Amendment_0001_Specifications_24_May_17.pdf
PDF 1 MB Posted
- Attached to
- Construction - Peace Vector (PV) VII Package C in Cairo, Egypt Federal contract opportunity
- Solicitation number
- W912ER-17-R-0011
About this file
Amendment 0001 Revised Specs
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PV VII, Package C, Cairo West Air Base, Egypt 402784
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 15 00.12 10 SUPPLEMENTARY REQUIREMENTS
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 31 19.05 20 POST AWARD MEETINGS
01 32 17.12 10 COST-LOADED NETWORK ANALYSIS SCHEDULES (NAS)
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 42 15 METRIC MEASUREMENTS
01 45 00.00 10 QUALITY CONTROL
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE(RMS CM)
01 45 35 SPECIAL INSPECTIONS
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 58 00 PROJECT IDENTIFICATION
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION AND DECONSTRUCTION
02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs
AND MERCURY
DIVISION 03 - CONCRETE
03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING
03 15 00.00 10 CONCRETE ACCESSORIES
03 20 00.00 10 CONCRETE REINFORCING
03 30 00.00 10 CAST-IN-PLACE CONCRETE
03 35 00.00 10 CONCRETE FINISHING
03 37 13 SHOTCRETE
03 39 00.00 10 CONCRETE CURING
03 42 13.00 10 PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE
CONSTRUCTION
DIVISION 04 - MASONRY
04 20 00 UNIT MASONRY
DIVISION 05 - METALS
05 12 00 STRUCTURAL STEEL
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS REVISED BY AMENDMENT 0001
05 51 33 METAL LADDERS
05 52 00 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
06 61 16 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
PROJECT TABLE OF CONTENTS Page 1 W912ER-17-R-0011 Amendment 0001
07 14 00 FLUID-APPLIED WATERPROOFING
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 41 63 FABRICATED ROOF PANEL ASSEMBLIES ADDED IN ENTIRETY BY
AMENDMENT 0001
07 52 00 MODIFIED BITUMINOUS MEMBRANE ROOFING
07 55 00 PROTECTED MEMBRANE ROOFING
07 60 00 FLASHING AND SHEET METAL
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 33 23 OVERHEAD COILING DOORS
08 51 13 ALUMINUM WINDOWS
08 51 23 STEEL WINDOWS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 23 00 GYPSUM PLASTERING
09 24 23 CEMENT STUCCO
09 26 00 VENEER PLASTER
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 11 00 VISUAL DISPLAY UNITS
10 14 00.10 EXTERIOR SIGNAGE
10 14 00.20 INTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
10 51 13 METAL LOCKERS
DIVISION 11 - EQUIPMENT
11 11 00 VEHICLE SERVICE EQUIPMENT
11 68 33 ATHLETIC FIELD EQUIPMENT
DIVISION 12 - FURNISHINGS
12 21 00 WINDOW BLINDS
12 24 13 ROLLER WINDOW SHADES
12 51 00 FURNITURE, FURNISHINGS AND EQUIPMENT (FFE)
DIVISION 13 - SPECIAL CONSTRUCTION
13 34 19 METAL BUILDING SYSTEMS
13 48 00 SEISMIC PROTECTION FOR MISCELLANEOUS EQUIPMENT
PROJECT TABLE OF CONTENTS Page 2
13 48 00.00 10 SEISMIC PROTECTION FOR MECHANICAL EQUIPMENT
DIVISION 21 - FIRE SUPPRESSION
21 22 00.00 40 CLEAN AGENT FIRE EXTINGUISHING SYSTEMS
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
22 15 13.16 40 HIGH-PRESSURE COMPRESSED-AIR PIPING, PIPING COMPONENTS,
AND VALVES, STAINLESS
22 31 00 WATER SOFTENERS, CATION-EXCHANGE (SODIUM CYCLE) REVISED
BY AMENDMENT 0001
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 08 00.00 10 COMMISSIONING OF HVAC SYSTEMS
23 23 00 REFRIGERANT PIPING
23 35 00.00 10 OVERHEAD VEHICLE TAILPIPE AND WELDING FUME EXHAUST
REMOVAL SYSTEM(S)
23 82 02.00 10 UNITARY HEATING AND COOLING EQUIPMENT
DIVISION 26 - ELECTRICAL
26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT
26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 35 43 60 AND 400-HERTZ (HZ) SOLID STATE FREQUENCY CONVERTERS
26 41 00 LIGHTNING PROTECTION SYSTEM
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
26 56 20.00 10 AIRFIELD AND HELIPORT LIGHTING AND VISUAL NAVIGATION AIDS
REVISED BY AMENDMENT NO. 0001
DIVISION 27 - COMMUNICATIONS
