RFI_001.docx

DOCX document 13 KB Posted

Attached to
Add Water Main Loops Federal contract opportunity
Solicitation number
W912JB-18-R-9003
Issued by
Department of the Army Michigan Army National Guard

About this file

RFI Questions and answers

View the file

Other files for this federal contract opportunity

Other files attached to Add Water Main Loops, newest first.
File Type Posted
W912JB-18-R-9003-0002.pdf PDF
Evaluation_Factor_Amendment-0002.docx DOCX document
W912JB-18-R-9003-0001.pdf PDF
Amendment_to_instructions_to_offerors_section.docx DOCX document
RFI-002_Water_Main_Loops.pdf PDF
Wage_Determination_MI42.pdf PDF
RFI-001_Water_main_loops.docx DOCX document
Water_main_loops_site_visit_sign_in_sheet.docx DOCX document
Water_Main_Loops_Site_Visit_Minutes.docx DOCX document
Alpena_Base_Access_requirements.pdf PDF
B-3_Replace_Water_Main_Loops-_Drawings.pdf PDF
W912JB-18-R-9003.pdf PDF
B3_Specifications_-_Copy.doc DOC document
AF66_-_TDVG142913_Replace_Water_main_loops.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI 001

W912JB-18-R-9003

Add Water Main Loops

Will the water be able to be turned off?

· Yes, please place in your schedule when/where you need it to be shut off. Shut offs will need to in phases as to not negatively affect base operations.

Will the fence at the river club location need to be cut?

· Most likely What do we do with removed trees and other debris?

· Everything leaves the site. A location will be made available on base to stockpile debris and other materials while project is on-going.

File details come from the government source that posted it.