Amendment 0001

View the file

Other files

File Type Posted
Bid Abstract.pdf PDF
Amendment 4.pdf PDF
Amendment 3.pdf PDF
Amendment 2 .doc.pdf PDF
REGISTER.pdf PDF
Section 10 14 23.pdf PDF
Site VIsit.pdf PDF
Soundview-Plans-p3.pdf PDF
Specs.pdf PDF
Soundview-Plans-p2.pdf PDF
Soundview-Plans-p1.pdf PDF
Solicitation.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W16ROE11265545

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this Amendment is to:

a. Provide questions and Answ ers for INFORMATION PURPOSES ONLY

b. Provide Revised Wage Rates NY100003 07/29/2011 NY3

c. Provide Revised Bid Schedule.

d. Provide Revised Specif ications.

e. Questions must be submitted NO LATER THAN 12 August 2011 10:00 AM.

f. The due date remains 23 August 2011 @ 2:00pm EST.

NOTE: Bidders must acknow ledge receipt of this amendment by the date specif ied in the solicitation (or as amended) by one of the follow ing methods. In the space provided on the SF 1442, by separate letter, or by sinning the block 15 below . FAILURE TO ACKNOWLEDGE AMNEDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE

MODIFICATION OF BIDS OR LATE WITHDRAWAL OF BIDS (FAR 14.304)

1. CONTRACT ID CODE PAGE OF PAGES

J 1 41

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 04-Aug-2011

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-11-B-0006

X 9B. DATED (SEE ITEM 11)

19-Jul-2011

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

04-Aug-2011

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 1843

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS-11-B-0006

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 1

W912DS-11-B-0006

Amendment No. 1

USACE, NYD Corps of Engineers New York, NY 10278

AMENDMENT NO.1 FOR RFP NO. W912DS-11-B-0006

BIDDER’S QUESTIONS AND GOVERNMENT REPLY FOR INFORMATION

PURPOSES ONLY

Q1: When is high tide?

A1. Refer to Sheet C-102 of the plans for the high tide elevation

Q2: Contractor wanted to know the extent of the salt marsh area.

A2. Refer to Sheet CE-101 for the proposed salt marsh extent

Q3: Will a list of the contractor attendees of this site visit be available?

A3. Yes attached to Amendment 0001 is a copy of the sign in sheet.

Q4: Can the RFI be submitted via email? Can you provide the email address?

A4. Response: RFI can be submitted via email to Jason Parker @ jason.l.parker@usace.army.mil.

Q5: Is the gas stand pipeline on the northern section of the project clearly displayed on the plans?

A5. Refer to Sheet C-109 for the gas stand pipe

Q6: Was the placement site an old trash dump site?

A6. Corps soil samples do not indicate the site was formally used as a municipal household dump/trash site.

The following changes shall be made to the specifications.

1) SPECIFICATIONS:

1-Section 10 14 23 Insert Section 10 14 23 in its entirety.

2-Section 02 22 70

A- Revise paragraph 1.1.1 by deleting “0003AA” and replacing with “0003”

B- Revise paragraph 3.1.1 by deleting “0003AA” and replacing with “0003”

3-Section 31 05 22

A- Revise paragraph 1.1 by deleting “item no. 0005AA” and replacing with “item no.

0005”

4-Section 32 11 16

A- Revise paragraph 1.1 by deleting “item no. 0005AA” and replacing with “item no.

0005”

5-Section 00 80 00

A- Revise paragraph 1.a (iv) by deleting “If Option #1, Option #2, Option #3, Option #4, Option #5 and Option #6 are to be awarded, they shall be awarded within 60 calendar days from issuance of the Base Bid NTP date and no additional time shall be added to contract. The time stated for completion shall include the final cleanup of the premises. (FAR 52-212-3)” and replacing with “If Option #1, Option #2, Option #3, Option #4, Option #5, Option #6 and Option #7 are to be awarded, they shall be awarded within 60 calendar days from issuance of the Base Bid NTP date and no additional time shall be added to contract. The time stated for completion shall include the final cleanup of the premises. (FAR 52-212-3)”

6-Section 01 33 00.00 18

A- Revise Submittal Register by deleting Submittal Register at the end of Section 01 33 00.00 18 and replacing in its entirety with the new Submittal Register.

7-Section 00 01 00 Delete Section 00 01 00 in its entirety and replace in its entirety with the following:

Revised Bid Schedule

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Base Bid

FFP

The Base Bid shall focus on the clearing and grubbing of the project area, the restoration and construction of a marsh area, the placement of excavated soil at an onsite placement area, the construction of a new asphalt bike path, and the planting of vegetation on the project site. (CLIN 0001 IS FOR INFO ONLY. ONLY PRICE

THE SUB LINE ITEMS EXAMPLE 0001AA- 0001AP)

FOB: Destination

MILSTRIP: W16ROE11265545

PURCHASE REQUEST NUMBER: W16ROE11265545

NET AMT

0001AA 1 Lump Sum

MOBILIZATION AND DEMOBILIZATION

FFP

Furnishing and maintenance of services, equipment, and facilities & removal (as necessary), in accordance with the plans & specifications FOB: Destination

0001AB 1 Lump Sum

WORKSITE ACCESS ROADS

FFP

Labor, materials, equipment, installation, maintenance, removal, and restoring vegetations (as necessary) in accordance with the plans & specifications

0001AC 1 Lump Sum

STAGING AREA

FFP

Labor, materials, equipment, installation, maintenance, removal, and restoring vegetations (as necessary) in accordance with the plans & specifications

0001AD 1 Lump Sum

SITE CLEARING AND GRUBBING

FFP

Labor, equipment, material, installation, demolition, removal, and disposal in accordance with the plans & specifications

0001AE 2.73 Acre

HERBIVORY FENCE

FFP

Labor, materials, equipment, and installation in accordance with the plans & specifications

ITEM NO SUPPLIES/SERVICES ESTIMATED

QUANTITY

UNIT UNIT PRICE AMOUNT

0001AF 1,700 Cubic Yard

NON-HAZARDOUS SOIL REMOVAL

FFP

Labor, equipment, dewatering, hauling, removal, and disposal of non-hazardous soils with regulatory exceedances excavated from the marsh restoration area and disposed of at an approved off-site disposal site in accordance with the plans & specifications (Estimated Quantities)

UNIT UNIT PRICE AMOUNT

0001AG 8,240 Cubic

CONSTRUCTION DEBRIS REMOVAL

Labor, equipment, hauling, removal, and disposal to the approved disposal facility in accordance with the plans & specifications (Estimated Quantities)

UNIT UNIT PRICE AMOUNT

0001AH 42,260 Cubic

UNCLASSIFIED EXCAVATION

Labor, equipment, any necessary pumping or diversions, hauling, placement, and rough grading of soils excavated from the marsh restoration area which are suitable for onsite placement (soils with contamination levels below regulatory concern) in accordance with the plans & specifications (Estimated Quantities)

UNIT UNIT PRICE AMOUNT

0001AJ 11,310 Cubic

SAND FILL, IMPORTED

Labor, materials, equipment, hauling, and spreading on the marsh restoration area in accordance with the plans & specifications

0001AK 3.70 Acre

FINAL GRADING (MARSH RESTORATION AREA)

FFP

Labor, materials, equipment, and final survey for final grading of marsh restoration area in accordance with the plans & specifications

0001AL 1 Lump Sum

ASPHALT BIKE PATH

FFP

Labor, materials, equipment, and installation in accordance with the plans &

0001AM 1 Lump Sum

MARSH AND UPLAND AREA PLANTINGS

FFP

Labor, equipment, loading, hauling, and installation of Government supplied plugs, shrubs, and trees in the marsh and adjacent upland planting areas in accordance with the plans & specifications

0001AN 1 Lump Sum

GRASS SEEDING

FFP

(STAGING AREA, WORKSITE ACCESS ROADS AND ONSITE

PLACEMENT AREA) Labor, materials, loading, hauling, and equipment for grass seeding of the areas cleared and grubbed for the staging areas, the construction access roads and all other cleared areas not include in other bid items, as well as grass seeding for the onsite placement area after the addition of the clean fill cap as per Option #1 or Option #2, in accordance with the plans & specifications

0001AP 1 Lump Sum

GRASS SEEDING

FFP

(LOW-SALT TOLERANT UPLAND AREA) Labor, materials, loading, hauling, and equipment for grass seeding of the low-salt tolerant upland planting area, in accordance with the plans & specifications

OPTION OPTION Item No. 1

FFP

Option #1 includes the placement of a soil demarcation barrier and the placement and grading of 1 foot of compost and 1 foot of sandy loam fill on the onsite placement area to cap the excavation fill from the marsh restoration area. (CLIN

0002 IS FOR INFO ONLY. ONLY PRICE THE SUB LINE ITEMS EXAMPLE

0002AA-0002AD

UNIT UNIT PRICE AMOUNT

0002AA 9,470 Cubic

OPTION COMPOST, SUPPIED BY DSNY

Labor, equipment, and spreading from the Department of Sanitation stockpiling site in accordance with the plans & specifications (Estimated Quantities)

UNIT UNIT PRICE AMOUNT

0002AB 9,830 Cubic

OPTION SANDY LOAM FILL, IMPORTED

Labor, materials, equipment, hauling, and spreading in accordance with the plans & specifications (Estimated Quantities)

0002AC 6.24 Acre

OPTION FINAL GRADING

FFP

Labor, materials, equipment, and final survey in accordance with the plans &

0002AD 1 Lump Sum

OPTION SOIL DEMARCATION BARRIER

FFP

Labor, materials, equipment, and installation in accordance with the plans &

OPTION OPTION Item No. 2

FFP

Option #2 includes the incremental cost increase for the placement and grading of 1 ft of sandy loam fill in place of the 1 ft of compost (COMPOST, SUPPLIED BY DSNY) from Option #1 on the onsite placement area. This would be a total of 2 ft of sandy loam fill in lieu of 1 ft of compost and 1 ft of sandy loam fill. The soil demarcation barrier from Option #1 (0002AD) will not be required if Option #2 is exercised. Incremental cost increase for labor, materials, equipment, hauling, and spreading in accordance with the plans & specifications If Option 2 (Bid Item 0003) is exercised, all sub CLINS for Option 1 (Bid Item 0002) will be exercised in order to capture the total cost of 2 ft of sandy loam fill.

OPTION OPTION Item No. 3

FFP

Option #3 includes the placement and grading of 2 feet of sandy loam fill on a buffer area around the marsh restoration area and the planting of grasses and shrubs on that area (CLIN 0004 IS FOR INFO ONLY. ONLY PRICE THE SUB LINE

ITEMS EXAMPLE 0004AA-0004AD).

