Submittal Register

View the file

Other files

File Type Posted
Bid Abstract.pdf PDF
Amendment 4.pdf PDF
Amendment 3.pdf PDF
Amendment 2 .doc.pdf PDF
Section 10 14 23.pdf PDF
Amendment 1 .pdf PDF
Site VIsit.pdf PDF
Soundview-Plans-p3.pdf PDF
Specs.pdf PDF
Soundview-Plans-p2.pdf PDF
Soundview-Plans-p1.pdf PDF
Solicitation.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 6 PAGES

Soundview Park Aquatic Ecosystem Restoration

01 11 00 SD-01 Preconstruction Submittals G ROUtility Protection Plan G ROInitial Project Schedules G RORevised Project Schedule G ROPeriodic Schedule Update G ROProgress Curve Report Format G RONarrative report with schedule updates-Format 01 35 26 SD-01 Preconstruction Submittals

1.6 G ROAccident Prevention Plan (APP)

1.7 G ROActivity Hazard Analysis (AHA)

1.8 G ROConfined Space Entry Plan

1.6.1 G ROCrane Critical Lift Plan

G ROCrane Operators SD-06 Test Reports

1.12Reports 1.12.1Accident Reports 1.12.3Monthly Exposure Reports 1.12.4Crane Reports

Gas Protection SD-07 Certificates

1.9Confined Space Entry Permit 1.9Hot work permit

01 35 30 SD-01 Preconstruction Submittals G ROSite Safety and Health Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 6 PAGES

01 35 30 G ROExposure Monitoring/Air Sampling Program

SD-02 Shop Drawings

1.19.1 G ROWork Zones

1.20.1 G RODecontamination Facilities

1.21.1 G RODecontamination Facilities

SD-06 Test Reports G ROMonitoring/Sampling Results

1.19.2 G ROSite Control Log

01 45 04.00 18 SD-01 Preconstruction Submittals

G ROContractor Quality Plan (CQC) 01 56 10 SD-03 Product Data

G ROHerbivory Fence Fabric G ROFence Posts G RONylon Twine G ROMylar Flagging

01 57 20.00 10 SD-01 Preconstruction Submittals

1.7 G PBEnvironmental Protection Plan

02 23 20 SD-01 Preconstruction Submittals G ROBaseline Ties Plan

SD-05 Design Data G ROSurvey Data G ROCut Sheets G ROFinal Sections

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 6 PAGES

02 23 20 G RONew York State Surveyor Registration Certificate

SD-11 Closeout Submittals G ROAs-Built Drawings

02 27 50.00 18 SD-01 Preconstruction Submittals G ROFloating Turbidity Barrier

02 36 80 SD-03 Product Data G ROSilt Fence

02 56 16.00 18 SD-01 Preconstruction Submittals G ROSoil Demarcation Barrier

02 93 00 SD-01 Preconstruction Submittals G PBPlanting Plan G PBQuality Control Record G PBEstimated Planting Plan

SD-03 Product Data G PBLow Marsh Plugs G PBLow Marsh/High Marsh Transition

Plugs G PBHigh Marsh Plugs G PBMaritime Salt Shrub Plants and

Plugs G PBSalt Tolerant Upland Plants G PBLow-Salt Tolerant Upland Plants and Plugs G PBOption #3 Plugs G PBTree and Shrub Fertilizer

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 6 PAGES

02 93 00 G PBDelivery Schedule G PBEquipment G PBFinished Grade

SD-06 Test Reports G PBEquipment Calibration G PBSoils Test

SD-07 Certificates G PBTwo Full Growing Season

Planting Guarantee G PBNursery Certifications

SD-11 Closeout Submittals G PBAs-Planted Plan

10 14 23 SD-01 Preconstruction Submittals G ROFinal Layout and Art Work G ROVendor Brochures and/or Data

Sheets SD-02 Shop Drawings

G ROSign Shop Drawings SD-04 Samples

G ROSign and Framing Materials G ROPowdercoating

31 00 10 SD-03 Product Data G ROImported Sand Fill G ROImported Sandy Loam Fill

SD-04 Samples G ROSand Bags

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 6 PAGES

31 00 10 G ROSandy Loam 31 05 22 SD-04 Samples

2.1.1Geotextile SD-07 Certificates

2.1.1Geotextile 32 11 16 SD-03 Product Data

1.4Equipment Waybills and Delivery Tickets

SD-06 Test Reports 1.6Sampling and Testing

Field Density Tests 32 12 17 SD-05 Design Data

1.3.2Job-mix formula

2.2ASPHALT CEMENT BINDER

2.3MIX DESIGN

32 92 19 SD-03 Product Data GSeed Mix GSeeding Plan

2.5 GMycorrhizal Inoculation

GEquipment GFinished Grade GQuantity Check

SD-04 Samples GMulch

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 6 PAGES

32 92 19 GGermination tests, reports and recommendations.

SD-07 Certificates GIrrigation GPlant Guarantee GInstaller's Qualification. The installer's company name and address; training and experience and or certification

GSigned Plant Guarantee which guarantees plant survival at least 45 calendar days prior to commencement of planting schedule

GMonthly inspection and maintenance reports (once material has been planted until the guarantee has been satisfied)

SD-08 Manufacturer’s Instructions GErosion Control Materials

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR