Long Beach, NY Hurricane and Storm Damage Reduction Project Contract 2
Solicitation number
W912DS18B0002
Issued by

About this file

W912DS18B0002 - Amendment 2

View the file

Other files

File Type Posted
Final_W912DS-18-B-0002_Bid_Abstract.xlsx XLSX spreadsheet
W912DS18B0002-0008.pdf PDF
W912DS18B0002-0007.pdf PDF
W912DS18B0002-0006.pdf PDF
W912DS18B0002-0005.pdf PDF
31_24_00.00_18.pdf PDF
06_13_35.00_18.pdf PDF
Revised_Plans-_Volume_3.pdf PDF
01_50_00.pdf PDF
02_01_51.pdf PDF
Revised_Plans-_Volume_2.pdf PDF
31_62_19.pdf PDF
01_54_00.00_18.pdf PDF
01_30_00.pdf PDF
00_73_00.00_18.pdf PDF
01_11_00.pdf PDF
Revised_Plans-_Volume_1.pdf PDF
06_13_33.pdf PDF
W912DS18B0002-0004.pdf PDF
LB0711_NAVD_BATHY_MLLW_DATUM.xyz XYZ file
W912DS18B0002-0003.pdf PDF
longbeach.XYZ XYZ file
BIRDNESTING_ADDITONAL.XYZ XYZ file
W912DS18B0002-0001.pdf PDF
Water_Quality_Certifcate.pdf PDF
W912DS18B0002.pdf PDF
Long_Beach_Ct_2__RTA_SPECS_08DEC2017.pdf PDF
Long_Beach_Ct_2_RTA_PLANS_08DEC2017.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1) Provide answ ers to questions received.

2) Extend the bid due date to 06 March 2018

Bidders must acknow ledge receipt of this amendment by the date specified in the solicitation (or as amended) by one of the follow ing methods: In the space provided on the SF1442, by separate letter, by telegram, or by signing the block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIEDMAY RESULT OF REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE MODIFICATIONS OF BIDS OR LATE WITHDRAWAL OF BIDS (FAR 14.304). Except as provided herein, all terms and conditions ofthe document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

1. CONTRACT ID CODE PAGE OF PAGES

1 13

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 07-Feb-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS18B0002

X 9B. DATED (SEE ITEM 11)

12-Jan-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

05-Feb-2018

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 1843

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS18B0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

SUMMARY

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

REVISED BID SCHEDULE

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job Mobilization and Demobilization

FFP

FOB: Destination

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0002 2,749,456 Cubic

Yard

Hydraulic Beach Fill A

STA -4+00 to STA 179+58. Estimated quantity.

0003 706,004 Cubic

Hydraulic Beach Fill B

STA 179+58 to STA 254+65 STA 290+65 to STA 342+99 Estimated quantity.

0004 626,000 Cubic

Hydraulic Beach Fill C

STA 254+65 to STA 290+65. Estimated quantity.

0005 38,000 Cubic

Hydraulic Beach Fill Stockpile at STA 241+00 and STA 288+00. Estimated quantity.

0006 4,000 Cubic

Hand Placement of Beach Fill

0007 13 Each Demolition and Disposal-Existing Ramps

FFP

STA 46+00 to STA 144+00

PED Crossovers

0008AA 4 Each PED Crossover (Type P1)

FFP

including utilities

0008AB 11 Each PED Crossover (Type P2)

FFP

including utlities

0008AC 7 Each PED Crossover (Type P3)

0008AD 11 Each PED Crossover (Type P4)

0008AE 3 Each PED Crossover (Type P5)

0008AF 1 Each PED Crossover (Type P6)

0008AG 3 Each PED Crossover (Type P7

0009 1 Each PED/VEH Crossover (Type P/V)

0010 5 Each Gravel Crossover (Type V1)

0011 22.50 Acre Dune Planning

FFP

0012 64,000 Linear

Foot

Sand Fence

0013 1 Job Vibration Monitoring

0014 2,500 Linear

Foot

Stabilization Mats

0015 3,000 Square

Geotextile

0016 1 Job Demo and Disposal - Existing Sun Shelter

FFP

at STA 335+50

0017 1 Job New Sun Shelter

0018 60 Job OPTION Option 1 - Piling for Comfort Stations

FFP

and Lifegaurd Headquarters - 4 stations with 15 piles each, 12”dia, 25’deep, 40’long total

0019 1 Job OPTION Option 2

FFP

Additional Insurance for State, County, Town and City - IAW paragraph "Insurance Procured by Contractor”, section 007300

0020 66,996 Cubic

OPTION Option 3

Beachfill Work in front of Lido BeachTowne Houses between STA 250+00 and 256+50. Estimated quantity.

0021 133,544 Cubic

OPTION Option 4

Beachfill Work in front of Lido BeachTowne Houses between STA 176+00 and 184+50. Estimated quantity.

TOTALS

TOTAL BASE LINE ITEMS (ITEMS 0001 thru 0017) $

TOTAL OPTIONS (ITEMS 0018 thru 0021) $

TOTAL BASE PLUS OPTIONS (ITEMS 0001 thru 0021) $

AMENDMENT 02

1. The following changes are made to the plans:

a. Revise and reissue Sheets:

None

2. The following changes are made to the specifications:

a. Revise and reissue the sections below:

None

3. The following are responses to questions received from bidders (FOR INFORMATIONAL

PURPOSES ONLY):

(Questions that may be of general interest to all Offerors and/or the Government and that are not readily answered by the proceeding changes will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or simply revised to clarify and simplify the question(s). Questions and answers are issued to the Offerors “for information only” and do not revise the solicitation, plans or specifications.)

Question No. 2: Please provide survey data for the beach fill and borrow areas in xyz format.

Response: Native survey data is not available at this time. Please prepare your bid based on solicitation documents provided.

Question No. 3: Specifications Section 31 24 00: Beachfill Placement, Paragraph 3.1 Order of Work contains only a reference to “…paragraph 2 of Section 007300.0018 Special Contract Requirements”.

There is no Paragraph 2 contained in the referenced section. Please clarify.

Response: Please see paragraph 1.6 of section 0073000.0018 for Order of Work requirements.

Question No. 4: Please confirm that the Seasonal Restrictions outlined in Section 011400, paragraph 1.2.4 applies solely to clearing and grubbing, and that other construction activities are permitted year-round.

Response: For clarifications to seasonal restrictions, please see paragraph 5, “Activity Window” of Water Quality Certificate, dated 07 July 2015 issued to bidders on 26 January 2018.

Question No. 5: The bid schedule indicates that there are three separate stockpile locatins; however, we only observe two locations on the plans. Please clarify.

Response: The plans are correct—only two stockpiles are required. Bid Item 0005 has been revised to remove STA 297+00 leaving two stockpile locations.

Question No. 6: Should pricing for Bid Item 0006: Hand Placement for beachfill include dredging and placement of material, or does the USACE envisage that quantity will be sourced from the dredge material stockpile locations priced under bid item 0005? Is this quantity in addition to, or a component of, the other dredging line items?

Response: The hand placement quantity is in addition to the other dredging line items.

Question No. 7: Should contractors assume that the construction on the new Groins A-D will take place after completion of this project, and that the annual fill requirements outlined in WQC item 7 will not be required on this project?

Response: Groins A-D have already been constructed. Annual fill requirements are in effect.

SECTION 00 10 00 - SOLICITATION

The required response date/time 06-Mar-2018 02:00 PM has been added.

CLIN 0005

The CLIN extended description has changed from:

at STA 241+00, STA 288+00 and STA 297+00. Estimated quantity.

To:

at STA 241+00 and STA 288+00. Estimated quantity.

(End of Summary of Changes)