Amendment_0001_Specifications_24_May_17.pdf

PDF 1 MB Posted

Attached to
Construction - Peace Vector (PV) VII Package C in Cairo, Egypt Federal contract opportunity
Solicitation number
W912ER-17-R-0011
Issued by
Department of the Army Corps of Engineers Engineering District Middle East

About this file

Amendment 0001 Revised Specs

View the file

Other files for this federal contract opportunity

Other files attached to Construction - Peace Vector (PV) VII Package C in Cairo, Egypt, newest first.
File Type Posted
A154_Amendment_0002_Specifications_1_Jun_17.pdf PDF
A154_W912ER-17-R-0011-0002.pdf PDF
A154_Amendment_0002_Drawings_1_Jun_17.pdf PDF
W912ER-17-R-0011-0001_conform_copy.pdf PDF
Amendment_0001_Drawings.pdf PDF
W912ER-17-R-0011-0001.pdf PDF
01_45_35_Schedule_of_Special_Inspections.pdf PDF
Special_Instructions_Schedule.pdf PDF
H04_Pkg_C_Geotechnical_Engineering_&_Concrete_Coring_Report.pdf PDF
Attachment_A_-_Experience_Reference_Sheet.docx DOCX document
Appendix_D_-_USACE_Past_Performance_Questionnaire_PPQ-0.docx DOCX document
Attachment_C_-_Contact_Information_Sheet.docx DOCX document
Attachment_B_-_Offeror's_Prime_Experience_Form.docx DOCX document
CDC_Cost_Documents_5_Apr_17.pdf PDF
H01_PEACE_VECTOR_VII_-_CWAFB_PKG_C_-_VOLUME_1_-_07_APRIL_2017.pdf PDF
H01_PEACE_VECTOR_VII_-_CWAFB_PKG_C_-_VOLUME_2_-_07_APRIL_2017.pdf PDF
H01_PEACE_VECTOR_VII_-_CWAFB_PKG_C_-_VOLUME_4_-_07_APRIL_2017.pdf PDF
H01_PEACE_VECTOR_VII_-_CWAFB_PKG_C_-_VOLUME_3_-_07_APRIL_2017.pdf PDF
H01_PEACE_VECTOR_VII_-_CWAFB_PKG_C_-_VOLUME_5_-_07_APRIL_2017.pdf PDF
W912ER-17-R-0011.pdf PDF
H04_CDC_Vol_2_of_3_Specifications_5_Apr_17.pdf PDF
H04_CDC_12_51_00_Appendix_A_-_CID_Binder.pdf PDF
H04_CDC_Vol_3_of_3_Specifications_5_Apr_17.pdf PDF
H04_CDC_12_51_00_Appendix_B_-_SID_Color_Boards.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PV VII, Package C, Cairo West Air Base, Egypt 402784

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 SUMMARY OF WORK

01 14 00 WORK RESTRICTIONS

01 15 00.12 10 SUPPLEMENTARY REQUIREMENTS

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 31 19.05 20 POST AWARD MEETINGS

01 32 17.12 10 COST-LOADED NETWORK ANALYSIS SCHEDULES (NAS)

01 33 00 SUBMITTAL PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 42 15 METRIC MEASUREMENTS

01 45 00.00 10 QUALITY CONTROL

01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE(RMS CM)

01 45 35 SPECIAL INSPECTIONS

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 58 00 PROJECT IDENTIFICATION

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION AND DECONSTRUCTION

02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs

AND MERCURY

DIVISION 03 - CONCRETE

03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING

03 15 00.00 10 CONCRETE ACCESSORIES

03 20 00.00 10 CONCRETE REINFORCING

03 30 00.00 10 CAST-IN-PLACE CONCRETE

03 35 00.00 10 CONCRETE FINISHING

03 37 13 SHOTCRETE

03 39 00.00 10 CONCRETE CURING

03 42 13.00 10 PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE

CONSTRUCTION

DIVISION 04 - MASONRY

04 20 00 UNIT MASONRY

DIVISION 05 - METALS

05 12 00 STRUCTURAL STEEL

05 40 00 COLD-FORMED METAL FRAMING

05 50 13 MISCELLANEOUS METAL FABRICATIONS REVISED BY AMENDMENT 0001

05 51 33 METAL LADDERS

05 52 00 METAL RAILINGS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS

06 61 16 SOLID SURFACING FABRICATIONS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

PROJECT TABLE OF CONTENTS Page 1 W912ER-17-R-0011 Amendment 0001

07 14 00 FLUID-APPLIED WATERPROOFING

07 21 13 BOARD AND BLOCK INSULATION

07 21 16 MINERAL FIBER BLANKET INSULATION

07 41 63 FABRICATED ROOF PANEL ASSEMBLIES ADDED IN ENTIRETY BY

AMENDMENT 0001

07 52 00 MODIFIED BITUMINOUS MEMBRANE ROOFING

07 55 00 PROTECTED MEMBRANE ROOFING

07 60 00 FLASHING AND SHEET METAL

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 33 23 OVERHEAD COILING DOORS

08 51 13 ALUMINUM WINDOWS

08 51 23 STEEL WINDOWS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 91 00 METAL WALL LOUVERS

