Amendment 1 .pdf
PDF 126 KB Posted
- Solicitation number
- W912DS-11-B-0006
About this file
Amendment 0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Abstract.pdf | ||
| Amendment 4.pdf | ||
| Amendment 3.pdf | ||
| Amendment 2 .doc.pdf | ||
| REGISTER.pdf | ||
| Section 10 14 23.pdf | ||
| Site VIsit.pdf | ||
| Soundview-Plans-p3.pdf | ||
| Specs.pdf | ||
| Soundview-Plans-p2.pdf | ||
| Soundview-Plans-p1.pdf | ||
| Solicitation.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W16ROE11265545
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this Amendment is to:
a. Provide questions and Answ ers for INFORMATION PURPOSES ONLY
b. Provide Revised Wage Rates NY100003 07/29/2011 NY3
c. Provide Revised Bid Schedule.
d. Provide Revised Specif ications.
e. Questions must be submitted NO LATER THAN 12 August 2011 10:00 AM.
f. The due date remains 23 August 2011 @ 2:00pm EST.
NOTE: Bidders must acknow ledge receipt of this amendment by the date specif ied in the solicitation (or as amended) by one of the follow ing methods. In the space provided on the SF 1442, by separate letter, or by sinning the block 15 below . FAILURE TO ACKNOWLEDGE AMNEDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE
MODIFICATION OF BIDS OR LATE WITHDRAWAL OF BIDS (FAR 14.304)
1. CONTRACT ID CODE PAGE OF PAGES
J 1 41
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 04-Aug-2011
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-11-B-0006
X 9B. DATED (SEE ITEM 11)
19-Jul-2011
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
04-Aug-2011
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 1843
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DS-11-B-0006
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 1
W912DS-11-B-0006
Amendment No. 1
USACE, NYD Corps of Engineers New York, NY 10278
AMENDMENT NO.1 FOR RFP NO. W912DS-11-B-0006
BIDDER’S QUESTIONS AND GOVERNMENT REPLY FOR INFORMATION
PURPOSES ONLY
Q1: When is high tide?
A1. Refer to Sheet C-102 of the plans for the high tide elevation
Q2: Contractor wanted to know the extent of the salt marsh area.
A2. Refer to Sheet CE-101 for the proposed salt marsh extent
Q3: Will a list of the contractor attendees of this site visit be available?
A3. Yes attached to Amendment 0001 is a copy of the sign in sheet.
Q4: Can the RFI be submitted via email? Can you provide the email address?
A4. Response: RFI can be submitted via email to Jason Parker @ jason.l.parker@usace.army.mil.
Q5: Is the gas stand pipeline on the northern section of the project clearly displayed on the plans?
A5. Refer to Sheet C-109 for the gas stand pipe
Q6: Was the placement site an old trash dump site?
A6. Corps soil samples do not indicate the site was formally used as a municipal household dump/trash site.
The following changes shall be made to the specifications.
1) SPECIFICATIONS:
1-Section 10 14 23 Insert Section 10 14 23 in its entirety.
2-Section 02 22 70
A- Revise paragraph 1.1.1 by deleting “0003AA” and replacing with “0003”
B- Revise paragraph 3.1.1 by deleting “0003AA” and replacing with “0003”
3-Section 31 05 22
A- Revise paragraph 1.1 by deleting “item no. 0005AA” and replacing with “item no.
0005”
4-Section 32 11 16
A- Revise paragraph 1.1 by deleting “item no. 0005AA” and replacing with “item no.
0005”
5-Section 00 80 00
A- Revise paragraph 1.a (iv) by deleting “If Option #1, Option #2, Option #3, Option #4, Option #5 and Option #6 are to be awarded, they shall be awarded within 60 calendar days from issuance of the Base Bid NTP date and no additional time shall be added to contract. The time stated for completion shall include the final cleanup of the premises. (FAR 52-212-3)” and replacing with “If Option #1, Option #2, Option #3, Option #4, Option #5, Option #6 and Option #7 are to be awarded, they shall be awarded within 60 calendar days from issuance of the Base Bid NTP date and no additional time shall be added to contract. The time stated for completion shall include the final cleanup of the premises. (FAR 52-212-3)”
6-Section 01 33 00.00 18
A- Revise Submittal Register by deleting Submittal Register at the end of Section 01 33 00.00 18 and replacing in its entirety with the new Submittal Register.
7-Section 00 01 00 Delete Section 00 01 00 in its entirety and replace in its entirety with the following:
Revised Bid Schedule
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Base Bid
FFP
The Base Bid shall focus on the clearing and grubbing of the project area, the restoration and construction of a marsh area, the placement of excavated soil at an onsite placement area, the construction of a new asphalt bike path, and the planting of vegetation on the project site. (CLIN 0001 IS FOR INFO ONLY. ONLY PRICE
THE SUB LINE ITEMS EXAMPLE 0001AA- 0001AP)
FOB: Destination
MILSTRIP: W16ROE11265545
PURCHASE REQUEST NUMBER: W16ROE11265545
NET AMT
0001AA 1 Lump Sum
MOBILIZATION AND DEMOBILIZATION
FFP
Furnishing and maintenance of services, equipment, and facilities & removal (as necessary), in accordance with the plans & specifications FOB: Destination
0001AB 1 Lump Sum
WORKSITE ACCESS ROADS
FFP
Labor, materials, equipment, installation, maintenance, removal, and restoring vegetations (as necessary) in accordance with the plans & specifications
0001AC 1 Lump Sum
STAGING AREA
FFP
Labor, materials, equipment, installation, maintenance, removal, and restoring vegetations (as necessary) in accordance with the plans & specifications
0001AD 1 Lump Sum
SITE CLEARING AND GRUBBING
FFP
Labor, equipment, material, installation, demolition, removal, and disposal in accordance with the plans & specifications
0001AE 2.73 Acre
HERBIVORY FENCE
FFP
Labor, materials, equipment, and installation in accordance with the plans & specifications
ITEM NO SUPPLIES/SERVICES ESTIMATED
QUANTITY
UNIT UNIT PRICE AMOUNT
0001AF 1,700 Cubic Yard
NON-HAZARDOUS SOIL REMOVAL
FFP
Labor, equipment, dewatering, hauling, removal, and disposal of non-hazardous soils with regulatory exceedances excavated from the marsh restoration area and disposed of at an approved off-site disposal site in accordance with the plans & specifications (Estimated Quantities)
UNIT UNIT PRICE AMOUNT
0001AG 8,240 Cubic
CONSTRUCTION DEBRIS REMOVAL
Labor, equipment, hauling, removal, and disposal to the approved disposal facility in accordance with the plans & specifications (Estimated Quantities)
UNIT UNIT PRICE AMOUNT
0001AH 42,260 Cubic
UNCLASSIFIED EXCAVATION
Labor, equipment, any necessary pumping or diversions, hauling, placement, and rough grading of soils excavated from the marsh restoration area which are suitable for onsite placement (soils with contamination levels below regulatory concern) in accordance with the plans & specifications (Estimated Quantities)
UNIT UNIT PRICE AMOUNT
0001AJ 11,310 Cubic
SAND FILL, IMPORTED
Labor, materials, equipment, hauling, and spreading on the marsh restoration area in accordance with the plans & specifications
0001AK 3.70 Acre
FINAL GRADING (MARSH RESTORATION AREA)
FFP
Labor, materials, equipment, and final survey for final grading of marsh restoration area in accordance with the plans & specifications
0001AL 1 Lump Sum
ASPHALT BIKE PATH
FFP
Labor, materials, equipment, and installation in accordance with the plans &
0001AM 1 Lump Sum
MARSH AND UPLAND AREA PLANTINGS
FFP
Labor, equipment, loading, hauling, and installation of Government supplied plugs, shrubs, and trees in the marsh and adjacent upland planting areas in accordance with the plans & specifications
0001AN 1 Lump Sum
GRASS SEEDING
FFP
(STAGING AREA, WORKSITE ACCESS ROADS AND ONSITE
PLACEMENT AREA) Labor, materials, loading, hauling, and equipment for grass seeding of the areas cleared and grubbed for the staging areas, the construction access roads and all other cleared areas not include in other bid items, as well as grass seeding for the onsite placement area after the addition of the clean fill cap as per Option #1 or Option #2, in accordance with the plans & specifications
0001AP 1 Lump Sum
GRASS SEEDING
FFP
(LOW-SALT TOLERANT UPLAND AREA) Labor, materials, loading, hauling, and equipment for grass seeding of the low-salt tolerant upland planting area, in accordance with the plans & specifications
OPTION OPTION Item No. 1
FFP
Option #1 includes the placement of a soil demarcation barrier and the placement and grading of 1 foot of compost and 1 foot of sandy loam fill on the onsite placement area to cap the excavation fill from the marsh restoration area. (CLIN
0002 IS FOR INFO ONLY. ONLY PRICE THE SUB LINE ITEMS EXAMPLE
0002AA-0002AD
UNIT UNIT PRICE AMOUNT
0002AA 9,470 Cubic
OPTION COMPOST, SUPPIED BY DSNY
Labor, equipment, and spreading from the Department of Sanitation stockpiling site in accordance with the plans & specifications (Estimated Quantities)
UNIT UNIT PRICE AMOUNT
0002AB 9,830 Cubic
OPTION SANDY LOAM FILL, IMPORTED
Labor, materials, equipment, hauling, and spreading in accordance with the plans & specifications (Estimated Quantities)
0002AC 6.24 Acre
OPTION FINAL GRADING
FFP
Labor, materials, equipment, and final survey in accordance with the plans &
0002AD 1 Lump Sum
OPTION SOIL DEMARCATION BARRIER
FFP
Labor, materials, equipment, and installation in accordance with the plans &
OPTION OPTION Item No. 2
FFP
Option #2 includes the incremental cost increase for the placement and grading of 1 ft of sandy loam fill in place of the 1 ft of compost (COMPOST, SUPPLIED BY DSNY) from Option #1 on the onsite placement area. This would be a total of 2 ft of sandy loam fill in lieu of 1 ft of compost and 1 ft of sandy loam fill. The soil demarcation barrier from Option #1 (0002AD) will not be required if Option #2 is exercised. Incremental cost increase for labor, materials, equipment, hauling, and spreading in accordance with the plans & specifications If Option 2 (Bid Item 0003) is exercised, all sub CLINS for Option 1 (Bid Item 0002) will be exercised in order to capture the total cost of 2 ft of sandy loam fill.
OPTION OPTION Item No. 3
FFP
Option #3 includes the placement and grading of 2 feet of sandy loam fill on a buffer area around the marsh restoration area and the planting of grasses and shrubs on that area (CLIN 0004 IS FOR INFO ONLY. ONLY PRICE THE SUB LINE
ITEMS EXAMPLE 0004AA-0004AD).
UNIT UNIT PRICE AMOUNT
0004AA 1,550 Cubic
OPTION SANDY LOAM FILL, IMPORTED
Labor, materials, equipment, hauling, and spreading in accordance with the plans & specifications (Estimated Quantities)
0004AB .48 Acre
OPTION FINAL GRADING
FFP
Labor, materials, and equipment in accordance with the plans & specifications
0004AC 1 Lump Sum
OPTION OPTION #3 PLUGS
FFP
Labor, equipment, loading, hauling, and installation of Government supplied shrub plants in accordance with the plans & specifications
0004AD 1 Lump Sum
OPTION GRASS SEEDING (OPTION #3)
FFP
Labor, materials, loading, hauling, and equipment in accordance with the plans &
OPTION OPTION Item No. 4
FFP
Option #4 includes the construction of an asphalt overlook from the new asphalt bike path to look out onto the marsh restoration area. Labor, materials, equipment, and installation in accordance with the plans & specifications.
OPTION OPTION Item No. 5
FFP
Option #5 includes the clearing and grubbing of an area north of the onsite placement area, the placement of a soil demarcation barrier, the placement and grading of 1 foot of compost and 1 foot of clean fill on the area, and grass seeding on that area (CLIN 0006 IS FOR INFO ONLY. ONLY PRICE THE SUB LINE
ITEMS EXAMPLE 0006AA-0006AF).
0006AA 1 Lump Sum
OPTION SITE CLEARING AND GRUBBING
FFP
Labor, equipment, and material removal and disposal in accordance with the plans & specifications
UNIT UNIT PRICE AMOUNT
0006AB 2,485 Cubic
Labor, equipment, and spreading from the Department of Sanitation stockpiling
UNIT UNIT PRICE AMOUNT
0006AC 2,765 Cubic
OPTION CLEAN FILL, SUPPLIED BY DSNY
Labor, equipment, and spreading in accordance with the plans & specifications (Estimated Quantities)
0006AD 1.86 Acre
OPTION FINAL GRADING
FFP
0006AE 1 Lump Sum
OPTION GRASS SEEDING
FFP
Labor, materials, loading, hauling, and equipment in accordance with the plans &
0006AF 1 Lump Sum
OPTION SOIL DEMARCATION BARRIER
FFP
Labor, materials, equipment, and installation in accordance with the plans &
OPTION OPTION Item No. 6
FFP
Option #6 includes the clearing and grubbing of an area between the marsh restoration area and the onsite placement area and around the staging area, the placement of a soil demarcation barrier, placement and grading of 1 foot of compost and 1 foot of clean fill on the entire area including the site of the staging area, and grass seeding of the area (excluding the site of the staging area) (CLIN
0007 IS FOR INFO ONLY. ONLY PRICE THE SUB LINE ITEMS EXAMPLE
0007AA-0007AF).
0007AA 1 Lump Sum
OPTION SITE CLEARING AND GRUBBING
FFP
Labor, equipment, and material removal and disposal in accordance with the plans & specifications
UNIT UNIT PRICE AMOUNT
0007AB 5,375 Cubic
Labor, equipment, and spreading from the Department of Sanitation stockpiling
UNIT UNIT PRICE AMOUNT
0007AC 5,575 Cubic
OPTION CLEAN FILL, SUPPLIED BY DSNY
Labor, equipment, and spreading in accordance with the plans & specifications (Estimated Quantities)
0007AD 3.91 Acre
OPTION FINAL GRADING
FFP
0007AE 1 Lump Sum
OPTION GRASS SEEDING
FFP
Labor, materials, loading, hauling, and equipment in accordance with the plans &
0007AF 1 Lump Sum
OPTION SOIL DEMARCATION BARRIER
FFP
Labor, materials, equipment, and installation in accordance with the plans &
0008 1 Lump Sum OPTION OPTION Item No. 7
FFP
Option #7 includes the construction of an interpretive sign next to the marsh overlook. Labor, materials, equipment, and installation in accordance with the plans & specifications.
1.1.1 TOTAL
Total Amount
TOTAL BASE BID AMOUNT (CLIN 0001) $__________________________
TOTAL OPTIONS (CLINS 0002 Through 0008) $__________________________
TOTAL BASE PLUS OPTIONS (CLIN 0001 THRU 0008) $__________________________
NOTES:
1. The low bidder for purposes of award will be the lowest conforming responsible bidder offering the lowest Total Base Bid Amount and the Optional Bid Amount for all Items.
2. Any bid price for items indicated above which are materially unbalanced as to price for the Base Bid Item and the Optional Items may be rejected. An unbalanced bid is one, which is based on price significantly less than cost for some work and price which is significantly overstated for other work.
3. Bidders are required to bid on all items or their bid will be rejected.
4. Bidders are reminded that they must bid on the issued plans and specifications as amended, Any deviations, conditions, or amendments made by the bidders thereto may render the bid non-responsive and be cause for its rejection.
5. Optional bid items, if awarded will be as follows:
6. Option 1 - Bid Item 0002, Placement of a soil demarcation barrier, placement and grading of 1 foot of compost and 1 foot of clean fill, may be exercised within 60 calendar days from receipt of Base Bid NTP date. No additional time shall be added to the contract. CLIN 0002 IS FOR INFO ONLY. ONLY PRICE THE SUB LINE ITEMS EXAMPLE
0002AA-0002AD.
7. Option 1 - Bid Item 0002AA, Labor, equipment, and spreading of the compost from the Department of Sanitation stockpiling site may be exercised within 60 calendar days from receipt of Base Bid NTP date. No additional time shall be added to the contract.
8. Option 1 - Bid Item 0002AB, Labor, materials, equipment, hauling and spreading of the sandy loam fill may be exercised within 60 calendar days from receipt of Base Bid NTP date. No additional time shall be added to the contract.
9. Option 1 - Bid Item 0002AC, Labor, materials, equipment and final survey for the final grading, may be exercised within 60 calendar days from receipt of Base Bid NTP date. No additional time shall be added to the contract.
10. Option 1 - Bid Item 0002AD, Labor, materials, equipment and installation of a soil demarcation barrier, may be exercised within 60 calendar days from receipt of Base Bid NTP date. No additional time shall be added to the contract.
11. Option 2 - Bid Item 0003, Incremental cost increase for labor, materials, equipment, hauling and placement/spreading of 1 foot of sandy loam fill in lieu of only 1 foot of compost and the soil demarcation barrier from Option #1, may be exercised within 60 calendar days from receipt of Base Bid NTP date. No additional time shall be added to the contract.
12. If Option 2 (Bid Item 0003) is exercised, all sub CLINS for Option 1 (Bid Item 0002) will be exercised in order to capture the total cost of 2 feet of sandy loam fill. Option 1 consists of 1 foot of compost plus 1 foot of sandy loam fill, totaling 2 feet. Option 2 replaces 1 foot of compost from Option 1 with 1 foot of sandy loam fill. If Option 2 is exercised the contractor will have to place 2 feet of sandy loam fill and no compost.
13. Option 3 - Bid Item 0004, Placement and grading of 2 feet of clean fill and planting of grasses and shrubs may be exercised within 60 calendar days from receipt of Base Bid NTP date. No additional time shall be added to the contract. CLIN 0004 IS FOR INFO ONLY. ONLY PRICE THE SUB LINE ITEMS EXAMPLE 0004AA-0004AD.
14. Option 3 - Bid Item 0004AA, Labor, materials, equipment, hauling and spreading of the sandy loam fill, may be exercised within 60 calendar days from receipt of Base Bid NTP date. No additional time shall be added to the contract.
15. Option 3 - Bid Item 0004AB, Labor, materials and equipment for the final grading, may be exercised within 60 calendar days from receipt of Base Bid NTP date. No additional time shall be added to the contract.
16. Option 3 - Bid Item 0004AC, Labor, equipment, loading, hauling, and installation of Government supplied plug plants may be exercised within 60 calendar days from receipt of Base Bid NTP date. No additional time shall be added to the contract.
17. Option 3 - Bid Item 0004AD, Labor, materials, and equipment for the grass seeding, may be exercised within 60 calendar days from receipt of Base Bid NTP date. No additional time shall be added to the contract.
18. Option 4 - Bid Item 0005, Construction of an asphalt overlook, labor, materials, equipment and installation for the asphalt overlook may be exercised within 60 calendar days from receipt of Base Bid NTP date. No additional time shall be added to the contract.
19. Option 5 - Bid Item 0006, Clearing and grubbing of an area north of the onsite placement area, placement of a soil demarcation barrier, placement and grading of 1 foot compost and 1 foot of clean fill, and grass seeding, may be exercised within 60 calendar days from receipt of Base Bid NTP date. No additional time shall be added to the contract. . CLIN 0006 IS FOR INFO ONLY. ONLY PRICE THE SUB LINE ITEMS EXAMPLE 0006AA-0006AF.
20. Option 5 - Bid Item 0006AA, Labor, equipment, and material removal and disposal for site clearing and grubbing, may be exercised within 60 calendar days from receipt of Base Bid NTP date. No additional time shall be added to the contract.
21. Option 5 - Bid Item 0006AB, Labor, equipment, and spreading of the compost from the Department of Sanitation stockpiling site, may be exercised within 60 calendar days from receipt of Base Bid NTP date. No additional time shall be added to the contract.
22. Option 5 - Bid Item 0006AC, Labor, equipment and spreading of the clean fill supplied by Department of Sanitation, may be exercised within 60 calendar days from receipt of Base Bid NTP date. No additional time shall be added to the contract.
23. Option 5 - Bid Item 0006AD, Labor, materials and equipment for the final grading, may be exercised within 60 calendar days from receipt of Base Bid NTP date. No additional time shall be added to the contract.
24. Option 5 - Bid Item 0006AE, Labor, materials and equipment for the grass seeding, may be exercised within 60 calendar days from receipt of Base Bid NTP date. No additional time shall be added to the contract.
25. Option 5 - Bid Item 0006AF, Labor, materials, equipment, and installation of a soil demarcation barrier, may be exercised within 60 calendar days from receipt of Base Bid NTP date. No additional time shall be added to the contract.
26. Option 6 - Bid Item 0007, Clearing and grubbing, placement of a soil demarcation barrier, placement and grading of 1 foot of compost and 1 foot of clean fill and grass seeding, may be exercised within 60 calendar days from receipt of Base Bid NTP date. No additional time shall be added to the contract. CLIN 0007 IS FOR INFO ONLY. ONLY
PRICE THE SUB LINE ITEMS EXAMPLE 0007AA-0004AF.
27. Option 6 - Bid Item 0007AA, Labor, equipment and material removal and disposal for site clearing and grubbing, may be exercised within 60 calendar days from receipt of Base Bid NTP date. No additional time shall be added to the contract.
28. Option 6 - Bid Item 0007AB, Labor, equipment, and spreading of the compost from the Department of Sanitation stockpiling site, may be exercised within 60 calendar days from receipt of Base Bid NTP date. No additional time shall be added to the contract.
29. Option 6 - Bid Item 0007AC, Labor, equipment and spreading for the clean fill supplied by Department of Sanitation, may be exercised within 60 calendar days from receipt of Base Bid NTP date. No additional time shall be added to the contract.
30. Option 6 - Bid Item 0007AD, Labor, materials and equipment for the final grading, may be exercised within 60 calendar days from receipt of Base Bid NTP date. No additional time shall be added to the contract.
31. Option 6 - Bid Item 0007AE, Labor, materials and equipment for the grass seeding, may be exercised within 60 calendar days from receipt of Base Bid NTP date. No additional time shall be added to the contract.
32. Option 6 - Bid Item 0007AF, Labor, materials, equipment, and installation of a soil demarcation barrier, may be exercised within 60 calendar days from receipt of Base Bid NTP date. No additional time shall be added to the contract.
33. Option 7 - Bid Item 0008, Labor, materials, equipment, and installation of an interpretive sign, to be awarded within 60 calendar days from receipt of Base Bid NTP date. No additional time shall be added to the contract.
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
The following have been added by full text:
REVISED WAGE RATES
General Decision Number: NY100003 07/29/2011 NY3
Superseded General Decision Number: NY20080003
State: New York NC 7/29/11
Construction Types: Building, Heavy, Highway and Residential
Counties: Bronx, Kings, New York, Queens and Richmond Counties in New York.
BUILDING & RESIDENTIAL CONSTRUCTION PROJECTS (includes single family homes and apartments up to and including 4 stories), HEAVY AND HIGHWAY CONSTRUCTION PROJECTS
Modification Number Publication Date 0 03/12/2010 1 03/26/2010 2 04/16/2010 3 04/23/2010 4 07/23/2010 5 08/06/2010 6 08/27/2010 7 10/08/2010 8 10/15/2010 9 11/05/2010 10 11/12/2010 11 11/19/2010 12 12/03/2010 13 12/17/2010 14 12/31/2010 15 01/07/2011 16 01/28/2011 17 02/11/2011 18 03/25/2011 19 04/08/2011 20 04/22/2011 21 04/29/2011 22 05/06/2011 23 05/20/2011 24 06/03/2011 25 06/10/2011 26 06/17/2011
27 07/01/2011 28 07/15/2011 29 07/22/2011 30 07/29/2011
* ASBE0012‐001 07/04/2011
Rates Fringes
Asbestos Workers/Insulator Includes application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems.....................$ 60.03 25.89
HAZARDOUS MATERIAL HANDLER.......$ 30.00 9.10
BOIL0005‐001 01/01/2011
Rates Fringes
BOILERMAKER......................$ 47.32 19.43
FOOTNOTE:
a. PAID HOLIDAYS: New Year's Day, Thanksgiving Day, Memorial Day, Independence Day, Labor Day and Good Friday, Friday after Thanksgiving, Christmas Eve Day and New Year's Eve
BRNY0001‐001 07/01/2010
Rates Fringes
BRICKLAYER.......................$ 51.00 21.44
MASON ‐ STONE....................$ 57.61 23.86
BRNY0001‐002 06/01/2011
Rates Fringes
Pointer, cleaner and caulker.....$ 37.55 26.10
BRNY0004‐001 01/01/2011
Rates Fringes
MARBLE MASON.....................$ 51.53 25.60
BRNY0007‐001 01/01/2011
Rates Fringes
TERRAZZO FINISHER................$ 42.86 28.55
TERRAZZO WORKER/SETTER...........$ 44.39 28.55
BRNY0020‐001 01/01/2011
Rates Fringes
MARBLE FINISHER..................$ 42.20 24.93
BRNY0024‐001 01/01/2011
Rates Fringes
BRICKLAYER
MARBLE POLISHERS............$ 36.76 20.31
BRNY0052‐001 12/06/2010
Rates Fringes
Tile Layer.......................$ 47.98 25.81
BRNY0088‐001 12/06/2010
Rates Fringes
TILE FINISHER....................$ 39.09 21.81
CARP0001‐009 07/01/2008
Rates Fringes
Carpenters:
Carpenters & Soft floor layers......................$ 43.02 35.96
CARP0740‐001 07/01/2010
Rates Fringes
MILLWRIGHT.......................$ 46.19 44.93
CARP1456‐004 07/01/2008
Rates Fringes
Dock Builder & Piledrivermen
DOCKBUILDERS................$ 43.61 38.06
CARP1456‐005 07/01/2008
Diver Tender.....................$ 39.18 38.06 Diver............................$ 54.63 38.06
CARP1536‐001 07/01/2003
Rates Fringes
Carpenters:
TIMBERMEN...................$ 34.47 26.05
ELEC0003‐001 05/12/2010
Rates Fringes
ELECTRICIAN
Electricians................$ 49.00 38.97 Jobbing, and maintenance and repair work.............$ 25.30 38.97
PAID HOLIDAYS:
a. New Years Day, Martin Luther King, Jr.'s Birthday, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Columbus Day, Election Day, Thanksgiving Day, the day after Thanksgiving Day, and Christmas Day
ELEC1049‐001 04/06/2008
QUEENS COUNTY
Rates Fringes
Line Construction (Substation and Switching structures pipe type cable installation and maintenance jobs or projects;
Railroad electrical distribution/transmission systems maintenance (when work is not performed by railroad employees) Overhead and Underground transmission/distribution line work. Fiber optic, telephone cable and equipment) Groundman...................$ 24.83 17.91 Heavy Equipment Operator....$ 33.10 17.91
Lineman and Cable Splicer...$ 41.38 17.91 Tree Trimmer................$ 23.06 9.84
ELEV0001‐002 03/17/2011
Rates Fringes
ELEVATOR MECHANIC
Elevator Constructor........$ 53.27 24.855+a+b Modernization and Repair....$ 42.31 24.705+a+b
FOOTNOTE:
a. PAID HOLIDAYS: New Year's Day, Good Friday, President's Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veteran's Day, Thanksgiving Day, Friday after Thanksgiving, and Christmas Day.
b. PAID VACATION: An employee who has worked less than 5 years shall recieve vacation pay credit on the basis of 4% of his hourly rate for all hours worked; an employee who has worked 5 to 15 years shall receive vacation pay credit on the basis of 6% of his hourly rate for all hours worked;
an employee who has worked 15 or more years shall receive vacation pay credit on the basis of 8% of his hourly rate for all hours worked.
ENGI0014‐001 07/01/2011
Rates Fringes
Pavement equipment operator Asphalt Plants..............$ 48.46 24.15 Asphalt roller..............$ 57.65 24.15 Asphalt spreader............$ 59.25 24.15 Power Equipment Operator
(HEAVY & HIGHWAY)
GROUP 1....................$ 77.17 24.15
GROUP 10...................$ 55.32 24.15
GROUP 11...................$ 51.53 24.15
GROUP 12...................$ 52.71 24.15
GROUP 13...................$ 53.16 24.15
GROUP 14...................$ 39.58 24.15
GROUP 15...................$ 36.61 24.15
GROUP 2....................$ 63.29 24.15
GROUP 3....................$ 65.37 24.15
GROUP 4....................$ 63.78 24.15
GROUP 5....................$ 62.48 24.15
GROUP 6....................$ 59.90 24.15
GROUP 7....................$ 61.05 24.15
GROUP 8....................$ 59.25 24.15
GROUP 9....................$ 57.93 24.15
Steel erector Compressors, Welding Machines....................$ 37.87 24.15 Cranes, Hydraulic Cranes, 2 drum derricks, Forklifts, Boom Trucks......$ 64.91 24.15 Three drum derricks.........$ 67.62 24.15 Utility Laborer Horizontal Boring Rig.......$ 56.24 24.15 Off shift compressors.......$ 46.38 24.15 Utility Compressors.........$ 36.37 24.15
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Tower crane
GROUP 2: Backhoes, power shovel, Hydraulic clam shells, moles and machines of a similar type
GROUP 3: Mine hoists and crane, etc. used as mine hoists
GROUP 4: Gradalls, keystones, cranes (with digging buckets), bridge cranes, trenching machines, vermeer cutter and machines of a similar nature
GROUP 5: Piledrivers, derrick boats, tunnel shovels
GROUP 6: All drills, and machines of a similar nature
GROUP 7: Back filling machines, cranes, mucking machines, dual drum pavers
GROUP 8: Mixers (concrete w/loading attachments), concrete pavers, cableways, land derricks, power house (low pressure units), concrete pumps
GROUP 9: Concrete plants, well drilling machines, stone crushers double drum hoist, power house (other than above)
GROUP 10: Concrete mixers
GROUP 11: Elevators
GROUP 12: Concrete breaking machine, Hoists (single drum), load masters, locomotive and dinkies over 10 tons
GROUP 13: Vibratory console
GROUP 14: Compressors (portable 3 or more in battery), tugger machine (caissons), well point pumps, chum drill
GROUP 15: Boilers, (high pressure, compressors (portable, single, or 2 in battery, not over 100' apart), pumps (river cofferdam and welding machines (except where arc is operated by members of local 15) push button machines, all engines irrespective of power (power pac) used to drive auxilliary equipment, air, hydraulic etc.
PREMIUMS ON CRANES (Crawler or Truck):
100' to 149' boom ‐ add .50 150' to 249' boom ‐ add .75 250' to 349' boom ‐ add 1.00 350' to 450' boom ‐ add 1.50
Premiums for Cranes on Steel Erection:
100' to 149' boom ‐ add 1.75 150' to 249' boom ‐ add 2.00 250' to 349' boom ‐ add 2.25 350' to 450' boom ‐ add 2.75 Tower crane ‐ add 2.00
FOOTNOTE:
a. Paid Holidays: New Year's Day; Lincoln's Birthday;
Washington's Birthday; Memorial Day; Independence Day;
Labor Day; Veterans Day; Columbus Day; Election Day;
Thanksgiving Day; and Christmas Day; provided the employee works one day the payroll week in which the holiday occurs.
ENGI0014‐002 08/01/2010
Rates Fringes
Power Equipment Operator
BUILDING & RESIDENTIAL
GROUP 1....................$ 58.57 25.26+a GROUP 2....................$ 62.15 25.26+a GROUP 3....................$ 56.50 25.26+a GROUP 4....................$ 51.22 25.26+a GROUP 5....................$ 37.88 25.26+a
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Double drum
GROUP 2: Stone derrick, cranes, hydraulic cranes, boom trucks
GROUP 3: 4 pole Hoist, Single Drum Hoists
GROUP 4: Fork lift, house cars, plaster (platform machine), plaster bucket, concrete pump and all other equipment used for hoisting material
GROUP 5: Compressors, welding machines (cutting concrete work), paint spraying, sand blasting, pumps (with the exclusion of concrete pumps), house car (settlement basis only), all engines irrespective of power (power pac) used to drive auxiliary equipment, air, hydraulic, etc., boilers
Premiums for Cranes:
100'‐149' boom ‐ add 1.75 150'‐249' boom ‐ add 2.00 250'‐349' boom ‐ add 2.25 350'‐450' boom ‐ add 2.75 Tower cranes add 2.00
FOOTNOTE:
a. PAID HOLIDAYS: New Year's Day, Lincoln's Birthday, Memorial Day, Independence Day, Labor Day, Veteran's Day, Columbus Day, Election Day, Thanksgiving Day, and Christmas Day, provided the employee works one day in the payroll week in which the holiday occurs
IRON0040‐002 01/01/2011
BRONX, NEW YORK, RICHMOND
Rates Fringes
IRONWORKER, STRUCTURAL...........$ 43.30 30.88
IRON0046‐003 07/01/2010
Rates Fringes
IRONWORKER
METALLIC LATHERS............$ 39.00 47.36
IRON0197‐001 07/01/2009
Rates Fringes
IRONWORKER
STONE DERRICKMAN............$ 40.50 38.32
IRON0361‐002 01/01/2011
KINGS, QUEENS
Ironworkers:
(STRUCTURAL)................$ 43.30 30.88
IRON0580‐001 01/01/2009
Rates Fringes
IRONWORKER, ORNAMENTAL...........$ 39.85 39.67
LABO0006‐001 07/01/2003
Rates Fringes
Laborers:
BUILDING CONSTRUCTION
CEMENT AND CONCRETE
WORKERS....................$ 31.50 15.27
LABO0029‐001 07/01/2011
Rates Fringes
Laborers:
Heavy Blasters (hydraulic trac drill).....................$ 40.62 28.00 Blasters...................$ 39.89 28.00 Hydraulic Trac Drill.......$ 29.55 28.00 Jackhammers, Chippers, Spaders, Concrete Breakers, All Other Pneumatic Tools, Walk Behind Self‐Propelled Hydraulic Asphalt and Concrete Breaker...........$ 34.14 28.00 Powder Carriers............$ 30.68 28.00 Wagon; Airtrac; Quarry Bar Drill Runners..........$ 35.07 28.00
LABO0078‐001 12/01/2009
Rates Fringes
LABORERS
BUILDING CONSTRUCTION
ASBESTOS (Removal, Abatement, Encapsulation or Decontamination of asbestos); LEAD; &
HAZARDOUS WASTE LABORERS
(Hazardous Waste, Hazardous Materials, Biochemical and Mold Remediation, HVAC, Duct Cleaning, Re‐spray Fireproofing, etc).........$ 31.50 12.45
* LABO0079‐001 07/01/2011
Rates Fringes
Laborers Building Construction Demolition Laborers Tier A.....................$ 32.85 18.74 Tier B.....................$ 22.15 12.95 Mason Tenders...............$ 32.99 20.56
CLASSIFICATIONS
TIER A: Responsible for the removal of all interior petitions and structural petitions that can consist of sheet rock, block or masonry. Also, all structural slab openings for ducts, mechanical, shafts, elevators, slab openings and exterior walls where the building is not being completely demolitioned.
TIER B: Responsible for shoveling of debris into containers, pushing containers from the inside to the outside of the building.
LABO0147‐001 07/01/2003
Rates Fringes
LABORERS (FREE AIR & TUNNEL).....$ 28.86 30.51
Maintenance Men, Inside Muck Lock Tenders, Pump Men, Electricians, Cement Finishers, Caulkers, Hydraulic Men, Shield Men, Monorail Operators, Motor Men, Conveyor Men, Powder Carriers, Pan Men, Riggers, Chuck Tenders, Track Men Painters, Nippers, Brakemen, Cable Men, Hose Men, Grout Men, Gravel Men, Form Workers, Concrete Workers, Tunnel Laborers, Mole Nipper (one (1) Mole Sipper per Working Shaft per Shift for up to and including Two (2) Moles
LABO0731‐001 07/01/2011
Rates Fringes
Laborers:
Building, Heavy and Residential Construction
UNSKILLED..................$ 38.20 30.27
UTILITY LABORER............$ 38.05 30.27
Heavy & Highway Construction
LABORER/EXCAVATION
{Asbestos, Lead, Hazardous Waste Removal (including soil)..........$ 36.64 26.21
Paid Holidays: Labor Day and Thanksgiving Day
LABO1010‐001 07/01/2011
Rates Fringes
Laborers:
HIGHWAY CONSTRUCTION
Fence Installer & Repairer.$ 38.34 30.25
FORMSETTERS................$ 42.21 30.25
LABORERS...................$ 38.34 30.25
Landscape Planting & Maintenance................$ 38.34 30.25 Maintenance Safety Surface.$ 38.34 30.25 Slurry/Sealcoater/Play Equipment Installer........$ 38.34 30.25 Small Equipment Operator (Not Operating Engineer)..................$ 28.94 15.55+a Small Equipment Operator (Not Operating Engineer)...$ 38.34 30.25 Small Power Tools Operator.$ 38.34 30.25
FOOTNOTES:
a. PAID HOLIDAYS: Memorial Day, Fourth of July, Labor Day, Columbus Day, Election Day and Thanksgiving Day, provided the employee has worked one (1) day in the calendar week in which the said holiday occurs.
LABO1010‐002 07/01/2011
Rates Fringes
Laborers‐Asphalt Construction:
Micro Paver.................$ 44.86 30.25 Raker.......................$ 44.37 30.25 Screedperson................$ 44.86 30.25 Shoveler (Production Paving Only)................$ 41.08 30.25 Small Equipment Operator (Asphalt)...................$ 41.08 30.25
PAIN0009‐001 05/01/2010
GLAZIER..........................$ 39.00 32.24
Painters:
Painters, Drywall Finishers, Lead Abatement Worker......................$ 34.50 19.84 Spray, Scaffold and Sandblasting................$ 37.50 19.84
PAIN0806‐001 10/01/2010
Rates Fringes
Painters:
Structural Steel and Bridge.$ 46.25 31.03
PAIN1974‐001 07/01/2009
Rates Fringes
Painters:
Drywall Tapers/Pointers.....$ 41.32 20.81
PLAS0262‐001 08/01/2010
BRONX, NEW YORK AND RICHMOND COUNTIES:
Rates Fringes
PLASTERER........................$ 39.53 25.55
PLAS0262‐002 08/01/2010
KINGS AND QUEENS COUNTIES
Rates Fringes
PLASTERER........................$ 39.53 25.55
PLAS0530‐001 08/03/2005
Rates Fringes
PLASTERER
DRYWALL PLASTERERS..........$ 37.03 18.30
PLAS0780‐001 06/01/2010
CEMENT MASON/CONCRETE FINISHER...$ 49.50 35.57
PLUM0001‐001 07/01/2011
Rates Fringes
PLUMBER
MECHANICAL EQUIPMENT AND
SERVICE
Any repair and/or replacement of the present plumbing system that does not change the existing roughing..........$ 32.21 15.05
PLUMBERS:...................$ 51.11 22.53
PLUM0638‐001 07/01/2011
Rates Fringes
PLUMBER
SERVICE FITTERS.............$ 26.30 2.55
SPRINKLER FITTERS,
STEAMFITTERS................$ 56.06 68.08
Service Fitter work shall consist of all repair, service and maintenance work on domestic, commercial and industrial refrigeration, air conditioning and air cooling, stoker and oil burner apparatus and heating apparatus etc., including but not exclusively the charging, evacuation, leak testing and assembling for all machines for domestic, commercial and industrial refrigeration, air conditioning and heating apparatus. Also, work shall include adjusting, including capacity adjustments, checking and repairing or replacement of all controls and start up of all machines and repairing all defects that may develop on any system for domestic, commercial and industrial refrigeration and all air conditioning, air cooling, stoker and oil burner apparatus and heating apparatus regardless of size or type.
ROOF0008‐003 06/01/2010
Rates Fringes
ROOFER, Including Built Up, Composition and Single Ply Roofs............................$ 37.75 28.86
SHEE0028‐002 07/29/2010
SHEET METAL WORKER
BUILDING CONSTRUCTION.......$ 48.15 36.03
RESIDENTIAL CONSTRUCTION....$ 27.22 16.48
TEAM0282‐001 07/01/2009
Rates Fringes
Truck drivers:
TRUCK DRIVERS:
Asphalt....................$ 35.40 29.2025+a+b Euclids & Turnapulls.......$ 35.50 29.2025+a+b High Rise..................$ 42.21 29.2025+a+b
FOOTNOTES:
PAID HOLIDAYS: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Election Day, Veterans' Day (Armistice Day), Thanksgiving Day and Christmas Day. Employees working two (2) days in the calendar week in which a holiday falls are to be paid for such holiday, provided that they shape each remaining workday during such calendar week.
b. VACATION: For each 15 days worked within the contract year an employee will receive one day's vacation with pay with a maximum vacation of 3 weeks per year.
TEAM0813‐001 12/01/1998
Rates Fringes
Truck drivers:
GROUP 1....................$ 19.49 3.61+a GROUP 2....................$ 19.76 3.61+a GROUP 3....................$ 19.90 3.61+a GROUP 4....................$ 20.23 3.61+a GROUP 5....................$ 20.40 3.61+a GROUP 6....................$ 21.29 3.61+a GROUP 7....................$ 22.40 3.61+a GROUP 8....................$ 19.90 3.61+a
FOOTNOTE:
a. PAID HOLIDAYS: New Year's Day, Martin Luther King, Jr.'s Birthday, Presidents' Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Thanksgiving Day, Christmas Day, Employee's Birthday, Two (2) Personal Days, and any holiday or day of mourning proclaimed as such by the State or Federal Government.
TRUCK DRIVER CLASSIFICATIONS
GROUP 1: Closed body trucks with self contained loading unit up to and including 22 yard capacity
GROUP 2: Open trucks, rack body or trucks with no self contained mechanical loading device, up to 22 yard capacity. One‐container tractor hoist
GROUP 3: 10 wheel, open trucks, container loaders, dino‐master, over‐cab loaders, rack body trucks, or any trucks 22 yards to and including 25 yards capacity
GROUP 4: Rubbish and garbage trucks, 26 yards to and including 31 yards
GROUP 5: Single axle working non‐compactor containers up to 15 yards capacity on rubbish and garbage removal
GROUP 6: Roll‐off trucks up to and including 42 yard capacity
GROUP 7: Roll‐off truck with more than 42 yard capacity or any tractor trailer trucks
GROUP 8: One‐container tractor hoist on construction and alteration debris removal
WELDERS ‐ Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis‐Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
(End of Summary of Changes)
File details come from the government source that posted it. Updated .