Amendment_0004.pdf
PDF 187 KB Posted
- Attached to
- Eisenhower Barracks, West Point N. Y. Federal contract opportunity
- Solicitation number
- W912DS-17-B-0005
About this file
Amendment 0004
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Abstract.pdf | ||
| Amendment_0006.pdf | ||
| 08_71_00_Final.pdf | ||
| Amendment_05_All_Revised_Drawings.pdf | ||
| 23_00_00_Final.pdf | ||
| W912DS-17-B-0005-Amendment_0005.pdf | ||
| Site_Vist_Sign-In_Sheet.pdf | ||
| Amendment_0003.pdf | ||
| Amendment__0002.pdf | ||
| Amendment_0001.pdf | ||
| W912DS-17-B-0005_Specifications.pdf | ||
| Set_3_Eisenhower_Bid_Set_-_Stamped-3.pdf | ||
| Set_2_Eisenhower_Bid_Set_-_Stamped-2.pdf | ||
| Set_4_Eisenhower_Bid_Set_-_Stamped-4.pdf | ||
| Set_5_Eisenhower_Bid_Set_-_Stamped-5.pdf | ||
| Set_1_Eisenhower_Bid_Set_-_Stamped-1.pdf | ||
| W912DS-17-B-0005.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W16ROE70891780
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1) Bid opening date remains 25 August 2017 at 2:00 P.M. EST
2) Revise and Reissue Bid Schedule.
3) Revise and Reissue Bid Schedule Narrative
4) Answ er bidder questions.
5) Incorporate the Site Visit, Sign In Sheet.
NOTE: Bidders must acknow ledge receipt of this amendment by date specified in the bid (or as amended) by one of the follow ing methods:
In the space provided on the SF 1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENT BY DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE MODIFICATION OF BID, OR LATE
WITHDRAWAL OF BID (FAR 14.304)
1. CONTRACT ID CODE PAGE OF PAGES
J 1 20
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 08-Aug-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-17-B-0005
X 9B. DATED (SEE ITEM 11)
24-Jul-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
08-Aug-2017
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 1843
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DS-17-B-0005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0004
Eisenhower Barracks, West Point, NY
SECTION 00 10 00
BID SCHEDULE
Amendment 0004
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job All cost in connection with the
FFP
structurall Renovations (minus window supports) for Eisenhower Barracks.
FOB: Destination
MILSTRIP: W16ROE70891780
PURCHASE REQUEST NUMBER: W16ROE70891780
NET AMT
0002 1 Job All cost in connection with renovation of The exterior closure (minus windows) for Eisenhower Barracks
0003 1 Job All cost in connection with the
FFP
roofing for Eisenhower Barracks
0004 1 Job All cost in connection with
HVAC system for Eisenhower Barracks
0005 1 Job All cost in connection with
FFP
the Demolition for Eisenhower Barracks
0006 1 Job All cost in connection with
FFP
Supporting Facilities for Eisenhower Barracks
0007 1 Job As-built and Operation and Maintenance
FFP
Manuals
0008 1,591 Each All cost with Abatement of
FFP
fittings associated With fiberglass pipe insulation.
0009 1 Job OPTION All cost in connection with
FFP
installation for the elevator for Eisenhower Barracks
0010 1 Job OPTION All cost in connection with
FFP
Interior Construction for Eisenhower Barracks
0011 1 Job OPTION All cost in connection with
FFP
Interior Finishes for Eisenhower Barracks
0012 1 Job OPTION All cost in connection with
FFP
Plumbing for Eisenhower Barracks
0013 1 Job OPTION All cost in connection with
FFP
Fire Protection Systems for Eisenhower Barracks
0014 1 Job OPTION All cost in connection with
FFP
Electrical Power And Lighting for Eisenhower Barracks
0015 1 Job OPTION All cost in connection with
FFP
Electrical Systems for Eisenhower Barracks
0016 1 Job OPTION All cost in connection with
FFP
first floor Window structural supports for Eisenhower Barracks
0017 1 Job OPTION All cost in connection with
FFP
first floor exterior windows for Eisenhower Barracks
0018 1 Job OPTION All cost in connection with
FFP
second floor Window structural supports for Eisenhower Barracks
0019 1 Job OPTION All cost in connection with first
FFP
second exterior windows for Eisenhower Barracks
0020 1 Job OPTION All cost in connection with
FFP
third floor Window structural supports for Eisenhower Barracks
0021 1 Job OPTION All cost in connection with
FFP
third floor exterior windows for Eisenhower Barracks
0022 1 Job OPTION All cost in connection with
FFP
fourth floor Window structural supports for Eisenhower Barracks
0023 1 Job OPTION All cost in connection with
FFP
fourth floor exterior windows for Eisenhower Barracks
0024 1 Job OPTION All cost in connection with
FFP
fifth floor Window structural supports for Eisenhower Barracks
0025 1 Job OPTION All cost in connection with
FFP
fifth floor exterior windows for Eisenhower Barracks
0026 1 Job OPTION All cost in connection with
FFP
sixth floor Window structural supports for Eisenhower Barracks
0027 1 Job OPTION All cost in connection with
FFP
sixth floor exterior windows for Eisenhower Barracks
BID SCHEDULE NARRATIVE:
Bid Schedule Narrative: To better clarify the work that is represented by each CLIN in the bid schedule a brief explanation of the work for each CLIN is below. The CLINs consist mainly of the items listed below but not exclusively. When combined, the base bids and optional bids represent all of the work shown in the plans and specifications.
CLIN 0001 Structural Renovations includes the following major components of work:
Fill existing slab cracks with epoxy Install fiver reinforced polymer for slab strengthening Construct shear capitals at interior columns Repair spalled concrete surfaces Demo and replacement of slab on grade Install self-leveling grout Infill existing concrete slab openings Core Drill and Sawcut Concrete Slab Openings Construct Steel Rooftop Equipment Support Members Demolish Existing Concrete Members At Rooftop Mechanical Yard Construct Steel Parapet Screen Wall
Remove and Replace Topping Slab In Sally Ports Construct Concrete Curb Demolish Existing Areaway Infill Existing Concrete Wall Construct Concrete Pit In Basement Infill Existing Concrete Pit In Basement Remove and Replace Steam Tunnel Cover Slab
CLIN 0002 Exterior Closure includes the following major components of work:
Exterior Walls o Insulation and Vapor Barrier o Interior Skin
Repair Exterior Wall o Repair / Reseal / Repoint
Exterior Personnel Doors Exterior Wall Repair
CLIN 0003 Roofing includes the following major components of work:
All work required to install a new roof as depicted in the plans and specifications.
CLIN 0004 HVAC systems includes the following major components of work:
Heating Generating Systems Cooling Generating Systems Direct Expansion Systems Other Cooling generating Systems Air Distribution, Cooling and Heating Steam Distribution Systems Hot Water Distribution Systems Chilled Water Distribution Systems Exhaust Systems Other Distribution Systems Unit Heaters Fan Coil Units Package Units Controls and Instrumentation Systems Testing and Balancing HVAC Commissioning.
CLIN 0005 Demolition includes the following major components of work:
Exterior Closure Demolition Roofing Interior Construction & Finishes Elevators Plumbing Systems Mechanical Systems Electrical Systems Equipment & Furnishings Other Non-Hazardous Selective Building Demolition Hazardous Selective Building Demolition
CLIN 0006 Supporting Facilities includes the following major components of work:
Exterior Lighting Exterior Lighting Fixtures & Controls Utilities exterior to the building:
o Water, Sewer, and Gas o Water Supply & Distribution Systems o Potable Water Distribution o Sanitary Sewer Systems o Sanitary Sewer Piping o Sanitary Sewer Manholes & Cleanouts o Information Systems o Exterior Communications & Alarm o Telephone Systems Exterior Electrical Distribution o Underground Electrical Conductors o Ductbanks, Manholes, Handholes & Raceways
Paving, Walks, Curbs, & Gutters Storm Drainage o Storm Sewer Systems o Strom Sewer Piping o Storm Sewer Manholes o Headwalls & Catch Basins
Above Ground Site Demolition Underground Site Demolition Site Earthwork Temporary Erosion Control Fencing & Gates Security Structures Landscaping Seeding & Sodding Plantings Irrigation Systems
CLIN 0007 and CLIN 0008 – No additional note necessary.
Optional CLINS
CLIN 0009 Elevator includes the following major components of work:
All work required to install the elevator as depicted in the plans and specifications.
CLIN 0010 Interior Construction includes the following major components of work:
Partitions 132 o Fixed partitions o Interior Windows
Insulation and Vapor Barrier Standard Interior Doors Compartments, Cubicles and Toilet Partitions Toilet and Bath Accessories Chalkboards and Tack Board Identifying Devices Lockers Shelving Fire Extinguisher Cabinets Casework
CLIN 0011 Interior Finishes includes the following major components of work:
Wall Finishes o Gypsum Wallboard Finishes o Tile and Terrazzo Wall Finishes o Painting to Wall
Flooring and Floor Finishes o Tile Floor Finishes o Ceramic Tile o Terrazzao Floor Finishes o Painting and Staining Floors Ceiling and Ceiling Finishes o Gypsum Wallboard Ceiling Finish o Acoustical Ceiling Tiles & Panel o Painting and Staining Ceilings o Suspension Systems
CLIN 0012 Plumbing includes the following major components of work:
Plumbing Fixtures o Waterclosets o Urinals o Lavatories o Sinks o Showers/Tubs o Drinking Fountains & Coolers
Domestic Water Supply o Pipes and Fittings o Insulation & Identification
Sanitary Waste and Vent Systems o Waste Pipe and Fittings o Floor Drains
Rainwater Drainage System Plumbing Equipment
CLIN 0013 Fire Protection includes the following major components of work:
Water Supply Equipment & Piping Sprinkler Heads and Release Device Standpipe Equipment and Piping Fire Extinguishing Devices Special Fire Protection System
CLIN 0014 Electrical Power and Lighting includes the following major components of work:
Service and Distribution o Main Transformers o Main Switchboards o Interior Distribution Transformers o Panels o Enclosed Circuit Breakers o Other Service and Distribution
Disconnects and Switches Feeders Pull Boxes Lighting and Branch Wiring o Branch Wiring o Lighting Equipment o Other Lighting and Branch Wiring
CLIN 0015 Electrical Systems includes the following major components of work:
Communication, Security & Alarm Systems o Fire Alarm Systems o Telephone Systems o Public Address Systems o Clock and Program Systems o Existing DAS Relocation o Fire Radio DAS System o Television Systems o Security Systems o Access Control System o CCTV
Special Electrical Systems
Grounding Systems Lightning Protection
CLIN 0016 First Floor window structural supports includes the following major components of work:
Construct window supporting structures Connect supporting structures to building structure
CLIN 0017 First Floor Exterior windows includes the following major components of work:
Exterior Windows
CLIN 0018 Second Floor window structural supports includes the following major components of work:
CLIN 0019 Second Floor Exterior windows includes the following major components of work:
CLIN 0020 Third Floor window structural supports includes the following major components of work:
CLIN 0021 Third Floor Exterior windows includes the following major components of work:
CLIN 0022 Fourth Floor window structural supports includes the following major components of work:
CLIN 0023 Fourth Floor Exterior windows includes the following major components of work:
CLIN 0024 Fifth Floor window structural supports includes the following major components of work:
CLIN 0025 Fifth Floor Exterior windows includes the following major components of work:
CLIN 0026 Sixth Floor window structural supports includes the following major components of work:
CLIN 0027 Sixth Floor Exterior windows includes the following major components of work:
TOTALS
TOTAL BASE – NO OPTIONS (CLINS 0001 thru 0008)_________________________
TOTAL OPTIONS (CLINS 0009 thru 0027)__________________________
TOTAL BASE PLUS OPTIONS (CLINS 0001 thu 0027)________________________
NOTES TO BIDDERS
1. Bidders must bid on all items. Failure to bid on all items may be cause for rejection of the proposal.
2. Please see attached narrative description of the worked contained in each CLIN.
3. The Base and the options represent all work as shown in the plans and specifications.
4. Overhead and profit should be applied as a percentage to all the CLINS and not to only one CLIN.
Eisenhower Barracks, West Point, NY
Amendment 0004
To Bidders The bid schedule is revised with this amendment. The following changes shall be made to the drawings and specifications.
Please note the last day to submit questions regarding this solicitation is on 15 August 2017.
DRAWINGS
1. The following DRAWINGS have been REVISED and REISSUED:
-None
2. The following DRAWINGS have been ADDED:
-None
3. The following DRAWINGS have been REVISED but NOT REISSUED:
-AD100 – Replace Note 7 with the following: “Remove equipment, debris and furnishings not claimed by owner. Furniture to be removed from the typical room consists of, 3 metal frame beds, 3 mattresses, 3 wood dressers, 3 wood desks and 3 wood chairs.
SPECIFICATIONS:
1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:
-None
2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:
-None
3. The following SPECIFICATION SECTIONS have been REVISED but REISSUED:
-None
4. The following SPECIFICATION SECTIONS have been REVISED but NOT REISSUED:
-None
Questions and Answers:
(Questions that may be of general interest to all Offerors and/or the Government and that are not readily answered by the proceeding changes will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or simply revised to clarify and simplify the question(s). Questions and answers are issed to the Offerors “for information only” and do not revise the solicitation, plans or specifications.)
1. Question: The Locker Specs for this project list Metal but the Plans indicate Phenolic. Please confirm which is desired?
Answer: The Lockers are metal but the shower/bathroom casework (cubbies) are phenolic. There is no contradiction.
(End of Summary of Changes)