MBMV162472_Addendum_2.pdf
PDF 1 MB Posted
- Attached to
- Alter/Reconfigure B6922 for Cyber Ops Federal contract opportunity
- Solicitation number
- W912JB-18-R-8004
- Issued by
- Department of the Army National Guard
About this file
Addendum 0002
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MBMV162472 Addendum 1 180706.doc
X:\3141900\160242.01\CORR\3Bid\add\180629 ADDENDUM 01\MBMV162472 Addendum 1 180706.doc
Project name:
Repair Building 6922 for Cyber
Operations Client: USPFO for Michigan
Project location: Battle Creek ANGB, MI POC: Maj Nathan Finfrock
Project number: MBMV162472 Date: July 6, 2018
TO ALL BIDDERS: You are requested to make all changes and/or additions contained in this Addendum to the Bidding Documents. Failure to acknowledge this Addendum in Proposal shall result in rejection of bid. No change to the bid due date will be made for incorporation of these items in the bid.
I. DRAWINGS
A. Drawing C-101:
1) Modify Note 3 of Site Improvement Plan Notes to be: “CONDUIT TO BE HDPE FOR
DIRECTIONAL BORING OR PVC FOR TRENCH PLACEMENT. NEW HANDHOLE
FOR BASE COMMUNICATIONS CABLE SHALL BE NOMINAL SIZE 48" X 72" X 48",
LID RATING 15,000 LBS. OR GREATER. PROVIDE INSERTS FOR CABLE RACKS
AND PULLING IRONS. SEE SPECIFICATION SECTION 270543.”
B. Drawing AD101:
1) Modify keyed notes and callouts on the plan as provided on attached drawing AD101.
C. Drawing A-102:
2) Modify general and keyed notes, and callouts on the plan as provided on attached drawing A-102.
D. Drawing A-401:
3) Modify keyed notes and callouts on the plan as provided on attached drawing A-401.
E. Drawing A-501:
4) Modify keyed notes and callouts on the plan as provided on attached drawing A-501.
F. Drawing A-602:
5) Modify finish schedule as provided on attached drawing A-602.
G. Drawing F-001
1) ADD symbols for FSS and MIS. FSS = Federal Signal UVIC Panel (See Spec 283176);
MIS = Monaco Interface Panel (See Spec 283176)
II. SPECIFICATIONS
A. Replace Section 024119 – SELECTIVE DEMOLITION in its entirety with attached specification.
B. Replace Section 095113 – ACOUSTICAL PANEL CEILINGS in its entirety with attached specification.
C. Add Section 105126 - PLASTIC LOCKERS.
D. Modify SPECIFICATION 263213 - DIESEL ENGINE GENERATORS as follows:
1) ADD Article 2.6, Paragraph F.3.aa as follows: “Motorized Damper(s) not open warning.”
2) ADD Article 2.6, Paragraph I.20 as follows: “Motorized Damper(s) not open warning.”
Addendum #1
MBMV162472 Addendum 1 180706.doc
X:\3141900\160242.01\CORR\3Bid\add\180629 ADDENDUM 01\MBMV162472 Addendum 1 180706.doc
3) REVISE Article 2.9, Paragraph H.1 to the following: “Enclosure shall have fixed intake louver with bird screen and motorized damper and a grill protected radiator discharge opening. Motor-operated intake dampers shall be interlocked to open on unit start-up and close on unit shutdown.”
E. Add Section 270543 – UNDERGROUND PATHWAYS AND STRUCTURES FOR
COMMUNICATION SYSTEMS.
END OF ADDENDUM
4.002
4.002
4.002
4.005
4.002
4.0034.003
4.003 4.003 4.0034.003
4.003
4.003
4.003
4.005 4.005 4.005 4.005
4.006
4.006
4.0054.005
4.006
4.0054.0054.005
4.004
4.002
4.005
4.0064.006
4.006 4.006
4.006
4.007
4.009
4.010
4.010
4.023
4.010
4.011
4.011
4.011
4.013
4.014
4.012
4.012
4.006
4.016
4.010
4.015 4.015
4.016
4.015
4.016
4.015
4.016
4.015
4.016
4.015
4.016
4.015
4.016
4.015
4.015
4.015
4.016
4.015
4.015
4.016
4.016
4.015
4.0164.015
4.016
4.015
4.016
4.015
4.016
4.015
4.015
4.017
4.018
4.018
4.018
4.018
4.015
4.0174.017
4.015
4.017
4.015
4.017
4.015
4.017
4.015
4.015
4.017
4.015
4.017
4.015
4.017
4.015
4.017
4.015
4.017
4.015
4.017
4.015
4.017
4.019
4.0204.020
4.004
4.017
4.017 4.017 4.017 4.017
4.017
4.003
4.004 4.004
4.004
4.004
4.006
4.022
4.017
4.015
ENTRY
AFFOR STAFF
JOPES OPERATOR
DEPUTY
COMANDER'S
OFFICE
COMMANDER'S
OFFICE
COMANDER'S
CONFERENCE
AFFOR MEDIA
CHAPLAN HC
BREAK ROOM
PPE STORAGE
MECHANICAL
ELECTRICAL
MEN'S LOCKER
MEN'S
MEN'S
114A
JANITOR
WOMEN'S
WOMEN'S
116A
JUDGE ADVOCATE
(JAG)
CORRIDOR
DIRECTOR A-1
COMM.
A-3 CONFERENCE
AFFOR STAFF
CORRIDOR
DIRECTOR A-2
DIRECTOR A-3
DIRECTOR A-5
DIRECTOR A-6
A-6 CONFERENCE
VESTIBULE
CORRIDOR
TRAINING ROOM
AFFOR STAFF
COMM.
DIRECTOR A-4
DIRECTOR A-7
CONFERENCE
ROOM A-4/A-7
ACS EQUIPNMENT
STORAGE
MECHANICAL
ELECTRICAL
4.004 101A
103 104A 104B 106A 107
106B
116B
116A
114A
114B
119 120 121 122 125
134B
128129130
131A
4.019
4.018
4.025
4.026
4.027 4.026
4.026
4.018
4.018
4.018
4.018 4.018
4.018
4.018
4.018
4.018
4.018
4.018 4.006
4.028
4.029
A-402
113A
126C
4.018
4.019
765432
11'2'3'4'
A
B
AA
A.7
C
D
4.004
4.018
4.018
4.006
DEMOLITION PLAN GENERAL NOTES:
1. EXISTING FINISHED FIRST FLOOR ELEVATION = 100'-0".
2. FIELD VERIFY ALL DIMENSIONS, BRING ANY DISCREPANCIES TO THE
ATTENTION OF THE ARCHITECT/ENGINEER FOR FINAL DECISION.
3. SLAB ON GRADE ON EITHER SIDE OF WALLS SCHEDULES FOR DEMOLITION
MAY NOT BE EXACT ELEVATION. CONTRACTOR SHALL REVIEW AND GRIND
COMPLETE FLOOR AS NECESSARY TO PROVIDE NEW FLOOR FINISHES WITH
APPEARANCE OF BEING FLAT (<1/8" IN 10').
SHEET NO.:
SHEET CONTENTS
DO NOT SCALE DRAWINGS
ISSUED
Mead & Hunt, Inc.
2440 Deming Way
Middleton, WI 53562 phone: 608-273-6380 meadhunt.com
M&H NO.:
DATE:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
© Copyright This document, or any portion thereof, shall not be duplicated, disclosed, or used on any other project or extension of this project except by written agreement with Mead & Hunt, Inc. Mead & Hunt shall not be responsible for any unauthorized use of, or alteration to these documents.
/6
/2
:2 :5
A
M C
R e v it L o c a l\
-1
.0
-A
-C e n tr a l-m a rk .b ra it h w a it e .r v t
AD101
FIRST FLOOR
DEMOLITION PLAN
M
IC
H
IG
A N
A
IR
N A
T
IO
N A
L G
U A
R D
B A
T T
L E
C R
E E
K A
N G
B B
A T
T L E
C R
E E
K M
IC
H
IG
A
N
B A
T T
L E
C R
E E
K A
N G
B R
E P
A
IR
B L D
G
F O
R C
Y B
E R
O P
E R
A T
IO
N
S S
Q U
A D
R O
N
3141900-160242.01
MAB
RCL
DECEMBER 14, 2017
JTP
1/8" = 1'-0"1
FIRST FLOOR DEMOLITION PLAN
KEYED NOTES
4.015 REMOVE SUSPENDED CEILING SYSTEM INCLUDING LIGHT FIXTURES, DIFFUSERS, AND CEILING MOUNTED FIXTURES OF EQUIPMENT.
4.016 REMOVE EXISTING FLOOR FINISH, PREP EXISTING SURFACE FOR REINSTALLATION, COMPLY WITH INSTALLATION REQUIREMENTS FOR
NEW MATERIALS AS PER MANUFACTURERS RECOMMENDATIONS
4.017 SALVAGE AND STORE EXISTING CARPET FLOOR TILE, CARPET TILE TO BE REINSTALLED AND CLEANED, SEE ROOM FINISH SCHEDULE.
PREP EXISTING SURFACE FOR REINSTALLATION, COMPLY WITH INSTALLATION REQUIREMENTS FOR NEW MATERIALS AS PER
MANUFACTURERS RECOMMENDATIONS
4.018 REMOVE GYPSUM BOARD AND INSULATION FROM EXISTING METAL STUDS / FURRING.
4.019 REMOVE CONCRETE STOOP AND FOUNDATION.
4.020 REMOVE CONCRETE ROOF DECK ABOVE.
4.022 REMOVE ADVANTOR SYSTEM COMPONENT, COORDINATE WITH COORDINATE WITH ELECTRICAL.
4.023 REMOVE COUNTERTOP AND CASEWORK.
4.025 REMOVE GYPSUM BOARD ON THIS SIDE ONLY AND INSULATION FROM EXISTING METAL STUDS.
4.026 REMOVE GYPSUM BOARD, INSULATION AND METAL FURRING FROM WALL.
4.027 REMOVE CERAMIC TILE FROM WALL.
4.028 SALVAGE ENOOK CABINET AND STORE. SEE SHEET A-401 FOR NEW LOCATION.
4.029 SALVAGE CELL PHONE CUBBIES CABINET AND TURN OVER TO GOVERNMENT.
KEYED NOTES
4.002 REMOVE DOOR, FRAME AND HARDWARE FOR NEW INFILL IN EXISTING WALL. MATCH EXISTING WALL CONSTRUCTION AND FINISHES.
4.003 SALVAGE DOOR AND HARDWARE, REMOVE FRAME. REUSE EXISTING DOOR SEE DOOR SCHEDULE.
4.004 SALVAGE DOOR AND HARDWARE, REMOVE FRAME. REUSE EXISTING DOOR AND HARDWARE SEE DOOR SCHEDULE.
4.005 SALVAGE DOOR AND HARDWARE, REMOVE FRAME FOR NEW INFILL IN EXISTING WALL. MATCH EXISTING WALL CONSTRUCTION AND
FINISHES. REUSE EXISTING DOOR AND HARDWARE SEE DOOR SCHEDULE.
4.006 REMOVE PORTION OF WALL FOR NEW DOOR OR OPENING. COORDINATE WITH FLOOR PLAN FOR REQUIREMENTS, LOCATION AND
SIZE. COORDINATE WITH STRUCTURAL FOR LINTEL REQUIREMENTS.
4.007 REMOVE OVERHEAD DOOR, TRACK, HARDWARE AND OPENER.
4.009 REMOVE COUNTERTOP, CASEWORK AND SINK, SEE PLUMBING FOR CAPPING OR DEMOLITION OF PIPING.
4.010 SALVAGE COUNTERTOP, UPPER AND LOWER CASEWORK. CONTRACTOR TO STORE AND REINSTALL. COORDINATE WITH FLOOR PLAN
FOR LOCATIONS.
4.011 TOILET / SHOWER / LOCKER ROOMS - REMOVE CERAMIC TILE FLOOR. REMOVE TOILETS, URINALS, SINKS, SHOWERS, TOILET
PARTITIONS AND ACCESSORIES. SEE PLUMBING FOR CAPPING OR DEMOLITION OF PIPING.
4.012 REMOVE LOCKERS AND LOCKER BASE (METAL STUD CONSTRUCTION).
4.013 REMOVE UTILITY / JANITOR SINKS. SEE PLUMBING FOR CAPPING OR DEMOLITION OF PIPING.
4.014 REMOVE DRINKING FOUNTAIN. SEE PLUMBING FOR CAPPING OR DEMOLITION OF PIPING.
12/14/17 B3 FINAL
1 07/06/18 ADDENDUM 01
4.105
+/- 26' - 10"
A-301
A-301
A-301
A-302
A-302
4.115
A-501
A-501
SIM
4.120
4.120
4.120
765432
11'2'3'4'
A
B
AA
A.7
C
D
4.120
4.120
4.120
ROOF PLAN GENERAL NOTES:
1. EXISTING FINISHED FIRST FLOOR ELEVATION = 100'-0".
2. ALL DETAILS, SECTIONS AND NOTES SHOWN ARE INTENDED TO BE TYPICAL
AND SHALL APPLY TO SIMILAR CONDITIONS ELSEWHERE. FIELD VERIFY ALL
DIMENSIONS, BRING ANY DISCREPANCIES TO THE ATTENTION OF THE
ARCHITECT/ENGINEER FOR FINAL DECISION.
3. CONTRACTOR SHALL COORDINATE LOCATION OF PRE-MANUFACTURED
ROOF CURBS, DUCT PENETRATIONS, AND PIPING PENETRATIONS WITH
PLUMBING, MECHANICAL AND ELECTRICAL CONTRACTORS. CONTRACTORS
TO PROVIDE FLASHING AND ROOFING TERMINATION IN ACCORDANCE WITH
EPDM ROOFING MANUFACTURER'S DETAILS. WHERE DETAILS ARE NOT
PROVIDED BY ROOFING MANUFACTURER FOR SPECIAL CONDITIONS
CONTRACTOR TO OBTAIN DETAILS FROM ROOFING MANUFACTURER'S
REPRESENTATIVE.
4. MEMBRANE ROOFING SYSTEM PROVIDE 1/4" MINIMUM SLOPE.
5. PROVIDE 1/2" MINIMUM SLOPE ON ALL CRICKETS AND SADDLES.
6. CONTRACTOR TO MATCH EXISTING ROOF SYSTEM, CARLISLE SURE-WHITE
60 MIL EPDM, FULLY ADHERED TO TWO LAYERS OF ROOF INSULATION WITH
STAGGERED JOINTS OVER 1/2" SUBSTRATE WITH VAPOR RETARDER SYSTEM.
MATCH EXISTING INSULATION THICKNESS. ROOF EPDM MODIFICATIONS MUST
MAINTAIN EXISTING CARLISLE WARRANTY, CONTACT MANUFACTURER FOR
RECOMMENDED PROCEDURES AND INSTALLATION METHODS TO MAINTAIN
CURRENT ROOF WARRANTY.
SHEET NO.:
SHEET CONTENTS
DO NOT SCALE DRAWINGS
ISSUED
Mead & Hunt, Inc.
2440 Deming Way
Middleton, WI 53562 phone: 608-273-6380 meadhunt.com
M&H NO.:
DATE:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
© Copyright This document, or any portion thereof, shall not be duplicated, disclosed, or used on any other project or extension of this project except by written agreement with Mead & Hunt, Inc. Mead & Hunt shall not be responsible for any unauthorized use of, or alteration to these documents.
/6
/2
:2 :5
A
M C
R e v it L o c a l\
-1
.0
-A
-C e n tr a l-m a rk .b ra it h w a it e .r v t
A-102
ROOF PLAN
M
IC
H
IG
A N
A
IR
N A
T
IO
N A
L G
U A
R D
B A
T T
L E
C R
E E
K A
N G
B B
A T
T L E
C R
E E
K M
IC
H
IG
A
N
B A
T T
L E
C R
E E
K A
N G
B R
E P
A
IR
B L D
G
F O
R C
Y B
E R
O P
E R
A T
IO
N
S S
Q U
A D
R O
N
3141900-160242.01
MAB
RCL
DECEMBER 14, 2017
JTP
1/8" = 1'-0"1
ROOF PLAN
KEYED NOTES
4.105 INSTALL EPDM MEMBRANE ROOF SYSTEM OVER STRUCTURAL DECK IN THIS AREA. APPROXIMATELY
1010 SQ. FT. MAINTAIN SLOPE OF ROOF TO EXISTING ROOF DRAINS. CONTRACTOR TO MATCH
EXISTING ROOF SYSTEM, CARLISLE SURE-WHITE 60 MIL EPDM, FULLY ADHERED TO TWO LAYERS OF
ROOF INSULATION WITH STAGGERED JOINTS OVER 1/2" SUBSTRATE WITH VAPOR RETARDER
SYSTEM. MATCH EXISTING INSULATION THICKNESS. ROOF EPDM MODIFICATIONS MUST MAINTAIN
EXISTING CARLISLE WARRANTY, CONTACT MANUFACTURER FOR RECOMMENDED PROCEDURES AND
INSTALLATION METHODS.
4.115 ROOF DRAIN, SEE PLUMBING PLANS
4.120 PATCH ALL LOCATIONS WHERE EQUIPMENT AND PIPE PENETRATIONS ARE REMOVED. PATCHING TO
MAINTAIN ROOFING WARRANTY. COORDINATE WITH MECHANICAL.
12/14/17 B3 FINAL
1 07/06/18 ADDENDUM 01
R E
F
REF.REF.
PASSAGE
MEN'S
VESTIBULE 106
MEN'S
WOMEN'S
JANITOR
BREAK ROOM
WOMEN'S
LOCKER
MEN'S
LOCKER
PASSAGE
CONFERENCE
ROOM
ACOS / EXEC
OPEN OFFICE
G.O. OFFICE
A
A
A
A
A
106A
110A
4' - 0"
1' - 5 1/2"
4' - 6" 3' - 11 1/4"
6' - 5 7/8" 5' - 3 3/4" 21' - 2" 17' - 5 3/4" 6' - 4 7/8" 8' - 5 1/4"
/8
/4
/4
/2
5' - 3 5/8"
/4
11' - 9 5/8" 5' - 5 5/16" 3' - 4 7/8" 3' - 4 7/8" 3' - 4 7/8" 3' - 4 1/4" 3' - 9 11/16" 3' - 4 7/8" 3' - 4 7/8" 3' - 4 7/8" 5' - 0"
11' - 9 5/8"
/8
SA6
SA3
FC3
SA3
SA6SA6
SA6
SA6SA6
SA6
SA3
SA3
SA3
SA3
SA3 FC3 FC3 SA3 SA3
SA6
FC3
SA6
FC3
A-401
A-401
A-401
A-401
A-4021
GB-2
GB-1
GB-3
TPD
3' - 1" 3' - 1" 3' - 1" 5' - 0"
GB-1
GB-3
TPD
5' - 0" 3' - 1" 3' - 1"
SND
GB-2
TPD
SND
TPD
SNDTPDTPDTPDURS
PTD PTD PTD
PTD
SDSDSDSDSDSDSD
FSS
VSC
VSC
RH
FSS
VSC
VSC
RH
FSS
VSC
VSC
RH
FSS
VSC
VSC
RH
FSS
VSC
VSC
RH
PART PART
EWC
4.136 4.137
4.106
4.1364.136
4.108
A-402
A-402
A-402
A-301
A-301
4.1084.108
4.1104.110
TYP.
3' - 0" CLR. 1' - 6"
FSS
VSC
VSC
RH
TYP.
3' - 0" CLR.
FSS
VSC
VSC
RH
SA3
A-602 TYP
A-402
FC3
FC3
1' - 5 1/2"
2' - 10 1/2" 2' - 10 1/2" 2' - 10 1/2" 3' - 0 1/2" 3' - 1" 3' - 1" 5' - 1" 1' - 6" 1' - 6" 5' - 1" 3' - 1"
1' - 6" 3' - 0" 3' - 0" 3' - 0"3' - 0" 3' - 0" 3' - 0" 3' - 0" 1' - 6"
4.1274.127
4.128
A-402
4.129
FC3
120"
FSS FSS
FSS
GB-1
GB-3
MIR2
SA6
4.136
4.136
4.136
4.136
4.137 4.136
4.106
4.106
4.106
4.106
FD = FLOOR DRAIN (PITCH FLOOR TO DRAIN)
EWC = ELECTRIC WATER COOLER
FSS = FOLDING SHOWER SEAT
GB1 = GRAB BAR (42" L. x 33" A.F.F.)
GB2 = GRAB BAR (36" L. x 33" A.F.F.)
GB3 = GRAB BAR (18"" L. x 39" A.F.F.)
MS = MOP STRIP
MIR1 = MIRROR (2'-0"w. x 4'-0"h.)
MIR2 = MIRROR (2'-6"w. x 5'-0"h.)
PTD = PAPER TOWEL DISPENSER/DISPOSAL (GFCI)
PART = TOILET PARTITION
RH = ROBE HOOKS (3 HOOKS)
SCR = SHOWER CURTAIN ROD
SD = LIQUID SOAP DISPENSER (GFCI)
SND = SANITARY NAPKIN DISPOSAL UNIT
TPD = TOILET PAPER DISPENSER (GFCI)
URS = URINAL SCREEN
VSC = VINYL SHOWER CURTAIN
TOILET ROOM ACCESSORY GENERAL NOTES:
1. LAVATORIES IN TOILET ROOM ARE SOLID SURFACE COUNTERTOPS WITH
UNDERCOUNTER MOUNTED BOWLS, BACKSPLASH SHALL BE INTEGRAL
WITH COUNTERTOP.
2. PROVIDE BLOCKING IN WALLS FOR ALL WALL MOUNTED ACCESSORIES.
3. ALL DOORS AND DRAWERS IN CASEWORK TO HAVE LOCKS AND KEYS.
4. ALL EXPOSED SURFACES OF MILLWORK TO BE P. LAMINATE ON 3/4" PART. BD.,
TYPICAL, UNLESS NOTED OTHERWISE.
5. PROVIDE MOISTURE- AND MOLD-RESISTANT GYPSUM BOARD, AND TILE
BACKING GYPSUM BOARD AS SPECIFIED AND AS REQUIRED BY THE BUILDING
CODE.
6. SEE "ARCHITECTURAL FINISH LIST" IN SPECIFICATIONS FOR MATERIAL
INFORMATION.
7. SEE SHEET A-602 FOR "FINISH" ABBREVIATIONS.
8. SEE SHEET A-121 FOR "CEILING FINISH" ABBREVIATIONS.
9. SEE DETAIL 8/A-401 FOR ALL TOILET ACCESSORY MOUNTING HEIGHTS.
10. ALL TOWEL PINS MOUNTED AT 6' AND 3' ABOVE FINISHED FLOOR UNLESS
NOTED OTHERWISE.
11. VERIFY WALL DIMENSIONS WITH LOCKER MANUFACTURER PRIOR TO
CONSTRUCTION.
TOILET ACCESSORY KEY
M A
X
"M
A X
MIN
1'-3"
(URS)
URINAL
URINAL
@ NON-ADA
ACCESSIBLE
@ ADA
ACCESSIBLE
'-1
URINAL
SCREEN
(URS)
TOILET
PARTITION
(PART)
FLOOR LINE
MAX
6"
MAX
1' - 0"
T
O
GRAB BAR,
REQD (GB3)
GRAB BAR,
REQD (GB1)
GRAB
BAR,
REQD
(GB2)
(2) TOILET PAPER
DISPENSER DBL
ROLL (TPD)
SANITARY NAPKIN
DISPOSAL (SND)
WALL
MOUNT
TOILET
41"
39" TO
MIN
3' - 6"
1' - 6" 7" 8"
MIN
3' - 0"
A D
A R
E Q
M A
X
SOAP
DISPENSER
(SD)
LAVATORY
MIRROR
(MIR)
C L R
M A
X
M A
X
ELECTRIC
WATER
COOLER
HI-LO
(EWC)
M
IN
SHOWER
CURTAIN
ROD
(SCR)
ROBE
HOOKS
(RH)
PAPER
TOWEL
DISP.
(PTD)
SANITARY
NAPKIN
DISPOSAL
(SND)
"FAUCET ON
OPPOSITE WALL
FROM MOP
STRIP
(IF APPLICABLE)
SHELF W/
MOP STRIP
(MS)
MOP BASIN
FIRE
EXTINGUISHER
CABINET
(FEC)
M A
X
FOLDING
SHOWER
SEAT
(FSS)
MAX
2' - 3"
1' - 4" SHOWER HEIGHT
ACCESSORIES
M A
X
T.O. HOSE MOUNTING
BRACKET
DESIGN OPTION, STD HEAD
FLEXIBLE SHOWER SPRAY HOSE - 60" L
SINGLE LEVEL MIXING VALVE CONTROL
GRAB BAR (GB4)
MEN'S
MIR1 MIR1 MIR1
PTD
SD SD PTD8
A-402
4.203
MEN'S
URS URS
PART
TPDTPD
GB2
GB1
GB3
TPD TPD
4.203
GB1
GB3
MEN'S
LOCKER
4.106
4.106
4.106
VSC
SCR
FSS
RH
SCR SCR
VSC
FSS
RH
VSC
FSS
RH
VSC
FSS
RH
SA6
4.203
SCR
WOMEN'S
MIR1
EHD
SD
MIR1
SDPTD 8
A-402
4.203
WOMEN'S
TPD
GB2
GB1
GB3
SND
TPD
SND
TPD
SND
PART
4.203
WOMEN'S
LOCKER
VSC
SCR
FSS
RH
VSC
FSS
RH
SCR
4.106
SCR
VSC
FSS
RH
4.203
CTB-1
CT-1
CT-1
CT-2
CT-2
SEE SHEET A-602 FOR TILE FINISH INFORMATION
SHEET NO.:
SHEET CONTENTS
DO NOT SCALE DRAWINGS
ISSUED
Mead & Hunt, Inc.
2440 Deming Way
Middleton, WI 53562 phone: 608-273-6380 meadhunt.com
M&H NO.:
DATE:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
© Copyright This document, or any portion thereof, shall not be duplicated, disclosed, or used on any other project or extension of this project except by written agreement with Mead & Hunt, Inc. Mead & Hunt shall not be responsible for any unauthorized use of, or alteration to these documents.
/6
/2
:2 :2
A
M C
R e v it L o c a l\
-1
.0
-A
-C e n tr a l-m a rk .b ra it h w a it e .r v t
A-401
ENLARGED
INTERIOR PLANS
M
IC
H
IG
A N
A
IR
N A
T
IO
N A
L G
U A
R D
B A
T T
L E
C R
E E
K A
N G
B B
A T
T L E
C R
E E
K M
IC
H
IG
A
N
B A
T T
L E
C R
E E
K A
N G
B R
E P
A
IR
B L D
G
F O
R C
Y B
E R
O P
E R
A T
IO
N
S S
Q U
A D
R O
N
3141900-160242.01
MAB
RCL
DECEMBER 14, 2017
JTP
1/4" = 1'-0"1
ENLARGED FLOOR PLAN
1/4" = 1'-0"8
ACCESSORY MOUNTING HEIGHTS
1/4" = 1'-0"2
INTERIOR ELEVATION
1/4" = 1'-0"3
INTERIOR ELEVATION
1/4" = 1'-0"4
INTERIOR ELEVATION
1/4" = 1'-0"5
INTERIOR ELEVATION
1/4" = 1'-0"6
INTERIOR ELEVATION
1/4" = 1'-0"7
INTERIOR ELEVATION
KEYED NOTES
4.106 12" X 48" HDPE BENCH WITH STAINLESS STEEL TRAPEZOID PEDESTALS,
COLOR TO BE SELECTED BY GOVERNMENT REPRESENTATIVE.
4.108 REFRIGERATOR GFCI.
4.110 COFFEE MAKER GFCI.
4.127 ALIGN GYPSUM BOARD OF NEW PARTITION WITH EXISTING GYPSUM BOARD.
4.128 INSTALL EXISTING ENOOK CABINET.
4.129 RECESSED PLASTIC LAMINATE ELECTRONIC DEVICE STORAGE CABINET.
4.136 DOUBLE TIER HDPE LOCKERS.
4.137 SINGLE TIER HDPE LOCKERS.
4.203 SEE DETAIL 9/A-401 FOR TYPICAL WALL TILE ELEVATION.
1/2" = 1'-0"9
TOILET, SHOWER AND LOCKER ROOM
TYPICAL WALL TILE ELEVATION
12/14/17 B3 FINAL
1 07/06/18 ADDENDUM 01
PRE-FINISHED METAL CAP
FLASHING WITH CONTINUOUS
KEEPERS, MATCH EXISTING
2x BLOCKING, MATCH EXISTING
INSTALL EPDM MEMBRANE ROOF
SYSTEM AS SPECIFIED
1 1/2" ROOF DECK - SEE STRUCTURAL
BAR JOIST - SEE STRUCTURAL
CONT. SEALANT
JOIST BEARING
SEE STRUCTURAL
1/2 PLYWOOD ATTACHED TO
BONDBEAM, MATCH EXISTING
3/4 PLYWOOD, MATCH EXISTING
EXISTING WALL
1/2" SUBSTRATE WITH
VAPOR RETARDER SYSTEM
EXISTING WALL
NEW CMU BLOCK MATCH EXISTING.
TOOTH BLOCK INTO EXISTING.
NEW FACE BRICK, COLOR TO MATCH
EXISTING. TOOTH BRICK INTO
EXISTING. MATCH EXISTING BRICK
WALL REVEALS.
2" RIGID INSULATION OVER FLUID APPLIED
AIR BARRIER (SHOWN DASHED)
WEEP VENTS AT 24" O.C.
5/8" GYP. BD. OVER 3 5/8" FURRING
CONTINUOUS SEALANT AND
BACKER ROD
GYP. BD. JOINT
#5 DOWEL AT CENTER OF OPENING,
GROUT REINFORCED CORE SOLID
EXISTING WALL
NEW CMU BLOCK MATCH EXISTING.
TOOTH BLOCK INTO EXISTING.
NEW FACE BRICK, COLOR TO MATCH
EXISTING. TOOTH BRICK INTO
EXISTING. MATCH EXISTING BRICK
WALL REVEALS.
2" RIGID INSULATION OVER FLUID
APPLIED AIR BARRIER (SHOWN
DASHED)
5/8" GYP. BD. OVER 3 5/8" FURRING
CONTINUOUS SEALANT AND
BACKER ROD
GYP. BD. JOINT
NEW CMU BLOCK MATCH EXISTING.
TOOTH BLOCK INTO EXISTING.
NEW FACE BRICK, COLOR TO MATCH
EXISTING. TOOTH BRICK INTO
EXISTING. MATCH EXISTING BRICK
WALL REVEALS.
2" RIGID INSULATION OVER FLUID APPLIED
AIR BARRIER (SHOWN DASHED)
WEEP VENTS AT 24" O.C.
5/8" GYP. BD. OVER 3 5/8" FURRING
METAL FLASHING WITH DRIP MATCH EXISTING
CONTINUOUS CAVITY DRAINAGE MATERIAL
EXISTING FLOOR SLAB
FLEXIBLE THROUGH WALL FLASHING, OVERLAP
AND SEAL TO METAL FLASHING WITH DRIP
#5 DOWEL AT CENTER OF
OPENING, DRILL AND EPOXY
MININUM 1'-3" EMBED
#5 DOWEL AT CENTER OF OPENING,
GROUT REINFORCED CORE SOLID
ROOF MEMBRANE SYSTEM
EPDM FLASHING AND
SEALANTS
FLEXIBLE FLASHING BOOT
STAINLESS STEEL ADJUSTABLE
BOOT CLAMP (CUT OFF EXCESS)
CONTINUOUS SEALANT
NOTE:
COORDINATE LOCATION, SIZE AND
QUANTITY WITH MECHANICAL AND
ELECTRICAL CONTRACTOR.
1/2" TO 6"
M
IN
IM
U
M
1/2" SUBSTRATE WITH
VAPOR RETARDER SYSTEM
1' - 0" MIN 1' - 0" MIN
PROVIDE WALL BRACKETS AT 6'-0" OC
12" 1"
RAISED FLOOR SYSTEM WITH RFT FINISHEXISTING CONCRETE
WITH RFT FINISH
1 1/2"
SEE PLAN FOR PARTITION TYPE,
PROVIDE BLOCKING AS REQ'D
1 1/2 STD STEEL PIPE HANDRAIL.
WELD AND GRIND SMOOTH
ALL JOINTS
STEEL HANDRAIL BRACKET BOLTED TO
HANDRAIL, ATTACH TO WALL AT 38"
O.C. MAX, OR WELDED TO STEEL
INTERMEDIATE POSTS AT 38" O.C. MAX
SEE SPECIFICATION SECTION 09910
FOR PAINT REQUIREMENTS.
PAINT COLOR TO MATCH EXISTING
BASE STANDARD (DARK BRONZE)
/2
SEE PLAN FOR WALL TYPE,
PROVIDE BLOCKING AS REQ'D
1 1/2 STD STEEL PIPE
HANDRAIL. WELD AND
GRIND SMOOTH ALL JOINTS
2 1/4" RADIUS
3/16" x 3 1/2" DIA. STEEL PLATE WELD
TO HANDRAIL, ATTACH TO WALL AS
REQ'D FOR PARTITION TYPE
SEE SPECIFICATION SECTION 09910
FOR PAINT REQUIREMENTS.
PAINT COLOR TO MATCH EXISTING
BASE STANDARD (DARK BRONZE)
CONCRETE LANDING AND/OR TREAD
PL3/8x3x0'-6" ANCHOR PLATE WITH
(2) 3/4" DIA EXPANSION ANCHORS
1 1/2 STD STEEL PIPE HANDRAIL
SEE SPECIFICATION SECTION 09910
FOR PAINT REQUIREMENTS.
PAINT COLOR TO MATCH EXISTING
BASE STANDARD (DARK BRONZE)
1 1/2 STD STEEL VERTICAL POSTS,
MAXIMUM POST SPACING OF 4'-0" O.C.
1 1/2 STD REMOVABLE STEEL PIPE
GUARDRAIL ASSEMBLY (PAINTED)
RAIL POST SLEEVE (TYP.)
(PAINTED)
4" 5' - 0" MAXIMUM 4"
V E
R
IF
Y
SEE SPECIFICATION SECTION 09910
FOR PAINT REQUIREMENTS.
PAINT COLOR TO MATCH EXISTING
BASE STANDARD (DARK BRONZE)
1 1/2 STD STEEL PIPE GUARDRAIL,
MAXIMUM POST SPACING OF 5'-0"
(UNLESS NOTED OTHERWISE ON
PLANS) (PAINTED)
RAIL POST SLEEVE AT ENDS/WALL AND
5'-0" MAX. BETWEEN. 2" DIAMETER STEEL
PIPE. WELDED TO CHANNEL. (PAINTED)
1" x 1"x SOLID STOP PLATE
WELDED TO POST (PAINTED)
EASED EDGES
1/4
1/4
CONCRETE LANDING
PL3/8x12x10" WIDE ANCHOR PLATE
WITH (2) 3/4" DIA EXPANSION
ANCHORS (PAINTED)
SEE SPECIFICATION SECTION 09910
FOR PAINT REQUIREMENTS.
PAINT COLOR TO MATCH EXISTING
BASE STANDARD (DARK BRONZE)
1 1/2 STD STEEL PIPE GUARDRAIL
(PAINTED)
DUCT PENETRATING
ROOF STRUCTURE
20 GA. GALVANIZED METAL DECK
CLOSURE (TYPICAL 4 SIDES)
OPENING FRAMING, SEE STRUCTURAL.
NOTES:
1. COORDINATE LOCATION, SIZE AND QUANTITY
WITH MECHANICAL AND ELECTRICAL CONTRACTOR.
2. CURBS FOR ROOFTOP MECH. EQUIP. SUPPLIED BY MECHANICAL
CONTRACTOR (UNLESS NOTED OTHERWISE).
M
IN
A B
O V
E R
O O
F
ROOF TOP MECHANICAL EQUIPMENT
(SEE MECHANICAL DRAWINGS)
METAL FLASHING WITH
CONT. METAL CLEAT
MEMBRANE FLASHING
(RUN OVER TOP OF CURB)
PRE-MANUFACTURED
ROOF CURB
MEMBRANE ROOFING SYSTEM
TYPICAL LAP SEAM
1/2" SUBSTRATE WITH
VAPOR RETARDER SYSTEM
CUT 2 x 4 AND 2 x 12 FOR
FLUSH AND LEVEL FIT
ROOFING SUBSTRUCTURE
NOTES:
1. COORDINATE LOCATION, SIZE AND QUANTITY
WITH MECHANICAL AND ELECTRICAL CONTRACTOR.
ROOF TOP MECHANICAL EQUIPMENT
(SEE MECHANICAL DRAWINGS)
METAL FLASHING WITH
CONT. METAL CLEAT
MEMBRANE FLASHING
(RUN OVER TOP OF CURB)
MEMBRANE ROOFING SYSTEM
SEE TYPICAL LAP SEAM DETAIL
M
IN
IM
U
M
(2) LAYERS 1/2" PLYWOOD
1/2" SUBSTRATE WITH
VAPOR RETARDER SYSTEM
PRE-FINISHED METAL CAP FLASHING
WITH CONTINUOUS KEEPERS, MATCH
EXISTING SCREEN WALL
2x BLOCKING
CONT. SEALANT
TOP OF WALL
114'-0"
1/2 PLYWOOD ATTACHED TO BOND BEAM
3/4 PLYWOOD
8" CMU BLOCK PAINT TO MATCH
EXISTING SCREEN WALL
TOP OF WALL
SEE STRUCTURAL
BOND BEAM WITH (2) #5 BARS
CONTINOUS, TYPICAL
BOND BEAM WITH (2) #5 BARS
CONTINOUS, TYPICAL
VERTICAL WALL REINFORCEMENT,
SEE STRUCTURAL
4" BRICK VENEER MATCH EXISTING
SCREEN WALL
M
A T
C H
E X
IS
T
IN
G
M
A T
C H
E X
IS
T
IN
G
M
A T
C H
E X
IS
T
IN
G
FOUNDATION WALL, SEE
STRUCTURAL
WEEP VENTS AT 24" O.C. TOP AND
BOTTOM OF WALL
GROUT SOLID
CONTINUOUS CAVITY DRAINAGE MATERIAL
SHEET NO.:
SHEET CONTENTS
DO NOT SCALE DRAWINGS
ISSUED
Mead & Hunt, Inc.
2440 Deming Way
Middleton, WI 53562 phone: 608-273-6380 meadhunt.com
M&H NO.:
DATE:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
© Copyright This document, or any portion thereof, shall not be duplicated, disclosed, or used on any other project or extension of this project except by written agreement with Mead & Hunt, Inc. Mead & Hunt shall not be responsible for any unauthorized use of, or alteration to these documents.
/6
/2
:4 :5
A
M C
R e v it L o c a l\
-1
.0
-A
-C e n tr a l-m a rk .b ra it h w a it e .r v t
A-501
EXTERIOR PLAN
DETAILS
M
IC
H
IG
A N
A
IR
N A
T
IO
N A
L G
U A
R D
B A
T T
L E
C R
E E
K A
N G
B B
A T
T L E
C R
E E
K M
IC
H
IG
A
N
B A
T T
L E
C R
E E
K A
N G
B R
E P
A
IR
B L D
G
F O
R C
Y B
E R
O P
E R
A T
IO
N
S S
Q U
A D
R O
N
3141900-160242.01
MAB
RCL
DECEMBER 14, 2017
JTP
1 1/2" = 1'-0"1
PARAPET CAP
1 1/2" = 1'-0"2
MASONRY INFILL HEAD
1 1/2" = 1'-0"4
MASONRY INFILL JAMB
1 1/2" = 1'-0"3
MASONRY INFILL SILL
1 : 16
PIPE PENETRATION -EPDM
3/4" = 1'-0"8
TYP. RAMP HANDRAIL EXTENSION
3" = 1'-0"9
RAMP HANDRAIL TO WALL SUPPORT
3" = 1'-0"10
TYP. RAMP HANDRAIL RETURN
1" = 1'-0"11
HANDRAIL SECTION
1/2" = 1'-0"12
REMOVABLE GUARDRAIL ELEVATION
1" = 1'-0"13
REMOVABLE GUARDRAIL SECTION
1 1/2" = 1'-0"5
EPDM MECHANICAL DUCT PENTRATION CURB
1 1/2" = 1'-0"7
EPDM EQUIPMENT CURB FLASHING
12/14/17 B3 FINAL
1 07/06/18 ADDENDUM 01
1 1/2" = 1'-0"14
PARAPET CAP
PAINTED WALL, REFER TO
ARCHITECTURAL FINISH
PLANSPARTITION, AS SCHEDULED
SCHLUTER RONDEC
WALL TILE, REFER TO
ARCHITECTURAL FINISH
PLANS
A N
D S
C H
E D
U L E
F O
R H
E
IG
H T
R E
F E
R T
O F
IN
IS
H E
S P
L A
N
WALL TILE, REFER TO
ARCHITECTURAL FINISH
PLANS
COVE TILE BASE
PARTITION, AS SCHEDULED
ADHESIVE
CERAMIC FLOOR TILE,
REFER TO
ARCHITECTURAL FINISH
PLANS
ALUMINUM TRANSITION STRIP
WALL FINISH
PARTITION TYPES
PARTITION WIDTH
AS NOTED ON
PARTITION
(AS SCHEDULED)
ALUMINUM CORNER (TYP. AT
ALL OUTSIDE CORNERS)
METAL TRANSITION (1/8" - 3/8")
FASTENED TO CONCRETE
SLAB
SOLID VINYL FLOOR TILE,
REFER TO ARCHITECTURAL
FINISH PLANS
CERAMIC FLOOR TILE WITH
GROUT JOINT ABUTTING
TRANSITION STRIP, REFER TO
ARCHITECTURAL FINISH PLANS
FOR RUBBER FLOOR TILE (RFT) :
FEATHER LATEX OVER +/- 24" TO
RAISE RUBBER TO TOP OF
METAL EDGE.
CONCRETE SLAB
METAL EDGE TRANSITION,
FASTENED TO CONCRETE
SLAB
FEATHER LATEX OVER +/- 24"
TO RAISE TILE OR VINYL TO
TOP OF METAL EDGE
CARPET, REFER TO
ARCHITECTURAL FINISH PLANS
CONCRETE SLAB
SOLID VINYL FLOOR TILE,
REFER TO ARCHITECTURAL
FINISH PLANS
CORNER GUARD AS
SPECIFIED, WITH TOP AND
BOTTOM CAPS, INSTALL PER
MANUFACTURER'S
REQUIREMENTS
PROVIDE MINIMUM
CLEARANCE FROM INSTALLED
WALL BASE
C L
E A
R M
IN
IM
U M
WALL BASE, REFER TO
FINISH PLANS AND ROOM
FINISH SCHEDULE
SHOWER TILE, REFER TO
ARCHITECTURAL FINISH PLANS
SHOWER TILE, REFER TO
ARCHITECTURAL FINISH
PLANS
SHOWER TILE, REFER TO
ARCHITECTURAL FINISH
PLANS
FLOOR TILE, REFER TO
ARCHITECTURAL FINISH
PLANS
SHOWER TILE, REFER TO
ARCHITECTURAL FINISH
PLANSCONCRETE SLAB
CONCRETE SLAB
SQUARE
INLET
DRAIN
SQUARE
INLET
DRAIN
1/4" 12" 1/4"
12" 1/4"
12" 1/4"
12"
POURED CONCRETEPOURED CONCRETE - SLOPE
TO DRAIN
POURED CONCRETE - SLOPE
TO DRAIN
POURED CONCRETE - SLOPE
TO DRAIN
WATERPROOF MEMBRANE AND
VAPOR RETARDER EXTEND TO
SHOWER DRAIN CLAMPING RING
AS SPECIFIED
WATERPROOF MEMBRANE AND
VAPOR RETARDER EXTEND TO
SHOWER DRAIN CLAMPING RING
AS SPECIFIED WATERPROOF MEMBRANE
AND VAPOR RETARDER AS
SPECIFIED
WALL TILE, REFER TO
ARCHITECTURAL FINISH
PLANS
6 1/2"
SLOPE BACK TO
LOCKER ROOM
FLOOR TILE
ELEVATION
ARCHITECTURAL FINISHES SCHEDULE
FINISH
NUMBER FINISH DESCRIPTION
PRODUCT DESCRIPTION
REMARKSMANUFACTURER MODEL NUMBER STYLE COLOR SIZE
ACP-1 ACCOUSTIC CEILING PANEL - TYPE 1 USG 2220 RADAR CLIMA PLUS WHITE 24"x24" TYPICAL CEILING
ACP-2 ACCOUSTIC CEILING PANEL - TYPE 2 USG 56099 CLEANROOM CLIMA PLUS WHITE 24"x24" SERVER ROOM CEILING
ACP-3 ACCOUSTIC CEILING PANEL - TYPE 3 USG 3260 SHEETROCK WHITE 24"x24" TOILET AND LOCKER ROOM CEILING
CPT-1 CARPET - TYPE 1 J & J INVISION HIGHWIRE MODULAR 388 BREATHTAKING REUSE EXISTING CARPET TILE AND REINSTALL.
CT-1 CERAMIC TILE - TYPE 1 CROSSVILLE A1101 COLOR BLOX SAND BOX 12"x6" WALL FIELD COLOR - HORIZONTAL
CT-2 CERAMIC TILE - TYPE 2 CROSSVILLE A1103 COLOR BLOX BLUE SUEDE SHOES 6"x6" WALL ACCENT BANDING
CT-3 CERAMIC TILE - TYPE 3 CROSSVILLE A1108 COLOR BLOX SEA OTTER 12"X12"
CT-4 CERAMIC TILE - TYPE 4 CROSSVILLE A1108 COLOR BLOX SEA OTTER 2"X2" MOSAIC SURROUNDING FLOOR DRAINS & SHOWER RECEPTACLES
CTB-1 CERAMIC TILE BASE- TYPE 1 CROSSVILLE A1108 COLOR BLOX SEA OTTER 12"x6" COVE BASE
GR-1 GROUT COLOR - TYPE 1 BOSTIK H189 ALABASTER WALL GROUT IN TOILET
GR-2 GROUT COLOR - TYPE 2 BOSTIK H197 CLAY FLOOR GROUT IN TOILET
PLAM PLASTIC LAMINATE - TYPE 1 FORMICA 8842-WR LAMINATE WEATHERED ASH
PT-1 PAINT COLOR - TYPE 1 SHERWIN WILLIAMS SW 6103 KILIM BEIGE EXISTING; USE THROUGHOUT WITH ACCENT COLORS
PT-2 PAINT COLOR - TYPE 2 SHERWIN WILLIAMS SW 7007 CEILING BRIGHT WHITE CEILING/SOFFITS/BULKHEADS/COMM ROOMS/MEHCANICAL ROOMS/ELECTRICAL ROOMS
PT-3 PAINT COLOR - TYPE 3 SHERWIN WILLIAMS SW 7069 IRON ORE ALL DOOR FRAMES, HOLLOW METAL DOOR
PT-4 PAINT COLOR - TYPE 4 SHERWIN WILLIAMS SW 7018 DOVETAIL ACCENT COLOR OFFICES
PT-5 PAINT COLOR - TYPE 5 SHERWIN WILLIAMS SW 7075 WEB GRAY ACCENT COLOR BREAK ROOM, CONFERENCE ROOM, OPEN OFFICE 112, COF 142 AND TEAMS
RB-1 RUBBER WALL BASE - TYPE 1 JOHNSONITE COVE 20 CHARCOAL 4" 4" HIGH BASE
RF-1 RAISED FLOOR - TYPE 1 NEVERMAR MR60005-T WINTER GRAY MATRIX TO BE INSTALLED ON ACCESS FLOOR SYSTEM ONLY
RT-1 RUBBER TILE - TYPE 1 JOHNSONITE HNSP-LA3 SPECKLED RUBBER TILE SEASPRAY WG 24"X24" TO BE INSTALLED ON ACCESS FLOOR SYSTEM ONLY; SURFACE TEXTURE: HAMMERED
SC SEALED CONCRETE
SS-1 SOLID SURFACE - TYPE 1 CORIAN TERRA COLLECTION BLUE PEBBLE
VCT-1 VINYL COMPOSITION TILE - TYPE 1 AZROCK CG405 CORTINA GRANDE CINDER WHITE 16"x16"
VCT-2 VINYL COMPOSITION TILE - TYPE 2 AZROCK CG513 CORTINA GRANDE SPLASH 16"x16"
VCT-3 VINYL COMPOSITION TILE - TYPE 3 AZROCK CG511 CORTINA GRANDE COOL CRETE 16"x16"
ROOM FINISH SCHEDULE
ROOM
NO. ROOM NAME FLOOR BASE
WALLS CEILING
REMARKSNORTH EAST SOUTH WEST MTL HEIGHT
101 ENTRY LOBBY VCT-1, VCT-2,
VCT-3
RB-1 PT-1 PT-1 PT-1 PT-1 ACP-1 9'-0" SEE SHEET A-702 FOR VCT PATTERN
102 PASSAGE VCT-1, VCT-2,
VCT-3
RB-1 PT-1 PT-1 PT-1 PT-1 ACP-1 9'-0" SEE SHEET A-702 FOR VCT PATTERN
103 CONFERENCE ROOM CPT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACP-1 9'-0"
104 PASSAGE VCT-1, VCT-2,
VCT-3
RB-1 PT-1 PT-1 PT-1 PT-1 ACP-1 9'-0" SEE SHEET A-702 FOR VCT PATTERN
105 MEN'S VESTIBULE CT-3 CT-3 CT-1, CT-2 CT-1, CT-2 CT-1, CT-2 CT-1, CT-2 ACP-3 9'-0"
106 MEN'S CT-3 CT-3 CT-1, CT-2 CT-1, CT-2 CT-1, CT-2 CT-1, CT-2 ACP-3 9'-0"
107 MEN'S LOCKER CT-3 CT-3 CT-1, CT-2 CT-1, CT-2 CT-1, CT-2 CT-1, CT-2 ACP-3 9'-0"
108 WOMEN'S CT-3 CT-3 CT-1, CT-2 CT-1, CT-2 CT-1, CT-2 CT-1, CT-2 ACP-3 9'-0"
109 WOMEN'S LOCKER CT-3 CT-3 CT-1, CT-2 CT-1, CT-2 CT-1, CT-2 CT-1, CT-2 ACP-3 9'-0"
110 JANITOR VCT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACP-1 9'-0"
111 BREAK ROOM VCT-1, VCT-2,
VCT-3
RB-1 PT-1 PT-1 PT-5 PT-5 ACP-1 9'-0" SEE SHEET A-702 FOR VCT PATTERN
112 OPEN OFFICE CPT-1 RB-1 PT-5 PT-5 PT-5 PT-5 ACP-1 9'-0"
112B STORAGE CPT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACP-1 9'-0"
113 G.O. OFFICE CPT-1 RB-1 PT-1 PT-1 PT-1 PT-4 ACP-1 9'-0"
114 ACOS / EXEC CPT-1 RB-1 PT-1 PT-1 PT-1 PT-4 ACP-1 9'-0"
115 STORAGE CPT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACP-1 9'-0"
116 ACOS COMMANDER CPT-1 RB-1 PT-1 PT-4 PT-1 PT-1 ACP-1 9'-0"
117 PASSAGE CPT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACP-1 9'-0"
118 CONFERENCE ROOM CPT-1 RB-1 PT-1 PT-1 PT-1 PT-5 ACP-1 9'-0"
119 OFFICE CPT-1 RB-1 PT-1 PT-1 PT-1 PT-4 ACP-1 9'-0"
120 A2/A6 CPT-1 RB-1 PT-1 PT-1 PT-1 PT-4 ACP-1 9'-0"
121 A3/A5 CPT-1 RB-1 PT-1 PT-1 PT-1 PT-4 ACP-1 9'-0"
122 A4/A7 CPT-1 RB-1 PT-1 PT-1 PT-1 PT-4 ACP-1 9'-0"
123 A1 CPT-1 RB-1 PT-1 PT-1 PT-1 PT-4 ACP-1 9'-0"
124 ACOS AFFOR CPT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACP-1 12'-0"
125 OPEN OFFICE CPT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACP-1 9'-0"
125B STORAGE CPT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACP-1 9'-0"
126 COS COMMANDER CPT-1 RB-1 PT-1 PT-4 PT-1 PT-1 ACP-1 9'-0"
127 SUPER CPT-1 RB-1 PT-1 PT-4 PT-1 PT-1 ACP-1 9'-0"
128 DIRECTOR OF OPS CPT-1 RB-1 PT-1 PT-4 PT-1 PT-1 ACP-1 9'-0"
129 FIRST SGT CPT-1 RB-1 PT-1 PT-4 PT-1 PT-1 ACP-1 9'-0"
130 MAN TRAP VCT-1, VCT-2,
VCT-3
RB-1 PT-1 PT-1 PT-1 PT-1 ACP-1 9'-0" SEE SHEET A-702 FOR VCT PATTERN
131 SSO CPT-1 RB-1 PT-1 PT-1 PT-1 PT-4 ACP-1 9'-0"
132 PASSAGE VCT-1, VCT-2,
VCT-3
RB-1 PT-1 PT-1 PT-1 PT-1 ACP-1 9'-0" SEE SHEET A-702 FOR VCT PATTERN
133 ASC/IDS VCT-1 RB-1 PT-1 PT-1 PT-1 PT-4 PT-2 -
134 PASSAGE VCT-1,
VCT-2,VCT-3, RT-1
RB-1 PT-1 PT-1 PT-1 PT-1 ACP-1 VARIES SEE SHEET A-702 FOR VCT PATTERN
135 TEAMS RT-1 RB-1 PT-5 PT-5 PT-5 PT-5 PT-2 -
136 WEAPONS / INTEL RT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACP-1 10'-6"
137 FLT A RT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACP-1 10'-6"
138 FLT B RT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACP-1 10'-6"
139 CONFERENCE RT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACP-2 11'-6"
140 TRAINING RT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACP-2 11'-6"
141 FIRE CLOSET RT-1 RB-1 PT-1 PT-1 PT-1 PT-1 PT-2 -
142 COF RT-1 RB-1 PT-5 PT-5 PT-5 PT-5 PR-2 -
143 CYBER MAINTENCE / OPEN STORAGE RT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACP-1 11'-6"
144 SERVER RF-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACP-2 11'-6"
145 COS MECHANICAL SC RB-1 PT-1 PT-1 PT-1 PT-1 PT-2 -
146 COS ELECTRICAL SC RB-1 PT-1 PT-1 PT-1 PT-1 PT-2 -
147 ACOS MECHANICAL SC RB-1 PT-1 PT-1 PT-1 PT-1 PT-2 -
148 ACOS ELECTRICAL SC RB-1 PT-1 PT-1 PT-1 PT-1 PT-2 -
149 ACOS COMM. SC RB-1 PT-1 PT-1 PT-1 PT-1 PT-2 -
150 COS COMM. SC RB-1 PT-1 PT-1 PT-1 PT-1 PT-2 -
SHEET NO.:
SHEET CONTENTS
DO NOT SCALE DRAWINGS
ISSUED
Mead & Hunt, Inc.
2440 Deming Way
Middleton, WI 53562 phone: 608-273-6380 meadhunt.com
M&H NO.:
DATE:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
© Copyright This document, or any portion thereof, shall not be duplicated, disclosed, or used on any other project or extension of this project except by written agreement with Mead & Hunt, Inc. Mead & Hunt shall not be responsible for any unauthorized use of, or alteration to these documents.
/6
/2
:2 :4
A
M C
R e v it L o c a l\
-1
.0
-A
-C e n tr a l-m a rk .b ra it h w a it e .r v t
A-602
ARCHITECTURAL
SCHEDULES
M
IC
H
IG
A N
A
IR
N A
T
IO
N A
L G
U A
R D
B A
T T
L E
C R
E E
K A
N G
B B
A T
T L E
C R
E E
K M
IC
H
IG
A
N
B A
T T
L E
C R
E E
K A
N G
B R
E P
A
IR
B L D
G
F O
R C
Y B
E R
O P
E R
A T
IO
N
S S
Q U
A D
R O
N
3141900-160242.01
KAS
RCL
DECEMBER 14, 2017
JTP
3" = 1'-0"1
TILE WAINSCOT
6" = 1'-0"2
TILE WALL BASE
3" = 1'-0"3
WALL TILE OUTSIDE CORNER
6" = 1'-0"4 TRANSITION - CT or RFT/SVT
6" = 1'-0"5
TRANSITION - CPT/SVT
1/2" = 1'-0"7
CORNER GUARD ELEVATION
3" = 1'-0"6
SHOWER TILE BASE
NOTE: EXISTING MILLWORK IS TO BE RE-USED. IF REPAIRS ARE NEEDED USE FORMICA STORM 912-58 AND/OR FORMICA SHOJI SCREEN 3696-58 TO MATCH.
12/14/17 B3 FINAL
1 07/06/18 ADDENDUM 01
024119 - 1 SELECTIVE DEMOLITION
SECTION 024119 - SELECTIVE DEMOLITION
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Demolition and removal of selected site elements.
2. Salvage of existing items to be reused or recycled.
1.2 DEFINITIONS
A. Remove: Detach items from existing construction and legally dispose of them off-site unless indicated to be removed and salvaged or removed and reinstalled.
B. Remove and Salvage: Detach items from existing construction, in a manner to prevent damage, and deliver to Owner ready for reuse and/or store.
C. Remove and Reinstall: Detach items from existing construction, in a manner to prevent damage, prepare for reuse, and reinstall where indicated.
D. Existing to Remain: Existing items of construction that are not to be permanently removed and that are not otherwise indicated to be removed, removed and salvaged, or removed and reinstalled.
1.3 PREDEMOLITION MEETINGS
A. Predemolition Conference: Conduct conference at Project site.
1. Inspect and discuss condition of construction to be selectively demolished.
2. Review structural load limitations of existing structure.
3. Review requirements of work performed by other trades that rely on substrates exposed by selective demolition operations.
4. Review areas where existing construction is to remain and requires protection.
1.4 INFORMATIONAL SUBMITTALS
A. Statement of Refrigerant Recovery: Signed by refrigerant recovery technician.
B. Proposed Protection Measures: Submit report, including drawings, that indicates the measures proposed for protecting individuals and property, for environmental protection, for dust control and, for noise control. Indicate proposed locations and construction of barriers.
C. Schedule of selective demolition activities indicating the following:
1. Detailed sequence of selective demolition and removal work, with starting and ending dates for each activity.
2. Interruption of utility services.
3. Coordination for shutoff, capping, and continuation of utility services.
SELECTIVE DEMOLITION 024119 - 2
4. Detailed sequence of selective demolition and removal work to ensure uninterrupted progress of Government's on-site operations.
5. Coordination of Government's continuing occupancy of portions of existing building and of Government’s partial occupancy of completed Work.
6. Locations of temporary partitions and means of egress.
1.5 CLOSEOUT SUBMITTALS
A. Landfill Records: Indicate receipt and acceptance of hazardous wastes by a landfill facility licensed to accept hazardous wastes.
1.6 QUALITY ASSURANCE
A. Refrigerant Recovery Technician Qualifications: Certified by an EPA-approved certification program.
1.7 FIELD CONDITIONS
A. Conditions existing at time of inspection for bidding purpose will be maintained by Government as far as practical.
B. Notify Contracting Officer of discrepancies between existing conditions and Drawings before proceeding with selective demolition.
C. Hazardous Materials: It is not expected that hazardous materials will be encountered in the Work.
1. If suspected hazardous materials are encountered, do not disturb; immediately notify COR. Hazardous materials will be removed by Government under a separate contract.
D. Storage or sale of removed items or materials on-site is not permitted.
E. Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations.
1.8 WARRANTY
A. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or damaged during selective demolition, by methods and with materials so as not to void existing warranties. Notify warrantor before proceeding. Existing warranties include the following:
1. Roof System – Carlisle Syntec Systems.
PART 2 - PRODUCTS
2.1 PEFORMANCE REQUIREMENTS
024119 - 3 SELECTIVE DEMOLITION
A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.
B. Standards: Comply with ANSI/ASSE A10.6 and NFPA 241.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verify that utilities have been disconnected and capped before starting selective demolition operations.
B. Survey existing conditions and correlate with requirements indicated to determine extent of selective demolition required.
C. When unanticipated mechanical, electrical, or structural elements that conflict with intended function or design are encountered, investigate and measure the nature and extent of conflict. Promptly submit a written report to Contracting Officer.
D. Survey of Existing Conditions: Record existing conditions by use of preconstruction photographs.
3.2 PREPARATION
A. Refrigerant: Remove refrigerant from mechanical equipment to be selectively demolished according to 40 CFR 82 and regulations of authorities having jurisdiction.
3.3 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS
A. Existing Services/Systems to Remain: Maintain services/systems indicated to remain and protect them against damage.
B. Existing Services/Systems to Be Removed, Relocated, or Abandoned: Locate, identify, disconnect, and seal or cap off utility services and mechanical/electrical systems serving areas to be selectively demolished.
1. Owner will arrange to shut off indicated services/systems when requested by Contractor.
2. Arrange to shut off utilities with utility companies.
3. If services/systems are required to be removed, relocated, or abandoned, provide temporary services/systems that bypass area of selective demolition and that maintain continuity of services/systems to other parts of building.
4. Disconnect, demolish, and remove fire-suppression systems, plumbing, and HVAC systems, equipment, and components indicated on Drawings to be removed.
a. Piping to Be Removed: Remove portion of piping indicated to be removed and cap or plug remaining piping with same or compatible piping material.
b. Piping to Be Abandoned in Place: Drain piping and cap or plug piping with same or compatible piping material and leave in place.
SELECTIVE DEMOLITION 024119 - 4
c. Equipment to Be Removed: Disconnect and cap services and remove equipment.
d. Equipment to Be Removed and Reinstalled: Disconnect and cap services and remove, clean, and store equipment; when appropriate, reinstall, reconnect, and make equipment operational.
e. Equipment to Be Removed and Salvaged: Disconnect and cap services and remove equipment and deliver to Owner.
f. Ducts to Be Removed: Remove portion of ducts indicated to be removed and plug remaining ducts with same or compatible ductwork material.
3.4 PROTECTION
A. Temporary Facilities: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.
1. Provide protection to ensure safe passage of people around selective demolition area and to and from occupied portions of building.
2. Provide temporary weather protection, during interval between selective demolition of existing construction on exterior surfaces and new construction, to prevent water leakage and damage to structure and interior areas.
3. Protect walls, ceilings, floors, and other existing finish work that are to remain or that are exposed during selective demolition operations.
4. Comply with requirements for access and protection specified in Section 015000 "Temporary Facilities and Controls."
B. Temporary Shoring: Provide and maintain shoring, bracing, and structural supports as required to preserve stability and prevent movement, settlement, or collapse of construction and finishes to remain, and to prevent unexpected or uncontrolled movement or collapse of construction being demolished.
1. Strengthen or add new supports when required during progress of selective demolition.
3.5 SELECTIVE DEMOLITION, GENERAL
A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows:
1. Neatly cut openings and holes plumb, square, and true to dimensions required.
Use cutting methods least likely to damage construction to remain or adjoining construction. Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping, to minimize disturbance of adjacent surfaces. Temporarily cover openings to remain.
2. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.
3. Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flame-cutting operations. Maintain portable fire-suppression devices during flame-cutting operations.
4. Maintain fire watch during and for at least 1 hour after flame-cutting operations.
5. Maintain adequate ventilation when using cutting torches.
024119 - 5 SELECTIVE DEMOLITION
6. Remove decayed, vermin-infested, or otherwise dangerous or unsuitable materials and promptly dispose of off-site.
7. Remove structural framing members and lower to ground by method suitable to avoid free fall and to prevent ground impact or dust generation.
8. Locate selective demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.
9. Dispose of demolished items and materials promptly. Comply with requirements in Section 017419 "Construction Waste Management and Disposal."
B. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.
C. Removed and Salvaged Items:
1. Clean salvaged items.
2. Pack or crate items after cleaning. Identify contents of containers.
3. Store items in a secure area until delivery to Owner.
4. Transport items to Owner's storage area designated by Owner.
5. Protect items from damage during transport and storage.
D. Removed and Reinstalled Items:
1. Clean and repair items to functional condition adequate for intended reuse.
2. Pack or crate items after cleaning and repairing. Identify contents of containers.
3. Protect items from damage during transport and storage.
4. Reinstall items in locations indicated. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated.
E. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition. When permitted by Contracting Officer, items may be removed to a suitable, protected storage location during selective demolition and reinstalled in their original locations after selective demolition operations are complete.
F. Cleanly, full-depth saw cut asphalt pavement and concrete sidewalk at limits of removal.
3.6 SELECTIVE DEMOLITION PROCEDURES FOR SPECIFIC MATERIALS
A. Concrete: Demolish in small sections. Using power-driven saw, cut concrete to a depth of at least 3/4 inch (19 mm) at junctures with construction to remain. Dislodge concrete from reinforcement at perimeter of areas being demolished, cut reinforcement, and then remove remainder of concrete. Neatly trim openings to dimensions indicated.
B. Concrete: Demolish in sections. Cut concrete full depth at junctures with construction to remain and at regular intervals using power-driven saw, and then remove concrete between saw cuts.
C. Masonry: Demolish in small sections. Cut masonry at junctures with construction to remain, using power-driven saw, and then remove masonry between saw cuts.
SELECTIVE DEMOLITION 024119 - 6
D. Concrete Slabs-on-Grade: Saw-cut perimeter of area to be demolished, and then break up and remove.
E. Carpet and Resilient Floor Coverings: Remove floor coverings and adhesive according to recommendations in RFCI's "Recommended Work Practices for the Removal of Resilient Floor Coverings."
F. Roofing: Remove no more existing roofing than what can be covered in one day by new roofing and so that building interior remains watertight and weathertight, or provide temporary enclosure to protect interior until new structure and substrate are installed for new roofing material to be installed.
1. Remove existing roof membrane, flashings, copings, and roof accessories.
2. Remove existing roofing system down to substrate.
3.7 DISPOSAL OF DEMOLISHED MATERIALS
A. General: Except for items or materials indicated to be reused, salvaged, reinstalled, or otherwise indicated to remain Government's property, remove demolished materials from Project site.
1. Do not allow demolished materials to accumulate on-site.
2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.
3. Comply with requirements specified in Section 017419 "Construction Waste
Management and Disposal."
B. Burning: Do not burn demolished materials.
C. Disposal: Transport demolished materials off Government's property and legally dispose of them.
3.8 CLEANING
A. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.
3.9 SELECTIVE DEMOLITION SCHEDULE
A. Remove: As indicated in drawings.
B. Remove and Salvage: Existing lockers and locker room benches
C. Remove and Reinstall: Carpet tile.
D. Existing to Remain: As indicated on drawings.
END OF SECTION 024119
095113 - 1 ACOUSTICAL PANEL
CEILINGS
SECTION 095113 - ACOUSTICAL PANEL CEILINGS
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes acoustical panels and exposed suspension systems for ceilings.
1.2 SUBMITTALS
A. Product Data: For each type of product indicated.
B. Samples: For each exposed finish.
C. Maintenance data.
1.3 QUALITY ASSURANCE
A. Source Limitations:
1. Acoustical Ceiling Panel: Obtain each type through one source from a single manufacturer.
2. Suspension System: Obtain each type through one source from a single manufacturer.
B. Source Limitations: Obtain each type of acoustical ceiling panel and supporting suspension system through one source from a single manufacturer.
C. Comply with the following Design codes:
1. 2012 International Building Code
2. 2012 International Fire Code
3. NFPA 1, 2010 Edition
4. NFPA 101, 2010 Edition
D. Fire-Test-Response Characteristics: Provide acoustical panel ceilings that comply with the following requirements:
1. Fire-Resistance Characteristics: Where indicated, provide acoustical panel ceilings identical to those of assemblies tested for fire resistance per ASTM E 119 by UL or another testing and inspecting agency acceptable to authorities having jurisdiction.
a. Fire-Resistance Ratings: Indicated by design designations from UL's "Fire Resistance Directory" or from the listings of another testing and inspecting agency.
b. Identify materials with appropriate markings of applicable testing and inspecting agency.
2. Surface-Burning Characteristics: Provide acoustical panels with the following surface-burning characteristics complying with ASTM E 1264 for Class A materials as determined by testing identical products per ASTM E 84:
ACOUSTICAL PANEL
095113 - 2
a. Smoke-Developed Index: 450 or less.
1.4 DELIVERY, STORAGE, AND HANDLING
A. Deliver acoustical panels, suspension system components, and accessories to Project site in original, unopened packages and store them in a fully enclosed, conditioned space where they will be protected against damage from moisture, humidity, temperature extremes, direct sunlight, surface contamination, and other causes.
B. Before installing acoustical panels, permit them to reach room temperature and stabilized moisture content.
C. Handle acoustical panels carefully to avoid chipping edges or damaging units in any way.
1.5 PROJECT CONDITIONS
A. Environmental Limitations: Do not install acoustical panel ceilings until spaces are enclosed and weatherproof, wet work in spaces is complete and dry, work above ceilings is complete, and ambient temperature and humidity conditions are maintained at the levels indicated for Project when occupied for its intended use.
1. Pressurized Plenums: Operate ventilation system for not less than 48 hours before beginning acoustical panel ceiling installation.
1.6 COORDINATION
A. Coordinate layout and installation of acoustical panels and suspension system with other construction that penetrates ceilings or is supported by them, including light fixtures, HVAC equipment, fire-suppression system, and partition assemblies.
PART 2 - PRODUCTS
2.1 ACOUSTICAL PANEL CEILINGS, GENERAL
A. Acoustical Panel Standard: Comply with ASTM E 1264.
1. Recycled Content: Provide acoustical panels with recycled content such that postconsumer recycled content plus one-half of preconsumer recycled content constitutes a minimum of 50 percent by weight.
B. Metal Suspension System Standard: Comply with ASTM C 635.
1. Recycled Content: Provide products made from steel sheet with average recycled content such that postconsumer recycled content plus one-half of preconsumer recycled content is not less than 25 percent.
C. Attachment Devices: Size for five times the design load indicated in ASTM C 635, Table 1, "Direct Hung," unless otherwise indicated. Comply with seismic design requirements.
095113 - 3 ACOUSTICAL PANEL
D. Wire Hangers, Braces, and Ties: Zinc-coated carbon-steel wire; ASTM A 641/A 641M, Class 1 zinc coating, soft temper.
1. Size: Select wire diameter so its stress at 3 times hanger design load (ASTM C 635, Table 1, "Direct Hung") will be less than yield stress of wire, but provide not less than 0.106-inch- diameter wire.
E. Hold-Down Clips: Manufacturer’s standard product; spaced 24 inches o.c. on all cross tees.
F. Metal Edge Moldings and Trim: Type and profile indicated or, if not indicated, manufacturer's standard moldings for edges and penetrations that comply with seismic design requirements; formed from sheet metal of same material, finish, and color as that used for exposed flanges of suspension system runners.
2.2 ACOUSTICAL PANELS FOR ACOUSTICAL PANEL CEILING
A. Acoustical Panel Type: ACP-1, ACP-2
1. Manufacturer and Product: Basis of design
a. USG; Radar ClimaPlus Ceiling.
b. USG; Clean Room ClimaPlus Class 100
2.…