Set_1_Eisenhower_Bid_Set_-_Stamped-1.pdf
PDF 36 MB Posted
- Attached to
- Eisenhower Barracks, West Point N. Y. Federal contract opportunity
- Solicitation number
- W912DS-17-B-0005
About this file
Plans - Eisenhower Bid Set - Stamped-1
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Abstract.pdf | ||
| Amendment_0006.pdf | ||
| 08_71_00_Final.pdf | ||
| Amendment_05_All_Revised_Drawings.pdf | ||
| 23_00_00_Final.pdf | ||
| W912DS-17-B-0005-Amendment_0005.pdf | ||
| Site_Vist_Sign-In_Sheet.pdf | ||
| Amendment_0004.pdf | ||
| Amendment_0003.pdf | ||
| Amendment__0002.pdf | ||
| Amendment_0001.pdf | ||
| W912DS-17-B-0005_Specifications.pdf | ||
| Set_5_Eisenhower_Bid_Set_-_Stamped-5.pdf | ||
| W912DS-17-B-0005.pdf | ||
| Set_3_Eisenhower_Bid_Set_-_Stamped-3.pdf | ||
| Set_2_Eisenhower_Bid_Set_-_Stamped-2.pdf | ||
| Set_4_Eisenhower_Bid_Set_-_Stamped-4.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET ID
1 2 6 7
D R
AW
N
B Y:
D
ES
IG
N
B Y:
SU
B M
IT
TE
D B
Y:
SI
ZE
FI
LE
N
AM
E:
IS
SU
E D
AT
E :
C O
N
TR
AC
T
N O
SO
L I
C
IT
AT
IO
N N
O
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
C H
E C
KE
D B
Y:
US Army Corps of Engineers ®
AN
S I
D
F
A
C
AT
EG
O
R Y
C O
D E:
3 4 5 8 9 10
G
E
D
C
B
R
EP
AI
R
T O
E
IS
E N H
O W
E R B
AR
R
AC
KS
, B U
IL
D
IN
G
C F Y
S
R M
JU
N
E, W
2D S-
-B
-0
W
2D S-
-D
-0
D . D
IC
KE
Y
B.
R
EN
N
ER
T.
A
LL
EN
G-002
F
ED
ER
AL
P
LA
ZA
, N
EW
Y O
R K, N Y
N
EW
Y
O R
K D
IS
TR
IC
T
N
EW
Y O
R K, N
EW
Y O
R K
T.
A
LL
EN
D R
AW
IN
G I N
D
EX
W
ES
T
PO
IN
T, N E W
Y O
R K
G -0
BID SET
SHEET ID SHEET TITLE
A-432 BUILT-UP ROOF STANDARD DETAILS
A-440 PLAN DETAILS
A-441 PLAN DETAILS
A-442 PLAN DETAILS
A-443 PLAN DETAILS
A-460 COMPOSITE FIRST FLOOR PATTERN PLAN
A-480 CORRIDOR & STAIR TYPICAL FLOOR PATTERN PLAN
A-490 ENLARGED FLOOR PATTERN PLAN
A-491 ENLARGED FLOOR PATTERN PLAN
A-492 ENLARGED FLOOR & WALL PATTERN
A-500 BASEMENT RCP
A-501 BASEMENT RCP - PART A
A-502 BASEMENT RCP - PART B
A-503 BASEMENT RCP - PART C
A-510 FIRST FLOOR RCP
A-511 FIRST FLOOR RCP - PART A
A-512 FIRST FLOOR RCP - PART B
A-513 FIRST FLOOR RCP - PART C
A-520 SECOND FLOOR RCP
A-521 SECOND FLOOR RCP - PART A
A-522 SECOND FLOOR RCP - PART B
A-523 SECOND FLOOR RCP - PART C
A-530 THIRD FLOOR RCP
A-531 THIRD FLOOR RCP - PART A
A-532 THIRD FLOOR RCP - PART B
A-533 THIRD FLOOR RCP - PART C
A-540 FOURTH FLOOR RCP
A-541 FOURTH FLOOR RCP - PART A
A-542 FOURTH FLOOR RCP - PART B
A-543 FOURTH FLOOR RCP - PART C
A-550 FIFTH FLOOR RCP
A-551 FIFTH FLOOR RCP - PART A
A-552 FIFTH FLOOR RCP - PART B
A-553 FIFTH FLOOR RCP - PART C
A-560 SIXTH FLOOR RCP
A-561 SIXTH FLOOR RCP - PART A
A-562 SIXTH FLOOR RCP - PART B
A-563 SIXTH FLOOR RCP - PART C
A-570 CEILING DETAILS
A-601 PARTITION SCHEDULE AND DETAILS
A-602 PARTITION DETAILS
A-610 DOOR SCHEDULE - BASEMENT & FIRST FLOOR
A-611 DOOR SCHEDULE - SECOND & THIRD FLOOR
A-612 DOOR SCHEDULE - FOURTH & FIFTH FLOOR
A-613 DOOR SCHEDULE - SIXTH FLOOR & ROOF
A-615 DOOR & FRAME TYPES
A-616 WINDOW TYPES
A-617 WINDOW ASSEMBLY TYPE
A-620 DOOR DETAILS
A-621 DOOR DETAILS
A-625 WINDOW DETAILS
A-626 WINDOW DETAILS
A-640 FINISH KEY AND FINISH NOTES
A-641 SPECIAL ITEMS KEY
A-642 FINISH SCHEDULE - BASEMENT
A-643 FINISH SCHEDULE - FIRST FLOOR
A-644 FINISH SCHEDULE - SECOND FLOOR
A-645 FINISH SCHEDULE - THIRD FLOOR
A-646 FINISH SCHEDULE - FOURTH FLOOR
A-647 FINISH SCHEDULE - FIFTH FLOOR
A-648 FINISH SCHEDULE - SIXTH FLOOR
A-650 SIGNAGE SCHEDULE
A-651 SIGNAGE SCHEDULE
A-652 SIGNAGE SCHEDULE
A-653 SIGNAGE SCHEDULE
A-654 SIGNAGE DETAILS
A-655 SIGNAGE DETAILS
A-660 BASEMENT SIGNAGE PLAN - PART A
A-661 BASEMENT SIGNAGE PLAN - PART B
A-662 BASEMENT SIGNAGE PLAN - PART C
A-663 FIRST FLOOR SIGNAGE PLAN - PART A
A-664 FIRST FLOOR SIGNAGE PLAN - PART B
A-665 FIRST FLOOR SIGNAGE PLAN - PART C
A-666 SECOND FLOOR SIGNAGE PLAN - PART A
A-667 SECOND FLOOR SIGNAGE PLAN - PART B
A-668 SECOND FLOOR SIGNAGE PLAN - PART C
A-669 THIRD FLOOR SIGNAGE PLAN - PART A
A-670 THIRD FLOOR SIGNAGE PLAN - PART B
A-671 THIRD FLOOR SIGNAGE PLAN - PART C
SHEET ID SHEET TITLE
AD160 OVERALL DEMOLITION PLAN - SIXTH FLOOR
AD161 DEMOLITION PLAN - SIXTH FLOOR - PART A
AD162 DEMOLITION PLAN - SIXTH FLOOR - PART B
AD163 DEMOLITION PLAN - SIXTH FLOOR - PART C
AD170 OVERALL DEMOLITION ROOF PLAN
AD171 DEMOLITION ROOF PLAN - PART A
AD172 DEMOLITION ROOF PLAN - PART B
AD173 DEMOLITION ROOF PLAN - PART C
AD201 DEMOLITION ELEVATIONS - SALLY PORTS
A-100 BASEMENT FLOOR PLAN
A-101 BASEMENT FLOOR PLAN - PART A
A-102 BASEMENT FLOOR PLAN - PART B
A-103 BASEMENT FLOOR PLAN - PART C
A-110 FIRST FLOOR PLAN
A-111 FIRST FLOOR PLAN - PART A
A-112 FIRST FLOOR PLAN - PART B
A-113 FIRST FLOOR PLAN - PART C
A-120 SECOND FLOOR PLAN
A-121 SECOND FLOOR PLAN - PART A
A-122 SECOND FLOOR PLAN - PART B
A-123 SECOND FLOOR PLAN - PART C
A-130 THIRD FLOOR PLAN
A-131 THIRD FLOOR PLAN - PART A
A-132 THIRD FLOOR PLAN - PART B
A-133 THIRD FLOOR PLAN - PART C
A-140 FOURTH FLOOR PLAN
A-141 FOURTH FLOOR PLAN - PART A
A-142 FOURTH FLOOR PLAN - PART B
A-143 FOURTH FLOOR PLAN - PART C
A-150 FIFTH FLOOR PLAN
A-151 FIFTH FLOOR PLAN - PART A
A-152 FIFTH FLOOR PLAN - PART B
A-153 FIFTH FLOOR PLAN - PART C
A-160 SIXTH FLOOR PLAN
A-161 SIXTH FLOOR PLAN - PART A
A-162 SIXTH FLOOR PLAN - PART B
A-163 SIXTH FLOOR PLAN - PART C
A-170 ROOF PLAN
A-171 ROOF PLAN - PART A
A-172 ROOF PLAN - PART B
A-173 ROOF PLAN - PART C
A-201 NORTH ELEVATION - PART A
A-202 NORTH ELEVATION - PART B
A-203 SOUTH ELEVATION - PART A
A-204 SOUTH ELEVATION - PART B
A-205 EAST & PARTIAL EXTERIOR ELEVATIONS
A-206 WEST ELEVATIONS
A-210 ENLARGED EXTERIOR ELEVATIONS
A-211 ENLARGED ROOF ELEVATIONS
A-301 BUILDING SECTIONS
A-302 BUILDING SECTIONS
A-303 BUILDING SECTIONS
A-304 BUILDING SECTIONS
A-305 BUILDING SECTIONS
A-306 BUILDING SECTIONS
A-307 BUILDING SECTIONS
A-320 WALL SECTIONS
A-321 WALL SECTIONS
A-322 WALL SECTIONS
A-323 WALL SECTIONS
A-401 ENLARGED FLOOR PLANS - BASEMENT
A-402 ENLARGED FLOOR PLANS - FIRST FLOOR
A-403 ENLARGED FLOOR PLANS - FIRST FLOOR
A-404 ENLARGED FLOOR PLANS - SECOND FLOOR
A-405 ENLARGED FLOOR PLANS - SECOND FLOOR
A-406 ENLARGED FLOOR PLANS - THIRD FLOOR
A-407 ENLARGED FLOOR PLANS - THIRD FLOOR
A-408 ENLARGED CORE PLANS - FIRST FLOOR
A-409 ENLARGED CORE PLANS - TYPICAL FLOOR
A-410 INTERIOR ELEVATIONS
A-411 INTERIOR ELEVATIONS - CHAPLAIN AREA
A-420 ENLARGED STAIR 03 PLANS & SECTION
A-421 ENLARGED STAIR 02 PLANS & SECTION
