A154_Amendment_0002_Specifications_1_Jun_17.pdf

PDF 1 MB Posted

Attached to
Construction - Peace Vector (PV) VII Package C in Cairo, Egypt Federal contract opportunity
Solicitation number
W912ER-17-R-0011
Issued by
Department of the Army Corps of Engineers Engineering District Middle East

About this file

Amendment 0002 Specifications

View the file

Other files for this federal contract opportunity

Other files attached to Construction - Peace Vector (PV) VII Package C in Cairo, Egypt, newest first.
File Type Posted
A154_W912ER-17-R-0011-0002.pdf PDF
A154_Amendment_0002_Drawings_1_Jun_17.pdf PDF
W912ER-17-R-0011-0001_conform_copy.pdf PDF
Amendment_0001_Drawings.pdf PDF
W912ER-17-R-0011-0001.pdf PDF
Amendment_0001_Specifications_24_May_17.pdf PDF
01_45_35_Schedule_of_Special_Inspections.pdf PDF
Special_Instructions_Schedule.pdf PDF
H04_Pkg_C_Geotechnical_Engineering_&_Concrete_Coring_Report.pdf PDF
Attachment_A_-_Experience_Reference_Sheet.docx DOCX document
Appendix_D_-_USACE_Past_Performance_Questionnaire_PPQ-0.docx DOCX document
Attachment_C_-_Contact_Information_Sheet.docx DOCX document
Attachment_B_-_Offeror's_Prime_Experience_Form.docx DOCX document
CDC_Cost_Documents_5_Apr_17.pdf PDF
H01_PEACE_VECTOR_VII_-_CWAFB_PKG_C_-_VOLUME_1_-_07_APRIL_2017.pdf PDF
H01_PEACE_VECTOR_VII_-_CWAFB_PKG_C_-_VOLUME_2_-_07_APRIL_2017.pdf PDF
H01_PEACE_VECTOR_VII_-_CWAFB_PKG_C_-_VOLUME_4_-_07_APRIL_2017.pdf PDF
H01_PEACE_VECTOR_VII_-_CWAFB_PKG_C_-_VOLUME_3_-_07_APRIL_2017.pdf PDF
H01_PEACE_VECTOR_VII_-_CWAFB_PKG_C_-_VOLUME_5_-_07_APRIL_2017.pdf PDF
W912ER-17-R-0011.pdf PDF
H04_CDC_Vol_2_of_3_Specifications_5_Apr_17.pdf PDF
H04_CDC_12_51_00_Appendix_A_-_CID_Binder.pdf PDF
H04_CDC_Vol_3_of_3_Specifications_5_Apr_17.pdf PDF
H04_CDC_12_51_00_Appendix_B_-_SID_Color_Boards.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PV VII, Package C, Cairo West Air Base, Egypt 402784

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 SUMMARY OF WORK

01 14 00 WORK RESTRICTIONS

01 15 00.12 10 SUPPLEMENTARY REQUIREMENTS REVISED BY AMENDMENT 0002

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 31 19.05 20 POST AWARD MEETINGS

01 32 17.12 10 COST-LOADED NETWORK ANALYSIS SCHEDULES (NAS)

01 33 00 SUBMITTAL PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 42 15 METRIC MEASUREMENTS

01 45 00.00 10 QUALITY CONTROL

01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE(RMS CM)

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 58 00 PROJECT IDENTIFICATION

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION AND DECONSTRUCTION

02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs

AND MERCURY

DIVISION 03 - CONCRETE

03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING

03 15 00.00 10 CONCRETE ACCESSORIES

03 20 00.00 10 CONCRETE REINFORCING

03 30 00.00 10 CAST-IN-PLACE CONCRETE

03 35 00.00 10 CONCRETE FINISHING

03 37 13 SHOTCRETE

03 39 00.00 10 CONCRETE CURING

03 42 13.00 10 PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE

CONSTRUCTION

DIVISION 04 - MASONRY

04 20 00 UNIT MASONRY

DIVISION 05 - METALS

05 12 00 STRUCTURAL STEEL

05 40 00 COLD-FORMED METAL FRAMING

05 50 13 MISCELLANEOUS METAL FABRICATIONS REVISED BY AMENDMENT 0001

05 51 33 METAL LADDERS

05 52 00 METAL RAILINGS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS

06 61 16 SOLID SURFACING FABRICATIONS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

PROJECT TABLE OF CONTENTS Page 1 W912ER-17-R-0011 Amendment 0002

07 14 00 FLUID-APPLIED WATERPROOFING

07 21 13 BOARD AND BLOCK INSULATION

07 21 16 MINERAL FIBER BLANKET INSULATION

07 41 63 FABRICATED ROOF PANEL ASSEMBLIES ADDED IN ENTIRETY BY

AMENDMENT 0001

07 52 00 MODIFIED BITUMINOUS MEMBRANE ROOFING

07 55 00 PROTECTED MEMBRANE ROOFING

07 60 00 FLASHING AND SHEET METAL

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 33 23 OVERHEAD COILING DOORS

08 51 13 ALUMINUM WINDOWS

08 51 23 STEEL WINDOWS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 91 00 METAL WALL LOUVERS

DIVISION 09 - FINISHES

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 23 00 GYPSUM PLASTERING

09 24 23 CEMENT STUCCO

09 26 00 VENEER PLASTER

09 29 00 GYPSUM BOARD REVISED BY AMENDMENT 0002

09 30 10 CERAMIC, QUARRY, AND GLASS TILING

09 51 00 ACOUSTICAL CEILINGS

09 65 00 RESILIENT FLOORING

09 90 00 PAINTS AND COATINGS

DIVISION 10 - SPECIALTIES

10 11 00 VISUAL DISPLAY UNITS

10 14 00.10 EXTERIOR SIGNAGE

10 14 00.20 INTERIOR SIGNAGE

10 21 13 TOILET COMPARTMENTS

10 28 13 TOILET ACCESSORIES

10 44 16 FIRE EXTINGUISHERS

10 51 13 METAL LOCKERS

DIVISION 11 - EQUIPMENT

11 11 00 VEHICLE SERVICE EQUIPMENT

11 68 33 ATHLETIC FIELD EQUIPMENT REVISED BY AMENDMENT 0002

DIVISION 12 - FURNISHINGS

12 24 13 ROLLER WINDOW SHADES

12 51 00 FURNITURE, FURNISHINGS AND EQUIPMENT (FFE)