DIVISION 09 - FINISHES

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 23 00 GYPSUM PLASTERING

09 24 23 CEMENT STUCCO

09 26 00 VENEER PLASTER

09 29 00 GYPSUM BOARD

09 30 10 CERAMIC, QUARRY, AND GLASS TILING

09 51 00 ACOUSTICAL CEILINGS

09 65 00 RESILIENT FLOORING

09 90 00 PAINTS AND COATINGS

DIVISION 10 - SPECIALTIES

10 11 00 VISUAL DISPLAY UNITS

10 14 00.10 EXTERIOR SIGNAGE

10 14 00.20 INTERIOR SIGNAGE

10 21 13 TOILET COMPARTMENTS

10 28 13 TOILET ACCESSORIES

10 44 16 FIRE EXTINGUISHERS

10 51 13 METAL LOCKERS

DIVISION 11 - EQUIPMENT

11 11 00 VEHICLE SERVICE EQUIPMENT

11 68 33 ATHLETIC FIELD EQUIPMENT

DIVISION 12 - FURNISHINGS

12 21 00 WINDOW BLINDS

12 24 13 ROLLER WINDOW SHADES

12 51 00 FURNITURE, FURNISHINGS AND EQUIPMENT (FFE)

DIVISION 13 - SPECIAL CONSTRUCTION

13 34 19 METAL BUILDING SYSTEMS

13 48 00 SEISMIC PROTECTION FOR MISCELLANEOUS EQUIPMENT

PROJECT TABLE OF CONTENTS Page 2

13 48 00.00 10 SEISMIC PROTECTION FOR MECHANICAL EQUIPMENT

DIVISION 21 - FIRE SUPPRESSION

21 22 00.00 40 CLEAN AGENT FIRE EXTINGUISHING SYSTEMS

DIVISION 22 - PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

22 15 13.16 40 HIGH-PRESSURE COMPRESSED-AIR PIPING, PIPING COMPONENTS,

AND VALVES, STAINLESS

22 31 00 WATER SOFTENERS, CATION-EXCHANGE (SODIUM CYCLE) REVISED

BY AMENDMENT 0001

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 08 00.00 10 COMMISSIONING OF HVAC SYSTEMS

23 23 00 REFRIGERANT PIPING

23 35 00.00 10 OVERHEAD VEHICLE TAILPIPE AND WELDING FUME EXHAUST

REMOVAL SYSTEM(S)

23 82 02.00 10 UNITARY HEATING AND COOLING EQUIPMENT

DIVISION 26 - ELECTRICAL

26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT

26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 35 43 60 AND 400-HERTZ (HZ) SOLID STATE FREQUENCY CONVERTERS

26 41 00 LIGHTNING PROTECTION SYSTEM

26 51 00 INTERIOR LIGHTING

26 56 00 EXTERIOR LIGHTING

26 56 20.00 10 AIRFIELD AND HELIPORT LIGHTING AND VISUAL NAVIGATION AIDS

REVISED BY AMENDMENT NO. 0001

DIVISION 27 - COMMUNICATIONS

27 05 28.36 40 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

27 51 16 RADIO AND PUBLIC ADDRESS SYSTEMS

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 31 64.00 10 FIRE DETECTION AND ALARM SYSTEM, ADDRESSABLE

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID

PAVEMENTS

32 05 33 LANDSCAPE ESTABLISHMENT

32 11 16 SUBBASES FOR FLEXIBLE PAVING

32 11 23 GRADED-CRUSHED AGGREGATE BASE COURSE

32 12 10 BITUMINOUS TACK AND PRIME COATS

PROJECT TABLE OF CONTENTS Page 3

32 12 15.13 HOT-MIX ASPHALT AIRFIELD PAVING

32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS

32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE

FACILITIES

32 13 73 COMPRESSION JOINT SEALS FOR CONCRETE PAVEMENTS

32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS

32 17 24.00 10 PAVEMENT MARKINGS

32 31 13.53 HIGH-SECURITY CHAIN LINK FENCES AND GATES

32 84 23 UNDERGROUND SPRINKLER SYSTEMS

32 92 19 SEEDING

32 93 00 EXTERIOR PLANTS

DIVISION 33 - UTILITIES

33 05 23.19 TRENCHLESS EXCAVATION USING MICROTUNNELING

33 11 00 WATER UTILITY DISTRIBUTION AND STORAGE REVISED BY

AMENDMENT 0001

33 30 00 SANITARY SEWERS

33 32 13.13 PACKAGED SEWAGE LIFT STATIONS, WET WELL TYPE

33 40 00 STORM DRAINAGE UTILITIES

33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION

33 72 02 UNDERGROUND COMMUNICATION SYSTEM

33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT

41 22 13.15 BRIDGE CRANES, OVERHEAD ELECTRIC, UNDER RUNNING

DIVISION 46 - WATER AND WASTEWATER EQUIPMENT

46 07 53.13 PACKAGED WASTEWATER TREATMENT EQUIPMENT, AERATION

46 25 14 COALESCING OIL-WATER SEPARATORS

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 4

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 80 PAGES

PV VII, Package C, Cairo West Air Base, Egypt

01 14 00 SD-01 Preconstruction Submittals

1.3.1.1 G M/RList of Contact Personnel

1.3.6 G RTools and Equipment Inventory

List

01 15 00.12 10 SD-01 Preconstruction Submittals

1.2 G M/RForeign Objects Damage (FOD)

Control Plan

1.3.2 G M/RRequests for Digging Permits

1.5 G M/RProposed Means of Providing

Project Security

1.21.2 G M/RRequests for Hot Work Permits

1.22.2 G M/RShipping Documents

1.24.3.2 G M/RShipping Status Report

SD-07 Certificates

1.6Certificates Of Compliance

SD-11 Closeout Submittals

1.8.1.7 G M/RReports and Records

1.8.1.7 G M/RReports and Records

1.17 G M/RInventory of All Excess Supplies, Materials and Equipment

1.8.1.4 G M/RContractor Furnished

Computerized Maintenance

Management System (CMMS)