A-422 ENLARGED STAIR 01 PLANS & SECTION
A-423 ENLARGED STAIR 04 PLANS & SECTION
A-424 STAIR & RAILING DETAILS
A-426 CEILING DETAILS @ ELEVATOR
A-428 ROOF DETAILS
A-429 ROOF DETAILS
A-430 ROOF DETAILS
A-431 BUILT-UP ROOF STANDARD DETAILS
SHEET ID SHEET TITLE
S-124 SECOND FLOOR FRP LAYOUT PLAN
S-131 THIRD FLOOR PLAN - PART A
S-132 THIRD FLOOR PLAN - PART B
S-133 THIRD FLOOR PLAN - PART C
S-134 THIRD FLOOR FRP LAYOUT PLAN
S-141 FOURTH FLOOR PLAN - PART A
S-142 FOURTH FLOOR PLAN - PART B
S-143 FOURTH FLOOR PLAN - PART C
S-144 FOURTH FLOOR FRP LAYOUT PLAN
S-151 FIFTH FLOOR PLAN - PART A
S-152 FIFTH FLOOR PLAN - PART B
S-153 FIFTH FLOOR PLAN - PART C
S-154 FIFTH FLOOR FRP LAYOUT PLAN
S-161 SIXTH FLOOR PLAN - PART A
S-162 SIXTH FLOOR PLAN - PART B
S-163 SIXTH FLOOR PLAN - PART C
S-164 SIXTH FLOOR FRP LAYOUT PLAN
S-170 EXISTING ROOF SCREENWALL DEMOLITION PLAN
S-171 ROOF PLAN - PART A
S-172 ROOF PLAN - PART B
S-173 ROOF PLAN - PART C
S-301 TYPICAL SLAB DETAILS AND SECTIONS
S-302 TYPICAL SLAB DETAILS AND SECTIONS
S-303 TYPICAL SLAB DETAILS AND SECTIONS
S-304 PIPE RACK DETAIL AND SECTIONS
S-305 AREAWAY PLAN AND SECTIONS
S-306 AREAWAY SECTIONS
S-307 AREAWAY SECTIONS
S-308 ELECTRICAL VAULT DETAILS AND SECTIONS
S-351 EXISTING SCREEN WALL DEMOLITION SECTIONS
S-352 RTU AND SCREEN WALL SUPPORT FRAMING SECTIONS
S-401 ENLARGED FIRST FLOOR FRP LAYOUT PLAN - PART A
S-402 ENLARGED FIRST FLOOR FRP LAYOUT PLAN - PART B
S-403 ENLARGED FIRST FLOOR FRP LAYOUT PLAN - PART C
S-404 ENLARGED FIRST FLOOR FRP LAYOUT PLAN - PART D
S-405 ENLARGED FIRST FLOOR FRP LAYOUT PLAN - PART E
S-406 ENLARGED FIRST FLOOR FRP LAYOUT PLAN - PART F
S-407 ENLARGED FIRST FLOOR FRP LAYOUT PLAN - PART G
S-408 ENLARGED FIRST FLOOR FRP LAYOUT PLAN - PART H
S-409 ENLARGED 2ND-6TH FLOOR FRP LAYOUT PLAN - PART A
S-410 ENLARGED 2ND-6TH FLOOR FRP LAYOUT PLAN - PART B
S-411 ENLARGED 2ND-6TH FLOOR FRP LAYOUT PLAN - PART C
S-412 ENLARGED 2ND-6TH FLOOR FRP LAYOUT PLAN - PART D
S-413 ENLARGED 2ND-6TH FLOOR FRP LAYOUT PLAN - PART E
S-414 ENLARGED 2ND-6TH FLOOR FRP LAYOUT PLAN - PART F
S-415 ENLARGED 2ND-6TH FLOOR FRP LAYOUT PLAN - PART G
S-416 ENLARGED 2ND-6TH FLOOR FRP LAYOUT PLAN - PART H
S-421 WINDOW DETAILS
S-601 SCHEDULES
A-000 BASEMENT LIFE SAFETY PLAN
A-001 FIRST FLOOR LIFE SAFETY PLAN
A-002 SECOND FLOOR LIFE SAFETY PLAN
A-003 THIRD FLOOR LIFE SAFETY PLAN
A-004 FOURTH FLOOR LIFE SAFETY PLAN
A-005 FIFTH FLOOR LIFE SAFETY PLAN
A-006 SIXTH FLOOR LIFE SAFETY PLAN
AD100 OVERALL DEMOLITION PLAN - BASEMENT
AD101 DEMOLITION PLAN - BASEMENT - PART A
AD102 DEMOLITION PLAN - BASEMENT - PART B
AD103 DEMOLITION PLAN - BASEMENT - PART C
AD110 OVERALL DEMOLITION PLAN - FIRST FLOOR
AD111 DEMOLITION PLAN - FIRST FLOOR - PART A
AD112 DEMOLITION PLAN - FIRST FLOOR - PART B
AD113 DEMOLITION PLAN - FIRST FLOOR - PART C
AD120 OVERALL DEMOLITION PLAN - SECOND FLOOR
AD121 DEMOLITION PLAN - SECOND FLOOR - PART A
AD122 DEMOLITION PLAN - SECOND FLOOR - PART B
AD123 DEMOLITION PLAN - SECOND FLOOR - PART C
AD130 OVERALL DEMOLITION PLAN - THIRD FLOOR
AD131 DEMOLITION PLAN - THIRD FLOOR - PART A
AD132 DEMOLITION PLAN - THIRD FLOOR - PART B
AD133 DEMOLITION PLAN - THIRD FLOOR - PART C
AD140 OVERALL DEMOLITION PLAN - FOURTH FLOOR
AD141 DEMOLITION PLAN - FOURTH FLOOR - PART A
AD142 DEMOLITION PLAN - FOURTH FLOOR - PART B
AD143 DEMOLITION PLAN - FOURTH FLOOR - PART C
AD150 OVERALL DEMOLITION PLAN - FIFTH FLOOR
AD151 DEMOLITION PLAN - FIFTH FLOOR - PART A
AD152 DEMOLITION PLAN - FIFTH FLOOR - PART B
AD153 DEMOLITION PLAN - FIFTH FLOOR - PART C
SHEET ID SHEET TITLE
G-001 COVER SHEET
G-002 DRAWING INDEX
G-003 DRAWING INDEX CONT'D
G-004 DRAWING INDEX CONT'D
G-210 PROJECT DATA
H-100 COMPOSITE BASEMENT HAZARDOUS MATERIALS PLAN
H-110 COMPOSITE FIRST FLOOR HAZARDOUS MATERIALS PLAN
H-120 COMPOSITE SECOND FLOOR HAZARDOUS MATERIALS PLAN
H-130 COMPOSITE THIRD FLOOR HAZARDOUS MATERIALS PLAN
H-140 COMPOSITE FOURTH FLOOR HAZARDOUS MATERIALS PLAN
H-150 COMPOSITE FIFTH FLOOR HAZARDOUS MATERIALS PLAN
H-160 COMPOSITE SIXTH FLOOR HAZARDOUS MATERIALS PLAN
V-110 SURVEY PLAN
V-601 SURVEY UTILITY SCHEDULES
CD101 OVERALL DEMOLITION PLAN
CD110 DEMOLITION PLAN
CD111 DEMOLITION PLAN
CD112 DEMOLITION PLAN
CD113 DEMOLITION PLAN
CD501 DEMOLITION DETAILS
CS101 CONSTRUCTION LIMITS LAYOUT PLAN
CS110 LAYOUT PLAN
CS410 ENLARGED LAYOUT PLAN
CS411 ENLARGED LAYOUT PLAN
CS501 PAVEMENT DETAILS
CS502 PAVEMENT DETAILS
CS503 PAVEMENT DETAILS
CS504 PAVEMENT DETAILS
CS505 PAVEMENT DETAILS
CG101 OVERALL GRADE AND DRAIN PLAN
CG110 GRADE AND DRAIN PLAN
CG111 GRADE AND DRAIN PLAN
CG112 GRADE AND DRAIN PLAN
CG113 GRADE AND DRAIN PLAN
CG510 MISC DETAILS
CG511 MISC DETAILS
CG601 STORM DRAINAGE UTILITY SCHEDULE
CU101 OVERALL UTILITY PLAN
CU110 UTILITY PLAN
CU111 UTILITY PLAN
CU112 UTILITY PLAN
CU113 UTILITY PLAN
CU501 SANITARY SEWER DETAILS
CU510 WATER DETAILS
CU511 WATER DETAILS
CU601 UTLITY SCHEDULE
LI101 OVERALL LANDSCAPE IRRIGATION PLAN
LI110 LANDSCAPE IRRIGATION PLAN
LI111 LANDSCAPE IRRIGATION PLAN
LI501 LANDSCAPE IRRIGATION DETAILS
LP101 OVERALL LANDSCAPE PLANTING PLAN
LP110 ENLARGED LANDSCAPE PLANTING PLAN
LP111 ENLARGED LANDSCAPE PLANTING PLAN
LP501 PLANTING DETAILS
LP601 LANDSCAPE PLANT SCHEDULE
ES001 SITE ELECTRICAL LEGEND AND GENERAL NOTES
ES100 CAMPUS LIGHTING CONTROL PLAN
ES101 SITE ELECTRICAL PLAN
ES501 SITE ELECTRICAL DETAILS
ES502 SITE ELECTRICAL DETAILS
TS101 SITE COMMUNICATIONS PLAN
S-001 STRUCTURAL GENERAL NOTES, DESIGN CRITERIA
S-101 FOUNDATION/BASEMENT PLAN - PART A
S-102 FOUNDATION/BASEMENT PLAN - PART B
S-103 FOUNDATION/BASEMENT PLAN - PART C
S-111 FIRST FLOOR PLAN - PART A
S-112 FIRST FLOOR PLAN - PART B
S-113 FIRST FLOOR PLAN - PART C
S-114 FIRST FLOOR FRP LAYOUT PLAN
S-121 SECOND FLOOR PLAN - PART A
S-122 SECOND FLOOR PLAN - PART B
S-123 SECOND FLOOR PLAN - PART C
DRAWING INDEX
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
D R
AW
N
B Y:
D
ES
IG
N
B Y:
SU
B M
IT
TE
D B
Y:
SI
ZE
FI
LE
N
AM
E:
IS
SU
E D
AT
E :
C O
N
TR
AC
T
N O
SO
L I
C
IT
AT
IO
N N
O
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
C H
E C
KE
D B
Y:
US Army Corps of Engineers ®
AN
S I
D
F
A
C
AT
EG
O
R Y
C O
D E:
3 4 5 8 9 10
G
E
D
C
B
R
EP
AI
R
T O
E
IS
E N H
O W
E R B
AR
R
AC
KS
, B U
IL
D
IN
G
C F Y
S
R M
JU
N
E, W
2D S-
-B
-0
W
2D S-
-D
-0
D . D
IC
KE
Y
B.
R
EN
N
ER
T.
A
LL
EN
G-003
F
ED
ER
AL
P
LA
ZA
, N
EW
Y O
R K, N Y
N
EW
Y
O R
K D
IS
TR
IC
T
N
EW
Y O
R K, N
EW
Y O
R K
T.
A
LL
EN
D R
A W
IN
G
IN
D E X
C O
N T'
D
W
ES
T
PO
IN
T, N E W
Y O
R K
G -0
BID SET
SHEET ID SHEET TITLE
M-001 HVAC SYMBOLS LEGEND & SHEET INDEX
M-002 HVAC NOTES
MD101 BASEMENT HVAC DEMOLITION PLAN - PART A
MD102 BASEMENT HVAC DEMOLITION PLAN - PART B
MD103 BASEMENT HVAC DEMOLITION PLAN - PART C
MD111 FIRST FLOOR HVAC DEMOLITION PLAN - PART A
MD112 FIRST FLOOR HVAC DEMOLITION PLAN - PART B
MD113 FIRST FLOOR HVAC DEMOLITION PLAN - PART C
MD121 SECOND FLOOR HVAC DEMOLITION PLAN - PART A
MD122 SECOND FLOOR HVAC DEMOLITION PLAN - PART B
MD123 SECOND FLOOR HVAC DEMOLITION PLAN - PART C
MD131 TYPICAL FLOOR HVAC DEMOLITION PLAN (3RD THRU 5TH) - PART A
MD132 TYPICAL FLOOR HVAC DEMOLITION PLAN (3RD THRU 5TH) - PART B
MD133 TYPICAL FLOOR HVAC DEMOLITION PLAN (3RD THRU 5TH) - PART C
MD161 SIXTH FLOOR HVAC DEMOLITION PLAN - PART A
MD162 SIXTH FLOOR HVAC DEMOLITION PLAN - PART B
MD163 SIXTH FLOOR HVAC DEMOLITION PLAN - PART C
MD170 ROOF HVAC DEMOLITION PLAN
MH101 BASEMENT HVAC PLAN - PART A
MH102 BASEMENT HVAC PLAN - PART B
MH103 BASEMENT HVAC PLAN - PART C
MH111 FIRST FLOOR HVAC PLAN - PART A
MH112 FIRST FLOOR HVAC PLAN - PART B
MH113 FIRST FLOOR HVAC PLAN - PART C
MH121 SECOND FLOOR HVAC PLAN - PART A
MH122 SECOND FLOOR HVAC PLAN - PART B
MH123 SECOND FLOOR HVAC PLAN - PART C
MH131 TYPICAL FLOOR HVAC PLAN (3RD THRU 5TH) - PART A
MH132 TYPICAL FLOOR HVAC PLAN (3RD THRU 5TH) - PART B
MH133 TYPICAL FLOOR HVAC PLAN (3RD THRU 5TH) - PART C
MH161 SIXTH FLOOR HVAC PLAN - PART A
MH162 SIXTH FLOOR HVAC PLAN - PART B
MH163 SIXTH FLOOR HVAC PLAN - PART C
MH171 ROOF HVAC PLAN - PART A
MH172 ROOF HVAC PLAN - PART B
MH173 ROOF HVAC PLAN - PART C
MP101 BASEMENT PIPING PLAN - PART A
MP102 BASEMENT PIPING PLAN - PART B
MP103 BASEMENT PIPING PLAN - PART C
M-401 ENLARGED MECHANICAL ROOM PLANS
M-402 ENLARGED PARTIAL PLANS
M-403 ROOF SECTIONS
M-501 HVAC DETAILS
M-502 HVAC DETAILS
M-503 HVAC DETAILS
M-504 HVAC DETAILS
M-505 HVAC DETAILS
M-506 HVAC DETAILS
M-507 HVAC DETAILS
M-508 HVAC DETAILS
M-541 FCU RISER DIAGRAM
M-542 FCU RISER DIAGRAM
M-543 FCU RISER DIAGRAM
M-544 FCU RISER DIAGRAM
M-545 FCU RISER DIAGRAM
M-551 AIR RISER DIAGRAM
M-552 AIR RISER DIAGRAM
M-553 AIR RISER DIAGRAM
M-601 HVAC SCHEDULES
M-602 HVAC SCHEDULES
M-603 HVAC SCHEDULES
M-700 INSTRUMENTATION AND CONTROLS LEGEND
M-701 HEATING WATER P&ID
M-702 CHILLED WATER P&ID
M-703 STEAM P&ID
M-704 BAS ARCHITECTURE
M-705 ERU P&ID
M-706 P&ID'S
M-707 P&ID'S
SHEET ID SHEET TITLE
FA170 ROOF FIRE ALARM PLAN
FA501 LOCAL OPERATING CONSOLE DETAIL
FA601 FIRE ALARM MATRIX
FA602 FIRE ALARM RISER
FA603 FIRE ALARM RISER
F-001 FIRE PROTECTION LEGEND
FD100 BASEMENT FIRE PROTECTION DEMOLITION PLAN
FD101 FIRST FLOOR FIRE PROTECTION DEMOLITION PLAN
F-101 BASEMENT FIRE PROTECTION PLAN - PART A
F-102 BASEMENT FIRE PROTECTION PLAN - PART B
F-103 BASEMENT FIRE PROTECTION PLAN - PART C
F-111 FIRST FLOOR FIRE PROTECTION - PART A
F-112 FIRST FLOOR FIRE PROTECTION - PART B
F-113 FIRST FLOOR FIRE PROTECTION - PART C
F-121 SECOND FLOOR FIRE PROTECTION PLAN - PART A
F-122 SECOND FLOOR FIRE PROTECTION PLAN - PART B
F-123 SECOND FLOOR FIRE PROTECTION PLAN - PART C
F-131 TYPICAL FLOOR FIRE PROTECTION PLAN (3RD THRU 5TH) - PART A
F-132 TYPICAL FLOOR FIRE PROTECTION PLAN (3RD THRU 5TH) - PART B
F-133 TYPICAL FLOOR FIRE PROTECTION PLAN (3RD THRU 5TH) - PART C
F-161 SIXTH FLOOR FIRE PROTECTION PLAN - PART A
F-162 SIXTH FLOOR FIRE PROTECTION PLAN - PART B
F-163 SIXTH FLOOR FIRE PROTECTION PLAN - PART C
F-401 ENLARGED FIRE PROTECTION PLANS
P-000 PLUMBING LEGEND
PD000 UNDERGROUND PLUMBING DEMOLITION PLAN
PD001 UNDERGROUND PLUMBING DEMOLITION PLAN - PART A
PD002 UNDERGROUND PLUMBING DEMOLITION PLAN - PART B
PD003 UNDERGROUND PLUMBING DEMOLITION PLAN - PART C
PD100 BASEMENT PLUMBING DEMOLITION PLAN
PD101 FIRST FLOOR PLUMBING DEMOLITION PLAN
PD102 SECOND FLOOR PLUMBING DEMOLITION PLAN
PD103 THIRD FLOOR PLUMBING DEMOLITION PLAN
PD104 FOURTH FLOOR PLUMBING DEMOLITION PLAN
PD105 FIFTH FLOOR PLUMBING DEMOLITION PLAN
PD106 SIXTH FLOOR PLUMBING DEMOLITION PLAN
PD109 ROOF PLUMBING DEMOLITION PLAN
P-001 UNDERGROUND PLUMBING PLAN - PART A
P-002 UNDERGROUND PLUMBING PLAN - PART B
P-003 UNDERGROUND PLUMBING PLAN - PART C
P-101 BASEMENT PLUMBING PLAN - PART A
P-102 BASEMENT PLUMBING PLAN - PART B
P-103 BASEMENT PLUMBING PLAN - PART C
P-111 FIRST FLOOR PLUMBING - PART A
P-112 FIRST FLOOR PLUMBING - PART B
P-113 FIRST FLOOR PLUMBING - PART C
P-121 SECOND FLOOR PLUMBING PLAN - PART A
P-122 SECOND FLOOR PLUMBING PLAN - PART B
P-123 SECOND FLOOR PLUMBING PLAN - PART C
P-131 TYPICAL FLOOR PLUMBING PLAN (3RD THRU 5TH) - PART A
P-132 TYPICAL FLOOR PLUMBING PLAN (3RD THRU 5TH) - PART B
P-133 TYPICAL FLOOR PLUMBING PLAN (3RD THRU 5TH) - PART C
P-161 SIXTH FLOOR PLUMBING PLAN - PART A
P-162 SIXTH FLOOR PLUMBING PLAN - PART B
P-163 SIXTH FLOOR PLUMBING PLAN - PART C
P-171 ROOF PLUMBING PLAN - PART A
P-172 ROOF PLUMBING PLAN - PART B
P-173 ROOF PLUMBING PLAN - PART C
P-300 PLUMBING RISER DIAGRAMS
P-301 PLUMBING RISER DIAGRAMS
P-302 PLUMBING RISER DIAGRAMS
P-303 PLUMBING RISER DIAGRAMS
P-304 PLUMBING RISER DIAGRAMS
P-305 PLUMBING RISER DIAGRAMS
P-306 PLUMBING RISER DIAGRAMS
P-400 ENLARGED PLUMBING PLANS
P-401 ENLARGED PLUMBING PLANS
P-402 ENLARGED PLUMBING PLANS
P-403 ENLARGED PLUMBING PLANS
P-600 PLUMBING DETAILS
P-601 PLUMBING DETAILS
SHEET ID SHEET TITLE
A-672 FOURTH FLOOR SIGNAGE PLAN - PART A
A-673 FOURTH FLOOR SIGNAGE PLAN - PART B
A-674 FOURTH FLOOR SIGNAGE PLAN - PART C
A-675 FIFTH FLOOR SIGNAGE PLAN - PART A
A-676 FIFTH FLOOR SIGNAGE PLAN - PART B
A-677 FIFTH FLOOR SIGNAGE PLAN - PART C
A-678 SIXTH FLOOR SIGNAGE PLAN - PART A
A-679 SIXTH FLOOR SIGNAGE PLAN - PART B
A-680 SIXTH FLOOR SIGNAGE PLAN - PART C
A-701 MILLWORK DETAILS
A-702 MILLWORK DETAILS
A-703 MILLWORK DETAILS
A-704 MILLWORK DETAILS
A-705 MILLWORK DETAILS
A-706 MILLWORK DETAILS
A-801 AIR BARRIER FIRST FLOOR PLAN
A-802 AIR BARRIER SECOND FLOOR PLAN
A-803 AIR BARRIER UPPER FLOOR PLAN
A-804 EXTERIOR ENVELOPE DETAILS
A-805 AIR BARRIER TESTING AREAS - FIRST AND SECOND FLOOR
I-001 FURNITURE LEGEND
I-100 COMPOSITE BASEMENT FURNITURE PLAN
I-101 BASEMENT FURNITURE PLAN - PART A
I-102 BASEMENT FURNITURE PLAN - PART B
I-103 BASEMENT FURNITURE PLAN - PART C
I-110 COMPOSITE FIRST FLOOR FURNITURE PLAN
I-111 FIRST FLOOR FURNITURE PLAN -PART A
I-112 FIRST FLOOR FURNITURE PLAN - PART B
I-113 FIRST FLOOR FURNITURE PLAN - PART C
I-120 COMPOSITE SECOND FLOOR FURNITURE PLAN
I-121 SECOND FLOOR FURNITURE PLAN - PART A
I-122 SECOND FLOOR FURNITURE PLAN - PART B
I-123 SECOND FLOOR FURNITURE PLAN - PART C
I-130 COMPOSITE THIRD FLOOR FURNITURE PLAN
I-131 THIRD FLOOR FURNITURE PLAN - PART A
I-132 THIRD FLOOR FURNITURE PLAN - PART B
I-133 THIRD FLOOR FURNITURE PLAN - PART C
I-140 COMPOSITE FOURTH FLOOR FURNITURE PLAN
I-141 FOURTH FLOOR FURNITURE PLAN - PART A
I-142 FOURTH FLOOR FURNITURE PLAN - PART B
I-143 FOURTH FLOOR FURNITURE PLAN - PART C
I-150 COMPOSITE FIFTH FLOOR FURNITURE PLAN
I-151 FIFTH FLOOR FURNITURE PLAN - PART A
I-152 FIFTH FLOOR FURNITURE PLAN - PART B
I-153 FIFTH FLOOR FURNITURE PLAN -PART C
I-160 COMPOSITE SIXTH FLOOR FURNITURE PLAN
I-161 SIXTH FLOOR FURNITURE PLAN - PART A
I-162 SIXTH FLOOR FURNITURE PLAN - PART B
I-163 SIXTH FLOOR FURNITURE PLAN - PART C
I-401 ENLARGED FURNITURE PLAN
I-402 ENLARGED FURNITURE PLAN
I-403 ENLARGED FURNITURE PLAN
I-404 ENLARGED FURNITURE PLAN
FA001 FIRE ALARM & MASS NOTIFICATION LEGEND
FA101 BASEMENT FIRE ALARM PLAN - PART A
FA102 BASEMENT FIRE ALARM PLAN - PART B
FA103 BASEMENT FIRE ALARM PLAN - PART C
FA111 FIRST FLOOR FIRE ALARM PLAN - PART A
FA112 FIRST FLOOR FIRE ALARM PLAN - PART B
FA113 FIRST FLOOR FIRE ALARM PLAN - PART C
FA121 SECOND FLOOR FIRE ALARM PLAN - PART A
FA122 SECOND FLOOR FIRE ALARM PLAN - PART B
FA123 SECOND FLOOR FIRE ALARM PLAN - PART C
FA131 THIRD FLOOR FIRE ALARM PLAN - PART A
FA132 THIRD FLOOR FIRE ALARM PLAN - PART B
FA133 THIRD FLOOR FIRE ALARM PLAN - PART C
FA141 FOURTH FLOOR FIRE ALARM PLAN - PART A
FA142 FOURTH FLOOR FIRE ALARM PLAN - PART B
FA143 FOURTH FLOOR FIRE ALARM PLAN - PART C
FA151 FIFTH FLOOR FIRE ALARM PLAN - PART A
FA152 FIFTH FLOOR FIRE ALARM PLAN - PART B
FA153 FIFTH FLOOR FIRE ALARM PLAN - PART C
FA161 SIXTH FLOOR FIRE ALARM PLAN - PART A
FA162 SIXTH FLOOR FIRE ALARM PLAN - PART B
FA163 SIXTH FLOOR FIRE ALARM PLAN - PART C
DRAWING INDEX CONT'D
M
AR
K D
ES
C
R
IP
TI
O
N D
D R
AW
N
B Y:
D
ES
IG
N
B Y:
SU
B M
IT
TE
D B
Y:
SI
ZE
FI
LE
N
AM
E:
IS
SU
E D
AT
E :
C O
N
TR
AC
T
N O
SO
L I
C
IT
AT
IO
N N
O
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
C H
E C
KE
D B
Y:
US Army Corps of Engineers ®
AN
S I
D
F
A
C
AT
EG
O
R Y
C O
D E:
3 4 5 8 9 10
G
E
D
C
B
R
EP
AI
R
T O
E
IS
E N H
O W
E R B
AR
R
AC
KS
, B U
IL
D
IN
G
C F Y
S
R M
JU
N
E, W
2D S-
-B
-0
W
2D S-
-D
-0
D . D
IC
KE
Y
B.
R
EN
N
ER
Ap pr ov er
G-004
F
ED
ER
AL
P
LA
ZA
, N
EW
Y O
R K, N Y
N
EW
Y
O R
K D
IS
TR
IC
T
N
EW
Y O
R K, N
EW
Y O
R K
T.
A
LL
EN
D R
A W
IN
G
IN
D E X
C O
N T'
D
W
ES
T
PO
IN
T, N E W
Y O
R K
G -0
BID SET
SHEET ID SHEET TITLE
T-604 COMMUNICATION ONE-LINE
T-605 COMMUNICATION ONE-LINE
T-606 COMMUNICATION ONE-LINE
T-607 COMMUNICATION ONE-LINE
T-608 COMMUNICATION ONE-LINE
T-609 COMMUNICATION ONE-LINE
T-610 COMMUNICATION ONE-LINE
TY001 SECURITY LEGEND, GENERAL NOTES, AND ABBREVIATIONS
TY101 BASEMENT SECURITY PLAN - PART A
TY102 BASEMENT SECURITY PLAN - PART B
TY103 BASEMENT SECURITY PLAN - PART C
TY111 FIRST FLOOR SECURITY PLAN - PART A
TY112 FIRST FLOOR SECURITY PLAN - PART B
TY113 FIRST FLOOR SECURITY PLAN - PART C
TY121 SECOND FLOOR SECURITY PLAN - PART A
TY122 SECOND FLOOR SECURITY PLAN - PART B
TY123 SECOND FLOOR SECURITY PLAN - PART C
TY131 THIRD FLOOR SECURITY PLAN - PART A
TY132 THIRD FLOOR SECURITY PLAN - PART B
TY133 THIRD FLOOR SECURITY PLAN - PART C
TY141 FOURTH FLOOR SECURITY PLAN - PART A
TY142 FOURTH FLOOR SECURITY PLAN - PART B
TY143 FOURTH FLOOR SECURITY PLAN - PART C
TY151 FIFTH FLOOR SECURITY PLAN - PART A
TY152 FIFTH FLOOR SECURITY PLAN - PART B
TY153 FIFTH FLOOR SECURITY PLAN - PART C
TY161 SIXTH FLOOR SECURITY PLAN - PART A
TY162 SIXTH FLOOR SECURITY PLAN - PART B
TY163 SIXTH FLOOR SECURITY PLAN - PART C
TY170 ROOF SECURITY PLAN
TY501 SECURITY DETAILS
TY502 SECURITY DETAILS
TY503 SECURITY DETAILS
TY601 SECURITY CAMERA RISER
TY602 ACCESS CONTROL RISER DIAGRAM
SHEET ID SHEET TITLE
EP615 PANEL SCHEDULES
EP616 PANEL SCHEDULES
EP617 PANEL SCHEDULES
EP618 PANEL SCHEDULES
EP619 PANEL SCHEDULES
EP620 PANEL SCHEDULES
EP621 PANEL SCHEDULES
EP622 PANEL SCHEDULES
EP623 PANEL SCHEDULES
EP624 PANEL SCHEDULES
EP625 PANEL SCHEDULES
EP626 PANEL SCHEDULES
EP627 PANEL SCHEDULES
EP628 PANEL SCHEDULES
EP629 PANEL SCHEDULES
EP701 BASEMENT MECHANICAL POWER PLAN - PART A
EP702 BASEMENT MECHANICAL POWER PLAN - PART B
EP703 BASEMENT MECHANICAL POWER PLAN - PART C
EP711 FIRST FLOOR MECHANICAL POWER PLAN - PART A
EP712 FIRST FLOOR MECHANICAL POWER PLAN - PART B
EP713 FIRST FLOOR MECHANICAL POWER PLAN - PART C
EP721 SECOND FLOOR MECHANICAL POWER PLAN - PART A
EP722 SECOND FLOOR MECHANICAL POWER PLAN - PART B
EP723 SECOND FLOOR MECHANICAL POWER PLAN - PART C
EP731 THIRD FLOOR MECHANICAL POWER PLAN - PART A
EP732 THIRD FLOOR MECHANICAL POWER PLAN - PART B
EP733 THIRD FLOOR MECHANICAL POWER PLAN - PART C
EP741 FOURTH FLOOR MECHANICAL POWER PLAN - PART A
EP742 FOURTH FLOOR MECHANICAL POWER PLAN - PART B
EP743 FOURTH FLOOR MECHANICAL POWER PLAN - PART C
EP751 FIFTH FLOOR MECHANICAL POWER PLAN - PART A
EP752 FIFTH FLOOR MECHANICAL POWER PLAN - PART B
EP753 FIFTH FLOOR MECHANICAL POWER PLAN - PART C
EP761 SIXTH FLOOR MECHANICAL POWER PLAN - PART A
EP762 SIXTH FLOOR MECHANICAL POWER PLAN - PART B
EP763 SIXTH FLOOR MECHANICAL POWER PLAN - PART C
EP771 ROOF MECHANICAL POWER PLAN - PART A
EP772 ROOF MECHANICAL POWER PLAN - PART B
EP773 ROOF MECHANICAL POWER PLAN - PART C
EG170 LIGHTNING PROTECTION PLAN
EG501 GROUNDING DETAILS
EG502 GROUNDING DETAILS
EG601 GROUNDING ONE-LINE DIAGRAM
T-001 COMMUNICATIONS LEGEND, GENERAL NOTES, AND ABBREVIATIONS
T-101 BASEMENT COMMUNICATIONS PLAN - PART A
T-102 BASEMENT COMMUNICATIONS PLAN - PART B
T-103 BASEMENT COMMUNICATIONS PLAN - PART C
T-111 FIRST FLOOR COMMUNICATIONS PLAN - PART A
T-112 FIRST FLOOR COMMUNICATIONS PLAN - PART B
T-113 FIRST FLOOR COMMUNICATIONS PLAN - PART C
T-121 SECOND FLOOR COMMUNICATIONS PLAN - PART A
T-122 SECOND FLOOR COMMUNICATIONS PLAN - PART B
T-123 SECOND FLOOR COMMUNICATIONS PLAN - PART C
T-131 THIRD FLOOR COMMUNICATIONS PLAN - PART A
T-132 THIRD FLOOR COMMUNICATIONS PLAN - PART B
T-133 THIRD FLOOR COMMUNICATIONS PLAN - PART C
T-141 FOURTH FLOOR COMMUNICATIONS PLAN - PART A
T-142 FOURTH FLOOR COMMUNICATIONS PLAN - PART B
T-143 FOURTH FLOOR COMMUNICATIONS PLAN - PART C
T-151 FIFTH FLOOR COMMUNICATIONS PLAN - PART A
T-152 FIFTH FLOOR COMMUNICATIONS PLAN - PART B
T-153 FIFTH FLOOR COMMUNICATIONS PLAN - PART C
T-161 SIXTH FLOOR COMMUNICATIONS PLAN - PART A
T-162 SIXTH FLOOR COMMUNICATIONS PLAN - PART B
T-163 SIXTH FLOOR COMMUNICATIONS PLAN - PART C
T-170 ROOF COMMUNICATIONS PLAN
T-400 ENLARGED BASEMENT COMMUNICATIONS PLANS
T-410 ENLARGED FIRST FLOOR COMMUNICATIONS PLANS
T-420 ENLARGED SECOND FLOOR COMMUNICATIONS PLANS
T-430 ENLARGED THIRD FLOOR COMMUNCATIONS PLANS
T-440 ENLARGED FOURTH FLOOR COMMUNICATIONS PLANS
T-450 ENLARGED FIFTH FLOOR COMMUNICATIONS PLANS
T-460 ENLARGED SIXTH FLOOR COMMUNICATIONS PLANS
T-501 COMMUNICATIONS DETAILS
T-601 COMMUNICATIONS RISER DIAGRAM
T-602 DAS/CATV RISER DIAGRAM
T-603 PUBLIC ADDRESS/FIRE RADIO DAS RISER DIAGRAMS
SHEET ID SHEET TITLE
E-001 ELECTRICAL LEGEND AND ABBREVIATIONS
E-002 ELECTRICAL GENERAL NOTES
ED101 BASEMENT EXISTING ELECTRICAL AND DEMOLITION PLAN - PART A
ED102 BASEMENT EXISTING ELECTRICAL AND DEMOLITION PLAN - PART B
ED103 BASEMENT EXISTING ELECTRICAL AND DEMOLITION PLAN - PART C
ED111 FIRST FLOOR EXISTING ELECTRICAL AND DEMOLITION PLAN - PART A
ED112 FIRST FLOOR EXISTING ELECTRICAL AND DEMOLITION PLAN - PART B
ED113 FIRST FLOOR EXISTING ELECTRICAL AND DEMOLITION PLAN - PART C
ED120 SECOND FLOOR EXISTING ELECTRICAL AND DEMOLITION PLAN
ED130 THIRD FLOOR EXISTING ELECTRICAL AND DEMOLITION PLAN
ED140 FOURTH FLOOR EXISTING ELECTRICAL AND DEMOLITION PLAN
ED150 FIFTH FLOOR EXISTING ELECTRICAL AND DEMOLITION PLAN
ED160 SIXTH FLOOR EXISTING ELECTRICAL AND DEMOLITION PLAN
ED170 ROOF EXISTING ELECTRICAL AND DEMOLITION PLAN
EL101 BASEMENT LIGHTING PLAN - PART A
EL102 BASEMENT LIGHTING PLAN - PART B
EL103 BASEMENT LIGHTING PLAN - PART C
EL111 FIRST FLOOR LIGHTING PLAN - PART A
EL112 FIRST FLOOR LIGHTING PLAN - PART B
EL113 FIRST FLOOR LIGHTING PLAN - PART C
EL121 SECOND FLOOR LIGHTING PLAN - PART A
EL122 SECOND FLOOR LIGHTING PLAN - PART B
EL123 SECOND FLOOR LIGHTING PLAN - PART C
EL131 THIRD FLOOR LIGHTING PLAN - PART A
EL132 THIRD FLOOR LIGHTING PLAN - PART B
EL133 THIRD FLOOR LIGHTING PLAN - PART C
EL141 FOURTH FLOOR LIGHTING PLAN - PART A
EL142 FOURTH FLOOR LIGHTING PLAN - PART B
EL143 FOURTH FLOOR LIGHTING PLAN - PART C
EL151 FIFTH FLOOR LIGHTING PLAN - PART A
EL152 FIFTH FLOOR LIGHTING PLAN - PART B
EL153 FIFTH FLOOR LIGHTING PLAN - PART C
EL161 SIXTH FLOOR LIGHTING PLAN - PART A
EL162 SIXTH FLOOR LIGHTING PLAN - PART B
EL163 SIXTH FLOOR LIGHTING PLAN - PART C
EL170 ROOF LIGHTING PLAN
EL501 LIGHTING SCHEDULES & DETAILS
EL601 EMERGENCY LIGHTING CONTROL SYSTEM RISER DIAGRAM
EL602 LIGHTING CONTROL DIAGRAM
EP101 BASEMENT POWER PLAN - PART A
EP102 BASEMENT POWER PLAN - PART B
