Questions_and_Answers_Set_1.doc

DOC document 23 KB Posted

Attached to
Concrete Pads for Emergency Operations Tower
Solicitation number
W912GY19R0005
Issued by

View the file

Other files

File Type Posted
W192GY19R00050001.pdf PDF
Questions_and_Answers_Set_8.doc DOC document
Site_Visit_Sign_In_Sheet.pdf PDF
Questions_Set_7_Clarification_to_Question_1.doc DOC document
Questions_and_Answers_Set_7.doc DOC document
Questions_and_Answers_Set_6.doc DOC document
Questions_&_Answers_Set_5.doc DOC document
Concrete_Pad_Location.jpg JPG image
Questions_and_Answers_Set_4.doc DOC document
Question_and_Answer_Set_3.doc DOC document
Questions_and_Answers_Set_2.doc DOC document
Visitor_Request_form1246R_Mar-2017.pdf PDF
W912GY19R0005_-_CONCRETE_PADS_FOR_FIRE_TOWER.pdf PDF
EOTT_Grading_Plan_and_Location_Drawing.pdf PDF
BOLLARD_DETAIL.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers Set 1

1. The Grading Plan and Site Plan appears to show a center footer detail going both ways through the center of the new concrete pad, do you concur?

ANSWER: Concur. The footer goes thru the center and around the pad.

2. Detail 5.2.1 state that the compacted road base shall extend 5' around the perimeter of the pad. It also says that the base shall come within 2 feet of the existing road. Does this mean that in addition it will continue on one side of the to the 5' feet

It will continue approximately 42' to the road side on the side of the pad that the fire hydrant is located?

ANSWER: The five foot compacted road base will come within 2 foot of the south road. The hydrant is located off the east road that runs north-south.

3. Detail 5.2.2 addresses the psi of the concrete to be 4000, it does not however state that it shall be tested. Shall it be tested 3 cylinders per every 50 cubic yards an or a portion there of? Shall a slump test be done and if so how often?

ANSWER: Slump test on each concrete truck. 3 cylinders for every 50 cubic yards of concrete placed.