B.08.02.6 Arr 6 - BLG Template 19R0043.docx

DOCX document 13 KB Posted

Attached to
FY19 Command Control Facility and VMF, Chad
Solicitation number
W912GB19R0043
Issued by

About this file

Solicitation Attachments

View the file

Other files

File Type Posted
B.08.03_W912GB19R0043-0005_Extension.pdf PDF
B.08.04_ATTACHMENT_1__SOW_ar104_01010_2019-06-21_REVISED.pdf PDF
B.08.04_ATTACHMENT_2__SOW_ar123_01010_2019-06-21_REVISED.pdf PDF
B.08.04_W912GB19R0043-0004_SOWs_Updates.pdf PDF
B.08.03_W912GB19R0043-0003_Extension.pdf PDF
A.02.16_ar104_Att_6_NDJAMENA_C2_Location.pdf PDF
B.08.02_Att9_C2_VMF_Combined_-_MP_29_May_2019.docx DOCX document
ar104_01010_2019-05-29_Revised.docx DOCX document
ar123_01010_2019-05-24_Revised.docx DOCX document
B.08.03_W912GB19R0043-0002_SOWs_Updates,_Site_Visit,_Instructions.pdf PDF
B.01.03_W912GB19R0043_Amendment_0001.pdf PDF
B.08.02.2 SOW ar123_01010_2019-04-12.pdf PDF
B.08.02.1 SOW ar104_01010_12 APR 2019 Update.pdf PDF
B.08.02.1.1 ar104_Att 1_Conceptual Site Plan.pdf PDF
B.08.02.4 Past Performance Questionnaire - 19R0043.pdf PDF
B.08.02.1.3 ar104_Att 3_Room Data Sheets.pdf PDF
B.08.02.2.5 ar123 Att. 5 Structural Calculations Guideline.pdf PDF
B.08.02.2.2 ar123_Att_2_Conceptual Site Plan 2019-04-12.pdf PDF
B.08.02.2.1 ar123_Att1_LocationMap.pdf PDF
B.08.02.2.6 ar123_Att_6_Geotechnical Report for Adjacent Site.pdf PDF
B.08.02_W912GB19R0043_RFP_Faya_VMF_and_NDjamena_C2.pdf PDF
B.08.02.2.7 ar123_Att_7 Existing Generator Pad As-Builts.pdf PDF
B.08.02.1.5 ar104_Att 5_NASS BYOT ASSEMBLY INSTRUCTIONS.PDF PDF
B.08.02.1.2 ar104_Att 2_Conceptual Floor Plan_12 APR 19_update.pdf PDF
B.08.02.7 Att 7 Specification Binder.pdf PDF
B.08.02.1.4 ar104_Att 4_Structural Calculations Guideline.pdf PDF
B.08.02.2.4 ar123_Att_4 Vehicle for planning.pdf PDF
B.08.02.2.3 ar123_Att_3_Architectural Drawings.pdf PDF
B.08.02.3 Preproposal Conf Attendee Info Sheet.xlsx XLSX spreadsheet
B.08.02.5 Att 5 - BLA Template 19R0043.docx DOCX document
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BANK LETTER OF GUARANTEE

(BANK LETTERHEAD)

US Army Corps of Engineers Europe District Konrad Adenauer Ring 39, Box 7 ATTN: Contracting Officer 65187 Wiesbaden, Germany

LETTER OF GUARANTEE NUMBER:_______________ DATE:_________

I/We, the undersigned, acting as the duly authorized representative of the Bank, declare that the Bank hereby guarantees and is jointly and severally liable as the guarantor with FILL-IN (CONTRACTOR NAME) (herein after called the Contractor), to effect payment to the Contracting Office by check made payable to the Treasury of the United States, within five (5) calendar days after receipt of a simple request, by registered mail, from the Contracting Officer designated in the contract described below, or his successor, immediately and entirely without any need for the Contracting Officer to protest or take any legal action or obtain the prior consent of the Contractor, or for any other proof, action or decision by any other authority, up to the sum of €4,800,000, which represents the deposit required of the Contractor to guarantee fulfillment of its obligation for the satisfactory completion and timely performance of the work under Contract W912GB-19-D-00XX for JOB ORDER CONTRACT dated (AWARD DATE) at ITALY, in strict compliance with the terms and conditions of said contract, entered into between the United States of America and the Contractor, plus legal interest to be calculated from the date of receipt of the Contracting Officer’s registered letter request until the date of payment. Registered letter request shall inform the Bank that the Contractor failed to comply with the terms and conditions of the contract, or did not fulfill his undertaking in whole or in part.

I/We agree and consent that said contract may be modified by change order or supplemental agreement, affecting the contract amount and/or time of performance without prior consent of the bank and without affecting the validity of this guarantee; provided, however, that the amount of this guarantee shall be adjusted as required under the provisions of contract clause 52.228-2, Additional Bond Security (Oct 1997).

This letter of guarantee will continue in effect until the work has been finally accepted by the Government, and will continue thereafter in an amount equal to Five Percent (5%), until all applicable guarantees, or extensions thereof under the contract, have expired.

NAME & ADDRESS OF THE BANK

Signed By: ______________________________________

(TYPE NAME UNDERNEATH SIGNATURE)

Title:_______________________________________
Endorsement By:_______________________________________
(TYPE NAME UNDERNEATH SIGNATURE)
Title:_______________________________________

NOTE: Certificate of Authority is attached evidencing authority of the signers to bind the bank in this document.

File details come from the government source that posted it.