Questions_and_Answers_Set_8.doc
DOC document 23 KB Posted
- Attached to
- Concrete Pads for Emergency Operations Tower
- Solicitation number
- W912GY19R0005
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W192GY19R00050001.pdf | ||
| Site_Visit_Sign_In_Sheet.pdf | ||
| Questions_Set_7_Clarification_to_Question_1.doc | DOC document | |
| Questions_and_Answers_Set_7.doc | DOC document | |
| Questions_and_Answers_Set_6.doc | DOC document | |
| Questions_&_Answers_Set_5.doc | DOC document | |
| Concrete_Pad_Location.jpg | JPG image | |
| Questions_and_Answers_Set_4.doc | DOC document | |
| Question_and_Answer_Set_3.doc | DOC document | |
| Questions_and_Answers_Set_2.doc | DOC document | |
| Questions_and_Answers_Set_1.doc | DOC document | |
| Visitor_Request_form1246R_Mar-2017.pdf | ||
| W912GY19R0005_-_CONCRETE_PADS_FOR_FIRE_TOWER.pdf | ||
| EOTT_Grading_Plan_and_Location_Drawing.pdf | ||
| BOLLARD_DETAIL.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers Set 8
Item No. 0001 describes the scope of work and looks to be the only item that requires pricing.
Items No. A001, A002 & A003 state that these items are not separately priced and to not provide a price. Am I understanding that these items should be priced into Item No. 0001 or not priced at all?
ANSWER: The only line item that requires pricing is line item 0001. Line Items A001-A003 are contractor deliverables based on the performance work statement and are not separately priced. All costs associated with the project should be priced in line item 0001.