27 05 28.36 40 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
27 51 16 RADIO AND PUBLIC ADDRESS SYSTEMS
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 64.00 10 FIRE DETECTION AND ALARM SYSTEM, ADDRESSABLE
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID
PAVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
32 11 16 SUBBASES FOR FLEXIBLE PAVING
32 11 23 GRADED-CRUSHED AGGREGATE BASE COURSE
32 12 10 BITUMINOUS TACK AND PRIME COATS
PROJECT TABLE OF CONTENTS Page 3
32 12 15.13 HOT-MIX ASPHALT AIRFIELD PAVING
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE
FACILITIES
32 13 73 COMPRESSION JOINT SEALS FOR CONCRETE PAVEMENTS
32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS
32 17 24.00 10 PAVEMENT MARKINGS
32 31 13.53 HIGH-SECURITY CHAIN LINK FENCES AND GATES
32 84 23 UNDERGROUND SPRINKLER SYSTEMS
32 92 19 SEEDING
32 93 00 EXTERIOR PLANTS
DIVISION 33 - UTILITIES
33 05 23.19 TRENCHLESS EXCAVATION USING MICROTUNNELING
33 11 00 WATER UTILITY DISTRIBUTION AND STORAGE REVISED BY
AMENDMENT 0001
33 30 00 SANITARY SEWERS
33 32 13.13 PACKAGED SEWAGE LIFT STATIONS, WET WELL TYPE
33 40 00 STORM DRAINAGE UTILITIES
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 72 02 UNDERGROUND COMMUNICATION SYSTEM
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT
41 22 13.15 BRIDGE CRANES, OVERHEAD ELECTRIC, UNDER RUNNING
DIVISION 46 - WATER AND WASTEWATER EQUIPMENT
46 07 53.13 PACKAGED WASTEWATER TREATMENT EQUIPMENT, AERATION
46 25 14 COALESCING OIL-WATER SEPARATORS
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 4
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 80 PAGES
PV VII, Package C, Cairo West Air Base, Egypt
01 14 00 SD-01 Preconstruction Submittals
1.3.1.1 G M/RList of Contact Personnel
1.3.6 G RTools and Equipment Inventory
List
01 15 00.12 10 SD-01 Preconstruction Submittals
1.2 G M/RForeign Objects Damage (FOD)
Control Plan
1.3.2 G M/RRequests for Digging Permits
1.5 G M/RProposed Means of Providing
Project Security
1.21.2 G M/RRequests for Hot Work Permits
1.22.2 G M/RShipping Documents
1.24.3.2 G M/RShipping Status Report
SD-07 Certificates
1.6Certificates Of Compliance
SD-11 Closeout Submittals
1.8.1.7 G M/RReports and Records
1.8.1.7 G M/RReports and Records
1.17 G M/RInventory of All Excess Supplies, Materials and Equipment
1.8.1.4 G M/RContractor Furnished
Computerized Maintenance
Management System (CMMS)
01 31 19.05 20 SD-01 Preconstruction Submittals
1.3.6 G M/RProject Schedule
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 80 PAGES
01 31 19.05 20 1.3.5Performance Assessment Plan
(PAP)
GM/R
01 32 17.12 10 SD-01 Preconstruction Submittals
G M/RQualifications
G M/RBaseline Network Analysis
Schedule (NAS)
SD-07 Certificates
G MMonthly Network Analysis
Schedule Update
SD-11 Closeout Submittals
G M/RAs-Built Schedule
01 33 00 SD-01 Preconstruction Submittals
1.8 G M/RSubmittal Register
01 35 26 SD-01 Preconstruction Submittals
1.7 G M/RAccident Prevention Plan (APP)
SD-06 Test Reports
1.4 G M/RMonthly Exposure Reports
1.12Notifications and Reports
1.12.2 G M/RAccident Reports
1.12.3 G M/RLHE Inspection Reports
SD-07 Certificates
1.6.1.4Crane Operators/Riggers
1.7.2.2 G M/RStandard Lift Plan
1.7.2.3 G M/RCritical Lift Plan
1.8 G RActivity Hazard Analysis (AHA)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 80 PAGES
01 35 26 1.9.1 G RConfined Space Entry Permit
1.9.1 G RHot Work Permit
1.12.4Certificate of Compliance
1.14License Certificates
1.14.1 G RRadiography Operation Planning
Work Sheet
G RDaily Quality Control Report
01 45 00.00 10 SD-01 Preconstruction Submittals
3.2 G M/RContractor Quality Control (CQC)
Plan
SD-06 Test Reports
3.9Verification Statement
01 45 35 SD-01 Preconstruction Submittals
3.1.2Written Practices
3.1.2NDT Procedures and Equipment
Calibration Records
SD-06 Test Reports
3.1.2Daily Reports
3.1.1Biweekly Reports
SD-07 Certificates
2.1Fabrication Plant
2.1AC472 Accreditation
2.1Certificate of Compliance
1.5 GSpecial Inspector
3.1.2Qualification Records
01 50 00 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 80 PAGES
01 50 00 1.3Construction Site Plan
G; M/R
Traffic Control Plan
01 58 00 SD-02 Shop Drawings
1.4.1Sign Legend Orders
G; M/R
01 78 00 SD-03 Product Data
1.7.1Warranty Management Plan
1.7.4Warranty Tags
1.5Spare Parts Data
SD-08 Manufacturer’s Instructions
1.7.1Instructions
SD-10 Operation and Maintenance
Data
3.7 G ROperation and Maintenance
Manuals
SD-11 Closeout Submittals
3.1As-Built Drawings
G; M/R
3.2.1Record Drawings
3.3Record Drawings
3.6As-Built Record of Equipment and Materials
3.4Final Approved Shop Drawings
3.5Construction Contract
Specifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 80 PAGES
01 78 23 SD-10 Operation and Maintenance
Data
1.4 G M/RO&M Database
3.1.1 G M/RTraining Plan
3.1.3 G M/RTraining Outline
3.1.2 G M/RTraining Content
SD-11 Closeout Submittals
3.1.4 G M/RTraining Video Recording
3.1.6 G M/RValidation of Training Completion
02 41 00 SD-01 Preconstruction Submittals
1.2.1 G M/RDemolition Plan
1.2.1 G M/RDeconstruction Plan
1.10 G M/RExisting Conditions
SD-07 Certificates
1.6 GNotification
SD-11 Closeout Submittals
3.3.3 G M/RReceipts
02 84 16 SD-07 Certificates
1.8.1 GQualifications of CIH
1.8.1 GTraining Certification
1.8.2 GPCB and Lamp Removal Work
Plan
1.8.3 GPCB and Lamp Disposal Plan
SD-11 Closeout Submittals
3.5.2 G M/RTransporter certification
3.2.4 G M/RCertification of Decontamination
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 80 PAGES
02 84 16 3.5.2.1 G M/RCertificate of Disposal and/or recycling
03 11 13.00 10 SD-02 Shop Drawings
2.2.1 G MFormwork
3.1.1 G MFormwork
2.2.1 G MForm Removal Schedule
SD-03 Product Data
2.2Form Materials
SD-04 Samples
1.3 G RSample Panels
SD-05 Design Data
2.1 G MCalculations
SD-06 Test Reports
3.2 G MInspection
03 15 00.00 10 SD-02 Shop Drawings
2.4 G MWaterstops
SD-03 Product Data
2.2Preformed Expansion Joint Filler
2.3Sealant
2.4Waterstops
SD-04 Samples
2.3.2 G RLubricant for Preformed
Compression Seals
2.3.3 G RField-Molded Type
2.4 G RWaterstops
2.5.1 G RSplicing Waterstops
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 80 PAGES
03 15 00.00 10 SD-07 Certificates
2.2Preformed Expansion Joint Filler
2.3Sealant
2.4Waterstops
03 20 00.00 10 SD-01 Preconstruction Submittals
3.1.3.2 G M/RButt-Splices
SD-02 Shop Drawings
3.1 G MReinforcement
SD-03 Product Data
2.3.1 GMechanical Butt-Splices
2.3 GReinforcing Steel
SD-06 Test Reports
2.7 G MTests, Inspections, and
Verifications
SD-07 Certificates
2.3Reinforcing Steel
1.3.1Qualification of Steel Bar
Butt-Splicers
03 30 00.00 10 SD-01 Preconstruction Submittals
1.5.2 G M/RQuality Control Plan
1.5.1 G M/RLaboratory Accreditation
3.8.5.6 G M/RSampling Plan
SD-03 Product Data
2.2Cementitious Materials
2.9Vapor Barrier
2.1.6Floor Finish
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 80 PAGES
03 30 00.00 10 2.4Chemical Admixtures
SD-04 Samples
2.4.5 G RSurface Retarder
SD-05 Design Data
2.1.1 G MMixture Proportions
3.3 G MLightweight Aggregate Concrete
SD-06 Test Reports
2.1.1 G MMixture Proportions
3.8 G MTesting and Inspection for CQC
2.3 G MAggregates
3.8.5.1 G MAir Content
3.8.5.3 G MSlump
3.8.5.6 G MCompressive Strength
2.5 G MWater
SD-07 Certificates
1.5Contractor Quality Control personnel
3.2.1Ready-Mix Plant
03 37 13 SD-06 Test Reports
2.2 G MMixture Proportions
2.1.2 G MAggregates
2.1.4 G MAccelerator Compatibility
1.3.2 G MPreconstruction Test Panels
SD-07 Certificates
2.1.1.1Portland Cement
2.1.1.2Silica Fume
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 80 PAGES
03 37 13 2.1.4Accelerating Admixtures
2.1.5Curing Materials
1.3.1 GQualifications
03 39 00.00 10 SD-03 Product Data
2.1Curing Materials
SD-06 Test Reports
3.2 G MTesting and Inspection for CQC
SD-08 Manufacturer’s Instructions
2.1Curing Compound
03 42 13.00 10 SD-01 Preconstruction Submittals
1.3.1.2 G M/RQuality Control Procedures
SD-02 Shop Drawings
2.1.1 G MStandard Precast Units
2.1.2 G MCustom-Made Precast Units
3.2.4.3 G MSpecial Finishes
SD-03 Product Data
2.1.1Standard Precast Units
2.1.3Proprietary Precast Units
3.1.3Embedded Items
2.2.4Accessories
SD-05 Design Data
2.1.2 G MDesign Calculations
2.1.5.1 G MConcrete Mix Proportions
SD-06 Test Reports
1.3.1.4 G MTest Reports
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 80 PAGES
03 42 13.00 10 1.3.1.2Quality Control Procedures
04 20 00 SD-02 Shop Drawings
3.3.3.1 G MCut CMU
3.4.1.1 G MDetail Drawings
SD-03 Product Data
1.5.1 GHot Weather Procedures
1.5.2 GCold Weather Procedures
2.2.2.2.1 GCement
2.4.1.1 GCementitious Materials
SD-04 Samples
2.2.2.2 G RConcrete Masonry Units (CMU)
2.4.1.3 G RAdmixtures for Masonry Mortar
2.6.2 G RAnchors, Ties, and Bar
Positioners
2.6.3 G RJoint Reinforcement
SD-05 Design Data
2.1.2 G MMasonry Compressive Strength
2.2.2.3 G MFire-Rated Concrete Masonry
Units
3.2.5 G MBracing Calculations
SD-06 Test Reports
2.2.2.3 G MFire-Rated Concrete Masonry
Units
3.6.1.1 G MField Testing of Mortar
3.6.1.2 G MField Testing of Grout
3.6.1.3 G MPrism Tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 80 PAGES
04 20 00 3.6.1.4 G MSingle-Wythe Masonry Wall
Water Penetration Test
SD-07 Certificates
1.3.1Special Masonry Inspector
Qualifications
2.2.2.2Concrete Masonry Units (CMU)
2.2.3Precast Concrete Units
2.4.1.1Cementitious Materials
2.4.1.3Admixtures for Masonry Mortar
2.4.2.2Admixtures for Grout
2.6.2Anchors, Ties, and Bar
Positioners
2.6.3Joint Reinforcement
SD-08 Manufacturer’s Instructions
2.4.1.3Admixtures for Masonry Mortar
2.4.2.2Admixtures for Grout
05 12 00 SD-01 Preconstruction Submittals
1.4.1.1 G M/RErection Drawings
SD-02 Shop Drawings
1.4.2 G MFabrication Drawings
SD-03 Product Data
2.6.2Shop Primer
2.4.1Welding Electrodes and Rods
2.4.2Non-Shrink Grout
2.3.2Tension Control Bolts
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 80 PAGES
05 12 00 2.6.2 G MClass B Coating
2.3 G MBolts, Nuts, and Washers
3.7.1.2 G MWeld Inspection Reports
3.7.2.1 G MBolt Testing Reports
3.7.3 G MEmbrittlement Test Reports
SD-07 Certificates
2.2Steel
2.3Bolts, Nuts, and Washers
2.5Galvanizing
1.4.3.1Welding Procedures and
Qualifications
2.4.1Welding Electrodes and Rods
05 40 00 SD-02 Shop Drawings
1.5.1 G MFraming Components
SD-03 Product Data
2.1Purlins
SD-07 Certificates
1.4Structural Cold-Formed Metal
Framing
3.2.1Welds
05 50 13 SD-02 Shop Drawings
2.5 G MCover plates and frames
2.6 G MExpansion joint covers
2.7 G MFloor gratings and walkways
2.9 G Mangles and plates
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 80 PAGES
05 50 13 2.5Cover plates and frames
2.3Control-joint covers
2.6Expansion joint covers
2.7Floor gratings and walkways
2.1.9 GPost-Installed Reinforcing Bars
And Adhesive Anchors
2.1.8 GMechanical Anchors
SD-04 Samples
2.6 G RExpansion joint covers
2.3 G RControl-joint covers
05 51 33 SD-02 Shop Drawings
2.3 G MLadders
SD-03 Product Data
2.3Ladders
SD-07 Certificates
1.3Fabricator Certification for Ladder
Assembly
1.3Fabricator Certification for Ships
Ladder Assembly
05 52 00 SD-02 Shop Drawings
1.2.1 G MFabrication Drawings
3.2 G MIron and Steel Hardware
3.2 G MSteel Shapes, Plates, Bars and
Strips
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 80 PAGES
05 52 00 2.2.1 GStructural Steel Plates, Shapes, and Bars
2.2.2 GStructural Steel Tubing
2.2.4 GCold-Finished Steel Bars
2.2.3 GHot-Rolled Carbon Steel Bars
2.2.5 GCold-Drawn Steel Tubing
2.1.2 GProtective Coating
2.2.8 GSteel Railings and Handrails
1.2.1 GAnchorage and Fastening
Systems
2.2.7 GPost-Installed Adhesive Anchors
2.2.7 GMechanical Anchors
SD-07 Certificates
1.4.1 GWelding Procedures
1.4.2 GWelder Qualification
SD-08 Manufacturer’s Instructions
3.2 GInstallation Instructions
06 10 00 SD-03 Product Data
1.8Fire-retardant treatment
2.1.1.1Plywood
SD-06 Test Reports
1.4.2 G MPreservative-treated
SD-07 Certificates
1.7Preservative treatment
06 41 16.00 10 SD-02 Shop Drawings
2.7 G MShop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 80 PAGES
06 41 16.00 10 3.1 G MInstallation
SD-03 Product Data
2.1Wood Materials
SD-04 Samples
2.3 G RPlastic Laminates
2.4 G RCabinet Hardware
SD-07 Certificates
1.4Quality Assurance
3.1Laminate Clad Casework
06 61 16 SD-02 Shop Drawings
3.1 G MInstallation
SD-03 Product Data
2.1Solid Polymer Material
2.3Fabrications
SD-04 Samples
2.1 G RMaterial
2.3.5 G RCounter Tops
2.3.4 G RWindow Stools
SD-06 Test Reports
2.1 G MSolid Polymer Material
SD-07 Certificates
2.3Fabrications
SD-10 Operation and Maintenance
Data
3.2 G RClean-up
07 14 00 SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 80 PAGES
07 14 00 2.1Fluid-applied membrane
2.2Membrane primer
2.7Elastomeric sheet
2.9Flexible foam-backed elastomeric sheet
3.3Solvent
3.4.1Moisture meter
2.10Protection board
2.6Bond breaker
SD-11 Closeout Submittals
1.6 G M/RWarranty
07 21 13 SD-03 Product Data
1.3 GManufacturer's Standard Details
2.1 GBlock or Board Insulation
1.4 GProtection Board or Coatings
2.2 GAccessories
SD-07 Certificates
2.1 GBlock or Board Insulation
1.7 GSpecial Warranties
1.7 GSpecial Warranties
SD-08 Manufacturer’s Instructions
2.1Block or Board Insulation
2.2.1Adhesive
07 21 16 SD-03 Product Data
2.1Blanket Insulation
2.3Accessories
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 80 PAGES
07 21 16 SD-08 Manufacturer’s Instructions
3.3.1Insulation
07 41 63 SD-01 Preconstruction Submittals
1.4.1 G M/RQualification of Manufacturer
1.4.1 G M/RQualification of Installer
1.4.1 G M/RQualifications for Welding
1.4.1 G M/RWork Plan
1.4.1 G M/ROn-Site Inspection and
Acceptance Procedure
SD-02 Shop Drawings
1.4.1 G MRoofing Panels
1.4.1 G MFlashing and Accessories
1.4.1 G MGutter/Downspout Assembly
SD-03 Product Data
1.4.1Sustainable Acquisition
1.4.1Coil Stock
1.4.1Factory Color Finish
1.4.1Sub-girts and Formed Shapes
1.4.1Closure Materials
1.4.1Insulation
1.4.1Pressure-Sensitive Tape
1.4.1Sealants and Caulking
1.4.1Rated Wall Assembly
1.4.1Galvanizing Repair Paint
1.4.1Enamel Repair Paint
1.4.1Accessories
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 80 PAGES
07 41 63 SD-04 Samples
1.4.1 G RCoil Stock
1.4.1 G RRoofing Panels
2.3.1.2 G RFasteners
2.5.1 G RMetal Closure Strips
1.4.1 G RInsulation
1.4.1 G RManufacturer's Color Charts and
Chips
SD-05 Design Data
1.4.1 G MWind Design Analysis
1.4.1 G MSeismic Design Analysis
SD-06 Test Reports
3.4.1.2 G MLeakage Tests
1.4.1 G MFire Rating Test Report
3.1 G MCoatings and Base Metals of
Metal Roofing
1.4.1 G MFactory Finish and Color
Performance Requirements
1.4.1 G MWind Uplift Test Report
1.4.1 G MSeismic Test Report
SD-07 Certificates
1.4.1Coil Stock
2.3.1.2Fasteners
1.4.1Galvanizing Repair Paint
1.4.1Enamel Repair Paint
1.4.1Safety Data Sheets
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 80 PAGES
07 41 63 2.4.3Coating Physical Properties
SD-08 Manufacturer’s Instructions
1.4.1Installation of Roof Panel
Assemblies
SD-11 Closeout Submittals
1.7 G M/RWarranty
3.3.5 G M/RInformation Form and Placard
3.4.2 G M/RManufacturer's Field Inspection
Reports
1.4.1 G M/RApplication Instructions
3.6.2 G M/RDate of Installation Wall-Mounted
Placard
1.7.1 G M/R20-year 'No-Dollar-Limit'
Warranty for Labor and Materials
07 52 00 SD-02 Shop Drawings
1.4.5 G MRoof plan
SD-03 Product Data
2.1 GModified Bitumen Sheets
2.3Asphalt
2.1 GFiberglass Felt
2.5 GPrimer
2.6 GModified Bitumen Roof Cement
2.9Pre-Manufactured Accessories
2.8 GFasteners And Plates
1.9 GWarranty
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 80 PAGES
07 52 00 1.4.1Qualification of Manufacturer
1.4.2Qualification of Applicator
1.5.1Bill of Lading
1.4.4 GWind Uplift Resistance
1.4.3 GFire Resistance
SD-08 Manufacturer’s Instructions
3.3.4 GModified Bitumen Membrane
Application
3.3.5 GFlashing
3.2.3.1Temperature Limitations for
Asphalt
2.5Primer
2.8.1Fasteners
3.3.3Ventilating Base Sheets
1.6 GCold Weather Installation
SD-11 Closeout Submittals
1.9 G M/RWarranty
3.9 G M/RInformation Card
3.8 G M/RInstructions To Government
Personnel
07 55 00 SD-02 Shop Drawings
1.2.1 G MRoof Assembly
SD-07 Certificates
1.4.1Material and Equipment
1.4.2Energy Efficiency
1.4.3Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 80 PAGES
07 60 00 SD-02 Shop Drawings
3.1.20 G MCovering on flat, sloped, or
curved surfaces
3.1.14 G MGutters
3.1.15 G MDownspouts
3.1.16 G MFlashing for roof drains
3.1.10 G MBase flashing
3.1.11 G MCounterflashing
3.1.21 G MFlashing at roof penetrations
3.1.12 G MReglets
3.1.17 G MScuppers
3.1.13 G MDrip edge
3.1.18 G MConductor heads
3.1.19 G MEave flashing
SD-11 Closeout Submittals
3.5 G M/RQuality Control Plan
07 84 00 SD-02 Shop Drawings
2.1 G MFirestopping System
SD-03 Product Data
2.2 GFirestopping Materials
SD-06 Test Reports
3.3 G MInspection
SD-07 Certificates
2.2Firestopping Materials
1.5.1 GInstaller Qualifications
07 92 00 SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 80 PAGES
07 92 00 2.1 GSealants
2.2 GPrimers
2.3 GBond Breakers
2.4 GBackstops
SD-06 Test Reports
3.1 G MField Adhesion
08 11 13 SD-02 Shop Drawings
2.1 G MDoors
2.1 G MDoors
2.4 G MFrames
2.4 G MFrames
2.2 G MAccessories
SD-03 Product Data
2.1 GDoors
2.4 GFrames
2.2Accessories
2.6Weatherstripping
08 33 23 SD-02 Shop Drawings
2.2.1 G MOverhead Coiling Doors
2.2.3 G MCounterbalancing Mechanism
2.2.4 G MManual Door Operators
2.2.5 G MElectric Door Operators
2.2.1.3 G MBottom Bars
2.1.1.1 G MGuides
2.2.3.1 G MMounting Brackets
2.2.1.8 G MOverhead Drum
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 80 PAGES
08 33 23 3.3.2 G MHood
2.1.1.1 G MInstallation Drawings
SD-03 Product Data
2.2.1 GOverhead Coiling Doors
2.2.2 GHardware
2.2.3 GCounterbalancing Mechanism
2.2.4 GManual Door Operators
2.2.5 GElectric Door Operators
SD-05 Design Data
2.2.1 G MOverhead Coiling Doors
2.2.2 G MHardware
2.2.3 G MCounterbalancing Mechanism
2.2.4 G MManual Door Operators
2.2.5 G MElectric Door Operators
SD-10 Operation and Maintenance
Data
3.3.2 G ROperation and Maintenance
Manuals
3.3.2 G RMaterials
3.3.2 G RDevices
3.3.2 G RProcedures
3.3.2 G RManufacture's Brochures
3.3.2 G RParts Lists
SD-11 Closeout Submittals
3.3.1 G M/RWarranty
08 51 13 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 80 PAGES
08 51 13 2.1 G MWindows
1.9 G MFabrication Drawings
SD-03 Product Data
2.1 GWindows
2.2.7.1 GHardware
2.2.3 GFasteners
1.10 GWindow Performance
2.4 GThermal-Barrier Windows
2.2.9 GScreens
2.2.2 GWeatherstripping
2.2.7 GAccessories
2.2.4Adhesives
1.10.4 GThermal Performance
SD-04 Samples
1.4.2.1 G RFinish Sample
1.4.2.2 G RWindow Sample
SD-05 Design Data
2.1 G MStructural Calculations for
Deflection
SD-06 Test Reports
1.4.4 G MMinimum Condensation
Resistance Factor
1.4.4 G MResistance to Forced Entry
SD-10 Operation and Maintenance
Data
2.1 G RWindows
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 80 PAGES
08 51 23 SD-02 Shop Drawings
2.2 G MWindows
SD-03 Product Data
2.4Mullions
2.6.2Fasteners
2.6Accessories
SD-04 Samples
2.7.2 G RColor Coating
2.2 G RWindows
SD-06 Test Reports
1.3.1 G MAir Infiltration
1.3.1 G MWater Infiltration
1.3.2 G MMullion Wind Load
SD-10 Operation and Maintenance
Data
2.2 G RWindows
08 71 00 SD-02 Shop Drawings
1.4 G MHardware Schedule
2.3.6 G MKeying System
SD-03 Product Data
2.3 GHardware Items
SD-08 Manufacturer’s Instructions
3.1Installation
SD-10 Operation and Maintenance
Data
1.4 G RHardware Schedule
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 80 PAGES
08 71 00 SD-11 Closeout Submittals
1.5.1 G M/RKey Bitting
08 81 00 SD-03 Product Data
1.6.1Insulating Glass
1.3Glazing Accessories
SD-04 Samples
1.6.1 G RInsulating Glass
2.4.2 G RGlazing Compound
2.4.6 G RTape
2.4.3.1 G RSealant
SD-07 Certificates
1.6.1Insulating Glass
1.3Glazing Accessories
SD-08 Manufacturer’s Instructions
2.4Setting and Sealing Materials
3.2Glass Setting
08 91 00 SD-02 Shop Drawings
1.4 G MWall louvers
1.5 G MWall louvers
SD-03 Product Data
2.2Metal Wall Louvers
SD-04 Samples
1.4 G RWall louvers
1.5 G RWall louvers
