Soundview-Plans-p2.pdf
PDF 10 MB Posted
- Solicitation number
- W912DS-11-B-0006
About this file
Plans 2
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Abstract.pdf | ||
| Amendment 4.pdf | ||
| Amendment 3.pdf | ||
| Amendment 2 .doc.pdf | ||
| REGISTER.pdf | ||
| Section 10 14 23.pdf | ||
| Amendment 1 .pdf | ||
| Site VIsit.pdf | ||
| Soundview-Plans-p3.pdf | ||
| Specs.pdf | ||
| Soundview-Plans-p1.pdf | ||
| Solicitation.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LEGEND
APPROXIMATE LOCATION OF NEW PAVED
BIKE PATH
EXISTING CONTOURS
010 10 20FT
SCALE: 1’’= 10’
N
C-108
O P T
IO
N
S
IT
E
P L A
N
PROPOSED NEW MARSH CONTOURS
ADJACENT PUBLIC STREET
SALVAGED SITE STONES
SALVAGED SITE STONES
NEW PAVED BIKE PATH
MARSH RESTORATION AREA
OPTION #4 BOUNDARY POINTS
Opt 4 - #
REFERENCE LINE
POINT NORTHING EASTING
OPTION #4 BOUNDARY POINTS
OPT 4-1 234,691.0 1,022,884.4
OPT 4-2 234,685.4 1,022,907.9
OPT 4-3 234,681.2 1,022,927.9
OPT 4-4 234,677.5 1,022,949.6
OPT 4-5 234,676.6 1,022,939.1
OPT 4-6 234,674.9 1,022,934.4
OPT 4-7 234,670.9 1,022,930.0
OPT 4-8 234,666.6 1,022,926.4
OPT 4-9 234,664.7 1,022,920.7
OPT 4-10 234,665.8 1,022,913.5
OPT 4-11 234,667.1 1,022,907.9
OPT 4-12 234,670.2 1,022,904.2
OPT 4-13 234,677.5 1,022,902.1
OPT 4-14 234,682.5 1,022,899.0
OPT 4-15 234,686.6 1,022,893.0
FINISHED ASPHALT AREA
CROSS SECTION LOCATION (SHEET CG-301)
MHHW = 4.36ft
MHW = 3.92ft
M__
NEW MARSH TIDAL ELEVATIONS
MEET BIKE PATH GRADE
AT CONNECTION
ASPHALT OVERLOOK
MARSH RESTORATION AREA CROSS SECTION
TO SHOW MARSH OVERLOOK DETAIL
(SEE SHEET CG-301)
EXISTING SEWER LINE
NOTES:
1. OPTION #4 INVOLVES THE CONSTRUCTION OF A MARSH OVERLOOK AREA EXTENDING FROM THE NEW PAVED BIKE PATH TO THE MARSH RESTORATION AREA. THE NEW PAVED BIKE PATH IS CONSTRUCTED AS PART OF THE BASE PROJECT, (SEE SHEET C-105 FOR DETAILS).
2. THE MARSH OVERLOOK SHALL MEET THE GRADE OF THE NEW PAVED BIKE PATH AND SHALL BE LINED WITH STONES SALVAGED
FROM THE MARSH RESTORATION EXCAVATION, (SEE DETAIL).
3. BOUNDARY POINTS AND DIMENSIONS ARE FOR GUIDANCE ONLY. THE MARSH OVERLOOK SHALL HAVE AN ORGANIC SHAPE AS SHOWN, AND SHALL BE LOCATED A MINIMUM OF 30 FEET AWAY FROM THE NEW MHHW LEVEL OF THE MARSH RESTORATION AREA.
4. THE SALVAGED SITE STONES SHALL BE LARGE NATURAL STONE WITH A MINIMUM DIAMETER OF ONE (1) FOOT AND A MAXIMUM DIAMETER OF THREE (3) FEET, OR AS APPROVED BY THE COR. NATURAL STONE DOES NOT INCLUDE ANY CONCRETE OR CONSTRUCTION RUBBLE.
5. THE CONTRACTOR IS RESPONSIBLE FOR THE STRUCTURAL STRENGTH AND STABILITY OF THE SALVAGED SITE STONES TO LINE THE MARSH OVERLOOK, AND THE EDGE OF ROCK LINING THE ASPHALT PATH SHALL BE AT VERTICAL AS POSSIBLE TO ENSURE PUBLIC SAFETY.
6. THE OVERLOOK PATH CONSTRUCTION SHALL COMPLY WITH THE REQUIREMENTS OF PROJECT SPECIFICATIONS AND BE SIMILAR IN CONSTRUCTION AND MATERIALS TO THE NEW PAVED BIKE PATH, (SEE SHEET GC-502 FOR LARGER ASPHALT PAVING DETAIL).
7. THE OVERLOOK SHALL HAVE SLOPES NOT TO EXCEED 3% AND SHALL COMPLY WITH ALL STANDARDS AND REGULATIONS OF THE AMERICAN WITH DISABILITIES ACT (ADA), ADA ACCESSIBILITY GUILDLINES (ADAAG), AND UNIFORM FEDERAL ACCESSIBILITY STANDARDS (UFAS).
8. SEE SHEET CG-301 (CROSS SECTION 4+00) FOR THE OPTION #4 MARSH OVERLOOK AREA SHOWN ON THE MARSH CROSS SECTION.
D e s c ri p ti o n
D a te
A p p r.
8 7 6 5 4 3 2 0
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 01910
A p p r.
D a te
D e s c ri p ti o n
M a rk
M a rk
D e s ig n e d b y
A N
S I
D
S iz e
D a te
A M
P
D w n b y
A M
P
C k d b y
S o li c it ia ti o n n o
C o n tr a c t n o
P lo t d a te
P lo t b y
S c a le
R e v ie w e d b y
S u b m it te d b y
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
C
O R
P S O
F E
N G
IN
E E
R S
N
E W Y
O R
K
N E
W Y
O
K
F il e n a m e
V P a le n \S o u n d v ie w p a rk \1
D e s ig n \S
V P a rk
C -1 a n d .d g n
-J
U L -2
:4
E E
N D
A M
P
.0
:1 .0
Sheet reference number:
SHEET of 30
A M
P
V
P a l e n
S o u n d v i e w p a r k
D e s i g n
S V
P a r k
C a n d d g n
E
E N
D A
M P
S u b m i t t e d b y
J
U L
P l o t a t e
S
IS
S
IS
J u n e
S O
U N
D V
IE
W P
A R
K
A Q
U A
T
IC
E
C O
S Y
S T
E M R
E S
T O
R A
T
IO
N
B R
O N
X
N E
W Y
O R
K
DIRT +
GRAVEL ROAD
MH#8
5.0
7.0
9.0
11.0
13.0 ft
14.0
3.
3.1
25ft
N 234,750 ft
Opt 4 - 3
Opt 4 - 2
Opt 4 - 1
Opt 4 - 4
Opt 4 - 7
Opt 4 - 6
Opt 4 - 5
Opt 4 - 8 Opt 4 - 9Opt 4
- 10
Opt 4 - 11
Opt 4 - 12
Opt 4 - 13
Opt 4 - 15
Opt 4 - 14
E
,0
,0
FILTER FABRIC
C-108
ELEVATION VIEW N.T.S
MARSH OVERLOOK
TACK COAT
3" ASPHALT BINDER COURSE
COMPACTED
SUBGRADE
2" ASPHALT TOP COURSE
FINISHED GRADE OF
MARSH RESTORATION
AREA
1 2
M
IN
AGGREGATE SUBBASE
4" MIN AFTER COMPACTION
(NYSDOT TYPE 2 SUBBASE,
SEE SPEC SECTION 32 11 16)
SALVAGED SITE STONE
(CONTRACTOR SHALL
ENSURE STABILITY OF
ROCK LEDGE)
ROCK EDGE SHALL BE AS
VERTICAL AS POSSIBLE
5 EXISTING CONTOURS
LEGEND
N
030 30 60FT
SCALE: 1’’= 30’
OPTION #5 AREA BOUNDARY
Opt 5 - # OPTION #5 BOUNDARY POINT
AND POINT LABEL
C-109
O P T
IO
N
S
IT
E
P L A
N
L A
W R
E N
V
E N
U E
REFERENCE LINE
POINT NORTHING EASTING
OPTION #5 BOUNDARY POINTS
PROPOSED CONTOURS24
PROPOSED CONTOURS
AFTER PLACEM
ENT OF
COM
POST AND FILL
CROSS SECTION LOCATIONS
(SEE SHEET CG-303)
ADJACENT CONSTRUCTION PROJECT
APPROXIMATE OPTION
#5 BOUNDARY LINE
OPT 5-1 235,328.5 1,021,955.5
OPT 5-2 235,197.9 1,022,175.2
OPT 5-3 235,179.5 1,022,114.7
OPT 5-4 235,158.5 1,022,093.2
OPT 5-5 235,123.7 1,021,988.7
OPT 5-6 235,105.1 1,021,951.5
OPT 5-7 235,034.9 1,021,943.8
OPT 5-8 234,928.6 1,021,903.5
OPT 5-9 234,996.3 1,021,835.9
OPT 5-10 235,138.5 1,021,771.0
OPT 5-11 235,289.5 1,021,745.2
OPT 5-12 235,305.2 1,021,867.8
OPT 5-13 235,320.2 1,021,896.5
C O
M M
O N
W E
A L
E
N U E
PATERSON
AVENUE
ONSITE PLACEMENT AREA
NOTES:
1. OPTION #5 BOUNDARY POINTS ARE APPROXIMATE AND THE
BOUNDARY SHALL ENCOMPASS APPROXIMATELY 1.86 ACRES.
2. OPTION #5 INCLUDES CLEARING AND GRUBBING THE ENTIRE
OPTION AREA, THE PLACEMENT OF A SOIL DEMARCATION BARRIER
ON THE CLEARED AREA, THE PLACEMENT OF 1 FT OF COMPOST
ON THE DEMARCATION BARRIER, THE PLACEMENT OF 1 FT OF FILL
(SUPPLIED BY DSNY) ON THE COMPOST, AND GRASS SEEDING THE
ENTIRE AREA.
3. THE PLACEMENT OF COMPOST AND FILL ON THE OPTION AREA
SHALL BE TAPERED DOWN TO EXISTING GRADE AT THE OPTION
AREA BOUNDARY, AND TAPERED AROUND EXISTING TREES IF
NEEDED.
4. THE PROPOSED CONTOURS ARE APPROXIMATE AND GRADING OF
THE OPTION AREA SHALL PROMOTE PROPER SITE DRAINAGE. THE
MAJORITY OF THE AREA SHALL BE GRADED TO BE FAIRLY FLAT
WITH A MAXIMUM GRADING SLOPE OF 33% AT OPTION AREA EDGES.