01 31 19.05 20 SD-01 Preconstruction Submittals

1.3.6 G M/RProject Schedule

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 80 PAGES

01 31 19.05 20 1.3.5Performance Assessment Plan

(PAP)

GM/R

01 32 17.12 10 SD-01 Preconstruction Submittals

G M/RQualifications

G M/RBaseline Network Analysis

Schedule (NAS)

SD-07 Certificates

G MMonthly Network Analysis

Schedule Update

SD-11 Closeout Submittals

G M/RAs-Built Schedule

01 33 00 SD-01 Preconstruction Submittals

1.8 G M/RSubmittal Register

01 35 26 SD-01 Preconstruction Submittals

1.7 G M/RAccident Prevention Plan (APP)

SD-06 Test Reports

1.4 G M/RMonthly Exposure Reports

1.12Notifications and Reports

1.12.2 G M/RAccident Reports

1.12.3 G M/RLHE Inspection Reports

SD-07 Certificates

1.6.1.4Crane Operators/Riggers

1.7.2.2 G M/RStandard Lift Plan

1.7.2.3 G M/RCritical Lift Plan

1.8 G RActivity Hazard Analysis (AHA)

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 80 PAGES

01 35 26 1.9.1 G RConfined Space Entry Permit

1.9.1 G RHot Work Permit

1.12.4Certificate of Compliance

1.14License Certificates

1.14.1 G RRadiography Operation Planning

Work Sheet

G RDaily Quality Control Report

01 45 00.00 10 SD-01 Preconstruction Submittals

3.2 G M/RContractor Quality Control (CQC)

Plan

SD-06 Test Reports

3.9Verification Statement

01 45 35 SD-01 Preconstruction Submittals

3.1.2Written Practices

3.1.2NDT Procedures and Equipment

Calibration Records

SD-06 Test Reports

3.1.2Daily Reports

3.1.1Biweekly Reports

SD-07 Certificates

2.1Fabrication Plant

2.1AC472 Accreditation

2.1Certificate of Compliance

1.5 GSpecial Inspector

3.1.2Qualification Records

01 50 00 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 80 PAGES

01 50 00 1.3Construction Site Plan

G; M/R

Traffic Control Plan

01 58 00 SD-02 Shop Drawings

1.4.1Sign Legend Orders

G; M/R

01 78 00 SD-03 Product Data

1.7.1Warranty Management Plan

1.7.4Warranty Tags

1.5Spare Parts Data

SD-08 Manufacturer’s Instructions

1.7.1Instructions

SD-10 Operation and Maintenance

Data

3.7 G ROperation and Maintenance

Manuals

SD-11 Closeout Submittals

3.1As-Built Drawings

G; M/R

3.2.1Record Drawings

3.3Record Drawings

3.6As-Built Record of Equipment and Materials

3.4Final Approved Shop Drawings

3.5Construction Contract

Specifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 80 PAGES

01 78 23 SD-10 Operation and Maintenance

Data

1.4 G M/RO&M Database

3.1.1 G M/RTraining Plan

3.1.3 G M/RTraining Outline

3.1.2 G M/RTraining Content

SD-11 Closeout Submittals

3.1.4 G M/RTraining Video Recording

3.1.6 G M/RValidation of Training Completion

02 41 00 SD-01 Preconstruction Submittals

1.2.1 G M/RDemolition Plan

1.2.1 G M/RDeconstruction Plan

1.10 G M/RExisting Conditions

SD-07 Certificates

1.6 GNotification

SD-11 Closeout Submittals

3.3.3 G M/RReceipts

02 84 16 SD-07 Certificates

1.8.1 GQualifications of CIH

1.8.1 GTraining Certification

1.8.2 GPCB and Lamp Removal Work

Plan

1.8.3 GPCB and Lamp Disposal Plan

SD-11 Closeout Submittals

3.5.2 G M/RTransporter certification

3.2.4 G M/RCertification of Decontamination

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 80 PAGES

02 84 16 3.5.2.1 G M/RCertificate of Disposal and/or recycling

03 11 13.00 10 SD-02 Shop Drawings

2.2.1 G MFormwork

3.1.1 G MFormwork

2.2.1 G MForm Removal Schedule

SD-03 Product Data

2.2Form Materials

SD-04 Samples

1.3 G RSample Panels

SD-05 Design Data

2.1 G MCalculations

SD-06 Test Reports

3.2 G MInspection

03 15 00.00 10 SD-02 Shop Drawings

2.4 G MWaterstops

SD-03 Product Data

2.2Preformed Expansion Joint Filler

2.3Sealant

2.4Waterstops

SD-04 Samples

2.3.2 G RLubricant for Preformed

Compression Seals

2.3.3 G RField-Molded Type

2.4 G RWaterstops

2.5.1 G RSplicing Waterstops

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 80 PAGES

03 15 00.00 10 SD-07 Certificates

2.2Preformed Expansion Joint Filler

2.3Sealant

2.4Waterstops

03 20 00.00 10 SD-01 Preconstruction Submittals

3.1.3.2 G M/RButt-Splices

SD-02 Shop Drawings

3.1 G MReinforcement

SD-03 Product Data

2.3.1 GMechanical Butt-Splices

2.3 GReinforcing Steel

SD-06 Test Reports

2.7 G MTests, Inspections, and

Verifications

SD-07 Certificates

2.3Reinforcing Steel

1.3.1Qualification of Steel Bar

Butt-Splicers

03 30 00.00 10 SD-01 Preconstruction Submittals

1.5.2 G M/RQuality Control Plan

1.5.1 G M/RLaboratory Accreditation

3.8.5.6 G M/RSampling Plan

SD-03 Product Data

2.2Cementitious Materials

2.9Vapor Barrier

2.1.6Floor Finish

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 80 PAGES

03 30 00.00 10 2.4Chemical Admixtures

SD-04 Samples

2.4.5 G RSurface Retarder

SD-05 Design Data

2.1.1 G MMixture Proportions

3.3 G MLightweight Aggregate Concrete

SD-06 Test Reports

2.1.1 G MMixture Proportions

3.8 G MTesting and Inspection for CQC

2.3 G MAggregates

3.8.5.1 G MAir Content

3.8.5.3 G MSlump

3.8.5.6 G MCompressive Strength

2.5 G MWater

SD-07 Certificates

1.5Contractor Quality Control personnel

3.2.1Ready-Mix Plant

03 37 13 SD-06 Test Reports

2.2 G MMixture Proportions

2.1.2 G MAggregates

2.1.4 G MAccelerator Compatibility

1.3.2 G MPreconstruction Test Panels

SD-07 Certificates

2.1.1.1Portland Cement

2.1.1.2Silica Fume

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 80 PAGES

03 37 13 2.1.4Accelerating Admixtures

2.1.5Curing Materials

1.3.1 GQualifications

03 39 00.00 10 SD-03 Product Data

2.1Curing Materials

SD-06 Test Reports

3.2 G MTesting and Inspection for CQC

SD-08 Manufacturer’s Instructions

2.1Curing Compound

03 42 13.00 10 SD-01 Preconstruction Submittals

1.3.1.2 G M/RQuality Control Procedures

SD-02 Shop Drawings

2.1.1 G MStandard Precast Units

2.1.2 G MCustom-Made Precast Units

3.2.4.3 G MSpecial Finishes

SD-03 Product Data

2.1.1Standard Precast Units

2.1.3Proprietary Precast Units

3.1.3Embedded Items

2.2.4Accessories

SD-05 Design Data

2.1.2 G MDesign Calculations

2.1.5.1 G MConcrete Mix Proportions

SD-06 Test Reports

1.3.1.4 G MTest Reports

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 80 PAGES

03 42 13.00 10 1.3.1.2Quality Control Procedures

04 20 00 SD-02 Shop Drawings

3.3.3.1 G MCut CMU

3.4.1.1 G MDetail Drawings

SD-03 Product Data

1.5.1 GHot Weather Procedures

1.5.2 GCold Weather Procedures

2.2.2.2.1 GCement

2.4.1.1 GCementitious Materials

SD-04 Samples

2.2.2.2 G RConcrete Masonry Units (CMU)

2.4.1.3 G RAdmixtures for Masonry Mortar

2.6.2 G RAnchors, Ties, and Bar

Positioners

2.6.3 G RJoint Reinforcement

SD-05 Design Data

2.1.2 G MMasonry Compressive Strength

2.2.2.3 G MFire-Rated Concrete Masonry

Units

3.2.5 G MBracing Calculations

SD-06 Test Reports

2.2.2.3 G MFire-Rated Concrete Masonry

Units

3.6.1.1 G MField Testing of Mortar

3.6.1.2 G MField Testing of Grout

3.6.1.3 G MPrism Tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 80 PAGES

04 20 00 3.6.1.4 G MSingle-Wythe Masonry Wall

Water Penetration Test

SD-07 Certificates

1.3.1Special Masonry Inspector

Qualifications

2.2.2.2Concrete Masonry Units (CMU)

