s t he r esponsi bi l i t y of t he Cont r act or . Cont r act or management per sonnel must act i vel y par t i c i pat e i n i t s devel opment . Subcontractors wor ki ng on t he pr oj ect must al so cont r i but e i n devel opi ng and mai nt ai ni ng an accur at e Pr oj ect Schedul e. Pr ovi de a schedul e t hat i s a f or war d pl anni ng as wel l as a pr oj ect moni t or i ng t ool . Use t he Cr i t i cal Pat h Met hod ( CPM) of net wor k cal cul at i on t o gener at e al l Pr oj ect Schedul es.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.