EP103 BASEMENT POWER PLAN - PART C
EP111 FIRST FLOOR POWER PLAN - PART A
EP112 FIRST FLOOR POWER PLAN - PART B
EP113 FIRST FLOOR POWER PLAN - PART C
EP121 SECOND FLOOR POWER PLAN - PART A
EP122 SECOND FLOOR POWER PLAN - PART B
EP123 SECOND FLOOR POWER PLAN - PART C
EP131 THIRD FLOOR POWER PLAN - PART A
EP132 THIRD FLOOR POWER PLAN - PART B
EP133 THIRD FLOOR POWER PLAN - PART C
EP141 FOURTH FLOOR POWER PLAN - PART A
EP142 FOURTH FLOOR POWER PLAN - PART B
EP143 FOURTH FLOOR POWER PLAN - PART C
EP151 FIFTH FLOOR POWER PLAN - PART A
EP152 FIFTH FLOOR POWER PLAN - PART B
EP153 FIFTH FLOOR POWER PLAN - PART C
EP161 SIXTH FLOOR POWER PLAN - PART A
EP162 SIXTH FLOOR POWER PLAN - PART B
EP163 SIXTH FLOOR POWER PLAN - PART C
EP170 ROOF POWER PLAN
EP401 ENLARGED BASEMENT POWER PLAN
EP402 ENLARGED BASEMENT POWER PLAN
EP410 ENLARGED FIRST FLOOR POWER PLANS
EP420 ENLARGED SECOND FLOOR POWER PLANS
EP430 ENLARGED THIRD FLOOR POWER PLANS
EP440 ENLARGED FOURTH FLOOR POWER PLANS
EP450 ENLARGED FIFTH FLOOR POWER PLANS
EP460 ENLARGED SIXTH FLOOR POWER PLANS
EP501 ELECTRICAL DETAILS AND SCHEDULE
EP601 POWER ONE-LINE
EP602 POWER ONE-LINE
EP603 POWER ONE-LINE
EP604 POWER ONE-LINE
EP610 PANEL SCHEDULES
EP611 PANEL SCHEDULES
EP612 PANEL SCHEDULES
EP613 PANEL SCHEDULES
EP614 PANEL SCHEDULES
DRAWING INDEX CONT'D
M
AR
K D
ES
C
R
IP
TI
O
N D
S S
DRAWING ABBREVIATIONS INDEX OF DRAWINGS
LEGEND
NUMBERING SYSTEM:
AD.10/01
DISCIPLINE:
C - CIVIL
L - LANDSCAPE
A - ARCHITECTURE
M - MECHANICAL
E - ELECTRICAL
P - PLUMBING
S - STRUCTURAL
FP - FIRE PROTECTION
SERIES NUMBER
SHEET NUMBER WITHIN SERIES
NUMBER OF PLAN, DETAIL, ETC.
ON SHEET
CONCRETE/ PRECAST
CONCRETE
SOIL
SAND, EIFS FINISH COAT,
OR CEMENT PLASTER
BRICK
CMU
STONE
FIBERGLASS SEMI RIGID
INSULATION
FIBERGLASS BATT
INSULATION
POLYISOCYANURATE
INSULATION BOARD (SEE A-428)
EXPANDED POLYSTYRENE
RIGID INSULATION
EXTRUDED POLYSTYRENE
RIGID INSULATION
POLYISOCYANURATE RIGID
INSULATION
GYPSUM BOARD
EXTERIOR GYPSUM
SHEATHING
EXTERIOR CEMENT
BOARD
COATED GLASS MAT
WATER RESISTANT
GYP BD
PLYWOOD
COVER BOARD
MATERIALS
ANNOTATION CALLOUTS/DRAWING SYMBOLS
A ---------------------
A LABEL CLASS A DOOR
A/C AIR CONDITION
A/C UNIT AIR CONDITIONING UNIT
A/E ARCHITECT/ENGINEER
AB ANCHOR BOLT
ACC ACCESSIBLE
ACS AUTOMATIC CONTROL SYSTEM
ACS DR ACCESS DOOR
ACS PNL ACCESS PANEL
ACT ACOUSTICAL CEILING TILE
ADA AMERICANS WITH DISABILITIES ACT
ADMIN ADMINISTRATION
AFC ABOVE FINISHED COUNTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFS ABOVE FINISHED SLAB
AGGR AGGREGATE
AHU AIR HANDLING UNIT
AIB AIR INFILTRATION BARRIER
ALT ALTERNATE
ALUM ALUMINUM
ANOD ANODIZE
APC ACOUSTICAL PANEL CEILING
APPROX APPROXIMATE
AR AS REQUIRED
ARCH ARCHITECT
ASC ABOVE SUSPENDED CEILING
ASSY ASSEMBLY
ATC ACOUSTICAL TILE CEILING
AVG AVERAGE
AW ARCHITECTURAL WOODWORK
AWT ACOUSTICAL WALL TREATMENT
B ---------------------
B LABEL CLASS B DOOR
BALC BALCONY
BB BASEBOARD
BC BOOKCASE
BD BOARD
BDE BRIGADE
BDRY BOUNDARY
BFF BELOW FINISH FLOOR
BHMA BUILDER'S HARDWARE MANUFACTURER'S
ASSOCIATION
BLDG BUILDING
BLKG BLOCKING
BLT IN BUILT-IN
BN BULLNOSE
BO BOTTOM OF
BOS BOTTOM OF STEEL
BOT BOTTOM
BP BUILDING PAPER
BRKT BRACKET
BSMT BASEMENT
BTWN BETWEEN
BUR BUILT-UP ROOFING
C ---------------------
C CONC CAST CONCRETE
C LABEL CLASS C DOOR
CAB CABINET
CATW CATWALK
CAV CAVITY
CBB CEMENTITIOUS (BACKER) BOARD
CD CONSTRUCTION DOCUMENTS
CDW CHILLED DRINKING WATER
CEM PLAS CEMENT PLASTER
CER CERAMIC
CF CONTRACTOR FURNISHED
CF/CI CONTRACTOR FURNISHED/CONTRACTOR
INSTALLED
CFE CONTRACTOR FURNISHED EQUIPMENT
CFLG COUNTERFLASHING
CFM CUBIC FEET PER MINUTE
CFMF COLD-FORMED METAL FRAMING
CFS CUBIC FEET PER SECOND
CG CORNER GUARD
CGR CENTRAL GUARD ROOM
CI CAST IRON
CIP CAST-IN-PLACE
CJ CONTROL JOINT
CL CENTER LINE
CLG CEILING
CLG DIFF CEILING DIFFUSER
CLG HT CEILING HEIGHT
CLL COLUMN LINE
CLO CLOSET
CLR COLOR
CLRM CLASSROOM
CMU CONCRETE MASONRY UNIT
CNDS CONDENSATE
CDR CARD READER
CO CLEANOUT
COL COLUMN
COMM COMMUNICATION
CONC CONCRETE
CONC FLR CONCRETE FLOOR
CONF CONFERENCE
CONT CONTINUE
COORD COORDINATE
CORR CORRIDOR
CP CONCRETE PIPE
CPT CARPET
CR CONTROL ROOM
CS CAST STONE
CSWK CASEWORK
CT CERAMIC TILE
CTB CERAMIC TILE BASE
CTF CERAMIC TILE FLOOR
CTR CENTER
CU FT CUBIC FEET
CW CASEMENT WINDOW
D ---------------------
D DEPTH
D LABEL CLASS D DOOR
DBL DOUBLE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DIA DIAMETER
DIR DIRECTION
DIST DISTANCE
DOC DOCUMENT
DR DOOR
DS DOWNSPOUT
E ---------------------
E LABEL CLASS E DOOR
EA EACH
EF EACH FACE
EIFS EXTERIOR INSULATION AND FINISH SYSTEM
EJ EXPANSION JOINT
ES EACH SIDE
EL ELEVATION
ELEV ELEVATOR
ENTR ENTRANCE
EPS EXPANDED POLYSTYRENE BOARD (INSULATION)
EQ EQUAL
EWC ELECTRIC WATER COOLER
EXP EXPOSED
EXT EXTERIOR
EXT EXTINGUISHER
EXT GR EXTERIOR GRADE
1i
GRID / COLUMN
LINE DESIGNATOR
EQUIPMENT NUMBER
DOOR NUMBER
INTERIOR ELEVATION
1i
WALL TYPE
WINDOW TYPE
A101
SIM
SECTION
Room name
101 ROOM NAME/NUMBER
A101
Ref
A101
Ref
EXTERIOR ELEVATION
1 REVISION TAG
A-101
SIM
PLAN, BLOW-UP DETAIL NORTH ARROW
SPOT ELEVATION
Name
Elevation
FLOOR LEVEL & NAME
PLATE NUMBER WHERE
SECTION/DETAIL IS DRAWN
PLATE NUMBER WHERE
SECTION/DETAIL IS DRAWN
PLATE NUMBER WHERE
SECTION/DETAIL IS DRAWN
PLATE NUMBER WHERE
SECTION/DETAIL IS DRAWN
F ---------------------
FA FIRE ALARM
FAAP FIRE ALARM ANNUNCIATOR PANEL
FAS BD FASCIA BOARD
FC BRK FACE BRICK
FCO FLOOR CLEANOUT
FD FLOOR DRAIN
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FED FEDERAL
FF FINISH FACE
FF EL FINISH FLOOR ELEVATION
FF INSUL FOIL BACKED INSULATION
FGL FIBERGLASS
FH FIRE HOSE
FHP FULL HEIGHT PARTITION
FIN FINISH
FIN BS FINISH BOTH SIDES
FIN FLR FINISH FLOOR
FIN GR FINISH GRADE
FIXT FIXTURE
FLDG FOLDING
FLEX FLEXIBLE
FLG FLOORING
FLMT FLUSH MOUNT
FLR FLOOR
FM FACTORY MUTUAL
FOC FACE OF CONCRETE
FOM FACE OF MASONRY
FR FIRE RESISTANT
FRG FIBER REINFORCED GYPSUM
FRMG FRAMING
FRP FIBERGLASS REINFORCED PLASTIC
FRTW FIRE RETARDANT TREATED WOOD
FS FEDERAL SPECIFICATION
FSTNR FASTENER
FT FEET
FTG FOOTING
FWC FABRIC WALLCOVERING
G ---------------------
G NATURAL GAS
GALV GALVANIZED
GB GRAB BAR
GFCI GOVERNMENT FURNISHED CONTRACTOR
INSTALLED
GFGI GOVERNMENT INSTALLED FURNISHED
INSTALLED BY GOVERNMENT
GFRG GLASS-FIBER-REINFORCED GYPSUM
GLZ GLAZING
GR FL GROUND FLOOR
GUT GUTTER
GYP BD GYPSUM BOARD
GYP PLAS GYPSUM PLASTER
H ---------------------
HB HOSE BIBB
HDPE HIGH DENSITY POLYETHYLENE
HDW HARDWARE
HDWD HARDWOOD
HEPA HIGH EFFICIENCY PARTICULATE AIR (FILTER)
HM HOLLOW METAL
HMD HOLLOW METAL DOOR
HORIZ HORIZONTAL
HT HEIGHT
HYDR HYDRAULIC
I ---------------------
IBC INTERNATIONAL BUILDING CODE
INSUL INSULATION
INT INTERIOR
ILO IN LIEU OF
J ---------------------
JAN JANITOR
K ---------------------
KPD KEYPAD
KIT KITCHEN
KPL KICKPLATE
L ---------------------
LAM LAMINATE
LAV LAVATORY
LBR LUMBER
LBS POUND
LDG LANDING
LF LINEAR FEET (FOOT)
LIB LIBRARY
LIN LINEAR
LKR LOCKER
LOC LOCATION
LT LIGHT
LVDR LOUVER DOOR
LVR LOUVER
M ---------------------
MACH RM MACHINE ROOM
MATL MATERIAL
MAX MAXIMUM
MC MOISTURE CONTENT
MD METAL DECK
MECH MECHANICAL
MECH RM MECHANICAL ROOM
MEMB MEMBRANE
MF MILL FINISH
MFR MANUFACTURER
MID MIDDLE
MIL STD MILITARY STANDARD
MIN MINIMUM, MINUTE
MIRR MIRROR
MISC MISCELLANEOUS
MLDG MOLDING (MOULDING)
MO MASONRY OPENING
MOD MODIFY
MB MOISTURE BARRIER
MTG MOUNTING
MTL METAL
MVBL MOVABLE
MWP MEMBRANE WATERPROOFING
N ---------------------
N NORTH
NA NOT APPLICABLE
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NP NO PAINT
NRC NOISE REDUCTION COEFFICIENT
NTS NOT TO SCALE
O -------------------
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER
OFD OVERFLOW DRAIN
OFF OFFICE
OGL OBSCURE GLASS
OPH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OPQ OPAQUE
OWSJ OPEN WEB STEEL JOIST
OPR OPERABLE
ORD OVERFLOW ROOF DRAIN
ORIG ORIGINAL
P --------------------
PA PUBLIC ADDRESS
PAR PARAPET
PAT PATTERN
PB PULL BOX
PBD PARTICLEBOARD
PCC PRECAST CONCRETE
PCF POUNDS PER CUBIC FOOT
PCT PERCENT
PERF PERFORATED
PERIM PERIMETER
PH PHASE
PIL PILASTER
PL PROPERTY LINE
PL GL PLATE GLASS
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLBG PLUMBING
PLG PILING
PLYWD PLYWOOD
PNL PANEL
PP PL PUSH/PULL PLATE
PR PAIR
PRCST PRECAST
PRKG PARKING
PS CONC PRESTRESSED CONCRETE
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PRESSURE TREATED
PTD PAPER TOWEL DISPENSER
PTDR PAPER TOWEL DISPENSER AND RECEPTACLE
PTN PARTITION
PWR POWER
Q --------------------
QT QUARRY TILE
QTY QUANTITY
R --------------------
RB RESILIENT BASE
RBM REINFORCED BRICK MASONRY
RBR RUBBER
RC REINFORCED CONCRETE
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
RDG INS RIGID INSULATION, SOLID
REC RECESSED
REC ROOM RECREATION ROOM
REF REFERENCE
REM REMOVABLE
REP REPAIR
REPL REPLACE
REQ REQUIRE
REQD REQUIRED
RESIL RESILIENT
REST RESTROOM
RF RESILIENT FLOORING
RFG ROOFING
RH ROOF HATCH
RHR RIGHT HAND REVERSE
RL ROOF LEADER
RLG RAILING
RM ROOM
RO ROUGH OPENING
RSD ROLLING STEEL DOOR
RV ROOF VENT
RVL REVEAL
S --------------------
SB SPLASH BLOCK
SCHED SCHEDULE
SD SMOKE DETECTOR
SF SQUARE FOOT (FEET)
SFTWD SOFTWOOD
SGL SINGLE
SHT MTL FLASH SHEET METAL (FLASHING)
SHTHG SHEATHING
SHV SHELVING
SIM SIMILAR
SJ SCORED JOINT
SKLT SKYLIGHT
SLNT SEALANT
SMK SMOKE
SMLS SEAMLESS
SP EL SPOT ELEVATION
SPEC SPECIFICATION
SQ SQUARE
SQ IN SQUARE INCH
SQ YD SQUARE YARD
SST STAINLESS STEEL
ST STAIRS
STD STANDARD
STL JST STEEL JOIST
STL RF DK STEEL ROOF DECK
STOR STORAGE
STR STRINGERS
STRB/HRN STROBE/HORN
SUB FL SUBFLOOR
SV SHEET VINYL
SW SIDEWALK
T --------------------
T TREAD
T/S TUB/SHOWER
TC TERRA COTTA
TD TRENCH DRAIN
TEL TELEPHONE
TEMP TEMPORARY
TER TERRAZZO
TFF TOP OF FINISH FLOOR
THK THICKNESS
TK BD TACKBOARD
TMPD GL TEMPERED GLASS
TN TRUE NORTH
TOF TOP OF FOOTING
TOM TOP OF MASONRY
TOP TOP OF PARAPET
TOPO TOPOGRAPHY
TOS TOP OF SLAB
TOW TOP OF WALL
TRANS TRANSOM
TRTD TREATED
TV TELEVISION
TYP TYPICAL
U --------------------
UNO UNLESS NOTED OTHERWISE
V --------------------
VIF VERIFY IN FIELD
EGRESS ROUTE ID
AND SECTION
LENGTH
1 HR FIRE
SMOKE RESISTANT
4 HR FIRE
2 HR FIRE
3 HR FIRE
FIRE RATED WALL SYMBOLS:
SHEET KEYNOTE
Room Rm_Occupancy
150 SF
EGRESS :Egress_ID
Egress_Length
ROOM OCCUPANCY &
AREA
PROJECT
LOCATION
A101
SIM
SECTION
PLATE NUMBER WHERE
SECTION/DETAIL IS DRAWN
WALL SECTION
XX XX XX.XXX
PROTECTION BOARD
TRAFFIC DECK INSULATION
(SEE A-428)
01 WINDOW ASSEMBLY
TYPE
SHEET ID
1 2 6 7
D R
A W
N B
Y
D E
S
IG
N B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
C H
E C
K E
D B
Y
US Army Corps of Engineers ®
A N
S I D
F
A
C A
T E
G O
R Y
C O
D E
3 4 5 8 9 10
G
E
D
C
B
R E
P A
IR
T
O E
IS
E
N H
O W
E R
B A
R R
A C
K S
B
U
IL
D
IN
G
C
F Y
S
R M
J U
N E
W D
S -1
-B
-0
W D
S -1
-D
-0
O M
Y E
R S
O M
Y E
R S
L C
R O
W D
E R
G-210
F
E D
E R
A L P
L A
Z A
N
E W
Y O
R K
N
Y
N E
W Y
O R
K D
IS
T
R
IC
T N
E W
Y O
R K
N
E W
Y O
R K
L C
R O
W D
E R
P R
O J E
C T
D A
T A
W E
S T
P O
IN
T
N
E W
Y O
R K
G G
-2
SITE MAP NTS
REGIONAL MAP NTS
WEST POINT MAP NTS
EISENHOWER BARRACKS
M A
R K
D E
S C
R
IP
T
IO
N D
A T
FITTINGS ASSOCIATED WITH FIBERGLASS PIPE INSULATION
9” x 9” FLOOR TILE WITH BLACK MASTIC
METAL FIRE DOOR
PIPE PACKING MATERIAL
DUCT VIBRATION CLOTH
COVE BASE MASTIC
MASTIC ASSOCIATED WITH 12” X 12” FLOOR TILE
12” X 12” FLOOR TILE WITH BLACK MASTIC
9” X 9” FLOOR TILE WITH BLACK MASTIC (SECOND LAYER)
FITTINGS ASSOCIATED WITH FIBERGLASS PIPE INSULATION LOCATED
IN ACCESS PANEL
GLUE DOTS ASSOCIATED WITH SPLINE CEILING
'X' REPRESENTS QUANTITY1
X
745 C
SHEET ID
1 2 6 7
D R
AW
N
B Y:
D
ES
IG
N
B Y:
SU
B M
IT
TE
D B
Y:
SI
ZE
FI
LE
N
AM
E:
IS
SU
E D
AT
E :
C O
N
TR
AC
T
N O
SO
L I
C
IT
AT
IO
N N
O
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
C H
E C
KE
D B
Y:
US Army Corps of Engineers ®
AN
S I
D
F
A
C
AT
EG
O
R Y
C O
D E:
3 4 5 8 9 10
G
E
D
C
B
KEY PLAN
R
EP
AI
R
T O
E
IS
E N H
O W
E R B
AR
R
AC
KS
, B U
IL
D
IN
G
C F Y
S
R M
JU
N
E, W
2D S-
-B
-0
W
2D S-
-D
-0
R . P
R O
C
TO
R
M . U
SE
R
Y
T.
A
LL
EN
H-100
F
ED
ER
AL
P
LA
ZA
, N
EW
Y O
R K, N Y
N
EW
Y
O R
K D
IS
TR
IC
T
N
EW
Y O
R K, N
EW
Y O
R K
R . S
O U
TH
C
O M
PO
SI
T E B
AS
EM
E N T
H A Z
AR
D
O U
S M
AT
E R
IA
LS
P
LA
N
W
ES
T
PO
IN
T, N E W
Y O
R K
H -1
COMPOSITE BASEMENT HAZARDOUS MATERIALS PLAN
HAZARDOUS MATERIALS NOTES
HAZARDOUS MATERIALS LEGEND
1 1
33 3
20 EA
6 EA
26 EA
110 EA
50 EA
95 EA
1 25 EA
35 EA
16 EA
38 EA
1250 SF
32 EA
1430 SF
13 EA
32 EA
201 EA
32 EA10 EA
25 SF
1450 SF30 SF
29 EA
165 EA
30 EA
119 EA
46 EA
47 EA
1 EA
2 EA
2 EA
1 2 EA
110 EA
M
AR
K D
ES
C
R
IP
TI
O
N D
METAL FIRE DOOR
PIPE PACKING MATERIAL
DUCT VIBRATION CLOTH
COVE BASE MASTIC
MASTIC ASSOCIATED WITH 12” X 12” FLOOR TILE
12” X 12” FLOOR TILE WITH BLACK MASTIC
9” X 9” FLOOR TILE WITH BLACK MASTIC (SECOND LAYER)
FITTINGS ASSOCIATED WITH FIBERGLASS PIPE INSULATION LOCATED
IN ACCESS PANEL
GLUE DOTS ASSOCIATED WITH SPLINE CEILING
'X' REPRESENTS QUANTITY1
X
745 C
SHEET ID
1 2 6 7
D R
AW
N
B Y:
D
ES
IG
N
B Y:
SU
B M
IT
TE
D B
Y:
SI
ZE
FI
LE
N
AM
E:
IS
SU
E D
AT
E :
C O
N
TR
AC
T
N O
SO
L I
C
IT
AT
IO
N N
O
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
C H
E C
KE
D B
Y:
US Army Corps of Engineers ®
AN
S I
D
F
A
C
AT
EG
O
R Y
C O
D E:
3 4 5 8 9 10
G
E
D
C
B
KEY PLAN
R
EP
AI
R
T O
E
IS
E N H
O W
E R B
AR
R
AC
KS
, B U
IL
D
IN
G
C F Y
S
R M
JU
N
E, W
2D S-
-B
-0
W
2D S-
-D
-0
R . P
R O
C
TO
R
M . U
SE
R
Y
T.
A
LL
EN
H-110
F
ED
ER
AL
P
LA
ZA
, N
EW
Y O
R K, N Y
N
EW
Y
O R
K D
IS
TR
IC
T
N
EW
Y O
R K, N
EW
Y O
R K
R . S
O U
TH
C
O M
P O
SI
TE
F
IR
S T
F
LO
O R
H
AZ
AR
D
O U
S M
AT
E R
IA
LS
P
LA
N
W
ES
T
PO
IN
T, N E W
Y O
R K
H -1
COMPOSITE FIRST FLOOR HAZARDOUS MATERIALS PLAN
HAZARDOUS MATERIALS NOTES
HAZARDOUS MATERIALS LEGEND
20 LF
290 SF
3 3
3150 SF2 1 EA 1 150 SF 2
150 SF 2
20 LF
290 SF
20 LF
375 SF
20 LF
290 SF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
20 LF
290 SF
20 LF
290 SF
290 SF
20 LF
20 LF
290 SF
375 SF
20 LF
60 LF
760 SF
290 SF
20 LF
60 LF
760 SF
290 SF
20 LF
11 220 SF
11 530 SF
20 LF
290 SF
290 SF
20 LF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
6 20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
6 20 LF
6 20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
M
AR
K D
ES
C
R
IP
TI
O
N D
METAL FIRE DOOR
PIPE PACKING MATERIAL
DUCT VIBRATION CLOTH
COVE BASE MASTIC
MASTIC ASSOCIATED WITH 12” X 12” FLOOR TILE
12” X 12” FLOOR TILE WITH BLACK MASTIC
9” X 9” FLOOR TILE WITH BLACK MASTIC (SECOND LAYER)
FITTINGS ASSOCIATED WITH FIBERGLASS PIPE INSULATION LOCATED
IN ACCESS PANEL
GLUE DOTS ASSOCIATED WITH SPLINE CEILING
'X' REPRESENTS QUANTITY1
X
745 C
SHEET ID
1 2 6 7
D R
AW
N
B Y:
D
ES
IG
N
B Y:
SU
B M
IT
TE
D B
Y:
SI
ZE
FI
LE
N
AM
E:
IS
SU
E D
AT
E :
C O
N
TR
AC
T
N O
SO
L I
C
IT
AT
IO
N N
O
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
C H
E C
KE
D B
Y:
US Army Corps of Engineers ®
AN
S I
D
F
A
C
AT
EG
O
R Y
C O
D E:
3 4 5 8 9 10
G
E
D
C
B
KEY PLAN
R
EP
AI
R
T O
E
IS
E N H
O W
E R B
AR
R
AC
KS
, B U
IL
D
IN
G
C F Y
S
R M
JU
N
E, W
2D S-
-B
-0
W
2D S-
-D
-0
R . P
R O
C
TO
R
M . U
SE
R
Y
T.
A
LL
EN
H-120
F
ED
ER
AL
P
LA
ZA
, N
EW
Y O
R K, N Y
N
EW
Y
O R
K D
IS
TR
IC
T
N
EW
Y O
R K, N
EW
Y O
R K
R . S
O U
TH
C
O M
PO
SI
TE
S
EC
O
N D
F L O
O R
H
AZ
AR
D
O U
S M
AT
E R
IA
LS
P
LA
N
W
ES
T
PO
IN
T, N E W
Y O
R K
H -1
COMPOSITE SECOND FLOOR HAZARDOUS MATERIALS PLAN
HAZARDOUS MATERIALS NOTES
HAZARDOUS MATERIALS LEGEND
20 LF
290 SF
3 3
315 EA1 15 EA1 5 EA1 5 EA1 10 EA1 10 EA1 6 EA1 6 EA1
7 320 SF
250 SF2
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
290 SF
20 LF
290 SF
20 LF
20 LF
290 SF
290 SF
20 LF
20 LF
290 SF
290 SF
20 LF
20 LF
290 SF
20 LF
290 SF
20 LF
370 SF
20 LF
370 SF
20 LF
370 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
290 SF
20 LF
290 SF
20 LF
20 LF
290 SF
290 SF
20 LF
20 LF
290 SF
290 SF
20 LF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
290 SF
20 LF
290 SF
20 LF
20 LF
290 SF
290 SF
20 LF
20 LF
290 SF
20 LF
290 SF
20 LF
370 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
290 SF
20 LF
290 SF
20 LF
20 LF
290 SF
290 SF
20 LF
290 SF
20 LF
20 LF
290 SF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
6 20 LF
6 20 LF
301 SF
301 SF
M
AR
K D
ES
C
R
IP
TI
O
N D
METAL FIRE DOOR
PIPE PACKING MATERIAL
DUCT VIBRATION CLOTH
COVE BASE MASTIC
MASTIC ASSOCIATED WITH 12” X 12” FLOOR TILE
12” X 12” FLOOR TILE WITH BLACK MASTIC
9” X 9” FLOOR TILE WITH BLACK MASTIC (SECOND LAYER)
FITTINGS ASSOCIATED WITH FIBERGLASS PIPE INSULATION LOCATED
IN ACCESS PANEL
GLUE DOTS ASSOCIATED WITH SPLINE CEILING
'X' REPRESENTS QUANTITY1
X
745 C
SHEET ID
1 2 6 7
D R
AW
N
B Y:
D
ES
IG
N
B Y:
SU
B M
IT
TE
D B
Y:
SI
ZE
FI
LE
N
AM
E:
IS
SU
E D
AT
E :
C O
N
TR
AC
T
N O
SO
L I
C
IT
AT
IO
N N
O
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
C H
E C
KE
D B
Y:
US Army Corps of Engineers ®
AN
S I
D
F
A
C
AT
EG
O
R Y
C O
D E:
3 4 5 8 9 10
G
E
D
C
B
KEY PLAN
R
EP
AI
R
T O
E
IS
E N H
O W
E R B
AR
R
AC
KS
, B U
IL
D
IN
G
C F Y
S
R M
JU
N
E, W
2D S-
-B
-0
W
2D S-
-D
-0
R . P
R O
C
TO
R
M . U
SE
R
Y
T.
A
LL
EN
H-130
F
ED
ER
AL
P
LA
ZA
, N
EW
Y O
R K, N Y
N
EW
Y
O R
K D
IS
TR
IC
T
N
EW
Y O
R K, N
EW
Y O
R K
R . S
O U
TH
C
O M
P O
SI
TE
T
H
IR
D F
LO
O
R H
AZ
AR
D O
U S
M
AT
E R
IA
LS
P
LA
N
W
ES
T
PO
IN
T, N E W
Y O
R K
H -1
COMPOSITE THIRD FLOOR HAZARDOUS MATERIALS PLAN
HAZARDOUS MATERIALS NOTES
HAZARDOUS MATERIALS LEGEND
3 3
312 EA1 12 EA1 7 EA1 7 EA1 12 EA1 12 EA1 7 EA1 7 EA1
8 320 SF
250 SF2
20 LF6
20 LF
290 SF
3 3
316 EA1 16 EA1 7 EA1 7 EA1 16 EA1 16 EA1 7 EA1 7 EA1
8 320 SF
250 SF2
10 LF6
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
290 SF
20 LF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
6 20 LF
6 20 LF
301 SF
301 SF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF 2
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
M
AR
K D
ES
C
R
IP
TI
O
N D
METAL FIRE DOOR
PIPE PACKING MATERIAL
DUCT VIBRATION CLOTH
COVE BASE MASTIC
MASTIC ASSOCIATED WITH 12” X 12” FLOOR TILE
12” X 12” FLOOR TILE WITH BLACK MASTIC
9” X 9” FLOOR TILE WITH BLACK MASTIC (SECOND LAYER)
FITTINGS ASSOCIATED WITH FIBERGLASS PIPE INSULATION LOCATED
IN ACCESS PANEL
GLUE DOTS ASSOCIATED WITH SPLINE CEILING
'X' REPRESENTS QUANTITY1
X
745 C
SHEET ID
1 2 6 7
D R
AW
N
B Y:
D
ES
IG
N
B Y:
SU
B M
IT
TE
D B
Y:
SI
ZE
FI
LE
N
AM
E:
IS
SU
E D
AT
E :
C O
N
TR
AC
T
N O
SO
L I
C
IT
AT
IO
N N
O
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
C H
E C
KE
D B
Y:
US Army Corps of Engineers ®
AN
S I
D
F
A
C
AT
EG
O
R Y
C O
D E:
3 4 5 8 9 10
G
E
D
C
B
KEY PLAN
R
EP
AI
R
T O
E
IS
E N H
O W
E R B
AR
R
AC
KS
, B U
IL
D
IN
G
C F Y
S
R M
JU
N
E, W
2D S-
-B
-0
W
2D S-
-D
-0
R . P
R O
C
TO
R
M . U
SE
R
Y
T.
A
LL
EN
H-140
F
ED
ER
AL
P
LA
ZA
, N
EW
Y O
R K, N Y
N
EW
Y
O R
K D
IS
TR
IC
T
N
EW
Y O
R K, N
EW
Y O
R K
R . S
O U
TH
C
O M
PO
SI
TE
F
O U
R
TH
F L O
O R
H
AZ
AR
D
O U
S M
AT
E R
IA
LS
P
LA
N
W
ES
T
PO
IN
T, N E W
Y O
R K
H -1
COMPOSITE FOURTH FLOOR HAZARDOUS MATERIALS PLAN
HAZARDOUS MATERIALS NOTES
HAZARDOUS MATERIALS LEGEND
20 LF
290 SF
290 SF
20 LF
3 3
316 EA1 16 EA1 8 EA1 8 EA1 15 EA1 15 EA1 5 EA1 5 EA112 LF6
250 SF 2
320 SF2
290 SF
20 LF
20 LF
290 SF
8 290 SF
20 LF2
290 SF
20 LF
20 LF
290 SF
20 LF
290 SF
290 SF
20 LF
290 SF
20 LF
20 LF
290 SF
2 290 SF
20 LF6
8 290 SF
20 LF6
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
2 290 SF
20 LF6
2 290 SF
20 LF6
2 290 SF
20 LF6
20 LF
290 SF
8 290 SF
20 LF 6
8 290 SF
20 LF
8 290 SF
20 LF 6
20 LF
290 SF
8 290 SF
20 LF 2 290 SF
20 LF6
2 290 SF
20 LF6
2 290 SF
20 LF6
8 290 SF
20 LF 2 375 SF
20 LF6
2 290 SF
20 LF6
2 209 SF
20 LF6
2 290 SF
20 LF6
8 290 SF
20 LF 6
8 290 SF
20 LF
7 290 SF
20 LF
1 EA10
6 20 LF
6 20 LF
301 SF
301 SF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
M
AR
K D
ES
C
R
IP
TI
O
N D
METAL FIRE DOOR
PIPE PACKING MATERIAL
DUCT VIBRATION CLOTH
COVE BASE MASTIC
MASTIC ASSOCIATED WITH 12” X 12” FLOOR TILE
12” X 12” FLOOR TILE WITH BLACK MASTIC
9” X 9” FLOOR TILE WITH BLACK MASTIC (SECOND LAYER)
FITTINGS ASSOCIATED WITH FIBERGLASS PIPE INSULATION LOCATED
IN ACCESS PANEL
GLUE DOTS ASSOCIATED WITH SPLINE CEILING
'X' REPRESENTS QUANTITY1
X
745 C
SHEET ID
1 2 6 7
D R
AW
N
B Y:
D
ES
IG
N
B Y:
SU
B M
IT
TE
D B
Y:
SI
ZE
FI
LE
N
AM
E:
IS
SU
E D
AT
E :
C O
N
TR
AC
T
N O
SO
L I
C
IT
AT
IO
N N
O
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
C H
E C
KE
D B
Y:
US Army Corps of Engineers ®
AN
S I
D
F
A
C
AT
EG
O
R Y
C O
D E:
3 4 5 8 9 10
G
E
D
C
B
KEY PLAN
R
EP
AI
R
T O
E
IS
E N H
O W
E R B
AR
R
AC
KS
, B U
IL
D
IN
G
C F Y
S
R M
JU
N
E, W
2D S-
-B
-0
W
2D S-
-D
-0
R . P
R O
C
TO
R
M . U
SE
R
Y
T.