1.5 G RDoor louvers
09 22 00 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 80 PAGES
09 22 00 2.1 G MMetal support systems
09 23 00 SD-04 Samples
1.5.1 G RGypsum Plaster
SD-08 Manufacturer’s Instructions
2.7ready-mix gypsum plaster
09 24 23 SD-02 Shop Drawings
3.3 G MLath
SD-03 Product Data
3.6Proportions and Mixing
SD-04 Samples
2.2 G RColored Stucco Finish Coat
1.3 G RSample Panel
09 26 00 SD-03 Product Data
2.1.3Gypsum veneer plaster
09 29 00 SD-03 Product Data
2.1.2Water-Resistant Gypsum Backing
Board
2.1.3Impact Resistant Gypsum Board
2.1.7Accessories
2.1.1Gypsum Board
2.1.4Joint Treatment Materials
SD-07 Certificates
2.1 GAsbestos Free Materials
SD-08 Manufacturer’s Instructions
2.1Material Safety Data Sheets
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 80 PAGES
09 29 00 SD-10 Operation and Maintenance
Data
2.1 G RManufacturer maintenance
instructions
3.7 G RWaste Management
09 30 10 SD-02 Shop Drawings
3.2 G MDetail Drawings
SD-03 Product Data
2.1 GTile
2.2 GSetting-Bed
2.4 GGrout
SD-04 Samples
2.1 G RTile
2.1 G RAccessories
2.1 G RTransition Strips
2.4 G RGrout
SD-07 Certificates
2.1Tile
2.4Grout
SD-08 Manufacturer’s Instructions
3.5Maintenance Instructions
SD-10 Operation and Maintenance
Data
3.2 G RInstallation
09 51 00 SD-02 Shop Drawings
1.2 G MApproved Detail Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 80 PAGES
09 51 00 SD-03 Product Data
2.1Acoustical Ceiling Systems
SD-04 Samples
2.1 G RAcoustical Ceiling Systems
09 65 00 SD-02 Shop Drawings
2.7 G MResilient Flooring and
Accessories
SD-03 Product Data
2.7 GResilient Flooring and
Accessories
2.3Adhesives
2.1Vinyl Composition Tile
2.2Wall Base
SD-04 Samples
2.7 G RResilient Flooring and
Accessories
SD-08 Manufacturer’s Instructions
3.2 GSurface Preparation
3.1 GInstallation
SD-10 Operation and Maintenance
Data
2.7 G RResilient Flooring and
Accessories
09 90 00 SD-02 Shop Drawings
3.9 G MPiping identification
3.9 G Mstencil
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 80 PAGES
09 90 00 SD-03 Product Data
2.1 GCoating
2.1Manufacturer's Technical Data
Sheets
SD-04 Samples
1.9 G RColor
SD-07 Certificates
1.3Applicator's qualifications
1.4.1.2 GQualification Testing
SD-08 Manufacturer’s Instructions
3.2.1Application instructions
3.5.2Mixing
1.7.2Manufacturer's Material Safety
Data Sheets
SD-10 Operation and Maintenance
Data
2.1 G RCoatings
10 11 00 SD-03 Product Data
1.2 GVisual Display Board
SD-04 Samples
2.1.3 G RAluminum
2.1.1 G RPorcelain Enamel
2.1 G RMaterials
SD-07 Certificates
1.2Visual Display Board
10 14 00.10 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 80 PAGES
10 14 00.10 3.1 G MApproved Detail Drawings
SD-03 Product Data
3.1Installation
1.2 GExterior Signage
SD-04 Samples
1.2 G RExterior Signage
SD-10 Operation and Maintenance
Data
3.1.2 G RProtection and Cleaning
10 14 00.20 SD-02 Shop Drawings
1.4.2 G MDetail Drawings
SD-03 Product Data
3.1 GInstallation
1.6 GWarranty
SD-04 Samples
1.4.1 G RInterior Signage
1.3 G RSoftware
SD-10 Operation and Maintenance
Data
3.1 G RApproved Manufacturer's
Instructions
3.1.2 G RProtection and Cleaning
10 21 13 SD-02 Shop Drawings
2.1 G MFabrication Drawings
3.2 G MInstallation Drawings
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 80 PAGES
10 21 13 2.1Cleaning and Maintenance
Instructions
2.4Colors And Finishes
2.2.1Anchoring Devices and Fasteners
2.2.2Brackets
2.3.1Urinal Screens
SD-04 Samples
2.4 G RColors and Finishes
2.2.1 G RAnchoring Devices and Fasteners
SD-07 Certificates
1.4Warranty
SD-10 Operation and Maintenance
Data
2.1.1 G RPlastic Identification
10 28 13 SD-03 Product Data
2.1.2 GFinishes
2.2 GAccessory Items
SD-04 Samples
2.1.2 G RFinishes
2.2 G RAccessory Items
SD-07 Certificates
2.2Accessory Items
10 44 16 SD-01 Preconstruction Submittals
2.1.1 G M/RManufacturer's Data
SD-02 Shop Drawings
2.1.1 G MFire Extinguishers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 80 PAGES
10 44 16 Part 2 G MCabinets
SD-03 Product Data
2.1.1 GFire Extinguishers
3.2.1 GReplacement Parts List
SD-04 Samples
Part 2 G RAccessories
SD-07 Certificates
2.1.1 GFire Extinguishers
2.1.1 GManufacturer's Warranty with
Inspection Tag
10 51 13 SD-02 Shop Drawings
2.1 G MTypes
1.4 G MLocation
3.1 G MInstallation
3.2 G MNumbering system
SD-03 Product Data
2.2Material
2.3.1Locking Devices
2.3.4Handles
2.2.2Finish
2.3components
3.1Assembly
SD-04 Samples
1.5.1 G RColor chips
11 68 33 SD-02 Shop Drawings
2.1 G M/RBasketball Goal
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 80 PAGES
11 68 33 2.2 G M/RVolleyball Net And Posts
2.3 G M/RSoccer Goal
2.4 G M/RBleachers
SD-03 Product Data
2.1 G M/RBasketball Goal
2.2 G M/RVolleyball Net And Posts
2.3 G M/RSoccer Goal
2.4 G M/RBleachers
12 21 00 SD-02 Shop Drawings
3.3 G MInstallation
SD-03 Product Data
2.1 GWindow Blinds
3.3Installation
1.4Certification
SD-04 Samples
2.1 G RWindow Blinds
SD-06 Test Reports
2.1 G MWindow Blinds
SD-08 Manufacturer’s Instructions
2.1 GWindow Blinds
SD-10 Operation and Maintenance
Data
2.1 G RWindow Blinds
12 24 13 SD-02 Shop Drawings
3.2 G MInstallation
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 80 PAGES
12 24 13 2.1 GWindow Shades
SD-04 Samples
2.1 G RWindow Shades
SD-06 Test Reports
2.1 G MWindow Shades
SD-08 Manufacturer’s Instructions
2.1Window Shades
SD-10 Operation and Maintenance
Data
2.1 G RWindow Shades
12 51 00 SD-02 Shop Drawings
Part 2 G MEquipment Systems
Part 2 G MEquipment Systems
Part 2 G MDetail Drawings
Part 2 G MOverall Reference Drawings
Part 2 G MInstallation Drawings
SD-03 Product Data
Part 2 G MEquipment Systems
Part 2 G MEquipment Systems
Part 2 G MSeating, Tables, Equipment
Part 2 G MMiscellaneous Freestanding
Furniture
Part 2 G MVisual Display Units
Part 2 G MVisual Display Units
Part 2 G MAppliances And Miscellaneous
Equipment
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 80 PAGES
12 51 00 Part 2 G MManufacturer's Literature And
Equipment Data
Part 2 G MCertification
1.6 G MWarranty
SD-04 Samples
Part 2 G MSeating Fabrics And Finishes
Part 2 G MTable Veneers, Laminates, Trim
Edges, Paints
Part 2 G MMiscellaneous Freestanding
Furniture Fabric, Paints And
Finishes
Part 2 G MVisual Display Unit Surfaces, Fabrics, And Frames
Part 2 G MSamples
SD-06 Test Reports
Part 2 G MEmissions
SD-07 Certificates
Part 2 G MTask Seating
Part 2 G MLoose Seating
Part 2 G MTables
Part 2 G MDesking
Part 2 G MStorage Units
Part 2 G MEquipment Systems
Part 2 G MEquipment Systems
Part 2 G MVisual Display Units
Part 2 G MVisual Display Units
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 80 PAGES
12 51 00 SD-08 Manufacturer’s Instructions
Part 2 G MMaterial Safety Data Sheets
SD-10 Operation and Maintenance
Data
3.1 G MAssembly Manuals
3.2 G MMaintenance Manuals
3.2 G MCleaning
1.4.3 G MElectrical System
13 34 19 SD-01 Preconstruction Submittals
1.6.3 G M/RManufacturer's Qualifications
SD-02 Shop Drawings
1.2.1.6 G MDetail Drawings
1.6.1 G MDetail Drawings
SD-03 Product Data
1.6.1 GManufacturer's catalog data
SD-04 Samples
1.6.1 G RCoil Stock
2.1.8 G RCoil Stock
2.5.2 G RFasteners
2.8.1 G RMetal Closure Strips
1.4.7 G RInsulation
2.4.2 G RInsulation
2.4.4 G RManufacturer's color charts and
chips
SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 80 PAGES
13 34 19 1.6.1 G Mdescriptive and technical literature
1.6.1 G Mbuilding design analysis
SD-06 Test Reports
1.6.1 G Mtest reports
1.6.1 G MCoatings and base metals
1.6.1 G MFactory Color Finish Performance
Requirements
SD-07 Certificates
1.6.1 Gsystem components
1.6.1 GCoil Stock
2.1.8 GCoil Stock
1.6.1 GAluminized Steel Repair Paint
1.6.1 GGalvanizing Repair Paint
1.6.1 GEnamel Repair Paint
1.6.1 GQualification of Manufacturer
1.6.1 GQualification of Erector
SD-08 Manufacturer’s Instructions
1.6.2 GInstallation of Roof and Wall
panels
1.7 Gshipping, handling, and storage
SD-11 Closeout Submittals
3.13.1 G M/RManufacturer's Warranty
3.13.2 G…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .