Text version
W66QKZ72996170
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to revise portions of the Performance Work Statement. All revisions are indicated in bold blue text.
Revisions are located w ithin Section 4, 5, 8, Exhibit A, and Attachment 1.
This amendment also revises 52.212-2 to revise paragraph (b), w hich clarif ies the price evaluation of 52.217-8.
All other terms and conditions remain unchanged. Offerors shall return a signed copy of this amendment w ith the submission of the proposal package.
1. CONTRACT ID CODE PAGE OF PAGES
1 18
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 22-Jan-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9127N18R0027
X 9B. DATED (SEE ITEM 11)
21-Dec-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
22-Jan-2018
CODE
USACE PORTLAND DISTRICT
333 SW 1ST AVE
PORTLAND OR 97204-3440
W9127N 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9127N18R0027
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
The following have been modified:
PERFORMANCE WORK STATEMENT
PERFORMANCE WORK STATEMENT
FOR ELEVATOR MAINTENANCE SERVICES
THE DALLES DAM, WASCO COUNTY, OREGON
1.0 GENERAL STATEMENT.
US Army Corps of Engineers, Portland District is soliciting for a non-personnel services contract for full elevator maintenance services at The Dalles Dam located in Wasco County, Oregon. The Contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the elevator maintenance services as defined in this Performance Work Statement (PWS). The Contractor shall perform to the standards in the contract and comply with all local, state, and federal regulations during the services performed.
This firm fixed priced contract is for a base plus two option years per the Government’s discretion. The period of performance for the base year will be from 01 February 2018 through 31 January 2019. The following option year period of performances are outlined within the delivery/performance schedule of this requirement.
2.0 DEFINITIONS.
Throughout this Performance Work Statement (PWS), terms are defined as follows:
Acceptable Quality Level (AQL): Acceptable Quality Level equals the performance standards listed in 5.1 through 5.7. The Contractor must re-perform all unsatisfactory work unless excused by the Quality Assurance Evaluator (QAE).
Contract Discrepancy Report (CDR): A written record of unsatisfactory performance by the Contractor as observed by the QAE.
Contracting Officer (KO): The Government employee who is authorized to enter into, administer, and/or terminate contracts and make related determinations and findings.
Contracting Officer’s Representative (COR): The individual designated in accordance with subsection 201.602-2 of the Defense Federal Acquisition Regulation Supplement and authorized in writing by the Contracting Officer to perform specific technical or administrative functions. The COR is not authorized to make any commitments or changes that will affect price, quality, quantity, delivery, or any other term or condition of the contract.
Defective Service: A service output that does not meet the standard of performance associated with the Performance Work Statement.
Deliverable: Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.
Hazardous Energy Control Program (HECP): A program established to secure all hazardous energies, and allow a Contractor to safely perform work.
Physical Security: Actions that prevent the loss or damage of Government property.
Government Contract Quality Assurance: the various functions, including inspection, performed by the Government to determine whether a contractor has fulfilled the contract obligations pertaining to quality and quantity.
Quality Assurance Surveillance Plan (QASP): A written document specifying the surveillance methodology to be used for surveillance of Contractor performance.
Quality Control: All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
Quality Assurance Evaluator (QAE): The Government employees responsible for checking Contractor performance.
3.0 THE REQUIREMENTS; GOVERNMENT:
3.1 Utilities. The Government will provide potable water, electricity, HVAC, and debris disposal. Telephone service will not be provided. The Contractor shall place all trash and litter pickup in Government provided dumpsters located on the project. This does not include large pieces of equipment which shall be disposed of in a COR approved area. The Contractor shall instruct employees in utilities conservation practices. The Contractor shall be responsible for operating under conditions that preclude the waste of Government utilities.
3.2 Records. Any available elevator drawings may be obtained from the Government, and shall be retained on
Government premises. Applicable changes shall be noted on drawings (i.e. red-marked) and they shall be returned to the COR.
4.0 THE REQUIREMENTS; CONTRACTOR:
4.1 General. The Contractor shall furnish ALL labor, material, supplies, and tools necessary to perform cleaning, maintenance, inspection, repairs, or replacements to elevators, escalators, equipment, appurtenances, and accessories. Equipment shall be industrial grade. Equipment, appurtenances, and accessories including the following: hoist machinery, motor generators, controllers, selectors, worn gears, thrusts, bearings, brake magnet coils, brake shoes, hoist ropes, compensating ropes, step chains, rollers, handrails, governor ropes, brushes, windings, commutators, rotating elements, contacts, coils, resistors for operation and motor circuits, magnet frames, cams, car door and hoisting door hangers, tracks, and guides, door operating devices, limit switches, interlocks and contacts, and all other elevator signal accessory equipment complete, where included as part of the elevator installation at the time the bid for this work is submitted.
4.2 The Contractor is responsible for replacement labor of all light bulbs, tubes, sockets and receptacles for machine rooms, hoist ways, pits, elevator cars, hall entrances, signal systems, escalator runways and demarcations. Particular attention is to be given to maintaining all emergency signal systems and light units in an operable condition. The Contractor shall notify the Government of all malfunctions that may require other repair qualifications such as a Licensed Electrician.
4.3 License. The Contractor shall be licensed in the State of Oregon in the elevator repair business for a minimum of the last 5 years. A copy of the license shall be furnished to the COR seven days before the pre-work conference.
4.4 Materials. In performing the work under this contract, the Contractor shall provide only parts recommended by the manufacturer of the equipment for replacement or repair, and to use only those lubricants of a standard or grade recommended by the manufacturer of the equipment. If the Contractor discovers, in the course of needed repairs, that original equipment by the manufacturer (OEM) has been modified by previous Contractors, it is required for this Contractor to repair or replace per manufacturer recommendations or agreed upon engineered solution. Contractor shall reference Section 5.1.1 for notification of defects for costs that are over and above the scope of this work.
4.5 Efficiency. When purchasing energy consuming products, the Contractor shall procure an Energy Star product or a product that is designated under the Federal Energy Management Program (FEMP) of the Department of Energy as being among the highest 25 percent of equivalent products for energy efficiency, FEMP designated product unless (A) an Energy Star product or FEMP designated product is not cost-effective over the life of the product taking energy cost savings into account; or (B) no Energy Star product or FEMP designated product is reasonably available that meets the functional requirements.
4.6 All lubricants, oils greases, rope preservatives, and cleaning materials are to be furnished by the Contractor.
Lubricants shall be the proper grade for the purpose used and shall be as specified by the elevator manufacturer (see Attachment 1). All parts replaced shall be new and identical to original equipment or the equipment manufacturer’s recommended replacement parts. It shall be the responsibility of the Contractor to prevent the operation or attempted operation of electrical equipment or combinations of equipment which require powers exceeding the capacity of existing building circuits.
4.7 The Contractor shall abide by all applicable regulations, publications, manuals, and local policies and procedures. The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) - Safety and Health Requirements Manual
ASME INTERNATIONAL (ASME)
ASME A17.1 (2013) Safety Code for Elevators and Escalators ASME A17.2 (2013) Guide for Inspection of Elevators and Escalators
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 (2017) National Electrical Code
Current Oregon Elevator Specialty Code OAR 918-400-0455 Amendments to Oregon Elevator Specialty Code OAR 918-400-0458
5.0 PERFORMANCE STANDARDS & GUIDELINE REQUIREMENTS.
5.1 General. The Contractor shall provide services at a monthly rate for:
a. Routine Preventative Maintenance and Repairs of specified elevators. (See 5.2 & 5.3)
b. Responding to Trouble Calls (See 5.4)
c. Responding to Emergency Calls (See 5.5)
d. Providing all required testing and inspection (See 5.6)
e. Providing all maintenance, repair, inspection, and alteration documentation (See 5.7)
The Contractor shall provide services, repairs, inspections, testing, and maintenance services in compliance with the requirements of the latest edition of American Society of Mechanical Engineers (ASME) Safety Code for Elevators and Escalators, ASME 17.1, current Oregon Elevator Specialty Code (OAR 918-400- 0455 and 918-400-0458), the manufacturer’s recommendations, and all other applicable laws, regulations, rules, ordinances, codes. The Guide for Inspection of Elevators, ASME 17.2, shall be used as a guide to establish the equipment is operating safely.
The elevators shall be maintained in a fully operational mode at all times except for prescheduled downtime. Services include but not be limited to: scheduled maintenance and testing as required by ASME A17.1 and A17.2, and all necessary work performed relative to cleaning, lubrication, adjustment and calibration of the equipment where applicable to return each elevator and escalator to the specified condition.
5.1.1 Notification of Defects: The intent of this contract is that the Contractor is responsible for ALL corrective and preventative maintenance. If for an unforeseen reason the Contractor determines there is existence, or the development of any defects in, or repairs required, which the Contractor considers beyond the terms of this contract, they shall immediately notify the KO and COR in writing, and the Contractor SHALL NOT remedy the defect or repair. The Contractor shall not proceed in remedying a service that is considered not scope within the current contract until a bilateral modification has been issued and approved by the Contracting Officer. Any work performed outside of the terms and conditions of the contract shall be at the contractor’s own risk.
All proposed repairs and upgrades that are within the scope of the contract and not the Contractor’s corrective and preventative maintenance responsibility, shall be approved by the Contracting Officer in writing via a contract modification prior to services continuing.
5.1.2 Existing Circuits Proposed Changes: The Contractor shall make no changes to the existing circuits, circuitry wiring, and sequencing or otherwise alter the original circuit or wiring design of the elevators except as approved by the COR hereinafter provided. Any proposed change shall be approved by the COR prior to installation. The Contractor shall allow the COR a minimum of 15 calendar days for review of the existing circuit proposed changes.
5.1.3 Service Interruptions: The Contractor shall schedule and perform service to the elevators in a manner which minimally disrupts passenger flow. For example, the Station Service elevator is used and needed significantly more than the other four elevators. It is incumbent on the Contractor to return all elevators to quality service by the next business day, or within an “as soon as possible” timeframe agreed upon with the COR PRIOR to taking the elevator out of service.
5.1.4 Emergency Egress Procedures: The Contractor shall provide written procedures to the COR 7 days prior to the pre-work conference for the removal of people from an elevator from a) the elevator stuck at a floor, and b) the elevator stuck between floors. A procedure shall be prepared for each elevator and the appropriate electrical contacts shall be marked to correlate to the written procedure. This procedure is intended to be used by qualified Contractor personnel for emergency rescue of personnel only.
5.2 Preventive Maintenance Services. The Contractor shall maintain the elevators monthly in accordance with manufacturer tolerances and performances, in accordance with the latest edition of the ASME A17.1 and A17.2. The Contractor shall maintain the original contract speed for each elevator car, and the original performance time, which includes acceleration and retardation as designed and installed by the manufacturer.
The Contractor shall perform the necessary adjustments as required to maintain door opening and closing times, within limits of applicable codes. All work performed shall be as specified or recommended by the elevator manufacturer. All work, equipment, and materials shall be complete and operational, and shall have a neat and finished appearance.
5.3 Miscellaneous Preventative Maintenance: Replacement of burned out lamps in dispatch panel, car and hall push buttons, position indicators, hall lanterns, and car interior, emergency lighting, demarcation lights and hoist way lighting as required. Clean elevator pits and machine room floors (e.g., remove all oil and oil rags, remove tripping hazards). Empty and clean drip pans in Pits. Clean car grille and stile channels.
Keep the exterior of the machinery clean and presentable at all times. For all previously painted surfaces of elevator machinery, provide “touch-up” repainting over marred or scratched areas with matching color. The Contractor shall submit a written maintenance plan for all elevator systems, and provide it to the COR seven days before pre-work conference.
5.3 Repair Services. The Contractor shall be responsible for all costs associated with accomplishing repairs and replacements, including labor, equipment, and supplies for all equipment and systems specified or recommended by the system manufacturer. The Contractor shall not be required to make renewals or repairs made necessary by reason of negligence or misuse of the equipment by persons other than the Contractor, his/her representatives and employees, or by reason of any other cause beyond the control of the Contractor, except ordinary wear and tear. Other items excluded are car enclosures, car door panels, hoist way enclosures, hoist way door panels, and frame or sills. This does not exempt deficiencies from coverage under this contract that developed or were caused prior to the contract effective date. The Contractor shall not be required to make repairs caused by vandalism or other extraordinary circumstances.
Report these instances to the COR.
5.4 Trouble Calls and Emergency Calls. The Contractor shall have personnel available to receive telephone communications concerning trouble and emergency maintenance needs 24 hours a day, 7 day a week, 365 days a year. Seven days prior to the pre-work conference, the Contractor shall furnish the COR a point of contact telephone number and building ID# number for all response services.
- The Contractor shall provide unlimited trouble calls service during regular working hours.
Regular working hours at The Dalles Dam are Monday - Friday, 6:30a.m. - 5:00p.m. Pacific Time.
The Contractor shall respond and perform appropriate service within 24 hours from the time of notification.
- Emergency calls may be required due to trapped personnel or other non-trapped personnel emergency situations. The Contractor shall have personnel available to receive telephone communications concerning emergency maintenance needs 24 hours a day, 7 day a week, 365 days a year. In the case of an emergency call, the Contractor shall respond within and arrive at The Dalles Dam two (2) hours from the time of the Emergency Call for the rescue of personnel trapped in the elevator. For non-trapped personnel emergency situations, the contactor shall respond and arrive within four (4) hours from the time of the emergency call.
5.5 Testing and Inspection Services. Safety inspections and tests shall be performed on all elevators as required by ASME A17.1 and A17.2. These tests are prerequisite to annual safety inspections performed by the State of Oregon Elevator Inspector. All elevators will be brought into State of Oregon, ASME, and the manufacturers’ recommended operating criteria. Tests shall include:
a. Fire Service Testing due quarterly.
b. Annual elevator safeties, governors and oil buffers.
c. Five year elevator tests due in 2018.
A seven day notice shall be provided to the Government prior to inspections/tests being performed to allow the Government to have a representative available.
5.5.1 The Contractor shall submit a written schedule of contract required tests and inspections (other than the State of Oregon tests). The schedule shall specify the time frames for one-time events, target dates for submissions of materials and application plans, and the planned size of the work force. The schedule shall be submitted a minimum of 7 days prior to the pre-work conference. The Contractor shall submit five test and inspection check sheets specific to The Dalles site elevators to be posted in the respective elevator machinery room. A record of all periodic tests and inspections shall be completed, and physically posted in each conveyance machine room or space as required by State codes and ASME A17.1 for all elevators at the dam.
5.5.2 The Contractor shall provide and keep suitable check sheets, which are provided by the Government, for each of the five elevators. The check sheet shall show state inspections, repair tech inspections, maintenance, and repairs performed, and encompassing all items specified as a minimum for each elevator.
The check sheet shall be posted in an accessible locations in the machine rooms or COR approved location of the building on which entries shall be made to indicate the status of scheduled items of maintenance work performed. The Contractor shall properly initial and date the sheet to indicate that the work has been accomplished. The sheet shall be protected from deterioration, shall become the property of the Government and shall not be removed by the Contractor.
5.5.3 The Contractor Government is responsible for test and inspection scheduling, coordinating, paying for costs associated with, and for the Oregon State Elevator Inspector’s site visit at The Dalles Dam. The Oregon Department of Consumer and Business Services, Building Codes Division, Elevator Safety Program shall conduct inspections. The State of Oregon Elevator Safety Program office is located in Salem, Oregon and can be reached at 1-503-373-1298. Any deficiencies covered under this contract, shall be brought into ASME and the manufacturers’ recommended operating criteria.
5.6 Site Visit Documentation. The COR shall receive written notification within two business days after all site visits documenting the date the elevator repair technician visited the dam, the repair technician’s name, what elevator(s) they worked on, the elevator problem, and the work performed to remedy the problem.
This applies to routine maintenance, trouble calls, emergency calls, inspections, and any other site visits.
6.0 PERFORMANCE REQUIREMENTS SUMMARY.
6.1 To ensure that the Government receives the services for which it contracted, the Government will only pay for services received. The Performance Requirements Summary (PRS) determines if the Contractor meets the performance standards of the contract, as well as provides guidelines for how and when surveillance will be performed. It ensures timeliness, effectiveness and that the Contractor is delivering the results specified in the contract. Government contract quality assurance will be performed per the PRS surveillance schedule.
6.2 These are the criteria against which the performance will be evaluated. Work shall be considered not to have been performed when any one of the following conditions exists in accordance to the Quality Assurance Surveillance Plan (QASP).
PERFORMANCE REQUIREMENTS SUMMARY
Performance Objective Performance Standard Surveillance Method Allowed Number of
Discrepancies
Preventative Maintenance Services, Reference Section 5.2
All elevators are fully operational at all times, unless otherwise scheduled and approved by the COR.
100% Inspection Zero allowed discrepancies.
Timely and responsive to all service calls, trouble calls and emergency calls, Reference Section 5.3-5.5
Repairs, general and emergency, are made in a timely manner; Customers are informed of expected repair time. Response and repair is made within the specified time
100% Inspection Zero allowed discrepancies.
Submission of timely and accurate maintenance and
Accurate and complete reports are delivered
100% Inspection.
95% of reports are timely and accurate.
repair reports, Reference Section 5.7
Satisfactory/Passing State Inspection Report, Reference Section 5.6
Accurate and complete reports are delivered.
100% Inspection 100% of reports are timely and accurate.
Service Interruptions , Reference Section 5.1.3
Contractor shall schedule and perform service to the elevators in a manner which minimally disrupts passenger flow. Contractor notifies COR prior to taking the elevator out of service.
100% Inspection 1 discrepancy per quarter.
6.3 Surveillance. 100% inspections by the COR will serve as the surveillance methods. If the COR discovers deficiencies and/or receives complaints, the COR will pass them on to the Contractor's Quality Control Inspector (QCI) for correction.
6.4 Quality Control. The Contractor, not the Government, is responsible for quality control actions necessary to meet the quality standards set forth by the contract. The Contractor shall develop and submit their Quality Control Plan (QCP) for Government approval within 14 days after contract award in compliance with the PWS. Once accepted, the QCP becomes a part of the Quality Control Surveillance Plan (QASP).
The QASP is made part of the solicitation, but not a part of the resultant contract. The QASP is not a contractual instrument and may be changed at the KO’s discretion. The Contractor then uses the QASP to guide and document the implementation of the required management and quality control actions to achieve the specified results. The Government reserves the right under the Contract Terms and Conditions-- Commercial Items (FAR 52.212-4) to inspect and test the services called for by the contract, to the extent practicable at all times and places during the term of the contract. Non-conforming services shall be rejected.
6.5 Unacceptable Performance. When performance is determined unacceptable, as defined in the
Performance Requirements Summary, the Quality Assurance Evaluator (QAE) will inform the Contractor’s on-site representative that performance is unacceptable and provide written documentation by use of the Form DD 2772, Contract Discrepancy Report. By initialing and dating the form, the Contractor is only acknowledging notification of unacceptable performance. Disputes in surveillance should be referred to the
KO.
The GQAE will notify the COR and the KO of less than acceptable performance. If any of the services do not conform to contract requirements, the Government may require the Contractor to perform the services again in conformity with contract requirements, at no increase in contract amount. When the defect(s) in services cannot be corrected by re-performance, the Government may:
a. Require the Contractor to take necessary action to ensure future performance conforms to contract requirements.
b. Reduce the contract price to reflect the reduced value of the services performed.
c. If the Contractor fails to promptly re-perform the services, or to take the necessary action to ensure future performance in conformity with contract requirements, the Government may:
i. By contract or otherwise, perform the services and charge to the Contractor any cost incurred by the Government that is directly related to the performance of such service;
ii. Issue Cure Notice;
iii. Terminate the contract for Government convenience; and/or
iv. Terminate the contract for Cause.
6.6 Correction of Non-Performance of Work. Contractor shall employ an adequate quantity of personnel to insure that any area found to be not in compliance and therefore not acceptable, shall be made acceptable by the performance or re-performance of the work, where such re-performance is possible, during the first business day after noncompliance has been observed by or reported to and verified by the COR.
7. SECURITY, SAFETY, & ENVIORNMENTAL REQUIREMENTS.
7.1 Security Requirements.
7.1.1 Anti-Terrorism (AT) Level 1 Training. All Contractor employees, to include subContractor employees, requiring access to Army installations, facilities, controlled access areas, or require network access, shall complete AT Level I awareness training within 30 calendar days after contract start date. Upon request, the Contractor shall submit certificates of completion for each affected Contractor employee and subContractor employee, to the COR or to the KO (if a COR is not assigned), within 5 calendar days after completion of training by all employees and subContractor personnel. AT Level I awareness training is available at the following website: http://jko.jten.mil/courses/atl1/launch.html.
7.1.2 Access and General Protection/Security Policy and Procedures. All Contractor and all associated sub-
Contractors employees shall comply with applicable installation, facility, and area commander installation/facility access and local security policies and procedures (provided by government representative). The Contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by the Department of Defense (DOD), HQDA, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in Contractor security matters or processes.
Contractor and all associated sub-Contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05 / AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative, as NCIC and TSDB are available.
7.1.3 Suspicious Activity Reporting Training (e.g. iWatch, CorpsWatch, See Something, Say Something).
The Contractor and all associated sub-Contractors shall receive a brief/training on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR no later than 5 calendar days after the completion of the training.
7.1.4 Operations Security (OPSEC) Training. All new Contractor employees will complete Level I OPSEC
Training within 30 calendar days of their reporting for duty. Additionally, all Contractor employees must complete annual OPSEC awareness training. The Contractor shall submit certificates of completion for each affected Contractor and sub-Contractor employee to the COR, or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training. OPSEC awareness training is available at the following websites: https://www.iad.gov/ioss/ or http://www.cdse.edu/catalog/operations-security.html.
7.1.5 Pre-Screen Candidates Using e-Verify Program. The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award.
7.2 Safety and Environmental Requirements.
7.2.1 General. The Contractor shall follow all safety regulations as set by the Occupational Safety and Health
Administration (OSHA), Corps of Engineers Safety Manual EM 385-1-1, and project safe clearance procedures. A copy of the EM 385-1-1 can be downloaded at the following link:
http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf
Where conflicts in safety regulations occur, the COR shall designate the applicable regulation to be followed. Contractor employees shall wear personal protective equipment as required in accordance with
EM 385-1-1.
7.2.2 Accidents. The Contractor or the Contractor’s employees shall report any circumstances of needed repair of the facility which may affect the performance of the work and unhealthful or hazardous conditions or any delays or interference with the work caused by the employees or the Government. In the event that an accident or injury occurs to Contractor personnel, the Contractor shall first notify the The Dalles Dam Control Room at (541) 298-4007, and then the COR.
7.2.3 Accident Reports. The Contractor shall make a written report of each separate case of an injury or accident. The report shall include, but not be limited to; location, nature of the injury or accident, authorities notified, and the action taken along with any other pertinent information. The report shall be accompanied by sketches, graphs/drawings, and photographs as needed and forwarded to the COR within 24 hours.
7.2.4 Accident Prevention Plan. The Contractor shall submit an Accident Prevention Plan for their activities. It shall be submitted to the COR for approval. The plan shall detail the Contractor’s procedures and protocols designed to insure safe work.
7.2.5 Activity Hazard Analysis. An Activity Hazard Analysis (AHA) is required to be filled out for all anticipated activities at the dam in accordance with the Safety and Health Requirements Manual (EM 385- 1-1). The AHA is to list specific tasks, risks of each task, and ways to mitigate risks of each task. It is to be turned delivered to the COR a minimum of 7 days prior to the pre-work conference and prior to onsite work.
7.2.6 Hazardous Energy Control Program (HECP). A safe clearance system is used by The Dalles Project personnel to insure continuity of service and safety to personnel and equipment. Any work, service, or delivery performed which requires taking Project operating equipment out of service shall be done after a clearance is obtained by Corps personnel. The Contractor shall be responsible for their own safe clearance procedure. The Contractor’s safe clearance procedure shall be in accordance with EM 385-1-1 and NWP- HECP-01 (to be provided after contract award). The use of locks and tags is required for all points that locks can be applied. The use of personal locks for individuals working under Safe Clearance is required by NWP-HECP-01. The Contractor shall provide the necessary locks. HECP training can be acquired at http://Contractor.vividlms.com/. The Contractor shall provide a copy of the completed quiz to the COR at the pre-work conference.
When manufacturer’s specifications and/or industry recognized governing standards (e.g. ANSI and ASME) define the operation, inspection, testing, and maintenance of specific equipment the specification or governing standard may be used in lieu of the Corps Portland District HECP unless otherwise directed by the Responsible Official (RO) or his designated representative. This does not apply to taking clearances on hazardous equipment. The Contractor shall develop and submit a Safe Clearance Plan for approval a minimum of 7 days prior to the pre-work conference.
CONTRACTOR PERSONNEL ARE NOT PERMITTED TO HOLD CLEARANCES TO ISOLATE
HAZARDOUS ENERGIES.
7.2.7 Hazard Communication Plan. The Contractor shall submit to the COR copies of all Material Safety Data
Sheets (MSDS) for chemicals, solvents or oils which may be brought onto the Project prior to bring the chemicals on site. The MSDS sheets are due to the COR 7 days prior to the pre-work conference.
7.3 Facility Access. The Government shall provide the Contractor access to the required installation and offices necessary for this PWS. The Contractor shall be subject to all Government rules and regulations while working at the Government installation. Access by the Contractor and Contractor’s employees shall only be permitted during designated work hours. Contractor employees shall not be permitted to bring guests, family members, pets, or non-employees to the job site at any time.
7.3.1 Facility Access – Proximity Cards. The Army Corps of Engineers is mandated to comply with federal site access requirements. Proximity cards are used for site access. Proximity (prox) cards are acquired, utilized, and returned to the Government through the following process:
a. NERC CIP Criminal Background Check: The Contractor shall acquire a seven year background check for each employee listing all states the employee lived in for the past seven years, and their criminal history. Many Contractors acquire the background check from ACRANET Employment Screening.
The Background Check shall be sent ONLY to the Reliability Compliance Coordinator (RCC) for The Dalles Dam. The COR can furnish the RCC’s e-mail address post-award. The Background Check shall be given to the COR a minimum of 30 days prior to the pre-work conference.
b. NERC Cyber Training: Each Contractor employee reads Government provided Cyber Training materials and passes a short quiz. The completed quiz is given to the COR 7 days before the pre-work conference. NERC Cyber Training is an annual requirement.
c. The Dalles Dam Access Request Form: The Contractor fills out an access request form for each employee, and sends it to the COR. The completion and submittal of the access request form is an annual requirement.
d. Proximity Card Issuance: Issuance is dependent on approval by the COR of the criminal background check (7.3.1.a), cyber training quiz completion (7.3.1.b), access request form submittal (7.3.1.c), and by passing the HECP training (7.2.6). Prox Card issuance is done at The Dalles Dam in the Administration Building on the 1st floor. The COR will clear the Contractor employee for Prox Card Issuance and notify the Contractor. The Contractor then sets up an appointment with The Dalles Security Specialist, Robert Kampert. COR can furnish Robert’s e-mail address. State or federally issued photo ID is required to be brought to the appointment.
e. Escort Requirements: Contractor personnel not cleared for authorized unescorted access to the
Powerhouse may be escorted by Government or Contractor personnel that have authorized unescorted access to the Powerhouse. All costs related to the escorting of non-cleared personnel shall be at the expense of the Contractor. Additional burden shall not be placed upon the Government to provide these escorts. Prior to access of Contractor personnel not cleared for authorized unescorted access, coordination with the COR is required.
f. Return of Prox Card to the Government: Within 24 hours of the release of any employee and within seven days of the end of the Contract, the Contractor shall collect and return all Government-prescribed cards/keys to the Project Security Office. Failure to return any Government-prescribed cards or keys will result in a $250 per item charge to the Contractor. These fees will be deducted from the Contractor's monthly payment at no additional cost to the Government.
8. GENERAL.
8.1 Contract Administration. Contract will be administered by the following:
Department of the Army, Portland District, Corps of Engineers P. O. Box 2946 Attn: CECT-NWP-S Portland, Oregon 97208-2946
Contract Specialist: Brooke Patterson, brooke.l.patterson@usace.army.mil, 503-808-4618
Contracting Officer’s Representative: To be specified at time of award.
8.2 Invoice Submittals (in accordance with FAR Clause 52.212-4(g)).
Original to:
U.S. Army, COE, Finance Center Attn: CEFC-AO-P 5722 Integrity Drive Millington, TN 38054-5005
One Electronic Copy to the following:
Contracting Officer’s Representative: To be specified at time of award.
8.3 Insurance
The Contractor shall, at its own expense, provide and maintain during the entire performance period of this contract, at least the kinds and minimum amounts of insurance required by this Clause as follows:
TYPE AMOUNT
1) Workman's Compensation and Employer's As legally required by the State wherein the work Liability (including Federal Longshoremen and is being performed.
Harbor Worker's Insurance).
2) Comprehensive General Liability Insurance Personal Injury Liability:
$1 million per person $1 million per occurrence
Property Damage (may be included in general aggregate limits or combined single unit coverage): $1 million per occurrence
3) Automobile Liability Personal Injury Liability:
$1 million per person $1 million per occurrence
Property Damage (may be included in general aggregate limits or combined single unit coverage): $1 million per occurrence
4) If single general aggregate limits or combined single unit coverage is obtained for General Liability and/or Automobile Liability coverage, minimum amounts shall be the sum of the personal injury and property damage coverage required above. Umbrella Form Excess Liability insurance coverage shall be added to general liability and automobile liability coverage to determine if minimum insurance limits are met.
8.4 Identification of Contractor’s Employees.
The Contractor, before initiating the performance of work, shall provide the COR with a list of all employees, including photo IDs for all who shall perform work under this contract. The list shall include the full name, aliases, and work assignment of each employee. The Contractor shall notify the COR in writing of any addition, deletion or change in work assignment within one business day of such change.
All vehicles used by Contractor personnel on project shall bear suitable company identification to enable project personnel to identify such as authorized for access. The Contractor will provide the COR with a list of vehicles and their license plates that will be used to perform work. Vehicles shall be in good working condition, not dripping oil, etc. Safety features on vehicles shall be working.
The Contractor shall be responsible for requiring each employee engaged in work to wear identifying uniform marked with identifying name of the Contractor. All employees shall wear name tags with their name prominently displayed.
8.5 Walsh-Healey Public Contracts Act or the McNamara-O'Hara Service Contract Act (SCA).
Every employer performing work covered by the Walsh-Healey Public Contracts Act or the McNamara- O'Hara Service Contract Act (SCA) is required to post a notice of the compensation required (including, for service contracts, any applicable wage determination) in a prominent and accessible location at the worksite where it may be seen by all employees performing on the contract.
A copy of the poster is available in two versions at the following DOL website:
http://www.dol.gov/whd/regs/compliance/posters/sca.htm The rest of the content is subjective to each locations needs. There are the additional requirements that are to be observed by the Contractor
8.6 Veterans Employment Emphasis for U.S. Army Corps of Engineers Contracts.
U.S. Army Corps of Engineers (USACE) Contractors and sub-contractors at all tiers are encouraged to promote the training and employment of U.S. veterans while performing under a USACE contract. While no set-aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant contract, USACE Contractors are encouraged to seek out highly qualified veterans to perform services under this contract. The following resources are available to assist USACE Contractors in their outreach efforts:
U.S. Department of Labor Veterans employment: www.vets.gov/ Federal veteran employment information: www.fedshirevets.gov/index.aspx Veterans' Employment and Training Service (VETS): http://www.dol.gov/vets/ Veterans Opportunity to Work (VOW) Program: http://benefits.va.gov/vow/ U.S. Army Warrior Transition Command Employment Index:
http://www.wct.army.mil/modules/employers/index.html Hiring Our Heroes initiative: www.uschamberfoundation.org/hiring-our-heroes Guide to Hiring Veterans:
www.whitehouse.gov/sites/default/files/docs/white_house_business_council_- _guide_to_hiring_veterans_0.pdf
8.7 Hours of Operation. The Contractor is responsible for conducting business, between the hours of 6:30 a.m. and 5:00 pm Monday thru Thursday Friday except Federal holidays, or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. Working hours that extend past 5:00 p.m. weekdays or on weekends and holidays shall be coordinated through the COR and approved by the Project Staff.
8.6 Government Holidays. The Contractor is not required to perform routine services on the following recognized Federal holidays. The Contractor will be required to receive and respond to requests for emergency services on these days: New Year’s Day, Labor Day, Martin Luther King Day, Columbus Day, President’s Day, Thanksgiving Day, Independence Day, and Christmas Day.
8.8 Interfacing with Other Contractors. The Government may undertake or award other contracts for additional work and the Contractor shall fully cooperate with such other Contractors and Government employees and carefully fit his own work to such additional work as may be directed by the Contracting Officer. The Contractor shall not commit or permit any act which shall interfere with the performance of work by any other Contractor or by Government employees.
8.9 Interfacing with Government Operations. The Contractor and the Contractor’s employees shall perform all work in such a way as to not interfere with regularly scheduled Government operational activities.
8.10 Key Personnel. The Contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the Contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available Monday thru Friday except Federal holidays or when the government facility is closed for administrative reasons.
8.11 Post Award Conference/Periodic Progress Meetings. The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The contracting officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the contracting officer will apprise the Contractor of how the government views the Contractor's performance and the Contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues.
These meetings shall be at no additional cost to the government.
9.0 FORMS
Contractor Discrepancy Form:
http://www.esd.whs.mil/Portals/54/Documents/DD/forms/dd/dd2772.pdf
Activity Hazard Analysis Form:
http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf
10.0 EXHIBITS & ATTACHMENTS
Exhibit A – Schedule of Deliverables Attachment 1 – Elevators at The Dalles Dam
Exhibit A - Schedule of Deliverables
Deliverable Frequency PWS reference
Format Submit to
Post-Award Conference 7 days after award - In-Person -
State of Washington Oregon Elevator Maintenance License
7 days after award 4.3 Electronic
COR
Written Maintenance Plan for all Elevators 7 days after award 5.3 Electronic
COR
Call-in Number 7 days after award 5.4 Electronic
COR
Emergency Egress Procedure 7 days after award 5.1.4 Electronic
COR
Written Test and Inspection Plan 7 days after award 5.6 Electronic
COR
Test and Inspection Check Sheet 7 days after award 5.6 PDF Post in each elevator machinery room Periodic Test and Inspection Report 14 days after inspection date
5.6 Electronic
COR
State of Oregon Inspection Report 14 days after inspection date
5.6 Electronic
COR
Notification of Defects Immediately upon discovery
5.1.1 Electronic
COR
Quality Control Plan 7 days after award 6.4 Electronic
COR
Background Check *Foreign Nationals background check requires a minimum of 30-45 days for processing
Initiate immediately after award;
Required before performance of work or post-award conference attendance
7.3.1 Electronic
COR
Cyber Quiz 7 days after award 7.3.1 Electronic
COR
Safe Clearance Procedure 7 days after award 7.2.6 Electronic
COR
Accident Prevention Plan 7 days after award 7.2.4 Electronic
COR
Activity Hazard Analysis 7 days after award 7.2.5 Electronic
COR
Material Safety Data Sheet 7 days after award 7.2.7 Electronic
COR
Employer’s work liability, general liability insurance, and automobile liability insurance
7 days after award 8.3 Electronic
COR
*Interim milestones / frequencies can be adjusted in coordination with the Contracting Officer.
Attachment 1 - Elevators at The Dalles Dam
N…