UNIT UNIT PRICE AMOUNT

0004AA 1,550 Cubic

OPTION SANDY LOAM FILL, IMPORTED

Labor, materials, equipment, hauling, and spreading in accordance with the plans & specifications (Estimated Quantities)

0004AB .48 Acre

OPTION FINAL GRADING

FFP

Labor, materials, and equipment in accordance with the plans & specifications

0004AC 1 Lump Sum

OPTION OPTION #3 PLUGS

FFP

Labor, equipment, loading, hauling, and installation of Government supplied shrub plants in accordance with the plans & specifications

0004AD 1 Lump Sum

OPTION GRASS SEEDING (OPTION #3)

FFP

Labor, materials, loading, hauling, and equipment in accordance with the plans &

OPTION OPTION Item No. 4

FFP

Option #4 includes the construction of an asphalt overlook from the new asphalt bike path to look out onto the marsh restoration area. Labor, materials, equipment, and installation in accordance with the plans & specifications.

OPTION OPTION Item No. 5

FFP

Option #5 includes the clearing and grubbing of an area north of the onsite placement area, the placement of a soil demarcation barrier, the placement and grading of 1 foot of compost and 1 foot of clean fill on the area, and grass seeding on that area (CLIN 0006 IS FOR INFO ONLY. ONLY PRICE THE SUB LINE

ITEMS EXAMPLE 0006AA-0006AF).

0006AA 1 Lump Sum

OPTION SITE CLEARING AND GRUBBING

FFP

Labor, equipment, and material removal and disposal in accordance with the plans & specifications

UNIT UNIT PRICE AMOUNT

0006AB 2,485 Cubic

Labor, equipment, and spreading from the Department of Sanitation stockpiling

UNIT UNIT PRICE AMOUNT

0006AC 2,765 Cubic

OPTION CLEAN FILL, SUPPLIED BY DSNY

Labor, equipment, and spreading in accordance with the plans & specifications (Estimated Quantities)

0006AD 1.86 Acre

OPTION FINAL GRADING

FFP

0006AE 1 Lump Sum

OPTION GRASS SEEDING

FFP

Labor, materials, loading, hauling, and equipment in accordance with the plans &

0006AF 1 Lump Sum

OPTION SOIL DEMARCATION BARRIER

FFP

Labor, materials, equipment, and installation in accordance with the plans &

OPTION OPTION Item No. 6

FFP

Option #6 includes the clearing and grubbing of an area between the marsh restoration area and the onsite placement area and around the staging area, the placement of a soil demarcation barrier, placement and grading of 1 foot of compost and 1 foot of clean fill on the entire area including the site of the staging area, and grass seeding of the area (excluding the site of the staging area) (CLIN

0007 IS FOR INFO ONLY. ONLY PRICE THE SUB LINE ITEMS EXAMPLE

0007AA-0007AF).

0007AA 1 Lump Sum

OPTION SITE CLEARING AND GRUBBING

FFP

Labor, equipment, and material removal and disposal in accordance with the plans & specifications

UNIT UNIT PRICE AMOUNT

0007AB 5,375 Cubic

Labor, equipment, and spreading from the Department of Sanitation stockpiling

UNIT UNIT PRICE AMOUNT

0007AC 5,575 Cubic

OPTION CLEAN FILL, SUPPLIED BY DSNY

Labor, equipment, and spreading in accordance with the plans & specifications (Estimated Quantities)

0007AD 3.91 Acre

OPTION FINAL GRADING

FFP

0007AE 1 Lump Sum

OPTION GRASS SEEDING

FFP

Labor, materials, loading, hauling, and equipment in accordance with the plans &

0007AF 1 Lump Sum

OPTION SOIL DEMARCATION BARRIER

FFP

Labor, materials, equipment, and installation in accordance with the plans &

0008 1 Lump Sum OPTION OPTION Item No. 7

FFP

Option #7 includes the construction of an interpretive sign next to the marsh overlook. Labor, materials, equipment, and installation in accordance with the plans & specifications.

1.1.1 TOTAL

Total Amount

TOTAL BASE BID AMOUNT (CLIN 0001) $__________________________

TOTAL OPTIONS (CLINS 0002 Through 0008) $__________________________

TOTAL BASE PLUS OPTIONS (CLIN 0001 THRU 0008) $__________________________

NOTES:

1. The low bidder for purposes of award will be the lowest conforming responsible bidder offering the lowest Total Base Bid Amount and the Optional Bid Amount for all Items.

2. Any bid price for items indicated above which are materially unbalanced as to price for the Base Bid Item and the Optional Items may be rejected. An unbalanced bid is one, which is based on price significantly less than cost for some work and price which is significantly overstated for other work.

3. Bidders are required to bid on all items or their bid will be rejected.

4. Bidders are reminded that they must bid on the issued plans and specifications as amended, Any deviations, conditions, or amendments made by the bidders thereto may render the bid non-responsive and be cause for its rejection.

5. Optional bid items, if awarded will be as follows:

6. Option 1 - Bid Item 0002, Placement of a soil demarcation barrier, placement and grading of 1 foot of compost and 1 foot of clean fill, may be exercised within 60 calendar days from receipt of Base Bid NTP date. No additional time shall be added to the contract. CLIN 0002 IS FOR INFO ONLY. ONLY PRICE THE SUB LINE ITEMS EXAMPLE

0002AA-0002AD.

7. Option 1 - Bid Item 0002AA, Labor, equipment, and spreading of the compost from the Department of Sanitation stockpiling site may be exercised within 60 calendar days from receipt of Base Bid NTP date. No additional time shall be added to the contract.

8. Option 1 - Bid Item 0002AB, Labor, materials, equipment, hauling and spreading of the sandy loam fill may be exercised within 60 calendar days from receipt of Base Bid NTP date. No additional time shall be added to the contract.

9. Option 1 - Bid Item 0002AC, Labor, materials, equipment and final survey for the final grading, may be exercised within 60 calendar days from receipt of Base Bid NTP date. No additional time shall be added to the contract.

10. Option 1 - Bid Item 0002AD, Labor, materials, equipment and installation of a soil demarcation barrier, may be exercised within 60 calendar days from receipt of Base Bid NTP date. No additional time shall be added to the contract.

11. Option 2 - Bid Item 0003, Incremental cost increase for labor, materials, equipment, hauling and placement/spreading of 1 foot of sandy loam fill in lieu of only 1 foot of compost and the soil demarcation barrier from Option #1, may be exercised within 60 calendar days from receipt of Base Bid NTP date. No additional time shall be added to the contract.

12. If Option 2 (Bid Item 0003) is exercised, all sub CLINS for Option 1 (Bid Item 0002) will be exercised in order to capture the total cost of 2 feet of sandy loam fill. Option 1 consists of 1 foot of compost plus 1 foot of sandy loam fill, totaling 2 feet. Option 2 replaces 1 foot of compost from Option 1 with 1 foot of sandy loam fill. If Option 2 is exercised the contractor will have to place 2 feet of sandy loam fill and no compost.

13. Option 3 - Bid Item 0004, Placement and grading of 2 feet of clean fill and planting of grasses and shrubs may be exercised within 60 calendar days from receipt of Base Bid NTP date. No additional time shall be added to the contract. CLIN 0004 IS FOR INFO ONLY. ONLY PRICE THE SUB LINE ITEMS EXAMPLE 0004AA-0004AD.

14. Option 3 - Bid Item 0004AA, Labor, materials, equipment, hauling and spreading of the sandy loam fill, may be exercised within 60 calendar days from receipt of Base Bid NTP date. No additional time shall be added to the contract.

15. Option 3 - Bid Item 0004AB, Labor, materials and equipment for the final grading, may be exercised within 60 calendar days from receipt of Base Bid NTP date. No additional time shall be added to the contract.

16. Option 3 - Bid Item 0004AC, Labor, equipment, loading, hauling, and installation of Government supplied plug plants may be exercised within 60 calendar days from receipt of Base Bid NTP date. No additional time shall be added to the contract.

17. Option 3 - Bid Item 0004AD, Labor, materials, and equipment for the grass seeding, may be exercised within 60 calendar days from receipt of Base Bid NTP date. No additional time shall be added to the contract.

18. Option 4 - Bid Item 0005, Construction of an asphalt overlook, labor, materials, equipment and installation for the asphalt overlook may be exercised within 60 calendar days from receipt of Base Bid NTP date. No additional time shall be added to the contract.

19. Option 5 - Bid Item 0006, Clearing and grubbing of an area north of the onsite placement area, placement of a soil demarcation barrier, placement and grading of 1 foot compost and 1 foot of clean fill, and grass seeding, may be exercised within 60 calendar days from receipt of Base Bid NTP date. No additional time shall be added to the contract. . CLIN 0006 IS FOR INFO ONLY. ONLY PRICE THE SUB LINE ITEMS EXAMPLE 0006AA-0006AF.

20. Option 5 - Bid Item 0006AA, Labor, equipment, and material removal and disposal for site clearing and grubbing, may be exercised within 60 calendar days from receipt of Base Bid NTP date. No additional time shall be added to the contract.

21. Option 5 - Bid Item 0006AB, Labor, equipment, and spreading of the compost from the Department of Sanitation stockpiling site, may be exercised within 60 calendar days from receipt of Base Bid NTP date. No additional time shall be added to the contract.

22. Option 5 - Bid Item 0006AC, Labor, equipment and spreading of the clean fill supplied by Department of Sanitation, may be exercised within 60 calendar days from receipt of Base Bid NTP date. No additional time shall be added to the contract.

23. Option 5 - Bid Item 0006AD, Labor, materials and equipment for the final grading, may be exercised within 60 calendar days from receipt of Base Bid NTP date. No additional time shall be added to the contract.

24. Option 5 - Bid Item 0006AE, Labor, materials and equipment for the grass seeding, may be exercised within 60 calendar days from receipt of Base Bid NTP date. No additional time shall be added to the contract.

25. Option 5 - Bid Item 0006AF, Labor, materials, equipment, and installation of a soil demarcation barrier, may be exercised within 60 calendar days from receipt of Base Bid NTP date. No additional time shall be added to the contract.

26. Option 6 - Bid Item 0007, Clearing and grubbing, placement of a soil demarcation barrier, placement and grading of 1 foot of compost and 1 foot of clean fill and grass seeding, may be exercised within 60 calendar days from receipt of Base Bid NTP date. No additional time shall be added to the contract. CLIN 0007 IS FOR INFO ONLY. ONLY

PRICE THE SUB LINE ITEMS EXAMPLE 0007AA-0004AF.

27. Option 6 - Bid Item 0007AA, Labor, equipment and material removal and disposal for site clearing and grubbing, may be exercised within 60 calendar days from receipt of Base Bid NTP date. No additional time shall be added to the contract.

28. Option 6 - Bid Item 0007AB, Labor, equipment, and spreading of the compost from the Department of Sanitation stockpiling site, may be exercised within 60 calendar days from receipt of Base Bid NTP date. No additional time shall be added to the contract.

29. Option 6 - Bid Item 0007AC, Labor, equipment and spreading for the clean fill supplied by Department of Sanitation, may be exercised within 60 calendar days from receipt of Base Bid NTP date. No additional time shall be added to the contract.

30. Option 6 - Bid Item 0007AD, Labor, materials and equipment for the final grading, may be exercised within 60 calendar days from receipt of Base Bid NTP date. No additional time shall be added to the contract.

31. Option 6 - Bid Item 0007AE, Labor, materials and equipment for the grass seeding, may be exercised within 60 calendar days from receipt of Base Bid NTP date. No additional time shall be added to the contract.

32. Option 6 - Bid Item 0007AF, Labor, materials, equipment, and installation of a soil demarcation barrier, may be exercised within 60 calendar days from receipt of Base Bid NTP date. No additional time shall be added to the contract.

33. Option 7 - Bid Item 0008, Labor, materials, equipment, and installation of an interpretive sign, to be awarded within 60 calendar days from receipt of Base Bid NTP date. No additional time shall be added to the contract.

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

The following have been added by full text:

REVISED WAGE RATES

General Decision Number: NY100003 07/29/2011 NY3

Superseded General Decision Number: NY20080003

State: New York NC 7/29/11

Construction Types: Building, Heavy, Highway and Residential

Counties: Bronx, Kings, New York, Queens and Richmond Counties in New York.

BUILDING & RESIDENTIAL CONSTRUCTION PROJECTS (includes single family homes and apartments up to and including 4 stories), HEAVY AND HIGHWAY CONSTRUCTION PROJECTS

Modification Number Publication Date 0 03/12/2010 1 03/26/2010 2 04/16/2010 3 04/23/2010 4 07/23/2010 5 08/06/2010 6 08/27/2010 7 10/08/2010 8 10/15/2010 9 11/05/2010 10 11/12/2010 11 11/19/2010 12 12/03/2010 13 12/17/2010 14 12/31/2010 15 01/07/2011 16 01/28/2011 17 02/11/2011 18 03/25/2011 19 04/08/2011 20 04/22/2011 21 04/29/2011 22 05/06/2011 23 05/20/2011 24 06/03/2011 25 06/10/2011 26 06/17/2011

27 07/01/2011 28 07/15/2011 29 07/22/2011 30 07/29/2011

* ASBE0012‐001 07/04/2011

Rates Fringes

Asbestos Workers/Insulator Includes application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems.....................$ 60.03 25.89

HAZARDOUS MATERIAL HANDLER.......$ 30.00 9.10

BOIL0005‐001 01/01/2011

Rates Fringes

BOILERMAKER......................$ 47.32 19.43

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Thanksgiving Day, Memorial Day, Independence Day, Labor Day and Good Friday, Friday after Thanksgiving, Christmas Eve Day and New Year's Eve

BRNY0001‐001 07/01/2010

Rates Fringes

BRICKLAYER.......................$ 51.00 21.44

MASON ‐ STONE....................$ 57.61 23.86

BRNY0001‐002 06/01/2011

Rates Fringes

Pointer, cleaner and caulker.....$ 37.55 26.10

BRNY0004‐001 01/01/2011

Rates Fringes

MARBLE MASON.....................$ 51.53 25.60

BRNY0007‐001 01/01/2011

Rates Fringes

TERRAZZO FINISHER................$ 42.86 28.55

TERRAZZO WORKER/SETTER...........$ 44.39 28.55

BRNY0020‐001 01/01/2011

Rates Fringes

MARBLE FINISHER..................$ 42.20 24.93

BRNY0024‐001 01/01/2011

Rates Fringes

BRICKLAYER

MARBLE POLISHERS............$ 36.76 20.31

BRNY0052‐001 12/06/2010

Rates Fringes

Tile Layer.......................$ 47.98 25.81

BRNY0088‐001 12/06/2010

Rates Fringes

TILE FINISHER....................$ 39.09 21.81

CARP0001‐009 07/01/2008

Rates Fringes

Carpenters:

Carpenters & Soft floor layers......................$ 43.02 35.96

CARP0740‐001 07/01/2010

Rates Fringes

MILLWRIGHT.......................$ 46.19 44.93

CARP1456‐004 07/01/2008

Rates Fringes

Dock Builder & Piledrivermen

DOCKBUILDERS................$ 43.61 38.06

CARP1456‐005 07/01/2008

Diver Tender.....................$ 39.18 38.06 Diver............................$ 54.63 38.06

CARP1536‐001 07/01/2003

Rates Fringes

Carpenters:

TIMBERMEN...................$ 34.47 26.05

ELEC0003‐001 05/12/2010

Rates Fringes

ELECTRICIAN

Electricians................$ 49.00 38.97 Jobbing, and maintenance and repair work.............$ 25.30 38.97

PAID HOLIDAYS:

a. New Years Day, Martin Luther King, Jr.'s Birthday, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Columbus Day, Election Day, Thanksgiving Day, the day after Thanksgiving Day, and Christmas Day

ELEC1049‐001 04/06/2008

QUEENS COUNTY

Rates Fringes

Line Construction (Substation and Switching structures pipe type cable installation and maintenance jobs or projects;

Railroad electrical distribution/transmission systems maintenance (when work is not performed by railroad employees) Overhead and Underground transmission/distribution line work. Fiber optic, telephone cable and equipment) Groundman...................$ 24.83 17.91 Heavy Equipment Operator....$ 33.10 17.91

Lineman and Cable Splicer...$ 41.38 17.91 Tree Trimmer................$ 23.06 9.84

ELEV0001‐002 03/17/2011

Rates Fringes

ELEVATOR MECHANIC

Elevator Constructor........$ 53.27 24.855+a+b Modernization and Repair....$ 42.31 24.705+a+b

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Good Friday, President's Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veteran's Day, Thanksgiving Day, Friday after Thanksgiving, and Christmas Day.

b. PAID VACATION: An employee who has worked less than 5 years shall recieve vacation pay credit on the basis of 4% of his hourly rate for all hours worked; an employee who has worked 5 to 15 years shall receive vacation pay credit on the basis of 6% of his hourly rate for all hours worked;

an employee who has worked 15 or more years shall receive vacation pay credit on the basis of 8% of his hourly rate for all hours worked.

ENGI0014‐001 07/01/2011

Rates Fringes

Pavement equipment operator Asphalt Plants..............$ 48.46 24.15 Asphalt roller..............$ 57.65 24.15 Asphalt spreader............$ 59.25 24.15 Power Equipment Operator

(HEAVY & HIGHWAY)

GROUP 1....................$ 77.17 24.15

GROUP 10...................$ 55.32 24.15

GROUP 11...................$ 51.53 24.15

GROUP 12...................$ 52.71 24.15

GROUP 13...................$ 53.16 24.15

GROUP 14...................$ 39.58 24.15

GROUP 15...................$ 36.61 24.15

GROUP 2....................$ 63.29 24.15

GROUP 3....................$ 65.37 24.15

GROUP 4....................$ 63.78 24.15

GROUP 5....................$ 62.48 24.15

GROUP 6....................$ 59.90 24.15

GROUP 7....................$ 61.05 24.15

GROUP 8....................$ 59.25 24.15

GROUP 9....................$ 57.93 24.15

Steel erector Compressors, Welding Machines....................$ 37.87 24.15 Cranes, Hydraulic Cranes, 2 drum derricks, Forklifts, Boom Trucks......$ 64.91 24.15 Three drum derricks.........$ 67.62 24.15 Utility Laborer Horizontal Boring Rig.......$ 56.24 24.15 Off shift compressors.......$ 46.38 24.15 Utility Compressors.........$ 36.37 24.15

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Tower crane

GROUP 2: Backhoes, power shovel, Hydraulic clam shells, moles and machines of a similar type

GROUP 3: Mine hoists and crane, etc. used as mine hoists

GROUP 4: Gradalls, keystones, cranes (with digging buckets), bridge cranes, trenching machines, vermeer cutter and machines of a similar nature

GROUP 5: Piledrivers, derrick boats, tunnel shovels

GROUP 6: All drills, and machines of a similar nature

GROUP 7: Back filling machines, cranes, mucking machines, dual drum pavers

GROUP 8: Mixers (concrete w/loading attachments), concrete pavers, cableways, land derricks, power house (low pressure units), concrete pumps

GROUP 9: Concrete plants, well drilling machines, stone crushers double drum hoist, power house (other than above)

GROUP 10: Concrete mixers

GROUP 11: Elevators

GROUP 12: Concrete breaking machine, Hoists (single drum), load masters, locomotive and dinkies over 10 tons

GROUP 13: Vibratory console

GROUP 14: Compressors (portable 3 or more in battery), tugger machine (caissons), well point pumps, chum drill

GROUP 15: Boilers, (high pressure, compressors (portable, single, or 2 in battery, not over 100' apart), pumps (river cofferdam and welding machines (except where arc is operated by members of local 15) push button machines, all engines irrespective of power (power pac) used to drive auxilliary equipment, air, hydraulic etc.

PREMIUMS ON CRANES (Crawler or Truck):

100' to 149' boom ‐ add .50 150' to 249' boom ‐ add .75 250' to 349' boom ‐ add 1.00 350' to 450' boom ‐ add 1.50

Premiums for Cranes on Steel Erection:

100' to 149' boom ‐ add 1.75 150' to 249' boom ‐ add 2.00 250' to 349' boom ‐ add 2.25 350' to 450' boom ‐ add 2.75 Tower crane ‐ add 2.00

FOOTNOTE:

a. Paid Holidays: New Year's Day; Lincoln's Birthday;

Washington's Birthday; Memorial Day; Independence Day;

Labor Day; Veterans Day; Columbus Day; Election Day;

Thanksgiving Day; and Christmas Day; provided the employee works one day the payroll week in which the holiday occurs.

ENGI0014‐002 08/01/2010

Rates Fringes

Power Equipment Operator

BUILDING & RESIDENTIAL

GROUP 1....................$ 58.57 25.26+a GROUP 2....................$ 62.15 25.26+a GROUP 3....................$ 56.50 25.26+a GROUP 4....................$ 51.22 25.26+a GROUP 5....................$ 37.88 25.26+a

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Double drum

GROUP 2: Stone derrick, cranes, hydraulic cranes, boom trucks

GROUP 3: 4 pole Hoist, Single Drum Hoists

GROUP 4: Fork lift, house cars, plaster (platform machine), plaster bucket, concrete pump and all other equipment used for hoisting material

GROUP 5: Compressors, welding machines (cutting concrete work), paint spraying, sand blasting, pumps (with the exclusion of concrete pumps), house car (settlement basis only), all engines irrespective of power (power pac) used to drive auxiliary equipment, air, hydraulic, etc., boilers

Premiums for Cranes:

100'‐149' boom ‐ add 1.75 150'‐249' boom ‐ add 2.00 250'‐349' boom ‐ add 2.25 350'‐450' boom ‐ add 2.75 Tower cranes add 2.00

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Lincoln's Birthday, Memorial Day, Independence Day, Labor Day, Veteran's Day, Columbus Day, Election Day, Thanksgiving Day, and Christmas Day, provided the employee works one day in the payroll week in which the holiday occurs

IRON0040‐002 01/01/2011

BRONX, NEW YORK, RICHMOND

Rates Fringes

IRONWORKER, STRUCTURAL...........$ 43.30 30.88

IRON0046‐003 07/01/2010

Rates Fringes

IRONWORKER

METALLIC LATHERS............$ 39.00 47.36

IRON0197‐001 07/01/2009

Rates Fringes

IRONWORKER

STONE DERRICKMAN............$ 40.50 38.32

IRON0361‐002 01/01/2011

KINGS, QUEENS

Ironworkers:

(STRUCTURAL)................$ 43.30 30.88

IRON0580‐001 01/01/2009

Rates Fringes

IRONWORKER, ORNAMENTAL...........$ 39.85 39.67

LABO0006‐001 07/01/2003

Rates Fringes

Laborers:

BUILDING CONSTRUCTION

CEMENT AND CONCRETE

WORKERS....................$ 31.50 15.27

LABO0029‐001 07/01/2011

Rates Fringes

Laborers:

Heavy Blasters (hydraulic trac drill).....................$ 40.62 28.00 Blasters...................$ 39.89 28.00 Hydraulic Trac Drill.......$ 29.55 28.00 Jackhammers, Chippers, Spaders, Concrete Breakers, All Other Pneumatic Tools, Walk Behind Self‐Propelled Hydraulic Asphalt and Concrete Breaker...........$ 34.14 28.00 Powder Carriers............$ 30.68 28.00 Wagon; Airtrac; Quarry Bar Drill Runners..........$ 35.07 28.00

LABO0078‐001 12/01/2009

Rates Fringes

LABORERS

BUILDING CONSTRUCTION

ASBESTOS (Removal, Abatement, Encapsulation or Decontamination of asbestos); LEAD; &

HAZARDOUS WASTE LABORERS

(Hazardous Waste, Hazardous Materials, Biochemical and Mold Remediation, HVAC, Duct Cleaning, Re‐spray Fireproofing, etc).........$ 31.50 12.45

* LABO0079‐001 07/01/2011

Rates Fringes

Laborers Building Construction Demolition Laborers Tier A.....................$ 32.85 18.74 Tier B.....................$ 22.15 12.95 Mason Tenders...............$ 32.99 20.56

CLASSIFICATIONS

TIER A: Responsible for the removal of all interior petitions and structural petitions that can consist of sheet rock, block or masonry. Also, all structural slab openings for ducts, mechanical, shafts, elevators, slab openings and exterior walls where the building is not being completely demolitioned.

TIER B: Responsible for shoveling of debris into containers, pushing containers from the inside to the outside of the building.

LABO0147‐001 07/01/2003

Rates Fringes

LABORERS (FREE AIR & TUNNEL).....$ 28.86 30.51

Maintenance Men, Inside Muck Lock Tenders, Pump Men, Electricians, Cement Finishers, Caulkers, Hydraulic Men, Shield Men, Monorail Operators, Motor Men, Conveyor Men, Powder Carriers, Pan Men, Riggers, Chuck Tenders, Track Men Painters, Nippers, Brakemen, Cable Men, Hose Men, Grout Men, Gravel Men, Form Workers, Concrete Workers, Tunnel Laborers, Mole Nipper (one (1) Mole Sipper per Working Shaft per Shift for up to and including Two (2) Moles

LABO0731‐001 07/01/2011

Rates Fringes

Laborers:

Building, Heavy and Residential Construction

UNSKILLED..................$ 38.20 30.27

UTILITY LABORER............$ 38.05 30.27

Heavy & Highway Construction

LABORER/EXCAVATION

{Asbestos, Lead, Hazardous Waste Removal (including soil)..........$ 36.64 26.21

Paid Holidays: Labor Day and Thanksgiving Day

LABO1010‐001 07/01/2011

Rates Fringes

Laborers:

HIGHWAY CONSTRUCTION

Fence Installer & Repairer.$ 38.34 30.25

FORMSETTERS................$ 42.21 30.25

LABORERS...................$ 38.34 30.25

Landscape Planting & Maintenance................$ 38.34 30.25 Maintenance Safety Surface.$ 38.34 30.25 Slurry/Sealcoater/Play Equipment Installer........$ 38.34 30.25 Small Equipment Operator (Not Operating Engineer)..................$ 28.94 15.55+a Small Equipment Operator (Not Operating Engineer)...$ 38.34 30.25 Small Power Tools Operator.$ 38.34 30.25

FOOTNOTES:

a. PAID HOLIDAYS: Memorial Day, Fourth of July, Labor Day, Columbus Day, Election Day and Thanksgiving Day, provided the employee has worked one (1) day in the calendar week in which the said holiday occurs.

LABO1010‐002 07/01/2011

Rates Fringes

Laborers‐Asphalt Construction:

Micro Paver.................$ 44.86 30.25 Raker.......................$ 44.37 30.25 Screedperson................$ 44.86 30.25 Shoveler (Production Paving Only)................$ 41.08 30.25 Small Equipment Operator (Asphalt)...................$ 41.08 30.25

PAIN0009‐001 05/01/2010

GLAZIER..........................$ 39.00 32.24

Painters:

Painters, Drywall Finishers, Lead Abatement Worker......................$ 34.50 19.84 Spray, Scaffold and Sandblasting................$ 37.50 19.84

PAIN0806‐001 10/01/2010

Rates Fringes

Painters:

Structural Steel and Bridge.$ 46.25 31.03

PAIN1974‐001 07/01/2009

Rates Fringes

Painters:

Drywall Tapers/Pointers.....$ 41.32 20.81

PLAS0262‐001 08/01/2010

BRONX, NEW YORK AND RICHMOND COUNTIES:

Rates Fringes

PLASTERER........................$ 39.53 25.55

PLAS0262‐002 08/01/2010

KINGS AND QUEENS COUNTIES

Rates Fringes

PLASTERER........................$ 39.53 25.55

PLAS0530‐001 08/03/2005

Rates Fringes

PLASTERER

DRYWALL PLASTERERS..........$ 37.03 18.30

PLAS0780‐001 06/01/2010

CEMENT MASON/CONCRETE FINISHER...$ 49.50 35.57

PLUM0001‐001 07/01/2011

Rates Fringes

PLUMBER

MECHANICAL EQUIPMENT AND

SERVICE

Any repair and/or replacement of the present plumbing system that does not change the existing roughing..........$ 32.21 15.05

PLUMBERS:...................$ 51.11 22.53

PLUM0638‐001 07/01/2011

Rates Fringes

PLUMBER

SERVICE FITTERS.............$ 26.30 2.55

SPRINKLER FITTERS,

STEAMFITTERS................$ 56.06 68.08

Service Fitter work shall consist of all repair, service and maintenance work on domestic, commercial and industrial refrigeration, air conditioning and air cooling, stoker and oil burner apparatus and heating apparatus etc., including but not exclusively the charging, evacuation, leak testing and assembling for all machines for domestic, commercial and industrial refrigeration, air conditioning and heating apparatus. Also, work shall include adjusting, including capacity adjustments, checking and repairing or replacement of all controls and start up of all machines and repairing all defects that may develop on any system for domestic, commercial and industrial refrigeration and all air conditioning, air cooling, stoker and oil burner apparatus and heating apparatus regardless of size or type.

ROOF0008‐003 06/01/2010

Rates Fringes

ROOFER, Including Built Up, Composition and Single Ply Roofs............................$ 37.75 28.86

SHEE0028‐002 07/29/2010

SHEET METAL WORKER

BUILDING CONSTRUCTION.......$ 48.15 36.03

RESIDENTIAL CONSTRUCTION....$ 27.22 16.48

TEAM0282‐001 07/01/2009

Rates Fringes

Truck drivers:

TRUCK DRIVERS:

Asphalt....................$ 35.40 29.2025+a+b Euclids & Turnapulls.......$ 35.50 29.2025+a+b High Rise..................$ 42.21 29.2025+a+b

FOOTNOTES:

PAID HOLIDAYS: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Election Day, Veterans' Day (Armistice Day), Thanksgiving Day and Christmas Day. Employees working two (2) days in the calendar week in which a holiday falls are to be paid for such holiday, provided that they shape each remaining workday during such calendar week.

b. VACATION: For each 15 days worked within the contract year an employee will receive one day's vacation with pay with a maximum vacation of 3 weeks per year.

TEAM0813‐001 12/01/1998

Rates Fringes

Truck drivers:

GROUP 1....................$ 19.49 3.61+a GROUP 2....................$ 19.76 3.61+a GROUP 3....................$ 19.90 3.61+a GROUP 4....................$ 20.23 3.61+a GROUP 5....................$ 20.40 3.61+a GROUP 6....................$ 21.29 3.61+a GROUP 7....................$ 22.40 3.61+a GROUP 8....................$ 19.90 3.61+a

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Martin Luther King, Jr.'s Birthday, Presidents' Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Thanksgiving Day, Christmas Day, Employee's Birthday, Two (2) Personal Days, and any holiday or day of mourning proclaimed as such by the State or Federal Government.

TRUCK DRIVER CLASSIFICATIONS

GROUP 1: Closed body trucks with self contained loading unit up to and including 22 yard capacity

GROUP 2: Open trucks, rack body or trucks with no self contained mechanical loading device, up to 22 yard capacity. One‐container tractor hoist

GROUP 3: 10 wheel, open trucks, container loaders, dino‐master, over‐cab loaders, rack body trucks, or any trucks 22 yards to and including 25 yards capacity

GROUP 4: Rubbish and garbage trucks, 26 yards to and including 31 yards

GROUP 5: Single axle working non‐compactor containers up to 15 yards capacity on rubbish and garbage removal

GROUP 6: Roll‐off trucks up to and including 42 yard capacity

GROUP 7: Roll‐off truck with more than 42 yard capacity or any tractor trailer trucks

GROUP 8: One‐container tractor hoist on construction and alteration debris removal

WELDERS ‐ Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis‐Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

(End of Summary of Changes)