Amendment_0003.pdf

PDF 197 KB Posted

Attached to
Eisenhower Barracks, West Point N. Y. Federal contract opportunity
Solicitation number
W912DS-17-B-0005
Issued by
Department of the Army Corps of Engineers Engineering District New York

About this file

Amendment 0003

View the file

Other files for this federal contract opportunity

Other files attached to Eisenhower Barracks, West Point N. Y., newest first.
File Type Posted
Bid_Abstract.pdf PDF
Amendment_0006.pdf PDF
08_71_00_Final.pdf PDF
Amendment_05_All_Revised_Drawings.pdf PDF
23_00_00_Final.pdf PDF
W912DS-17-B-0005-Amendment_0005.pdf PDF
Site_Vist_Sign-In_Sheet.pdf PDF
Amendment_0004.pdf PDF
Amendment__0002.pdf PDF
Amendment_0001.pdf PDF
W912DS-17-B-0005_Specifications.pdf PDF
Set_2_Eisenhower_Bid_Set_-_Stamped-2.pdf PDF
Set_3_Eisenhower_Bid_Set_-_Stamped-3.pdf PDF
Set_5_Eisenhower_Bid_Set_-_Stamped-5.pdf PDF
Set_1_Eisenhower_Bid_Set_-_Stamped-1.pdf PDF
W912DS-17-B-0005.pdf PDF
Set_4_Eisenhower_Bid_Set_-_Stamped-4.pdf PDF
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W16ROE70891780

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1) Bid opening date remains 25 August 2017 at 2:00 P.M. EST

2) To better clarify the w ork that is represented by each CLIN, see continuation sheet for the Bid Schedule Narrative.

NOTE: Bidders must acknow ledge receipt of this amendment by date specified in the bid (or as amended) by one of the follow ing methods:

In the space provided on the SF 1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENT BY DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE MODIFICATION OF BID, OR LATE

WITHDRAWAL OF BID (FAR 14.304)

1. CONTRACT ID CODE PAGE OF PAGES

J 1 6

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 03-Aug-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-17-B-0005

X 9B. DATED (SEE ITEM 11)

24-Jul-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

03-Aug-2017

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 1843

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS-17-B-0005

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION/CONTRACT FORM

The following have been added by full text:

AMENDMENT 0003

Eisenhower Barracks, West Point N.Y.

Amendment 0003

Bid Schedule Narrative: To better clarify the work that is represented by each CLIN in the bid schedule a brief explanation of the work for each CLIN is below. The CLINs consist mainly of the items listed below but not exclusively. When combined, the base bids and optional bids represent all of the work shown in the plans and specifications.

CLIN 0001 Structural Renovations includes the following major components of work:

Fill existing slab cracks with epoxy Install fiver reinforced polymer for slab strengthening Construct shear capitals at interior columns Repair spalled concrete surfaces Demo and replacement of slab on grade Install self-leveling grout Construct window supporting structures Infill existing concrete slab openings Core Drill and Sawcut Concrete Slab Openings Construct Steel Rooftop Equipment Support Members Demolish Existing Concrete Members At Rooftop Mechanical Yard Construct Steel Parapet Screen Wall Remove and Replace Topping Slab In Sally Ports Construct Concrete Curb Demolish Existing Areaway Infill Existing Concrete Wall Construct Concrete Pit In Basement Infill Existing Concrete Pit In Basement Remove and Replace Steam Tunnel Cover Slab

CLIN 0002 Exterior Closure includes the following major components of work:

Exterior Walls o Insulation and Vapor Barrier o Interior Skin

Repair Exterior Wall o Repair / Reseal / Repoint

Exterior Windows Exterior Personnel Doors Exterior Wall Repair

CLIN 0003 Roofing includes the following major components of work:

All work required to install a new roof as depicted in the plans and specifications.

CLIN 0004 Elevator includes the following major components of work:

All work required to install the elevator as depicted in the plans and specifications.

