A154_W912ER-17-R-0011-0002.pdf

PDF 140 KB Posted

Attached to
Construction - Peace Vector (PV) VII Package C in Cairo, Egypt Federal contract opportunity
Solicitation number
W912ER-17-R-0011
Issued by
Department of the Army Corps of Engineers Engineering District Middle East

About this file

W912ER-17-R-0011-0002

View the file

Other files for this federal contract opportunity

Other files attached to Construction - Peace Vector (PV) VII Package C in Cairo, Egypt, newest first.
File Type Posted
A154_Amendment_0002_Drawings_1_Jun_17.pdf PDF
A154_Amendment_0002_Specifications_1_Jun_17.pdf PDF
W912ER-17-R-0011-0001_conform_copy.pdf PDF
Amendment_0001_Drawings.pdf PDF
W912ER-17-R-0011-0001.pdf PDF
Amendment_0001_Specifications_24_May_17.pdf PDF
01_45_35_Schedule_of_Special_Inspections.pdf PDF
Special_Instructions_Schedule.pdf PDF
H04_Pkg_C_Geotechnical_Engineering_&_Concrete_Coring_Report.pdf PDF
Attachment_A_-_Experience_Reference_Sheet.docx DOCX document
Appendix_D_-_USACE_Past_Performance_Questionnaire_PPQ-0.docx DOCX document
Attachment_C_-_Contact_Information_Sheet.docx DOCX document
Attachment_B_-_Offeror's_Prime_Experience_Form.docx DOCX document
CDC_Cost_Documents_5_Apr_17.pdf PDF
H01_PEACE_VECTOR_VII_-_CWAFB_PKG_C_-_VOLUME_3_-_07_APRIL_2017.pdf PDF
H01_PEACE_VECTOR_VII_-_CWAFB_PKG_C_-_VOLUME_5_-_07_APRIL_2017.pdf PDF
H01_PEACE_VECTOR_VII_-_CWAFB_PKG_C_-_VOLUME_1_-_07_APRIL_2017.pdf PDF
H01_PEACE_VECTOR_VII_-_CWAFB_PKG_C_-_VOLUME_2_-_07_APRIL_2017.pdf PDF
H01_PEACE_VECTOR_VII_-_CWAFB_PKG_C_-_VOLUME_4_-_07_APRIL_2017.pdf PDF
H04_CDC_12_51_00_Appendix_A_-_CID_Binder.pdf PDF
H04_CDC_Vol_3_of_3_Specifications_5_Apr_17.pdf PDF
H04_CDC_12_51_00_Appendix_B_-_SID_Color_Boards.pdf PDF
H04_CDC_Vol_2_of_3_Specifications_5_Apr_17.pdf PDF
W912ER-17-R-0011.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912ER-17-R-0011

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

W912ER-17-R-0011-0002

Please refer to the SF-30 Block 14 Continuation Page

1. CONTRACT ID CODE PAGE OF PAGES

1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 02-Jun-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912ER-17-R-0011

X 9B. DATED (SEE ITEM 11)

18-Apr-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

02-Jun-2017

CODE

W912ER DISTRICT (TAM), USACE

MIDDLE EAST DISTRICT (CETAM-CT)

PO BOX 2250

WINCHESTER VA 22604-1450

W912ER 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912ER-17-R-0011 Amendment 0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

AMENDMENT 0002

MIDDLE EAST DISTRICT

U.S. ARMY CORPS OF ENGINEERS

P.O. BOX 2250 WINCHESTER, VIRGINIA 22604-

1450 Amendment 0002

SUBJECT: Amendment 0002 to W912ER-17-R-0011, PV VII, Package C, Cairo West Air Base, Egypt

1. Specifications: Revised sections are replaced in their entirety. Revisions to the specification pages are shown on the pages in the following manner: New text is underlined and deleted text is shown using strikeout. The amendment number appears in the bottom margin on all pages of the revised sections.

The following have been revised/added:

Project Table of Contents - Replaced in its entirety Section 01 15 00.12 10

Paragraph 1.8.1.3.e – page 8

Section 01 33 00 Submittal Register

01 45 35 – Deleted 09 29 00 – Revised – page 27 of 78 11 68 33 – Revised – pages 33 of 78 12 21 00 – Deleted

Section 01 45 35 – Deleted in its entirety

Section 09 29 00

Paragraph 1.2 – page 4 Paragraph 2.1.3 and subparagraphs - page 6

Section 11 11 00

Attachment – Added in its entirety

Section 11 68 33 Paragraph 1.1 – page 2 Paragraph 1.3 – page 2 Paragraph 2.1 – page 3 Paragraph 2.2 – pages 3 and 4 Paragraph 2.3 – page 4 Part 3 – page 5 Paragraph 3.1 – page 5

W912ER-17-R-0011 Amendment 0002

Section 12 21 00 – deleted in its entirety

Section 22 00 00 Paragraph 1.1 – page 8 Paragraph 2.10.1 – page 28 Paragraph 2.16 – pages 31 thru 33

Section 33 71 02

Paragraph 2.14.1 – page 18 Paragraph 2.14.2 – page 18 Paragraph 2.14.3 – page 18

2. Drawings. Revisions to the following drawings are identified by a triangle placed on the drawing near each revision and a "cloud" drawn around both the triangle and change.

GI001 Index of Drawings GI002 Index of Drawings GI003 Index of Drawings

SITE DESIGN: CD250, CG250B, CP250, CU232 and CU250

FACILITY “REC” SITE DESIGN: C-101

FACILITY “RQ” SITE DESIGN: C-101 and CU101

FACILITY “CC” PERSONNEL SUPPORT FACILITY: I-101, PL101 and PL901

FACILITY “DDD” WASTEWATER TREATMENT PLANT: MP102

FACILITY H – SQUADRON OPERATIONS: I-101, PL402, PL901, MH102, MH103

and MH104

FACILITY MA – MUNITIONS ASSEMBLY: FA200, PL102, EL101, EG101 and

EG102

FACILITY “MSM” MODULAR STORAGE MAGAZINE: E-001

FACILITY “RU” AIRFIELD LIGHTING VAULT: EL101

FACILITY “Z” VEHICLE MAINTENANCE FACILITY: I-101, PL101, PL102,

PL401, PL901, PL902 and EL101

STANDARD DETAILS: SC102, SP001, SP003, SC04 and SC07

3. The proposal due date has been extended to 4:00 PM (EST) on June, 13, 2017.

4. All other terms and conditions remain unchanged.