W912DS18B0002 Amendment 0004

View the file

Other files

File Type Posted
Final_W912DS-18-B-0002_Bid_Abstract.xlsx XLSX spreadsheet
W912DS18B0002-0008.pdf PDF
W912DS18B0002-0007.pdf PDF
W912DS18B0002-0006.pdf PDF
W912DS18B0002-0005.pdf PDF
31_24_00.00_18.pdf PDF
06_13_35.00_18.pdf PDF
Revised_Plans-_Volume_3.pdf PDF
01_50_00.pdf PDF
02_01_51.pdf PDF
Revised_Plans-_Volume_2.pdf PDF
31_62_19.pdf PDF
01_54_00.00_18.pdf PDF
01_30_00.pdf PDF
00_73_00.00_18.pdf PDF
01_11_00.pdf PDF
Revised_Plans-_Volume_1.pdf PDF
06_13_33.pdf PDF
LB0711_NAVD_BATHY_MLLW_DATUM.xyz XYZ file
W912DS18B0002-0003.pdf PDF
longbeach.XYZ XYZ file
BIRDNESTING_ADDITONAL.XYZ XYZ file
W912DS18B0002-02.pdf PDF
W912DS18B0002-0001.pdf PDF
Water_Quality_Certifcate.pdf PDF
W912DS18B0002.pdf PDF
Long_Beach_Ct_2__RTA_SPECS_08DEC2017.pdf PDF
Long_Beach_Ct_2_RTA_PLANS_08DEC2017.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1) Provide answ ers to questions received.

2) Provide xyz files

Bidders must acknow ledge receipt of this amendment by the date specified in the solicitation (or as amended) by one of the follow ing methods: In the space provided on the SF1442, by separate letter, by telegram, or by signing the block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIEDMAY RESULT OF REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE MODIFICATIONS OF BIDS OR LATE WITHDRAWAL OF BIDS (FAR 14.304). Except as provided herein, all terms and conditions ofthe document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

1. CONTRACT ID CODE PAGE OF PAGES

1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 14-Feb-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS18B0002

X 9B. DATED (SEE ITEM 11)

12-Jan-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

14-Feb-2018

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 1843

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS18B0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 4

1. The following changes are made to the plans:

a. Revise and reissue

Sheets: None

2. The following changes are made to the specifications:

a. Revise and reissue the sections below: None

3. The following are responses to questions received from bidders

(FOR INFORMATIONAL PURPOSES ONLY):

(Questions that may be of general interest to all Offerors and/or the Government and that are not readily answered by the proceeding changes will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or simply revised to clarify and simplify the question(s). Questions and answers are issued to the Offerors “for information only” and do not revise the solicitation, plans or specifications.)

Question No. 13:

Can the Government clarify:

a) As shown on Page C-110 of the Contract Plans, it appears the beachfill stops in the vicinity of Sta 238+00 on Page C-109. There is additional dune work to be performed between Sta 249+00 and 252+00 also Sta 255+00 to Sta 268+00 which does not appear to have beach fill in this area. Will the Contractor be reshaping existing material in these areas?

b) As shown on Sheet C-111 on the Contract Plans, and listed in Bid Item 005, there is no stockpile shown on the plans at Station 297+00, can the Government clarify this, and reissue plans showing this area?

Response:

a) Existing material shall not be disturbed. Additional beachfill is required as per cross sections on sheet C-307.

b) There are only two stockpiles: STA 241+00, and STA 288+00. There is no requirement for a stockpile at Station 297+00. Plans shall be revised and re-issued in a forthcoming amendment.

Question No. 14: Can the Government provide the last known date the Borrow Areas for this project were utilized and if they produced any UXO?

Response: This borrow area has not been dredged to date.

Question No. 15: Are UXO screens required on the discharge end of the pipeline, if so please specify the dimensions of the screens required.

Response: There are no requirements for UXO screens while dredging this borrow area.

Question No. 16: Will the dredging contractor be able to pump both in an easterly and westerly direction off of one pipeline landing location on the beach, or will the contractor be required to pump one continuous direction from each pipeline landing?

Please specify.

Response: There are no restrictions on the direction(s) of pumping by the dredging contractor.

Question No. 17: Regarding line items No. 0002 thru No. 0004, what is the difference between hydraulic beach fill A, hydraulic beach fill B and hydraulic beach fill C, and if they correlate with borrow areas A, B and C?

Response: These three beachfill areas do not correlate with the three borrow areas.

They were selected to correspond with various municipal boundaries.

Question No. 18: Section 01 74 19 Part 1.3 of the Contract Specifications discusses appropriate piping plover monitoring experience or shorebird monitoring experience which needs to be approved by the NYSDEC and/or USFWS. Can the Government provide detail regarding the required experience for approval by the NYSDEC and /or USFWS?

Response: Qualified monitors shall have the following minimum qualifications:

• Have working knowledge of State and Federal Guidelines for the protection of piping plovers and other listed shorebird species on multi-use recreational beaches.

• Identify piping plovers, piping plover tracks, and nests

• Observe territorial behavior and identify territories

• Identify mammal tracks and other predator sign by sight

• Use a GPS to collect geospatial data (UTM or decimal degrees in NAD83)

• Good observational skills; ability to follow survey protocols outlined in SSP

• Ability to perform physical labor associated with the placing of posts, signage, symbolic fencing, and protective exclosures in habitat areas.

• Ability to walk up to 5 miles per day within habitat area for survey and protection activities.

• Knowledge and experience, or willingness to obtain, with four wheel drive vehicles.

• Ability to work independently with little direct supervisory oversight.

• A valid driver’s license.

Question No. 19: The drawings state the data depicted on the maps should not be used for volume calculation purposes. Please provide the XYZ data for the Borrow Areas.

Response: The requested XYZ files are provided as part of this amendment.

Question No. 20: Is beach fill placement allowed west of Groin 52 during the environmental window, April 1st to August 31st?

Response: Yes. Item #5 of WQC applies west of Groin 52: “a 1,000 meter no work, no disturbance buffer zone must be established and maintained around adult piper plover nesting and brood foraging areas during April 1 to August 31 closed window period”.

(End of Summary of Changes)