CLIN 0005 HVAC systems includes the following major components of work:

Heating Generating Systems Cooling Generating Systems Direct Expansion Systems Other Cooling generating Systems Air Distribution, Cooling and Heating Steam Distribution Systems Hot Water Distribution Systems Chilled Water Distribution Systems Exhaust Systems Other Distribution Systems Unit Heaters Fan Coil Units Package Units Controls and Instrumentation Systems Testing and Balancing HVAC Commissioning.

CLIN 0006 Demolition includes the following major components of work:

Exterior Closure Demolition Roofing Interior Construction & Finishes Elevators Plumbing Systems Mechanical Systems Electrical Systems Equipment & Furnishings Other Non-Hazardous Selective Building Demolition Hazardous Selective Building Demolition

CLIN 0007 Supporting Facilities includes the following major components of work:

Exterior Lighting Exterior Lighting Fixtures & Controls Utilities exterior to the building:

o Water, Sewer, and Gas o Water Supply & Distribution Systems o Potable Water Distribution o Sanitary Sewer Systems o Sanitary Sewer Piping o Sanitary Sewer Manholes & Cleanouts o Information Systems o Exterior Communications & Alarm o Telephone Systems Exterior Electrical Distribution o Underground Electrical Conductors o Ductbanks, Manholes, Handholes & Raceways

Paving, Walks, Curbs, & Gutters

Storm Drainage o Storm Sewer Systems o Strom Sewer Piping o Storm Sewer Manholes o Headwalls & Catch Basins

Above Ground Site Demolition Underground Site Demolition Site Earthwork Temporary Erosion Control Fencing & Gates Security Structures Landscaping Seeding & Sodding Plantings Irrigation Systems

CLIN 0008 and CLIN 0009 – No additional note necessary.

Optional CLINS

CLIN 0010 Interior Construction includes the following major components of work:

Partitions 132 o Fixed partitions o Interior Windows

Insulation and Vapor Barrier Standard Interior Doors Compartments, Cubicles and Toilet Partitions Toilet and Bath Accessories Chalkboards and Tack Board Identifying Devices Lockers Shelving Fire Extinguisher Cabinets Casework

CLIN 0011 Interior Finishes includes the following major components of work:

Wall Finishes o Gypsum Wallboard Finishes o Tile and Terrazzo Wall Finishes o Painting to Wall

Flooring and Floor Finishes o Tile Floor Finishes o Ceramic Tile o Terrazzao Floor Finishes o Painting and Staining Floors

Ceiling and Ceiling Finishes o Gypsum Wallboard Ceiling Finish o Acoustical Ceiling Tiles & Panel o Painting and Staining Ceilings o Suspension Systems

CLIN 0012 Plumbing includes the following major components of work:

Plumbing Fixtures o Waterclosets o Urinals o Lavatories o Sinks o Showers/Tubs o Drinking Fountains & Coolers

Domestic Water Supply o Pipes and Fittings o Insulation & Identification

Sanitary Waste and Vent Systems o Waste Pipe and Fittings o Floor Drains

Rainwater Drainage System Plumbing Equipment

CLIN 0013 Fire Protection includes the following major components of work:

Water Supply Equipment & Piping Sprinkler Heads and Release Device Standpipe Equipment and Piping Fire Extinguishing Devices Special Fire Protection System

CLIN 0014 Electrical Power and Lighting includes the following major components of work:

Service and Distribution o Main Transformers o Main Switchboards o Interior Distribution Transformers o Panels o Enclosed Circuit Breakers o Other Service and Distribution

Disconnects and Switches Feeders Pull Boxes Lighting and Branch Wiring o Branch Wiring o Lighting Equipment o Other Lighting and Branch Wiring

CLIN 0015 Electrical Systems includes the following major components of work:

Communication, Security & Alarm Systems o Fire Alarm Systems o Telephone Systems o Public Address Systems o Clock and Program Systems o Existing DAS Relocation o Fire Radio DAS System o Television Systems o Security Systems o Access Control System o CCTV

Special Electrical Systems Grounding Systems Lightning Protection

(End of Summary of Changes)

File details come from the government source that posted it. Updated .