Questions_and_Answers_Set_2.doc

DOC document 23 KB Posted

Attached to
Concrete Pads for Emergency Operations Tower
Solicitation number
W912GY19R0005
Issued by

View the file

Other files

File Type Posted
W192GY19R00050001.pdf PDF
Questions_and_Answers_Set_8.doc DOC document
Site_Visit_Sign_In_Sheet.pdf PDF
Questions_Set_7_Clarification_to_Question_1.doc DOC document
Questions_and_Answers_Set_7.doc DOC document
Questions_and_Answers_Set_6.doc DOC document
Questions_&_Answers_Set_5.doc DOC document
Concrete_Pad_Location.jpg JPG image
Questions_and_Answers_Set_4.doc DOC document
Question_and_Answer_Set_3.doc DOC document
Questions_and_Answers_Set_1.doc DOC document
Visitor_Request_form1246R_Mar-2017.pdf PDF
W912GY19R0005_-_CONCRETE_PADS_FOR_FIRE_TOWER.pdf PDF
EOTT_Grading_Plan_and_Location_Drawing.pdf PDF
BOLLARD_DETAIL.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers - Set 2

1. Exhibit 1 stated is the install of a tower after the concrete pad is placed.

Also in the SOW it gives mention to multiple concrete pads. I believe the

SOW was reduced and these statements are an oversite, agreed?

ANSWER: Agreed that these statements are an oversite. Concrete contractor will not install the tower. It is really 1 concrete pad that has a 5x5foot "tab" sticking out as I clearly stated that the hydrant pad rebar will tie into the main pad rebar.