W912P5-17-B-0015_TSpecs_050523pg3-_AMD_003.pdf

PDF 15 KB Posted

Attached to
Kentucky Lock Site, Demolitions, and Utilities Construction
Solicitation number
W912P517B0015
Issued by

About this file

Revised Technical Specification Section 05 05 23 Pg3

View the file

Other files

File Type Posted
OF1419_Construction-signed.pdf PDF
Amendment_0005.pdf PDF
W912P517B00150004.pdf PDF
W912P517B00150003.pdf PDF
W912P5-17-B-0015_TSpecs_051200pg6_-_AMD_003.pdf PDF
Amend_0002_Errata_Sheet.pdf PDF
W912P517B00150002.pdf PDF
W912P5-17-B-0015_Plans_-_AMD_002.pdf PDF
W912P5-17-B-0015_TSpecs_-_AMD_002.pdf PDF
KYLK_As-Built_Folio_1_Part15.pdf PDF
KYLK_As-Built_Folio_1_Part8.pdf PDF
KYLK_As-Built_Folio_1_Part10.pdf PDF
KYLK_As-Built_Folio_1_Part1.pdf PDF
KYLK_As-Built_Folio_2_Part3.pdf PDF
KYLK_As-Built_Folio_2_Part11.pdf PDF
KYLK_As-Built_Folio_1_Part4.pdf PDF
KYLK_As-Built_Folio_1_Part11.pdf PDF
KYLK_As-Built_Folio_1_Part9.pdf PDF
KYLK_As-Built_Folio_2_Part5.pdf PDF
KYLK_As-Built_Folio_2_Part7.pdf PDF
KYLK_As-Built_Folio_1_Part13.pdf PDF
KYLK_As-Built_Folio_2_Part9.pdf PDF
KYLK_As-Built_Folio_1_Part14.pdf PDF
KYLK_As-Built_Folio_1_Part3.pdf PDF
KYLK_As-Built_Folio_1_Part2.pdf PDF
KYLK_As-Built_Folio_2_Part4.pdf PDF
KYLK_As-Built_Folio_2_Part6.pdf PDF
KYLK_As-Built_Folio_2_Part10.pdf PDF
KYLK_As-Built_Folio_1_Part12.pdf PDF
KYLK_As-Built_Folio_2_Part2.pdf PDF
KYLK_As-Built_Folio_2_Part8.pdf PDF
KYLK_As-Built_Folio_1_Part6.pdf PDF
KYLK_As-Built_Folio_2_Part1.pdf PDF
KYLK_As-Built_Folio_1_Part7.pdf PDF
KYLK_As-Built_Folio_1_Part16.pdf PDF
KYLK_As-Built_Folio_1_Part5.pdf PDF
P&L_Railroad_Bridge_Reference_Folio.pdf PDF
Site_Visit_Roster.pdf PDF
Ky_Lock_SDU_-_Site_Visit_Presentation.pdf PDF
W912P517B00150001.pdf PDF
Mechanical_Reference_Folio.pdf PDF
Powerhouse_Access_Bridge_Reference_Folio.pdf PDF
US_62^641_Highway_Bridge_Reference_Folio.pdf PDF
Combined_Abutments_Reference_Folio.pdf PDF
SDU_-_QA_spreadsheet_-_Amend_1_v3.pdf PDF
Electrical_Reference_Folio.pdf PDF
W912P517B0015.pdf PDF
FN_Site_Visit_Form-KY_Lock.pdf PDF
W912P517B0015_Bid_Schedule.xlsx XLSX spreadsheet
W912P5-17-B-0015_TSpecs.pdf PDF
Show 40 more

Latest 50 of 52 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Site, Demolition and Utility Relocations Kentucky Lock Addition W912P5-17-B-0015 Grand Rivers, Livingston County, KY

Welding Quality Assurance Plan

SD-03 Product Data

Welding Procedure Qualifications; G Welder, Welding Operator, and Tacker Qualification Inspector Qualification Previous Qualifications Pre-Qualified Procedures Welding Electrodes and Rods

SD-06 Test Reports

Nondestructive Testing

SD-07 Certificates

Certified Welding Procedure Specifications (WPS) Certified Brazing Procedure Specifications (BPS) Certified Procedure Qualification Records (PQR) Certified Welder Performance Qualifications (WPQ) Certified Brazer Performance Qualifications (BPQ)

1.3 QUALITY ASSURANCE

Except for pre-qualified (in accordance with AWS D1.1/D1.1M ) and previously qualified procedures, each Contractor performing welding must record in detail and qualify the welding procedure specification for any welding procedure followed in the fabrication of weldments. Conform welding procedure qualifications to AWS D1.1/D1.1M , AWS D1.8/D1.8M and to the specifications in this section. Submit for approval copies of the welding procedure specification and the results of the procedure qualification test records for each type of welding which requires procedure qualification and the welder, welding operator, or tacker qualification test records.. Approval of any procedure, however, does not relieve the Contractor of the sole responsibility for producing a finished structure meeting all the specified requirements. Submit this information on the forms in Annex M of AWS D1.1/D1.1M . Individually identify and clearly reference on the detail drawings and erection drawings all welding procedure specifications, or suitably key them to the contract drawings.

In case of conflict between this specification and AWS D1.1/D1.1M , this specification governs.

1.3.1 General Requirements

Fabricate work in an AISC Certified Fabrication Plant, Category Std .

Work must be erected by an AISC Certified Erector, Category CSEA .

a. For Structural Projects, provide documentation of the following:

(1) Component Thickness 1/8 inch and greater: Qualification documents (WPS, PQR, and WPQ) in accordance with AWS D1.1/D1.1M .

(2) Component Thickness Less than 1/8 inch: Qualification documents (WPS, PQR, and WPQ) in accordance with AWS D1.3/D1.3M .

(3) Reinforcing Steel: Qualification documents (WPS, PWR, and WPQ) in accordance with AWS D1.4/D1.4M .

SECTION 05 05 23 Page 3

Section 05 05 23 Amend 3 Revision
Section 05 12 00 Amend 3 Revision

File details come from the government source that posted it.