Questions_and_Answers_Set_7.doc

DOC document 23 KB Posted

Attached to
Concrete Pads for Emergency Operations Tower
Solicitation number
W912GY19R0005
Issued by

View the file

Other files

File Type Posted
W192GY19R00050001.pdf PDF
Questions_and_Answers_Set_8.doc DOC document
Site_Visit_Sign_In_Sheet.pdf PDF
Questions_Set_7_Clarification_to_Question_1.doc DOC document
Questions_and_Answers_Set_6.doc DOC document
Questions_&_Answers_Set_5.doc DOC document
Concrete_Pad_Location.jpg JPG image
Questions_and_Answers_Set_4.doc DOC document
Question_and_Answer_Set_3.doc DOC document
Questions_and_Answers_Set_2.doc DOC document
Questions_and_Answers_Set_1.doc DOC document
Visitor_Request_form1246R_Mar-2017.pdf PDF
W912GY19R0005_-_CONCRETE_PADS_FOR_FIRE_TOWER.pdf PDF
EOTT_Grading_Plan_and_Location_Drawing.pdf PDF
BOLLARD_DETAIL.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers Set 7

1. According to 5.2.4 the existing water line to be tapped in a 8 in steel line, and according to the grading plan you are asking for 8 in lateral, feeding a 5 1/4 inch hydrant. Can the lateral be down sized to a 6 in C900 line, or will the 8 inch main need to have a T cut in?

ANSWER: The lateral can be down sized to 6inch and can be C900 line.

2. Can you provide an approximate dept of the 8 inch main line.

ANSWER: Historically we have found the main water lines to be buried between 5 feet to 10 feet deep.