Evaluation_Factor_Amendment-0002.docx

DOCX document 12 KB Posted

Attached to
Add Water Main Loops Federal contract opportunity
Solicitation number
W912JB-18-R-9003
Issued by
Department of the Army Michigan Army National Guard

About this file

Evaluation Factor Amendment-002

View the file

Other files for this federal contract opportunity

Other files attached to Add Water Main Loops, newest first.
File Type Posted
W912JB-18-R-9003-0002.pdf PDF
Amendment_to_instructions_to_offerors_section.docx DOCX document
W912JB-18-R-9003-0001.pdf PDF
RFI-002_Water_Main_Loops.pdf PDF
Wage_Determination_MI42.pdf PDF
RFI-001_Water_main_loops.docx DOCX document
Water_Main_Loops_Site_Visit_Minutes.docx DOCX document
Water_main_loops_site_visit_sign_in_sheet.docx DOCX document
RFI_001.docx DOCX document
B-3_Replace_Water_Main_Loops-_Drawings.pdf PDF
Alpena_Base_Access_requirements.pdf PDF
W912JB-18-R-9003.pdf PDF
B3_Specifications_-_Copy.doc DOC document
AF66_-_TDVG142913_Replace_Water_main_loops.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912JB-18-R-9003-002

Evaluation Factor amendment

The Technical Evaluation consists of one factor: Construction Schedule.

Provide a construction schedule with a period of performance (POP) not to exceed 60 days after NTP. The schedule shall be task oriented, capturing all Statement of Work (SOW) requirements and indicate dates by which milestones are to be achieved. The offeror shall use a either a GANTT chart or an equivalent critical path scheduling approach. Equivalents shall include start dates, end dates and duration for each task and demonstrate the order in which tasks will be completed.

Acceptability will be based on the offeror’s demonstration of execution of the construction schedule outlining completion within the desired POP. The schedule shall capture all SOW requirements, execution timelines, and critical path items.

RATING
DESCRIPTION
Acceptable
Proposal clearly meets the minimum requirements of the solicitation
Unacceptable
Proposal does not clearly meets the minimum requirements of the solicitation