31_24_00.00_18.pdf
PDF 61 KB Posted
- Solicitation number
- W912DS18B0002
About this file
Revised Spec - 31 24 00.00 18
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Final_W912DS-18-B-0002_Bid_Abstract.xlsx | XLSX spreadsheet | |
| W912DS18B0002-0008.pdf | ||
| W912DS18B0002-0007.pdf | ||
| W912DS18B0002-0006.pdf | ||
| W912DS18B0002-0005.pdf | ||
| 06_13_35.00_18.pdf | ||
| Revised_Plans-_Volume_3.pdf | ||
| 01_50_00.pdf | ||
| 02_01_51.pdf | ||
| Revised_Plans-_Volume_2.pdf | ||
| 31_62_19.pdf | ||
| 01_54_00.00_18.pdf | ||
| 01_30_00.pdf | ||
| 00_73_00.00_18.pdf | ||
| 01_11_00.pdf | ||
| Revised_Plans-_Volume_1.pdf | ||
| 06_13_33.pdf | ||
| W912DS18B0002-0004.pdf | ||
| LB0711_NAVD_BATHY_MLLW_DATUM.xyz | XYZ file | |
| W912DS18B0002-0003.pdf | ||
| longbeach.XYZ | XYZ file | |
| BIRDNESTING_ADDITONAL.XYZ | XYZ file | |
| W912DS18B0002-02.pdf | ||
| W912DS18B0002-0001.pdf | ||
| Water_Quality_Certifcate.pdf | ||
| W912DS18B0002.pdf | ||
| Long_Beach_Ct_2__RTA_SPECS_08DEC2017.pdf | ||
| Long_Beach_Ct_2_RTA_PLANS_08DEC2017.pdf |
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Long Beach Contract 2 LONGBEACH2 Amendment 0005
SECTION 31 24 00.00 18
BEACH FILL PLACEMENT
PART 1 GENERAL
1.1 MOBILIZATION AND DEMOBILIZATION
Mobilization shall include all costs for operations accomplished prior to commencement of actual dredging operations, such as transfer of dredge and attendant plant and equipment to site, initial installations of pipe, preparation of beach fill areas, and other incidentals in advance of the actual dredging. Demobilization shall include general preparation for transfer of plant to home base, removal of pipelines, cleanup of beach fill areas, and transfer of plant to its home base. The cost of work other than mobilization and demobilization of the Contractor's dredging plant and equipment shall not be included in this item. For payment for Mobilization and Demobilization see contract clause Section 00 72 00 .
All costs connected with the mobilization and demobilization of all of the contractor's dredging plant and equipment will be paid for at the contract lump sum price for this item. Sixty percent (60%) of the lump sum price will be paid to the Contractor upon completion of his mobilization to the work site. The remaining forty percent (40%) will be included in the final payment for work under this contract.
In the event the Contracting Officer and/or his Representative considers that the amount in this item (60%), which represents mobilization, does not bear a reasonable relation to the cost of the work in this contract, the Contracting Officer and/or his Representative may require the Contractor to justify this portion of the bid. Failure to justify such price to the satisfaction of the Contracting Officer and/or his Representative will result in payment of actual mobilization costs as determined by the Contracting Officer and/or his Representative, at the completion of mobilization and payment of the remainder of this item in the final payment under this contract. The determination of the Contracting Officer and/or his Representative is not subject to appeal.
1.2 SCOPE
The work covered by this section consists of furnishing all labor, materials, and equipment, and performing all operations required for removal of material from the designated borrow area as shown on the contract drawing, conducting borrow area pre-and post-removal surveys, transportation and placing the material as beach fill on the Atlantic Ocean shore within the limits specified herein and shown on the drawings, conducting pre- and post-placement beach condition surveys and grab samples GSD analysis as specified.
1.3 DREDGING OF BORROW AREAS
The beach renourishment to be done under these specifications will be the dredging of the Borrow Areas with placement of the dredged sand along the shoreline, as shown on the contract drawings.
SECTION 31 24 00.00 18 Page 1 Date: 02/15/18 Time: 11:42 AM
1.4 MEASUREMENT AND PAYMENT
1.4.1 Beach Fill Placement
The total amount of material acceptably placed on the beach (from the borrow areas) is to be paid for at the contract unit price as shown on the bid schedule (Section 00 10 00 ), shall be measured by the cubic yard in place on the beach by computing the volume between the beach surface shown by a survey made before filling and beach surface shown on a survey after filling. The reference datum shall be NAVD. No payment shall be made for material placed:
(1) In excess of the quantity to the design grade plus the 0.5 foot tolerance. See paragraph 3.2.6 for exception regarding Compensated Slope.
(2) For the extent of the project fronting the boardwalk in the City of Long Beach, above El. +14 ft NAVD plus tolerance on the dune crest;
beyond the 1 on 3 slope line on the northern dune side slope plus tolerance, beyond the 1 on 5 slope line on the southern dune side slope plus tolerance, above the +9 ft NAVD plus tolerance on the landward berm, beyond the 1 on 10 slope plus tolerance on the step between berms; above the +7 ft NAVD plus tolerance on the seaward berm, and beyond the onshore slope of 1 on 20 plus tolerance, and beyond the point where the 1 on 20 slope line plus tolerance intersects with the ocean bottom. See paragraph 3.2.6 for exception below elevation +3.0 ft NAVD.
(3) For the extent of the project west of the boardwalk in the City of Long Beach and east of the boardwalk eastward to approximately Station 237+00, the same limits as in (2) above, except that no payment shall be made for material placed beyond the 1 on 5 slope line on the northern side of the dune.
(4) For the extent of the project from approximately Station 237+00 to approximately Station 292+43 (dune only placement area) no payment shall be made for material placed above El. +14 ft NAVD plus tolerance on the dune crest; beyond the 1 on 5 slope line on the northern dune side slope plus tolerance, or beyond the 1 on 5 slope line on the southern dune side slope plus tolerance.
(5) For the extent of the project east of approximately station 292+43 (the dune only placement area), above El. +14 ft NAVD plus tolerance on the dune crest; beyond the 1 on 5 slope line on the northern dune side slope plus tolerance, beyond the 1 on 5 slope line on the southern dune side slope plus tolerance, above the +9 ft NAVD plus tolerance on the berm, and beyond the onshore slope of 1 on 20 plus tolerance, and beyond the point where the 1 on 20 slope line plus tolerance intersects with the ocean bottom. See paragraph 3.2.6 for exception below elevation +3.0 ft NAVD.
(6) Which was obtained from outside the designated borrow area or below the maximum dredging limit of the borrow area, except as directed by the Contracting Officer or his representative.
1.4.1.1 Original and Final Surveys
The Contractor shall make original and final surveys under the supervision of the Contracting Officer's representative and shall make computations to
SECTION 31 24 00.00 18 Page 2 determine the quantities of materials placed on the beach for acceptance.
1.4.1.2 Surveys for Progress Payments
The Contractor will make any surveys for periods for which progress payments are requested and shall make the computations based on these surveys.
1.4.1.3 Initial and Final Surveys
Initial and final surveys for acceptance will be taken immediately prior to and after fill placement. Before fill, surveys shall not be taken more than 14 days prior to fill placement. Surveys will be taken on parallel profile lines (ranges) spaced at a maximum of 100-foot intervals. The minimum stationing interval will be 25 feet or at breaks in slope.
The Contractor shall conduct the original and final surveys, with the presence of Government representatives, and make the computations based on them. The Contractor shall conduct the surveys for any periods for which progress payments are requested and shall make the computations based on these surveys. All surveys conducted by the Contractor shall be done by a New York licensed surveyor and certified hydrographer subjected to approval by the Contracting Officer.
- The Contractor shall be responsible to conduct all surveys. The Contractor shall maintain work sections - a pre-construction and final acceptance section surveyed while construction is taking place in between.
The pre-construction sections should be maintained at a minimum 300 feet ahead of the fill placement. The Contractor shall make such computations as are necessary to determine the quantities of work performed or finally in place and submit the computation for Government approval.
-Promptly upon completing a survey, the Contractor shall furnish the originals of all field notes and all other records relating to the survey or to the layout of the work to the Contracting Officer, who shall use them as necessary to determine the amount of progress payments. The Contractor shall retain copies of all such material furnished to the Contracting Officer or his representative. (FAR 52.236-16)
For Beach Fill Placement:
The Contractor will coordinate with the Contracting Officer's representative to maintain work sections. The Contractor will perform preconstruction surveys between 500 feet and 1500 feet in advance of the last acceptance station but not more than 14 days prior to fill placement. Prior to construction, add dune profile at every crossover location. The surveys shall be performed in 100 foot increments.
Acceptance surveys shall be performed when 500 linear feet of beach is dressed and graded to template.
For Borrow Area Surveys:
A pre- and post- construction survey of the borrow area at least 100 feet along the length of the borrow area and 25-foot intervals is required for this project to monitor the pre- and post-construction borrow area conditions with other survey methods approved by the COR.
In addition, weekly borrow area surveys are required at 200-foot sections
SECTION 31 24 00.00 18 Page 3 and 50 foot intervals. The Contractor shall compute the volume extracted and furnish all computations, Fathometer plots, and depth readings utilized to the Contracting Officer with each Monday's QC report.
1.4.1.4 Original Field Notes, Computations and Other Records
All original field notes, computations and other records for the purpose of layout of surveys conducted by the Contractor shall be recorded in duplicating field books, the original pages of which shall be furnished promptly to the Contracting Officer, or his representative, at the site of work. The Contractor shall furnish the Contracting Officer, or his representative, profile data for the survey on a computer disk. The survey data shall be in a format compatible with both the HYPACK or Bmap/Rmap program and in X, Y, Z format, and stored on DVD's. The Contractor shall submit to the Contracting Officer, prior to surveying, a base line drawing showing all offsets, elevation, reference lines and range line locations to be utilized.
1.4.1.5 Original Drawings
All original drawings that are submitted to the Contracting Officer will be accompanied by three prints of each.
1.4.2 Hand Placement of Beach Fill
1.4.2.1 Payment
Payment will be made for costs associated with all work necessary to hand place beach fill in accordance with the drawings and specifications.
1.4.2.2 Measurement
See MEASUREMENT AND PAYMENT, Beach Fill Placement.
1.4.2.3 Unit Of Measure
Cubic Yards
1.4.3 Temporary Fencing
No separate payment shall be made for temporary fencing, and all costs in connection therewith shall be included in the contract unit price for Hydraulic Beach Fill.
1.5 SITE CONDITIONS
Bidders are expected to examine the site of the work, including the placement areas and decide for themselves the conditions affecting their operations prior to submitting their bids. See Contract Clause entitled:
"SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK" (FAR 52.236-3).
1.6 SEDIMENTATION PERMITS
No local governmental sedimentation or erosion control permits are required for this work except that as required in accordance with Contract Clause entitled: "PERMITS AND RESPONSIBILITIES" (FAR 52.236 7).
SECTION 31 24 00.00 18 Page 4
1.7 SUBMITTALS
The Contractor shall submit for approval, by the Contracting Officer and/or his Representative, his plan for development of any contractor-furnished placement areas or any modification to the Government furnished placement area. This plan shall show areas or portions thereof to be used. The plan shall also show the manner in which the dredged material will be distributed in the areas. Such plans shall be provided by the contractor at the Preconstruction Conference (see Section 00 73 00.00 18 SPECIAL CONTRACT REQUIREMENTS ). If the plan is not accepted the Contractor is to perform the work in accordance with the specifications.
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Grain Size Distribution Curves of beach fill material after placement ; G, RO
SD-11 Closeout Submittals
Before and After Beach Fill Placement Surveys ; G, RO
Before and After Dredge Surveys of the Borrow Area ; G, RO
Weekly Borrow Area Surveys per paragraph INITIAL AND FINAL SURVEYS
1.8 QUALITY CONTROL
a. QUALITY CONTROL: The Contractor shall establish and maintain quality control for material placement to assure compliance with contract requirements, and maintain records of his quality control for all construction operations, including but not limited to the following:
1) Dredging, including suitability of dredged material and manipulation and control of the dredge discharge.
2) Placement of sand fill material, including continuity and order of placement; distribution of material and measures used to control loss of material.
a. Not Used
b. The Contractor will have a "NOTICE TO MARINERS" published by the Coast Guard 15 days prior to start of work. Provide a copy to the Contracting Officer.
c. PLACEMENT PLAN: The Contractor shall submit for approval his placement plan at the Preconstruction Conference (Section 00 73 00.00 18 SPECIAL CONTRACT REQUIREMENTS). The placement plan shall include the particular site(s) to be utilized, all special conditions (i.e., NYSDEC, etc.)
specific to sites(s) being used, coordination with crossover construction, temporary beach access plan, contractor access to the site(s) locations and cross-section of existing and proposed dikes, maximum elevations and
SECTION 31 24 00.00 18 Page 5 quantities of placement material for each site, weir and drainage structure locations, manner in which the dredged material will be distributed in the areas, etc. Approval of the placement plan by the Contracting Officer or his representative is required prior to placement site(s) preparation. The Contractor shall conduct his work in accordance with the Placement Plan, however, approval of the plan for development of the placement area does not in any manner relieve the Contractor of his responsibility for the adequacy of the design and construction and drainage facilities required. In addition, the Contractor shall also submit at the pre-construction meeting, his plan for road crossings of the discharge pipeline. The contractor shall be responsible for securing the appropriate permits for any road crossings of discharge pipeline or similar activities and may not begin work until such permits are received from the appropriate agencies.
d. Pre-Construction Site Visit: Prior to actual construction of any placement site, the Contractor and the Contracting Officer and/or his representatives shall visit the site(s) for the purpose of delineating areas of access avoidance (cultural resource, protection of existing dune, and/or wetland concerns).
e. Construction/Maintenance of Containment Structure. The Contractor shall construct all retaining dikes, waste weirs and drainage structures as are necessary for confining the dredged material and for controlling placement area effluent until acceptance of all work under the contract.
f. Protection of Structures and Adjacent Areas. The contractor shall be responsible for the maintenance, repair and stability of all dikes, roads and structures, used by him under the contract. The Contractor shall restore all dikes, roads, and areas he disturbs through his operations to a satisfactory condition, as approved by the Contracting Officer or his representative, at no additional cost to the Government.
g. Protection of Existing Dunes and Dune Vegetation: Existing dunes and dune vegetation shall be undisturbed to the maximum extent practicable.
Limits of existing dune and dune vegetation shall be identified and delineated prior to fill placement. Limits shall be coordinated with Nassau Co., the Town of Hempstead, the City of Long Beach, and the Contracting Officer. Pipelines and access for construction equipment shall not cross existing dunes or dune vegetation except as directed by the Contracting Officer. Truck access from Station 235+00 to 292+00 shall be restricted to access routes to be established on-site with USACE, Nassau County, and the Town of Hempstead personnel.
h. Protection of Existing and Newly Constructed Dune Crossovers: Dune fill placed under or adjacent to existing timber crossovers or crossovers constructed under this contract shall be hand placed to preclude damage to crossover structures.
i. Inspection of Structures and Adjacent Areas. The Contractor shall inspect all dikes, roads, waste weirs, and adjacent areas utilized during this operation on a daily basis to assure their safety and stability. The Contractor shall include these inspections in his daily quality control report. The inspection shall include but not be limited to structures, equipment, safety, security, drainage and seepage.
j. Reporting Requirements. The Contractor shall maintain a daily written record of all placement site operations. This requirement shall be made a part of the Contractor's Quality Control Plan and each record shall be
SECTION 31 24 00.00 18 Page 6 included in the Contractor's Quality Control Report.
k. Containment Structure Restoration. The Contractor shall restore any feature of any containment structures as required to prevent the escape of dredged material from the placement site on to adjacent areas.
l. Control of Placement Area Effluent. The contractor shall monitor and control placement area conditions and placement effluent quality as prescribed in these specifications. The Contractor's Quality control Plan shall identify monitoring requirements and measures, which will be taken to control placement area conditions to insure effluent quality meets the requirements identified in the Water Quality Certificates (Section 00 90 01 02).
m. New York State Water Quality Certifications. The contractor shall comply with all requirements identified in the NYSDEC Water Quality Certificate (WQC) including all special conditions. A copy of the WQC is included in Section 00 90 0102 of this specification.
n. Removal of Containment Area Structures. Any structures (i.e., weirs, pipeline, etc.) installed by the Contractor for use in his placement operations shall be removed and the contractor shall repair and stabilize all areas affected by the removal of these structures as approved by the Contracting Officer.
o. The contractor shall obtain grab samples of the placed fill from: the beach backshore; edge of berm; mean high water (MHW); and mean low water (MLW). One set of samples shall be taken every 200 feet along the placed fill area. A grain size analysis of each sand sample will be made using sieve sizes comparable to the Wentworth size classifications (shown in Section 00 90 03 ) and the results plotted on an appropriate curve format.
The laboratory analysis results and plotted grain size distribution curves shall be furnished with the Daily Construction Quality Reports.
1.9 REPORTING REQUIREMENTS
1.9.1 Daily Report of Operations
The Contractor will, on Eng. Form 4267, be required to prepare and maintain a daily report of operations and inspections and furnish copies thereof to the Contracting Officer or his representative. All the forms prescribed for the required information are found in Section 00 90 04 .
Further instructions on the preparation of the report will be furnished at a pre-construction conference. Attached to the form, the Contractor shall submit a plan of the borrow area indicating the location, depth and extent of his dredging operations for that day.
1.9.2 Dredge Operation Production Records
When a hopper dredge operation is used, the Contractor will submit daily records of hopper loads, including tonnages of empty and fully loaded conditions prior to pumpout. For all types of dredge operations the Contractor will furnish production meter records (using properly calibrated instruments) of suctionline densities and pipeline velocities.
Production meter records and loadmeter records must be cataloged either by time of day or load number.
SECTION 31 24 00.00 18 Page 7
PART 2 PRODUCTS
2.1 CHARACTER OF MATERIALS
The character of materials within the borrow areas is provided in Section 00 90 03 . If rock, rubble, or any other debris is encountered during dredging, the Contractor shall immediately cease operations and relocate to another section of the borrow areas. He shall report the encounter with the rock, rubble or any other debris on the quality control form and immediately notify the Contracting Officer, or his representative, verbally, providing location in Long Island Lambert coordinates of the area of rock, rubble or any other debris. Rock, rubble, or any debris larger than two (2) inches in diameter which is excavated and placed on the beach will be removed by the Contractor, totally at his own cost. If the Contractor fails to remove the rock, rubble, or any other debris, such material may be removed by the Government and the cost of such removal may be deducted from the money due, or to become due to the Contractor or may be recovered under his bond. Bidders are expected to examine the site of the work and boring samples and decide for themselves the character of the materials.
2.2 BORROW AREAS
2.2.1 Quantity
2.2.1.1 Off-Shore Borrow Areas
For this project, a sufficient quantity of material suitable for the beach fill is available from the borrow areas shown on the Contract Drawings.
2.2.2 Borrow Area Limits
All material shall be dredged from within these areas. In the event any portion of the borrow areas yields material unsuitable for use on the beach, the Contracting Officer, or his representative, may direct that the depth of excavation be changed or that the excavating equipment be moved to other portions of the borrow areas that will yield suitable material.
Under no circumstances shall material be obtained from outside the established limits of the borrow areas. Should it be determined that an area outside the limits of the designated borrow areas was used for borrow, the Contractor shall restore such area to original condition.
Borrow areas limits shown on the drawing are toe of slope.
2.2.3 Soundings
Soundings in the borrow area are shown on the drawings. Dredging in the borrow areas will be allowed to the depths indicated on the drawings.
2.2.4 Slopes
The dredge cuts in the borrow area shall not have side slopes steeper than 1 on 3. Borrow area entrance and exit slopes shall not be steeper than 1 on 3. Borrow area must have a uniform bottom elevation.
2.3 GRAIN SIZE DISTRIBUTION CURVES
2.3.1 After Placement
Submit the Grain Size Distribution Curves of beach fill material after
SECTION 31 24 00.00 18 Page 8 placement to the Contracting Officer for approval.
PART 3 EXECUTION
3.1 ORDER OF WORK
See Paragraph 2 of Section 00 73 00.00 18 SPECIAL CONTRACT REQUIREMENTS.
3.2 PLACEMENT OF SAND FILL
3.2.1 Placement
The material dredged from the designated borrow areas shall be placed on the beach fill areas to the specified limits and cross sections shown on the drawings, provided, however, that the provisions of subparagraph 3.2.8(4) shall be controlling with respect to the limits and sections of the beach fill area below El. +3.0 NAVD. The material shall be deposited as evenly as practicable by the hydraulic method to form a comparatively smooth and uniform beach surface. A tolerance of 0.5 foot above El. +3.0 NAVD and 0.5 ft. below El. +3.0 NAVD, measured vertically, will be allowed and paid for on material placed above the required design grades.
3.2.2 Material Deposited Elsewhere
Any material that is placed elsewhere than in places designated or approved by the Contracting Officer, or his representative, will not be paid for, and the Contractor may be required to remove such material, and placed it where directed, at his expense.
3.2.3 Dredge Material
Dredge material shall be pumped directly from the dredging vessel to the beach placement area. No bottom placement and re-handling will be allowed.
Dredge discharge shall be manipulated and controlled by the Contractor in such a manner that a minimum of shaping by mechanical equipment will be required and a minimum amount of material will be lost.
3.2.4 Floatable Material
All floatable material excavated, including, without limitation, wood and tires, shall be disposed of at an existing approved upland disposal area.
Should the Contractor encounter floatable material, a copy of a letter granting the permission of appropriate authorities to use an existing approved upland disposal area shall be submitted to the Contracting Officer and/or his representative.
3.2.5 Final Beach Berm
The final beach berm of placed fill shall be shaped above El. +3.0 ft NAVD by bulldozing or other approved means as required, to provide the design beach sections shown on the drawings. No reshaping of the existing beach, which is above the lines and grades of the design section will be permitted.
3.2.6 Compensated Slope
If the construction template cannot be achieved at the toe of the section (below elevation +3.0 NAVD), then a compensated slope to offset voids in the construction fill template will be allowed, upon the approval of the
SECTION 31 24 00.00 18 Page 9
COR. Such excess material shall be placed below elevation +8.5 ft NAVD and graded at the design slope to +3.0 ft NAVD and allowed to fall hydraulic below+3.0 ft NAVD; and the payable quantity shall not exceed the deficiency in template volume plus tolerance.
3.2.6.1 Acceptance of Fill Section
A fill section will not be accepted unless the payable quantity equals or exceeds the cross sectional volume between the design grade and the pre-existing grades (excludes tolerance).
3.2.7 Dredge Discharge
It is intended that dredge discharge shall be manipulated and controlled by the Contractor in such a manner that a minimum of shaping by mechanical equipment will be required and a minimum amount of material will be lost.
3.2.8 Placement of Dredged Material
Placement of dredged material on the beach fill area shall be subject to the following conditions:
(1) Any discharge pipeline crossing navigation channels must be submerged so that sufficient depth for navigation exists.
(2) Such discharge pipeline must be marked by signs, lights or other devices to insure safety to navigation by day and by night. All of these devices shall be in complete accordance with Coast Guard regulations. The contractor shall provide a written discussion of pipeline markings in the Accident Prevention Plan (Section
00 73 00.00 18 SPECIAL CONTRACT REQUIREMENTS).
(3) The discharge pipeline shall be arranged as approved by the Contracting Officer or his representative.
(4) It is expected that in placing the sand fill hydraulically, most of the silt and other fines being pumped will be washed into the ocean and dissipated by wave action. Ponding of the dredge effluent will not be allowed. However, baffles or dikes to control the flow of the dredge effluent will be required. The final seaward slope of the sand fill to be placed below El. +3.0 ft NAVD shall be the uncontrolled hydraulic slope of the material placed by the dredging process, estimated to be a 1 vertical to 20 horizontal slope down to the ocean bottom. The dredge effluent shall in all cases return directly to the ocean and not to the inshore side of the fill.
(5) A dike shall be constructed at the inshore limit of fill to prevent the dredge effluent from extending beyond the contract limits.
(6) Tracked vehicles shall be operated on the fill in such manner so that they do not cause excessive gouging.
(7) The Contractor shall be solely responsible for any damage caused by him to any boardwalk, existing dune or dune vegetation, dune cross-over, pavement, curbs, signs, lamps, bulkhead, seawall, groin, beach grass, or any other property adjacent to the beach fill areas, and shall be required to repair at his own expense any such damage caused during the performance of work under this contract. Dune fill placed under or adjacent to existing timber crossovers or crossovers
SECTION 31 24 00.00 18 Page 10 constructed under this contract shall be hand placed to preclude damage to crossover structures. Prior to the commencement of operations and after completion thereof, a joint inspection by representatives of the Contractor, The Contracting Officer and local interests pertaining to the above will be made.
(8) In order to provide access for pedestrians across the pipeline in beach use areas within the contract limits, the pipeline shall be ramped with sand on both sides at a 1:10 slope over the top elevation of the pipe at pedestrian access ways or at 500-foot intervals, as directed or approved by the Contracting Officer. Width of the ramps shall be 10 feet. The Contractor may provide another method of maintaining pedestrian thoroughfare across the pipe-line upon approval by the Contracting Officer or his representative. Pedestrian thoroughfare shall be maintained for the duration of the contract.
Also, in order to provide for the safety of persons using the beach, local authorities as listed in Points of Contact Section 00 73 00.00 18 SPECIAL CONTRACT REQUIREMENTS shall be contacted by the Contractor to restrict appropriate beach areas. During all pumping operations, the Contractor shall provide personnel to maintain visual control at the end of the discharge line. Radio contact shall also be provided by the Contractor to enable such personnel to halt dredging in case of emergency.
(9) The Contractor may be directed to move to another location within the Borrow Area if undesirable material begins to be pumped onto the beach (i.e. silt).
(10) The area where filling operations are in progress shall be floodlighted during the hours of darkness. Illumination shall be provided by using portable light equipment such as model No.LDA I6 MTVE manufactured by ALLMAND BROS. INC. of HOLDREIRE, or approved equal. A minimum of 3-foot candles of illumination shall be maintained in the immediate vicinity of the pipe discharge.
(11) Monitoring the discharge operation by radio communication from the discharge location to the leverman during all pumping operations is required.
(12) A placement section will not be accepted for final survey unless the section is graded and dressed so as to eliminate any undrained pockets, abrupt lumps, and depressions in the beach fill surface.
(13) During all pumping operations, the Contractor shall provide personnel to maintain visual control of the end of the discharge line. Radio contact shall also be provided by the Contractor to enable such personnel to halt dredging in case of emergencies or undesirable material placement as directed by the USACE.
(14) Completed work on the beach fill placement will be accepted in 500-foot long sections. Upon completion of all filling operations within an acceptance section, the fill shall be graded and dressed so as to eliminate any un-drained pockets, abrupt lumps, and depressions in the beach fill surfaces. The bank caused by ocean wave erosion shall be graded down to a slope not steeper than one (1) foot vertical to twenty (20) feet horizontal to Elev. +3.0 NAVD. Final surveys as required in paragraph entitled QUANTITY SURVEYS of the Special Contract Requirements may not be performed until fill is graded and dressed. Final acceptance of the beach fill work will be as defined in
SECTION 31 24 00.00 18 Page 11 paragraph entitled FINAL EXAMINATION AND ACCEPTANCE of the Special Contract Requirements.
(15) The Contractor shall obtain grab samples of placed fill from: the beach back-shore; edge of berm; mean high water (MHW); and mean low water (MLW). One set of samples shall be taken every 200 feet along the placed fill area. A grain size analysis of each sand sample will be made using sieve sizes comparable to the Wentworth size classifications and the results plotted on the curve format given in Section 00 90 03 . The laboratory analysis results and plotted grain size distribution curves shall be furnished with the Daily Construction Quality Reports.
3.3 PLANT
The Contractor agrees to keep on the job sufficient plant to meet the requirements of the work. The plant shall be in a satisfactory operating condition and capable of safely and efficiently performing the work as set forth in the specifications. The plant shall be subject to the inspection of the Contracting Officer and/or his Representative at all times. No reduction in the capacity of the plant employed on the work shall be made except by written permission of the Contracting Officer and/or his Representative. The measure of the "capacity of the plant" shall be its actual performance on the work to which these specifications apply.
3.3.1 Scows
No scows are used in this project
3.3.2 Hydraulic Pipelines
All pipelines for hydraulic dredging Plant must be kept in good condition at all times and any leaks or breaks along their length shall be promptly repaired. All breaks in any pipeline shall be reported on the Contractor's Daily Quality Control Report for the date the break occurred. An estimation of the duration of the break and the quantity of misplaced material shall be provided in the report.
3.3.3 Marking of Floating Dredge Pipelines
The contractor shall be required to mark floating dredge pipelines in accordance with the requirements of 88.15 of Annex V of U.S. Navigation Rules, inland, COMDTINST M 16672.2A, dated 23 December 1983. Dredge pipelines that are floating or supported on trestles shall display one row of yellow lights, visible all around the horizon for at least 2 miles on a clear, dark night. The lights shall flash at 50 or 70 times per minute and be places not less than 1 and not more than 3-5 meters (9.8-16 feet) above the water. The lights shall be sufficient in number to clearly show the length and course of the pipeline.
3.3.4 Dredge Pipelines Crossing Navigable Channels
The arrangement of any pipeline crossing a navigable channel shall be approved by the Contracting Officer. Where the pipeline crosses a navigable channel the spacing of the lights shall not be more than 10 meters (33 feet) apart. Two red lights, visible all around the horizon for at least 2 miles on a clear, dark night, shall be displayed at each end of the pipeline, including the ends in a channel where the pipeline is separated to allow vessels to pass (whether open or closed). The lights
SECTION 31 24 00.00 18 Page 12 shall be one meter (3.3 feet) apart in a vertical line with the lower light at the same height above the water as the flashing yellow light.
3.3.5 Submerged Pipelines
Any discharge pipeline submerged to cross a navigation channel shall be submerged so that sufficient depth for navigation exists. Such discharge pipeline shall be marked by signs, lights or other devices to insure safety to navigation by day and by night. All of these devices shall be in complete accordance with Coast Guard regulations.
3.3.6 Road Crossings
A detailed plan of the pipeline route to be used by the Contractor shall be submitted prior to laying of the pipeline. A ramp over any discharge pipeline crossing any roadways at the project site(s) shall be provided.
Additionally, adequate signs (caution and stop, if necessary), and flashing warning lights, shall be provided by the contractor to ensure safety to vehicles and their occupants using the roadway. Under no circumstances shall any portion of the paved portion of any roadway be disturbed. If the roadway is disturbed, the Contractor shall provide an adequate base to allow traffic to pass over the pipeline, and repairs to the roadway after completion of the project area, such that the roadway is restored to a condition equal to or better than the condition prior to disturbance. In addition, prior to placement of the pipeline across any roadway, the Contractor shall contact personnel at the appropriate municipality to determine if the warning signs and lights are adequate for safety purposes.
3.3.7 Towing Vessels
A sufficient number of vessels of adequate size and horsepower, each designed, outfitted, and equipped for towing service, shall be available at all times to move both self- and non-self propelled plant against tides, current, and winds during severe weather conditions.
3.4 DREDGE LOCATION CONTROL
The Contractor is required to have electronic positioning equipment that will accurately compute and plot the position of the dredge. Whenever dredging operations are underway, the location of the dredge shall be continuously monitored and the dredge location, in Long Island Lambert Coordinates, shall be recorded at intervals not to exceed one (1) minute.
Such records, and an accurate map showing actual dredging locations, shall be furnished to the Contracting Officer, or his representative daily as part of the Quality Control Reports. The electronic positioning equipment shall be installed on the dredge so as to monitor, as closely as possible, the actual location of the cutterhead or dragarm. This equipment shall be continuously accessible by the Government representative on board the dredge, who must be able to verify equipment calibration at any time. The electronic positioning equipment shall be required to be calibrated monthly, maintained and operated so that the maximum error for the coordinates recorded do not exceed 3 feet. The location on the dredge of the master antenna and the distance and direction from the master antenna to the cutterhead shall be reported on the Quality Control Reports. No dredging will take place outside the borrow area limits as shown on the drawings. Dredging outside of the borrow area limits will result in immediate shutdown of work. The Contractor's methods of location of the dredge shall be submitted with the quality control plan. Information to be
SECTION 31 24 00.00 18 Page 13 submitted shall include a written description of the equipment, including applicable manufacturers brochure and data, and previous jobs on which the equipment has been used.
3.4.1 Dredging Depth Monitoring Equipment
The Contractor shall have in continuous operation whenever dredging operations are underway, electronic equipment which measures the cutterhead or dragarm depth. The depth measuring device (as approved by the Contracting Officer or Contracting Officer Representative) shall be used and interfaced with the electronic positioning equipment required in Paragraph 3.4. The depth measuring device shall be calibrated by a bar check daily. This equipment shall be accessible to the Government Representative onboard the dredge, who shall be able to verify calibration. Vertical accuracy shall be + or -0.1 foot. Records required for dredge location (Paragraph 3.4) shall also include depth corrected for tide (elevation reference to MLW). Details of the depth measuring device shall be submitted with the quality control plan.
3.5 NOTIFICATION OF ON-SHORE BARGE OPERATION
A minimum of one hour's notice must be furnished by the Contractor to the Contracting Officer, or his representative, and concurrently to the municipal or local agency responsible for beach operations prior to a barge coming on shore between the hours of 9 AM and 7 PM. Barges will not be allowed to come on shore on weekends or State holidays between the hours 9 AM and 7 PM. At no time will a barge be allowed to come on shore in an area other than the immediate work area.
3.6 BUOY REMOVAL
The Contractor shall notify the Coast Guard at least 15 days prior to the date desired for having buoys removed or relocated which interfere with dredging operations. Requests shall be made in writing to:
COMMANDER (OAN)
FIRST COAST GUARD DISTRICT
408 ATLANTIC AVENUE
BOSTON, MASS. 02110
or by telephoning (617) 223 8337
3.7 TEMPORARY FENCES
3.7.1 Land Booster Pumps
If land booster pumps are used, a temporary protective stock mesh wire fence shall be installed by the Contractor around the booster facility.
This fence shall have either wood or steel posts of adequate size installed to the acceptance of the contracting office, and/or his representative, and the wire mesh shall conform to federal specification rr-f221 & int. Am-1, table ix, type ii, style 8, chicken fencing 6'-0" high, 4"x6" mesh, 14 ½ gage wire, design 2672-6 or approved substitute.
The fence shall be removed by the Contractor at the completion of the work or when directed by the contracting officer and/or his representative and all material used shall remain property of the contractor.
3.7.2 Beach Access Ramps
Beach access ramps and stairs to the work areas within 500 ft of the
SECTION 31 24 00.00 18 Page 14 designated work area shall be closed by the contractor by erection of a minimum 4 feet high wire mesh snow fence.
The Contractor shall also provide signage at the beach access points indicating "DO NOT ENTER - CONSTRUCTION AREA", as approved by the Contracting Officer.
Ramps, stairs, or other access features requiring closure will be identified during on-site pre-construction meeting between the Corps of Engineers, the Contractor, and local interests.
3.7.3 Sand Fence
Sand fence will be installed on the beach enclosing the 1,000-foot long designated work section from the backshore limit of fill to the mean high water line. The fence shall also be installed along the backshore to prevent entry to the work area. Reference SECTION 32 31 10.00 18 SAND FENCE for fencing details. Orange (plastic) safety fence is not acceptable. Adequate security personnel shall be provided by the Contractor to restrict unauthorized entry into the work area during all times of operation.
The ends of each work area shall be closed off during work in that area by erection of a sand fence extending from the landward limit of fill seaward to the mean high water line.
3.7.4 Removal of Temporary Fencing
The fence shall be removed by the Contractor at the completion of the work or when directed by the Contracting Officer, or his representative, and all material used shall remain the property of the Contractor.
For measurement and payment of temporary fences see paragraph 1.4.2 Temporary Fencing.
3.8 SECURITY OF WORK AREA
In the work area provide a combination of fencing above the high water line securing the north, west and east sides of the work area and a warning tape to the low water line. Place signs indicating "No Trespassing-Construction Area" on the fence every 50 feet of length.
Employ one or more uniformed security persons solely to restrict public access in the work area at all times.
3.9 SURVEY RECORDS
3.9.1 Beach Fill Placement Surveys
Submit the Before and After Beach Fill Placement Surveys for Contracting Officer's approval.
3.9.2 Dredge Surveys of the Borrow Area
Submit the Before and After Dredge Surveys of the Borrow Area for Contracting Officer's approval.
-- End of Section --
SECTION 31 24 00.00 18 Page 15
| 31 24 00.00 18 - BEACH FILL PLACEMENT |
| PART 1 GENERAL |
| 1.1 MOBILIZATION AND DEMOBILIZATION |
| 1.2 SCOPE |
| 1.3 DREDGING OF BORROW AREAS |
| 1.4 MEASUREMENT AND PAYMENT |
| 1.4.1 Beach Fill Placement |
| 1.4.1.1 Original and Final Surveys |
| 1.4.1.2 Surveys for Progress Payments |
| 1.4.1.3 Initial and Final Surveys |
| 1.4.1.4 Original Field Notes, Computations and Other Records |
| 1.4.1.5 Original Drawings |
| 1.4.2 Hand Placement of Beach Fill |
| 1.4.2.1 Payment |
| 1.4.2.2 Measurement |
| 1.4.2.3 Unit Of Measure |
1.4.3 Temporary Fencing
| 1.5 SITE CONDITIONS |
| 1.6 SEDIMENTATION PERMITS |
| 1.7 SUBMITTALS |
| 1.8 QUALITY CONTROL |
| 1.9 REPORTING REQUIREMENTS |
| 1.9.1 Daily Report of Operations |
| 1.9.2 Dredge Operation Production Records |
| PART 2 PRODUCTS |
| 2.1 CHARACTER OF MATERIALS |
| 2.2 BORROW AREAS |
| 2.2.1 Quantity |
| 2.2.1.1 Off-Shore Borrow Areas |
| 2.2.2 Borrow Area Limits |
| 2.2.3 Soundings |
| 2.2.4 Slopes |
| 2.3 GRAIN SIZE DISTRIBUTION CURVES |
| 2.3.1 After Placement |
| PART 3 EXECUTION |
| 3.1 ORDER OF WORK |
| 3.2 PLACEMENT OF SAND FILL |
| 3.2.1 Placement |
| 3.2.2 Material Deposited Elsewhere |
| 3.2.3 Dredge Material |
| 3.2.4 Floatable Material |
| 3.2.5 Final Beach Berm |
| 3.2.6 Compensated Slope |
| 3.2.6.1 Acceptance of Fill Section |
| 3.2.7 Dredge Discharge |
| 3.2.8 Placement of Dredged Material |
| 3.3 PLANT |
| 3.3.1 Scows |
| 3.3.2 Hydraulic Pipelines |
| 3.3.3 Marking of Floating Dredge Pipelines |
| 3.3.4 Dredge Pipelines Crossing Navigable Channels |
| 3.3.5 Submerged Pipelines |
| 3.3.6 Road Crossings |
| 3.3.7 Towing Vessels |
| 3.4 DREDGE LOCATION CONTROL |
| 3.4.1 Dredging Depth Monitoring Equipment |
| 3.5 NOTIFICATION OF ON-SHORE BARGE OPERATION |
| 3.6 BUOY REMOVAL |
| 3.7 TEMPORARY FENCES |
| 3.7.1 Land Booster Pumps |
| 3.7.2 Beach Access Ramps |
| 3.7.3 Sand Fence |
| 3.7.4 Removal of Temporary Fencing |
| 3.8 SECURITY OF WORK AREA |
| 3.9 SURVEY RECORDS |
| 3.9.1 Beach Fill Placement Surveys |
| 3.9.2 Dredge Surveys of the Borrow Area |
File details come from the government source that posted it.