5. SEE SHEET GC-502 FOR DETAILS ON THE SOIL DEMARCATION
BARRIER.
6. SEE SHEET CG-303 FOR CROSS-SECTIONS.
7. FILL FOR OPTION #5 SHALL NOT BE PLACED WITHIN THE 15 FT
BUFFER FROM THE EXISTING SEWER LINE. THIS BUFFER IS 15 FT
FROM THE OUTSIDE WALL OF THE SEWER PIPE AND SHALL BE
VERIFIED BY THE CONTRACTOR IN THE FIELD.
LIMIT OF DISTURBANCE FOR
ADJACENT CONSTRUCTION
PROJECT FOR NYC PARKS
EXISTING SEWER LINE
15 FOOT BUFFER FROM
EXISTING SEWER LINE
D e s c ri p ti o n
D a te
A p p r.
8 7 6 5 4 3 2 0
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G p r.
D a te
D e s c ri p ti o n
M a rk
M a rk
D e s ig n e d b y
A N
S I
D
S iz e
D a te
A M
P
D w n b y
A M
P
C k d b y
S o li c it ia ti o n n o
C o n tr a c t n o
P lo t d a te
P lo t b y
S c a le
R e v ie w e d b y
S u b m it te d b
A R
M Y E
N G
IN
E E
R D
IS
T R
R
P S O
F E
N G
IN
E E
W Y
O R
K
N E
W Y
O e n a m e
V P a le n \S o u n d v ie w p a rk \1
D e s ig n \S
V P a rk
C -1 a n d .d g n
-J
U L -2
:4
E E
N D
A M
P
.0
:1 .0
Sheet reference number:
SHEET of 30
A M
P
V
P a l e n
S o u n d v i e w p a r k s i g n
S V
P a r k
C a n d d g n
E
E N
D A
M P
S u b m i t t e d b y
J
U L
P l t e
S
IS
S
IS
J u n e
S O
U N
D V
IE
W P
A R
K
A Q
U A
T
IC
E
C O
S Y
S T
E M R
E S
T O
R A
T
IO
N
B R
O N
X
N E
W Y
O R
K
N 235,000
E
,0
,0
Opt 5 - 10
Opt 5 - 11
10’0" X 9’0"
PIPE (R5)
(N.F.V.
, S.N.3
Stan d Pi pe
Stan d Pi pe
MH#10
10’0" X 9’0"
PIPE (R5)
(N.F.V.
, S.N.3
.4
Opt 5 - 6
Opt 5 - 7
Opt 5 - 8
Opt 5 - 9
Opt 5 - 12
Opt 5 - 5
Opt 5 - 4
Opt 5 - 3
Opt 5 - 2
Opt 5 - 13
Opt 5 - 1
15’
15’
15’
8’6" X 8’0"
PIPE (R5)
(N.F.V.
, S.N.3
’9
X
’0
P
IP
E
(R
N .F .V
S .N .3
20’
20’
20’
20’
25’2
25’
25’
040 40 80FT
SCALE: 1’’= 40’
N 5 EXISTING CONTOURS
LEGEND
OPTION #6 AREA BOUNDARY
Opt # - #
MARSH RESTORATION AREA
O P
TI
O N
A R E A
OPTION #3 AREA
EXISTING BIKE PATH
N
W
P
V
B
IK
E
P
A T H
APPROXIMATE LOCATION OF NEW PAVED
BIKE PATH
APPROXIMATE OPTION
#6 BOUNDARY
OPTION #4 AREA
ONSITE PLACEMENT AREA
C-110
O P T
IO
N
S
IT
E
P L A
N
REFERENCE LINE
POINT NORTHING EASTING
OPTION #6 BOUNDARY POINTS
OPTION #6 AND #3 BOUNDARY POINTS
AND POINT LABELS
OPTION #6 PROPOSED CONTOURS19
STAGING AREA
BOUNDARY
CROSS SECTION LOCATIONS
(SEE SHEET CG-303)
OPT 6-1 234,990.3 1,022,510.0
OPT 6-2 234,739.8 1,022,854.8
OPT 6-3 234,718.7 1,022,852.3
OPT 3-17 234,697.0 1,022,834.2
OPT 3-18 234,680.3 1,022,775.3
OPT 3-19 234,629.3 1,022,718.0
OPT 3-20 234,578.0 1,022,693.3
OPT 3-21 234,551.0 1,022,688.3
OPT 3-22 234,515.9 1,022,693.5
OPT 3-23 234,445.4 1,022,725.3
OPT 3-24 234,443.0 1,022,743.9
OPT 3-25 234,410.2 1,022,766.6
OPT 3-26 234,405.0 1,022,803.8
OPT 3-27 234,402.3 1,022,818.9
OPT 3-28 234,394.6 1,022,832.7
OPT 3-29 234,382.7 1,022,834.5
OPT 3-30 234,370.5 1,022,827.0
OPT 6-4 234,343.8 1,022,808.1
OPT 6-5 234,444.2 1,022,462.8
OPT 6-6 234,482.3 1,022,421.0
OPT 6-7 234,504.6 1,022,366.3
OPT 6-8 234,517.5 1,022,309.1
OPT 6-9 234,518.5 1,022,212.0
OPT 6-10 234,538.7 1,022,141.7
OPT 6-11 234,580.6 1,022,032.4
OPT 6-12 234,624.4 1,022,044.0
OPT 6-13 234,615.5 1,022,074.0
OPT 6-14 234,593.6 1,022,119.4
OPT 6-15 234,583.8 1,022,171.6
OPT 6-16 234,580.3 1,022,234.5
OPT 6-17 234,582.0 1,022,285.6
OPT 6-18 234,594.4 1,022,335.0
OPT 6-19 234,617.5 1,022,386.9
OPT 6-20 234,647.5 1,022,428.5
OPT 6-21 234,704.5 1,022,483.7
OPT 6-22 234,768.1 1,022,527.5
OPT 6-23 234,811.2 1,022,534.4
LIMIT OF DISTURBANCE FOR
ADJACENT CONSTRUCTION
PROJECT FOR NYC PARKS
ADJACENT CONSTRUCTION PROJECT AREA
APPROXIMATE LOCATION OF STAGING
AND WORKSITE ACCESS AREAS (TO BE
CLEARED AND SEEDED IN BASE PROJECT)
ADDITIONAL CLEARING AND GRUBBING
REQUIRED FOR OPTION #6
CLEARING AND GRUBBING
FOR OPTION #6
CLEARING AND GRUBBING
FOR OPTION #6
EXISTING SEWER PIPE
15 FT BUFFER FROM
EXISTING SEWER PIPE
PROPOSED
CONTOURS
NOTES:
1. OPTION #6 BOUNDARY POINTS ARE APPROXIMATE AND THE BOUNDARY SHALL
ENCOMPASS APPROXIMATELY 3.7 ACRES.
2. OPTION #6 INCLUDES CLEARING AND GRUBBING THE OPTION AREA THAT
WAS NOT CLEARED IN THE BASE PROJECT. THIS INCLUDES THE STRIPPING OF
AT LEAST THE TOP SIX (6) INCHES OF MATERIAL.
3.OPTION #6 ALSO INCLUDES THE INSTALLATION OF A DEMARCATION BARRIER
ON THE CLEARED AREA (INCLUDING THE STAGING AND WORKSITE ACCESS
ROAD AREAS AFTER THEY ARE REMOVED), PLACEMENT OF 1 FT OF COMPOST ON
THE DEMARCATION BARRIER, THE PLACEMENT OF 1 FT OF CLEAN FILL (SUPPLIED
BY DSNY) ON THE COMPOST, AND GRASS SEEDING ON THE AREA THAT WAS NOT
INCLUDED IN THE BASE PROJECT, (THE SEEDING FOR THE STAGING AND ACCESS
ROAD AREAS IS INCLUDED IN THE BASE PROJECT).
4. THE PLACEMENT OF COMPOST AND CLEAN FILL ON THE OPTION AREA SHALL
BE TAPERED DOWN TO EXISTING GRADE AT THE OPTION AREA BOUNDARY, AND
TAPERED AROUND EXISTING TREES IF NEEDED.
5. THE PROPOSED CONTOURS ARE APPROXIMATE AND GRADING OF THE OPTION
AREA SHALL PROMOTE PROPER SITE DRAINAGE. THE MAJORITY OF THE OPTION
AREA SHALL BE GRADED TO BE FAIRLY FLAT WITH A MAXIMUM SLOPE OF 33%
AT AREA EDGES.
6. SEE SHEET GC-502 FOR DETAILS ON THE SOIL DEMARCATION BARRIER.
7. SEE SHEET CG-303 FOR CROSS-SECTIONS.
8. THE FILL FOR OPTION #6 MAY NOT BE PLACED WITHIN THE 15 FOOT BUFFER
AROUND THE EXISTING SEWER LINE.
D e s c ri p ti o n
D a te
A p p r.
8 7 6 5 4 3 2 0
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G p r.
D a te
D e s c ri p ti o n
M a rk
M a rk
D e s ig n e d b y
A N
S I
D
S iz e
D a te
A M
P
D w n b y
A M
P
C k d b y
S o li c it ia ti o n n o
C o n tr a c t n o
P lo t d a te
P lo t b y
S c a le
R e v ie w e d b y
S u b m it te d b
A R
M Y E
N G
IN
E E
R D
IS
T R
R
P S O
F E
N G
IN
E E
W Y
O R
K
N E
W Y
O e n a m e
V P a le n \S o u n d v ie w p a rk \1
D e s ig n \S
V P a rk
C -1 a n d .d g n
-J
U L -2
:4
E E
N D
A M
P
.0
:1 .0
Sheet reference number:
SHEET of 30
A M
P
V
P a l e n
S o u n d v i e w p a r k s i g n
S V
P a r k
C a n d d g n
E
E N
D A
M P
S u b m i t t e d b y
J
U L
P l t e
S
IS
S
IS
J u n e
S O
U N
D V
IE
W P
A R
K
A Q
U A
T
IC
E
C O
S Y
S T
E M R
E S
T O
R A
T
IO
N
B R
O N
X
N E
W Y
O R
K
22 23
E
,0
,5
N 235,000
E
,0
,5
N 234,500N 234,500
E
,0
,0
CONC.
D.W.
D.W.
CONC.
O.P
CONC.
D.W.
C O
N
W
MH#8
10’0" X 9’0" PIPE (R5)(N.F.V., S.N.3)
Opt 6 - 7
Opt 6 - 8
Opt 6 - 10
Opt 6 - 11
Opt 6 - 12
Opt 6 - 17
Opt 6 - 1
Opt 6 -
O pt
O pt
O pt
Opt 6 - 23
Opt 3 - 30
Opt 3 - 29
Opt 3 - 28
Opt 3 - 27
Opt 3 - 26 Opt 3 - 25
Opt 3 - 24
Opt 3 - 23
Opt 3 - 22
Opt 3 - 21
Opt 3 - 20
Opt 3 - 19
Opt 3 - 18
Opt 3 - 17
Opt 6 - 1
Opt 6 - 2
Opt 6 - 3
Opt 6 - 4
Opt 6 - 6
Opt 6 - 9
Opt 6 - 13
Opt 6 - 14 Opt 6 - 15 Opt 6 - 16
I
G
A V
L
Opt 6 - 5
B E
A
E N
U E
T A
Y L
E N
GC-101
LEGEND
EXISTING CONTOURS
N
POINT NORTHING EASTING
POINT NORTHING EASTING
C-1 234,801.7 1,022,521.7
C-2 234,770.9 1,022,627.3
C-3 234,757.1 1,022,615.2
C-4 234,786.7 1,022,516.0
C-5 234,757.9 1,022,746.8
C-6 234,781.8 1,022,822.9
C-7 234,769.4 1,022,837.5
C-8 234,746.4 1,022,758.7
C-9 234,728.9 1,022,776.7
C-10 234,720.1 1,022,819.0
C-11 234,715.0 1,022,861.8
C-12 234,688.2 1,023,013.0
C-13 234,683.5 1,023,066.7
C-14 234,688.2 1,023,120.3
C-15 234,717.2 1,023,195.2
C-16 234,781.2 1,023,307.1
C-17 234,755.2 1,023,295.6
C-18 234,705.0 1,023,204.5
C-19 234,678.7 1,023,140.9
C-20 234,669.8 1,023,087.2
C-21 234,680.1 1,022,973.5
C-22 234,700.6 1,022,862.3
C-23 234,705.3 1,022,817.2
C-24 234,712.1 1,022,760.3
ONSITE PLACEMENT AREA
MARSH RESTORATION AREA
S - # STAGING AREA BOUNDARY POINT
AND POINT LABEL
C - #
EXISTING BIKE PATH
NEW BIKE PATH
ENTRANCE TO PARK WITH
TEMPORARY SECURITY GATE
APPROXIMATE LOCATION OF NEW
PAVED BIKE PATH
TEMPORARY SECURITY FENCE OR
GATES FOR BASE PROJECT
080 80 160FT
SCALE: 1’’= 80’
OPTION #6 AREA
BOUNDARY LINE
ADJACENT CONSTRUCTION PROJECT
WORKSITE ACCESS ROAD BOUNDARY
POINT AND POINT LABEL
W O
R K S
IT
C E
D S T
A G
IN
E A S
STAGING AREA SURROUNDED
BY SECURITY FENCE
S-1 234,826.0 1,022,676.5
C-9 234,728.9 1,022,776.7
C-24 234,712.1 1,022,760.3
S-2 234,708.8 1,022,732.6
S-3 234,664.4 1,022,656.5
S-4 234,536.2 1,022,573.6
S-5 234,501.4 1,022,527.0
S-6 234,487.3 1,022,457.5
S-7 234,522.3 1,022,365.8
S-8 234,601.6 1,022,399.8
S-9 234,575.2 1,022,457.4
S-10 234,625.6 1,022,506.8
S-11 234,654.7 1,022,484.2
S-12 234,726.8 1,022,551.0
S-13 234,684.0 1,022,594.3
S-14 234,736.4 1,022,634.3
S-15 234,756.3 1,022,614.4
STAGING AREA BOUNDARY POINTS
(FOR STAGING, STOCKPILING, AND DEWATERING STAGING AREA)
POINT NORTHING EASTING
STAGING AREA BOUNDARY POINTS
S-16 234,718.5 1,022,856.0
S-17 234,747.4 1,022,859.4
S-18 234,740.3 1,022,870.9
S-19 234,734.6 1,022,890.2
S-20 234,731.7 1,022,913.1
S-21 234,732.5 1,022,935.7
S-22 234,745.1 1,023,010.1
S-23 234,750.3 1,023,051.3
S-24 234,755.4 1,023,075.6
S-25 234,685.1 1,023,084.2
S-26 234,687.1 1,023,040.7
S-27 234,694.7 1,022,987.1
S-28 234,711.6 1,022,899.6
(FOR STAGING AREA SURROUNDED BY SECURITY FENCE)
AREA AVAILABLE FOR
STAGING, STOCKPILING,
AND DEWATERING
STAGING AREA SURROUNDED BY
TEMPORARY SECURITY FENCING
WORKSITE ACCESS ROADS AND
PROPOSED STAGING AREA
ADDITIONAL TEMPORARY SECURITY
FENCE NEEDED FOR OPTION #5
TEMPORARY SECURITY FENCE GATES
WORKSITE ACCESS BOUNDARY POINTS
WORKSITE EXIT WITH
ANTI-TRACKING PAD AND
TEMPORARY SECURITY GATE
OPTION #5 APPROXIMATE
TEMPORARY CLF LINE
OPTION #5 AREA
BOUNDARY LINE
EXISTING SEWER LINE
15 FT BUFFER FROM
EXISTING SEWER LINE
REFERENCE LINE
TEMPORARY CLF
SECURITY GATES
ACCESS TO ONSITE
PLACEMENT AREA
NOTES:
1. BOUNDARY POINTS ARE FOR GUIDANCE ONLY AND THE SHOWN AREAS AND FENCE LINES ARE APPROXIMATED. FENCE LINES MAY BE ALTERED WITH APPROVAL FROM THE COR FOR EASE OF CONSTRUCTION OR TO AVOID OBSTRUCTIONS.
2. THE MAIN WORKSITE ACCESS ROAD SHALL BE LOCATED ON THE APPROXIMATE LOCATION OF THE NEW BIKE PATH IN
ORDER TO MINIMUM ADDITIONAL EFFECTS TO THE SURROUNDING VEGETATION.
3. ANY STOCK PILING OR DEWATERING OPERATIONS SHALL OCCUR WITHIN A STAGING AREA AND PROPER SEDIMENT AND EROSION CONTROL MEASURES SHALL BE PROVIDED. THE SHOWN STAGING AREA IS AN APPROXIMATE AVAILABLE AREA FOR STAGING, DEWATERING, AND STOCKPILING ACTIVITIES. THE CONTRACTOR MAY PROPOSE OTHER OR ADDITIONAL STAGING
AREAS TO BE APPROVED BY THE CONTRACTING OFFICER (COR).
4. THE WORKSITE ACCESS AND STAGING AREA SHALL BE SITUATED TO MINIMIZE DISTURBANCE TO SURROUNDING TREES, AND TREE PROTECTION SHALL BE PROVIDED FOR ADJACENT TREES AS PER SHEET GC-102.
5. WORKSITE ACCESS ROADS SHALL BE 14 FEET WIDE MINIMUM.
6. TEMPORARY CHAIN-LINK SECURITY FENCE SHALL BE PLACED AROUND PORTION OF THE STAGING AREA AND AROUND THE PROJECT BOUNDARY AS SHOWN. THIS FENCING SHALL BE 8 FOOT HIGH CHAIN-LINK FENCE AND SHALL REMAIN IN PLACE FOR
THE DURATION OF THE PROJECT.
7. GATES IN THE SECURITY FENCE SHALL BE PROVIDED AS SHOWN AND ADDITIONAL GATES MAY BE PROVIDED AS NEEDED WITH APPROVAL FROM THE CONTRACTING OFFICER (COR). A SECURE PERIMETER SHALL ALWAYS BE MAINTAINED.
8. NEW TEMPORARY SECURITY FENCE MAY BE TIED INTO EXISTING CHAIN LINK FENCE AROUND THE PARK AS LONG AS THE EXISTING FENCE IS REPAIRED AND PROVIDES AN ADEQUATELY SECURED PERIMETER AROUND THE PROJECT SITE.
9. THE PORTION OF THE STAGING AREA TO BE SURROUNDED BY TEMPORARY SECURITY FENCE SHALL HOLD THE CONSTRUCTION TRAILERS AND ANY EQUIPMENT WHILE NOT IN USE. THE CONSTRUCTION TRAILERS SHALL NOT BE PLACED DIRECTLY UPON THE EXISTING SEWER LINE AND SHALL BE KEPT OUT OF THE SEWER LINE 15 FOOT BUFFER AREA AS MUCH AS POSSIBLE. THE EXISTING MANHOLE (MH#8) IN THIS STAGING AREA SHALL BE MADE AVAILABLE IF REQUESTED BY THE COR OR NYCDEP. THE CONTRACTOR WILL BE RESPONSIBLE FOR ANY DAMAGE THAT MAY OCCUR TO THE SEWER LINE DURING THE PROJECT.
10. AN ANTI-TRACKING PAD OR WASH STATION SHALL BE LOCATED AT THE WORKSITE ACCESS ROAD EXIT TO CONTROL THE
SPREAD OF SEDIMENTS FROM THE PROJECT SITE BY CONSTRUCTION VEHICLES.
11. IF OPTION #5 IS ENACTED, ADDITIONAL TEMPORARY SECURITY FENCE IS REQUIRED AROUND THIS AREA AS SHOWN. ADDITIONAL CLF MAY BE PLACED FOR THE PROJECT WITH APPROVAL FROM THE CONTRACTING OFFICER REPRESENTATIVE (COR).
12. WHEN COMPLETED WITH THE PROJECT, THE CONTRACTOR SHALL REMOVE ALL MATERIALS USED IN THE CONSTRUCTION OF THE STAGING AREAS, ACCESS ROADS, AND FENCE LINES. THE CONTRACTOR SHALL ENSURE THAT NO ADDITIONAL MATERIAL OR LOADS AREA LEFT ON TOP OF THE EXISTING SEWER LINE OR WITHIN THE SEWER LINE BUFFER.
13. AFTER FINAL REMOVAL OF THE TEMPORARY STAGING AREA AND ACCESS ROADS, THE AFFECTED GROUND SHALL BE
GRASS SEEDED. SEE SHEET CE-502 FOR GRASS SEED MIX TABLES.
TEMPORARY CLF FOR
BASE PROJECT
TEMPORARY CLF LINE
FOR BASE PROJECT
ANTI-TRACKING PAD LOCATION
(SEE SPEC SECTION 02 38 10.00 18)
D e s c ri p ti o n
D a te
A p p r.
8 7 6 5 4 3 2 0
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G p r.
D a te
D e s c ri p ti o n
M a rk
M a rk
D e s ig n e d b y
A N
S I
D
S iz e
D a te
A M
P
D w n b y
A M
P
C k d b y
S o li c it ia ti o n n o
C o n tr a c t n o
P lo t d a te
P lo t b y
S c a le
R e v ie w e d b y
S u b m it te d b
A R
M Y E
N G
IN
E E
R D
IS
T R
R
P S O
F E
N G
IN
E E
W Y
O R
K
N E
W Y
O e n a m e
V P a le n \S o u n d v ie w p a rk \1
D e s ig n \S
V P a rk
G
C -1 a n d .d g n
-J
U L -2
:5
E E
N D
A M
P
.0
:1 .0
Sheet reference number:
SHEET of 30
A M
P
V
P a l e n
S o u n d v i e w p a r k s i g n
S V
P a r k
G C a n d d g n
E
E N
D A
M P
S u b m i t t e d b y
J
U L
P l t e
S
IS
S
IS
J u n e
S O
U N
D V
IE
W P
A R
K
A Q
U A
T
IC
E
C O
S Y
S T
E M R
E S
T O
R A
T
IO
N
B R
O N
X
N E
W Y
O R
K
.4
1+65.4
E
,0
,5
N 235,000
N 235,500
N 234,500
S - 4
C - 15
CONC.
D.W.
C.P
C.P
CONC.
D.W.
D.W.
CONC.
O.P
CONC.
D.W.
C O
N
W
DIRT +
GRAVEL ROAD
10’0" X 9’0
" PIPE (R5
)(N.F.V
., S.N .3)
MH#8
MH#9
MH#10
Stan d Pi pe
Stan d Pi pe
1+00
0+00
E
,0
,5
E
,0
,5
5’
5’ 5’
5’
5’
5’
5’
5’
10’
10’
10’
10’
10’
A S
P H
A L
T
ASPHALT
A S P
H A L T
ASPHALT
L E
L A
E N
U E
S - 7
S - 1
S - 2
S - 15
S - 14 S - 12
S - 11
S - 10
S - 8
S - 13
S - 9
S - 6
C - 1
C - 4
C - 2
C - 3 C - 5
C - 8
C - 6
C - 7
C - 9
C - 10
C - 23
C - 11
C - 22
C - 12
C - 21 C - 13
C - 20
C - 14
C - 19
C - 18
C - 16
C - 17
S - 16
S - 17
S - 18
S - 19
S - 20 S - 21
S - 22
S - 24 S - 23
S - 25S - 26
S - 27
S - 28
A V
15’
15’
15’
15’
15’
15’
S - 5
ASPHALT
’9
X
’0
P
IP
E
(R
N .F .V
S .N .3
8’6" X 8’0"
PIPE (R5)
(N.F.V.
, S.N.3
’9
X
’0
P
IP
E
(R
N .F .V
S .N .3
’9 "X
’0 "P
IP
E
(R
N .F .V S .N .3
RIM=14.33
INV=-0.8
ASPHALT
20’
20’
20’
20’
20’2
20’
’ 2
C - 24
25’2
25’
25’
CONC.
D.W.
5.0 ’ C
ONC.
WALL
CONC.
S.W.
S - 3
L A
W R
E N
E N
U E
PATERSON
AVENUE
B E
A
E N
U E
T A
Y L
E N
E R I
E N
OBRIEN AVENUE
L A
E N
M M
O N
W E
A L
E N
GC-102
R
E E
P
R O
T E
C T
IO
A
N
N
LEGEND
APPROXIMATE LOCATION OF NEW PAVED
BIKE PATH
EXISTING CONTOURS
X TREE TO BE REMOVED
BRUSH LINE
FOREST LINE
TREE TO REMAIN (WITHOUT PROTECTION)
MARSH RESTORATION AREA
STAGING AREA
STAGING AREA
ONSITE PLACEMENT AREA
080 80 160FT
SCALE: 1’’= 80’
ADDITIONAL TREES TO BE PROTECTED IF
PROJECT OPTION #5 IS ENACTED
REFERENCE LINE
EXISTING BIKE PATH
NEW BIKE PATH
ADDITIONAL TREES TO BE PROTECTED IF
PROJECT OPTION #6 IS ENACTED
PROJECT AREA TREES FOR REMOVAL TREES TO PROTECT
ESTIMATED TREE REMOVAL AND PROTECTION QUANTITIES
OPTION #6
BOUNDARY
NOTE: THE ABOVE TABLE DISPLAYS THE QUANTITIES OF TREES TO BE REMOVED AND THE QUANTITIES THAT REQUIRE PROTECTION BY PROJECT AREA. THESE QUANTITIES ARE FOR APPROXIMATION ONLY. THE TREE DATA IS ONLY CURRENT TO THE DATE OF THE SURVEYS AND TREE CONDITIONS AND QUANTITIES MAY HAVE CHANGED AT THE PROJECT SITE. THE CONTRACTOR IS RESPONSIBLE FOR THE CURRENT SITE CONDITIONS, NOT THOSE DISPLAYED ON THIS PLAN SHEET. THE CONTRACTOR WILL NOT RECEIVE ADDITIONAL PAYMENTS FOR PROTECTING OR REMOVING TREES NOT DISPLAYED ON THIS PLAN SHEET, YET THE CONTRACTOR IS
RESPONSIBLE FOR PROVIDING SUCH SERVICES.
PROPOSED MARSH CONTOURS
BASE PROJECT:
MARSH RESTORATION 51 5
STAGING, ACCESS, & BIKE PATH 15 36
ONSITE PLACEMENT 4 0
OPTION #5 AREA: 0 33
OPTION #6 AREA: 0 12
TREE TO REQUIRE TREE PROTECTION
(SEE NOTE 2)
EXISTING SEWER LINE
15 FT BUFFER FROM
EXISTING SEWER LINE
OPTION #5 AREA
NOTES:
1. TREES AROUND THE PROJECT SITE NOT NOTED FOR REMOVAL SHALL BE
PROTECTED FROM DAMAGE.
2. TREE PROTECTION REQUIRES ORANGE CONSTRUCTION FENCING BE
INSTALLED AROUND THE DRIPLINE OF THE TREE WHERE THE SPACE IS
PROVIDED. IF INADEQUATE SPACE IS AVAILABLE, THE LARGEST POSSIBLE
RADIUS SHALL BE PROVIDED AND MAINTAINED.
3. TREES IN THE ONSITE PLACEMENT AREAS THAT ARE NOT MARKED TO BE
REMOVED SHALL REMAIN IN PLACE AND BE BURIED BY THE EXCAVATED FILL
MATERIAL TO THE ELEVATIONS AS NOTED IN THE ONSITE PLACEMENT AREA
PLAN (SHEET C-106).
4. ALL TREE PROTECTION FENCING SHALL BE INSTALLED AS PER THE ORANGE
CONSTRUCTION FENCE DETAIL ON SHEET GC-502.
5. TREE SPECIES AND LOCATIONS ARE FROM THE SITE SURVEYS AND ARE ONLY
CURRENT FROM THE DATE OF THE SURVEY.
6. ALL TREES IN OPTION AREAS #5 AND #6 SHALL BE PROTECTED FROM
CLEARING AND GRUBBING. THE FILL AND COMPOST TO BE PLACED IN THESE
OPTION AREAS MAY BE PLACED UP TO THE TREE TRUCKS OF THESE TREES OR
THE FILL MAY BE TAPERED DOWN TO THE EXISTING GRADE AROUND THE BASE
OF THESE TREES IF NEEDED IN ORDER TO AVOID ABRUPT EDGES OR DROPS IN
GRADE, OR TO PROTECT THE INTEGRITY OF THE TREES.
7. ANY TREES THAT OVERHANG THE WORK AREA AND HAVE LIMBS THAT ARE
DAMAGED DURING CONSTRUCTION SHALL BE PRUNED ACCORDING TO THE
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI) A300 STANDARDS FOR TREE
CARE OPERATIONS, ANSI A300 (PART 1) - 2008 PRUNING.
8. IN THE EVENT OF PROJECT AREA CHANGES OR ADDITIONAL STAGING AREAS
LOCATED, THE CONTRACTOR SHALL PROTECT AS MANY TREES AS POSSIBLE
FROM REMOVAL.
D e s c ri p ti o n
D a te
A p p r.
8 7 6 5 4 3 2 0
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G p r.
D a te
D e s c ri p ti o n
M a rk
M a rk
D e s ig n e d b y
A N
S I
D
S iz e
D a te
A M
P
D w n b y
A M
P
C k d b y
S o li c it ia ti o n n o
C o n tr a c t n o
P lo t d a te
P lo t b y
S c a le
R e v ie w e d b y
S u b m it te d b
A R
M Y E
N G
IN
E E
R D
IS
T R
R
P S O
F E
N G
IN
E E
W Y
O R
K
N E
W Y
O e n a m e
V P a le n \S o u n d v ie w p a rk \1
D e s ig n \S
V P a rk
G
C -1 a n d .d g n
-J
U L -2
:5
E E
N D
A M
P
.0
:1 .0
Sheet reference number:
SHEET of 30
A M
P
V
P a l e n
S o u n d v i e w p a r k s i g n
S V
P a r k
G C a n d d g n
E
E N
D A
M P
S u b m i t t e d b y
J
U L
P l t e
S
IS
S
IS
J u n e
S O
U N
D V
IE
W P
A R
K
A Q
U A
T
IC
E
C O
S Y
S T
E M R
E S
T O
R A
T
IO
N
B R
O N
X
N E
W Y
O R
K
6" ATLANTIS
6" ATLANTIS
6" ATLANTIS
8" ATLANTIS
12" POPLAR
6" ATLANTIS (2)
8" POPLAR
8" POPLAR
8" POPLAR
10" POPLAR (2)
12" POPLAR
10" POPLAR (2)
10" POPLAR
12" POPLAR
10" POPLAR
8" POPLAR (2)
8" POPLAR
6" POPLAR
8" POPLAR
12" POPLAR
6" POPLAR
6" POPLAR
8" POPLAR
10" POPLAR
12" POPLAR
15" POPLAR
14" POPLAR
8" POPLAR (2)
8" POPLAR
10" POPLAR
15" POPLAR (2)
0+00
1+00
1+65.4
.4
N 235,500
8" POPLAR (2)
7" ALANTIS
15" LOCUST
7" LOCUST
6" LOCUST
9" LOCUST
7" BLACK CHERRY (3)
20" MULBERRY
20" MULBERRY
10" BOXELDER (2)
7" BLACK CHERRY (3)
7" ELM (2)
11" POPLAR
8" POPLAR
11" POPLAR
8" POPLAR (3)
11" POPLAR
11" POPLAR
8" POPLAR
8" POPLAR (2)
16" POPLAR
14" POPLAR
8" POPLAR (2)
8" POPLAR
8" POPLAR
10" POPLAR
7" POPLAR
12" POPLAR
10" POPLAR
20" POPLAR
10" POPLAR
6" POPLAR
11" POPLAR
8" POPLAR (2)
N 235,500
N 235,000
E
,0
,5
N 234,500
N 235,000
2 STORY FRAME
X X
X
XXX
X
XX
X
X
XX
X XX
X
X
X
XX
X
X
X X
BRUSH
BRUSH
BRUSH
BRUSH
BRUSH
BRUSH
BRUSH
BRUSH
BRUSH
BRUSH
BRUSH
BRUSH
BRUSH
BRUSH
BRUSH
BRUSH
BRUSH
BRUSH
BRUSH
BRUSH
BRUSH
BRUSH
BRUSH
BRUSH
BRUSH
BRUSH
BRUSH
BRUSH
BRUSH
BRUSH
BRUSH
BRUSH
BRUSH
BRUSH
BRUSH
BRUSH
BRUSH
BRUSH
BRUSH
BRUSH
BRUSH
BRUSH BRUSH
BRUSH
BRUSH
BRUSH
BRUSH
BRUSH
BRUSH
BRUSH
BRUSH
BRUSH
BRUSH
BRUSH
O
Y
I
C K
2 STY
FRAME
# 17
2 STY
BRICK
# 17
2 STY
BRICK
# 17
2 STY
FRAME
# 17
2 STY
FRAME
# 17
832 STY
FRAME
# 17
2 STORY FRAME
# 41
GARAGE
2 STY
BRICK
# 18
R A
CONC.
D.W.
# 3
# 3
# 3
# 3
C.P
C.P
CONC.
PATIO
SHED
SHED
CONC.
D.W.
D.W.
CONC.
# 3
# 3
# 3
# 3
O.P
GARAGE
CONC.
D.W.
# 3
# 3
SHED
SHED
SHED
FR.
SHED
# 3
# 3
GARAGE
C O
N
W
1 STY FRAME
# 12
1 STY FRAME
2 STY FRAME
# 12
STY
FRAME
1 STY
FRAME
1�
STY FR.
# 18
2 S
TY B
RICK
2 S
TY
BRICK
& F
RAME
1�STY
FRAME
# 3
2 S
TY B
R.
& F
RAME
# 3
2 S
TY B
RICK
& F
RAME
2 S
TY F
RAME
& B
RICK
1 S
TY F
RAME
# 3
1 S
TY F
RAME
2 S
TY F
RAME
# 3
S T
Y
F R
A M E
B R I C
K
2 S
TY F
RAME
2 S
TY F
RAME
# 3
2 S
TY F
RAME
& B
RICK
2 S
TY F
RAME
2 S
TY F
RAME
O
I
C K
DIRT +
GRAVEL ROAD
MH#8
MH#9
MH#10
Stan d Pi pe
Stan d Pi pe
SUM 72" POPLAR
14.5" POPLAR (2)
X X
E
,0
,5
E
,0
,5
E
,0
,5
BRUSH
BRUSH
6"
LOCUST
4" LOCUST
26" POPLAR
8" POPLAR
6" POPLAR
8"POPLAR
8" SUMAC
20" POPLAR
24" MULBERRY
24" POPLAR
30" POPLAR
15" POPLARS (3)
32" POPLAR
16" POPLAR
20" POPLAR
18" POPLAR
20" POPLAR
32" MULBERRY
7" POPLAR
16" POPLAR
18" POPLAR
16" POPLAR
20" POPLAR
10" POPLAR
10" POPLAR
4" SUMAC
14" POPLAR
10" POPLAR
7" POPLAR
9" POPLAR
10" POPLAR
14" POPLAR
9" POPLAR
28" POPLAR
32" BOXELDER
33" MULBERRY
10" BLACK CHERRY
30" ALANTIS
10" ALANTIS
35" POPLAR
QUAD POPLAR
10"-10"-10"-12"
20" BLACK CHERRY (2)
SUM 40" POPLAR
14" ALANTIS
6" POPLARS (2)
10" BRADFORD PEAR
5" POPLARS (2)
14" ALANTIS
8" POPLAR
10" POPLAR
27" POPLAR
11" POPLAR
7" POPLAR
9" POPLAR
9" POPLAR
11" POPLAR
7" POPLAR
8" POPLAR
8" POPLAR
11" POPLARS (2)
9" ALANTIS
5’
5’ 5’
5’
5’
X
15" POPLAR
X
8"
TREE OF HEAVEN
X
12" POPLAR
X
18" POPLAR
X
10" POPLAR
X8" POPLAR
X6" MAPLE
10’
10’
10’
X
6" LOCUST
10"
TREE OF HEAVEN
10"
TREE OF HEAVEN
15"
TREE OF HEAVEN
14"
TREE OF HEAVEN
14"
ROYAL PALONIA
X
4" ELM
X
12" SUMAC
2 8" ELMS
16"
TREE OF HEAVEN
X
4" ELM
20"
TREE OF HEAVEN
X
QUAD 12" POPLAR
A S
P H
A L
T
X8" SUMAC
X
16" POPLAR
X
14" LOCUST
X
6" POPLAR
BRUSH
10" POPLAR
X
6" LOCUST
16" WALNUT
10" MAPLE
X
4" POPLAR
12" MULBERRY
8" LOCUST
6" POPLAR
X
4" POPLAR
8" POPLAR
X12"
TREE OF HEAVEN
X
8" POPLAR
8" POPLAR
8" POPLAR
8" POPLAR
12" LOCUST
ASPHALT
6" MULBERRY
X
16" POPLAR
12"
TREE OF HEAVEN
X
12" LOCUST
10" SUMAC
A S P
H A L T
12" LOCUST
X18" LOCUST
32" POPLAR
X
24" POPLAR
ASPHALT
9" BRADFORD PEAR
22" POPLAR
BRUSH
L E
L A
E N
U E
8" MULBERRY
12"
TREE OF HEAVEN
XX
8" BRADFORD PEAR
6" ELM
X
QUAD 15" POPLAR
A V
X
6" SUMAC
X
8" BRADFORD PEAR
X
24" POPLAR
X
20" POPLAR
20" POPLAR
X
16" POPLAR
6" SUMAC
16" SUMAC
6" LOCUST
12" SUMAC
6" SUMAC
18"
WILLOW OAK
X
24" POPLAR
18" POPLAR
6" LOCUST
X
8" LOCUST
X
8" CHERRY
12" LOCUST
4" MULBERRY
6" LOCUST
9" BRADFORD PEAR
18" LOCUST
6" LOCUST
10" LOCUST
10"
TREE OF HEAVEN
15’
15’
15’
15’
15’
15’
FRAME
GARAGE
1 STY
FRAME
1 STY
FRAME
6" LOCUST
6" MULBERRY
X
28" POPLAR
24" POPLAR
8" LOCUST
6"
TREE OF HEAVEN
12" MAPLE
8" LOCUST
8" SUMAC
15" LOCUST
16" LOCUST
X
12" POPLAR
3 8" LOCUSTS
8" SUMAC10" SUMAC
14"
TREE OF HEAVEN
18" LOCUST
16" MAPLE
30" POPLAR
12" LOCUST
2 6" SUMACS
X4" POPLAR
8" MAPLE
4" LOCUST
10" LOCUST
24"
POPLAR
28" POPLAR
15" LOCUST
X
5" SUMAC
4" MULBERRY
26" POPLAR
X
X5" SUMAC
3 8"
LOCUSTS
X4" POPLAR
X
4" POPLAR
4" LOCUST
X6" POPLAR
8" LOCUST
ASPHALT
10" LOCUST
6"
18" POPLAR
3 6"
LOCUSTS
8" MAPLE
’9
X
’0
P
IP
E
(R
N .F .V
S .N .3
10’0" X 9’0"
PIPE (R5)
(N.F.V.
, S.N.3
8’6" X 8’0"
PIPE (R5)
(N.F.V.
, S.N.3
’9
X
’0
P
IP
E
(R
N .F .V
S .N .3
’9 "X
’0 "P
IP
E
(R
N .F .V S .N .3
RIM=14.33
INV=-0.8
2 8" LOCUSTS 8"5"
8"4"
8"
8" MAPLE
8" LOCUST
16"
POPLAR
5"
4"
5"
GROUP OF LOCUSTS
4"
6"
8" QUAD
MULBERRY
ASPHALT
8"
MULBERRY
20’
20’
20’
20’
20’2
20’
20’
’ 2
10"
TREE OF HEAVEN
10" LOCUST
8" MAPLE
24" POPLAR
SUMMER VEGETATIONSUMMER VEGETATION
2 STY BRICK FRAME
2 STY BRICK
& FRAME
2 STY BRICK
& FRAME
2 STY BRICK
& FRAME
STORY
BRICK & FRAME
# 33
# 33
# 33
# 34
# 34
# 34
# 34
# 34
# 35
# 35
# 34
# 34
# 34
# 35
# 35
# 35
# 35
# 17
# 17
# 17
SHED
SHED
SUMMER VEGETATIONSUMMER VEGETATION
X
SUMMER VEGETATIONSUMMER VEGETATION
25’2
25’
25’
SUMMER VEGETATIONSUMMER VEGETATION
SUMMER VEGETATIONSUMMER VEGETATION
SUMMER VEGETATIONSUMMER VEGETATION
1 STY FR.
GARAGE
CONC.
D.W.
CONC.
2 STY FRAME
A M
E
A M
E
1 STY BRICK
# 25
1 STY BRICK
# 25
1 STY FRAME
# 11
1 STY FRAME
# 11
1 STY FRAME
# 11
2 STY FRAME
# 11
2 STY FRAME
# 11
1 STY FRAME
# 11
2 STY FRAME
# 11
1 STY FRAME
# 12
1 STY FRAME
# 12
1 STY FRAME
# 12
1 STY FRAME
# 1
1 STY FRAME
GARAGE
1 STY FRAME
# 11
2 STY FRAME
# 11
1 STY FRAME
# 11
1 STY FRAME
# 12
1 STY FRAME
# 12
2 STY
FR.
2 STY
MASONRY
1 STY FRAME
# 12
SUMMER VEGETATION
SUMMER VEGETATION
SUMMER VEGETATION
SUMMER VEGETATION
S U
M M
ER
V
EG
ETA
TIO
N
SUMMER VEGETATION
SUMMER V
EGETATION
S U
M M
ER
V
EG
ETA
TIO
N
SUMMER VEGETATION
SUMMER V
EGETATION
5.0 ’ C
ONC.
WALL
CONC.
S.W.
Y
F R
A M
E
2 STY
FRAME
2 S
TY F
RAME
# 1
1 S
TY B
RICK
# 1
1 S
TY F
RAME
# 1
1 S
TY F
RAME
# 1
1 STY FRAME
# 12
1 STY FRAME
# 12
2 STY FRAME
# 12
1 STY FRAME
# 12
2 STY FRAME
# 11
1 STY FRAME
# 11
1�
STY FRAME
# 11
L A
W R
E N
E N
U E
PATERSON
AVENUE
B E
A
E N
U E
T A
Y L
E N
E R I
E N
L A
E N
M M
O N
W E
A L
E N
LEGEND
EXISTING CONTOURS
GC-103
E R
O S
E
D
IM
E N
T
C
O N
T R
O L
P L A
N
080 80 160FT
SCALE: 1’’= 80’
APPROXIMATE LOCATION OF NEW
PAVED BIKE PATH
APPROXIMATE SILT FENCE
LOCATIONS FOR BASE PROJECT
APPROXIMATE SILT FENCE LOCATION
FOR PROJECT OPTIONS
PROPOSED MARSH CONTOURS
BASE PROJECT SILT FENCE
BASE PROJECT SILT FENCEBASE PROJECT SILT FENCE
ADDITIONAL SILT FENCE REQUIRED
FOR OPTION #6 WORK
ADDITIONAL SILT FENCE REQUIRED
FOR OPTION #6 WORK
ONSITE PLACEMENT AREA
OPTION #6 AREA
STAGING AREA
MARSH RESTORATION AREA
APPROXIMATE OPTION #5
BOUNDARY LINE
APPROXIMATE OPTION #6
BOUNDARY LINE
APPROXIMATE ACCESS
ROAD LOCATION
APPROXIMATE ACCESS ROAD LOCATIONAPPROXIMATE ACCESS ROAD LOCATION
REFERENCE LINE
REFERENCE LINE
TURBIDITY CURTAIN
APPROXIMATE TURBIDITY CURTAIN
LOCATION FOR BASE PROJECT
BASE PROJECT
SILT FENCE
BASE PROJECT
SILT FENCE
LIMIT OF DISTURBANCE FOR
ADJACENT CONSTRUCTION
PROJECT FOR NYC PARKS
STAGING AREA
EXISTING FRINGE MARSH LOCATION
LIMIT OF DISTURBANCE TO
EXISTING FRINGE MARSH
LIMIT OF DISTURBANCE TO FRINGE MARSH
EXISTING SEWER LINE
ADDITIONAL SILT FENCE REQUIRED
FOR OPTION #5 WORK
NOTES:
1. SITE FENCE AND TURBIDITY CURTAIN SHALL BE INSTALLED PRIOR TO BREAKING GROUND FOR ANY PROJECT WORK, AND SHALL BE PROVIDED TO CONTROL EROSION THROUGHOUT THE DURATION OF THE PROJECT.
2. THE FENCE LINES SHOWN ARE APPROXIMATE AND MAY BE ALTERED WITH THE APPROVAL FROM THE COR
FOR EASE OF CONSTRUCTION OR TO AVOID OBSTRUCTIONS.
3. SILT FENCE SHALL ALSO BE PROVIDED FOR AROUND STOCKPILES IN THE STAGING AREAS AS REQUIRED.
4. ADDITIONAL SILT FENCE SHALL BE PROVIDED IF DEEMED NECESSARY FOR THE EXISTING SITE CONDITIONS.
5. ADDITIONAL SILT FENCE WILL BE REQUIRED FOR OPTION AREAS IF THE OPTION IS ENACTED FOR THE
PROJECT.
6. SILT FENCE AND TURBIDITY CURTAIN SHALL BE INSTALL AS PER DETAILS ON SHEET GC-501.
7. DISTURBANCE TO EXISTING FRINGE MARSH SHALL BE KEPT TO A MINIMUM. THE EXISTING FRINGE MARSH AREAS THAT WILL NOT BE DISTURBED DUE TO THE PROJECT GRADING ACTIVITIES SHALL BE IDENTIFIED AND A FENCE (SUCH AS ORANGE CONSTRUCTION FENCE) SHALL BE PLACED AT THIS LIMIT TO PREVENT
ACCIDENTAL DISTURBANCE.
8. ALL PROJECT DEWATERING ACTIVITIES IN THE STAGING AREAS AND THE ONSITE PLACEMENT AREA SHALL
BE SITUATED TO NOT IMPACT THE EXISTING FRINGE MARSH.
APPROXIMATE OPTION #6
BOUNDARY LINE
APPROXIMATE OPTION #6
BOUNDARY LINE
ADDITIONAL SILT FENCE REQUIRED
FOR OPTION #6 WORK APPROXIMATE STAGING
AREA BOUNDARY LINE
BASE PROJECT SILT FENCE
EXISTING PATH TO BE REMOVED
NEW BIKE PATH
D e s c ri p ti o n
D a te
A p p r.
8 7 6 5 4 3 2 0
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G p r.
D a te
D e s c ri p ti o n
M a rk
M a rk
D e s ig n e d b y
A N
S I
D
S iz e
D a te
A M
P
D w n b y
A M
P
C k d b y
S o li c it ia ti o n n o
C o n tr a c t n o
P lo t d a te
P lo t b y
S c a le
R e v ie w e d b y
S u b m it te d b
A R
M Y E
N G
IN
E E
R D
IS
T R
R
P S O
F E
N G
IN
E E
W Y
O R
K
N E
W Y
O e n a m e
V P a le n \S o u n d v ie w p a rk \1
D e s ig n \S
V P a rk
G
C -1 a n d .d g n
-J
U L -2
:5
E E
N D
A M
P
.0
:1 .0
Sheet reference number:
SHEET of 30
A M
P
V
P a l e n
S o u n d v i e w p a r k s i g n
S V
P a r k
G C a n d d g n
E
E N
D A
M P
S u b m i t t e d b y
J
U L
P l t e
S
IS
S
IS
J u n e
S O
U N
D V
IE
W P
A R
K
A Q
U A
T
IC
E
C O
S Y
S T
E M R
E S
T O
R A
T
IO
N
B R
O N
X
N E
W Y
O R
K
.4
1+65.4
1+00
0+00
N 234,500
N 235,500
N 235,000 N 235,000
2 STORY FRAME
O
I
C K
2 STY
FRAME
# 17
2 STY
BRICK
# 17
2 STY
BRICK
# 17
2 STY
FRAME
# 17
2 STY
FRAME
# 17
832 STY
FRAME
# 17
2 STORY FRAME
# 41
GARAGE
2 STY
BRICK
# 18
R A
CONC.
# 3
# 3
# 3
# 3
C.P
C.P
CONC.
PATIO
SHED
SHED
CONC.
D.W.
D.W.
CONC.
# 3
# 3
# 3
# 3
O.P
GARAGE
CONC.
D.W.
# 3
# 3
SHED
SHED
SHED
FR.
SHED
# 3
# 3
GARAGE
C O
N
W
1 STY FRAME
# 12
1 STY FRAME
2 STY FRAME
# 12
STY
FRAME
1 STY
FRAME
1�
STY FR.
# 18
2 S
TY B
RICK
2 S
TY
BRICK
& F
RAME
1�STY
FRAME
# 3
2 S
TY B
R.
& F
RAME
# 3
2 S
TY B
RICK
& F
RAME
2 S
TY F
RAME
& B
RICK
1 S
TY F
RAME
# 3
1 S
TY F
RAME
2 S
TY F
RAME
# 3
S T
Y
F R
A M E
B R I C
K
2 S
TY F
RAME
2 S
TY F
RAME
# 3
2 S
TY F
RAME
& B
RICK
2 S
TY F
RAME
2 S
TY F
RAME
O
I
C K
DIRT +
GRAVEL ROAD
MH#8
10’0" X 9’0
" PIPE (R5
)(N.F.V
., S.N .3)
MH#9
Stan d Pi pe
MH#10
Stan d Pi pe
E
,0
,5
E
,0
,5
E
,0
,5
E
,0
,5
N 235,500
5’
5’ 5’
5’
5’
5’
10’
10’
10’
10’
A S
P H
A L
T
ASPHALT
A S P
H A L T
ASPHALT
L E
L A
E N
U E
GILDERSLEEVE
AVE.
A V
15’
15’
15’
15’
15’
15’
FRAME
GARAGE
1 STY
FRAME
1 STY
FRAME
ASPHALT
’9
X
’0
P
IP
E
(R
N .F .V
S .N .3
ASPHALT
20’
20’
20’
20’
20’2
20’
20’
’20’
’ 2
2 STY BRICK FRAME
2 STY BRICK
& FRAME
2 STY BRICK
& FRAME
2 STY BRICK
& FRAME
STORY
BRICK & FRAME
# 33
# 33
# 33
# 34
# 34
# 34
# 34
# 34
# 35
# 35
# 34
# 34
# 34
# 35
# 35
# 35
# 35
# 17
# 17
# 17
SHED
SHED
25’2
25’
25’
1 STY FR.
GARAGE
CONC.
D.W.
CONC.
A M
E
A M
E
1 STY BRICK
# 25
1 STY BRICK
# 25
1 STY FRAME
# 11
1 STY FRAME
# 11
1 STY FRAME
# 11
2 STY FRAME
# 11
2 STY FRAME
# 11
1 STY FRAME
# 11
2 STY FRAME
# 11
1 STY FRAME
# 12
1 STY FRAME
# 12
1 STY FRAME
# 12
1 STY FRAME
# 1
1 STY FRAME
GARAGE
1 STY FRAME
# 11
2 STY FRAME
# 11
1 STY FRAME
# 11
1 STY FRAME
# 12
1 STY FRAME
# 12
2 STY
FR.
2 STY
MASONRY
1 STY FRAME
# 12
5.0 ’ C
ONC.
WALL
CONC.
S.W.
Y
F R
A M
E
2 STY
FRAME
2 S
TY F
RAME
# 1
1 S
TY B
RICK
# 1
1 S
TY F
RAME
# 1
1 S
TY F
RAME
# 1
1 STY FRAME
# 12
1 STY FRAME
# 12
2 STY FRAME
# 12
1 STY FRAME
# 12
2 STY FRAME
# 11
1 STY FRAME
# 11
1�
STY FRAME
# 11
L A
W R
E N
E N
U E
PATERSON
AVENUE
B E
A
E N
U E
T A
Y L
E N
E R I
E N
L A
E N
M M
O N
W E
A L
E N
GC-501
R
O S
E
D
IM
E N
T
C
O N
T R
O L
D E T
A
IL
S
D e s c ri p ti o n
D a te
A p p r.
8 7 6 5 4 3 2 0
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G p r.
D a te
D e s c ri p ti o n
M a rk
M a rk
D e s ig n e d b y
A N
S I
D
S iz e
D a te
A M
P
D w n b y
A M
P
C k d b y
S o li c it ia ti o n n o
C o n tr a c t n o
P lo t d a te
P lo t b y
S c a le
R e v ie w e d b y
S u b m it te d b
A R
M Y E
N G
IN
E E
R D
IS
T R
R
P S O
F E
N G
IN
E E
W Y
O R
K
N E
W Y
O e n a m e
V P a le n \S o u n d v ie w p a rk \1
D e s ig n \S
V P a rk
G
C -5 a n d .d g n
-J
U L -2
:5
E E
N D
A M
P
.0
:1 .0
Sheet reference number:
SHEET of 30
A M
P
V
P a l e n
S o u n d v i e w p a r k s i g n
S V
P a r k
G C a n d d g n
E
E N
D A
M P
S u b m i t t e d b y
J
U L
P l t e
S
IS
S
IS
J u n e
S O
U N
D V
IE
W P
A R
K
A Q
U A
T
IC
E
C O
S Y
S T
E M R
E S
T O
R A
T
IO
N
B R
O N
X
N E
W Y
O R
K
TURBIDITY
CURTAIN
SHORE ANCHOR
POINT
APPLICATION NOTES:
GENERAL NOTES:
1. TURBIDITY CURTAIN SHALL BE A MAXIMUM OF 100’ LONG
FOR EACH SECTION OF CURTAIN REQUIRED. END SECTIONS
SHALL TERMINATE 10’ BEYOND THE LIMIT OF DISTURBANCE.
2. THE TURBIDITY CURTAIN SHALL BE PLACED AS CLOSE
TO THE WORK AS POSSIBLE WITHOUT INTERFERING WITH
CONSTRUCTION OPERATIONS.
3. THE CONTRACTOR SHALL CONTINUALLY MONITOR THE
INSTALLATION, TAKING INTO ACCOUNT WEATHER PATTERNS
AND REVAILING WIND DIRECTIONS THAT MAY AFFECT WATER
LEVELS, VELOCITY AND MOVEMENT OF THE TURBIDITY CURTAIN.
4. THE TURBIDITY CURTAIN SHALL BE REMOVED BY PULLING
TOWARD THE SHORE TO MINIMIZE ESCAPE OF SEDIMENT INTO
THE WATERWAY.
5. THE WEIGHTED ANCHOR SYSTEM SHALL BE A TYPE THAT
ALLOWS THE CURTAIN TO CONFORM TO THE CONTOUR OF
THE BOTTOM OF THE WATERWAY.
PROPOSED
WORK SITE
EXISTING GROUND/ WATER BANK
WEIGHTED ANCHORING SYSTEM
SEE NOTE 5
ROPE OR CABLE WITH FLOATS
(6"MIN)
A. THE PURPOSE OF A TURBIDITY CURTAIN IS TO SEPARATE
WORK AREAS IN OR ADJACENET TO WATERWAYS, TO PREVENT
TURBIDITY FROM ENERING THE WATERWAY.
B. TURBIDITY CURTAIN SHALL NOT BE PLACED ACROSS A
FLOWING WATERWAY.
C. CONCENTRATED FLOW OUTLETS SUCH AS CULVERT
OUTLETS, DITCHES, ETC. SHALL NOT BE LOCATED BEHIND
TURBIDITY CURTAIN.
POST
MESH REINFORCEMENT
(IF NECESSARY)
SILT FENCE ASSEMBLY
SILT FENCE GEOTEXTILE
EXISTING GROUND
TOE OF SLOPE
WOOD POST WITH
STAPLE PLACEMENT
WOOD POST
WITH BATTEN
SCREW
PLACMENT
A A
GC-103
GC-103
TO UNDISTURBED BOTTOM
APPLICATION NOTES
GENERAL NOTES
S H
A.
B.
C.
GC-103
GC-103
THE PRIMARY PURPOSE OF A SILT FENCE IS TO REDUCE RUNOFF VELOCITY AND TRAP
SEDIMENT. VELOCITY IS REDUCED, WATER IS IMPOUNDED BEHIND THE MEASURE, AND
SEDIMENT FALLS OUT OF SUSPENSION.
SILT FENCE SHALL BE INSTALLED ON A LINE OF EQUAL ELEVATION (CONTOUR). THEY MAY
BE INSTALLED AT INTERMEDIATE POINTS UP SLOPES AS WELL AS AT THE BOTTOM, AS
SHOWN IN THE DETAIL.
SILT FENCE SHALL NOT BE USED IN OR ACROSS A FLOWING NATURAL CHANNEL, OR AREAS
OF CONCENTRATED FLOW.
1.
2.
3.
4.
5.
6.
7.
GC-103
GC-103
2SILT FENCE PLACEMENT
PLAN N.T.S
1SILT FENCE
ELEVATION VIEW N.T.S
PLACE THE END POST OF THE
SECOND FENCE INSIDE THE END
POST OF THE FIRST FENCE.
ROTATE BOTH POSTS AT LEAST
360 DEGREES IN A CLOCKWISE
DIRECTION TO CREATE A TIGHT
SEAL WITH THE GEOTEXTILE.
DIRECTION OF RUNOFF
DRIVE BOTH POSTS
ABOUT 10 INCHES
INTO THE GROUND
AND BURY FLAP.
STAPLE 6" SPACING
VERTICALLY
SECTION B
SECTION A
POSTS
STAPLE 6" SPACING
VERTICALLY
N.T.S
ATTACHMENT OF TWO SILT FENCES
WIDE LONG
GAUGE CROWN LEGS
LENGTH
PHILLIPS
HEADS SCREW/POST
SCREWS 2 " 2" 6 MIN.
WIRE STAPLES 17 MIN.
4"
2" 5 MIN.
STAPLES/POST
N.T.S
SILT FENCE FASTENER PLACEMENT
SHORE ANCHOR POINT
LOCATED 3’ MIN. UPLAND
OF ORDINARY HIGH
WATER MARK (TYP.)
PLAN VIEW N.T.S
TURBIDITY CURTAIN
TIDAL WATERS
T Y P
S E E
N O
T E
ELEVATION VIEW N.T.S
TURBIDY CURTAIN
SECTION A-A
APPROVED (TURBIDITY
CURTAIN) GEOTEXTILE
WITH FOLDS FOR
WATER FLUCTUATION
VARIES
SEE NOTE 2
WORK AREA
ANCHOR POINTS EVERY 100 FT. MAX
BARRIER MOVEMENT DUE TO TIDAL CHANGE
STAKE OR ANCHOR EVERY 100 FT. MAX
18" MIN.
EMBEDMENT
6"
30" (TYP.)
24" MIN.
(T Y P
SEDIMENT CONTAINMENT AREA
10’-0" MIN. (SEE NOTE 1)
FLOW
RETAIN EXISTING VEGETATION,
IF POSSIBLE
LH (SEE NOTE 8)
LS VARIES (SEE NOTE 8)
EXCAVATE TRENCH, BURY SILT FENCE FABRIC
AND BACKFILL / COMPACT EXCAVATED EARTH
GROUND
1" X 3" BATTEN
GROUND
6"
3"
6"
6"
6"
3"
SLOPE
.5
T
S L O
P E
.5
6’-0" MAX.
(SEE NOTE 2)
10"-0" MIN.
(SEE NOTE 1)
SEDIMENT
CONTAINMENT
AREA
SILT FENCE SHALL BE PLACED A MINIMUM OF 10’-0" FROM TOE OF SLOPE, TO PROVIDE
ADEQUATE AREA FOR SEDIMENT STORAGE AND FACILITATE MAINTENANCE OF SEDIMENT
CONTAINMENT AREA.
POSTS MAY BE 2" X 2" (MIN.) HARDWOOD, OR 1.3 LB/FT (MIN.) STEEL. SPACING FOR
THE PROVIDED SILT FENCE POSTS SHALL BE 6’-0" MAXIMUM.
THE BOTTOM EDGE OF SILT FENCE SHALL BE BURIED A MINIMUM OF 6" BELOW
GROUND. THE FENCE SHALL BE INSTALLED WITH THE POSTS ON THE DOWNSTREAM SIDE OF
THE FABRIC.
MEASURES SHALL BE INSPECTED EVERY SEVEN (7) CALENDAR DAYS OR AFTER EACH MAJOR
RAINFALL WITHIN A 24 HOUR PERIOD. MEASURES SHALL BE CLEANED AND REPAIRED AS
REQUIRED.
SEDIMENT SHALL BE REMOVED WHEN ACCUMULATION REACHES 6" OR WHEN SEDIMENT CREATES
BREACHES OR BULGES IN THE FABRIC. SEDIMENT SHALL BE DISPOSED OF AS UNSUITABLE
MATERIAL.
THE FOLLOWING ARE MAXIMUM SLOPE LENGTHS TO THESE MEASURES:
SILT FENCE
SLOPE SLOPE HORIZ
LENGTH LENGTH
L (FT) L (FT)
2:1 25 22
3:1 50 47
4:1 75 73
5:1 100 98
5:1 100 98
INSTALLATION, INCLUDING EXCAVATION, BACKFILL, AND COMPACTION OF SILT FENCE
SHALL BE INCLUDED IN THE UNIT PRICE BID FOR ITEM.
GC-502
O
A D
W
T
A
IL
S
D e s c ri p ti o n
D a te
A p p r.
8 7 6 5 4 3 2 0
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G p r.
D a te
D e s c ri p ti o n
M a rk
M a rk
D e s ig n e d b y
A N
S I
D
S iz e
D a te
A M
P
D w n b y
A M
P
C k d b y
S o li c it ia ti o n n o
C o n tr a c t n o
P lo t d a te
P lo t b y
S c a le
R e v ie w e d b y
S u b m it te d b
A R
M Y E
N G
IN
E E
R D
IS
T R
R
P S O
F E
N G
IN
E E
W Y
O R
K
N E
W Y
O e n a m e
V P a le n \S o u n d v ie w p a rk \1
D e s ig n \S
V P a rk
G
C -5 a n d .d g n
-J
U L -2
:5
E E
N D
A M
P
.0
:1 .0
Sheet reference number:
SHEET of 30
A M
P
V
P a l e n
S o u n d v i e w p a r k s i g n
S V
P a r k
G C a n d d g n
E
E N
D A
M P
S u b m i t t e d b y
J
U L
P l t e
S
IS
S
IS
J u n e
S O
U N
D V
IE
W P
A R
K
A Q
U A
T
IC
E
C O
S Y
S T
E M R
E S
T O
R A
T
IO
N
B R
O N
X
N E
W Y
O R
K
ORANGE PLASTIC
METAL POST (TYP.)
CONSTRUCTION FENCE
10’ MAX.
M
IN
M
IN
TREE PROTECTION FENCE
ORANGE CONSTRUCTION FENCE
GC-102
ELEVATION VIEW N.T.S
GROUND
6" MINIMUM THICKNESS
DIRECTION OF
SURFACE
RUNOFF FLOW GRADE TO DRAIN IN
DIRECTION OFSURFACE FLOW
EXISTING
FILTER FABRIC-SEPARATION
14’ WIDE
GC-101
1WORKSITE ACCESS ROAD DETAIL
#3 CRUSHED STONE OR GRAVEL
STRENGTH CLASS 1
CROSS-SECTION VIEW N.T.S COMPACTED SUBGRADE
N.T.S
3" ASPHALT BINDER
COURSE
ASPHALT PAVING:
BIKE PATH AND OPTION #4
C-105, C-108
4" AGGREGATE
SUBBASE
(NYSDOT TYPE 2
SUBBASE, SEE
SPEC 32 11 16)
2" ASPHALT TOP COURSE
TACK COAT
1 2
1.
2.
3.
4.
5.
WORKSITE ACCESS ROAD NOTES:
THE PURPOSE OF A STABILIZED CONSTRUCTION ENTRANCE IS TO REDUCE OR ELIMINATE
THE TRACKING OF SEDIMENT ONTO PUBLIC RIGHTS OF WAY OR STREETS.
MODIFICATIONS MAY BE REQUIRED TO MATCH FIELD CONDITIONS.
A 30’ WASH AREA AND ANTI-TRACKING PAD SHALL BE PROVIDED AT CONSTRUCTION EXIT;
ADDITIONAL GRADING MAY BE REQUIRED TO PROVIDE WASHING AREAS.
THE CONTRACTOR SHALL GRADE TO PREPARE AND SMOOTH ORIGINAL GROUND FOR
PLACEMENT OF 6" OF #3 CRUSHED STONE OR GRAVEL ENTRANCE MATERIAL UP TO THE
EDGE OF PAVEMENT.
PERIODIC MAINTENANCE MAY BE REQUIRED AND COST OF THIS MAINTENANCE WILL BE
INCLUDED IN THE UNIT PRICE BID.
EDGE OF EXISTING
PAVEMENT
OUTSIDE EDGE
OF TRAVEL LANE
SAME SLOPE
AS SHOULDER
GC-101
2WORKSITE ACCESS ROAD DETAIL
PROFILE VIEW N.T.S
(SEE SPECIFICATION SECTION 02 38 10.00 18)
50’ MIN. LENGTH MEASURED ALONG CENTERLINEOF CONSTRUCTION ENTRANCE (SEE NOTES 1, 2, AND 3)
24" TRANSITION (TYP.)
AREA FOR ANTI-TRACKING PAD AND WASHING OPERATION - 30’ MINIMUM
1’ COMPOST
1’ CLEAN SANDY
LOAM FILL
C-109, C-110CROSS-SECTION VIEW N.T.S
FOR OPTION #5 AND OPTION #6 AREAS
1’ COMPOST
C-106CROSS-SECTION VIEW N.T.S
FOR OPTION #1 ON THE ONSITE PLACEMENT AREA
EXCAVATED FILL FROM
MARSH RESTORATION
AREA (DEPTH VARIES)
1’ COMPOST
EXCAVATED FILL FROM
MARSH RESTORATION
AREA (DEPTH VARIES)
C-106
FOR OPTION #5 AND OPTION #6 AREAS FOR OPTION #1 CAPPING OF THE ONSITE PLACEMENT AREA
CROSS-SECTION VIEW N.T.S
FOR OPTION #1 INTO SIDE OF ONSITE PLACEMENT AREA
CLEAN FILL
CLEAN FILL CLEAN FILL
COMPOST
COMPOST COMPOST
EXCAVATED FILL
EXCAVATED FILL
1’ CLEAN FILL
1’ CLEAN SANDY
LOAM FILL
1.
2.
3.
4.
5.
6.
SOIL DEMARCATION BARRIER NOTES:
THE PURPOSE OF THE SOIL DEMARCATION BARRIER IS TO
ESTABLISH AN INDICATOR FOR THE SEPARATION BETWEEN
IMPORTED FILL AND THE EXISTING UNDISTURBED GROUND
SURFACE (FOR OPTION #5 AND OPTION #6) OR BETWEEN
IMPORTED FILL AND THE PLACED EXCAVATED FILL FROM
THE MARSH RESTORATION AREA (FOR OPTION #1) FOR
FUTURE REFERENCE AT THE PROJECT SITE.
THE SOIL DEMARCATION BARRIER SHALL BE A NON-
BIODEGRADABLE GEOSYNTHETIC MESH OR FENCING MADE
OF HIGH DENSITY POLYETHYLENE (HDPE) OR AN APPROVED
EQUAL THAT WILL CREATE A VISUALLY NOTICEABLE,
PERMANENT LAYER THAT WILL BE QUICKLY RECOGNIZED BY
PERSONS DIGGING IN THE AREA AS AN INDICATION OF A
TRANSITION IN SOIL MATERIAL.
CHOSEN MATERIAL FOR THE SOIL DEMARCATION BARRIER
SHALL BE APPROVED BY NYSDEC BEFORE PLACEMENT.
THE SOIL DEMARCATION BARRIER SHALL BE ORANGE IN COLOR.
SEE SPECIFICATION SECTION 02 56 16.00 18, SOIL DEMARCATION
BARRIER, FOR DETAILS AND INSTRUCTIONS.
SOIL DEMARCATION BARRIER WILL NOT BE PLACED ON THE
EXCAVATED FILL IN THE ONSITE PLACEMENT AREA IF OPTION
#2 IS AWARDED.
1SOIL DEMARCATION BARRIER
EXISTING GROUND
SOIL DEMARCATION BARRIER
1SOIL DEMARCATION BARRIER
EXISTING GROUND
EXISTING GROUND
SOIL DEMARCATION BARRIER 2
OF ONSITE PLACEMENT AREA
GRADE TO EXISTING SIDE
SOIL DEMARCATION BARRIER
SOIL DEMARCATION BARRIER
TAPER DOWN TO EXISTING GRADE (MAX 33% SLOPE)
TAPER DOWN TO EXISTING GRADE (MAX 33% SLOPE)
CE-101
5 EXISTING CONTOURS
LEGEND
M A
R
A
N T
IN
A
N
PROPOSED MARSH CONTOURS
LOW MARSH AREA
030 30 60FT
SCALE: 1’’= 30’
HIGH MARSH
MARITIME SALT SHRUBS
MARSH PLANTING AREAS
AREA ELEVATION RANGE
REFERENCE LINE
LOW MARSH/HIGH MARSH TRANSITION
NOTES:
1. MARSH PLANTING AREAS ARE BASED ON THE FINISHED
ELEVATIONS OF THE MARSH RESTORATION AREA.
2. THE FINAL LOW MARSH ELEVATIONS WILL BE VERIFIED IN
THE FIELD WITH APPROVAL FROM THE COR.
3. HERBIVORY FENCING WILL BE INSTALLED AND MAINTAINED
ON THE LOW MARSH, LOW MARSH/HIGH MARSH TRANSITION,
AND HIGH MARSH AREAS OF MARSH RESTORATION AREA.
4. SEE SHEET CE-501 FOR PLANTING TABLE AND DETAILS.
LOW-SALT TOLERANT UPLAND SHRUBS & TREES
SALT TOLERANT UPLAND SHRUBS
LOW MARSH 0.4 - 3.1
LOW MARSH/HIGH 3.1 - 3.8
MARSH TRANSITION
HIGH MARSH 3.8 - 4.5
MARITIME SALT SHRUBS 4.5 - 5.0
SALT TOLERANT 5.0 - 6.5
UPLAND SHRUBS
LOW-SALT TOLERANT 6.5 - 14.0
UPLAND SHRUBS & TREES
EXISTING FRINGE MARSH LOCATION
NOTE: MHW = 3.92 FT, MHHW = 4.36 FT
NEW BIKE PATH
EXISTING SEWER LINE
D e s c ri p ti o n
D a te
A p p r.
8 7 6 5 4 3 2 0
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G p r.
D a te
D e s c ri p ti o n
M a rk
M a rk
D e s ig n e d b y
A N
S I
D
S iz e
D a te
A M
P
D w n b y
A M
P
C k d b y
S o li c it ia ti o n n o
C o n tr a c t n o
P lo t d a te
P lo t b y
S c a le
R e v ie w e d b y
S u b m it te d b
A R
M Y E
N G
IN
E E
R D
IS
T R
R
P S O
F E
N G
IN
E E
W Y
O R
K
N E
W Y
O e n a m e
V P a le n \S o u n d v ie w p a rk \1
D e s ig n \S
V P a rk
C
E -1 a n d .d g n
-J
U L -2
:5
E E
N D
A M
P
.0
:1 .0
Sheet reference number:
SHEET of 30
A M
P
V
P a l e n
S o u n d v i e w p a r k s i g n
S V
P a r k
C E a n d d g n
E
E N
D A
M P
S u b m i t t e d b y
J
U L
P l t e
S
IS
S
IS
J u n e
S O
U N
D V
IE
W P
A R
K
A Q
U A
T
IC
E
C O
S Y
S T
E M R
E S
T O
R A
T
IO
N
B R
O N
X
N E
W Y
O R
K
1+65.4
1+00
N 234,500
E
,0
,0
SHED
SHED
DIRT +
GRAVEL ROAD
MH#8
10’0" X 9’0
" PIPE (R5
)(N.F.V
., S.N .3)
3.1
5.0 6.0
7.0 8.0
9.0 10.0
11.0 12.0
3.1
3.0
2.5
2.0
1.5
2.0
1.0
0.0
.5
3.0
2.5
2.5
-0.5
0.5
.5
2.0 .5
1.5 1.5
1.5
2.0
.0
2.
2.0
1.0
1.
1.
.5
.5
.0
.0
3.0
3.03.1
.1
.1
5.
7.
9.
.0
.0 7 .0 9 .0
11.0
.0
.0
.0
.0
.0
.0
.0
.0
13.0
.0
.0
1+60
1+40
1+20
0+80
0+60
0+40
0+20
0+00
3.0
2.5
.0
1.0
3.1
1.5 .5
.5
3.
.1
14.0
.0
.0
13.0
13.0
.0
# 11
2 STY FRAME
# 11
1 STY FRAME
2 STY
MASONRY
SUMMER VEGETATION
SUMMER V
EGETATION
5.0 ’ C
ONC.
WALL
T H
E R I
E N
File details come from the government source that posted it. Updated .