About this file

Fort Indiantown Gap Installation Design Guide (reference document).

View the file

Other files

File Type Posted
QuestionsAnswers-14May2010.pdf PDF
QuestionsAnswers-5May2010.pdf PDF
QuestionsAnswers-4May2010.pdf PDF
QuestionsAnswers-3May2010.pdf PDF
QuestionsAnswers-29Apr2010.pdf PDF
QuestionsAnswers-27Apr2010.pdf PDF
QuestionsAnswers-2-22Apr2010.pdf PDF
QuestionsAnswers-22Apr2010.pdf PDF
21April2010SecondarySiteVisitAttendees.pdf PDF
QuestionsAnswers-21Apr2010.pdf PDF
QuestionsAnswers-19Apr2010.pdf PDF
QuestionsAnswers-16Apr2010.pdf PDF
Amended Exhibit F.doc DOC document
Amended Exhibit G.doc DOC document
QuestionsAnswers-3-9Apr2010.pdf PDF
QuestionsAnswers-2-9Apr2010.pdf PDF
QuestionsAnswers9Apr2010.pdf PDF
Exhibit F.doc DOC document
Exhibit G.doc DOC document
Exhibit E4-1.doc DOC document
Exhibit D.doc DOC document
Exhibit B.doc DOC document
Exhibit E.doc DOC document
Exhibit C.doc DOC document
Exhibit E-1.doc DOC document
Exhibit E2.doc DOC document
Exhibit E4.doc DOC document
Exhibit A.doc DOC document
Exhibit E2-1.doc DOC document
7April2010ConferenceAttendees.pdf PDF
Pre-Proposal Conference.pdf PDF
QuestionsAnswers2Apr2010.pdf PDF
QuestionsAnswers31Mar2010.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INSTALLATION DESIGN GUIDE

FORT INDIANTOWN GAP

ANNVILLE, PA. 17003-5002

Revised

JULY 2008

FOR PURPOSES OF SOLICITATION W912KC-10-R-0001 any and all references to brand name products/services within this Installation Design Guide are to be considered as “BRAND OR EQUAL” products/services.

This document was last revised July 2008, any and all references to regulations or codes are to be interpreted as references to the regulation or code as currently in effect.

1. INTRODUCTION

2. DESIGN GUIDELINES

Part 1 – General requirements

1.0 - Contractor Access and Security

1.1 - Safety

1.2 - Environmental

1.3 - Inspection Services - Major and Minor Construction

1.4 - Codes and Regulations

1.5 – Project Site Restrictions

1.6 - ADA Requirements

1.7 - A/E Design Submission and Review Process

1.8 - Construction Drawings and Specifications

Part 2 – Site Construction

2.0 – Piped Utilities – Basic Materials and Methods

2.1 – Earthwork

2.2 – Potable Water Supply Wells

2.3 – Sanitary Sewage

2.4 – Natural Gas / Propane Distribution

2.5 – Storm Drainage

2.6 – Chain-Link Fences and Gates

2.7 – Playground Equipment and MWR Structures

2.8 – Lawns and Grasses

2.9 – Exterior Plants

Part 3 – Concrete

3.0 – Cast-in-place Concrete

3.1 – Plant-Precast Structural Concrete

Part 4 – Masonry

4.0 – Unit Masonry Assemblies

4.1 – Stone Masonry

Part 5 – Metals

5.0 – Structural Steel

5.1 – Steel Joist

5.2 – Steel Deck

5.3 – Cold Formed Metal Framing

Part 6 – Wood and Plastics

6.0 - Sheathing

Part 7 – Thermal and Moisture Protection

7.0 – Building Insulation

7.1 – Exterior Insulation and Finish Systems

7.2 – Asphalt Shingles

7.3 – Metal Roof Panels

7.4 – Metal Wall Panels

7.5 – Built-Up Asphalt Roofing

7.6 – EPDM Membrane Roofing

7.7 – Manufactured Roof Specialties

Part 8 – Doors and Windows

8.0 – Steel Doors and Frames

8.1 – Flush Wood Doors

8.2 – Glass Storefront Entrances

8.3 – Door Hardware

8.4 – Security Glazing

Part 9 – Finishes

9.0 – Acoustical Tile Ceilings

9.1 – Exterior Painting

Part 10 – Specialties

10.0 – Louvers and Vents

10.1 – Singage

10.2 – Fire Protection Specialties

10.3 – Security Fire Protection Specialties

Part 11 – Special Construction

11.0 – Metal Building Systems

11.1 – Prefabricated Control Booths

11.2 – Perimeter Security

11.3 – Intrusion Detection

11.4 – Security Access

11.5 – Video Surveillance

11.6 – Exterior Fire Protection

11.7 – Fire Alarm

Part 12 – Mechanical

12.0 – Domestic Water Piping

12.1 – Sanitary Waste and Vent Piping

12.2 – Storm Drainage Piping

12.3 – Plumbing Fixtures

12.4 – Plumbing Specialties

12.5 – Furnaces

12.6 – Metal Ducts

12.7 – HVAC Instrumentation and Controls

Part 13 – Electrical

13.0 - Electricity Metering

13.1 - Packaged Engine Generators

13.2 - Panelboards

13.3 - Voice and Data Communication Cabling

13.4 - Public Address System

13.5 - Utilities

13.6 - Wiring Devices

13.7 – Interior & Exterior Lighting

Part 14 - Acronyms

STANDARD FORMS

A. ARNG Environmental Checklist

1. Record of ENV Consideration.xls [TO BE PROVIDED AT TIME OF

TASK ORDER AWARD]

B. Special Excavation Permit

INTRODUCTION:

Fort Indiantown Gap is located in south-central Pennsylvania, approximately 22 miles northeast of the state capital, Harrisburg along Interstate 81. Fort Indiantown Gap is approximately 11 miles long and five miles wide and contains approximately 17,000 acres of land. Most of Fort Indiantown Gap, including all of its buildings and facilities, lies in the northwest corner of Lebanon County and East Hanover and Union Townships. The western-most part of Fort Indiantown Gap’s firing range extends into Dauphin County. Blue Mountain, the southern-most ridge of the Blue Mountains, separates the cantonment area from the training areas. Most training areas are located in the valley between Blue and Second Mountains.

The purpose of the Installation Design Guide for Fort Indiantown Gap is to provide a consolidated quick reference guide for contractors and architectural and engineering firms to assist in the planning, design and development of new construction and renovation projects that will reflect consistency in materials, colors, fixture type and maintenance procedures. The Design Guide will attempt to address common and unique design features that are exclusive to structures on Fort Indiantown Gap. This Design Guide is not intended to be all inclusive, but will serve as a solid preparatory guideline for planners, architects, contractors and designers. As deviations from this Design Guide will certainly arise, each can be addressed on a case by case basis. This Design Guide does not constitute a construction specification, but rather establishes parameters with which to design and construct facilities in Fort Indiantown Gap.

Energy and Environmental Design – New Construction (LEED-NC®). For all FY 08 military vertical building construction and later year projects, the Army sustainable rating level standard is the US Green Building Council (USGBC), LEED-NC® Silver rating. See Deputy Assistant Secretary of the Army (Installation and Housing) Memorandum, dated 05 January 2006, subject:

Sustainable Design and Development Policy Update – SPiRiT to LEED Transition, paragraph 2. LEED Project Checklists are available on the web at www.usgbc.org.

The Security and Antiterrorism Standards will be integrated into the total project.

Design of protective elements will seek to visually function enhance and complement the design of a facility. Site elements such as fences, courtyards, screen walls, swales, berms, planters, and retaining walls can be used effectively for facility protection. These design elements will be designed to provide visual harmony with the main facility, producing architectural compatibility through consistent use and application of materials, forms, and colors. Accommodating the need for security and antiterrorism is a significant concern for all military facilities design.

Design decisions to meet security and antiterrorism requirements and resolve conflicts will require coordination among the design disciplines and appropriate functional areas to include land planners, landscape architects, architects, intelligence personnel, security personnel, Force Protection Officer, facility users, and engineers. The designers must work to balance force protection requirements with all other requirements that impact design and development.

These include the Americans with Disabilities Act Accessibility Guidelines (ADAAG), the Uniform Federal Accessibility Standards (UFAS), National Fire Protection Codes (NFPA), and all applicable local building codes, ordinances, and Host Nation Standards. The design team will also consult security personnel to determine whether portions of the design documents are subject to access limitations.

PART 1- GENERAL REQUIREMENTS

1.0 - CONTRACTOR ACCESS AND SECURITY

A. CONTRACTOR BADGING AND SECURITY CLEARANCES

Contractor should secure badges from the FTIG Access Facility. See SOP #380, Fort Indiantown Gap Access Control Procedures, dated 6 May 2008, for further direction.

1.1 – SAFETY

A. All contractors are required to comply with all Federal, State, DOD and local directives relating to occupational safety and health (OSH).

B. All Federal OSH information can be obtained at the Occupational Safety and Health Administration (OSHA) website (www.osha.gov).

C. DOD and Local directives can be found at the PAARNG State Safety Office website.

D. The State Safety Office is located in building 11-9, and can be reached via telephone at 717-861-8813.

E. The BFE Safety Office is located in building 11-19 and can be reached at 717-861-9462.

1.1.1 - General Polices

A. Contractors are subject to inspection by the State Safety Office. The TSFE Inspector has the primary safety inspection role, and will accompany the SSO representative during their inspection.

B. Items noted during the inspection will be corrected on the spot, for items that can not be corrected immediately; a reasonable timeline will be established and alternate procedures will be put in place.

C. Items determined to be Immediately Dangerous to Life and Health (IDLH) will cause a stop work until the condition is abated.

D. Contractors are required to provide their own Personal Protective Equipment, Safety Equipment and training.

1. The SSO will provide any “Site Specific” training required by the contractor.

2. The contractor will maintain its own Hazard Communication Program IAW 29 CFR 1910.1200.

3. The Contractor will post a contractor’s certification of operator’s qualifications on equipment. Copies will be kept in the Site Office of the Contractor.

4. Contractors are to brief their employees to remain clear of all military equipment (Tanks, A/C, weapon systems etc…).

5. Contractors are required to provide a copy of their OSH plan to the CO, for review and approval, prior to start of work.

E. UXO’s

1. Unexploded Ordinance (UXOs) are a hazard at any military training site. These items can be LETHAL, and should not be handled or disturbed in any way. Contractors will be briefed on UXO awareness, by Range Control. The contractor is responsible for ensuring their employees are familiar with UXOs and the procedures should they find one.

2. Should a UXO be discovered the following steps are to be followed:

a. Do not disturb the UXO any further.

b. Mark the area in a conspicuous manner.

c. Remove all personnel from the area.

d. Call the TSFE’s (Training Site Facility Engineers) or Range Control (717-861-2152) Provide the following:

Name of company, location and job site.

F. The State Safety Office is here to assist with your safety needs, please feel free to contact the office at anytime.

1.2 – ENVIRONMENTAL

NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) DOCUMENTATION FOR

CONSTRUCTION PROJECTS

Training Site Facilities Engineers (TSFE) Responsibilities

A. TSFE is the proponent for all construction projects its staff oversees at Fort Indiantown Gap. In order to assess the potential environmental impacts of proposed construction projects and the type of NEPA documentation required, the TSFE will coordinate with the Environmental

Division and prepare a ARNG REC Form 1 June 03 (see attachment) prior to start of construction.

B. The TSFE should coordinate with the Environmental Division (ENV), Environmental NEPA Planning Supervisor as early in the planning process as possible.

C. For MILCON projects, ENV should be contacted one year in advance of construction if possible. (Environmental Assessments can take from six months to three years depending on their complexity; therefore, in order to maintain construction timelines the Environmental Division should be notified as soon as possible.)

D. For minor construction, the Environmental Division should be notified ninety days in advance of construction.

PRODUCT DATA SHEET 0 - The TSFE (proponent) will identify the proposed action (project) and the purpose of the project as well as why the project is needed. In addition, for Environmental Assessments (EA) and Environmental Impact Statements (EIS) the TSFE will also provide reasonable alternatives to the proposed project. These alternatives should also satisfy all or some of the same needs as the proposed project, alternatives to the project likely do not satisfy all the requirements.

