About this file

Solicitation Exhibit E2

View the file

Other files

File Type Posted
QuestionsAnswers-14May2010.pdf PDF
QuestionsAnswers-5May2010.pdf PDF
FTIGInstallationDesignGuide.pdf PDF
QuestionsAnswers-4May2010.pdf PDF
QuestionsAnswers-3May2010.pdf PDF
QuestionsAnswers-29Apr2010.pdf PDF
QuestionsAnswers-27Apr2010.pdf PDF
QuestionsAnswers-2-22Apr2010.pdf PDF
QuestionsAnswers-22Apr2010.pdf PDF
21April2010SecondarySiteVisitAttendees.pdf PDF
QuestionsAnswers-21Apr2010.pdf PDF
QuestionsAnswers-19Apr2010.pdf PDF
QuestionsAnswers-16Apr2010.pdf PDF
Amended Exhibit F.doc DOC document
Amended Exhibit G.doc DOC document
QuestionsAnswers-3-9Apr2010.pdf PDF
QuestionsAnswers-2-9Apr2010.pdf PDF
QuestionsAnswers9Apr2010.pdf PDF
Exhibit F.doc DOC document
Exhibit G.doc DOC document
Exhibit E4-1.doc DOC document
Exhibit D.doc DOC document
Exhibit B.doc DOC document
Exhibit E.doc DOC document
Exhibit C.doc DOC document
Exhibit E-1.doc DOC document
Exhibit E4.doc DOC document
Exhibit A.doc DOC document
Exhibit E2-1.doc DOC document
7April2010ConferenceAttendees.pdf PDF
Pre-Proposal Conference.pdf PDF
QuestionsAnswers2Apr2010.pdf PDF
QuestionsAnswers31Mar2010.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IDIQ MATOC

RFP W912KC-10-R-0001

EXHIBIT E2 PROTOTYPICAL PROJECT TWO

NOTICE OF PROPOSED PROJECT, PROPOSAL FORM

Date: 30 March 2010 PROJECT TITLE AND NO.: FTIG Community Club Electrical Upgrade.

PROJECT DESCRIPTION: The work includes the following and incidental related work: 1. Removal of existing pole mounted transformers; 2. Removal of existing utility poles and excess wiring; 3. Installation of reinforced concrete encased ductbank; 4. Installation of handhole; 5. Installation of 300 KVA and 100 KVA pad mounted transformers with precast vaults; 6. The routing of wire and conduit, via the reinforced concrete encased ductbank from 300 KVA/100 KVA pad transformers to respective termination points; and 7. Installation of new panelboards.

MAGNITUDE OF PROJECT: $500,000 - $1,000,000.

PERFORMANCE PERIOD: 180 Days, after receipt of Notice to Proceed

SITE VISIT: A site visit will be conducted in conjunction with the MATOC pre-proposal meeting. See Section 00100 of the solicitation for details.

PERFORMANCE & PAYMENT BONDS: In accordance with FAR 28.102-1 and Contract Clause 52.228-15, Contractors are reminded that any amount awarded over $30,000 shall require Payment Bonds, and awards exceeding $100,000 shall require both Payment and Performance Bonds. All bonds are due no later than 10 days after award.

LIQUIDATED DAMAGES: (X) YES or ( ) NO- reference Contract Clause 52.211-12. Fill-in amout is “a one time fee of $200.00 for legal services, plus $421.12 per day” CONSTRUCTION: (X ) YES or ( ) NO- reference Contract Clause 52.246-21, Warranty of Construction, is applicable to this task order.

WAGE DETERMINATION: Currently, General Decision Number PA100008, dated March 12, 2010 is applicable to this task order. However, the current prevailing Wage Determination will be incorporated at time of award.

PROJECT SAFETY: In accordance with FAR 52.236-13, Accident Prevention, construction contractors are required to use the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1. To view this manual click here http://www.usace.army.mil/inet/usace-docs/eng-manuals/em385-1-1/toc.htm PROPOSAL DUE DATE: All offers are due with proposal for MATOC basic contract. Failure to provide a price will make offer noncompliant, eliminated from the competition and offeror ineligible for a basic contract award. Basis for award is in the RFP.

Item

Number

Description

Lump Sum Amount

Complete Community Club

Electrical Upgrades IAW specifications and drawings

SIGNATURE:

COMPANY NAME

Name and title of person authorized to sign

Offer Date

File details come from the government source that posted it. Updated .