DIVISION 13 - SPECIAL CONSTRUCTION

13 34 19 METAL BUILDING SYSTEMS

13 48 00 SEISMIC PROTECTION FOR MISCELLANEOUS EQUIPMENT

13 48 00.00 10 SEISMIC PROTECTION FOR MECHANICAL EQUIPMENT

PROJECT TABLE OF CONTENTS Page 2

DIVISION 21 - FIRE SUPPRESSION

21 22 00.00 40 CLEAN AGENT FIRE EXTINGUISHING SYSTEMS

DIVISION 22 - PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE REVISED BY AMENDMENT 0002

22 15 13.16 40 HIGH-PRESSURE COMPRESSED-AIR PIPING, PIPING COMPONENTS,

AND VALVES, STAINLESS

22 31 00 WATER SOFTENERS, CATION-EXCHANGE (SODIUM CYCLE) REVISED

BY AMENDMENT 0001

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 08 00.00 10 COMMISSIONING OF HVAC SYSTEMS

23 23 00 REFRIGERANT PIPING

23 35 00.00 10 OVERHEAD VEHICLE TAILPIPE AND WELDING FUME EXHAUST

REMOVAL SYSTEM(S)

23 82 02.00 10 UNITARY HEATING AND COOLING EQUIPMENT

DIVISION 26 - ELECTRICAL

26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT

26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 35 43 60 AND 400-HERTZ (HZ) SOLID STATE FREQUENCY CONVERTERS

26 41 00 LIGHTNING PROTECTION SYSTEM

26 51 00 INTERIOR LIGHTING

26 56 00 EXTERIOR LIGHTING

26 56 20.00 10 AIRFIELD AND HELIPORT LIGHTING AND VISUAL NAVIGATION AIDS

REVISED BY AMENDMENT NO. 0001

DIVISION 27 - COMMUNICATIONS

27 05 28.36 40 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

27 51 16 RADIO AND PUBLIC ADDRESS SYSTEMS

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 31 64.00 10 FIRE DETECTION AND ALARM SYSTEM, ADDRESSABLE

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID

PAVEMENTS

32 05 33 LANDSCAPE ESTABLISHMENT

32 11 16 SUBBASES FOR FLEXIBLE PAVING

32 11 23 GRADED-CRUSHED AGGREGATE BASE COURSE

32 12 10 BITUMINOUS TACK AND PRIME COATS

32 12 15.13 HOT-MIX ASPHALT AIRFIELD PAVING

32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS

PROJECT TABLE OF CONTENTS Page 3

32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE

FACILITIES

32 13 73 COMPRESSION JOINT SEALS FOR CONCRETE PAVEMENTS

32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS

32 17 24.00 10 PAVEMENT MARKINGS

32 31 13.53 HIGH-SECURITY CHAIN LINK FENCES AND GATES

32 84 23 UNDERGROUND SPRINKLER SYSTEMS

32 92 19 SEEDING

32 93 00 EXTERIOR PLANTS

DIVISION 33 - UTILITIES

33 05 23.19 TRENCHLESS EXCAVATION USING MICROTUNNELING

33 11 00 WATER UTILITY DISTRIBUTION AND STORAGE REVISED BY

AMENDMENT 0001

33 30 00 SANITARY SEWERS

33 32 13.13 PACKAGED SEWAGE LIFT STATIONS, WET WELL TYPE

33 40 00 STORM DRAINAGE UTILITIES

33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION REVISED BY AMENDMENT

33 72 02 UNDERGROUND COMMUNICATION SYSTEM

33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT

41 22 13.15 BRIDGE CRANES, OVERHEAD ELECTRIC, UNDER RUNNING

DIVISION 46 - WATER AND WASTEWATER EQUIPMENT

46 07 53.13 PACKAGED WASTEWATER TREATMENT EQUIPMENT, AERATION

46 25 14 COALESCING OIL-WATER SEPARATORS

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 4

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 15 00.12 10

SUPPLEMENTARY REQUIREMENTS REVISED BY AMENDMENT 0002

PART 1 GENERAL

1.1 SUBMITTALS

1.2 FOREIGN OBJECTS DAMAGE CONTROL

1.3 DIGGING PERMITS

1.3.1 Requirements for Digging Permits

1.3.2 Requests for Digging Permits

1.3.3 Preparation of Requests for Digging Permits

1.3.4 Existing Underground Utilities

1.3.5 Use of Underground Utility Detecting Device

1.3.6 Hand Excavation

1.4 HAUL ROUTES - SPECIAL REQUIREMENTS

1.5 RESPONSIBILITY FOR PHYSICAL SECURITY

1.6 CERTIFICATES OF COMPLIANCE

1.7 ACCIDENT PREVENTION

1.7.1 Ground Fault Circuit Interrupter (GFCI) Requirement - Overseas

Construction

1.7.2 Temporary Power - Electrical Distribution Boxes

1.8 OPERATION AND MAINTENANCE (O&M) PERFORMANCE PERIOD

1.8.1 SCOPE OF WORK

1.8.1.1 General

1.8.1.2 Operation

1.8.1.3 Maintenance

1.8.1.4 Contractor Furnished Computerized Maintenance Management

System (CMMS)

1.8.1.5 Technical Library

1.8.1.6 Personnel

1.8.1.7 Reports and Records

1.8.1.8 Reliability Tests

1.8.1.9 Quality of Work

1.8.2 PAYMENTS

1.8.3 CONTRACTOR'S DATA SUBMITTAL REQUIREMENTS

1.8.4 CONTRACTOR'S DATA SUBMITTAL SCHEDULE

1.8.5 GOVERNMENT REMEDIES

1.8.6 EQUIPMENT EVALUATION AND CONDITION

1.9 LOCALLY AVAILABLE SERVICE FOR EQUIPMENT

1.10 CONTRACTOR'S MOBILIZATION AREA

1.11 CONTRACTOR'S OFF BASE MOBILIZATION AREA

1.11.1 Facilities Within the Mobilization Site

1.11.2 Special Requirements

1.12 CONTRACTOR FURNISHED SPARE PARTS

1.12.1 General

1.12.2 Selection of Spare Parts to be Furnished

1.12.3 Procurement and Delivery of Spare Parts

1.12.3.1 Shipment and Delivery

1.12.3.2 Turnover of Spare Parts

1.12.3.3 Parts and Package Identification

1.12.3.4 Preservation and Packaging Instruction

SECTION 01 15 00.12 10 Page 1

1.12.4 Warranty

1.12.5 Payments for Spare Parts

1.13 PHYSICAL CONDITIONS

1.14 STANDARDIZATION

1.15 ON-BASE PHOTOGRAPHY PROHIBITION

1.16 PUBLIC RELEASE OF INFORMATION

1.16.1 Prohibition

1.16.2 Subcontract and Purchase Orders

1.17 CUSTOM EXEMPT CONTRACT

1.18 COMPLIANCE WITH HOST COUNTRY RULES AND CUSTOMS

1.18.1 Contractor's Responsibilities

1.19 COMPLIANCE WITH HOST COUNTRY RULES AND CUSTOMS (EGYPT)

1.19.1 Contractor's Responsibilities

1.19.2 Security Clearance for Site Access

1.19.2.1 For U.S. Citizens (Contractor and Subcontractor Personnel)

1.19.2.2 For Egyptian Citizens (Contractor and Subcontractor

Personnel)

1.19.2.3 For Personnel Making Short, Site Visits

1.19.2.4 For Vehicles

1.20 RADIO TRANSMITTER RESTRICTIONS

1.21 BASE HOT WORK PERMITS

1.21.1 Requirement for Hot Work Permits

1.21.2 Requests for Hot Work Permits

1.21.3 Preparatory Inspections and Inspection of Equipment

1.22 CONTRACTOR TRANSPORTATION AND CUSTOMS CLEARANCE

1.22.1 Shipments of Materials

1.22.2 Contractor's Responsibilities

1.22.3 Physical Handling of Materials

1.22.4 Certification

1.23 REQUIREMENT FOR USE OF U.S. CITIZENS

1.24 GOVERNMENT OF EGYPT (GOE) FURNISHED TRANSPORTATION SERVICES

1.24.1 General

1.24.2 Use of Government of Egypt (GOE) Furnished Shipping Containers

1.24.3 Coordination

1.24.3.1 Egyptian Freight Forwarder

1.24.3.2 Shipping Status Report

1.24.4 Shipping Documents

1.24.5 Marking

1.24.5.1 Document Number

1.24.6 Alternate Transportation Arrangements

1.24.7 Shipping Charges

1.24.8 Payment for Material Delivered to the Government of Egypt

Freight Forwarder

1.24.9 Other Materials

1.24.10 Consolidated Warehouse Operation

1.25 EGYPTIAN AIR FORCE (EAF) REQUIREMENTS

1.25.1 Egyptian Subcontractor

1.25.2 Project Manager

1.26 USE OF MILITARY POSTAL SYSTEM (MPS) FACILITIES: (Applicable to

United States Firms and Citizens ONLY)

1.26.1 Authorized Use

1.26.2 Use and Restrictions

1.26.3 Compliance With Regulations

1.26.4 AAFES and Commissary (Applicable to US Personnel Only)

-- End of Section Table of Contents --

SECTION 01 15 00.12 10 Page 2

SECTION 01 15 00.12 10

SUPPLEMENTARY REQUIREMENTS

REVISED BY AMENDMENT 0002

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Foreign Objects Damage (FOD) Control Plan; G M/R

Requests for Digging Permits; G M/R

Proposed Means of Providing Project Security; G M/R

Requests for Hot Work Permits; G M/R

Shipping Documents (Egypt); G M/R

Shipping Status Report (Egypt); G M/R

SD-07 Certificates

Certificates Of Compliance

SD-11 Closeout Submittals

O&M Performance Period Reports and Records; G M/R

Consolidated Inventory of All Excess Supplies, Materials and Equipment (Egypt); G M/R

O&M Performance Period Reports and Records; G M/R

Contractor Furnished Computerized Maintenance Management System (CMMS) Database; G M/R

1.2 FOREIGN OBJECTS DAMAGE CONTROL

The Contractor shall prepare and submit to the Contracting Officer, for approval, his plan to control Foreign Objects Damage (FOD) at its mobilization site, construction site and during work on or near aircraft runways and/or taxiways. The plan shall be specific and shall describe in detail measures to be implemented to prevent deposit of foreign objects on runways and/or taxiways during construction. The Foreign Objects Damage (FOD) Control Plan shall be submitted fifteen (15) calendar days prior to the start of any work on or near aircraft runways or taxiways. No work will be allowed near any runways or taxiways without approval of the FOD

SECTION 01 15 00.12 10 Page 3 control plan by the Contracting Officer.

1.3 DIGGING PERMITS

1.3.1 Requirements for Digging Permits

Prior to the start of any work activity which requires excavation within the project site, the Contractor shall obtain a digging permit.

1.3.2 Requests for Digging Permits

Requests for Digging Permits shall be submitted through the Contracting Officer to the project site a minimum of seven (7) days prior to the start of the work activity covered by the permit. The request for a Digging Permit shall include a narrative description of the work to be performed and a detailed map of the area of the excavation clearly marking the location of all known utilities or other obstructions. If the work activity covered by the Digging Permit request also requires a utility outage, a separate request for the outage shall be submitted.

1.3.3 Preparation of Requests for Digging Permits

Prior to submitting a request for a Digging Permit, the Contractor shall carefully review the area to be excavated to determine the location of existing utilities and other obstructions. The Contractor will review available drawings and will conduct a visual inspection of the site. The Contractor will utilize underground utility detecting devices such as metal and cable detectors to determine the location of existing utilities.

All utility lines found shall be clearly flagged or marked and the location of the utility shall be shown on the drawing to be submitted with the request for Digging Permit.

1.3.4 Existing Underground Utilities

The Contractor is provided notice that existing utilities are present in the construction area which may not be shown, or are inaccurately shown, on the base as-built drawings and the contract drawings.The Contractor shall exercise utmost care in researching locations of existing utilities and reducing damage to existing utilities. Any utilities damaged by the Contractor shall be promptly repaired by the Contractor. The Contracting Officer will review and approve any proposed repairs. Any damage to existing utilities will be immediately reported to the Contracting Officer and the Base/Site Operator.

1.3.5 Use of Underground Utility Detecting Device

Prior to any excavation, a metal and/or cable detecting device shall be used along the route of the excavation. All underground utilities discovered by this method will be flagged a minimum distance of one-half (1/2) meter on each side of the location.

1.3.6 Hand Excavation

Hand excavation methods and special supervisory care shall be used between any flagged markers, in areas of known or suspected hazards, and in areas known or suspected to have multiple and/or concentrated utility lines or connections.

SECTION 01 15 00.12 10 Page 4

1.4 HAUL ROUTES - SPECIAL REQUIREMENTS

The Contractor shall be responsible for coordinating with the Host Government use of any existing roads as haul routes. Construction, and routing of new haul roads, and/or upgrading of existing roads for the Contractor's use, is the sole responsibility of the Contractor. It shall be the Contractor's responsibility to obtain such local authorizations, permits and licenses necessary to establish his mobilization camp, quarry operations, batching operations and haul routes.

1.5 RESPONSIBILITY FOR PHYSICAL SECURITY

Prior to mobilization, the Contractor shall submit his proposed means of providing project security to prevent unauthorized access to equipment, facilities, materials and documents, and to safeguard them against sabotage, damage, and theft. The Contractor shall be responsible for physical security of all materials, supplies, and equipment of every description, including property which may be Government-furnished or owned, for all areas occupied jointly by the Contractor and the Government, as well as for all work performed.

1.6 CERTIFICATES OF COMPLIANCE

Any certificates required for demonstrating proof of compliance of materials with specification requirements shall be executed in accordance with Section 01 33 00 SUBMITTAL PROCEDURES. Each certificate shall be signed by an official authorized to certify in behalf of the manufacturing company involved and shall contain the name and address of the Contractor, the project name and location, description and the quantity of the items involved, and date or dates of shipment or delivery to which the certificates apply. Copies of laboratory test reports submitted with certificates shall contain the name and address of the testing laboratory and the date or dates of the tests to which the report applies.

Certification shall not be construed as relieving the Contractor from furnishing satisfactory material.

1.7 ACCIDENT PREVENTION

The Contractor shall comply with all applicable Host Country laws and with such additional measures as the Contracting Officer may find necessary in accordance with CONTRACT CLAUSE 52.236-13 entitled ACCIDENT PREVENTION (NOV 1991)-ALTERNATE 1 (APR 1984). Applicable provisions of the Corps of Engineers manual entitled Safety and Health Requirements Manual EM 385-1-1, will be applied to all work under this contract. The referenced manual may be obtained from the Contracting Officer's Representative at the jobsite or from the Middle East District at Winchester, Virginia.

1.7.1 Ground Fault Circuit Interrupter (GFCI) Requirement - Overseas Construction

The Corps of Engineers Health and Safety Manual, EM 385-1-1, section 11.C.05.a. states: "The GFCI device shall be calibrated to trip within the threshold values of 5 ma +/- 1 ma as specified in Underwriters Laboratory (UL) Standard 943." A variance from USACE has been granted allowing 10 ma, in lieu of 5 ma, for overseas activities that use 220 Volts(V)/50 hertz(hz) electrical power.

SECTION 01 15 00.12 10 Page 5

1.7.2 Temporary Power - Electrical Distribution Boxes

EM 385-1-1 section 11.A.01.a. states "All electrical wiring and equipment shall be a type listed by a nationally recognized testing laboratory for the specific application for which it is to be used." This includes temporary electrical distribution boxes. Locally manufactured electrical boxes will not be allowed. Only manufactured electrical distribution boxes that meet the European CE requirements, with 10 ma CE type GFCIs installed shall be allowed.

Contractors shall:

a. Make no modifications that might void any CE or manufacturer certification.

b. Test the installed systems to demonstrate that they operate properly and provide the 10 ma earth leakage protection.

c. Ensure GFCIs will have an integral push-to-test function. The testing shall be performed on a regular basis.

d. Check that proper grounding is checked regularly and flexible cords, connectors, and sockets inspected before each use.

1.8 OPERATION AND MAINTENANCE (O&M) PERFORMANCE PERIOD

The contractor will provide services including but not limited to equipment surveys, repair as required, preventive maintenance, and spares as specified. Services and spare parts shall be in accordance with the manufacturer's recommendations.

Unless otherwise stated elsewhere in this contract:

a. The work associated with this section is listed and priced as a separate CLIN in the Proposal Schedule.

b. The duration of work under this section shall be for a period of one (1) year.

c. The work specified in this section shall begin on the day following the date of final acceptance, of the work on this contract.

d. All contract provisions under this contract remain in force throughout the Operation and Maintenance periods. However, the work required under this section is not included in the work which must be finally accepted for reducing the amount of the Bank Letter of Guaranty, or Bond requirements.

1.8.1 SCOPE OF WORK

1.8.1.1 General

The contractor will provide equipment, surveys, repair as required, preventive maintenance, and spares per the manufacturers' recommendations for Package C facilities. Services shall be in accordance with the manufacturer's recommendations. It is noted that the word "operations" included in the term "operations & maintenance" does not mean that the contractor is required to operate the equipment for the user. This word is referring to the requirement for the contractor to keep the equipment

SECTION 01 15 00.12 10 Page 6 properly maintained and operational. Operation and Maintenance Services Bid Items listed in the proposal schedule includes all routine maintenance repairs and installation of spare parts.

The equipment, systems, and/or facilities to be operated and maintained are as follows:

a. Mechanical Equipment: Inspect and maintain the Mechanical Equipment in accordance with the manufacturer's instructions. Regular maintenance shall follow manufacturer's instructions and frequencies including but not limited to inspecting for proper operations and maintenance, cleaning sand, dirt and debris, and inspecting and maintaining installed heating, ventilating, and air conditioning system in accordance with the manufacturer's instructions.

b. Interior/Exterior Plumbing Features: Inspect and maintain the Interior/Exterior Plumbing in accordance with the manufacturer's instructions. Regular maintenance shall follow manufacturer's instructions and frequencies including but not limited to inspecting for proper operations and maintenance, cleaning sand, dirt and debris.

c. Ventilation, Detection, and Alarm Systems: Inspect for proper operations and maintenance. Regular maintenance shall follow manufacturer's instructions and frequencies including but not limited to inspecting for proper operations and maintenance, cleaning sand, dirt and debris from the Ventilation, Detection, and Alarm Systems.

d. Interior/Exterior Electrical service, distribution, and controls:

Inspect for proper operations and maintenance. Regular maintenance shall follow manufacturer's instructions and frequencies including but not limited to inspecting for proper operations and maintenance, cleaning sand, dirt and debris from the Interior/Exterior Electrical service, distribution, and controls.

e. Closed circuit television (CCTV): Inspect and maintain the CCTV system in accordance with the manufacturer's instructions.

1. Cameras: Inspect for proper operations and maintenance.

Regular maintenance shall follow manufacturer's instructions and frequencies including but not limited to inspecting and testing of each camera to ensure proper operations, cleaning of body and lenses, and adjustment of mechanical components.

2. Communications: Inspect for proper operations and maintenance. Regular maintenance shall follow manufacturer's instructions and frequencies including but not limited to inspecting for proper operations and maintenance, cleaning sand, dirt and debris from the communications equipment.

1.8.1.2 Operation

a. Operation of equipment shall be in accordance with approved O&M manuals submitted by the Contractor in accordance Section 01 78 23

OPERATION AND MAINTENANCE DATA.

b. Operating schedules shall provide for regular maintenance periods in accordance with the manufacturer's recommendations including periodic start-up and shut-down operations.

SECTION 01 15 00.12 10 Page 7

1.8.1.3 Maintenance

a. Preventive Maintenance (PM): The Contractor shall perform preventive maintenance inspections and servicing as follows:

1. The contractor shall perform all inspection and services that are required by the manufacturer and at the frequencies that correspond to the operation conditions and tempo as recommended by the manufacturer and at the recommended frequency.

2. Maintain a schedule for PM activities.

3. Maintain a file of completed checklists showing PM functions performed, date and any corrective action. Reports must be made available to the Base Commander regarding repair status, readiness of all facilities as required by Egypt.

b. Repair and Overhaul:The contractor shall submit repair and overhaul requests for approval by the Contracting Officer; once approved the contractor shall perform the necessary work to restore a failed or failing system, or piece of equipment to full operating capability.

The Contractor will troubleshoot, repair or replace following items:

1. Mechanical Equipment: Repair or replace damaged or broken components and systems.

2. Interior/Exterior Plumbing Features: Repair or replace damaged or broken components and systems.

3. Ventilation, Detection, and Alarm Systems: Repair or replace damaged or broken components and systems.

4. Interior/Exterior Electrical service, distribution, and controls: Repair or replace damaged or broken components and systems.

5. Closed circuit television (CCTV): Repair or replace inoperable cameras, monitoring equipment, electrical or control wiring and components, and heating, ventilating and air conditioning systems. Provide software updates or computer support.

c. Emergency Repairs: The Contractor shall be prepared to make emergency repairs twenty-four (24) hours a day, seven (7) days a week.

d. Warranty Service: The Contractor shall be responsible for obtaining warranty service (in accordance with the warranty of construction specified in the contract) from equipment manufacturers as applicable.

Work shall not be delayed or remain undone due to conflict of warranty responsibility.

e. Parts and Supplies: The Contractor shall be responsible for providing, procuring and storing all parts (including manufacturers' recommended spare parts) and supplies required to operate and maintain all equipment/systems under paragraph 1.2.1 paragraph 1.8 of this section, for each O&M period. Those parts and supplies used from the supply of spare parts provided under this contract, must be replaced.

All parts/supplies stored on site and unused at the time of completion of the contract, shall become the property of the Egyptian Air Force

SECTION 01 15 00.12 10 Page 8

(EAF) and shall remain stored on site. Upon completion of the O&M period, the Contractor shall deliver all spare parts and materials procured for the Operation and Maintenance period to the designated location provided by the Contracting Officer and an inventory shall be taken at that time, in coordination with the Contracting Officer's Representative.

The cost of the spare parts & supplies required for the O&M should be included in the CLINs for the O&M period.

f. Tools: All Contractor's tools not specified for incorporation into the contract shall remain the property of the Contractor upon completion of the contract. Specialized tools purchased to support this O&M contract shall be turned over to EAF at the end of the contract.

1.8.1.4 Contractor Furnished Computerized Maintenance Management System

(CMMS)

The contractor shall provide, operate and maintain a computerized maintenance management system (CMMS). The CMMS will be part of the information, management and control system for performing preventive maintenance, checks, services, calibration, maintenance and repair functions to maintain equipment and systems in working order so that they are capable of meeting their design specifications in an efficient and economical manner. CCMS database shall be submitted to the Government upon completion of the contract.

The CMMS capabilities shall include, as a minimum:

1. Work management ability to track and manage all aspects of work requests, labor, planning, scheduling and document and track employee certification.

2. Capability to produce work orders that are used to specify and track all work (preventative maintenance, scheduled and unscheduled maintenance, and repair) being executed on a site, at a facility, or on a piece of equipment.

3. Include a hierarchical relationship to accumulate the work on the components of larger systems and individual facilities at a site.

4. Facilitate planning, scheduling and tracking of Preventive Maintenance and Inspections (PMl's).

5. Capture item specifications warranty information, manufacturer's data, associated service contracts, spare parts, vendor and other purchase information as well as other pertinent data.

6. Create job plans to record and track the work steps, any material to be used as well as special tools and/or trade skills thereto.

7. Materials management which includes reservations of material for specific work orders, identifying and procuring spare parts that are applicable as well as substitutes and inventory adjustments, minimum order quantities, and ideal order and issue quantities.

SECTION 01 15 00.12 10 Page 9

1.8.1.5 Technical Library

The Contractor shall utilize the technical data supplied under Section 01 78 23 OPERATION AND MAINTENANCE DATA. This information shall be supplemented and corrected as found necessary through experience gained during the operating and maintenance period.

1.8.1.6 Personnel

a. The facilities shall be attended and operated by experienced personnel who are fully qualified and skilled in all phases of operating the particular equipment assigned to be operated during each shift. The crews and shifts need not necessarily be comprised of equal numbers of personnel, and the qualifications of each crew/watch need not necessarily be equivalent. Each crew, however, shall be capable of fully operating and maintaining the systems under the normally expected operating conditions during an assigned shift. A selected portion of the remainder of the off-duty staff shall be scheduled to be available, on-call, for emergencies.

b. The operating staff shall be supervised by a chief operator with a minimum of five (5) years relevant experience. The supervisor shall provide continuity among all personnel to improve staff effectiveness and operational procedures.

c. The maintenance staff shall be comprised of personnel with previous experience in the repair of the type equipment covered under this contract.

d. The maintenance staff shall be supervised by a technically qualified and certified by equipment manufacturer maintenance engineer with a minimum of five (5) years relevant experience.

e. Supervisors shall assure that safety practices are promulgated and posted, and that all staff members understand and abide by established safety procedures. Supervisors also ensure the staff is adhering to all security, badging and access procedures.

f. The Contractor shall designate one individual as the overall manager responsible for the O&M portion of this contract, and this individual shall meet the approval of the Contracting Officer. This manager may have dual functions. In addition, supervisors and key personnel shall be approved by the Contracting Officer. The requests for review and approval shall include a resume for each person.

g. The manager, supervisors and key personnel shall be on board thirty

(30) calendar days prior to implementation of OPERATION AND MAINTENANCE (O&M). A list of those to be on board shall be provided to the Contracting Officer 90 calendar days prior to completion of the construction contract.

h. Key staff personnel shall be able to communicate in English and or Arabic language.

1.8.1.7 Reports and Records

The Contractor shall:

1. Maintain a record of all maintenance performed on major units of

SECTION 01 15 00.12 10 Page 10 equipment.

2. Maintain an inventory record of all supplies and parts including stock levels, materials procured, materials ordered, receipts, issues and requisition status.

3. Maintain a file of completed checklists for all operator maintenance to include lubricant schedule, frequency and type of lubricant required.

4. Prepare monthly operating summaries for each facility.

5. Develop, perform, and maintain logs of appropriate weekly fire and safety inspections.

6. All of the above reports and records shall remain on site and copies shall be provided to the Contracting Officer upon request.

1.8.1.8 Reliability Tests

The systems shall be maintained and repaired as required to keep them in a like-new operating condition and at the end of the operating and maintenance period shall be put in a like-new condition prior to turnover to EAF. The evaluation of the conditions of the facility, including all equipment, will be made by the Contracting Officer based on:

1. Evaluation of records of maintenance and repairs performed.

2. Physical inspection of the facility including all equipment.

3. The Contractor's demonstration of the specified operational capability of the systems by putting all equipment in service on a design load type operation for a forty-eight (48) hour reliability run. This reliability test shall start ten (10) calendar days prior to completion of the O&M period. All of the above must be made to the satisfaction of the Contracting Officer prior to final payment for

OERATIONS AND MAINTENANCE (O&M) SERVICES.

1.8.1.9 Quality of Work

The Contractor is responsible for the quality of work performed. The Contractor measures that quality through the Contractor's own Quality Control (QC) Program. QC is work output, not workers, and therefore includes work performed under this contract regardless of whether the work is performed by Contractor employees or by subcontractors. The Government will perform Quality Assurance (QA}. Quality Assurance is defined as the functions and associated contract oversight actions performed by the Government to ensure that contract requirements are performed in accordance with contract specifications and contract terms and conditions, and that an acceptable level of Contractor quality control activities is in place and operational. The Government executes its QA Program through direct observation supplemented by input from customers served by the Contractor. Successful quality assurance is a team effort. Quality Assurance Evaluators (QAEs) observe and evaluate contractor performance.

Quality Assurance will be measured by a mix of 100% evaluation, random sampling, periodic evaluation, and customer input as appropriate to specific tasks.

SECTION 01 15 00.12 10 Page 11

1.8.2 PAYMENTS

The payment amount for the O&M portion of this contract will be as designated in the Proposal Schedule.

a. The Contractor shall submit separate monthly invoices to the Contracting Officer for work performed under this contract.

b. Final payment will be withheld until the satisfactory completion of the reliability run (as defined in this section) and shall be no less than 10% of the payment item.

PERFORMANCE METRICS

The Contractor's performance will be rated per the below metrics. This is not the only tool that will be used to evaluate Contractor's performance, but it is the first step or action in the process.

Note that the Contracting Officer's Representative will distribute the client or customer questionnaire monthly and will seek their opinions as to the Contractor's performance. These questionnaires will be released to the Contractor at the discretion of the Contracting Officer.

Issues with Contractor performance will be addressed with the Contractor by the Contracting Officer. This will be done in a timely manner so that all issues are quickly resolved.

REQUIRED

SERVICE

PERFORMANCE

STANDARDS

ACCEPTABLE

QUALITY

LEVELS

METHOD OF

SURVEILLANCE

INCENTIVE

(NEGATIVE)

(IMPACT ON

CONTRACTOR

PAYMENTS)

The contractor shall conduct quarterly inspections of the equipment and items listed above

Contractor shall conduct quarterly inspections on-time and on schedule

90% of all quarterly inspections are completed on-time and on schedule quarterly reports, periodic and/or random, observations, customer surveys or user complaints

Contractual remedies

SECTION 01 15 00.12 10 Page 12

REQUIRED

SERVICE

PERFORMANCE

STANDARDS

ACCEPTABLE

QUALITY

LEVELS

METHOD OF

SURVEILLANCE

INCENTIVE

(NEGATIVE)

(IMPACT ON

CONTRACTOR

PAYMENTS)

The contractor shall submit the Quarterly Inspection Report within five calendar days of the first day of each quarter

Contractor shall submit the Quarterly Inspection Report within five calendar days of the first day of each quarter

90% of the Quarterly Inspection Reports are submitted on time.

Quarterly reports, periodic and/or random, observations, customer surveys or user complaints

Contractual remedies

Contractor shall promptly respond to urgent calls

Contractor shall respond within 24 hours of all urgent calls from the Host Nation or the local Corps of Engineer's Contracting Officer's Representative

100% of all urgent calls are responded to within 24 hours unless base access is denied

Quarterly reports, periodic and/or random, observations, customer surveys or user complaints

Contractual remedies

The Contractor shall notify the Contracting Officer and Program Manager whenever 20% or less of the spare parts inventory remains

Contractor shall include this spare parts inventory within their Monthly Inspection Reports

90% of the spare parts inventory list is reported monthly to the Contracting Officer and Program Manager

Quarterly reports, periodic and/or random, observations, review of contractor pay estimates

Contractual remedies

SECTION 01 15 00.12 10 Page 13

REQUIRED

SERVICE

PERFORMANCE

STANDARDS

ACCEPTABLE

QUALITY

LEVELS

METHOD OF

SURVEILLANCE

INCENTIVE

(NEGATIVE)

(IMPACT ON

CONTRACTOR

PAYMENTS)

Parts, supplies and services provided by the Contractor for the equipment maintained have been properly paid

Contractor shall provide the KO monthly reports that show that the invoices paid for parts, supplies and services are on-time

90% of all invoices are timely and accurate.

Quarterly reports, periodic and/or random, observations, review of contractor pay estimates

Contractual remedies

Customer or client surveys indicate overall satisfactory performance or better by the contractor

Contractor is required to at least attain an overall "Satisfactory" rating on all customer or client surveys.

Overall Satisfactory or better rating monthly

Quarterly reports, periodic and/or random, observations, customer surveys or user complaints

Contractual remedies

1.8.3 CONTRACTOR'S DATA SUBMITTAL REQUIREMENTS

The Contractor is required to furnish the following data submittals as specified:

(1) INSPECTION and EVALUATION REPORT

(2) WARRANTY

(3) MAINTENANCE PLAN

(4) MANAGEMENT PLAN

(5) CERTIFICATES OF CONFORMANCE

(6) INSPECTION REPORTS

(7) QUALIFIED PERSONNEL RESUMES

(8) SAFETY PLAN (EM 385.1.1)

SECTION 01 15 00.12 10 Page 14

(9) EQUIPMENT EVALUATION PLAN

(10) QUALITY CONTROL PLAN

1.8.4 CONTRACTOR'S DATA SUBMITTAL SCHEDULE

The Contractor shall complete and submit one copy of ENG Form 4025, "Transmittal of Shop Drawings, Equipment Data, Material Samples, or Manufacturer's Certificates of Compliance" (included as an attachment to this contract) with each data submittal. All submittals will be transmitted by ENG Form 4025 with a copy of the form attached to each submittal copy. The transmittal forms shall be consecutively numbered beginning with the number "1". Any resubmittals shall be identified using an alphabetical suffix beginning with the letter "A" (i.e., if the fifth submittal, No. 5, is resubmitted, the first resubmittal will be No. 5A, the second 5B, etc.). All pertinent information required by the ENG Form 4025 shall be supplied. Submittals as specified shall be complete for the equipment being furnished and any inapplicable information shall be marked out or deleted. Submittal packages shall be suitably identified by (i) the type of submittal (i.e., Special Tools and Equipment, Warranty, etc.),

(ii) contract number, and (iii) Contract Line Item Number (CLIN). The item numbers in the Submittal Schedule below shall be submitted for each Contract Line Item in this contract as applicable.

Submittals requiring approval by the Contracting Officer or his authorized representative are so designated in the Submittal Schedule below. In the event data submittals are rejected and returned to the Contractor for correction and resubmission, the Contractor shall submit acceptable data to the Government in not more than 10 calendar days after receipt of initial rejection. All costs for resubmission of disapproved submittals shall be borne by the Contractor.

The required submittal (s) shall be forwarded in the designated number of copies at the times listed on the Submittal Schedule below. Note: All times listed in the submittal schedule are CALENDAR DAYS. Submittals should be provided to the COR at the site.

SUBMITTAL SCHEDULE

ITEM REQUIRED NUMBER

NO. DESCRIPTION DELIVERY DATE OF COPIES

1 Inspection and Evaluation As required 1

2 Warranty SERVICES: Manufacturer warranties for major repair parts shall be provided in addition to the Certificates of Conformance Test

FOR APPROVAL: 1

30 Days after Installation

3 Maintenance Plan FOR APPROVAL: 1 30 Days after Receipt of Award

SECTION 01 15 00.12 10 Page 15

4 Qualified Personnel FOR APPROVAL: 1 Resumes Within 10 days After receipt of Contract Award

Required initially and when personnel are changed, new personnel are added for a specific task, a specialized subcontractor service is engaged, and when the COR request additional info.

5 Safety Plan FOR APPROVAL 1 Within 15 days of Contract Award

6 Equipment Evaluation FOR APPROVAL Plan Within 30 days of Contract Award

7 Quality Control Plan FOR APPROVAL 1 Within 15 days of Contract Award

1.8.5 GOVERNMENT REMEDIES

The Contracting Officer shall follow FAR 52.246-4, Inspection of Services-Fixed Price, for contractor's failure to perform satisfactory services or failure to correct non-conforming services.

1.8.6 EQUIPMENT EVALUATION AND CONDITION

The contractor is required to provide an equipment evaluation every two months. This evaluation will provide the cost of repairs during the reporting period; look ahead 6 month parts requirement; equipment age, down time during reporting period, performance level and overall condition of the equipment.

1.9 LOCALLY AVAILABLE SERVICE FOR EQUIPMENT

All equipment furnished under this contract, regardless of country of manufacture or purchase, must have in-country service availability. In the event that the Contractor proposed to provide equipment for which in-country service is not available, the Contractor must provide written justification for the Contracting Officer's approval. This justification shall be submitted for each product or material for which a waiver is sought concurrently with the submittal required by the Technical Provisions. Submission of group or "blanket" waivers is unacceptable.

1.10 CONTRACTOR'S MOBILIZATION AREA

The Contractor shall not be authorized to have living accommodations for his work force on the site. The Contractor is responsible for obtaining any required additional mobilization area above that designated. On completion of the contract, all facilities shall be removed from the mobilization area by the Contractor and shall be disposed of in accordance with applicable Host Government Laws and Regulations. The site shall be cleared of construction debris and other materials and the area restored

SECTION 01 15 00.12 10 Page 16 to its final grade. See Section 01 50 00 TEMPORARY CONSTRUCTION FACILITIES for additional requirements.

1.11 CONTRACTOR'S OFF BASE MOBILIZATION AREA

The Contractor shall provide, furnish, operate and maintain facilities for his batching operations (e.g. concrete, asphalt, etc.) major shops and living facilities for his workers in an area off base. The specific area must be located such that no new contractor facilities are within the "Inhabited Building Clear Zone" (approximately 1355 meters, radius) surrounding ammunition/explosives storage and/or handling areas. The Contractor must submit his desired site location to the Contracting Officer for approval. All utilities will be the responsibility of the Contractor and shall be provided at no cost to the Government. On completion of the contract, all facilities shall be removed by the Contractor and shall be disposed of in the manner directed by the Contracting Officer. The site shall be cleared of construction debris and other materials and the area restored to its original condition. See Section 01 50 00 TEMPORARY CONSTRUCTION FACILITIES for additional requirements.

1.11.1 Facilities Within the Mobilization Site

All facilities within the Contractor's mobilization site shall be of substantial construction suitable for the local weather conditions.

Housing, messing and sanitary facilities shall meet the requirements of Corps of Engineers Safety and Health Requirements Manual EM 385-1-1. The Contractor shall provide all utilities required to make the site self-sufficient.

1.11.2 Special Requirements

The Contractor shall be responsible for coordinating with the Host Government use of any existing roads as haul routes, or any batching operations within the on-base mobilization area. Construction, and routing of new haul roads, and/or upgrading of existing roads for the Contractor's use, is the sole responsibility of the Contractor. It shall be the Contractor's responsibility to obtain such local authorizations, permits and licenses necessary to establish his mobilization camp, quarry operations, batching operations and haul routes (See paragraphs entitled "COMPLIANCE WITH HOST COUNTRY RULES AND CUSTOMS" or "COMPLIANCE WITH HOST

COUNTRY RULES AND CUSTOMS (EGYPT))".

1.12 CONTRACTOR FURNISHED SPARE PARTS

1.12.1 General

The requirements of this clause are in addition to any requirements for the provision of specific spare parts to be provided by the Contractor included in the contract documents. The Contractor shall furnish spare parts as directed by the Contracting Officer under the provisions of this clause for all equipment for which O&M data is to be provided under Section 01 78 23 Operations and Maintenance Data of this contract. The term "spare parts" as used herein shall include spare parts, special tools and test equipment.

1.12.2 Selection of Spare Parts to be Furnished

The Contractor shall provide master parts lists, recommended spare parts lists and lists of special tools and test equipment as a part of the

SECTION 01 15 00.12 10 Page 17 equipment O&M data required by Section 01 78 23 Operations and Maintenance Data. The master parts list shall include the supplier's price for each part. After review of the lists, the Contracting Officer will select spare parts and furnish written direction to the Contractor indicating quantities and types of spare parts to be furnished by the Contractor.

Written directions for spare parts orders may be provided on an incremental basis as reviews of O&M data submitted by the Contractor are completed but will not necessarily be issued in the sequence in which the Contractor submitted the equipment O&M data.

1.12.3 Procurement and Delivery of Spare Parts

The Contractor shall procure and be responsible for delivery, receipt, handling, placing in storage, inventory, and turnover to the Contracting Officer all spare parts selected by the Contracting Officer.

In addition to the recommended spare parts list required in paragraph SELECTION OF SPARE PARTS TO BE FURNISHED above, the Contractor is responsible to have six (6) months supply of manufacturer's recommended spare parts on site ready to turn over to the Contracting Officer at the time of acceptance of the facility. Procurement and delivery of spare parts shall be made as part of the award CLIN that covers the items associated with six (6) month manufacturers recommendation.

1.12.3.1 Shipment and Delivery

The Contractor shall be responsible for the shipment and delivery of spare parts to the location on or near the site in Egypt as selected by the Contracting Officer. The Contractor shall provide all manpower and equipment required to receive and place into designated storage areas all spare parts purchased under this clause. The Contractor shall give the Contracting Officer thirty (30) calendar days notice of arrival at the site of the first shipment.

1.12.3.2 Turnover of Spare Parts

The Contractor shall notify the Contracting Officer seventy-two (72) hours prior to delivery of spare parts to the designated storage area. The Contractor and a representative of the Contracting Officer will perform a joint inventory of the spare parts and the spare parts will be turned over to the Contracting Officer. Spare parts purchased under this clause shall not be used by the Contractor.

1.12.3.3 Parts and Package Identification

Prior to shipment from point of purchase, each spare part shall be tagged or otherwise marked or labeled. Such labeling may be placed or affixed to the container, box or packaging in which spare parts are located when it is not feasible to place or affix such labeling directly on each spare part. Tags or labels shall include, but not necessarily be limited to;

part number, description, parent equipment name and number location, project and/or other data as directed by the Contracting Officer.

1.12.3.4 Preservation and Packaging Instruction

a. Items ordered under this contract shall be preserved and packed for a minimum of three (3) years shelf life storage. All items shall be individually packaged except when the manufacturer specifies that the items are to be used in sets. Appropriate identification labels must

SECTION 01 15 00.12 10 Page 18 be affixed to the items protective box or package. After the spare parts are packaged, the manufacturer shall weigh the spare parts and packaging and place the weight and size of the packaged container on the label with other information as outlined herein. Each item, not normally identified with manufacturer's name and part number, shall have an appropriate label affixed to it with manufacturer's name and part number.

b. Machined spare parts shall be lubricated or coated in order to withstand extensive periods of storage in a highly corrosive atmosphere.

c. Large items (greater than 50 lbs., or larger than one cubic foot) shall be packaged in waterproof wooden boxes and properly braced.

Cushioning shall be used to prevent damage to the item and to the packaging material.

d. Solid state components, such as diodes, transistors, integrated circuits or equipment consisting of such parts which can be damaged as a result of static electricity and other stray electro-magnetic fields shall be packaged in heat-sealed, aluminum foil, laminated, flexible packages.

e. All other spare parts shall be packaged in heat sealed plastic bags or wrap. Delicate and more fragile items such as test equipment shall be cushioned or wrapped with transparent bubble wrap material prior to being inserted into the plastic package.

1.12.4 Warranty

All spare parts provided by the Contractor under this clause are subject to the general warranty clauses of this contract.

1.12.5 Payments for Spare Parts

Payments for spare parts ordered under the paragraph entitled "Selection of Spare Parts To Be Furnished" will be made…