A
LL
EN
H-150
F
ED
ER
AL
P
LA
ZA
, N
EW
Y O
R K, N Y
N
EW
Y
O R
K D
IS
TR
IC
T
N
EW
Y O
R K, N
EW
Y O
R K
R . S
O U
TH
C
O M
P O
SI
TE
F
IF
T H
F
LO
O R
H
AZ
AR
D
O U
S M
AT
E R
IA
LS
P
LA
N
W
ES
T
PO
IN
T, N E W
Y O
R K
H -1
COMPOSITE FIFTH FLOOR HAZARDOUS MATERIALS PLAN
HAZARDOUS MATERIALS NOTES
HAZARDOUS MATERIALS LEGEND
20 LF
290 SF
209 SF
20 LF
20 LF
290 SF
20 LF
290 SF
209 SF
20 LF
370 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF9
290 SF
20 LF
290 SF9
20 LF
290 SF
290 SF
20 LF
20 LF
290 SF
290 SF
20 LF
20 LF
290 SF
3 3
312 EA1 12 EA1 7 EA1 7 EA1 12 EA1 12 EA1 7 EA1 7 EA1
8 320 SF
290 SF
20 LF
250 SF2
20 LF6
20 LF
290 SF
290 SF9
290 SF
20 LF
290 SF
20 LF 2
290 SF
20 LF
290 SF
20 LF 2
290 SF
20 LF
290 SF
20 LF 2
290 SF
20 LF
290 SF
20 LF 2
290 SF
20 LF
375 SF
20 LF 2
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
20 LF
290 SF 6
20 LF
290 SF
290 SF
20 LF 6
20 LF
290 SF
6 20 LF
6 20 LF
301 SF
301 SF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
209 SF
20 LF
209 SF
20 LF
209 SF
20 LF
209 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
M
AR
K D
ES
C
R
IP
TI
O
N D
METAL FIRE DOOR
PIPE PACKING MATERIAL
DUCT VIBRATION CLOTH
COVE BASE MASTIC
MASTIC ASSOCIATED WITH 12” X 12” FLOOR TILE
12” X 12” FLOOR TILE WITH BLACK MASTIC
9” X 9” FLOOR TILE WITH BLACK MASTIC (SECOND LAYER)
FITTINGS ASSOCIATED WITH FIBERGLASS PIPE INSULATION LOCATED
IN ACCESS PANEL
GLUE DOTS ASSOCIATED WITH SPLINE CEILING
'X' REPRESENTS QUANTITY1
X
745 C
SHEET ID
1 2 6 7
D R
AW
N
B Y:
D
ES
IG
N
B Y:
SU
B M
IT
TE
D B
Y:
SI
ZE
FI
LE
N
AM
E:
IS
SU
E D
AT
E :
C O
N
TR
AC
T
N O
SO
L I
C
IT
AT
IO
N N
O
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
C H
E C
KE
D B
Y:
US Army Corps of Engineers ®
AN
S I
D
F
A
C
AT
EG
O
R Y
C O
D E:
3 4 5 8 9 10
G
E
D
C
B
KEY PLAN
R
EP
AI
R
T O
E
IS
E N H
O W
E R B
AR
R
AC
KS
, B U
IL
D
IN
G
C F Y
S
R M
JU
N
E, W
2D S-
-B
-0
W
2D S-
-D
-0
R . P
R O
C
TO
R
M . U
SE
R
Y
T.
A
LL
EN
H-160
F
ED
ER
AL
P
LA
ZA
, N
EW
Y O
R K, N Y
N
EW
Y
O R
K D
IS
TR
IC
T
N
EW
Y O
R K, N
EW
Y O
R K
R . S
O U
TH
C
O M
P O
SI
TE
S
IX
T H
F
LO
O R
H
AZ
AR
D
O U
S M
AT
E R
IA
LS
P
LA
N
W
ES
T
PO
IN
T, N E W
Y O
R K
H -1
COMPOSITE SIXTH FLOOR HAZARDOUS MATERIALS PLAN
HAZARDOUS MATERIALS NOTES
HAZARDOUS MATERIALS LEGEND
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
20 LF
290 SF
375 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
375 SF
20 LF
20 LF
290 SF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
20 LF
290 SF
290 SF
20 LF
290 SF
20 LF
2 290 SF2 375 SF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
3 3
290 SF
20 LF
1 15 EA 1 15 EA 1 5 EA 1 5 EA 1 17 EA 1 17 EA 1 7 EA 1 7 EA
8 320 SF
10 LF
2 250 SF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
375 SF
20 LF
290 SF
20 LF
20 LF
290 SF
290 SF
20 LF
20 LF
290 SF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
375 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
375 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
6 20 LF
6 20 LF
6 20 LF
6 20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
290 SF
20 LF
301 SF
301 SF
M
AR
K D
ES
C
R
IP
TI
O
N D
S
D
SD
SD
SD
2'X2.3' FH
VALVE BOX
SIGN "STOP"
155.52
BOLLARD
BOLLARD
SD
SD
SD SD
S
D
S
D
S
D
S
D
S D
S D
S D
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
S A
N
S A
N
S A
N
S A
N
S A
N
S
A
N
S
A
N
S
A
N
S D
S D
BOLLARD
LIGHT
LIGHT
158.29
156.69
156.57
156.60
156.67 156.75
156.77
156.72 156.71
156.77 156.77
156.69
156.69
156.67
156.72
156.65
156.73
156.65
156.47
156.39
SIGN
"STOP"
SIGN
BOLLARD
155.83
155.97
156.00
156.02
156.04
154.60
154.27
LIGHT
154.79
155.32
155.77
B
E
N
C
H
155.82
155.88
155.78
155.87
SILL=160.88
.6 SQUARE
UTLITY BOX
SILL=159.53
SILL=158.86
SILL=158.74
REMOVABLE
BOLLARDS
SILL=160.88
SILL=158.18
SILL=158.19
COBBLESTONE
COBBLESTONE
COBBLESTONE
SILL=153.55
156.00
TUNNEL
TUNNEL
156.01
155.82
TUNNEL
155.47
155.84
155.97
157.07
157.06
157.01
156.50
G A
T E
TRASH
ENCLOSURE
SAN
SAN
156.20
FF=162.73
156.08
SINGLE YELLOW LINE
SAN
CONC.
STEPS
CLOCK
MONUMENT
SIGN "I.D."
SILL=158.40
C
O
N
C
E
P
S
L I G
H
O N
C
S
I D
E W
A L K
BASKETBALL COURT
BASKETBALL
COURT
156.24
COBBLESTONE
C
O
N
R
A
M
P
.6 SQUARE UTLITY BOX
2'X2.3'
ELEC.
BOX
CONC. STEPS
2'X2.3'
ELEC.
BOX
TC=000.00
BC=000.00
BC=155.89
SILL=158.14
CONC.
STEPS
ASPHALT
PAVEMENT
TC=156.33
BC=155.92
TC=000.00
BC=000.00
TC=156.11
BC=156.72
TC=000.00
BC=000.00
BC=156.53
BC=156.58
BC=156.59
BC=156.71
BC=156.62
BC=156.53
BC=156.56
BC=156.55BC=156.74
BC=156.50
BC=156.53 BC=156.54
BC=156.48
BC=156.46
BC=156.48
BC=157.01
BC=157.44
STMH-1
STMH-2
STMH-5
STMH-7
STMH-6
STMH-3
STMH-4
STMH-8
STMH-9
STMH-10
EMH-1
EMH-2
EMH-3
EMH-4
EMH-5
EMH-6
EMH-7
EMH-9
EMH-8
GMH-1
GMH-2
GMH-3
GMH-4
ASPHALT
PAVEMENT
ASPHALT
PAVEMENT
CP-1
CP-2
CP-3
STEAM
TUNNEL
STEAM
TUNNEL
PERSHING
BARRACKS
EISENHOWER
BARRACKS
NININGER
HALL
BRADLEY
BARRACKS
WASHINGTON
HALL
S
A
N
S
A
N
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W
W
W W
W
W
W W W W W
W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W
W W
W W
W W
W W
W
S A
N S
A N
ELEC. MH
RIM=150.48
SD SD SD SD
S U
R V
Y
P
L A
N
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
F I L E
N A
M E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
N
US Army Corps of Engineers
C A
T E
G O
D
E
D E
S C
R I P
T I O
N
VERTICAL AND HORIZONTAL CONTROL
POINT NAME
COORDINATES (FT)
ELEVATION DESCRIPTION
NORTHING EASTING
CP-1 932128.687 640880.458 156.00 MAG NAIL
CP-2 932016.865 641030.058 155.04 MAG NAIL
CP-3 932364.347 641327.273 157.04 MAG NAIL
30' 15' 0 30' 60' 90'
GRAPHIC SCALE: 1" = 30'
N
1. LOCATION OF ALL UNDERGROUND UTILITIES ARE
APPROXIMATE. ALL LOCATIONS AND SIZES ARE BASED
ON ABOVE GROUND STRUCTURES THAT WERE VISIBLE &
ACCESSIBLE IN THE FIELD. ASBUILT PLANS AND UTILITY
MARKOUTS DO NOT ENSURE MAPPING OF ALL
UNDERGROUND UTILITIES AND STRUCTURES. BEFORE
ANY EXCAVATION IS TO BEGIN, ALL UNDERGROUND
UTILITIES SHOULD BE VERIFIED AS TO THEIR LOCATION,
SIZE AND TYPE. A UTILITY ONE CALL WAS NOT
PERFORMED FOR THIS SURVEY.
2. THIS PLAN IS BASED ON INFORMATION PROVIDED BY A
SURVEY PREPARED IN THE FIELD BY WILKINSON INC.
AND OTHER REFERENCE MATERIAL AS LISTED HEREON.
THIS SURVEY WAS PREPARED WITHOUT THE BENEFIT OF
A TITLE REPORT.
3. THIS PROPERTY MAY BE SUBJECT TO RESTRICTIONS,
COVENANTS AND/OR…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .