Set_4_Eisenhower_Bid_Set_-_Stamped-4.pdf
PDF 38 MB Posted
- Attached to
- Eisenhower Barracks, West Point N. Y. Federal contract opportunity
- Solicitation number
- W912DS-17-B-0005
About this file
Plans - Eisenhower Bid Set - Stamped-4
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Abstract.pdf | ||
| Amendment_0006.pdf | ||
| 08_71_00_Final.pdf | ||
| Amendment_05_All_Revised_Drawings.pdf | ||
| 23_00_00_Final.pdf | ||
| W912DS-17-B-0005-Amendment_0005.pdf | ||
| Amendment_0004.pdf | ||
| Site_Vist_Sign-In_Sheet.pdf | ||
| Amendment_0003.pdf | ||
| Amendment__0002.pdf | ||
| Amendment_0001.pdf | ||
| W912DS-17-B-0005_Specifications.pdf | ||
| Set_3_Eisenhower_Bid_Set_-_Stamped-3.pdf | ||
| Set_5_Eisenhower_Bid_Set_-_Stamped-5.pdf | ||
| Set_1_Eisenhower_Bid_Set_-_Stamped-1.pdf | ||
| W912DS-17-B-0005.pdf | ||
| Set_2_Eisenhower_Bid_Set_-_Stamped-2.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
L-3
L-3
L-3
L-3
L-3
L-3
L-3
L-3
L-3
L-3
L-3
L-3
1/2" HWR
1" CW
1" HW
1/2" HWR
1/2" HWR
1" CW
1" HW
1" CW
1" HW
1" CW, 1" HW,
1/2" HWR DN
SA-1
CONNECT HWR TO
HW AT LEVEL 6
NOTE:
CONTRACTOR SHALL SIZE AND
INSTALL SHOCK ARRESTORS PER
MANUFACTURER'S REQUIREMENTS
AND PDI-WH 201.
WWH-1
WWH-2
WWH-3
WWH-4
BOOSTER
PUMPS
DUAL 4" WATTS 994 BACKFLOW
PREVENTER WITH STRAINER
STRAINER
ISTEC 1800 WATER METER
WITH PULSE OUTPUT AND
ISOLATION VALVE
6" CW
4" HOLBY MIXING
VALVE. SEE DETAIL
RP-1
6" CW
4" BYPASS
(N.C.)
6" CW
1-1/2" HWR
4" CW
4" TEMPERED
WATER
4" HW
1-1/2" HWR
4" CW
4" HW
4" CW
4" CW
2-1/2" CW
4" HW
4" HW
4" HW
1-1/2" HWR
4" HW
SUPPLY WATER HEATERS
WITH ELECTRICAL CONTROL
VALVES. STEAM CONNECTIONS
SHALL BE FLANGED.
REVERSE FLOW PIPE
ARRANGEMENT
UNION
TYP.
BY PASS
AMTROL EXPANSION
TANK ST-60VC
CHECK
VALVE
SHEET ID
1 2 6 7
D R
A W
N B
Y
D E
S
IG
N B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
C H
E C
K E
D B
Y
US Army Corps of Engineers ®
A N
S I D
F
A
C A
T E
G O
R Y
C O
D E
3 4 5 8 9 10
G
E
D
C
B
R E
P A
IR
T
O E
IS
E
N H
O W
E R
B A
R R
A C
K S
B
U
IL
D
IN
G
C
F Y
S
R M
J U
N E
W
D S
-1
-B -0
W D
S -1
-D
-0
D e s ig n e r
A u th o r
A p p ro v e r
P-305
F
E D
E R
A L P
L A
Z A
N
E W
Y O
R K
N
Y
N E
W Y
O R
K D
IS
T
R
IC
T N
E W
Y O
R K
N
E W
Y O
R K
C h e c k e r
P L U
M B
IN
G
R
IS
E R
D I A
G R
A M
S
W E
S T
P O
IN
T
N
E W
Y O
R K
P -3
P-305
1 TYPICAL CADET ROOM - WATER RISER DIAGRAM
P-305
2 MECHANICAL ROOM WATER RISER DIAGRAM
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
4" WS
4" S DN
CO
SH-1
SH-1 SH-1
MS-1
3" S
4" S
2" S
2" S
4" S DN
4" WS
SH-1
SH-1
SH-1
4" S
4" S
4" S DN
4" WS
4" WS
3" FD-1
3" FD-1
3" FD-1
2" V UP
2" V
3" WS
3" WS
CO
3" WS
4" S
3" S
3" S
4" S
4" S
3" S4" VS
3" V DN
EWC-1
L-1
L-1
L-1
L-1
EWC-14" VS
U-1
WC-1
U-1
WC-1 WC-1
3" FD-1
3" FD-1
3" FD-1
3" FD-1
3" FD-1
4" VS
4" WS
4" S DN
4" V DN
4" WS
3" WS
4" VS
2" V UP
3" WS
CO
CO
CO
SH-1
SH-1
SH-1
SH-1
SH-1
4" WS
4" S UP
4" S DN
CO
CO
4" S UP
4" S UP
4" S UP
4" S
4" S
4" S
4" S
4" S
4" S
4" S
4" S
4" S
WC-1
WC-1
4" V
2" V
L-1
L-1
L-1
L-1
WC-1
WC-1
3" S
3" S
3" S
4" S
3" S
3" S
3" FD-1
3" FD-1
3" FD-1
CO
CO
CO
4" S DN
3" S
4" S
3" S
3" S
4" S
4" S
3" S 3" S
4" S
4" WS
3" WS
3" WS
3" WS 4" WS
3" FD-1
L-1 L-1
CO
WC-1
WC-1
3" WS
2" WS
4" WS
4" VS
CO
4" S
4" S
4" V 2" S
EWC-1
2" S
3" S
3" S
3" S
3" S DN
2" V
2" V
CO
3" S DN
3" S
CO
3" FD-1
L-1
L-1
3" WS
2" V
3" S
3" S
3" S
4" VS
4" WS
3" FD-1
3" FD-1
3" FD-1
3" S
3" S
3" S
4" S
CO
L-1
L-1
2" V
2" V DN
U-1
WC-1
4" V
4" S
3" S
3" WS
4" V
4" S
L-1
L-1
3" FD-1
CO
WC-1
WC-1
U-1
SH-1
SH-1
3" WS
4" WS
3" WS
4" VS3" S
4" S
4" S
4" V
3" S
3" S
2" S
4" S
SHEET ID
1 2 6 7
D R
A W
N B
Y
D E
S
IG
N B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
C H
E C
K E
D B
Y
US Army Corps of Engineers ®
A N
S I D
F
A
C A
T E
G O
R Y
C O
D E
3 4 5 8 9 10
G
E
D
C
B
R E
P A
IR
T
O E
IS
E
N H
O W
E R
B A
R R
A C
K S
B
U
IL
D
IN
G
C
F Y
S
R M
J U
N E
W
D S
-1
-B -0
W D
S -1
-D
-0
D e s ig n e r
A u th o r
A p p ro v e r
P-306
F
E D
E R
A L P
L A
Z A
N
E W
Y O
R K
N
Y
N E
W Y
O R
K D
IS
T
R
IC
T N
E W
Y O
R K
N
E W
Y O
R K
C h e c k e r
P L U
M B
IN
G
R
IS
E R
D I A
G R
A M
S
W E
S T
P O
IN
T
N
E W
Y O
R K
P -3
P-306
1 ISO - COLUMN 25,26-E
P-306
2 ISO - COLUMN 25,26-C
P-306
3 ISO - COLUMN 23,24-C,E
P-306
4 ISO - COLUMN 21,22-C,E
P-306
5 ISO - COLUMN 18,19-C,E
P-306
6 ISO - COLUMN 17-E
P-306
7 ISO - COLUMN 17-C
P-306
8 ISO - COLUMN 13,14-E
P-306
9 ISO - COLUMN 13,14-C
M A
R K
D E
S C
R
IP
T
IO
N D
A
275.53 SF
WOMEN'S
LATRINE
E165294.89 SF
MEN'S LATRINE
E166
83.70 SF
MEN'S
LOCKER
E167
153.31 SF
MEN'S
SHOWER
E168
115.39 SF
TELECOM
E170
LC1
LC1
LC1
LC1
LC1
LC1LC1
LC1
LC1
LC1
LC1
LC1LC1LC1
LC1
LC1
LC1
LC1
LC1
LC1
WOMEN'S
SHOWER
E164
U-1
SH-1 SH-1 SH-1
SH-1 SH-1 SH-1
WC-1
WC-1
L-1 L-1
L-1 L-1
L-1 L-1
L-1 L-1
WC-1
WC-1
WC-1
WC-1
SH-1
SH-1
SH-1
SH-1
SH-1
HB-1
HB-1
3" FD-1
3" FD-1
4" WS 4" WS
3" WS
3" WS
4" WS 4" WS
3" WS
3" WS
4" WS 4" VS
4" WS
4" VS UP,
4" V DN TO
BASEMENT
4" WS
4" WS
4" WS
EWC-1
2" WSEWC-1
2" WS
4" VS
4" VS UP,
3" V DN TO
BASEMENT
AP AP
AP AP
AP
AP
AP
AP
2 1/2" CW, 1 1/2" HW, 3/4" HWR RISERS UP
1" CW, 1" HW, 1/2" HWR RISERS UP
2" CW, 1 1/4" HW, 1/2" HWR RISERS UP3
2 1/2" CW, 2" HW, 3/4" HWR RISERS UP4
2" CW, 2" HW, 3/4" HWR RISERS UP5
3" CW, 2" HW, 3/4" HWR RISERS UP6
1 1/2" CW, 3/4" HW DN7
2" CW, 1" HW UP8
3" FD-1
3" FD-1
3" FD-1
3" FD-1
3" FD-1
3" WS
U-1
NOTE: REFER TO RISER DIAGRAMS
FOR DETAILS ON PIPE SIZES.
MS-1
CONNECT 4" VS AT
BASE TO 4" S OR WS
CONNECT 4" VS AT
BASE TO 4" S OR WS
2" V DN
2" V DN
2" V
2" V
WOMEN'S
LATRINE
E152
WOMEN'S
LOCKER
E153
WOMEN'S
SHOWER
E154
L-1 L-1
L-1 L-1
WC-1
SH-1
SH-1
SH-1
WC-1
WC-1
U-1
SH-1
SH-1 SH-1 SH-1
SH-1
SH-1
SH-1
L-1 L-1
L-1 L-1
WC-1
WC-1
WC-1
WC-1
HB-1
HB-1
3" FD-1
3" FD-1
3" FD-1
3" FD-1
3" WS
4" WS
3" WS
3" WS
4" WS
3" WS
4" WS
4" WS
4" WS
4" WS
3" WS
3" WS
4" VS
4" V DN
TO BASEMENT
4" VS UP
2" WS
2" WS
EWC-1
EWC-1
4" VS
4" VS, 2" V DN
TO BASEMENT
AP
AP
AP
AP
AP
6 4
3" FD-13" WS
3" FD-1
3" WS
3" FD-1
3" FD-1
U-1
CONNECT 4" VS AT
BASE TO 4" S OR WS
CONNECT 4" VS AT
BASE TO 4" S OR WS
CONNECT 4" VS AT
BASE TO 4" S OR WS
NOTE: REFER TO RISER DIAGRAMS FOR
DETAILS ON PIPE SIZES.
2" V DN
SHEET ID
1 2 6 7
D R
A W
N B
Y
D E
S
IG
N B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
C H
E C
K E
D B
Y
US Army Corps of Engineers ®
A N
S I D
F
A
C A
T E
G O
R Y
C O
D E
3 4 5 8 9 10
G
E
D
C
B
R E
P A
IR
T
O E
IS
E
N H
O W
E R
B A
R R
A C
K S
B
U
IL
D
IN
G
C
F Y
S
R M
J U
N E
W
D S
-1
-B -0
W D
S -1
-D
-0
J .A
L F
O R
D
D .T
A B
O A
D A
J .A
L F
O R
D
P-400
F
E D
E R
A L P
L A
Z A
N
E W
Y O
R K
N
Y
N E
W Y
O R
K D
IS
T
R
IC
T N
E W
Y O
R K
N
E W
Y O
R K
J .A
L F
O R
D E
N L A
R G
E D
P L U
M B
IN
G
P L A
N S
W E
S T
P O
IN
T
N
E W
Y O
R K
P -4
1/4" = 1'-0" P-400
1 ENLARGED CORE PLAN FIRST FLOOR (PART A AND PART B)
1/4" = 1'-0" P-400
2 ENLARGED CORE PLAN FIRST FLOOR (PART B AND PART C)
02 4 8134
SCALE: 1/4"=1'-0"
02 4 8134
SCALE: 1/4"=1'-0"
M A
R K
D E
S C
R
IP
T
IO
N D
A
CORRIDOR 01
E255A
MEN'S LATRINE
E270
MEN'S
LOCKER
E271
MEN'S SHOWER
E272
WOMEN'S
SHOWER
E273
WOMEN'S
LATRINE
E274
MEN'S LATRINE
E275
MEN'S
LOCKER
E276
MEN'S
SHOWER
E277
U-1
SH-1 SH-1 SH-1
SH-1 SH-1 SH-1
WC-1
WC-1
WC-1
L-1 L-1
L-1 L-1
L-1 L-1
L-1 L-1
WC-1
WC-1
WC-1
WC-1
SH-1
SH-1
SH-1
SH-1
SH-1
SH-1 SH-1 SH-1
SH-1
SH-1 SH-1
SH-1
SH-1
SH-1
SH-1
L-1 L-1
L-1 L-1
WC-1
WC-1WC-1
U-1
HB-1 HB-1
HB-1
3" FD-1
3" FD-1
3" FD-1 3" FD-1
3" FD-1
4" WS 4" WS
3" WS
3" WS
4" WS
4" WS
3" WS
3" WS
4" WS 4" VS
4" WS
4" VS
4" WS 4" WS
4" WS
4" WS 4" WS
3" WS
3" WS
4" WS
4" VS
4" WS 4" VS
4" VS
4" VS EWC-1
EWC-1
2" WS EWC-1
EWC-1
2" WS
2" WS
AP
AP AP
AP
AP
AP
AP
AP
AP
AP
3" FD-1
3" FD-1
3" FD-1
3" FD-1
U-1
3" WS
3"FD-1
3" WS
3" WS
2" V DN
2" V DN
3" FD-1
MS-1
3" S
3" FD-1
NOTE: REFER TO RISER DIAGRAMS
FOR DETAILS ON PIPE SIZES.
WOMEN'S
LATRINE
E261
WOMEN'S
LOCKER
E262
WOMEN'S
SHOWER
E263
TELECOM
E264
MEN'S SHOWER
E265
MEN'S LATRINE
E266
L-1 L-1
L-1 L-1
WC-1
WC-1
SH-1
WC-1
U-1
SH-1
SH-1
SH-1
SH-1 SH-1 SH-1
SH-1 SH-1 SH-1
WC-1
WC-1
WC-1
WC-1
L-1 L-1
L-1 L-1
HB-1 HB-1
3" FD-1
3" FD-1
3" FD-1
3" FD-1
3" WS
4" WS
3" WS
3" WS
4" WS 4" WS
4" WS
4" WS
4" WS
3" WS
3" WS
4" VS
4" VS
3" WS
4" VS
4" VS
EWC-1
EWC-1 2" WS
2" WS
AP
AP
AP
AP
AP
5 4
2 1/2" CW, 1 1/2" HW, 3/4" HWR RISERS
1" CW, 1" HW, 1/2" HWR RISERS
2" CW, 1 1/4" HW, 1/2" HWR RISERS3
2 1/2" CW, 2" HW, 3/4" HWR RISERS4
3" CW, 2" HW, 3/4" HWR RISERS5
3" CW, 2" HW, 3/4" HWR RISERS6
1 1/2" CW, 3/4" HW DN7
2" CW, 1" HW UP8
3" FD-1
3" FD-1
3" FD-1
3" FD-1
U-1
NOTE: REFER TO RISER DIAGRAMS
FOR DETAILS ON PIPE SIZES.
SHEET ID
1 2 6 7
D R
A W
N B
Y
D E
S
IG
N B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
C H
E C
K E
D B
Y
US Army Corps of Engineers ®
A N
S I D
F
A
C A
T E
G O
R Y
C O
D E
3 4 5 8 9 10
G
E
D
C
B
R E
P A
IR
T
O E
IS
E
N H
O W
E R
B A
R R
A C
K S
B
U
IL
D
IN
G
C
F Y
S
R M
J U
N E
W
D S
-1
-B -0
W D
S -1
-D
-0
J .A
L F
O R
D
D .T
A B
O A
D A
J .A
L F
O R
D
P-401
F
E D
E R
A L P
L A
Z A
N
E W
Y O
R K
N
Y
N E
W Y
O R
K D
IS
T
R
IC
T N
E W
Y O
R K
N
E W
Y O
R K
J .A
L F
O R
D E
N L A
R G
E D
P L U
M B
IN
G
P L A
N S
W E
S T
P O
IN
T
N
E W
Y O
R K
P -4
1/4" = 1'-0" P-401
1 ENLARGED CORE PLAN TYP FLOOR (PART A)
1/4" = 1'-0" P-401
2 ENLARGED CORE PLAN TYP FLOOR (PART B)
02 4 8134
SCALE: 1/4"=1'-0"
02 4 8134
SCALE: 1/4"=1'-0"
M A
R K
D E
S C
R
IP
T
IO
N D
A
LS-1
WM-1
WM-1
WM-1
WM-1
WM-1
3" FD-2
3" S
SHUT-OFF
VALVES
AP
4" WS
L-3
1/2" CW & HW
TO EACH WASHING
MACHINE TYP.
4" VS
1/2" CW & HW
TO LAUNDRY
SINK TYP.
1" CW & HW
TO WASHING
MACHINES
2" CW, 2" HW
3/4" HWR & 3" WS
NOTE: REFER TO RISER DIAGRAMS FOR
DETAILS ON PIPE SIZES.
EWC-1
L-4
WC-2
SH-2
SH-3
WC-1
L-1
3" FD-1
3" FD-1
WC-1
L-2
SHUT-OFF
VALVES TYP.
3" S DN
CO
4" S DN
AP
AP
3" FD-1
NOTE: REFER TO RISER DIAGRAMS FOR
DETAILS ON PIPE SIZES.
STAIR 03
E257
MEN'S SHOWER
E258
MEN'S
LOCKER
E259
MEN'S LATRINE
E260
L-1 L-1
L-1 L-1
WC-1WC-1
U-1
WC-1
U-1
SH-1 SH-1 SH-1
SH-1 SH-1 SH-1
SH-1
SH-1
SH-1
SH-1
HB-1
3" FD-1
3" FD-1
3" WS
3" WS
4" WS
4" WS
4" WS
4" WS
4" WS
4" WS4" VS
4" VS
AP
2 1/2" CW, 1 1/2" HW, 3/4" HWR RISERS
1" CW, 1" HW, 1/2" HWR RISERS
2" CW, 1 1/4" HW, 1/2" HWR RISERS3
2 1/2" CW, 2" HW, 3/4" HWR RISERS4
3" CW, 2" HW, 3/4" HWR RISERS5
3" CW, 2" HW, 3/4" HWR RISERS6
1 1/2" CW, 3/4" HW DN7
2" CW, 1" HW UP8
2" CW RISER9
3" FD-13" WS3" FD-1
3" WS
3" FD-1
2" V DN
NOTE: REFER TO RISER DIAGRAMS
FOR DETAILS ON PIPE SIZES.
212.51 SF
OIC GUARD
E143
216.19 SF
CGR STORAGE
E144
SH-1
L-2
WC-1
6" ST UP
& DN3" FD-1
SHUT-OFF
VALVES TYP.
1/2" CW & HW
TO SHOWER
1/2" CW &
HW TO LAV.
1" CW
TO WC-1
3" V UP
2" V DN
1" CW, 1" HW, 1/2" HWR UP
2" CW, 1-1/4" HW, 1/2" HWR DN
3" WS UP & DN.
4" S DN
2" V DN
NOTE: REFER TO RISER DIAGRAMS
FOR DETAILS ON PIPE SIZES.
SHEET ID
1 2 6 7
D R
A W
N B
Y
D E
S
IG
N B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
C H
E C
K E
D B
Y
US Army Corps of Engineers ®
A N
S I D
F
A
C A
T E
G O
R Y
C O
D E
3 4 5 8 9 10
G
E
D
C
B
R E
P A
IR
T
O E
IS
E
N H
O W
E R
B A
R R
A C
K S
B
U
IL
D
IN
G
C
F Y
S
R M
J U
N E
W
D S
-1
-B -0
W D
S -1
-D
-0
J .A
L F
O R
D
D .T
A B
O A
D A
J .A
L F
O R
D
P-402
F
E D
E R
A L P
L A
Z A
N
E W
Y O
R K
N
Y
N E
W Y
O R
K D
IS
T
R
IC
T N
E W
Y O
R K
N
E W
Y O
R K
J .A
L F
O R
D E
N L A
R G
E D
P L U
M B
IN
G
P L A
N S
W E
S T
P O
IN
T
N
E W
Y O
R K
P -4
1/4" = 1'-0" P-402
1 ENLARGED TYPICAL LAUNDRY ROOM
1/4" = 1'-0" P-402
2 PRIVATE LATRINE E147 AND E148 (FIRST FLOOR PART C)
1/4" = 1'-0" P-402
3 ENLARGED CORE PLAN TYP FLOOR (PART C)
1/4" = 1'-0" P-402
4 OIC GUARD LATRINE E143C (FIRST FLOOR PART C)
02 4 8134
SCALE: 1/4"=1'-0"
02 4 8134
SCALE: 1/4"=1'-0"
02 4 8134
SCALE: 1/4"=1'-0"
02 4 8134
SCALE: 1/4"=1'-0"
M A
R K
D E
S C
R
IP
T
IO
N D
A
WOMEN'S
LATRINE
E007 MEN'S LATRINE
E006
L-2L-2
WC-1 WC-1
1/2" CW & HW TO
EACH LAV TYP.
1-1/4" CW TO
EACH WC TYP.
1-1/2" CW &
3/4" HW
4" S DN
4" S DN
4" V
4" V UP
CO
4" S UP
4" S UP
4" S UP
4" S
3" FD-13" FD-1
3" S UP
TO FD-1
NOTE: REFER TO RISER DIAGRAMS FOR
DETAILS ON PIPE SIZES.
LATRINE
E180
SUPPLY CLOSET
E182
L-2
WC-1
3" V
1-1/4" CW DN,
1" TO WC
1/2" CW & HW
TO LAV TYP.
2" S DN,
2" V UP
4" S DN
1/2" CW & HW
FROM BELOW
3" FD-1
SA-1 ON HW & CW
3" V
SA-1
NOTE: REFER TO RISER DIAGRAMS
FOR DETAILS ON PIPE SIZES.
CADET ROOM
E349
CADET ROOM
E348
L-3L-3
1/2" CW & HW TO
EACH LAV TYP.
1/2" HWR RISER
3" WS
1" HW RISER
1" CW RISER
NOTE: REFER TO RISER DIAGRAMS FOR
DETAILS ON PIPE SIZES.
BREAK ROOM
E173
2" V
2" S DN,
2" V
1/2" CW &
HW TO SINK
S-1
320.61 SF
CORRIDOR 02
E281B
S.H.A.R.P.
OFFICE
E285
WC-1
L-1
2" V
SHUT-OFF
VALVES TYP.
CONNECT
TO 3" VS
1" CW
TO WC-1
1/2" CW &
HW TO LAV
1-1/4" CW, 1-1/4" HW, 3/4" HWR UP
1-1/2" CW, 1-1/4" HW, 3/4" HWR DN
3" WS UP & DN
4" ST UP
& DN
1-1/4" CW
4" S DN
3" FD-1
2" V
SA-1
SA-1
ACCESS
PANEL
NOTE: REFER TO RISER DIAGRAMS
FOR DETAILS ON PIPE SIZES.
MECHANICAL
ROOM
E028
DUAL 4" WATTS 994 BACKFLOW
PREVENTOR WITH STRAINER
ISTEC 1800 WATER METER
WITH PULSE OUTPUT AND
ISOLATION VALVE
4" BYPASS
(N.C.)
CONTROL PANEL
FOR BOOSTER
PUMPS
DOMESTIC BOOSTER PUMPS
SEE SCHEDULE SHEET P-000
6" STRAINER
4" HOLBY MIXING
VALVE. SEE DETAIL
4" CONCRETE PAD6" CW
6" CW
WWH-1 WWH-2 WWH-3 WWH-4
4" HW
3" S UP
1" CW,
1" HW &
1/2" HWR
4" CW
4" HW
4" TEMPERED
WATER 4" CW
4" HW1-1/2" HWR
3" S DN
CO
3" S UP
6" CW
3/4" CW
RP-1 (SEE
SCHEDULE
& DETAIL)
4" FD-2 4" FD-2 4" FD-2 4" FD-2
6" FS-1
4" FD-2
SHUT-OFF
VALVES TYP.
4" CONCRETE PAD
4" V
3" S
4" V
4" V DN
6" CW
SEE WATER HEATER
SCHEDULE SHEET P-000
2" HWR
1-1/2" HWR
1-1/2" HWR
4" CW
2" HWR
6" CW 4" CW
2-1/2" CW
3/4"
HWR
2" HW
1" CW, 1" HW,
1/2" HWR UP
4" CW
4" CW 2-1/2"
CW 6" CW
2-1/2" HW
4" HW 4" HW
NOTE: REFER TO RISER DIAGRAMS
FOR DETAILS ON PIPE SIZES.
SHEET ID
1 2 6 7
D R
A W
N B
Y
D E
S
IG
N B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
C H
E C
K E
D B
Y
US Army Corps of Engineers ®
A N
S I D
F
A
C A
T E
G O
R Y
C O
D E
3 4 5 8 9 10
G
E
D
C
B
R E
P A
IR
T
O E
IS
E
N H
O W
E R
B A
R R
A C
K S
B
U
IL
D
IN
G
C
F Y
S
R M
J U
N E
W
D S
-1
-B -0
W D
S -1
-D
-0
J .A
L F
O R
D
D .T
A B
O A
D A
J .A
L F
O R
D
P-403
F
E D
E R
A L P
L A
Z A
N
E W
Y O
R K
N
Y
N E
W Y
O R
K D
IS
T
R
IC
T N
E W
Y O
R K
N
E W
Y O
R K
J .A
L F
O R
D E
N L A
R G
E D
P L U
M B
IN
G
P L A
N S
W E
S T
P O
IN
T
N
E W
Y O
R K
P -4
1/4" = 1'-0" P-403
1 ENLARGED WOMENS E007 & MENS LATRINE E006
1/4" = 1'-0"
P-403
2 ENLARGED LATRINE E180
1/4" = 1'-0" P-403
3 ENLARGED TYPICAL CADET ROOM
1/4" = 1'-0" P-403
4 BREAK ROOM E173
1/4" = 1'-0"
P-403
5 S.H.A.R.P. LATRINE E283B
1/4" = 1'-0" P-403
6 MECHANICAL ROOM ENLARGED02 4 8134
SCALE: 1/4"=1'-0"
02 4 8134
SCALE: 1/4"=1'-0"
02 4 8134
SCALE: 1/4"=1'-0"
02 4 8134
SCALE: 1/4"=1'-0"
02 4 8134
SCALE: 1/4"=1'-0"
02 4 8134
SCALE: 1/4"=1'-0"
M A
R K
D E
S C
R
IP
T
IO
N D
A
GATE VALVE
CHECK VALVE
CONNECTION
PROVIDE FLANGE OR UNION
SUMP PUMP
HOT WATER RECIRCULATION PUMP
No Scale
LINT TRAP DETAIL 4
MIXING VALVE SCHEMATIC
No Scale
1 CONCRETE INSERT HANGER
No Scale
No Scale
ELEVATOR SUMP PUMP
NO SCALE
5 DRIP PAN DETAIL
NO SCALE
CHECK VALVE
UNION OR FLANGED TYPE
PUMP SERVICING CONNECTION
(TYP.)
MOTOR
NOTE: SUPPORT PUMP FROM
STRUCTURE, WALL, OR
FLOOR AS REQUIRED.
GATE VALVE OR FULL
PORT BALL VALVE (TYP.)
BALANCING VALVE
BALL VALVE
THERMOMETER
OR EQUAL
EQUAL
B-LINE B3100 OR
ADJUSTABLE CLEVIS
I.T.T. GRINNELL (RED HEAD)
PHILLIPS CONCRETE FASTENER
ALL THREAD ROD
I.T.T. GRINNELL FIG. 69
PIPE HANGER RING
ROD SIZES:
FOR STANDARD CLEVIS TYPE HANGERS-
PIPE SIZES 1" THROUGH 2" SIZE 3/8" ROD
PIPE SIZES 2-1/2" THROUGH 3-1/2" SIZE 1/2" ROD
PIPE SIZES 6" THROUGH 8" SIZE 3/4" ROD
FOR ADJUSTABLE BAND HANGERS-
PIPE SIZES 1" THROUGH 4" SIZE 3/8" ROD
PIPE SIZES 4" THROUGH 5" SIZE 5/8" ROD
PIPE SIZES 5" THROUGH 8" SIZE 1/2" ROD
NOTE:
ALL HANGER COMPONENTS SHALL BE GALVANIZED COATED.
CEILING
ACCESSIBLE
TERMINATE AT
GALVANIZED STEEL
16 GAUGE
STORM PIPE
WATER OR
GROUT OPENINGS WATERTIGHT
BASIN OR EQUIVALENT
CONCRETE LAUNDRY CATCH
BROOKS PRODUCTS INC.
DIMENSION
24" SQUARE INSIDE
12"
CLEANOUT
1/8 BEND
BRONZE WIRE MESH, BRAZED TO
1 1/2"ANGLE FRAME (TO BE
REMOVABLE FOR CLEANING)
VENT LINE, SEE PLANS
1 1/2" ANGLE FRAME, SECURED
TO SIDE OF PIT WITH
EXPANSION SHIELDS AND
STAINLESS STEEL BOLTS
NEENAH GASKETED FRAME
AND COVER NO. R-6665-2HP
4" THICK CONCRETE PIT WITH
#4 STEEL REBAR 12" ON CENTERS
BOTH WAYS
4"
HEAVY DUTY
THE WATER HEATERS
HOT WATER RETURN TO
HOT WATER SUPPLY (140°)
NOTE: REFER TO PLAN DRAWINGS FOR PIPE SIZES
MIXING VALVE
11O°
CIRCULATING PUMP
THERMOMETER
CHECK VALVE
HOT WATER RECIRCULATION
COLD WATER SUPPLY
BALL VALVE(BALANCING)
CHECK VALVE
INSTALL PENTEK ODS OIL SENSOR
ON WALL, CONNECT SUMP PUMP
TO CONTROLLER
3/4" COPPER PIPE AT
LOW END OF SLOPED
PIPE
SEAL END OF
PAN
METAL BAND
OR STRAP
ELEVATOR PIT
SUMP
FLOAT SWITCH AND
OIL SENSOR
ROUTE TO FLOOR
DRAIN WITH AIR GAP
FLOOR SLAB
CONTROLLER
FIELD COORDINATE PROPER
LENGTH OF POWER CORD
AND CONTROL WIRING
SHEET ID
1 2 6 7
D R
A W
N B
Y
D E
S
IG
N B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
C H
E C
K E
D B
Y
US Army Corps of Engineers ®
A N
S I D
F
A
C A
T E
G O
R Y
C O
D E
3 4 5 8 9 10
G
E
D
C
B
R E
P A
IR
T
O E
IS
E
N H
O W
E R
B A
R R
A C
K S
B
U
IL
D
IN
G
C
F Y
S
R M
J U
N E
W
D S
-1
-B -0
W D
S -1
-D
-0
J .A
L F
O R
D
D .T
A B
O A
D A
J .A
L F
O R
D
P-600
F
E D
E R
A L P
L A
Z A
N
E W
Y O
R K
N
Y
N E
W Y
O R
K D
IS
T
R
IC
T N
E W
Y O
R K
N
E W
Y O
R K
J .A
L F
O R
D P
L U
M B
IN
G
D E
T A
IL
S
W E
S T
P O
IN
T
N
E W
Y O
R K
P -6
M A
R K
D E
S C
R
IP
T
IO
N D
A
6" TO BUILDING
6" STRAINER
6" INCOMING
WATER SUPPLY
MAIN SHUT-OFF
VALVE
6" ISTEC WATER METER
WITH PULSE OUTPUT
DUAL 4" WATTS 994
BACKFLOW PREVENTERS
ROUTE DRAIN LINES
TO LARGE SUMP DRAIN
UNION
UNION
SHUT-OFF VALVE
CHECK VALVE
BALANCING VALVE
COLD WATER SUPPLY,
REVERSE FLOW ARRANGEMENT
SHUT OFF VALVES (TYP.
SUPPLY UNIONS OR FLANGES
AT EACH CONNECTION
STEAM AND CONDENSATE CONNECTION SUPPLY
WATER HEATERS WITH CONTROL VALVES
SEE HVAC FOR CONTINUATION, ALL STEAM
CONNECTIONS SHALL BE FLANGED.
HOT WATER SUPPLY
TO MIXING VALVE
T & P RELIEF VALVE
ROUTE TO FLOOR DRAIN,
DRAIN PIPE SHALL BE
COPPER TYPE "L"
ROUTE TANK DRAIN TO
FLOOR DRAIN,
DRAIN PIPE SHALL BE
COPPER TYPE "L"
INSTALL ON 4"
CONCRETE PAD
FIELD INSULATE AND JACKET
EACH WATER HEATER
CHECK VALVE
CHECK VALVE
FROM BLDG. RECIRC. SYSTEM
THERMAL EXPANSION TANK
EQUAL TO AMTROL ST-60VC
SHEET ID
1 2 6 7
D R
A W
N B
Y
D E
S
IG
N B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
C H
E C
K E
D B
Y
US Army Corps of Engineers ®
A N
S I D
F
A
C A
T E
G O
R Y
C O
D E
3 4 5 8 9 10
G
E
D
C
B
R E
P A
IR
T
O E
IS
E
N H
O W
E R
B A
R R
A C
K S
B
U
IL
D
IN
G
C
F Y
S
R M
J U
N E
W
D S
-1
-B -0
W D
S -1
-D
-0
J .A
L F
O R
D
D .T
A B
O A
D A
J .A
L F
O R
D
P-601
F
E D
E R
A L P
L A
Z A
N
E W
Y O
R K
N
Y
N E
W Y
O R
K D
IS
T
R
IC
T N
E W
Y O
R K
N
E W
Y O
R K
J .A
L F
O R
D P
L U
M B
IN
G
D E
T A
IL
S
W E
S T
P O
IN
T
N
E W
Y O
R K
P -6
" A
.F .F
M A
R K
D E
S C
R
IP
T
IO
N D
A
EQUIP.
M
P
A 200
ES
CO₂
T
H
UP
UP WITHIN
FLOOR
DOWN
24x12
M-3#
16/8
24x12
10x8 8Ø
12x8
UC
PRS
SP
RTU
RS/L
OAL
VAV
SA
RHC
RPM
RA
PVC
PSIG
PSI
PRV
OA
NTS
NO
NC
LD
LWT
LAT
GPM
MBH
KW
MCA
MOCP
UNO
TSP
V/PH
VFD
MOD
PTAC
SS
TAD
TAB
MAU
SF
IH
UH
PRBP
FM
M
S
CHWS
CHWR
RL
RS
PC DD
HPS
MPS
LPS
CR
CD
HWS
HWR
HPR
MPR
LPR
P
PD
RF
HED
HV
HWS
HWR
LFT
TD
- AIR DEVICE TAG
- CO2 SENSOR
- EMERGENCY SWITCH
- SHEET NOTE CALL-OUT
- DEMOLISH TO POINT INDICATED
- CONNECT TO EXISTING
- DUCT SMOKE DETECTOR
- PRESSURE SENSOR
- PLAN/SECTION REFERENCE: TOP, PLAN/SECTION#
BOTTOM-DRAWING# SHOWN ON
- REVISION REFERENCE
- THERMOSTAT/TEMPERATURE SENSOR
- HUMIDISTAT/HUMIDITY SENSOR
- MOTORIZED CONTROL DAMPER
- RECTANGULAR CEILING DIFFUSER
- SQUARE CEILING DIFFUSER
- RETURN/EXHAUST REGISTER OR
GRILLE (VERTICAL MOUNT, SIDEWALL)
- SUPPLY REGISTER OR GRILLE
(VERTICAL MOUNT, SIDEWALL)
- ROUND CEILING DIFFUSER
- CEILING RETURN
- CEILING EXHAUST
- FIRE DAMPER (WITH ACCESS
PANEL)
- FIRE & SMOKE DAMPER (WITH
ACCESS PANEL)
- MANUAL BALANCING DAMPER
- REMOVE DUCTWORK / EQUIPMENT
- DUCTWORK SOUND ATTENUATOR
- EXHAUST AIR LOUVER
- OUTSIDE AIR LOUVER
- OUTSIDE AIR FAN ON ROOF W/DUCT
DOWN THROUGH ROOF
- OUTSIDE AIR DUCT UP THROUGH SLAB
W/FAN ON ROOF ABOVE
- FLAT OVAL DUCT SECTION UP
- ROUND DUCT SECTION UP
- RECTANGULAR DUCT SECTION UP,
POSITIVE PRESSURE, SUPPLY OR
OUTSIDE AIR
- RECTANGULAR DUCT SECTION UP,
NEGATIVE PRESSURE, RETURN
- RECTANGULAR DUCT SECTION UP,
EXHAUST
- EXHAUST FAN ON ROOF W/DUCT
DOWN THROUGH ROOF
- EXHAUST DUCT UP THROUGH SLAB
W/FAN ON ROOF ABOVE
- NEW DUCTWORK, FIRST DIMENSION
IS SIDE SHOWN
- DUCT ELBOW, POSITIVE
PRESSURE (SUPPLY), FIRST
- DUCT ELBOW, EXHAUST
- DUCT ELBOW, NEGATIVE
PRESSURE, RETURN
- DUCT ELBOW UP
- UNDERCUT DOOR
- DOOR GRILLE
- ACCESS DOORS, VERTICAL OR
HORIZONTAL
- FLAT OVAL DUCT
- SPIN-IN TAKE-OFF W/VOLUME
DAMPER & ROUND DUCT
- SPIN-IN TAKE-OFF W/VOLUME
DAMPER & FLEXIBLE DUCT
- RADIUS TEE
- SQUARE THROAT TEE
- RECTANGULAR / ROUND
CONICAL TAKE-OFF OR ROUND /
ROUND CONICAL TAKE-OFF
- SQUARE THROAT ELBOW
W/TURNING VANES
- TRANSITION, CONCENTRIC
- CHANGE OF ELEVATION
- FLEXIBLE DUCT
- TRANSITION, ECCENTRIC
- RADIUS ELBOW
- STANDARD BRANCH TAKE-OFF
- TRANSITION, SQUARE TO
ROUND
- RECTANGLE-TO-ROUND TAKE-OFF
- INLINE CENTRIFUGAL FAN
- 1" INTERNALLY LINED DUCTWORK
- HYDRONIC REHEAT COIL
- ENTERING FLUID TEMPERATURE
- EXHAUST AIR
- DUCT SOUND ATTENUATOR
- ELECTRIC DUCT HEATER
- EXHAUST FAN
- ENERGY RECOVERY UNIT
- CONSTANT VOLUME TERMINAL UNIT
- ABOVE FINISHED ROOF
- EXTERNAL STATIC PRESSURE
- ADJUSTABLE FREQUENCY DRIVE
- AIR HANDLING UNIT
- ABOVE FINISHED FLOOR
- ACCESS PANEL
- BACKFLOW PREVENTER
- BRAKE HORSEPOWER
- BRITISH THERMAL UNIT
- CONDENSATE DRAIN
- COOLING TOWER
- CUBIC FEET PER MINUTE
- CONDENSING UNIT
- DOWN
- ENTERING AIR TEMPERATURE
- ENTERING WATER TEMPERATURE
- FAN COIL UNIT
- FIRE DAMPER
- CONSTANT AIR VOLUME
- DIRECT DIGITAL CONTROLS
- FINAL FILTERS
- LEAVING FLUID TEMPERATURE
- HEATING WATER RETURN
- HEATING WATER SUPPLY
- HEATING AND VENTING UNIT
- HOSE END DRAIN VALVE
- PRESSURE DROP
- PRESSURE REDUCING
BACKFLOW PREVENTER
- INFRARED GAS-FIRED HEATER
- MAKE-UP AIR UNIT
- MOTOR OPERATED CONTROL
DAMPER (MOD)
- MAXIMUM OVER CURRENT
PROTECTION
- MINIMUM CIRCUIT AMPS
- KILOWATT
- THOUSAND BTUH PER HOUR
- FEET PER MINUTE
- GALLONS PER MINUTE
- LEAVING AIR TEMPERATURE
- LEAVING WATER TEMPERATURE
- LINEAR DIFFUSER
- NORMALLY CLOSED
- NORMALLY OPEN
- NOT TO SCALE
- OUTSIDE AIR
- PRESSURE REDUCING VALVE
- OUTSIDE AIR LOUVER
- FULL LOAD AMPS
- TEPERATURE DROP /
TEMPERATURE DIFFERENCE
- RETURN / RELIEF FAN
- UNIT HEATER
- SUPPLY FAN
- TEST AND BALANCE
- TRANSFER AIR DUCT
- STAINLESS STEEL
- PACKAGED TERMINAL AIR CONDITIONER
- UNLESS NOTED OTHERWISE
- VARIABLE FREQUENCY DRIVE
- VOLTS / PHASE
- TOTAL STATIC PRESSURE
- POUNDS PER SQUARE INCH
- PSI GAUGE
- POLYVINYL CHLORIDE PIPE
- RETURN AIR
- REVOLUTIONS PER MINUTE
- REHEAT COIL
- SUPPLY AIR
- VARIABLE AIR VOLUME
- REFRIGERANT SUCTION &
LIQUID LINES
- ROOFTOP AIR HANDLING UNIT
- STATIC PRESSURE
- PRESSURE REDUCING STATION
- GLOBE VALVE
- STEAM TRAP
- FLOW METER
- RELIEF VALVE
- PRESSURE GAUGE
- MANUAL VENT
- TWO-WAY CHECK
VALVE
- P-TRAP
- THERMOMETER
- THREE-WAY CONTROL
VALVE
- O.S.&Y. GATE VALVE
- FLEX CONNECTION
- SLOPE DIRECTION
(DOWN)
- UNION
- CALIBRATING
BALANCING VALVE
- GAS COCK
- STRAINER
- PSI REG.
- FLOW SWITCH
- REMOVE PIPING
- ACTUATED TWO-WAY
VALVE
- MODULATING CONTROL
VALVE
- PRESSURE /
TEMPERATURE PORT
- ECCENTRIC REDUCER
- CONCENTRIC REDUCER
- PIPE ANCHORS
- INLINE PUMP
- INLINE PUMP
- WATER METER
- TEE, OUTLET UP
- TEE, OUTLET DOWN
- ELBOW, TURNED UP
- ELBOW, TURNED DOWN
- ELBOW, 45°
- ELBOW, 90°
- COUPLING
- CONNECTION, TOP
- CONNECTION, BOTTOM
- CAP
- VALVE ON RISER
- 45° PIPE RISE (R) /
DROP (D)
- CHECK VALVE
- BUTTERFLY VALVE
- FLOW DIRECTION
- MEDIUM PRESSURE STEAM
RETURN
- LOW PRESSURE
STEAM RETURN
- HIGH PRESSURE STEAM
RETURN
- CONDENSATE RETURN
- MEDIUM PRESSURE
STEAM SUPPLY
- LOW PRESSURE
STEAM SUPPLY
- HIGH PRESSURE STEAM
SUPPLY
- PUMPED CONDENSATE
- GATE VALVE
- BALL VALVE
- REFRIGERANT SUCTION
- REFRIGERANT LIQUID
- HOT WATER RETURN
- HOT WATER SUPPLY
- CONDENSATE DRAIN
- CHILLED WATER RETURN
- CHILLED WATER SUPPLY
- CONTROL VALVE
- COMBINATION FIRE / SMOKE DAMPER
SYMBOL DESCRIPTION
(4-WAY THROW)
(4-WAY THROW)
12Ø - ROUND DUCT
UP WITHIN
FLOOR
DOWN
UP WITHIN
FLOOR
DOWN
SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION
SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION
- ROUND DUCT ELBOW DOWN
- OVAL DUCT ELBOW DOWN
- ACCESS DOOR
- BOTTOM OF PIPE
- CENTER TO CENTER
- HOURHR
- DRY-BULB
- FEET
- GALLONGAL
- HORSE POWERHP
IN - INCHES
- LOW PRESSURE STEAMLPS
(15 PSIG AND BELOW)
- LOW PRESSURE CONDENSATE RETURNLPR
MIN - MINIMUM
- ON CENTEROC
- PHASEPH
- PUMPED CONDENSATE RETURNPC
- POUNDSLBS
- POUNDS PER SQUARE INCHPSI
VTR - VENT THROUGH ROOF
- HIGH PRESSURE STEAMHPS
(GREATER THAN 15 PSIG)
- HIGH PRESSURE CONDENSATE RETURNHPR
WB - WET-BULB
W/ - WITH
DB
CC
BOP
AD
FSD
EFT
EA
DS
EDH
EF
ERU
CTV
AFR
FLA
ESP
AFD
AHU
AFF
AP
BHP
BFP
BTU
CD
CT
CFM
CU
DN
EAT
EWT
FCU
FD
FPM
CV
DDC
FF
- HOSE END DRAIN VALVE
WITH CAP AND CHAINHED
- BASE MOUNTED END SUCTIONBMES
IL - IN-LINE MOUNTED
SV - STEAM VENT PIPE
FT
- FINNED TUBE RADIATORFTR
- GATE VALVEGV
MECHANICAL SHEET INDEX
HVAC ABBREVIATIONS HVAC PIPING SYMBOL LEGEND
HVAC SYMBOL LEGEND
SHEET ID
1 2 6 7
D R
A W
N B
Y
D E
S
IG
N B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
C H
E C
K E
D B
Y
US Army Corps of Engineers ®
A N
S I D
F
A
C A
T E
G O
R Y
C O
D E
3 4 5 8 9 10
G
E
D
C
B
R E
P A
IR
T
O E
IS
E
N H
O W
E R
B A
R R
A C
K S
B
U
IL
D
IN
G
C
F Y
S
R M
J U
N E
W
D S
-1
-B -0
W D
S -1
-D
-0
W L J U
N G
Q U
IS
T
R Z
U R
IT
A
A p p ro v e r
M-001
F
E D
E R
A L P
L A
Z A
N
E W
Y O
R K
N
Y
N E
W Y
O R
K D
IS
T
R
IC
T N
E W
Y O
R K
N
E W
Y O
R K
D H
E
ID
E M
A N
H V
A C
S Y
M B
O L S
L E
G E
N D
S
H E
E T
I N
D E
X
W E
S T
P O
IN
T
N
E W
Y O
R K
M -0
SHEET
NUMBER SHEET TITLE SCALE
M-001 HVAC SYMBOLS LEGEND & SHEET INDEX No Scale
M-002 HVAC NOTES No Scale
MD101 BASEMENT HVAC DEMOLITION PLAN - PART A 1/8"=1'-0"
MD102 BASEMENT HVAC DEMOLITION PLAN - PART B 1/8"=1'-0"
MD103 BASEMENT HVAC DEMOLITION PLAN - PART C 1/8"=1'-0"
MD111 FIRST FLOOR HVAC DEMOLITION PLAN - PART A 1/8"=1'-0"
MD112 FIRST FLOOR HVAC DEMOLITION PLAN - PART B 1/8"=1'-0"
MD113 FIRST FLOOR HVAC DEMOLITION PLAN - PART C 1/8"=1'-0"
MD121 SECOND FLOOR HVAC DEMOLITION PLAN - PART
A
1/8"=1'-0"
MD122 SECOND FLOOR HVAC DEMOLITION PLAN - PART
B
1/8"=1'-0"
MD123 SECOND FLOOR HVAC DEMOLITION PLAN - PART
C
1/8"=1'-0"
MD131 TYPICAL FLOOR HVAC DEMOLITION PLAN (3RD
THRU 5TH) - PART A
1/8"=1'-0"
MD132 TYPICAL FLOOR HVAC DEMOLITION PLAN (3RD
THRU 5TH) - PART B
1/8"=1'-0"
MD133 TYPICAL FLOOR HVAC DEMOLITION PLAN (3RD
THRU 5TH) - PART C
1/8"=1'-0"
MD161 SIXTH FLOOR HVAC DEMOLITION PLAN - PART A 1/8"=1'-0"
MD162 SIXTH FLOOR HVAC DEMOLITION PLAN - PART B 1/8"=1'-0"
MD163 SIXTH FLOOR HVAC DEMOLITION PLAN - PART C 1/8"=1'-0"
MD170 ROOF HVAC DEMOLITION PLAN 1/16"=1'-
0"
MH101 BASEMENT HVAC PLAN - PART A 1/8"=1'-0"
MH102 BASEMENT HVAC PLAN - PART B 1/8"=1'-0"
MH103 BASEMENT HVAC PLAN - PART C 1/8"=1'-0"
MH111 FIRST FLOOR HVAC PLAN - PART A 1/8"=1'-0"
MH112 FIRST FLOOR HVAC PLAN - PART B 1/8"=1'-0"
MH113 FIRST FLOOR HVAC PLAN - PART C 1/8"=1'-0"
MH121 SECOND FLOOR HVAC PLAN - PART A 1/8"=1'-0"
MH122 SECOND FLOOR HVAC PLAN - PART B 1/8"=1'-0"
MH123 SECOND FLOOR HVAC PLAN - PART C 1/8"=1'-0"
MH131 TYPICAL FLOOR HVAC PLAN (3RD THRU 5TH) -
PART A
1/8"=1'-0"
MH132 TYPICAL FLOOR HVAC PLAN (3RD THRU 5TH) -
PART B
1/8"=1'-0"
MH133 TYPICAL FLOOR HVAC PLAN (3RD THRU 5TH) -
PART C
1/8"=1'-0"
MH161 SIXTH FLOOR HVAC PLAN - PART A 1/8"=1'-0"
MH162 SIXTH FLOOR HVAC PLAN - PART B 1/8"=1'-0"
MH163 SIXTH FLOOR HVAC PLAN - PART C 1/8"=1'-0"
MH171 ROOF HVAC PLAN - PART A 1/8"=1'-0"
MH172 ROOF HVAC PLAN - PART B 1/8"=1'-0"
MH173 ROOF HVAC PLAN - PART C 1/8"=1'-0"
MP101 BASEMENT PIPING PLAN - PART A 1/8"=1'-0"
MP102 BASEMENT PIPING PLAN - PART B 1/8"=1'-0"
MP103 BASEMENT PIPING PLAN - PART C 1/8"=1'-0"
M-401 ENLARGED MECHANICAL ROOM PLANS 1/4"=1'-0"
M-402 ENLARGED PARTIAL PLANS 1/4"=1'-0"
M-403 ROOF SECTIONS
M-501 HVAC DETAILS No Scale
M-502 HVAC DETAILS No Scale
M-503 HVAC DETAILS No Scale
M-504 HVAC DETAILS No Scale
M-505 HVAC DETAILS No Scale
M-506 HVAC DETAILS No Scale
M-507 HVAC DETAILS No Scale
M-508 HVAC DETAILS No Scale
M-541 FCU RISER DIAGRAM No Scale
M-542 FCU RISER DIAGRAM No Scale
M-543 FCU RISER DIAGRAM No Scale
M-544 FCU RISER DIAGRAM No Scale
M-545 FCU RISER DIAGRAM No Scale
M-551 AIR RISER DIAGRAM No Scale
M-552 AIR RISER DIAGRAM No Scale
M-553 AIR RISER DIAGRAM No Scale
M-601 HVAC SCHEDULES No Scale
M-602 HVAC SCHEDULES No Scale
M-603 HVAC SCHEDULES No Scale
M-700 INSTRUMENTATION AND CONTROLS LEGEND No Scale
M-701 HEATING WATER P&ID No Scale
M-702 CHILLED WATER P&ID No Scale
M-703 STEAM P&ID No Scale
M-704 BAS ARCHITECTURE No Scale
M-705 ERU P&ID No Scale
M-706 P&ID'S No Scale
M-707 P&ID'S No Scale
M A
R K
D E
S C
R
IP
T
IO
N D
A
DUCT SIZES AND ALL OPENINGS THROUGH
BUILDING CONSTRUCTION SHALL SUIT EQUIPMENT
FURNISHED.
