Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this Amendment is to correct the Bidder Inquiry Key Code and provide an update to the pre-proposal conference. Please see paragraphs 2.c. and 3 w ithin Section 00 21 00 - Instructions, A. Proposal Submission for updates.
1. CONTRACT ID CODE PAGE OF PAGES
1 8
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912GB19R0043
X 9B. DATED (SEE ITEM 11)
10-May-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
U0001
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
14-May-2019
CODE
CONTRACTING DIVISION
US ARMY CORPS OF ENGINEERS
KONRAD ADENAUER RING 39
D-65187 WIESBADEN GERMANY
WIESBADEN 65187
W912GB 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912GB19R0043
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 21 00 - INSTRUCTIONS
The following have been modified:
INSTRUCTIONS TO OFFERORS
A. PROPOSAL SUBMISSION
1. Introduction. To assure timely and equitable evaluation of proposals, Offerors must follow the instructions contained herein. Offerors are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors. The Offeror shall submit in the proposal all requested information specified in this section of the Request for Proposal (RFP) solicitation at or before the exact time specified. There will be no public opening of the proposals received as a result of this RFP. Failure to meet a requirement may result in an offer being ineligible for award. Copies of the RFP are available by INTERNET ACCESS ONLY. All RFP documents will made available for viewing at the Federal Business Opportunities (FBO) website (http://www.fbo.gov). All amendments will be made available for viewing in FBO. It shall be the Offeror’s responsibility to check the website for any amendments.
2. Preproposal Conference. The Government will hold a pre-proposal conference. Details are as follows:
a. Location: The conference will be located on site at the C2 Node Fusion Center project location in Ndjamena, Chad (GPS coordinates 12°08'10.55"N, 15°01'54.29"E).
b. Time/Date: The conference will take place the week of 10 June 2019. An exact date and time will be provided via solicitation amendment.
c. Registration Instructions: Offerors must pre-register their attendees no later than 27 May 2019 at 1700 Central European Summer Time. To Pre-Register, complete the site visit attendee information sheet (RFP attachment) submit via email to the solicitation points of contact listed in RFP section 00 00 00. Offerors MUST pre-register in order to attend the pre-proposal conference.
3. Inquiries. Offerors with technical inquiries shall submit their inquiries in writing via “Bidder
Inquiry” in ProjNet at www.projnet.org\projnet. The bidder inquiry key is 446XX6-KYR3C6. The government reserves the right to decline addressing certain questions. Further, no questions, unless in the government’s interest, will be answered any later than ten calendar days prior to the stated deadline for offers. All Offerors are encouraged to register on ProjNet for alerts so as to stay abreast of Q&A’s that are posted in reference to this solicitation. Only self-registered users on ProjNet can submit & review inquiries. To self-register, go to the webpage, click BID tab, select Bidder Inquiry, select agency USACE, enter the key for this solicitation listed above and your email address. After initial login, enter all the required information to create your user ID. Verify the information on the next screen and from there you may submit and view inquiries. Those submitting inquiries will receive a system generated email notification when their inquiry has been processed and answered. It is the Offeror’s responsibility to monitor for inquiries and responses.
4. General Proposal Submission Requirements.
d. Electronic Proposals. In an effort to reduce paperwork and costs, ALL RESPONSES TO
THIS ANNOUNCEMENT SHALL BE SUBMITTED ELECTRONICALLY. Hand carried delivery or
USPS/UPS/Fedex delivery of hard copies and/or CD-ROMs are not authorized. Facsimile submission is not authorized. Email submission is not authorized. ELECTRONIC PROPOSAL SUBMISSION IS
REQUIRED THROUGH THE FEDBIZOPPS (FBO.GOV) “ELECTRONIC RESPONSE” FEATURE.
The FBO vendor user guide has information & instructions on how to utilize this feature. The FBO vendor user guide is accessible via the following web URL:
https://www.fbo.gov/downloads/FBO_Vendor_Guide.pdf.
e. File Size Limitations. Offerors are advised to follow the FBO instructions for uploading files larger than 10MB (java upload). FBO has not posted official file size limitations for its electronic response module, however it has been observed that uploads to FBO tend to be problematic when the files are sized 100MB or greater. If needed, Offerors are advised to break the files down into smaller sections in order to upload it to the system. In such cases, please divide the sections as logically as possible and be sure to clearly name the files as specified below.
f. File Names. To ensure your submission is received and processed appropriately, it is important that interested parties CAREFULLY ensure their electronic files adhere to the following naming convention: Each filename shall begin with the solicitation number, followed by the word “RESPONSE”, followed by your firm’s name, and finally a brief file description. EXAMPLES:
(1) “W912GB19R0043 RESPONSE Firmname Volume I.pdf”
(2) “W912GB19R0043 RESPONSE Firmname Volume I Part 1.pdf”
(3) “W912GB19R0043 RESPONSE Firmname Volume I Part 2.pdf”
(4) “W912GB19R0043 RESPONSE Firmname Volume I diagrams, figures.pdf”
(5) “W912GB19R0043 RESPONSE Firmname Volume II.pdf”
g. File Organization, Formatting, and other instructions. Although hard copies are not accepted, each file shall be clearly indexed, and logically assembled. Font size shall be 10 or larger.
Pages shall be letter sized--larger page sizes (such as 11x17 foldouts, etc.) will be counted as two pages. Offerors shall prepare proposals in the English language. Proposals shall be in a narrative format, organized and titled so that each section of the proposal follows the order and format of the factors. Information presented should be organized so as to pertain to only the evaluation factor in the section that the information is presented. Information pertaining to more than one evaluation factor should be repeated in the each section for each factor. Electronic files shall be Microsoft Windows compatible. Files shall be submitted in their native format (i.e. doc, xls, ppt, etc.), or if in pdf format, shall be in searchable text. If the electronic files are of a size at which they must be compressed (zipped), they shall be compressed into one zipped folder.
h. Upload Completion & Deadline. Interested parties shall submit responses no later than the date specified on solicitation document. The time & date of proposal receipt will be the upload completion / delivery time & date recorded within FBO. Do not assume that electronic submission will occur instantaneously. Large files (e.g. 10MB or more) will take some time to upload. Offerors should time their upload effort with prudence by not waiting until the last few minutes—this will allow for unexpected delays in the transmittal process and troubleshooting. Proposal submission difficulties should be coordinated with the Federal Service Desk at https://fsd.gov and/or +1-866-606-8220 (Mon-Fri 8am- 8pm Eastern Time UTC -5:00). Experience shows that if an upload doesn’t complete until after the deadline, the FBO system WILL NOT COMPLETE. The FBO system will automatically shut off the “Electronic Submission” feature at the specified deadline--once that occurs, the feature will disappear from the announcement. Offerors are encouraged to keep a copy of the upload confirmation for their record.
Submissions after the deadline may be emailed to MSG Natasha McKellum, Contract Specialist (Natasha.S.Mckellum@usace.army.mil), but be advised they will be considered late and as such will be processed in accordance with FAR 15.208.
i. Any information, presented in a proposal that the Offeror wants safeguarded from disclosure to other parties must be identified and labeled in accordance with the requirements of Provision “FAR 52.215-1, Instructions to OfferorsCompetitive Acquisition (Jan 2004),” subparagraph (e), which is found in Section L of the RFP. The Government will endeavor to honor the restrictions against release requested by Offerors, to the extent permitted under United States law and regulations.
j. SPECIAL NOTICE: System for Award Management. Please take notice that the System for Award Management (SAM, www.sam.gov) has a new entity registration requirement that firms submit an "original, signed notarized letter identifying the authorized Entity Administrator for the entity associated with the Data Universal Numbering System (DUNS) number before the registration will be activated." This applies to all new entity registrations and all entity registration renewals, effective 29 April 2018. Further information behind this new requirement is posted to the General Services Administration's (GSA) announcement page at https://www.gsa.gov/samupdate. Please also refer to Federal Service Desk's (FSD) instructions on how to comply with this new requirement.
NOTE: the instructions are different for domestic (U.S. based) and international (not U.S. based) firms.
Offerors are reminded that this solicitation includes the provision FAR 52.204-7 SAM or FAR 52.212- 1 Instructions to Offerors--Commercial Items, and the resulting award will include the clause FAR 52.204-13 SAM Maintenance or 52.212-4 Contract Terms and Conditions--Commercial Items. These provisions/clauses require all contractors to register and maintain an active SAM entity registration in order to be eligible for contract awards, as prescribed by the regulation at FAR Subpart 4.11. In order to eligible for the contract award resulting from this solicitation, Offerors are advised to take immediate action to ensure your SAM entity registration is current and/or will be current at the time of proposal receipt by this contracting office. Instructions for domestic entities (located in the U.S. or its outlying areas): https://fsd.gov/fsd-gov/answer.do?sysparm_kbid=d2e67885db0d5f00b3257d321f96194b&sysparm_search=kb0013183.
Instructions for international entities (not located in the U.S. or its outlying areas):
https://www.fsd.gov/fsd-gov/answer.do?sysparm_kbid=dbf8053adb119344d71272131f961946&sysparm_search=KB0013221
2. Submission Requirements, Volume I, Non-Price Proposal: Volume I shall include a section for each Non-
Price factor, as described above under Evaluation Factors. Volume I shall be organized as follows:
a. Section A - Executive Summary. Include a one page cover letter, the Proposal Data Sheet not to exceed one page (Appendix L1), and any applicable executed joint venture agreements or other evidence of formal teaming agreements.
i. JV agreements shall include the following:
(1) A copy of their JV agreement in English, signed by all parties of the JV.
(2) A detailed statement outlining the following in terms of percentages, where appropriate:
(a) The relationship of the joint venture parties in terms of business ownership, capital contribution, and profit distribution or loss sharing.
(b) The management approach of the joint venture in terms of who will conduct, direct, supervise and control the project and have custody and control of the assets of the joint venture and perform the duties necessary to complete the work.
(c) The structure of the joint venture and decision-ranking responsibilities of the joint venture parties in terms of who will control the manner and method of performance of the work.
(d) Identification of the key personnel having authority to legally bind the joint venture to subcontracts and state who will provide or contract for the labor and materials for the joint venture.
(e) Identification of party maintaining the joint venture bank accounts for the payment of all expenses and the deposits of all receipts, keep the books and records, and pay applicable taxes for the joint venture.
(f) Identification of party furnishing the facilities, such as office supplies and telephone service.
(g)Identification of party having overall control of the joint venture.
(3) Other sections of the proposal shall identify, where appropriate, whether key personnel are employees of the individual joint venture parties and identify the party, or hired as employees of the joint venture.
(4) If one of the joint venture parties possesses relevant experience and/or past performance, the experience and/or past performance of that firm will be considered as the experience and/or past performance of the joint venture.
(5) A complete and legally binding document with all the information required under this section titled “Joint Ventures” shall be included.
ii. Other formal teaming agreements shall include the following:
(1) A copy of their teaming agreement in English, signed by all parties of the team.
a. Section B- Factor 1, Technical Approach. The Government requires that the Offeror provide the following:
i. Offerors shall submit their proposed technical approach to achieve all necessary tasks covered in the SOW. At a minimum, the Offeror shall include their technical approach to the design build of the Command and Control Node Fusion Center and the Vehicle Maintenance Facility as provided within the SOWs. There is a limit of twenty (20) single spaced typed pages (A4 or letter size), using at a minimum a 12 pitch font. If more than twenty pages (20) are submitted, only the first twenty (20) pages will be reviewed and evaluated. The methodology shall state at a minimum:
(1) Typical number of people per team
(2) Make up of teams by trade displayed in an Organization chart with explanations
(3) Tools, equipment, special equipment requirements
(4) Cost effectiveness in accomplishing tasks to include purchase of building materials
(5) Capital Management Plan that includes discussion of how the Offeror plans to track and financially plan for Value Added Tax (VAT) reimbursements or exemptions applicable to work in the Host Nation
(6) Safety processes
(7) Knowledge of requirements and constraints applicable to work in the Host Nation
(8) Plan to perform multiple projects at the same time
(9) Maintaining internet connectivity/communications due to remote locations.
ii. Subcontracting Plan that specifies the technical aspects to be conducted by the prime and subcontractor, and explains how the Offeror will use proposed personnel and sub-contractor resources to assure the delivery of quality workmanship in accordance with the SOW. The subcontracting plan shall also include the name, address, DUNS number and CAGE/NCAGE code for any Architect-Engineer subcontractor identified in the proposal.
b. Section C- Factor 2, Schedule. Offerors shall include a schedule and an accompanying narrative with the minimum components listed below, and using the assumptions specified herein.
i. Schedule Narrative. The schedule narrative shall define the primary assumptions made, skilled labor requirements for critical work (e.g. cast-in-place concrete) and critical elements of the Offeror’s schedule shall be included. The narrative should identify how the Offeror will manage 30, 60 and 90 day out submittals and look ahead at potential issues and how they will work to resolve them beforehand. The narrative shall include a discussion of how the Offeror will manage subcontractors from a schedule perspective. The narrative shall not exceed 5 pages.
ii. Schedule. The schedule submission may be submitted in Primavera "xer", Excel, Word, or pdf file format and shall be specifically-tailored to the project contemplated by this solicitation.
The schedule should clearly demonstrate critical milestones throughout, the anticipated overall critical path, and any parallel activities. The schedule should clearly identify schedule constraints as they relate to the site access for workers and delivery of materials, long lead items, the Government’s periods for review and approval of submittals, anticipated delays throughout, etc.
The schedule should show activities between contract Award and Notice to Proceed (NTP), and also NTP to Beneficial Occupancy Date (BOD). The schedule should clearly distinguish between prime and subcontractor activities. Offerors must account for the restrictions associated with local holidays and United States holidays. The schedule should include at a minimum the activities listed below:
(1) Contract Award
(2) BLG, Insurance Submission and other pre-construction approvals
(3) NTP
(4) Preconstruction Submittals
(5) Design Submittals
(6) Construction Start & DFOW
(7) Initial & Final Inspections
(8) Construction Completion
(9) Closeout Documents
(10) Warranty Period
iii. Schedule Assumptions. For the purposes of evaluation under this factor, the Offeror should utilize the following assumptions: plan for a 365 calendar day construction duration, Offeror shall use the dates of 31 August 2019 for award and 7 September 2019 for issuance of the NTP, and should prepare the schedule assuming that all base line items and options will be awarded on that date.
c. Section D- Factor 3, Past Performance. Offerors shall provide Project Details of up to three (3) projects substantially complete or completed by the prime contractor within the last six (6) years which are similar to this project in size, scope, and location. For each project submitted, Offerors shall provide a completed Project Detail Sheet included at Appendix A, and either a completed CPARS record or a completed PPQ (see below for further details). Projects considered similar in size will have a dollar value between $500,000 and $1,500,000. Offerors may submit higher valued projects if there is a distinct scope of work with a measurable monetary value with a larger project that is considered relevant to this procurement. Projects considered similar in scope include construction of new facilities, design build, single and multi-story, structural work, architectural work, building systems (mechanical, electrical, water, sewer, etc). The prime contractor must have self-performed at least 15% of the direct contract labor (including testing and layout personnel), exclusive of other general condition or field overhead personnel, material, equipment, or subcontractors to be considered similar. Projects will be considered similar in location if they were performed in Chad, and, to a lesser extent Sahel region and then Africa. An Indefinite Delivery Indefinite Quantity (IDIQ) contract may be submitted only if a single task order could be considered similar to this project. Task orders may not be combined in order for the project to be considered similar.
If available, a final completed record from the Contractor’s Performance Assessment Reporting System (CPARS) will be accepted for evaluation under this factor. An interim CPARs rating will be considered as long as the minimum requirements have been met. If a final completed CPARS record is not available, Offerors shall complete and provide a Past Performance Questionnaire (PPQ) (Enclosed).
PPQ Instructions: The offeror shall complete Blocks 1-4 of the provided Past Performance Questionnaire (Enclosed) and have the Contracting Activity and the Technical Representative responsible for the past/current contract complete the remainder of the Past Performance Questionnaire. Offeror shall ensure correct phone numbers and email addresses are provided for the client point of contact. Completed Past Performance Questionnaires shall be submitted with the proposal. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror shall complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government’s point of contact via email no later than the closing date of this RFP. For projects which were performed for other government entities that do not use CPARS, submit the performance appraisal sheets used by that government entity if available. Also include performance recognition documents received for the projects such as awards, award fee determinations, customer letters of commendation, and any other forms of performance recognition. Offerors shall provide a copy of any Cure Notices or Show Cause Letters received by the offeror for each submitted project and a description of any corrective action implemented by the offeror. The offerors shall indicate if any of the contracts listed were terminated and the type and reasons for the termination. The Government may call and confirm information provided by the offeror on the Past Performance Information Sheet with the points of contact. The Government reserves the right to interview other individuals if the point of contact is not available. If an offeror has no relevant past performance history, the offeror must affirmatively state that it possesses no relevant directly related or similar past performance.
While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.
NOTE: For purposes of evaluating past performance, the Prime Contractor is defined as the contractor identified in Block 14 of the Standard Form 1442. If more than one contractor is listed in Block 14, then a signed joint venture must be submitted with the proposal and the joint venture shall be registered as such in the System for Award Management (SAM). However, each party of the Joint Venture must submit their own DUNS number with the JV proposal. Projects performed by other contractors than the offeror, such as teaming partners or subcontractors, will not be evaluated for past performance, unless those other contractors are part of a joint venture offeror as demonstrated by a signed joint venture agreement. If the Offeror represents the combining of two or more companies as a joint venture for the purpose of this RFP, each company in the joint venture may submit project examples, but the total submitted by the joint venture will not exceed three (3).
3. Volume II, Administrative Matters: Volume II shall include the following:
a. Section A- A completed Standard Form (SF) 1449, using a printed copy of the SF 1449 included in this solicitation for the contract. As applicable, Offerors shall also submit a completed SF 30 for each solicitation amendment, acknowledging the amendments.
b. Section B- Section D – SAM Registration, Representations & Certifications. Offerors shall submit the following:
i. A completed clause FAR 52.204-8(d).
ii. A copy of their current “Entity Registration” in the System for Award Management
(SAM) as recorded at www.sam.gov, showing the following sections: “core data, “assertions”, and “POCs”.
iii. A copy of their current “FAR and DFARS Report” that demonstrates all completed representations and certifications as recorded at www.sam.gov.
c. Section C-Financial Information Offerors shall submit financial information to demonstrate they have adequate financial resources to perform the contract, or the ability to obtain them. For example, past three years financial statements, annual reports, Dun & Bradstreet Ratings, and/or bank name, number and POC, etc.
B. DISCUSSIONS
1. GENERAL INFORMATION. The Government intends to award without discussions, in accordance with the provisions of the RFP and applicable acquisition regulations. The Government will evaluate offers in accordance with the NON-PRICE EVALUATION FACTORS as described above. Pursuant to FAR 15.306(d), however, discussion sessions may be held if the Contracting officer determines them necessary to determine that award will satisfactorily provide the Government its requirement. Should discussions take place, a competitive range will be established, and all Offerors in the competitive range will be allowed an opportunity to submit Final Proposal Revisions. In addition, if the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.
2. DISCUSSION SCHEDULING. If discussions are conducted, the Contracting Officer will schedule the discussion sessions, and each Offeror will be notified in advanced. The Contracting Officer will provide additional instructions with the notification.
(End of Summary of Changes)