PRODUCT DATA SHEET 1 - The DFE/CFMO will provide funding to prepare EAs and EIS’s where contractor support is required.

PRODUCT DATA SHEET 2 - The TSFE (proponent) will ensure that the required NEPA documentation (and supporting documentation) is completed prior to construction and that such documentation adequately addresses the project regardless of who the author is.

PRODUCT DATA SHEET 3 - If mitigation measures are required as part of an EA or EIS, the proponent will ensure adequate funding to perform all mitigation for the prescribed time. For example, if wetlands must be constructed to replace one impacted by construction than the proponent must ensure enough funding is available for the replacement wetlands construction. In addition, regulators typically require monitoring of constructed wetlands for several years. The proponent will ensure funding is available for such monitoring.

PRODUCT DATA SHEET 4 - (Reference 32 CFR Part 651 Environmental Analyses of Army Actions).

SCHEDULE 1 - Completing ARNG Environmental Checklist

PRODUCT DATA SHEET 0 - The proponent is responsible for completing ARNG REC Form 1 June 03 titled “ARNG Environmental Checklist”. The Environmental Division will assist the proponent in the completion of this form.

PRODUCT DATA SHEET 1 - For construction activities the following information should be completed prior to the submitting the checklist to the Environmental Division for review. The following information should be provided when the proponent completes the Checklist:

1.1 Brief description of the project/proposal and exact location of the project (item #4).

1.2 Under the Air Section any air emissions sources such as boilers, degreasing and parts washers should be noted in the explanation box.

1.3 Under the Traffic Section any increases (or decreases) vehicle (including construction vehicles) washers should be noted in the explanation box.

1.4 Under the Earth Section:

A. The total square footage of all impervious surfaces should be noted.

The project’s form 1390/91 should also be attached to checklist.

B. A brief description of proposed Erosion & Sedimentation controls should be noted in the explanation box.

C. If project will require an NPDES permit for construction state whether it will be an individual or general permit.

D. When permit application is submitted to the appropriate agency a copy of the application should be sent to the Environmental Division Planning Supervisor.

1.5 Under Hazardous Waste:

A. Any hazardous chemical or products used in construction should be noted in the explanation box.

B. If any hazardous waste storage areas, sheds etc. are part of the project they should be described in the explanation box.

1.6 Under Water Section:

A. List any aboveground storage tanks, underground storage tanks, and bulk POL storage to be constructed and/or utilized during construction or operation of project.

B. If any work will occur in a flood plain indicate the type of activities.

C. Indicate any oil/water separators and/or grease traps to be installed or modified as part of this project.

1.7 Under the Cultural Resources Section:

A. If any buildings are going to be altered as part of the construction project.

PRODUCT DATA SHEET 2 - The Environmental Division will assist the proponent in completing checklist items and interpreting applicability of checklist items to the proposed construction project.

PRODUCT DATA SHEET 3 - After reviewing the completed checklist ENV in coordination with the proponent will determine the appropriate level of NEPA documentation required.

SCHEDULE 2 CATEGORICAL EXCLUSIONS (CX) & RECORDS OF

ENVIRONMENTAL CONSIDERATION (REC) Most minor and many MILCON construction projects can be covered under a CX where only a REC would be required. Construction projects typically fall under one or more of the following CX’s:

PRODUCT DATA SHEET 0 – C-1 Construction on a previously undisturbed site if area to be disturbed has no more than 5.0 cumulative acres of new surface disturbance.

PRODUCT DATA SHEET 1 - C-2 - Demolition of non-historic buildings, structures, or other improvements and disposal of this debris.

PRODUCT DATA SHEET 2 – C-3 - Road or trail construction and repair on existing right-of-ways or on previously disturbed areas. (CX does not require a

REC.)

PRODUCT DATA SHEET 3 - D-2 – Routine maintenance of streams and ditches or rainwater conveyance structures (in accordance with USACE permit authority under Section 404 of Clean Water Act and applicable and local permits, see section xxx) and erosion control and storm water control structures.

PRODUCT DATA SHEET 4 - E-2 – Acquisition, installation, and operation of utility and communication systems, mobile antennas, data processing cable and similar electronic equipment that uses existing right-of-way, easement, distribution systems, and/or facilities.

PRODUCT DATA SHEET 5 - F-1 – Grants or acquisitions of leases, licenses, easements, permits for use of real property or facilities in which there is no significant change in land or facility use.

PRODUCT DATA SHEET 6 - G-1 – Routine repairs of buildings, airfields, grounds, equipment, and other facilities. (CX does not require a REC unless asbestos, lead paint, historic structures or similar situations exist.)

PRODUCT DATA SHEET 7 - G-2 – Routine repairs and maintenance of roads, trails, and firebreaks.

PRODUCT DATA SHEET 8 - Refer to 32 CFR Part 651Appendix B for additional information.

SCHEDULE 3 - SCREENING CRITERIA FOR CX AND REC USAGE (Refer to 32 CFR Part 651.129 for details.) To use a CX (with or without REC) the proponent must satisfy the three following screening criteria:

PRODUCT DATA SHEET 0 - No segmentation of project has occurred. For example, in order to construct three barracks each having a two-acre footprint, the proponent may not break the proposal into two projects: a two-acre project with one barracks on it, and a four-acre project with the other two barracks.

PRODUCT DATA SHEET 1 - No exceptional circumstances exist. (Listed in the reference).

PRODUCT DATA SHEET 2 - One or more of the CX listed in Refer to 32 CFR Part 651 fits the project.

SCHEDULE 4 - OMNG Project Request Form NGB Form 420R Dec04 (as prescribed by NGR 420-10) will not be signed by the Environmental Programs Manager until the ARNG REC Form 1 June 03 titled “ARNG Environmental Checklist” is submitted to the Environmental Division and the appropriate level of NEPA documentation has been completed.

1.3 - INSPECTION SERVICES-MAJOR AND MINOR CONSTRUCTION

1. Construction inspection services can vary by project and contract stipulations.

The Training Site Engineers employs a team of federal, state and contract employees capable of providing construction inspection services. Additionally, “Type C” inspection services can be contracted to assist with more complex designs as required. All facets of the inspection team work as an integral force in execution and completion of the construction inspection process.

1.4 - CODES AND REGULATIONS

1. Building Codes: The Fort Indiantown Gap Training Center has adopted the International Code Council as its governing Building code. These codes are as, but not limited to the latest edition of the following:

- International Building Code

- International Fire Code

- International Mechanical Code

- International Plumbing Code

- International Fuel Gas Code

- International Energy Conservation Code

- NFPA 70 National Electrical Code

- 29 CFR Occupational Safety and Health

Regulations (OSHA Standards)

- Pa. Uniform Construction Code

2. Other Code Standards: The following are additional standard building codes (latest editions) that have also been adopted by Fort Indiantown Gap Training Center as governing bodies for facility designs:

- NFPA 101, Life Safety Code

- Pennsylvania Code Title 34, ADA Accessibility

Guidelines

- Pennsylvania Department of Environmental

Protection, Erosion and Sediment Pollution Control Program Manual

- PA DEP Title 25. Environmental Protection

- Department of Defense, Unified Facilities Code

4-010-01 Antiterrorism Standards for Buildings, 8 Oct, 2003

- US Army Corps of Engineers, Sustainable

Project Rating Tool (SPiRiT) Version 1.4.1

Federal Aviation Administration Regulations

Pa. Dept. of Labor and Industry

Pa. Dot Publication 408

NG Pam 415-5

NGR 415-5

- NG Pam 415-12

- DG 415-1

- DG 415-2

- DG 415-3

- DG 415-3

- DG 415-4

- DG 415-5

3. Basis of Design recommendations for Fort Indiantown Gap Training Center Zone Location (The Zone information being provided is meant for simple guideline references only. Proper design calculations and code requirements shall supersede the following):

a. Seismic Loads – IBC 2003, Category B

b. Snow Loads – IBC 2003, 30lbs/sf (min.)

c. Thermal Insulation Values – Zone 4

1. Roof/Ceiling – R30 min.

2. Exterior Walls – R19 min.

3. Floors – R19 min.

d. Wind Loads

1. (3) Second Gust – 90mph

2. Fastest Mile Wind Speed – 75mph

e. Frost Protection

1. Average Infiltration Depth – 15 inches

2. Design Depths – 36 inches (bottom of footers, min.)

1.5 – PROJECT SITE RESTRICTIONS

Certain areas within the post limits may contain site restrictions due to environmental, historical, range safety zones and or PA Air National Guard Flight Activities. All project sites will be determined and specified by the Fort Indiantown Gap Real Property Planning Board. All known site restrictions will be outlined during the initial project design meeting, unless directed otherwise design personnel shall adhere to the restraints detailed to them by the government design professional.

1.6 - ADA REQUIREMENTS (Incorporation into Designs)

ADA Requirements are applicable to the following:

1. State Funded/State owned facilities.

2. Federal Facilities that incorporate more than 10% of its’ operating staff to Contracted or Civilian Employees.

3. Federal Facilities that will house or have the potential to house public/civilian activities and events.

All ADA incorporating designs are to follow the code requirements as stated above in Section E – Codes and Regulations.

Facilities not listed above are to be considered as Military Training Sensitive, these facilities will be those utilized by soldiers and other personnel that by profession could not be handicap.

1.7 – A/E DESIGN SUBMISSION AND REVIEW PROCESS

Project Schedule & Submittal Requirements

The A-E shall complete the design work and services as follows, including attendance at all of the specified meetings at the National Guard Training Site, Fort Indiantown Gap. Coordinate all meetings with the Training Site Facility Engineer’s Office at (717) 861-9349 or 2207. In addition, the A-E shall help ensure coordination is maintained between PAARNG, NGB-ARI (Current –ARI POC’s Mr. Doug Patterson) and, if necessary, NGB-ARL, throughout the course of this work. All deliverables completed under this SOW shall be IAW NGB deliverable requirements as set forth in NGR 415-5 and NG Pam 415-5. The following schedule represents the longest amount of days available for each item. There is no float for delay. Therefore, the A-E will recommend shorter periods as possible and base their proposal on those days. Design activities and/or submissions include, but are not limited to:

Orientation/Criteria Review Conference (CRC)

This meeting will review the scope of work, answer questions so that the A-E may properly formulate their proposal, and walk the site.

Pre-design (Kick-off Conference)

As orchestrated by the PAARNG, anticipate a 1-day meeting scheduled within 15 days of NTP. This requirement may be canceled should the A-E and PAARNG Design Work Group (DWG) jointly determine there is not sufficient new information or details to be covered that were not addressed at the CRC.

15 Percent (Working) Concept Design

The concept design review conference at NGTC-FTIG will be held within 14 calendar days following the receipt of 15 percent concept design submittal. The Government’s 14-day review period commences upon receipt of the 15 percent concept design. The 15 percent working concept design consists of:

Site Investigation, Topographic Survey showing all existing features, utilities and buildings (all survey information, including reference points and benchmarks, will reference FTIG survey completed by Rettew and Associates, dated 30 September 2000, a topographic survey indicating existing utilities and features, Report of Design Considerations, and 15 percent (Approved) Concept Design.

35 Percent Design

Within 60 calendar days following resolution of any NGB-ARI comments. A 35 percent design review conference at NGTC-FTIG will be held near the end of the 30 calendar days of Government review following the receipt of 35 percent design submittal so that the Government may review its comments with the A-E.

65 Percent Design

A 65 percent on-board submittal review will be held at NGTC-FTIG not later than 90 calendar days following the receipt of Notice to Proceed to Final (given after resolution of comments from NGB-ARI on the preliminary). A 65 percent on– board design review conference at NGTC-FTIG will be held within 14 calendar days following the receipt of 65 percent design submittal. The A-E is responsible to incorporate direction and answer questions given verbally at this review.

95 Percent Design

Submit within 90 calendar days following the 65 percent design review conference. The Government will review within 30 days. A pre-final design review conference will be held at NGTC-FTIG to cover comments near the end of the 30-day period.

100 Percent (Final) Design and BCO (Biddability, Constructability, Operability) Submittal

Submit within 14 calendar days following NTP to the check set. At this time, or after the A-E has made required changes, notice to proceed to bid set will be given.

Building Commissioning

Building commissioning will be considered on every project if economically feasible.

AS-Built Drawings

Based on contract terms, the design professional or contractor will be responsible for submitting 3 electronic copies of as-built project drawings in a .dwg or dxf format.

1.8 - CONSTRUCTION DRAWINGS AND SPECIFICATIONS

1. Design Review Submissions and File Formats:

a. Drawings:

1. “Hard Copies”- One (1) full size, 24”x36” minimal and a minimum of three (3) half size sets.

2. Electronic Copy- In addition to the submitted hard copies, one (1) cd shall be submitted with CAD readable files included. The Cad files shall be in AutoCad 2000.dwg or a .dxf format. The Cad files should include copies for each drawing included in the design submission.

b. Specifications: A minimum of four (4) copies of Specifications and Design Guidelines shall be submitted with each review submission. An electronic copy in either Microsoft Word 2000 or Adobe .pdf format shall also be included on the electronic copy of the design submission. Specifications should follow the Construction Specifications Institutes 49 (2004) Divisional and Title standards.

PART 2 – SITE CONSTRUCTION

2.0 – PIPED UTILITIES – BASIC MATERIALS AND METHODS

All building utility service connections should be underground. Direct-burial cable for telephone, data, and electric service connections are not permitted. Conduit or piping passing under any vehicular travel or parking area shall be concrete encased. Participation in on-site water well, sanitary treatment system, and liquid petroleum gas, fuel oil or other heating system storage tank, including piping, will be authorized if respective public services are not available and the separate systems are consistent with the requirements of the local approval authority and with applicable Federal, State, and local environmental laws and regulations.

A. UTILITY MARKING: Permanent, bright-colored, continuous-printed, polyethylene tape. Not less than 6 inches (150 mm) wide by 4 mils (0.102 mm) thick. Compounded for permanent direct-burial service. Embedded continuous metallic strip or core. Printed legend shall indicate type of underground line.

Utility marking shall be buried 12 inches below finished grade.

2.1 – EARTHWORK

A. No digging shall proceed until a digging permit has been submitted and approved. The party requesting a digging permit shall contact State Reservation Maintenance at 717- 861-8870.

B. Site preparation: The work of clearing, grubbing, stripping, and stockpiling topsoil, excavating embankment, and rough grading required to develop the project site to subgrade levels and elevations for proper siting and drainage of facilities (including culverts, head walls, retaining walls, etc.). The State must use its own funds for the special handling/remediation/disposal of contaminated soil excavated from a non-Federal owned or leased project site.

2.1.1 DESIGNATED CLEAN FILL / TOPSOIL SITES

A. Clean fill site availability varies based on current construction effort and activities. Requestor shall check with the Training Site Engineer for current status or availability.

2.2 – POTABLE WATER SUPPLY WELLS

A. Water supply wells are generally discouraged on Fort Indiantown Gap. Please contact the Training Site Engineer for specific applications.

2.3 – SANITARY SEWAGE

A. Government Responsibilities

1. Identify external sewage/waste pipe or manhole tie-in location on site plan drawing.

2. Inspect/approve the sewer line installation and tap prior to contractor backfilling.

B. Contractor Responsibilities

1. Provide/install all sewage/waste water plumbing within construction limits as specified.

2. Trench for, provide, and install Schedule 40 PVC or SDR 35 of the size specified from building sewage/waste water plumbing system to tie-in location.

3. Install a clean-out within 10 feet of the building exterior.

4. Line trench with suitable material based on size of pipe. Upon laying of the pipe and after inspection, cover pipe with a minimum of 4 inches of AASHTO #8 stone.

5. Install marking tape with a tracer buried 12 inches below finished grade.

6. Tie pipe from building into the external sewage/waste water line.

7. If the distance between building sewage/waste water egress point and tie-in point is greater than 200 feet, provide/install a manhole and cleanout every 50 feet as specified.

2.4 – NATURAL GAS / PROPANE DISTRIBUTION

Natural gas is currently unavailable on Fort Indiantown Gap.

Propane Distribution

1. Identify propane location on provided site plan drawings.

1. Provide/install all gas supply distribution piping/systems within building as specified to include regulator.

2. Piping shall be painted inside building and clearly marked as fuel type Prep for and pour pad (to place propane tank) as specified.

3. Bury gas line 24 inches below finished grade; buried gas line shall be flexible, non corrosive UL approved.

2.5 – STORM DRAINAGE

Installation Storm Drainage Systems will be appropriate to the character of development they serve. All installations of storm drainage and E&S controls will conform to Pa. Department of Environmental Protection and the Lebanon and Dauphin County Conservation District guidelines for “Best Management Practices” latest edition. Every attempt must be made to implement “GREEN” building practices into the design/construction.

Corrugated metal drainage pipe is not authorized for drainage systems on Fort Indiantown Gap. Precast concrete structures should meet the most recent Penndot Specification.

2.6 – CHAIN-LINK FENCES AND GATES

Security fencing: A security-type fence consisting of a 6 foot high chain-link-type metal fabric, with a 12 inch high anti-climber will enclose the military vehicle parking, service and access areas, and ancillary facilities. Fencing will include vehicle and personnel gates, which may be electronically controlled. The fencing may be located approximately ten feet from the edge of the parking pavement;

and the area between the edge of pavement and the fence may be seeded with grass, or a well-designed non vegetative cover (not to exceed four inches of rigid pavement) may be substituted.

A. Chain link fabric shall be zinc-coated, steel wire manufactured in compliance with Fed. Spec. RR-R-191/1C and ASTM A-392, Class 1, galvanized after being helically woven by the hot dip Spelter Process at a coverage rate of 1.2 ounces of zinc per square foot of surface area, of the gauge and dimension indicated in the fabric schedule.

B. Fabric Schedule:

TYPE HGT MESH GAUGE DIA. BREAK LD.

Standard Industrial

72"

2" Diamond

0.148"

1290 LB

C. Top and bottom of fabric shall have twisted salvage edge (barb/barb).

2. STEEL FRAMING (POSTS, RAILS, FRAMES AND BRACES)

SPECIAL NOTE IN REGARDS TO THIS PARAGRAPH: Grade A, Type A, Type I are to be considered the same nomenclature and are interchangeable. Grade B, Type B, Type II are to be considered the same nomenclature and are interchangeable.

A. Class 1 round steel pipe, Grade A or Grade B, hydrostatic testing waived, size and weight as indicated in schedule.

B. Grade A - Schedule 40 steel pipe with an average zinc coating of 1.8 ounces per square foot of surface area inside and out in accordance with

ASTM A-120.

C. Grade B - pipe manufactured from steel conforming to ASTM A569, cold formed, high frequency welded and having minimum yield strength of 50,000psi. External surface triple coated with 1.0 ounce plus or minus 0.1 ounce of zinc per square foot of surface area, 30 micrograms plus or minus 15 micrograms of chromate per square inch and 0.5 mils plus or minus 0.2 mils of clear, cross linked polyurethane. Internal surface coated, after welding, with zinc-rich based organic coating having 87% zinc powder loading capable of providing galvanic protection.

D. Framing Schedule:

ITEM O.D. GRADE A GRADE B

Line posts, up to 6'-0" high *

1.900

2.72 LB/LF

2.28 LB/LF

Corner posts, up to 6'-0" high *

2.375

3.65 LB/LF

3.12 LB/LF

End posts up, to 6'-0" high *

Pulling posts

Braces

1.660

2.27 LB/LF

1.84 LB/LF

Gate posts (per width of single leaf)

6'-0" and less

2.875

5.79 LB/LF

4.64 LB/LF

6"-0" to 12'-0”,Grade A

4.000

9.11 LB/LF

N/A

6"-0" to 12'-0",Grade B

3.500

5.71 LB/LF

12'-0" to 18'-0"

6.625

18.9 LB/LF

Gate frames (per width of single leaf) up to 6'-0" high and/or 8’-0" wide

1.660

2.27 LB/LF

1.84 LB/LF

6'-0" to 8"-0" high and/or 8'-0" to 10'-0" wide

1.900

2.72 LB/LF

2.28 LB/LF

over 8'-0" high and/or 10'-0" wide

* 6'-0" to 9'-0" high increases to the next larger outside diameter

2.7 – PLAYGROUND EQUIPMENT AND MWR STRUCTURES

Child Development Centers (CDC). Child Development Centers are intended to serve two juvenile groups: ages 6 weeks to 5 years; and 6 to 10 years.

CDC facilities for newborns and small children 5 years of age shall conform to Appendix G, Child Development Center of TI 800-01, Design Criteria.

2.8 – LAWNS AND GRASSES

Fort Indiantown Gap Training Center Standard Planting Measures:

1. In order to comply with regulations pertaining to submission and execution of Erosion and Sediment Control plans and to minimize costs for operation and maintenance of ranges and facilities the following guidelines should be followed.

2. The following mixes are approved Fort Indiantown Gap National Guard Training Center Seed Mixes; the contractor shall perform any necessary soils test to determine situations requiring modification of the approved mixes.

FIG ITAM MIX

25% Perennial Ryegrass (Saint variety preferred) 10% Annual Ryegrass 20% Medium Red Clover 10% White Ladino Clover 10% White Dutch Clover 10% Vernal Alfalfa 10% Norcen Birdsfoot Trefoil 5% Crimson Clover

Seeding Rate: 20-50 lbs per acre

Penn DOT Formula L Low Grow Seed Mix -PDOT-L

%. Common Name Botanical Name 35.00% Creeping Red Fescue Festuca rubra 27.50% Defiant Hard Fescue Festuca ovina var. duriuscula 27.50% Stonehenge Fescue Festuca ovina var. duriuscula, 10.00% Annual Ryegrass Lolium multiflorum

Seeding Rate: 20-50 lbs per acre

3. No crown vetch, KY31 Fescue, Chinese Lespedeza, Native Warm Season Grass or other “native plants” unless approved by DMVA Biologist. We do not want non-PA ecotype seed/plants on Post due to genetic contamination.

4. Lime: Lime disturbed areas a minimum of 2 tons/acre. Lime can also be added to hydro-seeder mix.

2.9 – EXTERIOR PLANTS

Landscaping: This will be included as an integral part of the planning of the project to produce an aesthetically pleasing final site.

1. The State may program up to 3 percent of the basic building cost for planting trees, shrubs, and vines (exclusive of grading and seeding or sprigging and sodding for erosion control). In those locations that are considered to have an arid climate, the State may program up to 4 percent of the basic building cost and may use xeriscaping.

2. Additional planting for energy conserving landscaping may be authorized if the State justifies it on a life cycle cost basis.

3. An installed watering system is authorized.

PART 3 – CONCRETE

3.0 – CAST-IN-PLACE CONCRETE

Rigid concrete is authorized for paving those areas designated for the parking of military vehicles. For programming purposes the concrete will be a minimum of 8 inches in depth and 3500psi. Please refer to the NGB 415 Design Guide series for further information.

Standard Concrete Minimum PSI Chart Military Parking 3500 PSI POV Parking 3000 PSI Sidewalks 3000 PSI Footings 3000 PSI Slab on Grade 3000 PSI Track Vehicle Turning Pad 4000 PSI Aprons 3500 PSI

All other concrete requirements will be considered on a project by project basis.

Sidewalks: For programming purposes, sidewalks shall be 20% of the building footprint. However, the exact amount of sidewalk area will be determined at the preliminary design review based on an economical and practical site layout of the facilities.

3.1 – PLANT-PRECAST STRUCTURAL CONCRETE

The use of precast structural concrete is encouraged providing the cost is within project budget. Panels implemented into project design shall incorporate all appurtenances; this includes electrical conduits, window/door openings and insulation.

PART 4 – MASONRY

4.0 – UNIT MASONRY ASSEMBLIES

Buildings will be constructed of materials rated as non-combustible. The exterior walls may be brick with concrete masonry unit backup or other suitable systems.

In certain instances pre-fabricated metal buildings may be used where economically feasible. In those cases, exterior walls may be veneered with brick, split or cut faced concrete masonry unit or standard cmu. These considerations must be taking into account when collocated with a readiness center or when justified by environmental and aesthetic considerations of the surrounding facilities and communities. Exterior color scheme shall be a mixture of earth tones as approved by the Training Site Engineer.

4.1 – STONE MASONRY

Stone masonry is typically cost prohibitive and would generally require an exception to criteria and funding sources other than Federal dollars.

PART 5 – METALS

5.0 – Structural Steel

5.1 – Steel Joist

5.2 – Steel Deck

All the above disciplines that are incorporated into a project design must be designed by a licensed structural engineer. All drawings, details and schedules that relate to the above are to be sealed by the design professional.

5.3 – Cold Formed Metal Framing

Interior and exterior load bearing and non-load bearing wall studs shall be metal studs if project budget allows. All load bearing walls shall be designed and checked by a licensed structural engineer.

PART 6 – WOOD AND PLASTICS

6.0 – SHEATHING

Sheathing is required on all exterior studded walls, roof trusses and rafters. Wall sheathing shall be plywood or OSB and have a minimum of ½” in thickness.

Roof sheathing shall be a minimum of ¾” and materials utilized will be approved on a case by case basis.

PART 7 – THERMAL AND MOISTURE PROTECTION

7.0 – BUILDING INSULATION

The following minimal guidelines must be followed on all project designs:

Exterior Walls – R-19 Floors – R-19 (Excluding slab on-grade) Roof – R-30

7.1 – EXTERIOR INSULATION AND FINISH SYSTEMS

EIFS finishes are acceptable for certain applications. Design and installation must be in strict accordance with the approved manufacturer’s installation instructions. Color will be selected by a government design professional.

Special Note: - A product warranty of 20 years is required by the product manufacturer in order for the system to be accepted. Installer must have certification from the approved manufacturer.

7.2 – ASPHALT SHINGLES

Use of asphalt shingles is generally discouraged however if approved, product shall have a minimum 20 year warranty and with architectural style and quality.

7.3 – METAL ROOF PANELS

Roof systems should normally consist of lightweight joists, non-combustible decking, insulation above decking, hip or gable type construction (metal standing seam).

7.4 – METAL WALL PANELS

Metal wall panels may be used; however installation must be in conjunction with an approved masonry unit. Masonry unit veneer shall have minimum three feet height above finished grade.

7.5 – BUILT-UP ASPHALT ROOFING

Built-up asphalt roofing systems are generally discouraged from use on Fort Indiantown Gap based on past performance in this region.

7.6 – EPDM MEMBRANE ROOFING

EPDM Membrane roofing systems are generally discouraged from use on Fort Indiantown Gap based on past performance in this region.

7.7 – MANUFACTURED ROOF SPECIALITIES

Snow guards – Baffle style snow guards are required on all metal roofs with pitches greater than 3/12.

PART 8 – DOORS AND WINDOWS

8.0 – STEEL DOORS AND FRAMES

Specify 14 gauge frames and 16 gauge doors for routine applications. Consult the appropriate regulation for specialty applications.

8.1 – FLUSH WOOD DOORS

Low-Emitting Materials: Provide doors made with adhesives and composite wood products that do not contain urea formaldehyde.

8.2 – GLASS STOREFRONT ENTRANCES

Storefront entrances may be implemented into project designs under the following guidelines:

1. Glass must meet all anti-force protection guidelines.

2. Buildings that house high value assets or operations must have a secondary means of more secure access (steel doors and frames) installed after all storefront entrances.

8.3 – DOOR HARDWARE

Fort Indiantown Gap has adopted “Best” locks as the installation standard.

Keypad Lock

8.4 – SECURITY GLAZING

All glass doors and windows must incorporate a glazing procedure which is in strict accordance with the anti-force protection guideline. (Department of Defense, Unified Facilities Code 4-010-01 Antiterrorism Standards for Buildings, 8 Oct, 2003).

PART 9 – FINISHES

9.0 – ACOUSTICAL TILE CEILINGS

Specify 2’ X 2’ suspended ceiling tile. Installing 2’ X 4’ tiles should be avoided;

authorized by waiver only.

9.1 – EXTERIOR PAINTING

Exterior building material color make a major contribution to the scale, texture, and character of a military installation. A limited palette of earth tone colored durable, low maintenance materials should be used that, while encouraging a variety of expression, provides a cohesive and consistent architectural character through the installation and within each visual zone. Use materials with integral colors - avoid exterior painting.

PART 10 – SPECIALTIES

10.0 – LOUVERS AND VENTS

Install all louvers and vents in strict accordance with the anti-force protection guideline. (Department of Defense, Unified Facilities Code 4-010-01 Antiterrorism Standards for Buildings, 8 Oct, 2003).

10.1 – SIGNAGE

Provide standardized signage systems to facilitate movement, provide a sense of orientation, and reinforce standards of excellence and visually communicate information. The standards to apply for signage color, type, and sizing are found in Technical Manual (TM) 5-807-10, Signage (see Chapter 4, paragraph 4.6 Pavement Marking Standards).

Detached facilities sign/static display. In addition to the authorized building-mounted facilities sign, a freestanding sign is authorized identifying the facility name and type, the State, and Army National Guard. Lighting to illuminate the sign continuously during hours of darkness may be provided. Provisions may also be made at this facility for a static display(s), including a concrete slab or mounting pedestal.

10.2 – FIRE PROTECTION SPECIALTIES

All facilities will have approved secure cabinets built within the facility structure to allow for specified fire extinguishers.

PART 11 – SPECIAL CONSTRUCTION

11.0 – METAL BUILDING SYSTEMS

The use of pre-fabricated buildings is an accepted means of cost efficiency.

Buildings and associated foundations must be designed per regional requirements and be accompanied by engineer sealed design documentation.

11.1 – PREFABRICATED CONTROL BOOTHS

Installation entry points are key components in the force protection security program. The most effective entrances accommodate the functions of observation, detection, inspection, access control, and disablement of hostile personnel and vehicles, while containing the vehicles and pedestrians until access is granted. These areas are some of the most important installation features in the creation of a sense of arrival for both installation personnel and visitors. It is important that these areas present a positive public image.

Access Control Points (ACPs) The Army Facilities Standardization Committee has approved The Army Standard for Access Control Points (ACPs). The standard provides detailed criteria for the development of entrance facilities and appurtenances within, and related to, the ACP corridor, which will be understood to include the secured area between the entrance gate and the final set of vehicle barriers. Criteria shall be concerned with all aspects of Force Protection in regard to vehicular and pedestrian access to installations, safety, optimum working conditions for personnel, and the defeat of any threat to installation security. The Headquarters, Department of the Army force protection standards for ACPs is found in UFC 4-022-01, Security Engineering: Entry Control Facilities / Access Control Points.

11.2 – PERIMITER SECURITY

Perimeter security shall be incorporated per the anti-force protection guideline.

(Department of Defense, Unified Facilities Code 4-010-01 Antiterrorism Standards for Buildings, 8 Oct, 2003).

11.3 – INTRUSION DETECTION

Intrusion Detections systems shall be incorporated per the anti-force protection guideline. (Department of Defense, Unified Facilities Code 4-010-01 Antiterrorism Standards for Buildings, 8 Oct, 2003).

11.4 – SECURITY ACCESS

To assure the required physical measures are met the installation Provost Marshall or Physical Security Officer will be coordinated with during the planning, design, and construction of all construction projects. (AR 190-13, The Army Physical Security Program, Para 1-26).

The Headquarters Department of the Army, Deputy Chief of Staff for Operations and Plans, DAMO-ODL, office in coordination with the Protective Design and Electronic Security Centers of Expertise are currently developing standards for Army Access Control Points (ACP) and a Unified Facilities Criteria (UFC). These standards will be published in the near future. Contact number for the current status of the Access Control Point standards is (703) 693-2906. See UFC 4-022- 01 25 May 2005, UNIFIED FACILITIES CRITERIA (UFC) SECURITY

ENGINEERING: ENTRY CONTROL FACILITIES / ACCESS CONTROL POINTS

http://www.wbdg.org/ccb/DOD/UFC/ufc_4_022_01.pdf.

11.5 – VIDEO SURVEILLANCE

Provide lighting systems for security operations with illumination for visual and Closed-Circuit Television (CCTV) surveillance of boundaries, sensitive inner areas, and entry points. When CCTV is used as part of security operations, the lighting system will be coordinated with the CCTV system. The specific installation environment and the intended use determine lighting system requirements. Often two or more types of lighting systems are used within a single area. The standard for security lighting is UFC 4-010-02, Design (FOUO):

DoD Minimum Standoff Distances for Buildings See the guidance provided on the Security Engineering Working Group website.

11.6 – EXTERIOR FIRE PROTECTION

Exterior fire protection: Consideration will be given to the size of the structure, the type of construction, and the exposure to fire hazard that it creates for or receives from nearby buildings. Except in cases of conflict with State requirements, exterior fire protection should be in conformance with National Fire Protection Association requirements. Extension of water mains for fire protection is limited to that needed to ensure that an adequate number of fire hydrants can be located between 50 and 400 feet of any building. The Fort Indiantown Gap Standard for fire hydrants is Mueller.

11.7 – FIRE ALARM

All new facilities must incorporate a fire alarm system into the design. The system shall consist of smoke detectors, CO2 detectors, pull stations, monitoring system and all other aspects deemed necessary by federal, state and local code requirements.

Fort Indiantown Gap has in place, a central monitoring system for all fire and security alarms located in building 7-5. Due to the complexity of the system and its components, FIG has adopted Sonitrol as the installation standard. This discipline does not contain an “or equal” stipulation; no exceptions allowed.

PART 12 – MECHANICAL

12.0 – DOMESTIC WATER PIPING

1. Identify external water line tie-in location on provided site plan drawings.

2. Inspect/approve the water line installation and tap prior to contractor backfilling.

3. Identify by type and manufacturer the recommended devices for contractor provision/installation.

1. Provide/install all water supply distribution/plumbing systems within building as specified.

2. Trench for, provide, and install specified diameter water supply pipe from building water supply system to tie-in location.

3. Burial depth of water line shall be a minimum of 4 feet.

4. Water line ditch shall be stoned with a minimum of 4" of AASHTO #8 prior to laying the pipe.

5. Place additional AASHTO #8 stone after laying pipe to at least 4" above top of pipe.

6. Install water line curb stop within 10 feet of the building.

7. Water line supply into the building shall consist of copper piping with a ball-valve shut off at the closest point of entry inside the facility

8. Where backflow preventer and or water meter devices are installed, install ball-valve shutoffs to isolate the devices for maintenance.

9. Install marking tape with a tracer buried 12 inches below finished grade.

10. Tie/tap water supply pipe into the external water line.

11. All water main piping shall be ductile iron pipe.

12.1 – SANITARY WASTE AND VENT PIPING

All waste and vent piping shall be Schedule 40 of SDR 35. Piping shall be properly vented through building roof.

12.2 – STORM DRAINAGE PIPING

Storm Water take off should tie into the underground storm drainage system.

Use of U-drain will be considered in some applications.

12.3 – PLUMBING FIXTURES

ADA Water Closets

Standard Water Closets

Water Closet Seats

ADA Urinal

Flush Valve

Standard Lavatory

Features WALL-

MOUNT

LAVATORY

. •Vitreouschina K-1722

. • Ledge-back

ALSO K-1724, K-1728

. • Withhanger . • Withoverflow . • Drilledforconcealedarmcarrier . • 8″(20.3cm)centers(K-1724),4″(10.2cm)centers(K-1728)orsingle-hole(K-1722) . • 19-1/4″(48.9cm)x17-1/4″(43.8cm)

Codes/Standards Applicable Specified model meets or exceeds the following:

. • ADA

. • ASMEA112.19.2

. • IAPMO/UPC

. • ICC/ANSIA117.1

Specified…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .