Questions_Set_7_Clarification_to_Question_1.doc
DOC document 22 KB Posted
- Attached to
- Concrete Pads for Emergency Operations Tower
- Solicitation number
- W912GY19R0005
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W192GY19R00050001.pdf | ||
| Questions_and_Answers_Set_8.doc | DOC document | |
| Site_Visit_Sign_In_Sheet.pdf | ||
| Questions_and_Answers_Set_7.doc | DOC document | |
| Questions_and_Answers_Set_6.doc | DOC document | |
| Questions_&_Answers_Set_5.doc | DOC document | |
| Concrete_Pad_Location.jpg | JPG image | |
| Questions_and_Answers_Set_4.doc | DOC document | |
| Question_and_Answer_Set_3.doc | DOC document | |
| Questions_and_Answers_Set_2.doc | DOC document | |
| Questions_and_Answers_Set_1.doc | DOC document | |
| Visitor_Request_form1246R_Mar-2017.pdf | ||
| W912GY19R0005_-_CONCRETE_PADS_FOR_FIRE_TOWER.pdf | ||
| EOTT_Grading_Plan_and_Location_Drawing.pdf | ||
| BOLLARD_DETAIL.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions Set 7 Clarification to Question 1
Question 1- 5.2.4
CLARIFICATION:
The bidders must meet all plumbing codes in relation to tapping the existing 8inch metal water line with 6inch D900 plastic going to the new hydrant. The contractor will have to show that a "saddle" will meet code.
File details come from the government source that posted it.