2.2.3Precast Concrete Units

2.4.1.1Cementitious Materials

2.4.1.3Admixtures for Masonry Mortar

2.4.2.2Admixtures for Grout

2.6.2Anchors, Ties, and Bar

Positioners

2.6.3Joint Reinforcement

SD-08 Manufacturer’s Instructions

2.4.1.3Admixtures for Masonry Mortar

2.4.2.2Admixtures for Grout

05 12 00 SD-01 Preconstruction Submittals

1.4.1.1 G M/RErection Drawings

SD-02 Shop Drawings

1.4.2 G MFabrication Drawings

SD-03 Product Data

2.6.2Shop Primer

2.4.1Welding Electrodes and Rods

2.4.2Non-Shrink Grout

2.3.2Tension Control Bolts

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 80 PAGES

05 12 00 2.6.2 G MClass B Coating

2.3 G MBolts, Nuts, and Washers

3.7.1.2 G MWeld Inspection Reports

3.7.2.1 G MBolt Testing Reports

3.7.3 G MEmbrittlement Test Reports

SD-07 Certificates

2.2Steel

2.3Bolts, Nuts, and Washers

2.5Galvanizing

1.4.3.1Welding Procedures and

Qualifications

2.4.1Welding Electrodes and Rods

05 40 00 SD-02 Shop Drawings

1.5.1 G MFraming Components

SD-03 Product Data

2.1Purlins

SD-07 Certificates

1.4Structural Cold-Formed Metal

Framing

3.2.1Welds

05 50 13 SD-02 Shop Drawings

2.5 G MCover plates and frames

2.6 G MExpansion joint covers

2.7 G MFloor gratings and walkways

2.9 G Mangles and plates

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 80 PAGES

05 50 13 2.5Cover plates and frames

2.3Control-joint covers

2.6Expansion joint covers

2.7Floor gratings and walkways

2.1.9 GPost-Installed Reinforcing Bars

And Adhesive Anchors

2.1.8 GMechanical Anchors

SD-04 Samples

2.6 G RExpansion joint covers

2.3 G RControl-joint covers

05 51 33 SD-02 Shop Drawings

2.3 G MLadders

SD-03 Product Data

2.3Ladders

SD-07 Certificates

1.3Fabricator Certification for Ladder

Assembly

1.3Fabricator Certification for Ships

Ladder Assembly

05 52 00 SD-02 Shop Drawings

1.2.1 G MFabrication Drawings

3.2 G MIron and Steel Hardware

3.2 G MSteel Shapes, Plates, Bars and

Strips

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 80 PAGES

05 52 00 2.2.1 GStructural Steel Plates, Shapes, and Bars

2.2.2 GStructural Steel Tubing

2.2.4 GCold-Finished Steel Bars

2.2.3 GHot-Rolled Carbon Steel Bars

2.2.5 GCold-Drawn Steel Tubing

2.1.2 GProtective Coating

2.2.8 GSteel Railings and Handrails

1.2.1 GAnchorage and Fastening

Systems

2.2.7 GPost-Installed Adhesive Anchors

2.2.7 GMechanical Anchors

SD-07 Certificates

1.4.1 GWelding Procedures

1.4.2 GWelder Qualification

SD-08 Manufacturer’s Instructions

3.2 GInstallation Instructions

06 10 00 SD-03 Product Data

1.8Fire-retardant treatment

2.1.1.1Plywood

SD-06 Test Reports

1.4.2 G MPreservative-treated

SD-07 Certificates

1.7Preservative treatment

06 41 16.00 10 SD-02 Shop Drawings

2.7 G MShop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 80 PAGES

06 41 16.00 10 3.1 G MInstallation

SD-03 Product Data

2.1Wood Materials

SD-04 Samples

2.3 G RPlastic Laminates

2.4 G RCabinet Hardware

SD-07 Certificates

1.4Quality Assurance

3.1Laminate Clad Casework

06 61 16 SD-02 Shop Drawings

3.1 G MInstallation

SD-03 Product Data

2.1Solid Polymer Material

2.3Fabrications

SD-04 Samples

2.1 G RMaterial

2.3.5 G RCounter Tops

2.3.4 G RWindow Stools

SD-06 Test Reports

2.1 G MSolid Polymer Material

SD-07 Certificates

2.3Fabrications

SD-10 Operation and Maintenance

Data

3.2 G RClean-up

07 14 00 SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 80 PAGES

07 14 00 2.1Fluid-applied membrane

2.2Membrane primer

2.7Elastomeric sheet

2.9Flexible foam-backed elastomeric sheet

3.3Solvent

3.4.1Moisture meter

2.10Protection board

2.6Bond breaker

SD-11 Closeout Submittals

1.6 G M/RWarranty

07 21 13 SD-03 Product Data

1.3 GManufacturer's Standard Details

2.1 GBlock or Board Insulation

1.4 GProtection Board or Coatings

2.2 GAccessories

SD-07 Certificates

2.1 GBlock or Board Insulation

1.7 GSpecial Warranties

1.7 GSpecial Warranties

SD-08 Manufacturer’s Instructions

2.1Block or Board Insulation

2.2.1Adhesive

07 21 16 SD-03 Product Data

2.1Blanket Insulation

2.3Accessories

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 80 PAGES

07 21 16 SD-08 Manufacturer’s Instructions

3.3.1Insulation

07 41 63 SD-01 Preconstruction Submittals

1.4.1 G M/RQualification of Manufacturer

1.4.1 G M/RQualification of Installer

1.4.1 G M/RQualifications for Welding

1.4.1 G M/RWork Plan

1.4.1 G M/ROn-Site Inspection and

Acceptance Procedure

SD-02 Shop Drawings

1.4.1 G MRoofing Panels

1.4.1 G MFlashing and Accessories

1.4.1 G MGutter/Downspout Assembly

SD-03 Product Data

1.4.1Sustainable Acquisition

1.4.1Coil Stock

1.4.1Factory Color Finish

1.4.1Sub-girts and Formed Shapes

1.4.1Closure Materials

1.4.1Insulation

1.4.1Pressure-Sensitive Tape

1.4.1Sealants and Caulking

1.4.1Rated Wall Assembly

1.4.1Galvanizing Repair Paint

1.4.1Enamel Repair Paint

1.4.1Accessories

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 80 PAGES

07 41 63 SD-04 Samples

1.4.1 G RCoil Stock

1.4.1 G RRoofing Panels

2.3.1.2 G RFasteners

2.5.1 G RMetal Closure Strips

1.4.1 G RInsulation

1.4.1 G RManufacturer's Color Charts and

Chips

SD-05 Design Data

1.4.1 G MWind Design Analysis

1.4.1 G MSeismic Design Analysis

SD-06 Test Reports

3.4.1.2 G MLeakage Tests

1.4.1 G MFire Rating Test Report

3.1 G MCoatings and Base Metals of

Metal Roofing

1.4.1 G MFactory Finish and Color

Performance Requirements

1.4.1 G MWind Uplift Test Report

1.4.1 G MSeismic Test Report

SD-07 Certificates

1.4.1Coil Stock

2.3.1.2Fasteners

1.4.1Galvanizing Repair Paint

1.4.1Enamel Repair Paint

1.4.1Safety Data Sheets

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 80 PAGES

07 41 63 2.4.3Coating Physical Properties

SD-08 Manufacturer’s Instructions

1.4.1Installation of Roof Panel

Assemblies

SD-11 Closeout Submittals

1.7 G M/RWarranty

3.3.5 G M/RInformation Form and Placard

3.4.2 G M/RManufacturer's Field Inspection

Reports

1.4.1 G M/RApplication Instructions

3.6.2 G M/RDate of Installation Wall-Mounted

Placard

1.7.1 G M/R20-year 'No-Dollar-Limit'

Warranty for Labor and Materials

07 52 00 SD-02 Shop Drawings

1.4.5 G MRoof plan

SD-03 Product Data

2.1 GModified Bitumen Sheets

2.3Asphalt

2.1 GFiberglass Felt

2.5 GPrimer

2.6 GModified Bitumen Roof Cement

2.9Pre-Manufactured Accessories

2.8 GFasteners And Plates

1.9 GWarranty

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 80 PAGES

07 52 00 1.4.1Qualification of Manufacturer

1.4.2Qualification of Applicator

1.5.1Bill of Lading

1.4.4 GWind Uplift Resistance

1.4.3 GFire Resistance

SD-08 Manufacturer’s Instructions

3.3.4 GModified Bitumen Membrane

Application

3.3.5 GFlashing

3.2.3.1Temperature Limitations for

Asphalt

2.5Primer

2.8.1Fasteners

3.3.3Ventilating Base Sheets

1.6 GCold Weather Installation

SD-11 Closeout Submittals

1.9 G M/RWarranty

3.9 G M/RInformation Card

3.8 G M/RInstructions To Government

Personnel

07 55 00 SD-02 Shop Drawings

1.2.1 G MRoof Assembly

SD-07 Certificates

1.4.1Material and Equipment

1.4.2Energy Efficiency

1.4.3Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 80 PAGES

07 60 00 SD-02 Shop Drawings

3.1.20 G MCovering on flat, sloped, or

curved surfaces

3.1.14 G MGutters

3.1.15 G MDownspouts

3.1.16 G MFlashing for roof drains

3.1.10 G MBase flashing

3.1.11 G MCounterflashing

3.1.21 G MFlashing at roof penetrations

3.1.12 G MReglets

3.1.17 G MScuppers

3.1.13 G MDrip edge

3.1.18 G MConductor heads

3.1.19 G MEave flashing

SD-11 Closeout Submittals

3.5 G M/RQuality Control Plan

07 84 00 SD-02 Shop Drawings

2.1 G MFirestopping System

SD-03 Product Data

2.2 GFirestopping Materials

SD-06 Test Reports

3.3 G MInspection

SD-07 Certificates

2.2Firestopping Materials

1.5.1 GInstaller Qualifications

07 92 00 SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 80 PAGES

07 92 00 2.1 GSealants

2.2 GPrimers

2.3 GBond Breakers

2.4 GBackstops

SD-06 Test Reports

3.1 G MField Adhesion

08 11 13 SD-02 Shop Drawings

2.1 G MDoors

2.1 G MDoors

2.4 G MFrames

2.4 G MFrames

2.2 G MAccessories

SD-03 Product Data

2.1 GDoors

2.4 GFrames

2.2Accessories

2.6Weatherstripping

08 33 23 SD-02 Shop Drawings

2.2.1 G MOverhead Coiling Doors

2.2.3 G MCounterbalancing Mechanism

2.2.4 G MManual Door Operators

2.2.5 G MElectric Door Operators

2.2.1.3 G MBottom Bars

2.1.1.1 G MGuides

2.2.3.1 G MMounting Brackets

2.2.1.8 G MOverhead Drum

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 80 PAGES

08 33 23 3.3.2 G MHood

2.1.1.1 G MInstallation Drawings

SD-03 Product Data

2.2.1 GOverhead Coiling Doors

2.2.2 GHardware

2.2.3 GCounterbalancing Mechanism

2.2.4 GManual Door Operators

2.2.5 GElectric Door Operators

SD-05 Design Data

2.2.1 G MOverhead Coiling Doors

2.2.2 G MHardware

2.2.3 G MCounterbalancing Mechanism

2.2.4 G MManual Door Operators

2.2.5 G MElectric Door Operators

SD-10 Operation and Maintenance

Data

3.3.2 G ROperation and Maintenance

Manuals

3.3.2 G RMaterials

3.3.2 G RDevices

3.3.2 G RProcedures

3.3.2 G RManufacture's Brochures

3.3.2 G RParts Lists

SD-11 Closeout Submittals

3.3.1 G M/RWarranty

08 51 13 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 80 PAGES

08 51 13 2.1 G MWindows

1.9 G MFabrication Drawings

SD-03 Product Data

2.1 GWindows

2.2.7.1 GHardware

2.2.3 GFasteners

1.10 GWindow Performance

2.4 GThermal-Barrier Windows

2.2.9 GScreens

2.2.2 GWeatherstripping

2.2.7 GAccessories

2.2.4Adhesives

1.10.4 GThermal Performance

SD-04 Samples

1.4.2.1 G RFinish Sample

1.4.2.2 G RWindow Sample

SD-05 Design Data

2.1 G MStructural Calculations for

Deflection

SD-06 Test Reports

1.4.4 G MMinimum Condensation

Resistance Factor

1.4.4 G MResistance to Forced Entry

SD-10 Operation and Maintenance

Data

2.1 G RWindows

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 80 PAGES

08 51 23 SD-02 Shop Drawings

2.2 G MWindows

SD-03 Product Data

2.4Mullions

2.6.2Fasteners

2.6Accessories

SD-04 Samples

2.7.2 G RColor Coating

2.2 G RWindows

SD-06 Test Reports

1.3.1 G MAir Infiltration

1.3.1 G MWater Infiltration

1.3.2 G MMullion Wind Load

SD-10 Operation and Maintenance

Data

2.2 G RWindows

08 71 00 SD-02 Shop Drawings

1.4 G MHardware Schedule

2.3.6 G MKeying System

SD-03 Product Data

2.3 GHardware Items

SD-08 Manufacturer’s Instructions

3.1Installation

SD-10 Operation and Maintenance

Data

1.4 G RHardware Schedule

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 80 PAGES

08 71 00 SD-11 Closeout Submittals

1.5.1 G M/RKey Bitting

08 81 00 SD-03 Product Data

1.6.1Insulating Glass

1.3Glazing Accessories

SD-04 Samples

1.6.1 G RInsulating Glass

2.4.2 G RGlazing Compound

2.4.6 G RTape

2.4.3.1 G RSealant

SD-07 Certificates

1.6.1Insulating Glass

1.3Glazing Accessories

SD-08 Manufacturer’s Instructions

2.4Setting and Sealing Materials

3.2Glass Setting

08 91 00 SD-02 Shop Drawings

1.4 G MWall louvers

1.5 G MWall louvers

SD-03 Product Data

2.2Metal Wall Louvers

SD-04 Samples

1.4 G RWall louvers

1.5 G RWall louvers

1.5 G RDoor louvers

09 22 00 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 80 PAGES

09 22 00 2.1 G MMetal support systems

09 23 00 SD-04 Samples

1.5.1 G RGypsum Plaster

SD-08 Manufacturer’s Instructions

2.7ready-mix gypsum plaster

09 24 23 SD-02 Shop Drawings

3.3 G MLath

SD-03 Product Data

3.6Proportions and Mixing

SD-04 Samples

2.2 G RColored Stucco Finish Coat

1.3 G RSample Panel

09 26 00 SD-03 Product Data

2.1.3Gypsum veneer plaster

09 29 00 SD-03 Product Data

2.1.2Water-Resistant Gypsum Backing

Board

2.1.3Impact Resistant Gypsum Board

2.1.7Accessories

2.1.1Gypsum Board

2.1.4Joint Treatment Materials

SD-07 Certificates

2.1 GAsbestos Free Materials

SD-08 Manufacturer’s Instructions

2.1Material Safety Data Sheets

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 80 PAGES

09 29 00 SD-10 Operation and Maintenance

Data

2.1 G RManufacturer maintenance

instructions

3.7 G RWaste Management

09 30 10 SD-02 Shop Drawings

3.2 G MDetail Drawings

SD-03 Product Data

2.1 GTile

2.2 GSetting-Bed

2.4 GGrout

SD-04 Samples

2.1 G RTile

2.1 G RAccessories

2.1 G RTransition Strips

2.4 G RGrout

SD-07 Certificates

2.1Tile

2.4Grout

SD-08 Manufacturer’s Instructions

3.5Maintenance Instructions

SD-10 Operation and Maintenance

Data

3.2 G RInstallation

09 51 00 SD-02 Shop Drawings

1.2 G MApproved Detail Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 80 PAGES

09 51 00 SD-03 Product Data

2.1Acoustical Ceiling Systems

SD-04 Samples

2.1 G RAcoustical Ceiling Systems

09 65 00 SD-02 Shop Drawings

2.7 G MResilient Flooring and

Accessories

SD-03 Product Data

2.7 GResilient Flooring and

Accessories

2.3Adhesives

2.1Vinyl Composition Tile

2.2Wall Base

SD-04 Samples

2.7 G RResilient Flooring and

Accessories

SD-08 Manufacturer’s Instructions

3.2 GSurface Preparation

3.1 GInstallation

SD-10 Operation and Maintenance

Data

2.7 G RResilient Flooring and

Accessories

09 90 00 SD-02 Shop Drawings

3.9 G MPiping identification

3.9 G Mstencil

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 80 PAGES

09 90 00 SD-03 Product Data

2.1 GCoating

2.1Manufacturer's Technical Data

Sheets

SD-04 Samples

1.9 G RColor

SD-07 Certificates

1.3Applicator's qualifications

1.4.1.2 GQualification Testing

SD-08 Manufacturer’s Instructions

3.2.1Application instructions

3.5.2Mixing

1.7.2Manufacturer's Material Safety

Data Sheets

SD-10 Operation and Maintenance

Data

2.1 G RCoatings

10 11 00 SD-03 Product Data

1.2 GVisual Display Board

SD-04 Samples

2.1.3 G RAluminum

2.1.1 G RPorcelain Enamel

2.1 G RMaterials

SD-07 Certificates

1.2Visual Display Board

10 14 00.10 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 80 PAGES

10 14 00.10 3.1 G MApproved Detail Drawings

SD-03 Product Data

3.1Installation

1.2 GExterior Signage

SD-04 Samples

1.2 G RExterior Signage

SD-10 Operation and Maintenance

Data

3.1.2 G RProtection and Cleaning

10 14 00.20 SD-02 Shop Drawings

1.4.2 G MDetail Drawings

SD-03 Product Data

3.1 GInstallation

1.6 GWarranty

SD-04 Samples

1.4.1 G RInterior Signage

1.3 G RSoftware

SD-10 Operation and Maintenance

Data

3.1 G RApproved Manufacturer's

Instructions

3.1.2 G RProtection and Cleaning

10 21 13 SD-02 Shop Drawings

2.1 G MFabrication Drawings

3.2 G MInstallation Drawings

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 80 PAGES

10 21 13 2.1Cleaning and Maintenance

Instructions

2.4Colors And Finishes

2.2.1Anchoring Devices and Fasteners

2.2.2Brackets

2.3.1Urinal Screens

SD-04 Samples

2.4 G RColors and Finishes

2.2.1 G RAnchoring Devices and Fasteners

SD-07 Certificates

1.4Warranty

SD-10 Operation and Maintenance

Data

2.1.1 G RPlastic Identification

10 28 13 SD-03 Product Data

2.1.2 GFinishes

2.2 GAccessory Items

SD-04 Samples

2.1.2 G RFinishes

2.2 G RAccessory Items

SD-07 Certificates

2.2Accessory Items

10 44 16 SD-01 Preconstruction Submittals

2.1.1 G M/RManufacturer's Data

SD-02 Shop Drawings

2.1.1 G MFire Extinguishers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 80 PAGES

10 44 16 Part 2 G MCabinets

SD-03 Product Data

2.1.1 GFire Extinguishers

3.2.1 GReplacement Parts List

SD-04 Samples

Part 2 G RAccessories

SD-07 Certificates

2.1.1 GFire Extinguishers

2.1.1 GManufacturer's Warranty with

Inspection Tag

10 51 13 SD-02 Shop Drawings

2.1 G MTypes

1.4 G MLocation

3.1 G MInstallation

3.2 G MNumbering system

SD-03 Product Data

2.2Material

2.3.1Locking Devices

2.3.4Handles

2.2.2Finish

2.3components

3.1Assembly

SD-04 Samples

1.5.1 G RColor chips

11 68 33 SD-02 Shop Drawings

2.1 G M/RBasketball Goal

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 80 PAGES

11 68 33 2.2 G M/RVolleyball Net And Posts

2.3 G M/RSoccer Goal

2.4 G M/RBleachers

SD-03 Product Data

2.1 G M/RBasketball Goal

2.2 G M/RVolleyball Net And Posts

2.3 G M/RSoccer Goal

2.4 G M/RBleachers

12 21 00 SD-02 Shop Drawings

3.3 G MInstallation

SD-03 Product Data

2.1 GWindow Blinds

3.3Installation

1.4Certification

SD-04 Samples

2.1 G RWindow Blinds

SD-06 Test Reports

2.1 G MWindow Blinds

SD-08 Manufacturer’s Instructions

2.1 GWindow Blinds

SD-10 Operation and Maintenance

Data

2.1 G RWindow Blinds

12 24 13 SD-02 Shop Drawings

3.2 G MInstallation

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 80 PAGES

12 24 13 2.1 GWindow Shades

SD-04 Samples

2.1 G RWindow Shades

SD-06 Test Reports

2.1 G MWindow Shades

SD-08 Manufacturer’s Instructions

2.1Window Shades

SD-10 Operation and Maintenance

Data

2.1 G RWindow Shades

12 51 00 SD-02 Shop Drawings

Part 2 G MEquipment Systems

Part 2 G MEquipment Systems

Part 2 G MDetail Drawings

Part 2 G MOverall Reference Drawings

Part 2 G MInstallation Drawings

SD-03 Product Data

Part 2 G MEquipment Systems

Part 2 G MEquipment Systems

Part 2 G MSeating, Tables, Equipment

Part 2 G MMiscellaneous Freestanding

Furniture

Part 2 G MVisual Display Units

Part 2 G MVisual Display Units

Part 2 G MAppliances And Miscellaneous

Equipment

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 80 PAGES

12 51 00 Part 2 G MManufacturer's Literature And

Equipment Data

Part 2 G MCertification

1.6 G MWarranty

SD-04 Samples

Part 2 G MSeating Fabrics And Finishes

Part 2 G MTable Veneers, Laminates, Trim

Edges, Paints

Part 2 G MMiscellaneous Freestanding

Furniture Fabric, Paints And

Finishes

Part 2 G MVisual Display Unit Surfaces, Fabrics, And Frames

Part 2 G MSamples

SD-06 Test Reports

Part 2 G MEmissions

SD-07 Certificates

Part 2 G MTask Seating

Part 2 G MLoose Seating

Part 2 G MTables

Part 2 G MDesking

Part 2 G MStorage Units

Part 2 G MEquipment Systems

Part 2 G MEquipment Systems

Part 2 G MVisual Display Units

Part 2 G MVisual Display Units

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 80 PAGES

12 51 00 SD-08 Manufacturer’s Instructions

Part 2 G MMaterial Safety Data Sheets

SD-10 Operation and Maintenance

Data

3.1 G MAssembly Manuals

3.2 G MMaintenance Manuals

3.2 G MCleaning

1.4.3 G MElectrical System

13 34 19 SD-01 Preconstruction Submittals

1.6.3 G M/RManufacturer's Qualifications

SD-02 Shop Drawings

1.2.1.6 G MDetail Drawings

1.6.1 G MDetail Drawings

SD-03 Product Data

1.6.1 GManufacturer's catalog data

SD-04 Samples

1.6.1 G RCoil Stock

2.1.8 G RCoil Stock

2.5.2 G RFasteners

2.8.1 G RMetal Closure Strips

1.4.7 G RInsulation

2.4.2 G RInsulation

2.4.4 G RManufacturer's color charts and

chips

SD-05 Design Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 80 PAGES

13 34 19 1.6.1 G Mdescriptive and technical literature

1.6.1 G Mbuilding design analysis

SD-06 Test Reports

1.6.1 G Mtest reports

1.6.1 G MCoatings and base metals

1.6.1 G MFactory Color Finish Performance

Requirements

SD-07 Certificates

1.6.1 Gsystem components

1.6.1 GCoil Stock

2.1.8 GCoil Stock

1.6.1 GAluminized Steel Repair Paint

1.6.1 GGalvanizing Repair Paint

1.6.1 GEnamel Repair Paint

1.6.1 GQualification of Manufacturer

1.6.1 GQualification of Erector

SD-08 Manufacturer’s Instructions

1.6.2 GInstallation of Roof and Wall

panels

1.7 Gshipping, handling, and storage

SD-11 Closeout Submittals

3.13.1 G M/RManufacturer's Warranty

3.13.2 G…