PROVIDE CONCRETE HOUSEKEEPING PAD UNDER
ALL FLOOR-MOUNTED EQUIPMENT. REFER TO
SPECIFICATIONS FOR DETAILED REQUIREMENTS.
PROVIDE FLEXIBLE DUCT CONNECTIONS ON ALL
DUCTWORK CONNECTING TO EACH FAN, AIR
HANDLING UNITS, AND FAN COIL UNITS.
TRAPPED CONDENSATE DRAINS FROM ALL
MECHANICAL EQUIPMENT SHALL BE PROVIDED FOR
PROPER DRAINAGE TO SUIT EQUIPMENT FURNISHED.
ALL EQUIPMENT, DUCTWORK, ETC., SHALL BE
SUPPORTED AS DETAILED AND/OR SPECIFIED.
PROVIDE ADDITIONAL SUPPORTS AS REQUIRED TO
PROVIDE A VIBRATION-FREE, RIGID INSTALLATION.
LOCATE THERMOSTATS, TEMPERATURE SENSORS,
HUMIDISTATS, AND HUMIDITY SENSORS AT 48"
ABOVE FINISHED FLOOR UNLESS NOTED
OTHERWISE. COORDINATE LOCATIONS WITH OTHER
EQUIPMENT, FURNITURE, AND DOOR SWINGS.
SEE SPECIFICATIONS FOR GAUGES, THICKNESS,
BRACING, REQUIREMENTS, ETC., OF DUCTWORK.
DUCT CONSTRUCTION SHALL BE IN ACCORDANCE
WITH THE LATEST EDITION OF THE SMACNA HVAC
DUCT CONSTRUCTION STANDARD.
CONNECTION TO EQUIPMENT SHALL BE VERIFIED
WITH MANUFACTURER'S CERTIFIED DRAWINGS.
TRANSITIONS TO ALL EQUIPMENT SHALL BE VERIFIED
AND PROVIDED FOR EQUIPMENT FURNISHED.
PROVIDE AIR TURNING VANES IN ALL 90 DEGREE
MITERED RECTANGULAR DUCT ELBOWS.
COORDINATE DIFFUSER, GRILLE AND REGISTER
LOCATIONS WITH ARCHITECTURAL REFLECTED
CEILING PLANS AND EQUIPMENT OF ALL TRADES.
ALL DUCT SIZES SHOWN ARE INSIDE CLEAR
DIMENSIONS.
DAMPERS AND INSIDES OF DUCTS VISIBLE
THROUGH GRILLES, REGISTERS AND DIFFUSERS
SHALL BE PAINTED FLAT BLACK.
REFER TO TYPICAL DETAILS FOR PIPING AND
INSTALLATION OF EQUIPMENT.
ACCESS PANELS IN DUCTWORK AND CEILINGS
SHALL BE PROVIDED WHERE REQUIRED FOR
OPERATION, BALANCING OR MAINTENANCE OF ALL
MECHANICAL EQUIPMENT.
SLEEVE AND SEAL ALL PIPING PENETRATIONS
THROUGH BUILDING PARTITIONS.
UNLESS OTHERWISE NOTED, ALL EQUIPMENT AND
VALVE DRAINS SHALL BE INDEPENDENTLY PIPED
FULL SIZE TO THE NEAREST PLUMBING DRAIN.
PROVIDE TRANSITIONS AT DIFFUSER NECKS AS
REQUIRED TO MATCH SIZES OF FLEX DUCTS TO BE
CONNECTED.
WATER PRESSURE DROPS THROUGH COIL
CONTROL VALVES SHALL NOT EXCEED 5 PSI.
MAINTAIN CLEARANCE OF A MINIMUM OF 6"
BETWEEN DUCTWORK, PIPING, EQUIPMENT, ETC.,
AND ALL FIRE RATED AND FIRE/SMOKE RATED
PARTITIONS, TO ALLOW FOR INSPECTIONS OF
RATED WALLS.
1.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
25.
16.
24.
18.
19.
23.
20.
3.
DUCT RUNOUTS TO DIFFUSERS SHALL MATCH THE
SIZE OF THE DIFFUSER NECK.
22.
THE GENERAL CONTRACTOR SHALL VERIFY AND
COORDINATE ALL STRUCTURAL ITEMS INVOLVING
HVAC WITH THE MECHANICAL CONTRACTOR
BEFORE STARTING WORK ON OPENINGS,
HOUSEKEEPING PADS AND EQUIPMENT SUPPORT.
26.
ALL DUCTWORK AND PIPING IS SHOWN
SCHEMATICALLY. PROVIDE ALL TRANSITIONS,
TURNING VANES, ELBOWS, FITTINGS, ETC., TO
ALLOW SMOOTH FLOWS. ALL SPLIT DUCT FITTINGS
SHALL TRANSITION TO FULL SIZE OF THE SUM OF
BOTH BRANCHES, UPSTREAM OF SPLIT.
DIMENSIONS SHALL BE FIELD-VERIFIED AND
COORDINATED PRIOR TO PROCUREMENT OR
FABRICATION. COORDINATE THE WORK WITH OTHER
TRADES INVOLVED. FIELD MODIFICATIONS SUCH AS
OFFSETS IN PIPING OR DUCTWORK (INCLUDING
DIVIDED DUCTWORK) NEEDED DUE TO
OBSTRUCTIONS OR INTERFERENCES SHALL BE
PROVIDED AT NO ADDITIONAL COST.
2.
VERIFY FINISH WITH ARCHITECT PRIOR TO
PURCHASING GRILLES, REGISTERS, DIFFUSERS,
LOUVERS AND OTHER AIR DISTRIBUTION DEVICES.
17.
LOCATE ALL OUTSIDE AIR INTAKES A MINIMUM OF
15'-0" CLEAR FROM ALL PLUMBING VENTS AND
EXHAUST AIR DISCHARGE LOCATIONS. LOWEST
POINT OF EACH OUTSIDE AIR INTAKE ON ROOF
SHALL BE A MINIMUM OF 24" ABOVE ROOF.
21.
PROVIDE MANUAL AIR VENTS AT ALL HIGH POINTS IN
CHILLED WATER AND HOT WATER PIPING.
27.
DESIGN LOADS FOR HUNG EQUIPMENT SHALL BE
1.5 x THE EQUIPMENT OPERATING WEIGHT IN THE DOWNWARD DIRECTION AND 0.5 x THE EQUIPMENT
WEIGHT IN ANY HORIZONTAL DIRECTION. DESIGN
OF THE EQUIPMENT SUPPORTS SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR AND SHALL
BE DESIGNED BY THE A LICENSED STRUCTURAL
ENGINEER. ALL COMPONENTS OF THE EQUIPMENT
SUPPORT DESIGN SHALL BE INCLUDED IN THE
PIPING AND DUCTWORK SHOP DRAWINGS AND ALL
COORDINATION DRAWINGS.
28.
CONTRACTOR TO REVIEW INTERIOR SIGNAGE
SCHEDULE FOR ACTUAL ROOM NUMBERS PRIOR
TO LABELING ANY WIRING, CABLING, ELECTRICAL
PANELS, DDC CONTROLS, ETC.
29.
HVAC GENERAL NOTES
SHEET ID
1 2 6 7
D R
A W
N B
Y
D E
S
IG
N B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
C H
E C
K E
D B
Y
US Army Corps of Engineers ®
A N
S I D
F
A
C A
T E
G O
R Y
C O
D E
3 4 5 8 9 10
G
E
D
C
B
R E
P A
IR
T
O E
IS
E
N H
O W
E R
B A
R R
A C
K S
B
U
IL
D
IN
G
C
F Y
S
R M
J U
N E
W
D S
-1
-B -0
W D
S -1
-D
-0
W L J U
N G
Q U
IS
T
R Z
U R
IT
A
A p p ro v e r
M-002
F
E D
E R
A L P
L A
Z A
N
E W
Y O
R K
N
Y
N E
W Y
O R
K D
IS
T
R
IC
T N
E W
Y O
R K
N
E W
Y O
R K
D H
E
ID
E M
A N
H V
A C
N O
T E
S
W E
S T
P O
IN
T
N
E W
Y O
R K
M -0
M A
R K
D E
S C
R
IP
T
IO
N D
A
GENERAL DEMOLITION NOTES:
1. MAJOR EQUIPMENT AND MAJOR SYSTEM COMPONENTS ARE INDICATED ON THESE
PLANS FOR INFORMATION ONLY. THE CONTINUATION OF PIPING AND DUCTWORK
THROUGHOUT THE BUILDING SHALL BE FIELD VERIFIED BY THE CONTRACTOR. THE
CONTRACTOR SHALL VISIT THE PROJECT SITE PRIOR TO BIDDING AND VERIFY
EXISTING CONDITIONS.
2. REMOVE THE EXISTING HEATING, VENTILATING AND AIR CONDITIONING SYSTEM IN
ITS ENTIRETY.
3. REMOVE HIGH & LOW PRESSURE STEAM PIPING SYSTEMS, PRV'S, HEAT
EXCHANGERS, PUMPS,CONDENSATE PIPING SYSTEMS, RELIEF PIPING, AND
ASSOCIATED ANCILLARY COMPONENTS.
4. REMOVE HEATING AND VENTILATING SYSTEM DUCTWORK, AIR HANDLING UNITS,
HEATING & VENTILATION UNITS, FANS AND ASSOCIATED ANCILLARY COMPONENTS.
5. REMOVE VERTICAL HEATING WATER RISERS, HEATING WATER PIPING
DISTRIBUTION SYSTEM, RADIATORS AND ANCILLARY COMPONENTS.
2324282930
BB
FF
GG
25262740
C
A'
B'
C'
D'
E
E
H
JJ
STORAGE RM.
C - 31
MECHANICAL RM #
C - 30
BARRACKS
POLICE LOCKER
RM
C - 27
STORAGE
C - 28
LATRINE
C - 26
B.P. OFFICE
C - 25
CORRIDOR -C
C - 29
TRUNK # 4
C - 17
LAUNDRY & DRY
CLEANING
C - 19
TEL. ALCOVE
C - 20
I.M.S. # 6 C - 24
BARRACKS
POLICE STORAGE
C - 23
TRUNK RM # 5
C - 21
TRUNK RM # 6
C - 22
322.58 SF
I.M.S. # 5 C - 18
REMOVE DUCTWORK (TYP.)
EXISTING HWS & HWR
RISER TO REMAIN.
EXISTING CUH 7
REMOVE TRANSFER
GRILLE (TYP.)
REMOVE DUCT UP
REMOVE DUCT UP
DEMOLITION KEY NOTES:
1 REMOVE MAU, ASSOCIATED PIPING AND CONTROLS.
REMOVE PUMP, ASSOCIATED PIPING AND CONTROLS.
REMOVE SHELL AND TUBE HEAT EXCHANGER, PIPING AND ASSOCIATED
CONTROLS.
REMOVE EXPANSION TANK AND ASSOCIATED PIPING.
REMOVE CONDENSATE RETURN UNIT.
REMOVE DOMESTIC HOT WATER GENERATOR STEAM PIPING.
PROVIDE TEMPORARY SPACE HEATING PRIOR TO DEMOLITION.
C8
M-402
M-402
C1
REMOVE 3" PC
REMOVE 6" HPS
REMOVE 10" LPS
REMOVE 6" HPS
REMOVE 10" LPS
REMOVE 3" PC
SHEET ID
1 2 6 7
D R
A W
N B
Y
D E
S
IG
N B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
C H
E C
K E
D B
Y
US Army Corps of Engineers ®
A N
S I D
F
A
C A
T E
G O
R Y
C O
D E
3 4 5 8 9 10
G
E
D
C
B
KEY PLAN
R E
P A
IR
T
O E
IS
E
N H
O W
E R
B A
R R
A C
K S
B
U
IL
D
IN
G
C
F Y
S
R M
J U
N E
W
D S
-1
-B -0
W D
S -1
-D
-0
W L J U
N G
Q U
IS
T
R Z
U R
IT
A
A p p ro v e r
MD101
F
E D
E R
A L P
L A
Z A
N
E W
Y O
R K
N
Y
N E
W Y
O R
K D
IS
T
R
IC
T N
E W
Y O
R K
N
E W
Y O
R K
D H
E
ID
E M
A N
B A
S E
M E
N T
H V
A C
D E
M O
L
IT
IO
N
P L A
N
P A
R T
A
W E
S T
P O
IN
T
N
E W
Y O
R K
M D
1/8" = 1'-0"
MD101
A1 BASEMENT HVAC DEMOLITION PLAN - PART A
04 8 16268
SCALE: 1/8"=1'-0"
1/8" = 1'-0"
MD101
STEAM TUNNEL
EXISTING PIPING
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
LJUN6268
Typewritten Text underground
LJUN6268
Pen
LJUN6268
Pen
LJUN6268
Pen
1213141617181920212223
BB
FF
GG
CC
A
EE
JJ
STUDY RM # 3
C - 34
I.M.S. # 2 C - 9
STORAGE
C - 8
TRUNK RM # 2
C - 7
STUDY RM # 4
C - 33
STUDY RM # 5
C - 32
STORAGE RM.
C - 31
SIGNAL EQIUP.
C - 11
I.M.S. # 3 C - 15
I.M.S. # 4 C - 16
TRUNK # 4
C - 17
TRUNK RM # 3
C - 14
322.58 SF
I.M.S. # 5 C - 18
REMOVE RADIATOR AND
ASSOCIATED PIPING (TYP.)
REMOVE DUCTWORK (TYP.)
REMOVE TRANSFER
GRILLE (TYP.)
REMOVE SUPPLY
GRILLE (TYP.)
GENERAL DEMOLITION NOTES:
1. MAJOR EQUIPMENT AND MAJOR SYSTEM COMPONENTS ARE INDICATED ON THESE
PLANS FOR INFORMATION ONLY. THE CONTINUATION OF PIPING AND DUCTWORK
THROUGHOUT THE BUILDING SHALL BE FIELD VERIFIED BY THE CONTRACTOR. THE
CONTRACTOR SHALL VISIT THE PROJECT SITE PRIOR TO BIDDING AND VERIFY
EXISTING CONDITIONS.
2. REMOVE THE EXISTING HEATING, VENTILATING AND AIR CONDITIONING SYSTEM IN
ITS ENTIRETY.
3. REMOVE HIGH & LOW PRESSURE STEAM PIPING SYSTEMS, PRV'S, HEAT
EXCHANGERS, PUMPS,CONDENSATE PIPING SYSTEMS, RELIEF PIPING, AND
ASSOCIATED ANCILLARY COMPONENTS.
4. REMOVE HEATING AND VENTILATING SYSTEM DUCTWORK, AIR HANDLING UNITS,
HEATING & VENTILATION UNITS, FANS AND ASSOCIATED ANCILLARY COMPONENTS.
5. REMOVE VERTICAL HEATING WATER RISERS, HEATING WATER PIPING
DISTRIBUTION SYSTEM, RADIATORS AND ANCILLARY COMPONENTS.
SHEET ID
1 2 6 7
D R
A W
N B
Y
D E
S
IG
N B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
C H
E C
K E
D B
Y
US Army Corps of Engineers ®
A N
S I D
F
A
C A
T E
G O
R Y
C O
D E
3 4 5 8 9 10
G
E
D
C
B
KEY PLAN
R E
P A
IR
T
O E
IS
E
N H
O W
E R
B A
R R
A C
K S
B
U
IL
D
IN
G
C
F Y
S
R M
J U
N E
W
D S
-1
-B -0
W D
S -1
-D
-0
W L J U
N G
Q U
IS
T
R Z
U R
IT
A
A p p ro v e r
MD102
F
E D
E R
A L P
L A
Z A
N
E W
Y O
R K
N
Y
N E
W Y
O R
K D
IS
T
R
IC
T N
E W
Y O
R K
N
E W
Y O
R K
D H
E
ID
E M
A N
B A
S E
M E
N T
H V
A C
D E
M O
L
IT
IO
N
P L A
N
P A
R T
B
W E
S T
P O
IN
T
N
E W
Y O
R K
M D
1/8" = 1'-0"
MD102
A1 BASEMENT HVAC DEMOLITION PLAN - PART B
04 8 16268
SCALE: 1/8"=1'-0"
M A
R K
D E
S C
R
IP
T
IO
N D
A
123456789101112
D
FF
GG
CC
A
EE
JJ
STUDY RM # 1
C - 36
STUDY RM # 2
C - 35
STUDY RM # 3
C - 34
JANITOR
C - 6 STORAGE
C - 38
TRUNK RM # 1
C - 4
MECHANICAL RM #
C - 1
REMOVE RADIATOR AND
ASSOCIATED PIPING (TYP.)
REMOVE DUCTWORK (TYP.)
REMOVE DUCT UP
REMOVE TRANSFER
GRILLE (TYP.)
REMOVE SUPPLY
GRILLE (TYP.)
GENERAL DEMOLITION NOTES:
1. MAJOR EQUIPMENT AND MAJOR SYSTEM COMPONENTS ARE INDICATED ON THESE
PLANS FOR INFORMATION ONLY. THE CONTINUATION OF PIPING AND DUCTWORK
THROUGHOUT THE BUILDING SHALL BE FIELD VERIFIED BY THE CONTRACTOR. THE
CONTRACTOR SHALL VISIT THE PROJECT SITE PRIOR TO BIDDING AND VERIFY
EXISTING CONDITIONS.
2. REMOVE THE EXISTING HEATING, VENTILATING AND AIR CONDITIONING SYSTEM IN
ITS ENTIRETY.
3. REMOVE HIGH & LOW PRESSURE STEAM PIPING SYSTEMS, PRV'S, HEAT
EXCHANGERS, PUMPS,CONDENSATE PIPING SYSTEMS, RELIEF PIPING, AND
ASSOCIATED ANCILLARY COMPONENTS.
4. REMOVE HEATING AND VENTILATING SYSTEM DUCTWORK, AIR HANDLING UNITS,
HEATING & VENTILATION UNITS, FANS AND ASSOCIATED ANCILLARY COMPONENTS.
5. REMOVE VERTICAL HEATING WATER RISERS, HEATING WATER PIPING
DISTRIBUTION SYSTEM, RADIATORS AND ANCILLARY COMPONENTS.
DEMOLITION KEY NOTES:
1 REMOVE MAU, ASSOCIATED PIPING AND CONTROLS.
REMOVE PUMP, ASSOCIATED PIPING AND CONTROLS.
REMOVE SHELL AND TUBE HEAT EXCHANGER, PIPING AND ASSOCIATED
CONTROLS.
REMOVE EXPANSION TANK AND ASSOCIATED PIPING.
REMOVE CONDENSATE RETURN UNIT.
REMOVE DOMESTIC HOT WATER GENERATOR STEAM PIPING.
SHEET ID
1 2 6 7
D R
A W
N B
Y
D E
S
IG
N B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
C H
E C
K E
D B
Y
US Army Corps of Engineers ®
A N
S I D
F
A
C A
T E
G O
R Y
C O
D E
3 4 5 8 9 10
G
E
D
C
B
KEY PLAN
R E
P A
IR
T
O E
IS
E
N H
O W
E R
B A
R R
A C
K S
B
U
IL
D
IN
G
C
F Y
S
R M
J U
N E
W
D S
-1
-B -0
W D
S -1
-D
-0
W L J U
N G
Q U
IS
T
R Z
U R
IT
A
A p p ro v e r
MD103
F
E D
E R
A L P
L A
Z A
N
E W
Y O
R K
N
Y
N E
W Y
O R
K D
IS
T
R
IC
T N
E W
Y O
R K
N
E W
Y O
R K
D H
E
ID
E M
A N
B A
S E
M E
N T
H V
A C
D E
M O
L
IT
IO
N
P L A
N
P A
R T
C
W E
S T
P O
IN
T
N
E W
Y O
R K
M D
1/8" = 1'-0"
MD103
A1 BASEMENT HVAC PLAN DEMOLITION - PART C
04 8 16268
SCALE: 1/8"=1'-0"
M A
R K
D E
S C
R
IP
T
IO
N D
A
2324282930
FF
GG
25262740
C
A'
B'
C'
D'
E
E
HH
JJ
REMOVE RADIATOR AND
ASSOCIATED PIPING (TYP.)
REMOVE RADIATOR
AND ASSOCIATED
PIPING (TYP.)
REMOVE DUCTWORK (TYP.)
REMOVE DUCT UP
REMOVE DUCT UP
REMOVE SUPPLY
GRILLE (TYP.)
REMOVE EXHAUST
GRILLE (TYP.)
REMOVE EXHAUST
RISER (TYP.)
GENERAL DEMOLITION NOTES:
1. MAJOR EQUIPMENT AND MAJOR SYSTEM COMPONENTS ARE INDICATED ON THESE
PLANS FOR INFORMATION ONLY. THE CONTINUATION OF PIPING AND DUCTWORK
THROUGHOUT THE BUILDING SHALL BE FIELD VERIFIED BY THE CONTRACTOR. THE
CONTRACTOR SHALL VISIT THE PROJECT SITE PRIOR TO BIDDING AND VERIFY
EXISTING CONDITIONS.
2. REMOVE THE EXISTING HEATING, VENTILATING AND AIR CONDITIONING SYSTEM IN
ITS ENTIRETY.
3. REMOVE HIGH & LOW PRESSURE STEAM PIPING SYSTEMS, PRV'S, HEAT
EXCHANGERS, PUMPS,CONDENSATE PIPING SYSTEMS, RELIEF PIPING, AND
ASSOCIATED ANCILLARY COMPONENTS.
4. REMOVE HEATING AND VENTILATING SYSTEM DUCTWORK, AIR HANDLING UNITS,
HEATING & VENTILATION UNITS, FANS AND ASSOCIATED ANCILLARY COMPONENTS.
5. REMOVE VERTICAL HEATING WATER RISERS, HEATING WATER PIPING
DISTRIBUTION SYSTEM, RADIATORS AND ANCILLARY COMPONENTS.
A
SHEET ID
1 2 6 7
D R
A W
N B
Y
D E
S
IG
N B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
C H
E C
K E
D B
Y
US Army Corps of Engineers ®
A N
S I D
F
A
C A
T E
G O
R Y
C O
D E
3 4 5 8 9 10
G
E
D
C
B
KEY PLAN
R E
P A
IR
T
O E
IS
E
N H
O W
E R
B A
R R
A C
K S
B
U
IL
D
IN
G
C
F Y
S
R M
J U
N E
W
D S
-1
-B -0
W D
S -1
-D
-0
W L J U
N G
Q U
IS
T
R Z
U R
IT
A
A p p ro v e r
MD111
F
E D
E R
A L P
L A
Z A
N
E W
Y O
R K
N
Y
N E
W Y
O R
K D
IS
T
R
IC
T N
E W
Y O
R K
N
E W
Y O
R K
D H
E
ID
E M
A N
F
IR
S T
F L O
O R
H V
A C
D E
M O
L
IT
IO
N
P L
A N
P
A R
T A
W E
S T
P O
IN
T
N
E W
Y O
R K
M D
1/8" = 1'-0"
MD111
A1 FIRST FLOOR HVAC DEMOLITION PLAN - PART A
04 8 16268
SCALE: 1/8"=1'-0"
M A
R K
D E
S C
R
IP
T
IO
N D
A
1213141617181920212223
FF
GG
CC
A
EE
JJ
REMOVE RADIATOR
AND ASSOCIATED
PIPING (TYP.)
REMOVE RADIATOR
AND ASSOCIATED
PIPING (TYP.)
REMOVE DUCTWORK (TYP.)
REMOVE EXHAUST
RISER (TYP.)
REMOVE EXHAUST
GRILLE (TYP.)
GENERAL DEMOLITION NOTES:
1. MAJOR EQUIPMENT AND MAJOR SYSTEM COMPONENTS ARE INDICATED ON THESE
PLANS FOR INFORMATION ONLY. THE CONTINUATION OF PIPING AND DUCTWORK
THROUGHOUT THE BUILDING SHALL BE FIELD VERIFIED BY THE CONTRACTOR. THE
CONTRACTOR SHALL VISIT THE PROJECT SITE PRIOR TO BIDDING AND VERIFY
EXISTING CONDITIONS.
2. REMOVE THE EXISTING HEATING, VENTILATING AND AIR CONDITIONING SYSTEM IN
ITS ENTIRETY.
3. REMOVE HIGH & LOW PRESSURE STEAM PIPING SYSTEMS, PRV'S, HEAT
EXCHANGERS, PUMPS,CONDENSATE PIPING SYSTEMS, RELIEF PIPING, AND
ASSOCIATED ANCILLARY COMPONENTS.
4. REMOVE HEATING AND VENTILATING SYSTEM DUCTWORK, AIR HANDLING UNITS,
HEATING & VENTILATION UNITS, FANS AND ASSOCIATED ANCILLARY COMPONENTS.
5. REMOVE VERTICAL HEATING WATER RISERS, HEATING WATER PIPING
DISTRIBUTION SYSTEM, RADIATORS AND ANCILLARY COMPONENTS.
B
SHEET ID
1 2 6 7
D R
A W
N B
Y
D E
S
IG
N B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
C H
E C
K E
D B
Y
US Army Corps of Engineers ®
A N
S I D
F
A
C A
T E
G O
R Y
C O
D E
3 4 5 8 9 10
G
E
D
C
B
KEY PLAN
R E
P A
IR
T
O E
IS
E
N H
O W
E R
B A
R R
A C
K S
B
U
IL
D
IN
G
C
F Y
S
R M
J U
N E
W
D S
-1
-B -0
W D
S -1
-D
-0
W L J U
N G
Q U
IS
T
R Z
U R
IT
A
A p p ro v e r
MD112
F
E D
E R
A L P
L A
Z A
N
E W
Y O
R K
N
Y
N E
W Y
O R
K D
IS
T
R
IC
T N
E W
Y O
R K
N
E W
Y O
R K
D H
E
ID
E M
A N
F
IR
S T
F L O
O R
H V
A C
D E
M O
L
IT
IO
N
P L
A N
P
A R
T B
W E
S T
P O
IN
T
N
E W
Y O
R K
M D
1/8" = 1'-0"
MD112
A1 FIRST FLOOR HVAC DEMOLITION PLAN - PART B
04 8 16268
SCALE: 1/8"=1'-0"
M A
R K
D E
S C
R
IP
T
IO
N D
A
D
FF
GG
CC
A
EE
JJ
REMOVE RADIATOR
AND ASSOCIATED
PIPING (TYP.)
REMOVE RADIATOR
AND ASSOCIATED
PIPING (TYP.)
REMOVE DUCTWORK (TYP.)
REMOVE DUCT UP
REMOVE EXHAUST
RISER (TYP.)
REMOVE EXHAUST
GRILLE (TYP.)
REMOVE SUPPLY
RISER (TYP.)
GENERAL DEMOLITION NOTES:
1. MAJOR EQUIPMENT AND MAJOR SYSTEM COMPONENTS ARE INDICATED ON THESE
PLANS FOR INFORMATION ONLY. THE CONTINUATION OF PIPING AND DUCTWORK
THROUGHOUT THE BUILDING SHALL BE FIELD VERIFIED BY THE CONTRACTOR. THE
CONTRACTOR SHALL VISIT THE PROJECT SITE PRIOR TO BIDDING AND VERIFY
EXISTING CONDITIONS.
2. REMOVE THE EXISTING HEATING, VENTILATING AND AIR CONDITIONING SYSTEM IN
ITS ENTIRETY.
3. REMOVE HIGH & LOW PRESSURE STEAM PIPING SYSTEMS, PRV'S, HEAT
EXCHANGERS, PUMPS,CONDENSATE PIPING SYSTEMS, RELIEF PIPING, AND
ASSOCIATED ANCILLARY COMPONENTS.
4. REMOVE HEATING AND VENTILATING SYSTEM DUCTWORK, AIR HANDLING UNITS,
HEATING & VENTILATION UNITS, FANS AND ASSOCIATED ANCILLARY COMPONENTS.
5. REMOVE VERTICAL HEATING WATER RISERS, HEATING WATER PIPING
DISTRIBUTION SYSTEM, RADIATORS AND ANCILLARY COMPONENTS.
C
SHEET ID
1 2 6 7
D R
A W
N B
Y
D E
S
IG
N B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
C H
E C
K E
D B
Y
US Army Corps of Engineers ®
A N
S I D
F
A
C A
T E
G O
R Y
C O
D E
3 4 5 8 9 10
G
E
D
C
B
KEY PLAN
R E
P A
IR
T
O E
IS
E
N H
O W
E R
B A
R R
A C
K S
B
U
IL
D
IN
G
C
F Y
S
R M
J U
N E
W
D S
-1
-B -0
W D
S -1
-D
-0
W L J U
N G
Q U
IS
T
R Z
U R
IT
A
A p p ro v e r
MD113
F
E D
E R
A L P
L A
Z A
N
E W
Y O
R K
N
Y
N E
W Y
O R
K D
IS
T
R
IC
T N
E W
Y O
R K
N
E W
Y O
R K
D H
E
ID
E M
A N
F
IR
S T
F L O
O R
H V
A C
D E
M O
L
IT
IO
N
P L
A N
P
A R
T C
W E
S T
P O
IN
T
N
E W
Y O
R K
M D
1/8" = 1'-0"
MD113
A1 FIRST FLOOR HVAC DEMOLITION PLAN - PART C
04 8 16268
SCALE: 1/8"=1'-0"
M A
R K
D E
S C
R
IP
T
IO
N D
A
FF
GG
25262740
C
A'
B'
C'
D'
E
E
HH
J J
REMOVE RADIATOR AND
ASSOCIATED PIPING (TYP.)
REMOVE RADIATOR AND
ASSOCIATED PIPING (TYP.)
REMOVE DUCTWORK (TYP.)
REMOVE DUCT UP
REMOVE SUPPLY GRILLE (TYP.)
REMOVE EXHAUST
RISER (TYP.)
REMOVE EXHAUST GRILLE (TYP.)
GENERAL DEMOLITION NOTES:
1. MAJOR EQUIPMENT AND MAJOR SYSTEM COMPONENTS ARE INDICATED ON THESE
PLANS FOR INFORMATION ONLY. THE CONTINUATION OF PIPING AND DUCTWORK
THROUGHOUT THE BUILDING SHALL BE FIELD VERIFIED BY THE CONTRACTOR. THE
CONTRACTOR SHALL VISIT THE PROJECT SITE PRIOR TO BIDDING AND VERIFY
EXISTING CONDITIONS.
2. REMOVE THE EXISTING HEATING, VENTILATING AND AIR CONDITIONING SYSTEM IN
ITS ENTIRETY.
3. REMOVE HIGH & LOW PRESSURE STEAM PIPING SYSTEMS, PRV'S, HEAT
EXCHANGERS, PUMPS,CONDENSATE PIPING SYSTEMS, RELIEF PIPING, AND
ASSOCIATED ANCILLARY COMPONENTS.
4. REMOVE HEATING AND VENTILATING SYSTEM DUCTWORK, AIR HANDLING UNITS,
HEATING & VENTILATION UNITS, FANS AND ASSOCIATED ANCILLARY COMPONENTS.
5. REMOVE VERTICAL HEATING WATER RISERS, HEATING WATER PIPING
DISTRIBUTION SYSTEM, RADIATORS AND ANCILLARY COMPONENTS.
A
SHEET ID
1 2 6 7
D R
A W
N B
Y
D E
S
IG
N B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
C H
E C
K E
D B
Y
US Army Corps of Engineers ®
A N
S I D
F
A
C A
T E
G O
R Y
C O
D E
3 4 5 8 9 10
G
E
D
C
B
KEY PLAN
R E
P A
IR
T
O E
IS
E
N H
O W
E R
B A
R R
A C
K S
B
U
IL
D
IN
G
C
F Y
S
R M
J U
N E
W
D S
-1
-B -0
W D
S -1
-D
-0
W L J U
N G
Q U
IS
T
R Z
U R
IT
A
A p p ro v e r
MD121
F
E D
E R
A L P
L A
Z A
N
E W
Y O
R K
N
Y
N E
W Y
O R
K D
IS
T
R
IC
T N
E W
Y O
R K
N
E W
Y O
R K
D H
E
ID
E M
A N
S E
C O
N D
F L O
O R
H V
A C
D E
M O
L
IT
IO
N
P L
A N
P
A R
T A
W E
S T
P O
IN
T
N
E W
Y O
R K
M D
1/8" = 1'-0"
MD121
A1 SECOND FLOOR HVAC DEMOLITION PLAN - PART A
04 8 16268
SCALE: 1/8"=1'-0"
M A
R K
D E
S C
R
IP
T
IO
N D
A
12131416171819202122
BB
FF
GG
CC
A
EE
JJ
REMOVE RADIATOR AND
ASSOCIATED PIPING (TYP.)
REMOVE RADIATOR AND
ASSOCIATED PIPING (TYP.)
REMOVE EXHAUST RISER (TYP.)
REMOVE EXHAUST GRILLE (TYP.)
GENERAL DEMOLITION NOTES:
1. MAJOR EQUIPMENT AND MAJOR SYSTEM COMPONENTS ARE INDICATED ON THESE
PLANS FOR INFORMATION ONLY. THE CONTINUATION OF PIPING AND DUCTWORK
THROUGHOUT THE BUILDING SHALL BE FIELD VERIFIED BY THE CONTRACTOR. THE
CONTRACTOR SHALL VISIT THE PROJECT SITE PRIOR TO BIDDING AND VERIFY
EXISTING CONDITIONS.
2. REMOVE THE EXISTING HEATING, VENTILATING AND AIR CONDITIONING SYSTEM IN
ITS ENTIRETY.
3. REMOVE HIGH & LOW PRESSURE STEAM PIPING SYSTEMS, PRV'S, HEAT
EXCHANGERS, PUMPS,CONDENSATE PIPING SYSTEMS, RELIEF PIPING, AND
ASSOCIATED ANCILLARY COMPONENTS.
4. REMOVE HEATING AND VENTILATING SYSTEM DUCTWORK, AIR HANDLING UNITS,
HEATING & VENTILATION UNITS, FANS AND ASSOCIATED ANCILLARY COMPONENTS.
5. REMOVE VERTICAL HEATING WATER RISERS, HEATING WATER PIPING
DISTRIBUTION SYSTEM, RADIATORS AND ANCILLARY COMPONENTS.
SHEET ID
1 2 6 7
D R
A W
N B
Y
D E
S
IG
N B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
C H
E C
K E
D B
Y
US Army Corps of Engineers ®
A N
S I D
F
A
C A
T E
G O
R Y
C O
D E
3 4 5 8 9 10
G
E
D
C
B
KEY PLAN
R E
P A
IR
T
O E
IS
E
N H
O W
E R
B A
R R
A C
K S
B
U
IL
D
IN
G
C
F Y
S
R M
J U
N E
W
D S
-1
-B -0
W D
S -1
-D
-0
W L J U
N G
Q U
IS
T
R Z
U R
IT
A
A p p ro v e r
MD122
F
E D
E R
A L P
L A
Z A
N
E W
Y O
R K
N
Y
N E
W Y
O R
K D
IS
T
R
IC
T N
E W
Y O
R K
N
E W
Y O
R K
D H
E
ID
E M
A N
S E
C O
N D
F L O
O R
H V
A C
D E
M O
L
IT
IO
N
P L
A N
P
A R
T B
W E
S T
P O
IN
T
N
E W
Y O
R K
M D
1/8" = 1'-0"
MD122
A1 SECOND FLOOR HVAC DEMOLITION PLAN - PART B
04 8 16268
SCALE: 1/8"=1'-0"
M A
R K
D E
S C
R
IP
T
IO
N D
A
D
FF
GG
CC
A
EE
JJ
REMOVE RADIATOR AND
ASSOCIATED PIPING (TYP.)
REMOVE RADIATOR AND
ASSOCIATED PIPING (TYP.)
REMOVE DUCT UP (TYP.)
REMOVE EXHAUST RISER (TYP.) REMOVE EXHAUST GRILLE (TYP.)
GENERAL DEMOLITION NOTES:
1. MAJOR EQUIPMENT AND MAJOR SYSTEM COMPONENTS ARE INDICATED ON THESE
PLANS FOR INFORMATION ONLY. THE CONTINUATION OF PIPING AND DUCTWORK
THROUGHOUT THE BUILDING SHALL BE FIELD VERIFIED BY THE CONTRACTOR. THE
CONTRACTOR SHALL VISIT THE PROJECT SITE PRIOR TO BIDDING AND VERIFY
EXISTING CONDITIONS.
2. REMOVE THE EXISTING HEATING, VENTILATING AND AIR CONDITIONING SYSTEM IN
ITS ENTIRETY.
3. REMOVE HIGH & LOW PRESSURE STEAM PIPING SYSTEMS, PRV'S, HEAT
EXCHANGERS, PUMPS,CONDENSATE PIPING SYSTEMS, RELIEF PIPING, AND
ASSOCIATED ANCILLARY COMPONENTS.
4. REMOVE HEATING AND VENTILATING SYSTEM DUCTWORK, AIR HANDLING UNITS,
HEATING & VENTILATION UNITS, FANS AND ASSOCIATED ANCILLARY COMPONENTS.
5. REMOVE VERTICAL HEATING WATER RISERS, HEATING WATER PIPING
DISTRIBUTION SYSTEM, RADIATORS AND ANCILLARY COMPONENTS.
SHEET ID
1 2 6 7
D R
A W
N B
Y
D E
S
IG
N B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
C H
E C
K E
D B
Y
US Army Corps of Engineers ®
A N
S I D
F
A
C A
T E
G O
R Y
C O
D E
3 4 5 8 9 10
G
E
D
C
B
KEY PLAN
R E
P A
IR
T
O E
IS
E
N H
O W
E R
B A
R R
A C
K S
B
U
IL
D
IN
G
C
F Y
S
R M
J U
N E
W
D S
-1
-B -0
W D
S -1
-D
-0
W L J U
N G
Q U
IS
T
R Z
U R
IT
A
A p p ro v e r
MD123
F
E D
E R
A L P
L A
Z A
N
E W
Y O
R K
N
Y
N E
W Y
O R
K D
IS
T
R
IC
T N
E W
Y O
R K
N
E W
Y O
R K
D H
E
ID
E M
A N
S E
C O
N D
F L O
O R
H V
A C
D E
M O
L
IT
IO
N
P L
A N
P
A R
T C
W E
S T
P O
IN
T
N
E W
Y O
R K
M D
1/8" = 1'-0"
MD123
A1 SECOND FLOOR HVAC DEMOLITION PLAN - PART C
04 8 16268
SCALE: 1/8"=1'-0"
M A
R K
D E
S C
R
IP
T
IO
N D
A
FF
GG
25262740
C
A'
B'
C'
D'
E
E
HH
JJ
REMOVE RADIATOR
AND ASSOCIATED
PIPING (TYP.)
REMOVE RADIATOR
AND ASSOCIATED
PIPING (TYP.)
REMOVE DUCTWORK (TYP.)
REMOVE SUPPLY GRILLE (TYP.)
REMOVE EXHAUST
RISER (TYP.)
REMOVE EXHAUST GRILLE (TYP.)REMOVE DUCT UP
GENERAL DEMOLITION NOTES:
1. MAJOR EQUIPMENT AND MAJOR SYSTEM COMPONENTS ARE INDICATED ON THESE
PLANS FOR INFORMATION ONLY. THE CONTINUATION OF PIPING AND DUCTWORK
THROUGHOUT THE BUILDING SHALL BE FIELD VERIFIED BY THE CONTRACTOR. THE
CONTRACTOR SHALL VISIT THE PROJECT SITE PRIOR TO BIDDING AND VERIFY
EXISTING CONDITIONS.
2. REMOVE THE EXISTING HEATING, VENTILATING AND AIR CONDITIONING SYSTEM IN
ITS ENTIRETY.
3. REMOVE HIGH & LOW PRESSURE STEAM PIPING SYSTEMS, PRV'S, HEAT
EXCHANGERS, PUMPS,CONDENSATE PIPING SYSTEMS, RELIEF PIPING, AND
ASSOCIATED ANCILLARY COMPONENTS.
4. REMOVE HEATING AND VENTILATING SYSTEM DUCTWORK, AIR HANDLING UNITS,
HEATING & VENTILATION UNITS, FANS AND ASSOCIATED ANCILLARY COMPONENTS.
5. REMOVE VERTICAL HEATING WATER RISERS, HEATING WATER PIPING
DISTRIBUTION SYSTEM, RADIATORS AND ANCILLARY COMPONENTS.
SHEET ID
1 2 6 7
D R
A W
N B
Y
D E
S
IG
N B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
C H
E C
K E
D B
Y
US Army Corps of Engineers ®
A N
S I D
F
A
C A
T E
G O
R Y
C O
D E
3 4 5 8 9 10
G
E
D
C
B
KEY PLAN
R E
P A
IR
T
O E
IS
E
N H
O W
E R
B A
R R
A C
K S
B
U
IL
D
IN
G
C
F Y
S
R M
J U
N E
W
D S
-1
-B -0
W D
S -1
-D
-0
W L J U
N G
Q U
IS
T
R Z
U R
IT
A
A p p ro v e r
MD131
F
E D
E R
A L P
L A
Z A
N
E W
Y O
R K
N
Y
N E
W Y
O R
K D
IS
T
R
IC
T N
E W
Y O
R K
N
E W
Y O
R K
D H
E
ID
E M
A N
T Y
P
IC
A L F
L O
O R
H V
A C
D E
M O
L
IT
IO
N
P L A
N (3
R D
T H
R U
T
H
P
A R
T A
W E
S T
P O
IN
T
N
E W
Y O
R K
M D
1/8" = 1'-0"
MD131
A1 TYPICAL FLOOR HVAC DEMOLITION PLAN (3RD THRU 5TH) - PART A
04 8 16268
SCALE: 1/8"=1'-0"
M A
R K
D E
S C
R
IP
T
IO
N D
A
BB
FF
GG
CC
A
EE
JJ
REMOVE RADIATOR
AND ASSOCIATED
PIPING (TYP.)
REMOVE RADIATOR
AND ASSOCIATED
PIPING (TYP.)
REMOVE EXHAUST RISER (TYP.)
REMOVE EXHAUST GRILLE (TYP.)
GENERAL DEMOLITION NOTES:
1. MAJOR EQUIPMENT AND MAJOR SYSTEM COMPONENTS ARE INDICATED ON THESE
PLANS FOR INFORMATION ONLY. THE CONTINUATION OF PIPING AND DUCTWORK
THROUGHOUT THE BUILDING SHALL BE FIELD VERIFIED BY THE CONTRACTOR. THE
CONTRACTOR SHALL VISIT THE PROJECT SITE PRIOR TO BIDDING AND VERIFY
EXISTING CONDITIONS.
2. REMOVE THE EXISTING HEATING, VENTILATING AND AIR CONDITIONING SYSTEM IN
ITS ENTIRETY.
3. REMOVE HIGH & LOW PRESSURE STEAM PIPING SYSTEMS, PRV'S, HEAT
EXCHANGERS, PUMPS,CONDENSATE PIPING SYSTEMS, RELIEF PIPING, AND
ASSOCIATED ANCILLARY COMPONENTS.
4. REMOVE HEATING AND VENTILATING SYSTEM DUCTWORK, AIR HANDLING UNITS,
HEATING & VENTILATION UNITS, FANS AND ASSOCIATED ANCILLARY COMPONENTS.
5. REMOVE VERTICAL HEATING WATER RISERS, HEATING WATER PIPING
DISTRIBUTION SYSTEM, RADIATORS AND ANCILLARY COMPONENTS.
SHEET ID
1 2 6 7
D R
A W
N B
Y
D E
S
IG
N B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
C H
E C
K E
D B
Y
US Army Corps of Engineers ®
A N
S I D
F
A
C A
T E
G O
R Y
C O
D E
3 4 5 8 9 10
G
E
D
C
B
KEY PLAN
R E
P A
IR
T
O E
IS
E
N H
O W
E R
B A
R R
A C
K S
B
U
IL
D
IN
G
C
F Y
S
R M
J U
N E
W
D S
-1
-B -0
W D
S -1
-D
-0
W L J U
N G
Q U
IS
T
R Z
U R
IT
A
A p p ro v e r
MD132
F
E D
E R
A L P
L A
Z A
N
E W
Y O
R K
N
Y
N E
W Y
O R
K D
IS
T
R
IC
T N
E W
Y O
R K
N
E W
Y O
R K
D H
E
ID
E M
A N
T Y
P
IC
A L F
L O
O R
H V
A C
D E
M O
L
IT
IO
N
P L A
N (3
R D
T H
R U
T
H
P
A R
T B
W E
S T
P O
IN
T
N
E W
Y O
R K
M D
1/8" = 1'-0"
MD132
A1 TYPICAL FLOOR HVAC DEMOLITION PLAN (3RD THRU 5TH) - PART B
04 8 16268
SCALE: 1/8"=1'-0"
M A
R K
D E
S C
R
IP
T
IO
N D
A
D
FF
GG
CC
A
EE
J J
REMOVE RADIATOR AND
ASSOCIATED PIPING (TYP.)
REMOVE RADIATOR AND
ASSOCIATED PIPING (TYP.)
REMOVE DUCT UP (TYP.)
REMOVE EXHAUST RISER (TYP.) REMOVE EXHAUST GRILLE (TYP.)
GENERAL DEMOLITION NOTES:
1. MAJOR EQUIPMENT AND MAJOR SYSTEM COMPONENTS ARE INDICATED ON THESE
PLANS FOR INFORMATION ONLY. THE CONTINUATION OF PIPING AND DUCTWORK
THROUGHOUT THE BUILDING SHALL BE FIELD VERIFIED BY THE CONTRACTOR. THE
CONTRACTOR SHALL VISIT THE PROJECT SITE PRIOR TO BIDDING AND VERIFY
EXISTING CONDITIONS.
2. REMOVE THE EXISTING HEATING, VENTILATING AND AIR CONDITIONING SYSTEM IN
ITS ENTIRETY.
3. REMOVE HIGH & LOW PRESSURE STEAM PIPING SYSTEMS, PRV'S, HEAT
EXCHANGERS, PUMPS,CONDENSATE PIPING SYSTEMS, RELIEF PIPING, AND
ASSOCIATED ANCILLARY COMPONENTS.
4. REMOVE HEATING AND VENTILATING SYSTEM DUCTWORK, AIR…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .